Search results for: budget constraints
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1627

Search results for: budget constraints

1597 Public Policy for Quality School Lunch Development in Thailand

Authors: W. Kongnoo, J. Loysongkroa, S. Chotivichien, N. Viriyautsahakul, N. Saiwongse

Abstract:

Obesity, stunting and wasting problems among Thai school-aged children are increasing due to inappropriate food consumption behavior and poor environments for desirable nutritional behavior. Because of a low school lunch budget of only 0.40 USD per person per day, food quality is not up to nutritional standards. Therefore, the Health Department with the Education Ministry and the Thai Health Promotion Foundation have developed a quality school lunch project during 2009–2013. The program objectives were development and management of public policy to increase school lunch budget. The methods used a healthy public policy motivation process and movement in 241 local administrative organizations and 538 schools. The problem and solution research was organized to study school food and nutrition management, create a best practice policy mobilization model and hold a public hearing to motivate an increase of school meal funding. The results showed that local public policy has been motivated during 2009-2011 to increase school meal budget using local budgets. School children with best food consumption behavior and exercise increased from 13.2% in 2009 to 51.6% in 2013 and stunting decreased from 6.0% in 2009 to 4.7% in 2013. As the result of national policy motivation (2012-2013), the cabinet meeting on October 22, 2013 has approved an increase of school lunch budget from 0.40 USD to 0.62 USD per person per day. Thus, 5,800,469 school children nationwide have benefited from the budget increase.

Keywords: public policy, quality school lunch, Thailand, obesity

Procedia PDF Downloads 321
1596 Budgetary Performance Model for Managing Pavement Maintenance

Authors: Vivek Hokam, Vishrut Landge

Abstract:

An ideal maintenance program for an industrial road network is one that would maintain all sections at a sufficiently high level of functional and structural conditions. However, due to various constraints such as budget, manpower and equipment, it is not possible to carry out maintenance on all the needy industrial road sections within a given planning period. A rational and systematic priority scheme needs to be employed to select and schedule industrial road sections for maintenance. Priority analysis is a multi-criteria process that determines the best ranking list of sections for maintenance based on several factors. In priority setting, difficult decisions are required to be made for selection of sections for maintenance. It is more important to repair a section with poor functional conditions which includes uncomfortable ride etc. or poor structural conditions i.e. sections those are in danger of becoming structurally unsound. It would seem therefore that any rational priority setting approach must consider the relative importance of functional and structural condition of the section. The maintenance priority index and pavement performance models tend to focus mainly on the pavement condition, traffic criteria etc. There is a need to develop the model which is suitably used with respect to limited budget provisions for maintenance of pavement. Linear programming is one of the most popular and widely used quantitative techniques. A linear programming model provides an efficient method for determining an optimal decision chosen from a large number of possible decisions. The optimum decision is one that meets a specified objective of management, subject to various constraints and restrictions. The objective is mainly minimization of maintenance cost of roads in industrial area. In order to determine the objective function for analysis of distress model it is necessary to fix the realistic data into a formulation. Each type of repair is to be quantified in a number of stretches by considering 1000 m as one stretch. A stretch considered under study is having 3750 m length. The quantity has to be put into an objective function for maximizing the number of repairs in a stretch related to quantity. The distress observed in this stretch are potholes, surface cracks, rutting and ravelling. The distress data is measured manually by observing each distress level on a stretch of 1000 m. The maintenance and rehabilitation measured that are followed currently are based on subjective judgments. Hence, there is a need to adopt a scientific approach in order to effectively use the limited resources. It is also necessary to determine the pavement performance and deterioration prediction relationship with more accurate and economic benefits of road networks with respect to vehicle operating cost. The infrastructure of road network should have best results expected from available funds. In this paper objective function for distress model is determined by linear programming and deterioration model considering overloading is discussed.

Keywords: budget, maintenance, deterioration, priority

Procedia PDF Downloads 171
1595 Residents' Incomes in Local Government Unit as the Major Determinant of Local Budget Transparency in Croatia: Panel Data Analysis

Authors: Katarina Ott, Velibor Mačkić, Mihaela Bronić, Branko Stanić

Abstract:

The determinants of national budget transparency have been widely discussed in the literature, while research on determinants of local budget transparency are scarce and empirically inconclusive, particularly in the new, fiscally centralised, EU member states. To fill the gap, we combine two strands of the literature: that concerned with public administration and public finance, shedding light on the economic and financial determinants of local budget transparency, and that on the political economy of transparency (principal agent theory), covering the relationships among politicians and between politicians and voters. Our main hypothesis states that variables describing residents’ capacity have a greater impact on local budget transparency than variables indicating the institutional capacity of local government units (LGUs). Additional subhypotheses test the impact of each variable analysed on local budget transparency. We address the determinants of local budget transparency in Croatia, measured by the number of key local budget documents published on the LGUs’ websites. By using a data set of 128 cities and 428 municipalities over the 2015-2017 period and by applying panel data analysis based on Poisson and negative binomial distribution, we test our main hypothesis and sub-hypotheses empirically. We measure different characteristics of institutional and residents’ capacity for each LGU. Age, education and ideology of the mayor/municipality head, political competition indicators, number of employees, current budget revenues and direct debt per capita have been used as a measure of the institutional capacity of LGU. Residents’ capacity in each LGU has been measured through the numbers of citizens and their average age as well as by average income per capita. The most important determinant of local budget transparency is average residents' income per capita at both city and municipality level. The results are in line with most previous research results in fiscally decentralised countries. In the context of a fiscally centralised country with numerous small LGUs, most of whom have low administrative and fiscal capacity, this has a theoretical rationale in the legitimacy and principal-agent theory (opportunistic motives of the incumbent). The result is robust and significant, but because of the various other results that change between city and municipality levels (e.g. ideology and political competition), there is a need for further research (both on identifying other determinates and/or methods of analysis). Since in Croatia the fiscal capacity of a LGU depends heavily on the income of its residents, units with higher per capita incomes in many cases have also higher budget revenues allowing them to engage more employees and resources. In addition, residents’ incomes might be also positively associated with local budget transparency because of higher citizen demand for such transparency. Residents with higher incomes expect more public services and have more access to and experience in using the Internet, and will thus typically demand more budget information on the LGUs’ websites.

Keywords: budget transparency, count data, Croatia, local government, political economy

Procedia PDF Downloads 152
1594 A Contemporary Advertising Strategy on Social Networking Sites

Authors: M. S. Aparna, Pushparaj Shetty D.

Abstract:

Nowadays social networking sites have become so popular that the producers or the sellers look for these sites as one of the best options to target the right audience to market their products. There are several tools available to monitor or analyze the social networks. Our task is to identify the right community web pages and find out the behavior analysis of the members by using these tools and formulate an appropriate strategy to market the products or services to achieve the set goals. The advertising becomes more effective when the information of the product/ services come from a known source. The strategy explores great buying influence in the audience on referral marketing. Our methodology proceeds with critical budget analysis and promotes viral influence propagation. In this context, we encompass the vital bits of budget evaluation such as the number of optimal seed nodes or primary influential users activated onset, an estimate coverage spread of nodes and maximum influence propagating distance from an initial seed to an end node. Our proposal for Buyer Prediction mathematical model arises from the urge to perform complex analysis when the probability density estimates of reliable factors are not known or difficult to calculate. Order Statistics and Buyer Prediction mapping function guarantee the selection of optimal influential users at each level. We exercise an efficient tactics of practicing community pages and user behavior to determine the product enthusiasts on social networks. Our approach is promising and should be an elementary choice when there is little or no prior knowledge on the distribution of potential buyers on social networks. In this strategy, product news propagates to influential users on or surrounding networks. By applying the same technique, a user can search friends who are capable to advise better or give referrals, if a product interests him.

Keywords: viral marketing, social network analysis, community web pages, buyer prediction, influence propagation, budget constraints

Procedia PDF Downloads 236
1593 Exploring the Relationship among Job Stress, Travel Constraints, and Job Satisfaction of the Employees in Casino Hotels: The Case of Macau

Authors: Tao Zhang

Abstract:

Job stress appears nearly everywhere especially in the hospitality industry because employees in this industry usually have to work long time and try to meet conflicting demands of their customers, managers, and company. To reduce job stress, employees of casino hotels try to perform leisure activities or tourism. However, casino employees often meet many obstacles or constraints when they plan to travel. Until now, there is little understanding as to why casino hotel employees often face many travel constraints or leisure barriers. What is more, few studies explore the relationship between travel constraints and job stress of casino employees. Therefore, this study is to explore the construct of casino hotel employees' travel constraints and the relationship among job stress, travel constraints, and job satisfaction. Using convenient sampling method, this study planned to investigate 500 front line employees and managers of ten casino hotels in Macau. A total of 500 questionnaires were distributed, and 414 valid questionnaires were received. The return rate of valid questionnaires is 82.8%. Several statistical techniques such as factor analysis, t-test, one-way ANOVA, and regression analysis were applied to analyze the collected data. The findings of this study are as follows. Firstly, by using factor analysis, this study found the travel constraints of casino employees include intrapersonal constraints, interpersonal constraints, and structural constraints. Secondly, by using regression analysis, the study found travel constraints are positively related with job stress while negatively related with job satisfaction. This means reducing travel constraints may create a chance for casino employees to travel so that they could reduce job stress, therefore raise their job satisfaction. Thirdly, this research divided the research samples into three groups by the degree of job stress. The three groups are low satisfaction group, medium satisfaction group, and high satisfaction group. The means values of these groups were compared by t-test. Results showed that there are significant differences of the means values of interpersonal constraints between low satisfaction group and high satisfaction group. This suggests positive interpersonal relationship especially good family member relationship reduce not only job stress but also travel constraints of casino employees. Interestingly, results of t-test showed there is not a significant difference of the means values of structural constraints between low satisfaction group and high satisfaction group. This suggests structural constraints are outside variables which may be related with tourism destination marketing. Destination marketing organizations (DMO) need use all kinds of tools and techniques to promote their tourism destinations so as to reduce structural constraints of casino employees. This research is significant for both theoretical and practical fields. From the theoretical perspective, the study found the internal relationship between travel constraints, job stress, and job satisfaction and the different roles of three dimensions of travel constraints. From the practical perspective, the study provides useful methods to reduce travel constraints and job stress, therefore, raise job satisfaction of casino employees.

Keywords: hotel, job satisfaction, job stress, travel constraints

Procedia PDF Downloads 231
1592 An Optimal Algorithm for Finding (R, Q) Policy in a Price-Dependent Order Quantity Inventory System with Soft Budget Constraint

Authors: S. Hamid Mirmohammadi, Shahrazad Tamjidzad

Abstract:

This paper is concerned with the single-item continuous review inventory system in which demand is stochastic and discrete. The budget consumed for purchasing the ordered items is not restricted but it incurs extra cost when exceeding specific value. The unit purchasing price depends on the quantity ordered under the all-units discounts cost structure. In many actual systems, the budget as a resource which is occupied by the purchased items is limited and the system is able to confront the resource shortage by charging more costs. Thus, considering the resource shortage costs as a part of system costs, especially when the amount of resource occupied by the purchased item is influenced by quantity discounts, is well motivated by practical concerns. In this paper, an optimization problem is formulated for finding the optimal (R, Q) policy, when the system is influenced by the budget limitation and a discount pricing simultaneously. Properties of the cost function are investigated and then an algorithm based on a one-dimensional search procedure is proposed for finding an optimal (R, Q) policy which minimizes the expected system costs .

Keywords: (R, Q) policy, stochastic demand, backorders, limited resource, quantity discounts

Procedia PDF Downloads 616
1591 Budget Optimization for Maintenance of Bridges in Egypt

Authors: Hesham Abd Elkhalek, Sherif M. Hafez, Yasser M. El Fahham

Abstract:

Allocating limited budget to maintain bridge networks and selecting effective maintenance strategies for each bridge represent challenging tasks for maintenance managers and decision makers. In Egypt, bridges are continuously deteriorating. In many cases, maintenance works are performed due to user complaints. The objective of this paper is to develop a practical and reliable framework to manage the maintenance, repair, and rehabilitation (MR&R) activities of Bridges network considering performance and budget limits. The model solves an optimization problem that maximizes the average condition of the entire network given the limited available budget using Genetic Algorithm (GA). The framework contains bridge inventory, condition assessment, repair cost calculation, deterioration prediction, and maintenance optimization. The developed model takes into account multiple parameters including serviceability requirements, budget allocation, element importance on structural safety and serviceability, bridge impact on network, and traffic. A questionnaire is conducted to complete the research scope. The proposed model is implemented in software, which provides a friendly user interface. The framework provides a multi-year maintenance plan for the entire network for up to five years. A case study of ten bridges is presented to validate and test the proposed model with data collected from Transportation Authorities in Egypt. Different scenarios are presented. The results are reasonable, feasible and within acceptable domain.

Keywords: bridge management systems (BMS), cost optimization condition assessment, fund allocation, Markov chain

Procedia PDF Downloads 264
1590 Reconstruction of Performace-Based Budgeting in Indonesian Local Government: Application of Soft Systems Methodology in Producing Guideline for Policy Implementation

Authors: Deddi Nordiawan

Abstract:

Effective public policy creation required a strong budget system, both in terms of design and implementation. Performance-based Budget is an evolutionary approach with two substantial characteristics; first, the strong integration between budgeting and planning, and second, its existence as guidance so that all activities and expenditures refer to measurable performance targets. There are four processes in the government that should be followed in order to make the budget become performance-based. These four processes consist of the preparation of a vision according to the bold aspiration, the formulation of outcome, the determination of output based on the analysis of organizational resources, and the formulation of Value Creation Map that contains a series of programs and activities. This is consistent with the concept of logic model which revealed that the budget performance should be placed within a relational framework of resources, activities, outputs, outcomes and impacts. Through the issuance of Law 17/2003 regarding State Finance, local governments in Indonesia have to implement performance-based budget. Central Government then issued Government Regulation 58/2005 which contains the detail guidelines how to prepare local governments budget. After a decade, implementation of performance budgeting in local government is still not fully meet expectations, though the guidance is completed, socialization routinely performed, and trainings have also been carried out at all levels. Accordingly, this study views the practice of performance-based budget at local governments as a problematic situation. This condition must be approached with a system approach that allows the solutions from many point of views. Based on the fact that the infrastructure of budgeting has already settled, the study then considering the situation as complexity. Therefore, the intervention needs to be done in the area of human activity system. Using Soft Systems Methodology, this research will reconstruct the process of performance-based budget at local governments is area of human activity system. Through conceptual models, this study will invite all actors (central government, local government, and the parliament) for dialogue and formulate interventions in human activity systems that systematically desirable and culturally feasible. The result will direct central government in revise the guidance to local government budgeting process as well as a reference to build the capacity building strategy.

Keywords: soft systems methodology, performance-based budgeting, Indonesia, public policy

Procedia PDF Downloads 217
1589 Modeling of Production Lines Systems with Layout Constraints

Authors: Sadegh Abebi

Abstract:

There are problems with estimating time of product process of products, especially when there is variable serving time, like control stage. These problems will cause overestimation of process time. Layout constraints, reworking constraints and inflexible product schedule in multi product lines, needs a precise planning to reduce volume in particular situation of line stock. In this article, by analyzing real queue systems with layout constraints and by using concepts and principles of Markov chain in queue theory, a hybrid model has been presented. This model can be a base to assess queue systems with probable parameters of service. Here by presenting a case study, the proposed model will be described. so, production lines of a home application manufacturer will be analyzed.

Keywords: Queuing theory, Markov Chain, layout, line balance

Procedia PDF Downloads 599
1588 Solving One of the Variants of Necktie Paradox for Business Proposals

Authors: Natarajan Vijayarangan, Viswanath Kumar Ganesan, G. Kumudhavalli

Abstract:

This abstract figures out an uncertainty problem pertaining to evaluating business proposals or concept notes in an organisation. Let us consider business proposal evaluation process (BPEP) for execution of corporate research cum business projects in the organisation. Assume that two concept notes X and Y of BPEP are approved: one of them is a full-fledged type (100% financial approval given by the organisation) - X and other one is a conditional type (a partial financial approval given by the organisation) - Y. Then a penalty criteria has been introduced during the process. At the end of annual appraisal, if both of them complete as per the goals and objectives committed or figured out at the time of concept note submission, then both will get an incentive of $N from the organisation. If one of them doesn't fulfill the goals and objectives at the year-end appraisal, then d% reduction or cut will be levied on the project budget for the next year. If X fulfills the goals and objectives and Y doesn't , then X gets a gain of d% on Y's previous year budget and Y gets a loss of d% from the previous year budget for the next year. And vice-versa. Further, an incentive of $N will be given to those who gains. This process is a part of Necktie paradox and inherits an uncertainty principle on X or Y getting more than $N even if X or Y performs well.Solving the above problem and generalizing on finitely many concept notes will be a challenging task.

Keywords: concept notes, necktie paradox, annual appraisal, project budget and gain or loss

Procedia PDF Downloads 438
1587 Relaxing Convergence Constraints in Local Priority Hysteresis Switching Logic

Authors: Mubarak Alhajri

Abstract:

This paper addresses certain inherent limitations of local priority hysteresis switching logic. Our main result establishes that under persistent excitation assumption, it is possible to relax constraints requiring strict positivity of local priority and hysteresis switching constants. Relaxing these constraints allows the adaptive system to reach optimality which implies the performance improvement. The unconstrained local priority hysteresis switching logic is examined and conditions for global convergence are derived.

Keywords: adaptive control, convergence, hysteresis constant, hysteresis switching

Procedia PDF Downloads 361
1586 Resource Management Framework in Cloud Computing

Authors: Gagandeep Kaur, Sonal Chawla

Abstract:

In a Cloud Computing environment, resource provisioning, resource allocation and resource scheduling is the most complex issues these days. Cloud User expects the best resource utilization and Cloud Provider expects revenue maximization by considering budget and time constraints. In this research paper, Resource Management Framework has been proposed to allocate the resources to Cloud Users and Cloud Providers in Cloud environment. The main aim of the proposed work is to provide the resources and services to Cloud Providers and Cloud Users in an efficient and effective manner. The proposed framework has been simulated and tested using the CloudSim simulator tool.

Keywords: cloud computing, resource allocation, auction, provisioning

Procedia PDF Downloads 119
1585 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: dynamic planning, cost, time, performance, project management

Procedia PDF Downloads 440
1584 Characterization of Shorebird Populations in the Algerian Coast

Authors: Imad Eddine Rezouani, Khalil Draidi, Badis bakhouche, Selman Anes Chabani

Abstract:

The Algerian coast is an important site for wintering and migratory birds. Four species of shorebirds were surveyed, including Kentish plover Charadrius alexandrinus, Little ringed plover Charadrius dubius, Common ringed plover Charadrius hiaticula, and black-winged stilt Himantopus hilarious in three different sites, two important wetlands: Reghaia lake and Macta and a small area Sublette promenade to provide a new data about time activity budget. The study found a higher frequency of abundance in April during the study period (February to May), with a mean of 49. Estimating the temporal activity budget of these coastal birds, it was found that there were three main activities in different proportions between males and females: Pecking (29.51 %) for males, (26.59%) for females, Looking above (28.01%) for males, (19.54 %) for females And Away (9.95%) for males, (11.75%), contrarily the two previous one. Differences between study areas revealed differences in species behavior and distribution.

Keywords: wetland, behavioral, algerian coast, shorebirds, time budget activity

Procedia PDF Downloads 27
1583 A Social Network Analysis for Formulating Construction Defect Generation Mechanisms

Authors: Hamad Aljassmi, Sangwon Han

Abstract:

Various solutions for preventing construction defects have been suggested. However, a construction company may have difficulties adopting all these suggestions due to financial and practical constraints. Based on this recognition, this paper aims to identify the most significant defect causes and formulate their defect generation mechanism in order to help a construction company to set priorities of its defect prevention strategies. For this goal, we conducted a questionnaire survey of 106 industry professionals and identified five most significant causes including: (1) organizational culture, (2) time pressure and constraints, (3) workplace quality system, (4) financial constraints upon operational expenses and (5) inadequate employee training or learning opportunities.

Keywords: defect, quality, failure, risk

Procedia PDF Downloads 598
1582 CAD Tool for Parametric Design modification of Yacht Hull Surface Models

Authors: Shahroz Khan, Erkan Gunpinar, Kemal Mart

Abstract:

Recently parametric design techniques became a vital concept in the field of Computer Aided Design (CAD), which helps to provide sophisticated platform to the designer in order to automate the design process in efficient time. In these techniques, design process starts by parameterizing the important features of design models (typically the key dimensions), with the implementation of design constraints. The design constraints help to retain the overall shape of the model while modifying its parameters. However, the process of initializing an appropriate number of design parameters and constraints is the crucial part of parametric design techniques, especially for complex surface models such as yacht hull. This paper introduces a method to create complex surface models in favor of parametric design techniques, a method to define the right number of parameters and respective design constraints, and a system to implement design parameters in contract to design constraints schema. For this, in our proposed approach the design process starts by dividing the yacht hull into three sections. Each section consists of different shape lines, which form the overall shape of yacht hull. The shape lines are created using Cubic Bezier Curves, which allow larger design flexibility. Design parameters and constraints are defined on the shape lines in 3D design space to facilitate the designers for better and individual handling of parameters. Afterwards, shape modifiers are developed, which allow the modification of each parameter while satisfying the respective set of criteria and design constraints. Such as, geometric continuities should be maintained between the shape lines of the three sections, fairness of the hull surfaces should be preserved after modification and while design modification, effect of a single parameter should be negligible on other parameters. The constraints are defined individually on shape lines of each section and mutually between the shape lines of two connecting sections. In order to validate and visualize design results of our shape modifiers, a real time graphic interface is created.

Keywords: design parameter, design constraints, shape modifies, yacht hull

Procedia PDF Downloads 278
1581 Analysis of Information Sharing and Capacity Constraint on Backlog Bullwhip Effect in Two Level Supply Chain

Authors: Matloub Hussaina

Abstract:

This paper investigates the impact of information sharing and capacity constraints on backlog bullwhip effect of Automatic Pipe Line Inventory and Order Based Production Control System (APIOBPCS). System dynamic simulation using iThink Software has been applied. It has been found that smooth ordering by Tier 1 can be achieved when Tier 1 has medium capacity constraints. Simulation experiments also show that information sharing helps to reduce 50% of backlog bullwhip effect in capacitated supply chains. This knowledge is of value per se, giving supply chain operations managers and designers a practical way in to controlling the backlog bullwhip effect. Future work should investigate the total cost implications of capacity constraints and safety stocks in multi-echelon supply chain.

Keywords: supply chain dynamics, information sharing, capacity constraints, simulation, APIOBPCS

Procedia PDF Downloads 290
1580 Optimal Portfolio Selection under Treynor Ratio Using Genetic Algorithms

Authors: Imad Zeyad Ramadan

Abstract:

In this paper a genetic algorithm was developed to construct the optimal portfolio based on the Treynor method. The GA maximizes the Treynor ratio under budget constraint to select the best allocation of the budget for the companies in the portfolio. The results show that the GA was able to construct a conservative portfolio which includes companies from the three sectors. This indicates that the GA reduced the risk on the investor as it choose some companies with positive risks (goes with the market) and some with negative risks (goes against the market).

Keywords: oOptimization, genetic algorithm, portfolio selection, Treynor method

Procedia PDF Downloads 422
1579 On the Efficiency of the Algerian FRR Sovereign Fund

Authors: Abdelkader Guendouz, Fatima Zohra Adel

Abstract:

Since about two decades, the Algerian government created a new instrument in the field of its fiscal policy, which is the FRR (Fonds de Régulation des Recettes). The FRR is a sovereign fund, which the initial role was saving the surplus generated by the fixation of a referential oil price to establish the state budget in the aim equilibrium between budgetary incomes and public expenditures. After a while, the government turns to use this instrument in boosting the public investment more than keeping for funding a deficit budget in periods of crisis. This lead to ask some justified questions about the efficiency of this sovereign fund and its real role.

Keywords: FRR sovereign fund, public expenditures, public investment, efficiency

Procedia PDF Downloads 301
1578 Analysis of Constraints and Opportunities in Dairy Production in Botswana

Authors: Som Pal Baliyan

Abstract:

Dairy enterprise has been a major source of employment and income generation in most of the economies worldwide. Botswana government has also identified dairy as one of the agricultural sectors towards diversification of the mineral dependent economy of the country. The huge gap between local demand and supply of milk and milk products indicated that there are not only constraints but also; opportunities exist in this sub sector of agriculture. Therefore, this study was an attempt to identify constraints and opportunities in dairy production industry in Botswana. The possible ways to mitigate the constraints were also identified. The findings should assist the stakeholders especially, policy makers in the formulation of effective policies for the growth of dairy sector in the country. This quantitative study adopted a survey research design. A final survey followed by a pilot survey was conducted for data collection. The purpose of the pilot survey was to collect basic information on the nature and extent of the constraints, opportunities and ways to mitigate the constraints in dairy production. Based on the information from pilot survey, a four point Likert’s scale type questionnaire was constructed, validated and tested for its reliability. The data for the final survey were collected from purposively selected twenty five dairy farms. The descriptive statistical tools were employed to analyze data. Among the twelve constraints identified; high feed costs, feed shortage and availability, lack of technical support, lack of skilled manpower, high prevalence of pests and diseases and, lack of dairy related technologies were the six major constraints in dairy production. Grain feed production, roughage feed production, manufacturing of dairy feed, establishment of milk processing industry and, development of transportation systems were the five major opportunities among the eight opportunities identified. Increasing production of animal feed locally, increasing roughage feed production locally, provision of subsidy on animal feed, easy access to sufficient financial support, training of the farmers and, effective control of pests and diseases were identified as the six major ways to mitigate the constraints. It was recommended that the identified constraints and opportunities as well as the ways to mitigate the constraints need to be carefully considered by the stakeholders especially, policy makers during the formulation and implementation of the policies for the development of dairy sector in Botswana.

Keywords: dairy enterprise, milk production, opportunities, production constraints

Procedia PDF Downloads 364
1577 Advocacy for Increasing Health Care Budget in Parepare City with DALY Approach: Case Study on Improving Public Health Insurance Budget

Authors: Kasman, Darmawansyah, Alimin Maidin, Amran Razak

Abstract:

Background: In decentralization, advocacy is needed to increase the health budget in Parepare District. One of the advocacy methods recommended by the World Bank is the economic loss approach. Methods: This research is observational in the field of health economics that contributes directly to the magnitude of the economic loss of the community and the government and provides advocacy to the executive and legislative to see the harm it causes. Results: The research results show the amount of direct cost, which consists of household expenditure for transport Rp.295,865,500. Indirect Cost of YLD of Rp.14.688.000, and YLL of Rp.28.986.336.00, so the amount of DALY is Rp.43.674.336.000. The total economic loss of Rp.43.970.201.500. These huge economic losses can be prevented by increasing the allocation of health budgets for promotive and preventive efforts and expanding the coverage of health insurance for the community. Conclusion: There is a need to advocate the executive and legislative about the importance of guarantee on public health financing by conducting studies in terms of economic losses so that all strategic alliances believe that health is an investment.

Keywords: advocacy, economic lost, health insurance, economic losses

Procedia PDF Downloads 83
1576 The Relationship between Organizations' Acquired Skills, Knowledge, Abilities and Shareholders (SKAS) Wealth Maximization: The Mediating Role of Training Investment

Authors: Gabriel Dwomoh, Williams Kwasi Boachie, Kofi Kwarteng

Abstract:

The study looked at the relationship between organizations’ acquired knowledge, skills, abilities, and shareholders wealth with training playing the mediating role. The sample of the study consisted of organizations that spent 10% or more of its annual budget on training and those whose training budget is less than 10% of the organization’s annual budget. A total of 620 questionnaires were distributed to employees working in various organizations out of which 580 representing 93.5% were retrieved. The respondents that constitute the sample were drawn using convenience sampling. The researchers used regression models for their analyses with the help of SPSS 16.0. Analyzing multiple models, it was discovered that organizations training investment plays a considerable indirect and direct effect with partial mediation between organizations acquired skills, knowledge, abilities, and shareholders wealth. Shareholders should allow their agents to invest part of their holdings to develop the human capital of the organization but this should be done with caution since shareholders returns do not depend much on how much organizations spend in developing its human resource capital.

Keywords: skills, knowledge, abilities, shareholders wealth, training investment

Procedia PDF Downloads 218
1575 A Comparative Study of GTC and PSP Algorithms for Mining Sequential Patterns Embedded in Database with Time Constraints

Authors: Safa Adi

Abstract:

This paper will consider the problem of sequential mining patterns embedded in a database by handling the time constraints as defined in the GSP algorithm (level wise algorithms). We will compare two previous approaches GTC and PSP, that resumes the general principles of GSP. Furthermore this paper will discuss PG-hybrid algorithm, that using PSP and GTC. The results show that PSP and GTC are more efficient than GSP. On the other hand, the GTC algorithm performs better than PSP. The PG-hybrid algorithm use PSP algorithm for the two first passes on the database, and GTC approach for the following scans. Experiments show that the hybrid approach is very efficient for short, frequent sequences.

Keywords: database, GTC algorithm, PSP algorithm, sequential patterns, time constraints

Procedia PDF Downloads 357
1574 Experts' Perception of Secondary Education Quality Management Challenges in Ethiopia

Authors: Aklilu Alemu, Tak Cheung Chan

Abstract:

Following the intensification of secondary education in the developing world, the attention of Ethiopia has currently shifted to its quality education and its management. This study is aimed to explore experts’ perceptions of quality management challenges in secondary education in Ethiopia. The researchers employed a case study design recruiting participating supervisors from the Ministry of Education, region, zone, wereda, and cluster by using a purposeful sampling technique. Twenty-six interviewees took part in this study. The researchers employed NVivo 8 versions together with a thematic analysis process to analyze the data. This study revealed that major problems that affected quality management practices in Ethiopia were: lack of qualified experts at all levels; lack of accountability in every echelon; the changing nature of teacher education; the ineffectiveness of teacher-licensing programs; and lack of educational budget and the problem of utilizing this limited budget. The study concluded that the experts at different levels were not genuinely fulfilling their roles and responsibilities. Therefore, the Ministry of Finance and Economic Development, together with the concerned parties, needs to reconsider budget allocation for secondary education.

Keywords: education quality, Ethiopia, quality challenge, quality management, secondary education

Procedia PDF Downloads 175
1573 Dysfunctional Behavior of External Auditors, The Collision of Time Budget and Time Deadline

Authors: Rabih Nehme, Abdullah Al Mutawa

Abstract:

The general goal behind this research is to gain a better understanding of factors leading to dysfunctional behavior of auditors. Recent accounting scandals -Enron, Waste Management Inc., WorldCom, Xerox Corporation, etc. -provided an ample proof of how the role of auditors has become the basis of controversial debates in many circles and instances in our modern time. The majority of lawsuits and accounting scandals seem to have a central topic in focus, namely the question ''Where were the auditors? The survey we offer up for research is made up of 34 questions that are designed to analyse the perception of auditors and the cause of dysfunctional behavior. The object of this research is comprised of auditors positioned and employed at the Big Four audit firms in Kuwait. Dysfunctional behavior (DB) is measured against two signal proxies of dysfunctional behavior; premature sign-off and under reporting of chargeable time. DB is analysed against time budget pressure and time deadline pressure. The research results' suggest that the general belief among auditors is that the profession of accountancy predetermines their tendency to commit certain patterns of dysfunctional behavior. Having our investigation conducted at the Big Four audit firms, we have come to the conclusion that there is a general difference in behavior patterns among perceptions of dysfunctional behavior and normal skeptic professional behavior.

Keywords: big four, dysfunctional behavior, time budget, time deadline

Procedia PDF Downloads 434
1572 Comparative Connectionism: Study of the Biological Constraints of Learning Through the Manipulation of Various Architectures in a Neural Network Model under the Biological Principle of the Correlation Between Structure and Function

Authors: Giselle Maggie-Fer Castañeda Lozano

Abstract:

The main objective of this research was to explore the role of neural network architectures in simulating behavioral phenomena as a potential explanation for selective associations, specifically related to biological constraints on learning. Biological constraints on learning refer to the limitations observed in conditioning procedures, where learning is expected to occur. The study involved simulations of five different experiments exploring various phenomena and sources of biological constraints in learning. These simulations included the interaction between response and reinforcer, stimulus and reinforcer, specificity of stimulus-reinforcer associations, species differences, neuroanatomical constraints, and learning in uncontrolled conditions. The overall results demonstrated that by manipulating neural network architectures, conditions can be created to model and explain diverse biological constraints frequently reported in comparative psychology literature as learning typicities. Additionally, the simulations offer predictive content worthy of experimental testing in the pursuit of new discoveries regarding the specificity of learning. The implications and limitations of these findings are discussed. Finally, it is suggested that this research could inaugurate a line of inquiry involving the use of neural networks to study biological factors in behavior, fostering the development of more ethical and precise research practices.

Keywords: comparative psychology, connectionism, conditioning, experimental analysis of behavior, neural networks

Procedia PDF Downloads 38
1571 Water Budget in High Drought-Borne Area in Jaffna District, Sri Lanka during Dry Season

Authors: R. Kandiah, K. Miyamoto

Abstract:

In Sri Lanka, the Jaffna area is a high drought affected area and depends mainly on groundwater aquifers for water needs. Water for daily activities is extracted from wells. As households manually extract water from the wells, it is not drawn from mid evening to early morning. The water inflow at night provides the maximum water level that decreases during the daytime due to extraction. The storage volume of water in wells is limited or at its lowest level during the dry season. This study analyzes the domestic water budget during the dry season in the Jaffna area. In order to evaluate the water inflow rate into wells, storage volume and extraction volume from wells over time, water pressure is measured at the bottom of three wells, which are located in coastal area denoted as well A, in nonspecific area denoted as well B, and agricultural area denoted as well C. The water quality at the wells A, B, and C, are mostly fresh, modest fresh, and saline respectively. From the monitoring, we can find that the daily inflow amount of water into the wells and daily water extraction depend on each other, that is, higher extraction yields higher inflow. And, in the dry season, the daily inflow volume and the daily extraction volume of each well are almost in balance.

Keywords: accessible volume, consumption volume, inflow rate, water budget

Procedia PDF Downloads 336
1570 Job Shop Scheduling: Classification, Constraints and Objective Functions

Authors: Majid Abdolrazzagh-Nezhad, Salwani Abdullah

Abstract:

The job-shop scheduling problem (JSSP) is an important decision facing those involved in the fields of industry, economics and management. This problem is a class of combinational optimization problem known as the NP-hard problem. JSSPs deal with a set of machines and a set of jobs with various predetermined routes through the machines, where the objective is to assemble a schedule of jobs that minimizes certain criteria such as makespan, maximum lateness, and total weighted tardiness. Over the past several decades, interest in meta-heuristic approaches to address JSSPs has increased due to the ability of these approaches to generate solutions which are better than those generated from heuristics alone. This article provides the classification, constraints and objective functions imposed on JSSPs that are available in the literature.

Keywords: job-shop scheduling, classification, constraints, objective functions

Procedia PDF Downloads 413
1569 Efficiency, Effectiveness, and Technological Change in Armed Forces: Indonesian Case

Authors: Citra Pertiwi, Muhammad Fikruzzaman Rahawarin

Abstract:

Government of Indonesia had committed to increasing its national defense the budget up to 1,5 percent of GDP. However, the budget increase does not necessarily allocate efficiently and effectively. Using Data Envelopment Analysis (DEA), the operational units of Indonesian Armed Forces are considered as a proxy to measure those two aspects. The bootstrap technique is being used as well to reduce uncertainty in the estimation. Additionally, technological change is being measured as a nonstationary component. Nearly half of the units are being estimated as fully efficient, with less than a third is considered as effective. Longer and larger sets of data might increase the robustness of the estimation in the future.

Keywords: bootstrap, effectiveness, efficiency, DEA, military, Malmquist, technological change

Procedia PDF Downloads 280
1568 Application of De Novo Programming Approach for Optimizing the Business Process

Authors: Z. Babic, I. Veza, A. Balic, M. Crnjac

Abstract:

The linear programming model is sometimes difficult to apply in real business situations due to its assumption of proportionality. This paper shows an example of how to use De Novo programming approach instead of linear programming. In the De Novo programming, resources are not fixed like in linear programming but resource quantities depend only on available budget. Budget is a new, important element of the De Novo approach. Two different production situations are presented: increasing costs and quantity discounts of raw materials. The focus of this paper is on advantages of the De Novo approach in the optimization of production plan for production company which produces souvenirs made from famous stone from the island of Brac, one of the greatest islands from Croatia.

Keywords: business process, De Novo programming, optimizing, production

Procedia PDF Downloads 188