5726 Feasibility Conditions for Wind and Hydraulic Energy Coupling

Authors: Antonin Jolly, Bertrand Aubry, Corentin Michel, Rebecca Freva

Abstract:

Wind energy depends on wind strength and varies largely in time. When it is above the demand, it generates a loss while in the opposite case; energy needs are not fully satisfied. To overcome this problem specific to irregular energies, the process of pumped-storage hydroelectricity (PSH) is studied in present paper. A combination of wind turbine and pumped storage system is more predictable and is more compliant to provide electricity supply according to daily demand. PSH system is already used in several countries to accumulate electricity by pumping water during off-peak times into a storage reservoir, and to use it during peak times to produce energy. Present work discusses a feasibility study on size and financial productivity of PSH system actuated with wind turbines specific power.

Keywords: wind turbine, hydroelectricity, energy storage, pumped-storage hydroelectricity

Procedia PDF Downloads 372
5725 Structural Design Optimization of Reinforced Thin-Walled Vessels under External Pressure Using Simulation and Machine Learning Classification Algorithm

Authors: Lydia Novozhilova, Vladimir Urazhdin

Abstract:

An optimization problem for reinforced thin-walled vessels under uniform external pressure is considered. The conventional approaches to optimization generally start with pre-defined geometric parameters of the vessels, and then employ analytic or numeric calculations and/or experimental testing to verify functionality, such as stability under the projected conditions. The proposed approach consists of two steps. First, the feasibility domain will be identified in the multidimensional parameter space. Every point in the feasibility domain defines a design satisfying both geometric and functional constraints. Second, an objective function defined in this domain is formulated and optimized. The broader applicability of the suggested methodology is maximized by implementing the Support Vector Machines (SVM) classification algorithm of machine learning for identification of the feasible design region. Training data for SVM classifier is obtained using the Simulation package of SOLIDWORKS®. Based on the data, the SVM algorithm produces a curvilinear boundary separating admissible and not admissible sets of design parameters with maximal margins. Then optimization of the vessel parameters in the feasibility domain is performed using the standard algorithms for the constrained optimization. As an example, optimization of a ring-stiffened closed cylindrical thin-walled vessel with semi-spherical caps under high external pressure is implemented. As a functional constraint, von Mises stress criterion is used but any other stability constraint admitting mathematical formulation can be incorporated into the proposed approach. Suggested methodology has a good potential for reducing design time for finding optimal parameters of thin-walled vessels under uniform external pressure.

Keywords: design parameters, feasibility domain, von Mises stress criterion, Support Vector Machine (SVM) classifier

Procedia PDF Downloads 324
5724 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: Abdulaziz Alnajem, Amit Sharma

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays

Procedia PDF Downloads 212
5723 Kiira EV Project Transition from Student to Professional Team through Project-Based Skills Development

Authors: Doreen Orishaba, Paul Isaac Musasizi, Richard Madanda, Sandy Stevens Tickodri-Togboa

Abstract:

The world of academia tends to be a very insular place. Consequently, scholars who successfully completed their undergraduate and graduate studies are unpleasantly surprised at how challenging the transition to corporate life can get. This is a global trend even as the students who juggle work with attending some of the most demanding and best graduate programs may not easily adjust to and confirm to the professionalism required for corporate management of the industry. This paper explores the trends in the transition of Kiira EV Project from a predominantly student team to a professional team of a national pride program through mentorship and apprenticeship. The core disciplines within the Kiira EV Project include Electrical and Electronics Engineering, Mechanical Engineering, and Industrial Design.

Keywords: mentorship, apprenticeship, professional, development

Procedia PDF Downloads 409
5722 The Feasibility of a Protected Launch Site near Melkbosstrand for a Public Transport Ferry across Table Bay, Cape Town

Authors: Mardi Falck, André Theron

Abstract:

Traffic congestion on the Northern side of Table Bay is a major problem. In Gauteng, the implementation of the Gautrain between Pretoria and Johannesburg, solved their traffic congestion. In 2002 two entrepreneurs endeavoured to implement a hovercraft ferry service across the bay from Table View to the Port of Cape Town. However, the EIA process proved that disgruntled residents from the area did not agree with their location for a launch site. 17 years later the traffic problem has not gone away, but instead the congestion has increased. While property prices in the City Bowl of Cape Town are ever increasing, people tend to live more on the outskirts of the CBD and commute to work. This means more vehicles on the road every day and the public transport services cannot keep up with the demand. For this reason, the study area of the previous hovercraft plans is being extended further North. The study’s aim is thus to determine the feasibility of a launch site North of Bloubergstrand to launch and receive a public transport ferry across Table Bay. The feasibility is being established by researching ferry services across the world and on what makes them successful. Different types of ferries and their operational capacities in terms of weather and waves are researched and by establishing the offshore and nearshore wind and wave climate for the area, an appropriate protected launch site is determined. It was concluded that travel time could potentially be halved. A hovercraft proved to be the most feasible ferry type, because it does not require a conventional harbour. Other types of vessels require a protected launch site because of the wave climate. This means large breakwaters that influence the cost substantially. The Melkbos Cultural Centre proved to be the most viable option for the location of the launch site, because it already has buildings and infrastructure. It is recommended that, if a harbour is chosen for the proposed ferry service, it could be used for more services like fishing, eco-tourism and leisure. Further studies are recommended to optimise the feasibility of such a harbour.

Keywords: Cape Town, ferry, public, Table Bay

Procedia PDF Downloads 146
5721 Implementation of Social Network Analysis to Analyze the Dependency between Construction Bid Packages

Authors: Kawalpreet Kaur, Panagiotis Mitropoulos

Abstract:

The division of the project scope into work packages is the most important step in the preconstruction phase of construction projects. The work division determines the scope and complexity of each bid package, resulting in dependencies between project participants performing these work packages. The coordination between project participants is necessary because of these dependencies. Excessive dependencies between the bid packages create coordination difficulties, leading to delays, added costs, and contractual friction among project participants. However, the literature on construction provides limited knowledge regarding work structuring approaches, issues, and challenges. Manufacturing industry literature provides a systematic approach to defining the project scope into work packages, and the implementation of social network analysis (SNA) in manufacturing is an effective approach to defining and analyzing the divided scope of work at the dependencies level. This paper presents a case study of implementing a similar approach using SNA in construction bid packages. The study uses SNA to analyze the scope of bid packages and determine the dependency between scope elements. The method successfully identifies the bid package with the maximum interaction with other trade contractors and the scope elements that are crucial for project performance. The analysis provided graphical and quantitative information on bid package dependencies. The study can be helpful in performing an analysis to determine the dependencies between bid packages and their scope elements and how these scope elements are critical for project performance. The study illustrates the potential use of SNA as a systematic approach to analyzing bid package dependencies in construction projects, which can guide the division of crucial scope elements to minimize negative impacts on project performance.

Keywords: work structuring, bid packages, work breakdown, project participants

Procedia PDF Downloads 76
5720 Project Production Control (PPC) Implementation for an Offshore Facilities Construction Project

Authors: Muhammad Hakim Bin Mat Tasir, Erwan Shahfizad Hasidan, Hamidah Makmor Bakry, M. Hafiz B. Izhar

Abstract:

Every key performance indicator used to monitor a project’s construction progress emphasizes trade productivity or specific commodity run-down curves. Examples include the productivity of welding by the number of joints completed per day, quantity of NDT (Non-Destructive Tests) inspection per day, etc. This perspective is based on progress and productivity; however, it does not enable a system perspective of how we produce. This paper uses a project production system perspective by which projects are a collection of production systems comprising the interconnected network of processes and operations that represent all the work activities to execute a project from start to finish. Furthermore, it also uses the 5 Levels of production system optimization as a frame. The goal of the paper is to describe the application of Project Production Control (PPC) to control and improve the performance of several production processes associated with the fabrication and assembly of a Central Processing Platform (CPP) Jacket, part of an offshore mega project. More specifically, the fabrication and assembly of buoyancy tanks as they were identified as part of the critical path and required the highest demand for capacity. In total, seven buoyancy tanks were built, with a total estimated weight of 2,200 metric tons. These huge buoyancy tanks were designed to be reversed launching and self-upending of the jacket, easily retractable, and reusable for the next project, ensuring sustainability. Results showed that an effective application of PPC not only positively impacted construction progress and productivity but also exposed sources of detrimental variability as the focus of continuous improvement practices. This approach augmented conventional project management practices, and the results had a high impact on construction scheduling, planning, and control.

Keywords: offshore, construction, project management, sustainability

Procedia PDF Downloads 54
5719 Big Data in Construction Project Management: The Colombian Northeast Case

Authors: Sergio Zabala-Vargas, Miguel Jiménez-Barrera, Luz VArgas-Sánchez

Abstract:

In recent years, information related to project management in organizations has been increasing exponentially. Performance data, management statistics, indicator results have forced the collection, analysis, traceability, and dissemination of project managers to be essential. In this sense, there are current trends to facilitate efficient decision-making in emerging technology projects, such as: Machine Learning, Data Analytics, Data Mining, and Big Data. The latter is the most interesting in this project. This research is part of the thematic line Construction methods and project management. Many authors present the relevance that the use of emerging technologies, such as Big Data, has taken in recent years in project management in the construction sector. The main focus is the optimization of time, scope, budget, and in general mitigating risks. This research was developed in the northeastern region of Colombia-South America. The first phase was aimed at diagnosing the use of emerging technologies (Big-Data) in the construction sector. In Colombia, the construction sector represents more than 50% of the productive system, and more than 2 million people participate in this economic segment. The quantitative approach was used. A survey was applied to a sample of 91 companies in the construction sector. Preliminary results indicate that the use of Big Data and other emerging technologies is very low and also that there is interest in modernizing project management. There is evidence of a correlation between the interest in using new data management technologies and the incorporation of Building Information Modeling BIM. The next phase of the research will allow the generation of guidelines and strategies for the incorporation of technological tools in the construction sector in Colombia.

Keywords: big data, building information modeling, tecnology, project manamegent

Procedia PDF Downloads 124
5718 A New Suburb Renovation Concept

Authors: Anu Soikkelii, Laura Sorri

Abstract:

Finnish national research project, User- and Business-oriented Suburb Renovation Concept (KLIKK), was started in January 2012 and will end in June 2014. The perspective of energy efficiency is emphasised in the project, but also it addresses what improving the energy efficiency of suburban apartment buildings means from the standpoint of architecturally valuable buildings representing different periods. The project will also test the impacts of stricter energy efficiency requirements on renovation projects. The primary goal of the project is to develop a user-oriented, industrial, economic renovation concept for suburban apartment building renovation, extension and construction of additional storeys. The concept will make it possible to change from performance- and cost-based operation to novel service- and user-oriented, site-specifically tailored renovation methods utilizing integrated order and delivery chains.The present project is collaborating with Ministry of the Environment and participating cities in developing a new type of lighter town planning model for suburban renovations and in-fill construction. To support this, the project will simultaneously develop practices for environmental impact assessment tools in renovation and suburban supplementary and in-fill construction.

Keywords: energy efficiency, prefabrication, renovation concept, suburbs, sustainability, user-orientated

Procedia PDF Downloads 331
5717 The UAV Feasibility Trajectory Prediction Using Convolution Neural Networks

Authors: Adrien Marque, Daniel Delahaye, Pierre Maréchal, Isabelle Berry

Abstract:

Wind direction and uncertainty are crucial in aircraft or unmanned aerial vehicle trajectories. By computing wind covariance matrices on each spatial grid point, these spatial grids can be defined as images with symmetric positive definite matrix elements. A data pre-processing step, a specific convolution, a specific max-pooling, and a specific flatten layers are implemented to process such images. Then, the neural network is applied to spatial grids, whose elements are wind covariance matrices, to solve classification problems related to the feasibility of unmanned aerial vehicles based on wind direction and wind uncertainty.

Keywords: wind direction, uncertainty level, unmanned aerial vehicle, convolution neural network, SPD matrices

Procedia PDF Downloads 40
5716 The Use of Project to Enhance Learning Domains Stated by National Qualifications Framework: TQF

Authors: Duangkamol Thitivesa

Abstract:

This paper explores the use of project work in a content-based instruction in a Rajabhat University, Thailand. The use of project is to promote kinds of learning expected of student teachers as stated by Thailand Quality Framework: TQF. The kinds of learning are grouped into five domains: Ethical and moral development, knowledge, cognitive skill, interpersonal skills and responsibility, and analytical and communication skills. The content taught in class is used to lead the student teachers to relate their previously-acquired linguistic knowledge to meaningful realizations of the language system in passages of immediate relevance to their professional interests, teaching methods in particular. Two research questions are formulate to guide this study: 1) To what degree are the five domains of learning expected of student teachers after the use of project in a content class?, and 2) What is the academic achievement of the students’ writing skills, as part of the learning domains stated by TQF, against the 70% attainment target after the use of project to enhance the skill? The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of a summative achievement test, student writing works, an observation checklist, and project diary. The scores in the summative achievement test were analyzed by mean score, standard deviation, and t-test. Project diary serves as students’ record of the language acquired during the project. List of structures and vocabulary noted in the diary has shown students’ ability to attend to, recognize, and focus on meaningful patterns of language forms.

Keywords: Thailand quality framework, project Work, writing skill, summative

Procedia PDF Downloads 148
5715 3rd Generation Modular Execution: A Global Breakthrough in Modular Facility Construction System

Authors: Sean Bryner S. Rey, Eric Tanjutco

Abstract:

Modular execution strategies are performed to address the various challenges of any projects and are implemented on each project phase that covers Engineering, Procurement, Fabrication and Construction. It was until the recent years that the intent to surpass mechanical modularization approach were conceptualized to give solution to much greater demands of project components such as site location and adverse weather condition, material sourcing, construction schedule, safety risks and overall plot layout and allocation. The intent of this paper is to introduce the 3rd Generation Modular Execution with an overview of its advantages on project execution and will give emphasis on Engineering, Construction, Operation and Maintenance. Most importantly, the paper will present the key differentiator of 3rd Gen modular execution against other conventional project execution and the merits it bears for the industry.

Keywords: 3rd generation modular, process block, construction, operation & maintenance

Procedia PDF Downloads 470
5714 From Customer Innovations to Manufactured Products: A Project Outlook

Authors: M. Holle, M. Roth, M. R. Gürtler, U. Lindemann

Abstract:

This paper gives insights into the research project "InnoCyFer" (in the form of an outlook) which is funded by the German Federal Ministry of Economics and Technology. Enabling the integrated customer individual product design as well as flexible manufacturing of these products are the main objectives of the project. To achieve this, a web-based open innovation-platform containing an integrated Toolkit will be developed. This toolkit enables the active integration of the customer’s creativity and potentials of innovation in the product development process. Furthermore, the project will show the chances and possibilities of customer individualized products by building and examining the continuous process from innovation through the customers to the flexible manufacturing of individual products.

Keywords: customer individual product design, innovation networks, open innovation, open innovation platform, toolkit

Procedia PDF Downloads 311
5713 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image

Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang

Abstract:

Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.

Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image

Procedia PDF Downloads 503
5712 Providing Open Access for Scholarly Information in Libya

Authors: Mohamed Abolgasem Arteimi, Ahlam Al-Tajori

Abstract:

This paper describes an ongoing project at the Libyan Academy. The project aims to build digital library for thesis and dissertations (ETD). The researchers developed a system based on Greenstone open source systems for building ETD digital library. A metadata for theses and dissertations was developed. The paper addresses issues related to project design, development and user satisfaction. Conclusions highlighted some important lessons learned to date.

Keywords: digital library, electronic theses and dissertations, open access, ETD, metadata

Procedia PDF Downloads 312
5711 Feasibility Study of Constructed Wetlands for Wastewater Treatment and Reuse in Asmara, Eritrea

Authors: Hagos Gebrehiwet Bahta

Abstract:

Asmara, the capital city of Eritrea, is facing a sanitation challenge because the city discharges its wastewater to the environment without any kind of treatment. The aim of this research is to conduct a pre-feasibility study of using constructed wetlands in the peri-urban areas of Asmara for wastewater treatment and reuse. It was found that around 15,000 m³ of wastewater is used daily for agricultural activities, and products are sold in the city's markets, which are claimed to cause some health effects. In this study, three potential sites were investigated around Mai-Bela and an optimum location was selected on the basis of land availability, topography, and geotechnical information. Some types of local microphytes that can be used in constructed wetlands have been identified and documented for further studies. It was found that subsurface constructed wetlands can provide a sufficient pollutant removal with careful planning and design. Following the feasibility study, a preliminary design of screening, grit chamber and subsurface constructed wetland was prepared and cost estimation was done. In the cost estimation part, the filter media was found to be the most expensive part and consists of around 30% percent of the overall cost. The city wastewater drainage runs in two directions and the selected site is located in the southern sub-system, which only carries sewage (separate system). The wastewater analysis conducted particularly around this area (Sembel) indicates high heavy metal levels and organic concentrations, which reveals that there is a high level of industrial pollution in addition to the domestic sewage.

Keywords: agriculture, constructed wetland, Mai-Bela, wastewater reuse

Procedia PDF Downloads 202
5710 Cross-Cultural Competence Development through 'Learning by Reflection': A Case Study of Chinese International Students Learning through Taking Part-Time Jobs in the UK

Authors: Xin Zhao

Abstract:

The project aims to expand the notion of narrative learning and address the importance of learning by reflection in our learning and teaching context at a British university. Drawing on the key concepts such as development ZPD, transition and reflection-in and –on-action, this project analyses the learning experiences of a small sample of Chinese postgraduate students in a British University, who use part-time job experience to develop cross-cultural communication skills. The project adopts a mixed methods approach. Questionnaires and focus group interviews are used to examine the way in which students adapt (or not adapt) to the culture of learning in a British university and develop a renewed sense of self in transitions from one culture to the other. The project also looks at how the students appropriate opportunities for learning not just from classrooms but outside classrooms from everyday encounters. The project aims to address the implication of learning by reflection as development in transition. Time in and for learning, or duration, is taken for granted in theorising narrative learning. The project shall explore this very issue of time in relation to learning by reflection in considering time in/of/for learning as duration.

Keywords: cross-cultural competence, learning by refection, international student transition, part-time work experience

Procedia PDF Downloads 181
5709 The Effect of Technology in Improving Tourism Cluster Competitiveness

Authors: Michael Safwat Kotit Istemalek

Abstract:

In this study, a project on a small project called Zeytinseli, which plays an important role from the beginning to the end of olive oil and olive oil production, is presented with the help of tourism companies that play an important role in the tourism sector. In the study, first of all, a framework of ideas about travel agency, tourism, specific tourism agency and rural tourism was created and tourism knowledge in the modern world was emphasized. After this, the "olive", which had an important place in both mythology and the religion of God, disappeared in the field of rural tourism. Since Didim Zeytinseli is the Aydın district, accommodation prices were calculated within the scope of the project and a 15-day factory tour was given at the end of the project. It can be said that the study is an original study as it covers not only environmental and agricultural tourism but also cultural tourism and non-traditional tourism98.

Keywords: financial problems, the problems of tourism businesses, tourism businesses, internet, marketing, tourism, tourism management economic competitiveness, enhancing competitiveness

Procedia PDF Downloads 24
5708 The Prospective Assessment of Zero-Energy Dwellings

Authors: Jovana Dj. Jovanovic, Svetlana M. Stevovic

Abstract:

The highest priority of so called, projected passive houses is to meet the appropriate energy demand. Every single material and layer which is injected into a dwelling has a certain energy quantity stored. The passive houses include optimized insulation levels with minimal thermal bridges, minimum of air leakage through the building, utilization of passive solar and internal gains, and good circulation of air which leans on mechanical ventilation system. The focus of this paper is on passive house features, benefits and targets, their feasibility and energy demands which are set up during each project. Numerous passive house-standards outline the very significant role of zero-energy dwellings towards the modern label of sustainable development. It is clear that the performance of both built and existing housing stock must be addressed if the population across the world sets out the energy objectives. This scientific article examines passive house features since the many passive house cases are launched.

Keywords: benefits, energy demands, passive houses, sustainable development

Procedia PDF Downloads 331
5707 Stakeholder Management for Successful Software Projects

Authors: Kassem Saleh

Abstract:

An alarming number of software projects fail to deliver the required functionalities within the provided budget and timeframe and with the required qualities. Some of the main reasons for this problem include bad stakeholder management, poor communications and informal change management. Informal processes to identify, engage and control stakeholders lead to these reasons. Recently, to emphasize its importance, the Project Management Institute (PMI) updated the Project Management Body of Knowledge (PMBoK) to explicitly include the stakeholder management knowledge area. This knowledge area consists of four processes to identify stakeholders, plan stakeholder management, and manage and control stakeholder engagement. The use of appropriate techniques for stakeholder management in software projects will definitely lead to higher quality and successful software. In this paper, we describe some of the proven techniques that can be used during the execution of the four processes for stakeholder management. Development of collaboration tools for automating these processes are recommended and need to be integrated in available software project management tools.

Keywords: project management, stakeholder management, software development, project management body of knowledge

Procedia PDF Downloads 305
5706 The Influence of Beta Shape Parameters in Project Planning

Authors: Αlexios Kotsakis, Stefanos Katsavounis, Dimitra Alexiou

Abstract:

Networks can be utilized to represent project planning problems, using nodes for activities and arcs to indicate precedence relationship between them. For fixed activity duration, a simple algorithm calculates the amount of time required to complete a project, followed by the activities that comprise the critical path. Program Evaluation and Review Technique (PERT) generalizes the above model by incorporating uncertainty, allowing activity durations to be random variables, producing nevertheless a relatively crude solution in planning problems. In this paper, based on the findings of the relevant literature, which strongly suggests that a Beta distribution can be employed to model earthmoving activities, we utilize Monte Carlo simulation, to estimate the project completion time distribution and measure the influence of skewness, an element inherent in activities of modern technical projects. We also extract the activity criticality index, with an ultimate goal to produce more accurate planning estimations.

Keywords: beta distribution, PERT, Monte Carlo simulation, skewness, project completion time distribution

Procedia PDF Downloads 145
5705 Successful Optimization of a Shallow Marginal Offshore Field and Its Applications

Authors: Kumar Satyam Das, Murali Raghunathan

Abstract:

This note discusses the feasibility of field development of a challenging shallow offshore field in South East Asia and how its learnings can be applied to marginal field development across the world especially developing marginal fields in this low oil price world. The field was found to be economically challenging even during high oil prices and the project was put on hold. Shell started development study with the aim to significantly reduce cost through competitively scoping and revive stranded projects. The proposed strategy to achieve this involved Improve Per platform recovery and Reduction in CAPEX. Methodology: Based on various Benchmarking Tool such as Woodmac for similar projects in the region and economic affordability, a challenging target of 50% reduction in unit development cost (UDC) was set for the project. Technical scope was defined to the minimum as to be a wellhead platform with minimum functionality to ensure production. The evaluation of key project decisions like Well location and number, well design, Artificial lift methods and wellhead platform type under different development concept was carried out through integrated multi-discipline approach. Key elements influencing per platform recovery were Wellhead Platform (WHP) location, Well count, well reach and well productivity. Major Findings: Reservoir being shallow posed challenges in well design (dog-leg severity, casing size and the achievable step-out), choice of artificial lift and sand-control method. Integrated approach amongst relevant disciplines with challenging mind-set enabled to achieve optimized set of development decisions. This led to significant improvement in per platform recovery. It was concluded that platform recovery largely depended on the reach of the well. Choice of slim well design enabled designing of high inclination and better productivity wells. However, there is trade-off between high inclination Gas Lift (GL) wells and low inclination wells in terms of long term value, operational complexity, well reach, recovery and uptime. Well design element like casing size, well completion, artificial lift and sand control were added successively over the minimum technical scope design leading to a value and risk staircase. Logical combinations of options (slim well, GL) were competitively screened to achieve 25% reduction in well cost. Facility cost reduction was achieved through sourcing standardized Low Cost Facilities platform in combination with portfolio execution to maximizing execution efficiency; this approach is expected to reduce facilities cost by ~23% with respect to the development costs. Further cost reductions were achieved by maximizing use of existing facilities nearby; changing reliance on existing water injection wells and utilizing existing water injector (W.I.) platform for new injectors. Conclusion: The study provides a spectrum of technically feasible options. It also made clear that different drivers lead to different development concepts and the cost value trade off staircase made this very visible. Scoping of the project through competitive way has proven to be valuable for decision makers by creating a transparent view of value and associated risks/uncertainty/trade-offs for difficult choices: elements of the projects can be competitive, whilst other parts will struggle, even though contributing to significant volumes. Reduction in UDC through proper scoping of present projects and its benchmarking paves as a learning for the development of marginal fields across the world, especially in this low oil price scenario. This way of developing a field has on average a reduction of 40% of cost for the Shell projects.

Keywords: benchmarking, full field development, CAPEX, feasibility

Procedia PDF Downloads 154
5704 Photovoltaic Solar Energy in Public Buildings: A Showcase for Society

Authors: Eliane Ferreira da Silva

Abstract:

This paper aims to mobilize and sensitize public administration leaders to good practices and encourage investment in the PV system in Brazil. It presents a case study methodology for dimensioning the PV system in the roofs of the public buildings of the Esplanade of the Ministries, Brasilia, capital of the country, with predefined resources, starting with the Sustainable Esplanade Project (SEP), of the exponential growth of photovoltaic solar energy in the world and making a comparison with the solar power plant of the Ministry of Mines and Energy (MME), active since: 6/10/2016. In order to do so, it was necessary to evaluate the energy efficiency of the buildings in the period from January 2016 to April 2017, (16 months) identifying the opportunities to reduce electric energy expenses, through the adjustment of contracted demand, the tariff framework and correction of existing active energy. The instrument used to collect data on electric bills was the e-SIC citizen information system. The study considered in addition to the technical and operational aspects, the historical, cultural, architectural and climatic aspects, involved by several actors. Identifying the reductions of expenses, the study directed to the following aspects: Case 1) economic feasibility for exchanges of common lamps, for LED lamps, and, Case 2) economic feasibility for the implementation of photovoltaic solar system connected to the grid. For the case 2, PV*SOL Premium Software was used to simulate several possibilities of photovoltaic panels, analyzing the best performance, according to local characteristics, such as solar orientation, latitude, annual average solar radiation. A simulation of an ideal photovoltaic solar system was made, with due calculations of its yield, to provide a compensation of the energy expenditure of the building - or part of it - through the use of the alternative source in question. The study develops a methodology for public administration, as a major consumer of electricity, to act in a responsible, fiscalizing and incentive way in reducing energy waste, and consequently reducing greenhouse gases.

Keywords: energy efficiency, esplanade of ministries, photovoltaic solar energy, public buildings, sustainable building

Procedia PDF Downloads 129
5703 Application of Simulation of Discrete Events in Resource Management of Massive Concreting

Authors: Mohammad Amin Hamedirad, Seyed Javad Vaziri Kang Olyaei

Abstract:

Project planning and control are one of the most critical issues in the management of construction projects. Traditional methods of project planning and control, such as the critical path method or Gantt chart, are not widely used for planning projects with discrete and repetitive activities, and one of the problems of project managers is planning the implementation process and optimal allocation of its resources. Massive concreting projects is also a project with discrete and repetitive activities. This study uses the concept of simulating discrete events to manage resources, which includes finding the optimal number of resources considering various limitations such as limitations of machinery, equipment, human resources and even technical, time and implementation limitations using analysis of resource consumption rate, project completion time and critical points analysis of the implementation process. For this purpose, the concept of discrete-event simulation has been used to model different stages of implementation. After reviewing the various scenarios, the optimal number of allocations for each resource is finally determined to reach the maximum utilization rate and also to reduce the project completion time or reduce its cost according to the existing constraints. The results showed that with the optimal allocation of resources, the project completion time could be reduced by 90%, and the resulting costs can be reduced by up to 49%. Thus, allocating the optimal number of project resources using this method will reduce its time and cost.

Keywords: simulation, massive concreting, discrete event simulation, resource management

Procedia PDF Downloads 144
5702 Stage-Gate Based Integrated Project Management Methodology for New Product Development

Authors: Mert Kıranç, Ekrem Duman, Murat Özbilen

Abstract:

In order to achieve new product development (NPD) activities on time and within budgetary constraints, the NPD managers need a well-designed methodology. This study intends to create an integrated project management methodology for the ones who focus on new product development projects. In the scope of the study, four different management systems are combined. These systems are called as 'Schedule-oriented Stage-Gate Method, Risk Management, Change Management and Earned Value Management'. New product development term is quite common in many different industries such as defense industry, construction, health care/dental, higher education, fast moving consumer goods, white goods, electronic devices, marketing and advertising and software development. All product manufacturers run against each other’s for introducing a new product to the market. In order to achieve to produce a more competitive product in the market, an optimum project management methodology is chosen, and this methodology is adapted to company culture. The right methodology helps the company to present perfect product to the customers at the right time. The benefits of proposed methodology are discussed as an application by a company. As a result, how the integrated methodology improves the efficiency and how it achieves the success of the project are unfolded.

Keywords: project, project management, management methodology, new product development, risk management, change management, earned value, stage-gate

Procedia PDF Downloads 311
5701 Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: construction management, control process, cost control, planning and scheduling

Procedia PDF Downloads 242
5700 From Mathematics Project-Based Learning to Commercial Product Using Geometer’s Sketchpad (GSP)

Authors: Krongthong Khairiree

Abstract:

The purpose of this research study is to explore mathematics project-based learning approach and the use of technology in the context of school mathematics in Thailand. Data of the study were collected from 6 sample secondary schools and the students were 6-14 years old. Research findings show that through mathematics project-based learning approach and the use of GSP, students were able to make mathematics learning fun and challenging. Based on the students’ interviews they revealed that, with GSP, they were able to visualize and create graphical representations, which will enable them to develop their mathematical thinking skills, concepts and understanding. The students had fun in creating variety of graphs of functions which they can not do by drawing on graph paper. In addition, there are evidences to show the students’ abilities in connecting mathematics to real life outside the classroom and commercial products, such as weaving, patterning of broomstick, and ceramics design.

Keywords: mathematics, project-based learning, Geometer’s Sketchpad (GSP), commercial products

Procedia PDF Downloads 331
5699 Analysis on the Need of Engineering Drawing and Feasibility Study on 3D Model Based Engineering Implementation

Authors: Parthasarathy J., Ramshankar C. S.

Abstract:

Engineering drawings these days play an important role in every part of an industry. By and large, Engineering drawings are influential over every phase of the product development process. Traditionally, drawings are used for communication in industry because they are the clearest way to represent the product manufacturing information. Until recently, manufacturing activities were driven by engineering data captured in 2D paper documents or digital representations of those documents. The need of engineering drawing is inevitable. Still Engineering drawings are disadvantageous in re-entry of data throughout manufacturing life cycle. This document based approach is prone to errors and requires costly re-entry of data at every stage in the manufacturing life cycle. So there is a requirement to eliminate Engineering drawings throughout product development process and to implement 3D Model Based Engineering (3D MBE or 3D MBD). Adopting MBD appears to be the next logical step to continue reducing time-to-market and improve product quality. Ideally, by fully applying the MBD concept, the product definition will no longer rely on engineering drawings throughout the product lifecycle. This project addresses the need of Engineering drawing and its influence in various parts of an industry and the need to implement the 3D Model Based Engineering with its advantages and the technical barriers that must be overcome in order to implement 3D Model Based Engineering. This project also addresses the requirements of neutral formats and its realisation in order to implement the digital product definition principles in a light format. In order to prove the concepts of 3D Model Based Engineering, the screw jack body part is also demonstrated. At ZF Windpower Coimbatore Limited, 3D Model Based Definition is implemented to Torque Arm (Machining and Casting), Steel tube, Pinion shaft, Cover, Energy tube.

Keywords: engineering drawing, model based engineering MBE, MBD, CAD

Procedia PDF Downloads 433
5698 Potential of Visualization and Information Modeling on Productivity Improvement and Cost Saving: A Case Study of a Multi-Residential Construction Project

Authors: Sara Rankohi, Lloyd Waugh

Abstract:

Construction sites are information saturated. Digitalization is hitting construction sites to meet the incredible demand of knowledge sharing and information documentations. From flying drones, 3D Lasers scanners, pocket mobile applications, to augmented reality glasses and smart helmet, visualization technologies help real-time information imposed straight onto construction professional’s field of vision. Although these technologies are very applicable and can have the direct impact on project cost and productivity, experience shows that only a minority of construction professionals quickly adapt themselves to benefit from them in practice. The majority of construction managers still tend to apply traditional construction management methods. This paper investigates a) current applications of visualization technologies in construction projects management, b) the direct effect of these technologies on productivity improvement and cost saving of a multi-residential building project via a case study on Mac Taggart Senior Care project located in Edmonton, Alberta. The research shows the imaged based technologies have a direct impact on improving project productivity and cost savings.

Keywords: image-based technologies, project management, cost, productivity improvement

Procedia PDF Downloads 356
5697 Study on the Key Stakeholders' Perception and Establishment of Sustainability Goals in the Green Building Projects: The Case of Malaysia

Authors: Nor Kalsum M. Isa, Mohd Yazid M. Yunos, Anuar Alias, Mazdi Marzuki, Kamarul Ismail, Mohd H. Ibrahim

Abstract:

Green building is an emerging concept with the ultimate target to achieve sustainable development by integrating sustainability goals and principles into project development. Basically, a green building is a building that is designed, constructed and operated to boost environmental, economic, health and productivity performance over conventional buildings. The buildings have been proven to be successful in contributing towards sustainability and project success. The purpose of this study was to determine the benefits of sustainability application in building projects, looking towards project success from the perspective of Malaysian key project stakeholders. The study also aimed to explore the establishment of sustainability goals in the green building projects in Malaysia. The Triple Bottom Line (TBL) Concept of Sustainability was used as the foundation theoretical framework. Surveys, interviews and multiple case study methods were employed. A sample of 188 Malaysian building project stakeholders was selected for questionnaire surveys, and 15 stakeholders from three award-winning green building projects in Malaysia were involved in the interviews. The study found that the majority of the respondents were less aware that the sustainability integration in the building project can significantly affect cost reduction, schedule effectiveness and stakeholders’ satisfaction with the performance of buildings as at the same level as the quality performance. Of the four sustainability goals, the environmental aspect was given more priority than others in the development of the green building projects.

Keywords: green building, sustainability, project stakeholders, Malaysia