8180 National Project 'Environment' of Russian Federation as a Management Tool in Achieving SDGs

Authors: Ekaterina Posokhova, Boris Gavrilov

Abstract:

Priority national projects have become an essential phenomenon in the Russian Federation. Both regional and local government institutions and a significant part of the society have been involved in their implementation. The scale and multispectricity of the national projects give a reason to believe that their concept is beyond the scope of the individual state programs. The national project “environment” contains federal projects on waste management, water, and air quality, ecotourism development, and biodiversity conservation highlights the importance of the preservation and restoration of Volga River and Lake Baikal ecosystems. This study assesses the national projects according to their relativeness with the current SDGs (i.e., SGD 14 and 15), evaluates the methodology of the projects. The paper considers the peculiarities of the national projects as strategic management tools as well as the possibility of amending the project objective indicators. Conclusion on the effectiveness of NP in terms of achieving SDGs is provided.

Keywords: management, SDP, russia, conservation, law

Procedia PDF Downloads 144
8179 Sustainability of High-Rise Affordable Housing: Critical Issues in Applying Green Building Rating Tools

Authors: Poh Im. Lim, Hillary Yee Qin. Tan

Abstract:

Nowadays, going green has become a trend, and being emphasized in the construction industry. In Malaysia, there are several green rating tools available in the industry and among these, GBI and GreenRE are considered as the most common tools adopted for residential buildings. However, being green is not equal to or making something sustainable. Being sustainable is to take economic, environmental and social aspects into consideration. This is particularly essential in the affordable housing sector as the end-users belong to lower-income and places importance on many socio-economic needs beyond the environmental criteria. This paper discusses the arguments in proposing a sustainability framework that is tailor-made for high-rise affordable housing. In-depth interviews and observation mapping methods were used in gathering inputs from the end-users, non-governmental organisations (NGOs) as well as the professionals. ‘Bottom-up’ approach was applied in this research to show the significance of participation from the local community in the decision-making process. The proposed sustainability framework illustrates the discrepancies between user priorities and what the industry is providing. The outcome of this research suggests that integrating sustainability into high-rise affordable housing is achievable and beneficial to the industry, society, and the environment.

Keywords: green building rating tools, high-rise affordable housing, sustainability framework, sustainable development

Procedia PDF Downloads 138
8178 A Feasibility and Implementation Model of Small-Scale Hydropower Development for Rural Electrification in South Africa: Design Chart Development

Authors: Gideon J. Bonthuys, Marco van Dijk, Jay N. Bhagwan

Abstract:

Small scale hydropower used to play a very important role in the provision of energy to urban and rural areas of South Africa. The national electricity grid, however, expanded and offered cheap, coal generated electricity and a large number of hydropower systems were decommissioned. Unfortunately, large numbers of households and communities will not be connected to the national electricity grid for the foreseeable future due to high cost of transmission and distribution systems to remote communities due to the relatively low electricity demand within rural communities and the allocation of current expenditure on upgrading and constructing of new coal fired power stations. This necessitates the development of feasible alternative power generation technologies. A feasibility and implementation model was developed to assist in designing and financially evaluating small-scale hydropower (SSHP) plants. Several sites were identified using the model. The SSHP plants were designed for the selected sites and the designs for the different selected sites were priced using pricing models (civil, mechanical and electrical aspects). Following feasibility studies done on the designed and priced SSHP plants, a feasibility analysis was done and a design chart developed for future similar potential SSHP plant projects. The methodology followed in conducting the feasibility analysis for other potential sites consisted of developing cost and income/saving formulae, developing net present value (NPV) formulae, Capital Cost Comparison Ratio (CCCR) and levelised cost formulae for SSHP projects for the different types of plant installations. It included setting up a model for the development of a design chart for a SSHP, calculating the NPV, CCCR and levelised cost for the different scenarios within the model by varying different parameters within the developed formulae, setting up the design chart for the different scenarios within the model and analyzing and interpreting results. From the interpretation of the develop design charts for feasible SSHP in can be seen that turbine and distribution line cost are the major influences on the cost and feasibility of SSHP. High head, short transmission line and islanded mini-grid SSHP installations are the most feasible and that the levelised cost of SSHP is high for low power generation sites. The main conclusion from the study is that the levelised cost of SSHP projects indicate that the cost of SSHP for low energy generation is high compared to the levelised cost of grid connected electricity supply; however, the remoteness of SSHP for rural electrification and the cost of infrastructure to connect remote rural communities to the local or national electricity grid provides a low CCCR and renders SSHP for rural electrification feasible on this basis.

Keywords: cost, feasibility, rural electrification, small-scale hydropower

Procedia PDF Downloads 224
8177 Development of Value Based Planning Methodology Incorporating Risk Assessment for Power Distribution Network

Authors: Asnawi Mohd Busrah, Au Mau Teng, Tan Chin Hooi, Lau Chee Chong

Abstract:

This paper describes value based planning (VBP) methodology incorporating risk assessment as an enhanced and more practical approach to evaluate distribution network projects in Peninsular Malaysia. Assessment indicators associated with economics, performance and risks are formulated to evaluate distribution projects to quantify their benefits against investment. The developed methodology is implemented in a web-based software customized to capture investment and network data, compute assessment indicators and rank the proposed projects according to their benefits. Value based planning approach addresses economic factors in the power distribution planning assessment, so as to minimize cost solution to the power utility while at the same time provide maximum benefits to customers.

Keywords: value based planning, distribution network, value of loss load (VoLL), energy not served (ENS)

Procedia PDF Downloads 480
8176 Sustainable Housing and Urban Development: A Study on the Soon-To-Be-Old Population's Impetus to Migrate

Authors: Tristance Kee

Abstract:

With the unprecedented increase in elderly population globally, it is critical to search for new sustainable housing and urban development alternatives to traditional housing options. This research examines concepts of elderly migration pattern in the context of a high density city in Hong Kong to Mainland China. The research objectives are to: 1) explore the relationships between soon-to-be-old elderly and their intentions to move to Mainland upon retirement and their demographic characteristics; and 2) What are the desired amenities, locational factors and activities that are expected in the soon-to-be-old generation’s retirement housing environment? Primary data was collected through questionnaire survey conducted using random sampling method with respondents aged between 45-64 years old. The face-to-face survey was completed by 500 respondents. The survey was divided into four sections. The first section focused on respondent’s demographic information such as gender, age, education attainment, monthly income, housing tenure type and their visits to Mainland China. The second section focused on their retirement plans in terms of intended retirement age, prospective retirement funding and retirement housing options. The third section focused on the respondent’s attitudes toward retiring in Mainland for housing. It asked about their intentions to migrate retire into Mainland and incentives to retire in Hong Kong. The fourth section focused on respondent’s ideal housing environment including preferred housing amenities, desired living environment and retirement activities. The dependent variable in this study was ‘respondent’s consideration to move to Mainland China upon retirement’. Eight primary independent variables were integrated into the study to identify the correlations between them and retirement migration plan. The independent variables include: gender, age, marital status, monthly income, present housing tenure type, property ownership in Hong Kong, relationship with Mainland and the frequency of visiting Mainland China. In addition to the above independent variables, respondents were asked to indicate their retirement plans (retirement age, funding sources and retirement housing options), incentives to migrate to retire (choices included: property ownership, family relations, cost of living, living environment, medical facilities, government welfare benefits, etc.), perceived ideal retirement life qualities including desired amenities (sports, medical and leisure facilities etc.), desired locational qualities (green open space, convenient transport options and accessibility to urban settings etc.) and desired retirement activities (home-based leisure, elderly friendly sports, cultural activities, child care, social activities, etc.). The finding shows correlations between the used independent variables and consideration to migrate for housing options. The two independent variables indicated a possible correlation were gender and the frequency of visiting Mainland at present. When considering the increasing property prices across the border and strong social relationships, potential retirement migration is a very subjective decision that could vary from person to person. This research adds knowledge to housing research and migration study. Although the research is based in Mainland, most of the characteristics identified including better medical services, government welfare and sound urban amenities are shared qualities for all sustainable urban development and housing strategies.

Keywords: elderly migration, housing alternative, soon-to-be-old, sustainable environment

Procedia PDF Downloads 211
8175 Modeling and Simulating Productivity Loss Due to Project Changes

Authors: Robert Pellerin, Michel Gamache, Remi Trudeau, Nathalie Perrier

Abstract:

The context of large engineering projects is particularly favorable to the appearance of engineering changes and contractual modifications. These elements are potential causes for claims. In this paper, we investigate one of the critical components of the claim management process: the calculation of the impacts of changes in terms of losses of productivity due to the need to accelerate some project activities. When project changes are initiated, delays can arise. Indeed, project activities are often executed in fast-tracking in an attempt to respect the completion date. But the acceleration of project execution and the resulting rework can entail important costs as well as induce productivity losses. In the past, numerous methods have been proposed to quantify the duration of delays, the gains achieved by project acceleration, and the loss of productivity. The calculation related to those changes can be divided into two categories: direct cost and indirect cost. The direct cost is easily quantifiable as opposed to indirect costs which are rarely taken into account during the calculation of the cost of an engineering change or contract modification despite several research projects have been made on this subject. However, proposed models have not been accepted by companies yet, nor they have been accepted in court. Those models require extensive data and are often seen as too specific to be used for all projects. These techniques are also ignoring the resource constraints and the interdependencies between the causes of delays and the delays themselves. To resolve this issue, this research proposes a simulation model that mimics how major engineering changes or contract modifications are handled in large construction projects. The model replicates the use of overtime in a reactive scheduling mode in order to simulate the loss of productivity present when a project change occurs. Multiple tests were conducted to compare the results of the proposed simulation model with statistical analysis conducted by other researchers. Different scenarios were also conducted in order to determine the impact the number of activities, the time of occurrence of the change, the availability of resources, and the type of project changes on productivity loss. Our results demonstrate that the number of activities in the project is a critical variable influencing the productivity of a project. When changes occur, the presence of a large number of activities leads to a much lower productivity loss than a small number of activities. The speed of reducing productivity for 30-job projects is about 25 percent faster than the reduction speed for 120-job projects. The moment of occurrence of a change also shows a significant impact on productivity. Indeed, the sooner the change occurs, the lower the productivity of the labor force. The availability of resources also impacts the productivity of a project when a change is implemented. There is a higher loss of productivity when the amount of resources is restricted.

Keywords: engineering changes, indirect costs overtime, productivity, scheduling, simulation

Procedia PDF Downloads 238
8174 Abating the Barriers to the Deployment of RFID for Construction Project Delivery in South Africa

Authors: Matthew O. Ikuabe, Ayodeji E. Oke, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The use of technological innovations have been touted to be beneficial in the delivery of construction projects. Particularly, Radio Frequency Identification (RFID) technology is widely regarded to be of immense advantage for the management of construction projects. This study focused on evaluating the barriers to the use of Radio Frequency Identification (RFID) technology for the delivery of construction projects. Using Gauteng Provincein South Africa as the study area, questionnaire was used in eliciting responses from construction professionals, which made up the population of the study. Retrieved data was analysed using Mean Item Score and One-Sample t-test. Findings from the study showed that the most significant barriers to the deployment of RFID for construction project delivery are high cost and lack of awareness. Conclusively, the study made recommendations that would aid in the abatement of the barriers to the use of RFID technology for construction project delivery.

Keywords: barriers, construction, project delivery, RFID

Procedia PDF Downloads 206
8173 Exploring the Role of Building Information Modeling for Delivering Successful Construction Projects

Authors: Muhammad Abu Bakar Tariq

Abstract:

Construction industry plays a crucial role in the progress of societies and economies. Furthermore, construction projects have social as well as economic implications, thus, their success/failure have wider impacts. However, the industry is lagging behind in terms of efficiency and productivity. Building Information Modeling (BIM) is recognized as a revolutionary development in Architecture, Engineering and Construction (AEC) industry. There are numerous interest groups around the world providing definitions of BIM, proponents describing its advantages and opponents identifying challenges/barriers regarding adoption of BIM. This research is aimed at to determine what actually BIM is, along with its potential role in delivering successful construction projects. The methodology is critical analysis of secondary data sources i.e. information present in public domain, which include peer reviewed journal articles, industry and government reports, conference papers, books, case studies etc. It is discovered that clash detection and visualization are two major advantages of BIM. Clash detection option identifies clashes among structural, architectural and MEP designs before construction actually commences, which subsequently saves time as well as cost and ensures quality during execution phase of a project. Visualization is a powerful tool that facilitates in rapid decision-making in addition to communication and coordination among stakeholders throughout project’s life cycle. By eliminating inconsistencies that consume time besides cost during actual construction, improving collaboration among stakeholders throughout project’s life cycle, BIM can play a positive role to achieve efficiency and productivity that consequently deliver successful construction projects.

Keywords: building information modeling, clash detection, construction project success, visualization

Procedia PDF Downloads 259
8172 Housing Prices and Travel Costs: Insights from Origin-Destination Demand Estimation in Taiwan’s Science Parks

Authors: Kai-Wei Ji, Dung-Ying Lin

Abstract:

This study investigates the impact of transportation on housing prices in regions surrounding Taiwan's science parks. As these parks evolve into crucial economic and population growth centers, they attract an increasing number of residents and workers, significantly influencing local housing markets. This demographic shift raises important questions about the role of transportation in shaping real estate values. Our research examines four major science parks in Taiwan, providing a comparative analysis of how transportation conditions and population dynamics interact to affect housing price premiums. We employ an origin-destination (OD) matrix derived from pervasive traffic data to model travel patterns and their effects on real estate values. The methodology utilizes a bi-level framework: a genetic algorithm optimizes OD demand estimation at the upper level, while a user equilibrium (UE) model simulates traffic flow at the lower level. This approach enables a nuanced exploration of how population growth impacts transportation conditions and housing price premiums. By analyzing the interplay between travel costs based on OD demand estimation and housing prices, we offer valuable insights for urban planners and policymakers. These findings are crucial for informed decision-making in rapidly developing areas, where understanding the relationship between mobility and real estate values is essential for sustainable urban development.

Keywords: demand estimation, genetic algorithm, housing price, transportation

Procedia PDF Downloads 20
8171 A Geoprocessing Tool for Early Civil Work Notification to Optimize Fiber Optic Cable Installation Cost

Authors: Hussain Adnan Alsalman, Khalid Alhajri, Humoud Alrashidi, Abdulkareem Almakrami, Badie Alguwaisem, Said Alshahrani, Abdullah Alrowaished

Abstract:

Most of the cost of installing a new fiber optic cable is attributed to civil work-trenching-cost. In many cases, information technology departments receive project proposals in their eReview system, but not all projects are visible to everyone. Additionally, if there was no IT scope in the proposed project, it is not likely to be visible to IT. Sometimes it is too late to add IT scope after project budgets have been finalized. Finally, the eReview system is a repository of PDF files for each project, which commits the reviewer to manual work and limits automation potential. This paper details a solution to address the late notification of the eReview system by integrating IT Sites GIS data-sites locations-with land use permit (LUP) data-civil work activity, which is the first step before securing the required land usage authorizations and means no detailed designs for any relevant project before an approved LUP request. To address the manual nature of eReview system, both the LUP System and IT data are using ArcGIS Desktop, which enables the creation of a geoprocessing tool with either Python or Model Builder to automate finding and evaluating potentially usable LUP requests to reduce trenching between two sites in need of a new FOC. To achieve this, a weekly dump was taken from LUP system production data and loaded manually onto ArcMap Desktop. Then a custom tool was developed in model builder, which consisted of a table of two columns containing all the pairs of sites in need of new fiber connectivity. The tool then iterates all rows of this table, taking the sites’ pair one at a time and finding potential LUPs between them, which satisfies the provided search radius. If a group of LUPs was found, an iterator would go through each LUP to find the required civil work between the two sites and the LUP Polyline feature and the distance through the line, which would be counted as cost avoidance if an IT scope had been added. Finally, the tool will export an Excel file named with sites pair, and it will contain as many rows as the number of LUPs, which met the search radius containing trenching and pulling information and cost. As a result, multiple projects have been identified – historical, missed opportunity, and proposed projects. For the proposed project, the savings were about 75% ($750,000) to install a new fiber with the Euclidean distance between Abqaiq GOSP2 and GOSP3 DCOs. In conclusion, the current tool setup identifies opportunities to bundle civil work on single projects at a time and between two sites. More work is needed to allow the bundling of multiple projects between two sites to achieve even more cost avoidance in both capital cost and carbon footprint.

Keywords: GIS, fiber optic cable installation optimization, eliminate redundant civil work, reduce carbon footprint for fiber optic cable installation

Procedia PDF Downloads 219
8170 Evaluation and Selection of Contractors in Construction Projects with a View Supply Chain Management and Utilization of Promthee

Authors: Sara Najiazarpour, Mahsa Najiazarpour

Abstract:

There are many problems in contracting projects and their performance. At each project stage and due to different reasons, these problems affect cost, time and overall project quality. Hence, in order to increase the efficiency and performance in all levels of the chain and with supply chain management approach, there will be a coordination from the beginning of a project (contractor selection) to the end of project (handover of project). Contractor selection is the foremost part of construction projects which in this multi-criteria decision-making, the best contractor is determined by expert judgment, different variables and their priorities. In this paper for selecting the best contractor, numerous criteria were collected by asking from adept experts and then among them, 16 criteria with highest frequency were considered for questionnaire. This questionnaire was distributed between experts. Cronbach's alpha coefficient was obtained as 72%. Then based on Borda's function 12 important criteria was selected which was categorized in four main criteria and related sub-criteria as follow: Environmental factors and physical equipment: procurement and materials (supplier), company's machines, contractor’s proposed cost estimate - financial capacity: bank turnover and company's assets, the income of tax declaration in last year, Ability to compensate for losses or delays - past performance- records and technical expertise: experts and key personnel, the past technical backgrounds and experiences, employer satisfaction of previous contracts, the number of similar projects was done - standards: rank and field of expertise which company is qualified for and its validity, availability and number of permitted projects done. Then with PROMTHEE method, the criteria were normalized and monitored, finally the best alternative was selected. In this research, qualitative criteria of each company is became a quantitative criteria. Finally, information of some companies was evaluated and the best contractor was selected based on all criteria and their priorities.

Keywords: contractor evaluation and selection, project development, supply chain management, PROMTHEE method

Procedia PDF Downloads 72
8169 Adaptive Design of Large Prefabricated Concrete Panels Collective Housing

Authors: Daniel M. Muntean, Viorel Ungureanu

Abstract:

More than half of the urban population in Romania lives today in residential buildings made out of large prefabricated reinforced concrete panels. Since their initial design was made in the 1960’s, these housing units are now being technically and morally outdated, consuming large amounts of energy for heating, cooling, ventilation and lighting, while failing to meet the needs of the contemporary life-style. Due to their widespread use, the design of a system that improves their energy efficiency would have a real impact, not only on the energy consumption of the residential sector, but also on the quality of life that it offers. Furthermore, with the transition of today’s existing power grid to a “smart grid”, buildings could become an active element for future electricity networks by contributing in micro-generation and energy storage. One of the most addressed issues today is to find locally adapted strategies that can be applied considering the 20-20-20 EU policy criteria and to offer sustainable and innovative solutions for the cost-optimal energy performance of buildings adapted on the existing local market. This paper presents a possible adaptive design scenario towards sustainable retrofitting of these housing units. The apartments are transformed in order to meet the current living requirements and additional extensions are placed on top of the building, replacing the unused roof space, acting not only as housing units, but as active solar energy collection systems. An adaptive building envelope is ensured in order to achieve overall air-tightness and an elevator system is introduced to facilitate access to the upper levels.

Keywords: adaptive building, energy efficiency, retrofitting, residential buildings, smart grid

Procedia PDF Downloads 297
8168 The Eathquake Discourse as a Strategy of an Urban Renewal: A Case Study into the Karapınar Valley Regeneration Project in Eskişehir, Turkey

Authors: Cansu Civelek

Abstract:

The flexible and uneven character of neoliberalism has provided adaptation of urban strategies into the constantly changing circumstances in order to renew and reproduce the neoliberal accumulation model. Instrumentalization of catastrophic events to this end has been one of those global urban strategies. Regarding Turkey, exploitation of natural disasters has been the latest tactic of the Justice and Development Party (JDP) government to achieve radical economic goals. ‘Unhealthy’ and ‘risky’ structures of squatter settlements have often been articulated while the regenerations, expropriations, and exclusions have been sugarcoated through the discourses of ‘reintegrating the shanty zones into the cities’, ‘supplying healthy housing’, and ‘win-win’ character of the projects. Being the first regeneration project of Eskişehir, the Karapınar Regeneration Project has been initiated in 2011 by the partnership of the Odunpazarı Municipality of the JDP and the Mass Housing Organization. Discourses around the forthcoming disasters, ‘risky structures’ of the squatters, and the importance of the ‘security of life and property’ have been utilized, even though the zone is situated on a geotechnically stable area. Yet, many of the locals are worried about the payments while some have already decided to move elsewhere at the outskirts of the city.

Keywords: neoliberal urbanism, urban regeneration, illegal settlements, discourses

Procedia PDF Downloads 443
8167 Large Panel Technology Apartments of Yesterday and Today: Quality Aspects

Authors: Barbara Gronostajska

Abstract:

Currently, housing conditions of buildings executed in large panel technology are deteriorating. The article presents modernization solutions implemented throughout the variety of architectural activities (adding of balconies and staircases, connecting apartments) which guarantee very intriguing results that meet the needs and expectations of the modern society.

Keywords: housing estate, apartments, flats, modernization, plate blocks

Procedia PDF Downloads 480
8166 Tracing a Timber Breakthrough: A Qualitative Study of the Introduction of Cross-Laminated-Timber to the Student Housing Market in Norway

Authors: Marius Nygaard, Ona Flindall

Abstract:

The Palisaden student housing project was completed in August 2013 and was, with its eight floors, Norway’s tallest timber building at the time of completion. It was the first time cross-laminated-timber (CLT) was utilized at this scale in Norway. The project was the result of a concerted effort by a newly formed management company to establish CLT as a sustainable and financially competitive alternative to conventional steel and concrete systems. The introduction of CLT onto the student housing market proved so successful that by 2017 more than 4000 individual student residences will have been built using the same model of development and construction. The aim of this paper is to identify the key factors that enabled this breakthrough for CLT. It is based on an in-depth study of a series of housing projects and the role of the management company who both instigated and enabled this shift of CLT from the margin to the mainstream. Specifically, it will look at how a new building system was integrated into a marketing strategy that identified a market potential within the existing structure of the construction industry and within the economic restrictions inherent to student housing in Norway. It will show how a key player established a project model that changed both the patterns of cooperation and the information basis for decisions. Based on qualitative semi-structured interviews with managers, contractors and the interdisciplinary teams of consultants (architects, structural engineers, acoustical experts etc.) this paper will trace the introduction, expansion and evolution of CLT-based building systems in the student housing market. It will show how the project management firm’s position in the value chain enabled them to function both as a liaison between contractor and client, and between contractor and producer. A position that allowed them to improve the flow of information. This ensured that CLT was handled on equal terms to other structural solutions in the project specifications, enabling realistic pricing and risk evaluation. Secondly, this paper will describe and discuss how the project management firm established and interacted with a growing network of contractors, architects and engineers to pool expertise and broaden the knowledge base across Norway’s regional markets. Finally, it will examine the role of the client, the building typology, and the industrial and technological factors in achieving this breakthrough for CLT in the construction industry. This paper gives an in-depth view of the progression of a single case rather than a broad description of the state of the art of large-scale timber building in Norway. However, this type of study may offer insights that are important to the understanding not only of specific markets but also of how new technologies should be introduced in big and well-established industries.

Keywords: cross-laminated-timber (CLT), industry breakthrough, student housing, timber market

Procedia PDF Downloads 223
8165 Design Criteria Recommendation to Achieve Accessibility In-House to Different Users

Authors: Claudia Valderrama-Ulloa, Cristian Schmitt, Juan Pablo Marchetti, Viviana Bucarey

Abstract:

Access to adequate housing is a fundamental human right and a crucial factor for health. Housing should be inclusive, accessible, and able to meet the needs of all its inhabitants at every stage of their lives without hindering their health, autonomy, or independence. This article addresses the importance of designing housing for people with disabilities, which varies depending on individual abilities, preferences, and cultural considerations. Based on the components of the International Classification of Functioning, Disability and Health, wheelchair users, little people (achondroplasia), children with autism spectrum disorder and Down syndrome were characterized, and six domains of activities related to daily life inside homes were defined. The article describes the main barriers homes present for this group of people. It proposes a list of architectural and design aspects to reduce barriers to housing use. The aspects are divided into three main groups: space management, building services, and supporting facilities. The article emphasizes the importance of consulting professionals and users with experience designing for diverse needs to create inclusive, safe, and supportive housing for people with disabilities.

Keywords: achondroplasia, autism spectrum disorder, disability, down syndrome, wheelchair user

Procedia PDF Downloads 107
8164 Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: construction management, control process, cost control, planning and scheduling

Procedia PDF Downloads 247
8163 Sustainable Building Technologies for Post-Disaster Temporary Housing: Integrated Sustainability Assessment and Life Cycle Assessment

Authors: S. M. Amin Hosseini, Oriol Pons, Albert de la Fuente

Abstract:

After natural disasters, displaced people (DP) require important numbers of housing units, which have to be erected quickly due to emergency pressures. These tight timeframes can cause the multiplication of the environmental construction impacts. These negative impacts worsen the already high energy consumption and pollution caused by the building sector. Indeed, post-disaster housing, which is often carried out without pre-planning, usually causes high negative environmental impacts, besides other economic and social impacts. Therefore, it is necessary to establish a suitable strategy to deal with this problem which also takes into account the instability of its causes, like changing ratio between rural and urban population. To this end, this study aims to present a model that assists decision-makers to choose the most suitable building technology for post-disaster housing units. This model focuses on the alternatives sustainability and fulfillment of the stakeholders’ satisfactions. Four building technologies have been analyzed to determine the most sustainability technology and to validate the presented model. In 2003, Bam earthquake DP had their temporary housing units (THUs) built using these four technologies: autoclaved aerated concrete blocks (AAC), concrete masonry unit (CMU), pressed reeds panel (PR), and 3D sandwich panel (3D). The results of this analysis confirm that PR and CMU obtain the highest sustainability indexes. However, the second life scenario of THUs could have considerable impacts on the results.

Keywords: sustainability, post-disaster temporary housing, integrated value model for sustainability assessment, life cycle assessment

Procedia PDF Downloads 255
8162 Static Analysis Deployment Model for Code Quality on Research and Development Projects of Software Development

Authors: Jeong-Hyun Park, Young-Sik Park, Hyo-Teag Jung

Abstract:

This paper presents static analysis deployment model for code quality on R&D Projects of SW Development. The proposed model includes the scope of R&D projects and index for static analysis of source code, operation model and execution process, environments and infrastructure system for R&D projects of SW development. There is the static analysis result of pilot project as case study based on the proposed deployment model and environment, and strategic considerations for success operation of the proposed static analysis deployment model for R&D Projects of SW Development. The proposed static analysis deployment model in this paper will be adapted and improved continuously for quality upgrade of R&D projects, and customer satisfaction of developed source codes and products.

Keywords: static analysis, code quality, coding rules, automation tool

Procedia PDF Downloads 520
8161 The Reason of Principles of Construction Engineering and Management Being Necessary for Contracting Firms and Their Projects Managers

Authors: Mamoon Mousa Atout

Abstract:

The industries of construction are in continuous growth not only in Middle East rejoin but almost all over the world. For the last fifteen years, big expansion and increase of different types of projects has been observed. Many infrastructural projects have been developed, high rise buildings, big shopping malls, power sub-stations, roads, bridges, schools, universities and developing many of new cities with full and complete facilities. The growth and enlargement of the mentioned developed projects has been accomplished through many international and local contracting organizations. Senior management of these organizations depend on their qualified and experienced team whom are aware of the implications of project management, construction management, engineering management and resource management during tendering till final completion of the project. This research aims to find out why reasons of principles of construction engineering and management are necessary for contracting firms and their managers. Principles of construction management help contracting organizations to accomplish and deliver projects without delay. This can be maintained by establishing guidelines’ details for updating the adopted system of construction management that they have through qualified and experienced project managers. The research focuses on benefits of other essential skills of projects planning, monitoring and control. Defining roles and responsibilities of contractor project managers during tendering and execution is a part of the investigated factors that will be analyzed. Other skills like optimizing and utilizing the obtainable project resources to deliver the project within time, cost and quality will be also investigated to find out how these factors are affecting the performance of contracting firms, projects managers and projects. The conclusion of the research will help senior management team and the contractors project managers about the benefits of implications and benefits construction management system and its effect upon the performance and knowledge of contract values that they have, and the optimal profit margin of the firm it.

Keywords: construction management, contracting firms, project managers, planning processes, roles and responsibilities

Procedia PDF Downloads 299
8160 Estimating Housing Prices Using Automatic Linear Modeling in the Metropolis of Mashhad, Iran

Authors: Mohammad Rahim Rahnama

Abstract:

Market-transaction price for housing is the main criteria for determining municipality taxes and is determined and announced on an annual basis. Of course, there is a discrepancy between the actual value of transactions in the Bureau of Finance (P for short) or municipality (P´ for short) and the real price on the market (P˝). The present research aims to determine the real price of housing in the metropolis of Mashhad and to pinpoint the price gap with those of the aforementioned apparatuses and identify the factors affecting it. In order to reach this practical objective, Automatic Linear Modeling, which calls for an explanatory research, was utilized. The population of the research consisted of all the residential units in Mashhad, from which 317 residential units were randomly selected. Through cluster sampling, out of the 170 income blocks defined by the municipality, three blocks form high-income (Kosar), middle-income (Elahieh), and low-income (Seyyedi) strata were surveyed using questionnaires during February and March of 2015 and the information regarding the price and specifications of residential units were gathered. In order to estimate the effect of various factors on the price, the relationship between independent variables (8 variables) and the dependent variable of the housing price was calculated using Automatic Linear Modeling in SPSS. The results revealed that the average for housing price index is 788$ per square meter, compared to the Bureau of Finance’s prices which is 10$ and that of municipality’s which is 378$. Correlation coefficient among dependent and independent variables was calculated to be R²=0.81. Out of the eight initial variables, three were omitted. The most influential factor affecting the housing prices is the quality of Quality of construction (Ordinary, Full, Luxury). The least important factor influencing the housing prices is the variable of number of sides. The price gap between low-income (Seyyedi) and middle-income (Elahieh) districts was not confirmed via One-Way ANOVA but their gap with the high-income district (Kosar) was confirmed. It is suggested that city be divided into two low-income and high-income sections, as opposed three, in terms of housing prices.

Keywords: automatic linear modeling, housing prices, Mashhad, Iran

Procedia PDF Downloads 255
8159 Research on Land Use Pattern and Employment-Housing Space of Coastal Industrial Town Based on the Investigation of Liaoning Province, China

Authors: Fei Chen, Wei Lu, Jun Cai

Abstract:

During the Twelve Five period, China promulgated industrial policies promoting the relocation of energy-intensive industries to coastal areas in order to utilize marine shipping resources. Consequently, some major state-owned steel and gas enterprises have relocated and resulted in a large-scale coastal area development. However, some land may have been over-exploited with seamless coastline projects. To balance between employment and housing, new industrial coastal towns were constructed to support the industrial-led development. In this paper, we adopt a case-study approach to closely examine the development of several new industrial coastal towns of Liaoning Province situated in the Bohai Bay area, which is currently under rapid economic growth. Our investigations reflect the common phenomenon of long distance commuting and a massive amount of vacant residences. More specifically, large plant relocation caused hundreds of kilometers of daily commute and enterprises had to provide housing subsidies and education incentives to motivate employees to relocate to coastal areas. Nonetheless, many employees still refuse to relocate due to job stability, diverse needs of family members and access to convenient services. These employees averaged 4 hours of commute daily and some who lived further had to reside in temporary industrial housing units and subject to long-term family separation. As a result, only a small portion of employees purchase new coastal residences but mostly for investment and retirement purposes, leading to massive vacancy and ghost-town phenomenon. In contrast to the low demand, coastal areas tend to develop large amount of residences prior to industrial relocation, which may be directly related to local government finances. Some local governments have sold residential land to developers to general revenue to support the subsequent industrial development. Subject to the strong preference of ocean-view, residential housing developers tend to select coast-line land to construct new residential towns, which further reduces the access of marine resources for major industrial enterprises. This violates the original intent of developing industrial coastal towns and drastically limits the availability of marine resources. Lastly, we analyze the co-existence of over-exploiting residential areas and massive vacancies in reference to the demand and supply of land, as well as the demand of residential housing units with the choice criteria of enterprise employees.

Keywords: coastal industry town, commuter traffic, employment-housing space, outer suburb industrial area

Procedia PDF Downloads 221
8158 A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns

Authors: Saidu Ibrahim, Winston M. W. Shakantu

Abstract:

The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.

Keywords: conceptual framework, cost overrun, material waste, project stags

Procedia PDF Downloads 298
8157 Evaluation of Housing Quality in the Urban Fringes of Ibadan, Nigeria

Authors: Amao Funmilayo Lanrewaju

Abstract:

The study examined the socio-economic characteristics of the residents in selected urban fringes of Ibadan; identified and examined the housing and neighbourhood characteristics and evaluated housing quality in the study area. It analysed the relationship between the socio-economic characteristics of the residents, housing and neighbourhood characteristics as well as housing quality in the study area. This was with a view to providing information that would enhance the housing quality in urban fringes of Ibadan. Primary and secondary data were used for the study. A survey of eleven purposively selected communities from Oluyole and Egbeda local government areas in the urban fringes was conducted through a questionnaire administration and expert rating by five independent assessors (Qualified Architects) using penalty scoring within similar time-frames. The study employed a random sampling method to select a sample size of 480 houses representing 5% of the sampling frame of 9600 houses. Respondent in the first house was selected randomly and subsequently every 20th house in the streets involved was systematically selected for questionnaire administration, usually a household-head per building. The structured questionnaire elicited information on socio-economic characteristics of the residents, housing and neighbourhood characteristics, factors affecting housing quality and housing quality in the study area. Secondary data obtained for the study included the land-use plan of Ibadan from previous publications, housing demographics, population figures from relevant institutions and other published materials. The data collected were analysed using descriptive and inferential statistics such as frequency distribution, Cross tabulation, Correlation Analysis, Analysis of Variance (ANOVA) and Relative Importance Index (RII). The result of the survey revealed that respondents from the Yoruba ethnic group constituted the majority, comprising 439 (91.5%) of the 480 respondents from the two local government areas selected. It also revealed that the type of tenure status of majority of the respondents in the two local government areas was self-ownership (234, 48.8%), while 44.0% of the respondents acquired their houses through personal savings. Cross tabulation indicated that majority (67.1%, 322 out of 480) of the respondents were low-income earners. The study showed that both housing and neighbourhood services were not adequately provided across neighbourhoods in the study area. Correlation analysis indicated a significant relationship between respondents’ socio–economic status and their general housing quality (r=0.46; p-value of 0.01< 0.05). The ANOVA indicated that the relationship between socio-economic characteristics of the residents, housing and neighbourhood characteristics in the study area was significant (F=18.289, p=0.00; the coefficient of determination R2= 0.192). The findings from the study however revealed that there was no significant difference in the results obtained from users based evaluation and expert rating. The study concluded that housing quality in the urban fringes of Ibadan is generally poor and the socio-economic status of the residents significantly influenced the housing quality.

Keywords: housing quality, urban fringes, economic status, poverty

Procedia PDF Downloads 440
8156 National Projects' Impact on the Regional Division

Authors: Mosaad Hamouda, Kamal Khalaf, Zaker Mousa

Abstract:

National projects are considered Egypt's future vision in investing its various resources and the best way to bring about a developmental renaissance that constitutes a quantum leap because of its developmental impact on the planning regions, which it achieves in attracting and localizing investments to achieve urban development, and what this has a noticeable impact on dividing those regions in order to achieve a developmental balance or at least reduce the severity of the disparities between them, by measuring the impact of these projects, which appear in the per capita share of the various developmental variables, and also analyzing global and local experiences so that a balanced division of the country’s regions can be reached, and the research finds a set of planning foundations that are compatible with the settlement of these national projects in the future.

Keywords: national projects, regional development, division of regions, development disparities

Procedia PDF Downloads 126
8155 Price Compensation Mechanism with Unmet Demand for Public-Private Partnership Projects

Authors: Zhuo Feng, Ying Gao

Abstract:

Public-private partnership (PPP), as an innovative way to provide infrastructures by the private sector, is being widely used throughout the world. Compared with the traditional mode, PPP emerges largely for merits of relieving public budget constraint and improving infrastructure supply efficiency by involving private funds. However, PPP projects are characterized by large scale, high investment, long payback period, and long concession period. These characteristics make PPP projects full of risks. One of the most important risks faced by the private sector is demand risk because many factors affect the real demand. If the real demand is far lower than the forecasting demand, the private sector will be got into big trouble because operating revenue is the main means for the private sector to recoup the investment and obtain profit. Therefore, it is important to study how the government compensates the private sector when the demand risk occurs in order to achieve Pareto-improvement. This research focuses on price compensation mechanism, an ex-post compensation mechanism, and analyzes, by mathematical modeling, the impact of price compensation mechanism on payoff of the private sector and consumer surplus for PPP toll road projects. This research first investigates whether or not price compensation mechanisms can obtain Pareto-improvement and, if so, then explores boundary conditions for this mechanism. The research results show that price compensation mechanism can realize Pareto-improvement under certain conditions. Especially, to make the price compensation mechanism accomplish Pareto-improvement, renegotiation costs of the government and the private sector should be lower than a certain threshold which is determined by marginal operating cost and distortionary cost of the tax. In addition, the compensation percentage should match with the price cut of the private investor when demand drops. This research aims to provide theoretical support for the government when determining compensation scope under the price compensation mechanism. Moreover, some policy implications can also be drawn from the analysis for better risk-sharing and sustainability of PPP projects.

Keywords: infrastructure, price compensation mechanism, public-private partnership, renegotiation

Procedia PDF Downloads 179
8154 Exposing the Concealed Impact: Evaluating the Role of Development Projects on Corruption Perception in Afghanistan

Authors: Jawad Taheri

Abstract:

This paper investigates the impact of foreign aid-funded development projects on corruption perception in Afghanistan, utilizing instrumental variable (IV) approaches in regression analysis setting. Seven sub-categories of development projects are examined in order to have a glance over comparative usefulness of each project. The study incorporates natural disaster indicators as exogenous variables to mitigate endogeneity concerns and control variables. The findings reveal significant associations between certain types of projects and corruption perception. Road and bridge construction, irrigation, and agriculture projects are found to decrease corruption perception, fostering optimism and trust within affected communities. Mosque construction and healthcare initiatives aligned with religious beliefs also contribute to reduced corruption perception. However, drinking water projects are associated with increased corruption perception, highlighting potential challenges in their implementation. The study emphasizes the importance of well-implemented projects, cultural contexts, and effective governance in mitigating corruption and fostering trust within communities. These findings contribute to a refined understanding of the relationship between development projects and corruption perception in Afghanistan.

Keywords: foreign aid, development projects, corruption perception, Afghanistan, instrumental variable analysis, survey of Afghan people (SAP), natural disasters, exogenous variation

Procedia PDF Downloads 76
8153 Study on the Key Stakeholders' Perception and Establishment of Sustainability Goals in the Green Building Projects: The Case of Malaysia

Authors: Nor Kalsum M. Isa, Mohd Yazid M. Yunos, Anuar Alias, Mazdi Marzuki, Kamarul Ismail, Mohd H. Ibrahim

Abstract:

Green building is an emerging concept with the ultimate target to achieve sustainable development by integrating sustainability goals and principles into project development. Basically, a green building is a building that is designed, constructed and operated to boost environmental, economic, health and productivity performance over conventional buildings. The buildings have been proven to be successful in contributing towards sustainability and project success. The purpose of this study was to determine the benefits of sustainability application in building projects, looking towards project success from the perspective of Malaysian key project stakeholders. The study also aimed to explore the establishment of sustainability goals in the green building projects in Malaysia. The Triple Bottom Line (TBL) Concept of Sustainability was used as the foundation theoretical framework. Surveys, interviews and multiple case study methods were employed. A sample of 188 Malaysian building project stakeholders was selected for questionnaire surveys, and 15 stakeholders from three award-winning green building projects in Malaysia were involved in the interviews. The study found that the majority of the respondents were less aware that the sustainability integration in the building project can significantly affect cost reduction, schedule effectiveness and stakeholders’ satisfaction with the performance of buildings as at the same level as the quality performance. Of the four sustainability goals, the environmental aspect was given more priority than others in the development of the green building projects.

Keywords: green building, sustainability, project stakeholders, Malaysia

Procedia PDF Downloads 563
8152 The Mechanism of Upgrading and Urban Development in the Egyptian City: Case Study of Damietta

Authors: Lina Fayed Amin

Abstract:

The research studied, in the beginning, the related urban concepts such as the urban, development, urban development. As it also deals with the upgrading, urban upgrading, community participation and the role of local administration in development and upgrading projects. Then it studies some regional upgrading & urban development projects in Egypt followed by international projects, and the analysis the strategies followed in dealing with these projects. Afterwards, we state the regional aspects of both Damietta governorate & city, dealing with its potentials & development constraints. Followed by studying the upgrading and urban development projects strategies in reflection to the city’s crucial problems, and the constraints that faced the upgrading & development project. Then, it studied the implementation of the project’s strategies & it provided the financial resources needed for the development project in Damietta city. Followed by the studying of the urban and human development projects in the upgrading of Damietta city, as well as analyzing the different projects &analyzing the results of these projects on the aspects of the city’s needs. Then the research analysis in comparison the upgrading and urban development project in Damietta and the regional upgrading and development projects in Egypt. As well as the comparison between the upgrading and urban development project and the international projects in some Arabic and foreign countries in relation to the goals, problems, obstacles, the community participation, the finance resources and the results. Finally, it reviews the results and recommendations that were reached as a result of studying the similar urban upgrading projects in Egypt and in some Arabic and foreign countries. Followed by the analytical analysis of the upgrading and urban development in Egypt

Keywords: Damietta city, urban development, upgrading mechanisms, urban upgrading

Procedia PDF Downloads 424
8151 Factors Leading to the Renegotiation of Private Finance Initiative Design-Build-Finance-Operate Road Projects in the UK

Authors: Ajibola Fatokun, Akintola Akintoye, Champika Liyanage

Abstract:

The issue of renegotiation has not received public sector applause because of the outcomes recorded over years. Numerous reasons have been adduced by the stakeholders for the renegotiation of PPP road projects. In some instances, the reason can also be the factor leading to the renegotiation of PFI (DBFO) road projects. Thus, a number of factors inform the decision of the primary stakeholders to renegotiate the contract. This paper, therefore, evaluates and assesses the factors leading to the renegotiation of PFI (DBFO) road projects in the UK. Qualitative interviews involving both public and private stakeholders were extensively adopted on five PFI (DBFO) case study road projects in order to address the aim of this study. This serves to complement the findings of the literature with respect to the factors leading to the renegotiation of PPP road projects. The findings of this research reveal the respective factors leading to the renegotiations of PFI (DBFO) road projects in the UK. However, the prominent factors are a change in scope of the works necessitating works removal and an addition of assets, change in standards and obsolete specification occasioned by the long duration of the PFI road project concession among others.

Keywords: renegotiation, factors, Private Finance Initiative (PFI), design-build-finance-operate (DBFO) road projects

Procedia PDF Downloads 342