Search results for: infrastructure repair
2324 Induction of Adaptive Response in Yeast Cells under Influence of Extremely High Frequency Electromagnetic Field
Authors: Sergei Voychuk
Abstract:
Introduction: Adaptive response (AR) is a manifestation of radiation hormesis, which deal with the radiation resistance that may be increased with the pretreatment with small doses of radiation. In the current study, we evaluated the potency of radiofrequency EMF to induce the AR mechanisms and to increase a resistance to UV light. Methods: Saccharomyces cerevisiae yeast strains, which were created to study induction of mutagenesis and recombination, were used in the study. The strains have mutations in rad2 and rad54 genes, responsible for DNA repair: nucleotide excision repair (PG-61), postreplication repair (PG-80) and mitotic (crossover) recombination (T2). An induction of mutation and recombination are revealed due to the formation of red colonies on agar plates. The PG-61 and T2 are UV sensitive strains, while PG-80 is sensitive to ionizing radiation. Extremely high frequency electromagnetic field (EHF-EMF) was used. The irradiation was performed in floating mode and frequency changed during exposure from 57 GHz to 62 GHz. The power of irradiation was 100 mkW, and duration of exposure was 10 and 30 min. Treatment was performed at RT and then cells were stored at 28° C during 1 h without any exposure but after that they were treated with UV light (254nm) for 20 sec (strain T2) and 120 sec (strain PG-61 and PG-80). Cell viability and quantity of red colonies were determined after 5 days of cultivation on agar plates. Results: It was determined that EHF-EMF caused 10-20% decrease of viability of T2 and PG-61 strains, while UV showed twice stronger effect (30-70%). EHF-EMF pretreatment increased T2 resistance to UV, and decreased it in PG-61. The PG-80 strain was insensitive to EHF-EMF and no AR effect was determined for this strain. It was not marked any induction of red colonies formation in T2 and PG-80 strain after EHF or UV exposure. The quantity of red colonies was 2 times more in PG-61 strain after EHF-EMF treatment and at least 300 times more after UV exposure. The pretreatment of PG-61 with EHF-EMF caused at least twice increase of viability and consequent decrease of amount of red colonies. Conclusion: EHF-EMF may induce AR in yeast cells and increase their viability under UV treatment.Keywords: Saccharomyces cerevisiae, EHF-EMF, UV light, adaptive response
Procedia PDF Downloads 3202323 Modeling of Timing in a Cyber Conflict to Inform Critical Infrastructure Defense
Authors: Brian Connett, Bryan O'Halloran
Abstract:
Systems assets within critical infrastructures were seemingly safe from the exploitation or attack by nefarious cyberspace actors. Now, critical infrastructure is a target and the resources to exploit the cyber physical systems exist. These resources are characterized in terms of patience, stealth, replication-ability and extraordinary robustness. System owners are obligated to maintain a high level of protection measures. The difficulty lies in knowing when to fortify a critical infrastructure against an impending attack. Models currently exist that demonstrate the value of knowing the attacker’s capabilities in the cyber realm and the strength of the target. The shortcomings of these models are that they are not designed to respond to the inherent fast timing of an attack, an impetus that can be derived based on open-source reporting, common knowledge of exploits of and the physical architecture of the infrastructure. A useful model will inform systems owners how to align infrastructure architecture in a manner that is responsive to the capability, willingness and timing of the attacker. This research group has used an existing theoretical model for estimating parameters, and through analysis, to develop a decision tool for would-be target owners. The continuation of the research develops further this model by estimating the variable parameters. Understanding these parameter estimations will uniquely position the decision maker to posture having revealed the vulnerabilities of an attacker’s, persistence and stealth. This research explores different approaches to improve on current attacker-defender models that focus on cyber threats. An existing foundational model takes the point of view of an attacker who must decide what cyber resource to use and when to use it to exploit a system vulnerability. It is valuable for estimating parameters for the model, and through analysis, develop a decision tool for would-be target owners.Keywords: critical infrastructure, cyber physical systems, modeling, exploitation
Procedia PDF Downloads 1932322 Shortening Distances: The Link between Logistics and International Trade
Authors: Felipe Bedoya Maya, Agustina Calatayud, Vileydy Gonzalez Mejia
Abstract:
Encompassing inventory, warehousing, and transportation management, logistics is a crucial predictor of firm performance. This has been extensively proven by extant literature in business and operations management. Logistics is also a fundamental determinant of a country's ability to access international markets. Available studies in international and transport economics have shown that limited transport infrastructure and underperforming transport services can severely affect international competitiveness. However, the evidence lacks the overall impact of logistics performance-encompassing all inventory, warehousing, and transport components- on global trade. In order to fill this knowledge gap, the paper uses a gravitational trade model with 155 countries from all geographical regions between 2007 and 2018. Data on logistics performance is obtained from the World Bank's Logistics Performance Index (LPI). First, the relationship between logistics performance and a country’s total trade is estimated, followed by a breakdown by the economic sector. Then, the analysis is disaggregated according to the level of technological intensity of traded goods. Finally, after evaluating the intensive margin of trade, the relevance of logistics infrastructure and services for the extensive trade margin is assessed. Results suggest that: (i) improvements in both logistics infrastructure and services are associated with export growth; (ii) manufactured goods can significantly benefit from these improvements, especially when both exporting and importing countries increase their logistics performance; (iii) the quality of logistics infrastructure and services becomes more important as traded goods are technology-intensive; and (iv) improving the exporting country's logistics performance is essential in the intensive margin of trade while enhancing the importing country's logistics performance is more relevant in the extensive margin.Keywords: gravity models, infrastructure, international trade, logistics
Procedia PDF Downloads 2102321 TopClosure® of Large Abdominal Wall Defect Instead of Staged Hernia Repair as Part of Damage Control Laparotomy
Authors: Andriy Fedorenko
Abstract:
Background Early closure of the open abdomen is a priority after damage control laparotomy to prevent retraction of fascial layers and prevent hernia formation that requires definitive repair at a later stage. This substantially reduces the complications associated with ventral hernia formation for up to a year after initial surgery. TopClosure® is an innovative method that employs stress-relaxation and mechanical creep for skin stretching. Its use enables the primary closure of large abdominal wall defects and mitigates large ventral hernia formation. Materials and Methods A 7-year-old girl presented with severe blast injury. She underwent initial laparotomy in a facility within the conflict zone and was transferred in a state of septic shock to our facility for further care. Her abdominal injuries included liver lacerations, multiple perforations of the transverse colon and ileum, and a 8x16cm oblique abdominal wall defect. Further damage control laparotomy was performed with primary suture of the colon and ileum and temporary closure of the abdomen using a Bagota bag. Twelve hours later, negative pressure wound therapy (NPWT) was applied to the abdominal wound after relook laparotomy. Five days later, TopClosure® was applied to the lower part of the wound incorporating NPWT to the upper wound. Results The patient suffered leak from the colonic suture line and required relaparotomy. TopClosure® abdominal closure was achieved after every laparotomy. Conclusion TopClosure® utilizes the viscoelastic properties of the skin achieving full closure of the abdominal wall (including the fascia and skin),eliminating the need for prolonged NPWT, skin graft, and delayed ventral hernia repair surgery.Keywords: topclosure, abdominal wall defect, hernia, damage control
Procedia PDF Downloads 802320 Economic Indicators as Correlates of Inward Foreign Direct Investment in Nigeria
Authors: C. F. Popoola, P. Osho, S. B. Babarinde
Abstract:
This study examined economic indicators as correlates of inward FDI. An exploratory research design was used to obtained annual published data on inflation rate, market size, exchange rate, political instability, human development, and infrastructure from Central Bank of Nigeria, National Bureau of Statistics, Nigerian Capital Market, Nigeria Institute of Social and Economic Research, and UNCTAD. Data generated were analyzed using Pearson correlation, analysis of variance and regression. The findings of the study revealed that market size (r = 0.852, p < 0.001), infrastructure (r = 0.264, p < 0.001), human development (r = 0.154, p < 0.01) and exchange rate ( r= 0.178, p < 0.05) correlate positively with inward FDI, while inflation rate (r = -0.88, p < 0.001), and political instability (r= -0.102, p < 0.05) correlate negatively with inward FDI. Findings also revealed that the economic indicators significantly predicted inward FDI (R2 = 0.913; F(1,19) = 29.40; p < 0.05) for Nigeria. It was concluded that exchange rate, market size, human development, and infrastructure positively related to inward FDI while the high level of inflation and political instability negatively related to inward FDI. Therefore, it was suggested that policy makers and government agencies should readdress steps and design policies that would encourage more FDI into the country.Keywords: exchange rate, foreign direct investment, human development, inflation rate, infrastructure, market size, political instability
Procedia PDF Downloads 4152319 Modeling a Sustainable City in the Twenty-First Century: A Case Study of Ibadan Oyo State Nigeria
Authors: K. J. Jegede, O. O. Odekunle
Abstract:
The challenges facing government at all levels in the area of urban development are two folds, first is how to provide basic services for urban dwellers especially the urban poor and second, how to make cities and towns as model of good places for economic development. The key ingredients and catalysts for achieving these goals are strong and virile institutional capacity, urban infrastructure and a supportive urban policy framework. The government at all levels have been upgrading and expanding city infrastructure and services in Ibadan, the state capital to support sustainable economic development of the city, particularly in the areas of electricity, neighbourhood, solid waste management, transport, water supply, education, health facilities and markets developments to discourage street trading. This paper attempts to present Ibadan in the millennium as 'a model of a sustainable city'. A planned development strategy that had sustained the growth of the city from a war camp in the 19th century to a cosmopolitan city in the 21st century with the potential to become a megacity. The presentation examines, among others, the physical structure and population density of Ibadan city, the challenges of economic development, the development of urban infrastructure and services in Ibadan metropolitan area. The paper submitted by mapping out a strategy to achieve sustainable development of Ibadan city.Keywords: megacity, physical structure, sustainable city, urban infrastructure
Procedia PDF Downloads 2992318 ASEAN Limited Centrality in Connectivity: Managing the China-Japan Infrastructure Competition
Authors: Barbora Valockova
Abstract:
Scholars recommend the establishment of a multilateral coordination mechanism by ASEAN, such as an infrastructure forum, to contain the China-Japan infrastructure financing competition in the region. However, they do not systematically investigate the reasons for its absence. This paper aims to fill the gap by addressing the following question: Why has ASEAN been unable to set up any multilateral coordination mechanism to soften the China-Japan infrastructure financing competition? This paper argues that ASEAN has not been able to set up such a mechanism due to its limited centrality in connectivity. This limited centrality decreases ASEAN’s ability to manage the China-Japan competition in a more comprehensive and coordinated way. Rather, ASEAN acts as a scope setter in connectivity, although this is not completely ineffective. This paper is divided into four sections. The first section explores the key tenets of the concept of ASEAN centrality in connectivity, which is under-examined in the current literature. The second section examines the extent to which ASEAN limited centrality in connectivity is being respected by China and Japan. The third section analyses how various stakeholders, such as ASEAN member states, their leaders and bureaucracy, and foreign private companies prevent ASEAN from attaining stronger centrality. The last section concludes and offers recommendations. Data is gathered using primary sources (official ASEAN, Chinese, and Japanese documents, interviews, etc.) and secondary material. By providing a nuanced analysis of ASEAN centrality in connectivity and developing a new operationalization of the concept, this paper aims to contribute to the international relations literature on ASEAN centrality. Initial findings suggest that while ASEAN limited centrality in connectivity has some effectiveness, it is not sufficient for setting up a multilateral coordination mechanism. While it represents a solid departure point, any potential possessed by ASEAN to evolve beyond a scope setter in connectivity is hampered by stakeholders involved in infrastructure development. While these players and their interactions can have both positive and negative effects on the scope set by ASEAN, it is unlikely that they would allow ASEAN to become the real central player. There can be no stronger ASEAN centrality in connectivity without ASEAN unity and neutrality. However, the last two factors are difficult to attain in the context of infrastructure development since ASEAN member states and stakeholders all have their styles and preferences. All other things being equal, these circumstances favor a loose, vague, and quasi-prescriptive arrangement among the relevant stakeholders.Keywords: ASEAN centrality, China-Japan infrastructure competition, connectivity, scope setter
Procedia PDF Downloads 2002317 The Management of Urban Facilities in the City of Chlef
Authors: Belakhdar Salah Brahim
Abstract:
The Urban management is a major element of social control of public space and thus the functioning of society. As such, it is a key element of a social conception of sustainable development. Also, it is a cross-cutting sector that relies on land management, infrastructure management, habitat management, management of social services, the management of economic development, etc. This study aims to study how urban management focusing on the study of problems related to urban waste management in developing countries. It appears from the study that the city management is to improve infrastructure and urban services in order to increase the city's development and improve living conditions in cities. It covers various aspects including management of urban space, economic management, administrative management, asset management or infrastructure and finally waste management. Environmental management is important because it solves the pollution problems of life and preserve resources for future generations. Changing perceptions of waste has led to the definition of new policies for integrated waste management requirements appropriate to the urban site.Keywords: urbanization, urban management, environmental management, waste management
Procedia PDF Downloads 4332316 Association of Selected Polymorphisms of BER Pathway with the Risk of Colorectal Cancer in the Polish Population
Authors: Jacek Kabzinski, Karolina Przybylowska, Lukasz Dziki, Adam Dziki, Ireneusz Majsterek
Abstract:
The incidence of colorectal cancer (CRC) is increasing from year to year. Despite intensive research CRC etiology remains unknown. Studies suggest that at the basis of the process of carcinogenesis can lie reduced efficiency of DNA repair mechanisms, often caused by polymorphisms in DNA repair genes. The aim of the study was to determine the relationship between gene polymorphisms Pro242Arg of PolB gene and Arg780His of Lig3 gene and modulation of the risk of colorectal cancer in the Polish population. Determination of the molecular basis of carcinogenesis process and predicting increased risk will allow qualifying patients to increased risk group and including them in preventive program. We used blood collected from 110 patients diagnosed with colorectal cancer. The control group consisted of equal number of healthy people. Genotyping was performed by TaqMan method. The obtained results indicate that the genotype 780Arg/His of Lig3 gene is associated with an increased risk of colorectal cancer. On the basis of these results, we conclude that Lig3 gene polymorphism Arg780His may be associated with an increased risk of colorectal cancer.Keywords: BER, colorectal cancer, PolB, Lig3, polymorphisms
Procedia PDF Downloads 4542315 Preliminary Investigation of Hospital Buildings Maintenance Management in Malaysia
Authors: Christtestimony Oluwafemi Jesumoroti, AbdulLateef Ashola Olanrewaju, Khor Soo Cheen
Abstract:
The worth of buildings is known by the quality of the maintenance imbibe in them. Maintenance management being carried out in the hospitals has a direct impact on the performance of the hospital buildings, environment, and sustainable infrastructure, and as such, there is a need to give it adequate attention. The media and reports on hospital buildings maintenance management in Malaysia were not favorable. Hospital buildings in Malaysia need to have proper structure for maintenance management and sustainability as this will enhance the good infrastructure for users and the entire nation. The paper reports the preliminary results of the determinants of maintenance in hospital buildings. To achieve the aim of this research, a survey questionnaire was administered to the users of the hospital buildings. The findings of the study revealed that there are lack of maintenance standard, use of poor quality components and materials, Improper response time, Poor complaint reporting system. Hence, the influent of rework, thorough responsibilities of quality performance of hospital buildings, and others are the results of the investigations.Keywords: sustainable infrastructure, optimum performance, implementation, key performance indicators, maintenance policies
Procedia PDF Downloads 1572314 Decision-Making Tool for Planning the Construction of Infrastructure Projects
Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs
Abstract:
The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.Keywords: infrastructure, modularization, decision support, decision-making
Procedia PDF Downloads 632313 Comparing Repaired and Undamaged Specimens Test Results of Post-Tensioned Beam to Column Connections
Authors: Mustafa Kaya
Abstract:
After the 1999 Marmara earthquake in Turkey research by the Turkish Precast Union stated that 24.50% of the precast structures were damaged with some of this damage being observed in the beam to column connections of the structures. Since it is essential to provide those rendered homeless by the earthquake with safe, habitable accommodation repairing medium and slight levels of damage at the connection parts should be undertaken. In order to prove that a repaired connection was sufficiently strong, a precast beam to column post tensioned connection was tested in three phases. In phase one, the middle level damage was observed at 6% drift at these connections. As a result of the extra loads applied, little damage was observed. In the last phase, the four connections tested in the first phase were repaired using epoxy resin and then retested. The results from the tests on the repaired precast and the undamaged specimens showed that the repaired specimens were sufficiently strong, thus proving that repair to damaged precast beam to column post tensioned connections can be undertaken.Keywords: precast beam to column connection, moment-resisting connection, post-tensioned connections, repair of precast connections
Procedia PDF Downloads 4462312 REITs India- New Investment Avenue for Financing Urban Infrastructure in India
Authors: Rajat Kapoor
Abstract:
Indian Real Estate sector is the second largest employer after agriculture and is slated to grow at 30 percent over the next decade. Indian cities have shown tumultuous growth since last two decades. With the growing need of infrastructure, it has become inevitable for real estate sector to adopt more organized and transparent system of investment. SPVs such as REITs ensure transparency facilitating accessibility to invest in real estate for those who find it difficult to purchase real estate as an investment option with a realistic income expectation from their investment. RIETs or real estate investment trusts is an instrument of pooling funds similar to that of mutual funds. In a simpler term REIT is an Investment Vehicle in the form a trust which holds & manages large commercial rent¬ earning properties on behalf of investors and distributes most of its profit as dividends. REIT enables individual investors to invest their money in commercial real estate assets in a diversified portfolio and on the other hand provides fiscal liquidity to developers as easy exit option and channel funds for new projects. However, the success REIT is very much dependent on the taxation structure making such models attractive and adaptive enough for both developers and investors to opt for such investment option. This paper is intended to capture an overview of REITs with context to Indian real estate scenario.Keywords: Indian real estate, real estate infrastructure trusts, urban finance, infrastructure investment trusts
Procedia PDF Downloads 4692311 Trends of Public-Private Partnership Infrastructure in Thailand
Authors: Wasaporn Techapeeraparnich
Abstract:
Bringing private investor involving in providing public infrastructure have been increasingly used worldwide, and there is no exception for developing countries like Thailand. Recently, there is a huge investment opportunity for public-private partnership (PPP) in Thailand, especially in the transportation sector. This paper analyses the development of the PPP since the early beginning of PPP in different service sectors. It also summarizes the development of PPP and its application in terms of usage, opportunities and trends particularly in the transport sector. The results are aimed to draw some lessons learned for future development.Keywords: case study, public-private partnership, transportation, Thailand
Procedia PDF Downloads 4352310 Simulating Economic Order Quantity and Reorder Point Policy for a Repairable Items Inventory System
Authors: Mojahid F. Saeed Osman
Abstract:
Repairable items inventory system is a management tool used to incorporate all information concerning inventory levels and movements for repaired and new items. This paper presents development of an effective simulation model for managing the inventory of repairable items for a production system where production lines send their faulty items to a repair shop considering the stochastic failure behavior and repair times. The developed model imitates the process of handling the on-hand inventory of repaired items and the replenishment of the inventory of new items using Economic Order Quantity and Reorder Point ordering policy in a flexible and risk-free environment. We demonstrate the appropriateness and effectiveness of the proposed simulation model using an illustrative case problem. The developed simulation model can be used as a reliable tool for estimating a healthy on-hand inventory of new and repaired items, backordered items, and downtime due to unavailability of repaired items, and validating and examining Economic Order Quantity and Reorder Point ordering policy, which would further be compared with other ordering strategies as future work.Keywords: inventory system, repairable items, simulation, maintenance, economic order quantity, reorder point
Procedia PDF Downloads 1442309 An Experimental Investigation of Rehabilitation and Strengthening of Reinforced Concrete T-Beams Under Static Monotonic Increasing Loading
Authors: Salem Alsanusi, Abdulla Alakad
Abstract:
An experimental investigation to study the behaviour of under flexure reinforced concrete T-Beams. Those Beams were loaded to pre-designated stress levels as percentage of calculated collapse loads. Repairing these beans by either reinforced concrete jacket, or by externally bolted steel plates were utilized. Twelve full scale beams were tested in this experimental program scheme. Eight out of the twelve beams were loaded under different loading levels. Tests were performed for the beams before and after repair with Reinforced Concrete Jacket (RCJ). The applied Load levels were 60%, 77% and 100% of the calculated collapse loads. The remaining four beams were tested before and after repair with Bolted Steel Plate (BSP). Furthermore, out previously mentioned four beams two beams were loaded to the calculated failure load 100% and the remaining two beams were not subjected to any load. The eight beams recorded for the RCJ test were repaired using reinforced concrete jacket. The four beams recorded for the BSP test were all repaired using steel plate at the bottom. All the strengthened beams were gradually loaded until failure occurs. However, in each loading case, the beams behaviour, before and after strengthening, were studied through close inspection of the cracking propagation, and by carrying out an extensive measurement of deformations and strength. The stress-strain curve for reinforcing steel and the failure strains measured in the tests were utilized in the calculation of failure load for the beams before and after strengthening. As a result, the calculated failure loads were close to the actual failure tests in case of beams before repair, ranging from 85% to 90% and also in case of beams repaired by reinforced concrete jacket ranging from 70% to 85%. The results were in case of beams repaired by bolted steel plates ranging from (50% to 85%). It was observed that both jacketing and bolted steel plate methods could effectively restore the full flexure capacity of the damaged beams. However, the reinforced jacket has increased the failure load by about 67%, whereas the bolted steel plates recovered the failure load.Keywords: rehabilitation, strengthening, reinforced concrete, beams deflection, bending stresses
Procedia PDF Downloads 3062308 A Comprehensive Planning Model for Amalgamation of Intensification and Green Infrastructure
Authors: Sara Saboonian, Pierre Filion
Abstract:
The dispersed-suburban model has been the dominant one across North America for the past seventy years, characterized by automobile reliance, low density, and land-use specialization. Two planning models have emerged as possible alternatives to address the ills inflicted by this development pattern. First, there is intensification, which promotes efficient infrastructure by connecting high-density, multi-functional, and walkable nodes with public transit services within the suburban landscape. Second is green infrastructure, which provides environmental health and human well-being by preserving and restoring ecosystem services. This research studies incompatibilities and the possibility of amalgamating the two alternatives in an attempt to develop a comprehensive alternative to suburban model that advocates density, multi-functionality and transit- and pedestrian-conduciveness, with measures capable of mitigating the adverse environmental impacts of compactness. The research investigates three Canadian urban growth centers, where intensification is the current planning practice, and the awareness of green infrastructure benefits is on the rise. However, these three centers are contrasted by their development stage, the presence or absence of protected natural land, their environmental approach, and their adverse environmental consequences according to the planning cannons of different periods. The methods include reviewing the literature on green infrastructure planning, criticizing the Ontario provincial plans for intensification, surveying residents’ preferences for alternative models, and interviewing officials who deal with the local planning for the centers. Moreover, the research draws on recalling debates between New Urbanism and Landscape/Ecological Urbanism. The case studies expose the difficulties in creating urban growth centres that accommodate green infrastructure while adhering to intensification principles. First, the dominant status of intensification and the obstacles confronting intensification have monopolized the planners’ concerns. Second, the tension between green infrastructure and intensification explains the absence of the green infrastructure typologies that correspond to intensification-compatible forms and dynamics. Finally, the lack of highlighted social-economic benefits of green infrastructure reduces residents’ participation. Moreover, the results from the research provide insight into predominating urbanization theories, New Urbanism and Landscape/Ecological Urbanism. In order to understand political, planning, and ecological dynamics of such blending, dexterous context-specific planning is required. Findings suggest the influence of the following factors on amalgamating intensification and green infrastructure. Initially, producing ecosystem services-based justifications for green infrastructure development in the intensification context provides an expert-driven backbone for the implementation programs. This knowledge-base should be translated to effectively imbue different urban stakeholders. Moreover, due to the limited greenfields in intensified areas, spatial distribution and development of multi-level corridors such as pedestrian-hospitable settings and transportation networks along green infrastructure measures are required. Finally, to ensure the long-term integrity of implemented green infrastructure measures, significant investment in public engagement and education, as well as clarification of management responsibilities is essential.Keywords: ecosystem services, green infrastructure, intensification, planning
Procedia PDF Downloads 3562307 Computational Assistance of the Research, Using Dynamic Vector Logistics of Processes for Critical Infrastructure Subjects Continuity
Authors: Urbánek Jiří J., Krahulec Josef, Urbánek Jiří F., Johanidesová Jitka
Abstract:
These Computational assistance for the research and modelling of critical infrastructure subjects continuity deal with this paper. It enables us the using of prevailing operation system MS Office (SmartArt...) for mathematical models, using DYVELOP (Dynamic Vector Logistics of Processes) method. It serves for crisis situations investigation and modelling within the organizations of critical infrastructure. In the first part of the paper, it will be introduced entities, operators and actors of DYVELOP method. It uses just three operators of Boolean algebra and four types of the entities: the Environments, the Process Systems, the Cases and the Controlling. The Process Systems (PrS) have five “brothers”: Management PrS, Transformation PrS, Logistic PrS, Event PrS and Operation PrS. The Cases have three “sisters”: Process Cell Case, Use Case and Activity Case. They all need for the controlling of their functions special Ctrl actors, except ENV – it can do without Ctrl. Model´s maps are named the Blazons and they are able mathematically - graphically express the relationships among entities, actors and processes. In the second part of this paper, the rich blazons of DYVELOP method will be used for the discovering and modelling of the cycling cases and their phases. The blazons need live PowerPoint presentation for better comprehension of this paper mission. The crisis management of energetic crisis infrastructure organization is obliged to use the cycles for successful coping of crisis situations. Several times cycling of these cases is a necessary condition for the encompassment of the both the emergency event and the mitigation of organization´s damages. Uninterrupted and continuous cycling process bring for crisis management fruitfulness and it is a good indicator and controlling actor of organizational continuity and its sustainable development advanced possibilities. The research reliable rules are derived for the safety and reliable continuity of energetic critical infrastructure organization in the crisis situation.Keywords: blazons, computational assistance, DYVELOP method, critical infrastructure
Procedia PDF Downloads 3842306 Discussion on the Impact Issues in Urban by Earthquake Disaster Cases
Authors: M. C. Teng, M. C. Ke, C. Y. Yang, S. S. Ke
Abstract:
There are more than one thousand times a year of felt earthquakes in Taiwan. Because earthquakes are disaster threats to urban infrastructure, they often disrupt infrastructure services. For example, the highway system is very important to transportation infrastructure; however, it is vulnerable to earthquakes and typhoons in Taiwan. When a highway system is damaged by disaster, it will create a major impact on post-disaster communications and emergency relief and affect disaster relief works. In a study case on September 18th, 2022, the Taitung Chihshang earthquake, with a magnitude of 6.8 on the Richter scale with a depth of 7 km, caused one death; 171 people were injured and had a significant urban infrastructure impact. Hualien and Taitung areas have a large number of surface ruptures, road disruptions due to the collapses, over ten cases of bridges failure or closed, partial railroad section service shutdown, building collapses, and casualties. Taitung Chihshang earthquake, the peak ground acceleration is 585 gal (cm/s²), and the seismic intensity is Level 6 Upper(6+)in Chishang, Taitung County. After the earthquakes, we conducted on-site disaster investigation works in the disaster area; the disaster investigation works included a public and private building survey, a transportation facility survey, a total of ten damaged bridges, and one railroad station damaged were investigated in this investigation. The results showed that the affected locations were mainly concentrated along the Chihshang fault and the Yuli fault in the Huatung Longitudinal Valley. We recorded and described the impact and assessed its influence region in terms of its susceptibility to and the consequences of earthquake attacks. In addition, a lesson is learned from this study regarding the key issues after the Taitung Chihshang earthquake.Keywords: earthquake, infrastructure, disaster investigation, lesson learned
Procedia PDF Downloads 632305 Finite Element Analysis of Steel-Concrete Composite Structures Considering Bond-Slip Effect
Authors: WonHo Lee, Hyo-Gyoung Kwak
Abstract:
A numerical model considering slip behavior of steel-concrete composite structure is introduced. This model is based on a linear bond stress-slip relation along the interface. Single node was considered at the interface of steel and concrete member in finite element analysis, and it improves analytical problems of model that takes double nodes at the interface by adopting spring elements to simulate the partial interaction. The slip behavior is simulated by modifying material properties of steel element contacting concrete according to the derived formulation. Decreased elastic modulus simulates the slip occurrence at the interface and decreased yield strength simulates drop in load capacity of the structure. The model is verified by comparing numerical analysis applying this model with experimental studies. Acknowledgment—This research was supported by a grant(13SCIPA01) from Smart Civil Infrastructure Research Program funded by Ministry of Land, Infrastructure and Transport(MOLIT) of Korea government and Korea Agency for Infrastructure Technology Advancement(KAIA) and financially supported by Korea Ministry of Land, Infrastructure and Transport(MOLIT) as U-City Master and Doctor Course Grant Program.Keywords: bond-slip, composite structure, partial interaction, steel-concrete structure
Procedia PDF Downloads 1782304 Photoprotective and Antigenotoxic Effects of a Mixture of Posoqueria latifolia Flower Extract and Kaempferol Against Ultraviolet B Radiation
Authors: Silvia Ximena Barrios, Diego Armando Villamizar Mantilla, Raquel Elvira Ocazionez, , Elena E. Stashenko, María Pilar Vinardell, Jorge Luis Fuentes
Abstract:
Introduction: Skin overexposure to solar radiation has been a serious public health concern, because of its potential carcinogenicity. Therefore, preventive protection strategies using photoprotective agents are critical to counteract the harmful effect of solar radiation. Plants may be a source of photoprotective compounds that inhibit cellular mutations involved in skin cancer initiation. This work evaluated the photoprotective and antigenotoxic effects against ultraviolet B (UVB) radiation of a mixture of Posoqueria latifolia flower extract and Kaempferol (MixPoKa). Methods: The photoprotective efficacy of MixPoka (Posoqueria latifolia flower extract 250 μg/ml and Kaempferol 349.5 μM) was evaluated using in vitro indices such as sun protection factor SPFᵢₙ ᵥᵢₜᵣₒ and critical wavelength (λc). The MixPoKa photostability (Eff) at human minimal erythema doses (MED), according to the Fitzpatrick skin scale, was also estimated. Cytotoxicity and genotoxicity/antigenotoxicity were studied in MRC5 human fibroblasts using the trypan blue exclusion and Comet assays, respectively. Kinetics of the genetic damage repair post irradiation in the presence and absence of the MixPoka, was also evaluated. Results: The MixPoka -UV absorbance spectrum was high across the spectral bands between 200 and 400 nm. The UVB photoprotection efficacy of MixPoka was high (SPFᵢₙ ᵥᵢₜᵣₒ = 25.70 ± 0.06), showed wide photoprotection spectrum (λc = 380 ± 0), and resulted photostable (Eff = 92.3–100.0%). The MixPoka was neither cytotoxic nor genotoxic in MRC5 human fibroblasts; but presented significant antigenotoxic effect against UVB radiation. Additionally, MixPoka stimulate DNA repair post-irradiation. The potential of this phytochemical mixture as sunscreen ingredients was discussed. Conclusion: MixPoka showed a significant antigenotoxic effect against UVB radiation and stimulated DNA repair after irradiation. MixPoka could be used as an ingredient in a sunscreen cream.Keywords: flower extract, photoprotection, antigenotoxicity, cytotoxicity, genotoxicit
Procedia PDF Downloads 922303 Comparison of Various Landfill Ground Improvement Techniques for Redevelopment of Closed Landfills to Cater Transport Infrastructure
Authors: Michael D. Vinod, Hadi Khabbaz
Abstract:
Construction of infrastructure above or adjacent to landfills is becoming more common to capitalize on the limited space available within urban areas. However, development above landfills is a challenging task due to large voids, the presence of organic matter, heterogeneous nature of waste and ambiguity surrounding landfill settlement prediction. Prior to construction of infrastructure above landfills, ground improvement techniques are being employed to improve the geotechnical properties of landfill material. Although the ground improvement techniques have little impact on long term biodegradation and creep related landfill settlement, they have shown some notable short term success with a variety of techniques, including methods for verifying the level of effectiveness of ground improvement techniques. This paper provides geotechnical and landfill engineers a guideline for selection of landfill ground improvement techniques and their suitability to project-specific sites. Ground improvement methods assessed and compared in this paper include concrete injected columns (CIC), dynamic compaction, rapid impact compaction (RIC), preloading, high energy impact compaction (HEIC), vibro compaction, vibro replacement, chemical stabilization and the inclusion of geosynthetics such as geocells. For each ground improvement technique a summary of the existing theory, benefits, limitations, suitable modern ground improvement monitoring methods, the applicability of ground improvement techniques for landfills and supporting case studies are provided. The authors highlight the importance of implementing cost-effective monitoring techniques to allow observation and necessary remediation of the subsidence effects associated with long term landfill settlement. These ground improvement techniques are primarily for the purpose of construction above closed landfills to cater for transport infrastructure loading.Keywords: closed landfills, ground improvement, monitoring, settlement, transport infrastructure
Procedia PDF Downloads 2262302 An Investigation on Organisation Cyber Resilience
Authors: Arniyati Ahmad, Christopher Johnson, Timothy Storer
Abstract:
Cyber exercises used to assess the preparedness of a community against cyber crises, technology failures and critical information infrastructure (CII) incidents. The cyber exercises also called cyber crisis exercise or cyber drill, involved partnerships or collaboration of public and private agencies from several sectors. This study investigates organisation cyber resilience (OCR) of participation sectors in cyber exercise called X Maya in Malaysia. This study used a principal based cyber resilience survey called C-Suite Executive checklist developed by World Economic Forum in 2012. To ensure suitability of the survey to investigate the OCR, the reliability test was conducted on C-Suite Executive checklist items. The research further investigates the differences of OCR in ten Critical National Infrastructure Information (CNII) sectors participated in the cyber exercise. The One Way ANOVA test result showed a statistically significant difference of OCR among ten CNII sectors participated in the cyber exercise.Keywords: critical information infrastructure, cyber resilience, organisation cyber resilience, reliability test
Procedia PDF Downloads 3652301 Cloud Computing Impact on e-Government Adoption
Authors: Ali Elshabrawy
Abstract:
Cloud computing is expected to be important for e Government in near future. Governments need it for solving some of its e Government, financial, infrastructure, legacy systems and integration problems. It reduces information technology (IT) infrastructure needs and support costs, and offers on-demand infrastructure and computational power, improved collaboration capabilities, which are important for e Government projects start up and sustainability. Budget pressures will continue to drive more and more government IT to hybrid and even public clouds, and more cooperation between cloud service providers and governmental agencies are expected, Or developing governmental private, community clouds. Motivation to convince governments to use cloud computing services, will create a pressure on cloud service providers to cope with government's requirements for interoperability, security standards, open data and integration between their cloud systems There will be significant legal action arising out of governmental uses of cloud computing, and legislation addressing both IT and business needs and consumer fears and protections. Cloud computing is a considered a revolution for IT and E business in general and e commerce, e Government in particular. As governments faces increasing challenges regarding IT infrastructure required for e Government projects implementation. As a result of Lack of required financial resources allocated for e Government projects in developed and developing countries. Cloud computing can play a major role to solve some of e Government projects challenges such as, lack of financial resources, IT infrastructure, Human resources trained to manage e Government applications, interoperability, cost efficiency challenges. If we could solve some security issues related to cloud computing usage which considered critical for e Government projects. Pretty sure it’s Just a matter of time before cloud service providers will find out solutions to attract governments as major customers for their business.Keywords: cloud computing, e-government, adoption, supply side barriers, e-government requirements, challenges
Procedia PDF Downloads 3472300 Integrated Clean Development Mechanism and Risk Management Approach for Infrastructure Transportation Project
Authors: Debasis Sarkar
Abstract:
Clean development mechanism (CDM) can act as an effective instrument for mitigating climate change. This mechanism can effectively reduce the emission of CO2 and other green house gases (GHG). Construction of a mega infrastructure project like underground corridor construction for metro rail operation involves in consumption of substantial quantity of concrete which consumes huge quantity of energy consuming materials like cement and steel. This paper is an attempt to develop an integrated clean development mechanism and risk management approach for sustainable development for an underground corridor metro rail project in India during its construction phase. It was observed that about 35% reduction in CO2 emission can be obtained by adding fly ash as a part replacement of cement. The reduced emission quantity of CO2 which is of the quantum of about 21,646.36 MT would result in cost savings of approximately INR 8.5 million (USD 1,29,878).But construction and operation of such infrastructure projects of the present era are subject to huge risks and uncertainties throughout all the phases of the project, thus reducing the probability of successful completion of the project within stipulated time and cost frame. Thus, an integrated approach of combining CDM with risk management would enable the metro rail authorities to develop a sustainable risk mitigation measure framework to ensure more cost and energy savings and lesser time and cost over-run.Keywords: clean development mechanism (CDM), infrastructure transportation, project risk management, underground metro rail
Procedia PDF Downloads 4762299 Vehicle Risk Evaluation in Low Speed Accidents: Consequences for Relevant Test Scenarios
Authors: Philip Feig, Klaus Gschwendtner, Julian Schatz, Frank Diermeyer
Abstract:
Projects of accident research analysis are mostly focused on accidents involving personal damage. Property damage only has a high frequency of occurrence combined with high economic impact. This paper describes main influencing parameters for the extent of damage and presents a repair cost model. For a prospective evaluation method of the monetary effect of advanced driver assistance systems (ADAS), it is necessary to be aware of and quantify all influencing parameters. Furthermore, this method allows the evaluation of vehicle concepts in combination with an ADAS at an early point in time of the product development process. In combination with a property damage database and the introduced repair cost model relevant test scenarios for specific vehicle configurations and their individual property damage risk may be determined. Currently, equipment rates of ADAS are low and a purchase incentive for customers would be beneficial. The next ADAS generation will prevent property damage to a large extent or at least reduce damage severity. Both effects may be a purchasing incentive for the customer and furthermore contribute to increased traffic safety.Keywords: accident research, accident scenarios, ADAS, effectiveness, property damage analysis
Procedia PDF Downloads 3402298 Repair Workshop Queue System Modification Using Priority Scheme
Authors: C. Okonkwo Ugochukwu, E. Sinebe Jude, N. Odoh Blessing, E. Okafor Christian
Abstract:
In this paper, a modification on repair workshop queuing system using multi priority scheme was carried out. Chi square goodness of fit test was used to determine the random distribution of the inter arrival time and service time of crankshafts that come for maintenance in the workshop. The chi square values obtained for all the prioritized classes show that the distribution conforms to Poisson distribution. The mean waiting time in queue results of non-preemptive priority for 1st, 2nd and 3rd classes show 0.066, 0.09, and 0.224 day respectively, while preemptive priority show 0.007, 0.036 and 0.258 day. However, when non priority is used, which obviously has no class distinction it amounts to 0.17 days. From the results, one can observe that the preemptive priority system provides a very dramatic improvement over the non preemptive priority as it concerns arrivals that are of higher priority. However, the improvement has a detrimental effect on the low priority class. The trend of the results is similar to the mean waiting time in the system as a result of addition of the actual service time. Even though the mean waiting time for the queue and that of the system for no priority takes the least time when compared with the least priority, urgent and semi-urgent jobs will terribly suffer which will most likely result in reneging or balking of many urgent jobs. Hence, the adoption of priority scheme in this type of scenario will result in huge profit to the Company and more customer satisfaction.Keywords: queue, priority class, preemptive, non-preemptive, mean waiting time
Procedia PDF Downloads 3982297 A Literature Review on Sustainability Appraisal Methods for Highway Infrastructure Projects
Authors: S. Kaira, S. Mohamed, A. Rahman
Abstract:
Traditionally, highway infrastructure projects are initiated based on their economic benefits, thereafter environmental, social and governance impacts are addressed discretely for the selected project from a set of pre-determined alternatives. When opting for cost-benefit analysis (CBA), multi-criteria decision-making (MCDM) has been used as the default assessment tool. But this tool has been critiqued as it does not mimic the real-world dynamic environment. Indeed, it is because of the fact that public sector projects like highways have to experience intense exposure to dynamic environments. Therefore, it is essential to appreciate the impacts of various dynamic factors (factors that change or progress with the system) on project performance. Thus, this paper presents various sustainability assessment tools that have been globally developed to determine sustainability performance of infrastructure projects during the design, procurement and commissioning phase. Indeed, identification of the current gaps in the available assessment methods provides a potential to add prominent part of knowledge in the field of ‘road project development systems and procedures’ that are generally used by road agencies.Keywords: dynamic impact factors, micro and macro factors, sustainability assessment framework, sustainability performance
Procedia PDF Downloads 1402296 Budgetary Performance Model for Managing Pavement Maintenance
Authors: Vivek Hokam, Vishrut Landge
Abstract:
An ideal maintenance program for an industrial road network is one that would maintain all sections at a sufficiently high level of functional and structural conditions. However, due to various constraints such as budget, manpower and equipment, it is not possible to carry out maintenance on all the needy industrial road sections within a given planning period. A rational and systematic priority scheme needs to be employed to select and schedule industrial road sections for maintenance. Priority analysis is a multi-criteria process that determines the best ranking list of sections for maintenance based on several factors. In priority setting, difficult decisions are required to be made for selection of sections for maintenance. It is more important to repair a section with poor functional conditions which includes uncomfortable ride etc. or poor structural conditions i.e. sections those are in danger of becoming structurally unsound. It would seem therefore that any rational priority setting approach must consider the relative importance of functional and structural condition of the section. The maintenance priority index and pavement performance models tend to focus mainly on the pavement condition, traffic criteria etc. There is a need to develop the model which is suitably used with respect to limited budget provisions for maintenance of pavement. Linear programming is one of the most popular and widely used quantitative techniques. A linear programming model provides an efficient method for determining an optimal decision chosen from a large number of possible decisions. The optimum decision is one that meets a specified objective of management, subject to various constraints and restrictions. The objective is mainly minimization of maintenance cost of roads in industrial area. In order to determine the objective function for analysis of distress model it is necessary to fix the realistic data into a formulation. Each type of repair is to be quantified in a number of stretches by considering 1000 m as one stretch. A stretch considered under study is having 3750 m length. The quantity has to be put into an objective function for maximizing the number of repairs in a stretch related to quantity. The distress observed in this stretch are potholes, surface cracks, rutting and ravelling. The distress data is measured manually by observing each distress level on a stretch of 1000 m. The maintenance and rehabilitation measured that are followed currently are based on subjective judgments. Hence, there is a need to adopt a scientific approach in order to effectively use the limited resources. It is also necessary to determine the pavement performance and deterioration prediction relationship with more accurate and economic benefits of road networks with respect to vehicle operating cost. The infrastructure of road network should have best results expected from available funds. In this paper objective function for distress model is determined by linear programming and deterioration model considering overloading is discussed.Keywords: budget, maintenance, deterioration, priority
Procedia PDF Downloads 2082295 Entrepreneurship under the Effect of Information Technology
Authors: Mohammad Hadi Khorashadi Zadeh
Abstract:
An entrepreneur is a manager or the owner of the commercial company that creates resources and money by risking and initiative. The Netpreneur is the capability to run an online business. It needs only the Connectivity. An Entrepreneur, as long as he has a service which the market demands can set up a feasible and viable trade with his Intellectual Capital as the principle input and the Connectivity Infrastructure as the only physical input. The internet is possibly the most significant revolution in science and technology that our generation could fantasize or imagine. It has introduced in various benefits to the society, culture, economics and politics. The entrepreneur is a premium member in the community. She/he provides services to the society and community including employment.Keywords: entrepreneur, Netpreneur, intellectual capital, infrastructure
Procedia PDF Downloads 327