Search results for: earthquake risk evaluation
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 12059

Search results for: earthquake risk evaluation

11939 Seismic Preparedness Challenge in Ionian Islands (Greece) through 'Telemachus' Project

Authors: A. Kourou, M. Panoutsopoulou

Abstract:

Nowadays, disaster risk reduction requires innovative ways of working collaboratively, monitoring tools, management methods, risk communication, and knowledge, as key factors for decision-making actors. Experience has shown that the assessment of seismic risk and its effective management is still an important challenge. In Greece, Ionian Islands region is characterized as the most seismic area of the country and one of the most active worldwide. It is well known that in case of a disastrous earthquake the local authorities need to assess the situation in the affected area and coordinate the disaster response. In particular, the main outcomes of 'Telemachus' project are the development of an innovative operational system that hosts the needed data of seismic risk management in the Ionian Islands and the implementation of educational actions for the involved target groups. This project is funded in the Priority Axis 'Environmental Protection and Sustainable Development' of Operational Plan 'Ionian Islands 2014-2020'. EPPO is one of the partners of the project and it is responsible, among others, for the development of proper training material. This paper presents the training material of 'Telemachus' and its usage as a helpful, managerial tool in case of earthquake emergency. This material is addressed to different target groups, such as civil protection staff, people that involved with the tourism industry, educators of disabled people, etc. Very positive aspect of the project is the involvement of end-users that should evaluate the training products; test standards; clarify the personnel’s roles and responsibilities; improve interagency coordination; identify gaps in resources; improve individual performance; and identify opportunities for improvement. It is worth mentioning that even though the abovementioned material developed is useful for the training of specific target groups on emergency management issues within Ionian Islands Region, it could be used throughout Greece and other countries too.

Keywords: education of civil protection staff, Ionian Islands Region of Greece, seismic risk, training material

Procedia PDF Downloads 104
11938 Survey of Hawke's Bay Tourism Based Businesses: Tsunami Understanding and Preparation

Authors: V. A. Ritchie

Abstract:

The loss of life and livelihood experienced after the magnitude 9.3 Sumatra earthquake and tsunami on 26 December 2004 and magnitude 9 earthquake and tsunami in northeastern Japan on 11 March 2011, has raised global awareness and brought tsunami phenomenology, nomenclature, and representation into sharp focus. At the same time, travel and tourism continue to increase, contributing around 1 in 11 jobs worldwide. This increase in tourism is especially true for coastal zones, placing pressure on decision-makers to downplay tsunami risks and at the same time provide adequate tsunami warning so that holidaymakers will feel confident enough to visit places of high tsunami risk. This study investigates how well tsunami preparedness messages are getting through for tourist-based businesses in Hawke’s Bay New Zealand, a region of frequent seismic activity and a high probability of experiencing a nearshore tsunami. The aim of this study is to investigate whether tourists based businesses are well informed about tsunamis, how well they understand that information and to what extent their clients are included in awareness raising and evacuation processes. In high-risk tsunami zones, such as Hawke’s Bay, tourism based businesses face competitive tension between short term business profitability and longer term reputational issues related to preventable loss of life from natural hazards, such as tsunamis. This study will address ways to accommodate culturally and linguistically relevant tourist awareness measures without discouraging tourists or being too costly to implement.

Keywords: tsunami risk and response, travel and tourism, business preparedness, cross cultural knowledge transfer

Procedia PDF Downloads 133
11937 Post-Earthquake Road Damage Detection by SVM Classification from Quickbird Satellite Images

Authors: Moein Izadi, Ali Mohammadzadeh

Abstract:

Detection of damaged parts of roads after earthquake is essential for coordinating rescuers. In this study, an approach is presented for the semi-automatic detection of damaged roads in a city using pre-event vector maps and both pre- and post-earthquake QuickBird satellite images. Damage is defined in this study as the debris of damaged buildings adjacent to the roads. Some spectral and texture features are considered for SVM classification step to detect damages. Finally, the proposed method is tested on QuickBird pan-sharpened images from the Bam City earthquake and the results show that an overall accuracy of 81% and a kappa coefficient of 0.71 are achieved for the damage detection. The obtained results indicate the efficiency and accuracy of the proposed approach.

Keywords: SVM classifier, disaster management, road damage detection, quickBird images

Procedia PDF Downloads 600
11936 Performance of On-site Earthquake Early Warning Systems for Different Sensor Locations

Authors: Ting-Yu Hsu, Shyu-Yu Wu, Shieh-Kung Huang, Hung-Wei Chiang, Kung-Chun Lu, Pei-Yang Lin, Kuo-Liang Wen

Abstract:

Regional earthquake early warning (EEW) systems are not suitable for Taiwan, as most destructive seismic hazards arise due to in-land earthquakes. These likely cause the lead-time provided by regional EEW systems before a destructive earthquake wave arrives to become null. On the other hand, an on-site EEW system can provide more lead-time at a region closer to an epicenter, since only seismic information of the target site is required. Instead of leveraging the information of several stations, the on-site system extracts some P-wave features from the first few seconds of vertical ground acceleration of a single station and performs a prediction of the oncoming earthquake intensity at the same station according to these features. Since seismometers could be triggered by non-earthquake events such as a passing of a truck or other human activities, to reduce the likelihood of false alarms, a seismometer was installed at three different locations on the same site and the performance of the EEW system for these three sensor locations were discussed. The results show that the location on the ground of the first floor of a school building maybe a good choice, since the false alarms could be reduced and the cost for installation and maintenance is the lowest.

Keywords: earthquake early warning, on-site, seismometer location, support vector machine

Procedia PDF Downloads 224
11935 Identifying the Structural Components of Old Buildings from Floor Plans

Authors: Shi-Yu Xu

Abstract:

The top three risk factors that have contributed to building collapses during past earthquake events in Taiwan are: "irregular floor plans or elevations," "insufficient columns in single-bay buildings," and the "weak-story problem." Fortunately, these unsound structural characteristics can be directly identified from the floor plans. However, due to the vast number of old buildings, conducting manual inspections to identify these compromised structural features in all existing structures would be time-consuming and prone to human errors. This study aims to develop an algorithm that utilizes artificial intelligence techniques to automatically pinpoint the structural components within a building's floor plans. The obtained spatial information will be utilized to construct a digital structural model of the building. This information, particularly regarding the distribution of columns in the floor plan, can then be used to conduct preliminary seismic assessments of the building. The study employs various image processing and pattern recognition techniques to enhance detection efficiency and accuracy. The study enables a large-scale evaluation of structural vulnerability for numerous old buildings, providing ample time to arrange for structural retrofitting in those buildings that are at risk of significant damage or collapse during earthquakes.

Keywords: structural vulnerability detection, object recognition, seismic capacity assessment, old buildings, artificial intelligence

Procedia PDF Downloads 59
11934 Analysis of Steel Beam-Column Joints Under Seismic Loads

Authors: Mizam Doğan

Abstract:

Adapazarı railway car factory, the only railway car factory of Turkey, was constructed in 1950. It was a steel design and it had filled beam sections and truss beam systems. Columns were steel profiles and box sections. The factory was damaged heavily on Izmit Earthquake and closed. In this earthquake 90% of damaged structures are reinforced concrete, the others are %7 prefabricated and 3% steel construction. As can be seen in statistical data, damaged industrial buildings in this earthquake were generally reinforced concrete and prefabricated structures. Adapazari railway car factory is the greatest steel structure damaged in the earthquake. This factory has 95% of the total damaged steel structure area. In this paper; earthquake damages on beams and columns of the factory are studied by considering TS648 'Turkish Standard Building Code for Steel Structures' and also damaged connection elements as welds, rivets and bolts are examined. A model similar to the damaged system is made and high-stress zones are searched. These examinations, conclusions, suggestions are explained by damage photos and details.

Keywords: column-beam connection, seismic analysis, seismic load, steel structure

Procedia PDF Downloads 254
11933 Protection from Risks of Natural Disasters and Social and Economic Support to the Native Population

Authors: Maria Angela Bedini, Fabio Bronzini

Abstract:

The risk of natural disasters affects all the countries of the world, whether it refers to seismic events or tsunamis or hydrogeological disasters. In most cases, the risk can be considered in its three components: hazard, exposure, vulnerability (and urban vulnerability). The aim of this paper is to evaluate how the Italian scientific community has related the contribution of these three components, superimposing the three different maps that summarize the fundamental structure of the risk. Based on the three components considered, the study applies the Regional Planning methodology on the three phases of the risk protection and mitigation process: the prevention phase, the emergency intervention phase, the post-disaster phase. The paper illustrates the Italian experience of the pre-during-post-earthquake intervention. Main results: The study deepens these aspects in the belief that “a historical center” and an “island” can present similar problems at the international level, both in the phase of prevention (earthquake, tsunamis, hydrogeological disasters), in emergency phase (protocols and procedures of intervention) and in the post-disaster phase. The conclusions of the research identify the need to plan in advance how to deal with the post-disaster phase and consider it a priority with respect to the simple reconstruction of destroyed buildings. In fact the main result of the post-disaster intervention must be the return and the social and economic support of the indigenous population, and not only the construction of new housing and equipment. In this sense, the results of the research show that the elderly inhabitants of a historic center can be compared to the indigenous population of an atoll of fishermen, as both constitute the most important resource: the human resource. Their return in conditions of security testifies, with their presence, the culture, customs, and values rooted in the history of a people.

Keywords: post-disaster interventions, risk of natural disasters in Italy and abroad, seismic events in Italy, social and economic protection and support for the native population of historical centers

Procedia PDF Downloads 86
11932 Introduction of the Harmfulness of the Seismic Signal in the Assessment of the Performance of Reinforced Concrete Frame Structures

Authors: Kahil Amar, Boukais Said, Kezmane Ali, Hannachi Naceur Eddine, Hamizi Mohand

Abstract:

The principle of the seismic performance evaluation methods is to provide a measure of capability for a building or set of buildings to be damaged by an earthquake. The common objective of many of these methods is to supply classification criteria. The purpose of this study is to present a method for assessing the seismic performance of structures, based on Pushover method, we are particularly interested in reinforced concrete frame structures, which represent a significant percentage of damaged structures after a seismic event. The work is based on the characterization of seismic movement of the various earthquake zones in terms of PGA and PGD that is obtained by means of SIMQK_GR and PRISM software and the correlation between the points of performance and the scalar characterizing the earthquakes will be developed.

Keywords: seismic performance, pushover method, characterization of seismic motion, harmfulness of the seismic

Procedia PDF Downloads 357
11931 Seismic Analysis of URM Buildings in South Africa

Authors: Trevor N. Haas, Thomas van der Kolf

Abstract:

South Africa has some regions which are susceptible to moderate seismic activity. A peak ground acceleration of between 0.1g and 0.15g can be expected in the southern parts of the Western Cape. Unreinforced Masonry (URM) is commonly used as a construction material for 2 to 5 storey buildings in underprivileged areas in and around Cape Town. URM is typically regarded as the material most vulnerable to damage when subjected to earthquake excitation. In this study, a three-storey URM building was analysed by applying seven earthquake time-histories, which can be expected to occur in South Africa using a finite element approach. Experimental data was used to calibrate the in- and out-of-plane stiffness of the URM. The results indicated that tensile cracking of the in-plane piers was the dominant failure mode. It is concluded that URM buildings of this type are at risk of failure especially if sufficient ductility is not provided. The results also showed that connection failure must be investigated further.

Keywords: URM, seismic analysis, FEM, Cape Town

Procedia PDF Downloads 348
11930 Economic Growth After an Earthquake: A Synthetic Control Approach

Authors: Diego Diaz H., Cristian Larroulet

Abstract:

Although a large earthquake has clear and immediate consequences such as deaths, destruction of infrastructure and displacement (at least temporary) of part of the population, scientific research about the impact of a geological disaster in economic activity is inconclusive, especially when looking beyond the very short term. Estimating the economic impact years after a disaster strike is non-trivial since there is an unavoidable difficulty in attributing the observed effect to the disaster and not to other economic shocks. Case studies are performed that determine the impact of earthquakes in Chile, Japan, and New Zealand at a regional level by applying the synthetic control method, using the natural disaster as treatment. This consisted in constructing a counterfactual from every region in the same country that is not affected (or is slightly affected) by the earthquake. The results show that the economies of Canterbury and Tohoku achieved greater levels of GDP per capita in the years after the disaster than they would have in the absence of the disaster. For the case of Chile, however, the region of Maule experiences a decline in GDP per capita because of the earthquake. All the results are robust according to the placebo tests. Also, the results suggest that national institutional quality improve the growth process after the disaster.

Keywords: earthquake, economic growth, institutional quality, synthetic control

Procedia PDF Downloads 195
11929 Credit Risk Assessment Using Rule Based Classifiers: A Comparative Study

Authors: Salima Smiti, Ines Gasmi, Makram Soui

Abstract:

Credit risk is the most important issue for financial institutions. Its assessment becomes an important task used to predict defaulter customers and classify customers as good or bad payers. To this objective, numerous techniques have been applied for credit risk assessment. However, to our knowledge, several evaluation techniques are black-box models such as neural networks, SVM, etc. They generate applicants’ classes without any explanation. In this paper, we propose to assess credit risk using rules classification method. Our output is a set of rules which describe and explain the decision. To this end, we will compare seven classification algorithms (JRip, Decision Table, OneR, ZeroR, Fuzzy Rule, PART and Genetic programming (GP)) where the goal is to find the best rules satisfying many criteria: accuracy, sensitivity, and specificity. The obtained results confirm the efficiency of the GP algorithm for German and Australian datasets compared to other rule-based techniques to predict the credit risk.

Keywords: credit risk assessment, classification algorithms, data mining, rule extraction

Procedia PDF Downloads 154
11928 UEMSD Risk Identification: Case Study

Authors: K. Sekulová, M. Šimon

Abstract:

The article demonstrates on a case study how it is possible to identify MSD risk. It is based on a dissertation risk identification model of occupational diseases formation in relation to the work activity that determines what risk can endanger workers who are exposed to the specific risk factors. It is evaluated based on statistical calculations. These risk factors are main cause of upper-extremities musculoskeletal disorders.

Keywords: case study, upper-extremity musculoskeletal disorders, ergonomics, risk identification

Procedia PDF Downloads 472
11927 Earthquakes and Buildings: Lesson Learnt from Past Earthquakes in Turkey

Authors: Yavuz Yardım

Abstract:

The most important criteria for structural engineering is the structure’s ability to carry intended loads safely. The key element of this ability is mathematical modeling of really loadings situation into a simple loads input to use in structure analysis and design. Amongst many different types of loads, the most challenging load is earthquake load. It is possible magnitude is unclear and timing is unknown. Therefore the concept of intended loads and safety have been built on experience of previous earthquake impact on the structures. Understanding and developing these concepts is achieved by investigating performance of the structures after real earthquakes. Damage after an earthquake provide results of thousands of full-scale structure test under a real seismic load. Thus, Earthquakes reveille all the weakness, mistakes and deficiencies of analysis, design rules and practice. This study deals with lesson learnt from earthquake recoded last two decades in Turkey. Results of investigation after several earthquakes exposes many deficiencies in structural detailing, inappropriate design, wrong architecture layout, and mainly mistake in construction practice.

Keywords: earthquake, seismic assessment, RC buildings, building performance

Procedia PDF Downloads 243
11926 Earthquake Vulnerability and Repair Cost Estimation of Masonry Buildings in the Old City Center of Annaba, Algeria

Authors: Allaeddine Athmani, Abdelhacine Gouasmia, Tiago Ferreira, Romeu Vicente

Abstract:

The seismic risk mitigation from the perspective of the old buildings stock is truly essential in Algerian urban areas, particularly those located in seismic prone regions, such as Annaba city, and which the old buildings present high levels of degradation associated with no seismic strengthening and/or rehabilitation concerns. In this sense, the present paper approaches the issue of the seismic vulnerability assessment of old masonry building stocks through the adaptation of a simplified methodology developed for a European context area similar to that of Annaba city, Algeria. Therefore, this method is used for the first level of seismic vulnerability assessment of the masonry buildings stock of the old city center of Annaba. This methodology is based on a vulnerability index that is suitable for the evaluation of damage and for the creation of large-scale loss scenarios. Over 380 buildings were evaluated in accordance with the referred methodology and the results obtained were then integrated into a Geographical Information System (GIS) tool. Such results can be used by the Annaba city council for supporting management decisions, based on a global view of the site under analysis, which led to more accurate and faster decisions for the risk mitigation strategies and rehabilitation plans.

Keywords: Damage scenarios, masonry buildings, old city center, seismic vulnerability, vulnerability index

Procedia PDF Downloads 426
11925 Risk Prioritization in Tunneling Construction Projects

Authors: David Nantes, George Gilbert

Abstract:

There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.

Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects

Procedia PDF Downloads 67
11924 A Risk-Based Approach to Construction Management

Authors: Chloe E. Edwards, Yasaman Shahtaheri

Abstract:

Risk management plays a fundamental role in project planning and delivery. The purpose of incorporating risk management into project management practices is to identify and address uncertainties related to key project-related activities. The uncertainties, known as risk events, can relate to project deliverables that are quantifiable and are often measured by impact to project schedule, cost, or environmental impact. Risk management should be incorporated as an iterative practice throughout the planning, execution, and commissioning phases of a project. This paper specifically examines how risk management contributes to effective project planning and delivery through a case study of a transportation project. This case study focused solely on impacts to project schedule regarding three milestones: readiness for delivery, readiness for testing and commissioning, and completion of the facility. The case study followed the ISO 31000: Risk Management – Guidelines. The key factors that are outlined by these guidelines include understanding the scope and context of the project, conducting a risk assessment including identification, analysis, and evaluation, and lastly, risk treatment through mitigation measures. This process requires continuous consultation with subject matter experts and monitoring to iteratively update the risks accordingly. The risk identification process led to a total of fourteen risks related to design, permitting, construction, and commissioning. The analysis involved running 1,000 Monte Carlo simulations through @RISK 8.0 Industrial software to determine potential milestone completion dates based on the project baseline schedule. These dates include the best case, most likely case, and worst case to provide an estimated delay for each milestone. Evaluation of these results provided insight into which risks were the highest contributors to the projected milestone completion dates. Based on the analysis results, the risk management team was able to provide recommendations for mitigation measures to reduce the likelihood of risks occurring. The risk management team also provided recommendations for managing the identified risks and project activities moving forward to meet the most likely or best-case milestone completion dates.

Keywords: construction management, monte carlo simulation, project delivery, risk assessment, transportation engineering

Procedia PDF Downloads 87
11923 The Problems of Current Earth Coordinate System for Earthquake Forecasting Using Single Layer Hierarchical Graph Neuron

Authors: Benny Benyamin Nasution, Rahmat Widia Sembiring, Abdul Rahman Dalimunthe, Nursiah Mustari, Nisfan Bahri, Berta br Ginting, Riadil Akhir Lubis, Rita Tavip Megawati, Indri Dithisari

Abstract:

The earth coordinate system is an important part of an attempt for earthquake forecasting, such as the one using Single Layer Hierarchical Graph Neuron (SLHGN). However, there are a number of problems that need to be worked out before the coordinate system can be utilized for the forecaster. One example of those is that SLHGN requires that the focused area of an earthquake must be constructed in a grid-like form. In fact, within the current earth coordinate system, the same longitude-difference would produce different distances. This can be observed at the distance on the Equator compared to distance at both poles. To deal with such a problem, a coordinate system has been developed, so that it can be used to support the ongoing earthquake forecasting using SLHGN. Two important issues have been developed in this system: 1) each location is not represented through two-value (longitude and latitude), but only a single value, 2) the conversion of the earth coordinate system to the x-y cartesian system requires no angular formulas, which is therefore fast. The accuracy and the performance have not been measured yet, since earthquake data is difficult to obtain. However, the characteristics of the SLHGN results show a very promising answer.

Keywords: hierarchical graph neuron, multidimensional hierarchical graph neuron, single layer hierarchical graph neuron, natural disaster forecasting, earthquake forecasting, earth coordinate system

Procedia PDF Downloads 197
11922 Economic Evaluation Offshore Wind Project under Uncertainly and Risk Circumstances

Authors: Sayed Amir Hamzeh Mirkheshti

Abstract:

Offshore wind energy as a strategic renewable energy, has been growing rapidly due to availability, abundance and clean nature of it. On the other hand, budget of this project is incredibly higher in comparison with other renewable energies and it takes more duration. Accordingly, precise estimation of time and cost is needed in order to promote awareness in the developers and society and to convince them to develop this kind of energy despite its difficulties. Occurrence risks during on project would cause its duration and cost constantly changed. Therefore, to develop offshore wind power, it is critical to consider all potential risks which impacted project and to simulate their impact. Hence, knowing about these risks could be useful for the selection of most influencing strategies such as avoidance, transition, and act in order to decrease their probability and impact. This paper presents an evaluation of the feasibility of 500 MV offshore wind project in the Persian Gulf and compares its situation with uncertainty resources and risk. The purpose of this study is to evaluate time and cost of offshore wind project under risk circumstances and uncertain resources by using Monte Carlo simulation. We analyzed each risk and activity along with their distribution function and their effect on the project.

Keywords: wind energy project, uncertain resources, risks, Monte Carlo simulation

Procedia PDF Downloads 334
11921 Response of a Bridge Crane during an Earthquake

Authors: F. Fekak, A. Gravouil, M. Brun, B. Depale

Abstract:

During an earthquake, a bridge crane may be subjected to multiple impacts between crane wheels and rail. In order to model such phenomena, a time-history dynamic analysis with a multi-scale approach is performed. The high frequency aspect of the impacts between wheels and rails is taken into account by a Lagrange explicit event-capturing algorithm based on a velocity-impulse formulation to resolve contacts and impacts. An implicit temporal scheme is used for the rest of the structure. The numerical coupling between the implicit and the explicit schemes is achieved with a heterogeneous asynchronous time-integrator.

Keywords: bridge crane, earthquake, dynamic analysis, explicit, implicit, impact

Procedia PDF Downloads 279
11920 Disaster Preparedness for People with Disabilities through EPPO's Educational Awareness Initiative

Authors: A. Kourou, A. Ioakeimidou, E. Pelli, M. Panoutsopoulou, V. Abramea

Abstract:

Worldwide there is a growing recognition that education is a critical component of any disaster impacts reduction effort and a great challenge too. Given this challenge, a broad range of awareness raising projects at all levels are implemented and are continuously evaluated by Earthquake Planning and Protection Organization (EPPO). This paper presents an overview of EPPO educational initiative (seminars, lectures, workshops, campaigns and educational material) and its evaluation results. The abovementioned initiative is focused to aware the public, train teachers and civil protection staff, inform students and educate people with disabilities on subjects related to earthquake reduction issues. The better understating of how human activity can link to disaster and what can be done at the individual, family or workplace level to contribute to seismic reduction are the main issues of EPPO projects. Survey results revealed that a high percentage of teachers (included the ones of special schools) from all over the country have taken the appropriate preparedness measures at schools. On the other hand, the implementation of earthquake preparedness measures at various workplaces (kindergartens, banks, utilities etc.) has still significant room for improvement. Results show that the employees in banks and public utilities have substantially higher rates in preventive and preparedness actions in their workplaces than workers in kindergartens and other workplaces. One of the EPPO educational priorities is to enhance earthquake preparedness of people with disabilities. Booklets, posters and applications have been created with the financial support of the Council of Europe, addressed to people who have mobility impairments, learning difficulties or cognitive disability (ή intellectual disabilities). Part of the educational material was developed using the «easy-to-read» method and Makaton language program with the collaboration of experts on special needs education and teams of people with cognitive disability. Furthermore, earthquake safety seminars and earthquake drills have been implemented in order to develop children’s, parents’ and teachers abilities and skills on earthquake impacts reduction. To enhance the abovementioned efforts, EPPO is a partner at prevention and preparedness projects supported by EU Civil Protection Financial Instrument. One of them is E-PreS’ project (Monitoring and Evaluation of Natural Hazard Preparedness at School Environment). The main objectives of E-PreS project are: 1) to create smart tools which define, simulate and evaluate drills procedure at schools, centers of vocational training of people with disabilities or other workplaces, and 2) to involve students or adults with disabilities in the E-PreS system evacuation procedure in case of earthquake, flood, or volcanic occurrence. Two other EU projects (RACCE educational kit and EVANDE educational platform) are also with the aim of contributing to raising awareness among people with disabilities, students, teachers, volunteers etc. It is worth mentioning that even though in Greece many efforts have been done till now to build awareness towards earthquakes and establish preparedness status for prospective earthquakes, there are still actions to be taken.

Keywords: earthquake, emergency plans, E-PreS project, people with disabilities, special needs education

Procedia PDF Downloads 242
11919 Risk Assessment on Construction Management with “Fuzzy Logy“

Authors: Mehrdad Abkenari, Orod Zarrinkafsh, Mohsen Ramezan Shirazi

Abstract:

Construction projects initiate in complicated dynamic environments and, due to the close relationships between project parameters and the unknown outer environment, they are faced with several uncertainties and risks. Success in time, cost and quality in large scale construction projects is uncertain in consequence of technological constraints, large number of stakeholders, too much time required, great capital requirements and poor definition of the extent and scope of the project. Projects that are faced with such environments and uncertainties can be well managed through utilization of the concept of risk management in project’s life cycle. Although the concept of risk is dependent on the opinion and idea of management, it suggests the risks of not achieving the project objectives as well. Furthermore, project’s risk analysis discusses the risks of development of inappropriate reactions. Since evaluation and prioritization of construction projects has been a difficult task, the network structure is considered to be an appropriate approach to analyze complex systems; therefore, we have used this structure for analyzing and modeling the issue. On the other hand, we face inadequacy of data in deterministic circumstances, and additionally the expert’s opinions are usually mathematically vague and are introduced in the form of linguistic variables instead of numerical expression. Owing to the fact that fuzzy logic is used for expressing the vagueness and uncertainty, formulation of expert’s opinion in the form of fuzzy numbers can be an appropriate approach. In other words, the evaluation and prioritization of construction projects on the basis of risk factors in real world is a complicated issue with lots of ambiguous qualitative characteristics. In this study, evaluated and prioritization the risk parameters and factors with fuzzy logy method by combination of three method DEMATEL (Decision Making Trial and Evaluation), ANP (Analytic Network Process) and TOPSIS (Technique for Order-Preference by Similarity Ideal Solution) on Construction Management.

Keywords: fuzzy logy, risk, prioritization, assessment

Procedia PDF Downloads 569
11918 Torsional Design Method of Asymmetric and Irregular Building under Horizontal Earthquake Action

Authors: Radhwane Boudjelthia

Abstract:

Based upon elaborate analysis on torsional design methods of asymmetric and irregular structure under horizontal earthquake action, it points out that the main design principles of an asymmetric building subjected to horizontal earthquake are: the torsion of vertical members induced by the torsion angle of the floor (rigid diaphragm) cannot exceed the allowable value, the inter-story displacement at outermost frame or shear wall should be less than that required by design code, stresses in plane of the slab should be controlled within acceptable extent under different intensity earthquakes. That current seismic design code only utilizes the torsion displacement ratio to control the floor torsion, which seems not reasonable enough since its connotation is the multiple of the floor torsion angle and the distance of floor mass center to the edge frame or shear wall.

Keywords: earthquake, building, seismic forces, displacement, resonance, response

Procedia PDF Downloads 320
11917 A Case Study on Re-Assessment Study of an Earthfill Dam at Latamber, Pakistan

Authors: Afnan Ahmad, Shahid Ali, Mujahid Khan

Abstract:

This research presents the parametric study of an existing earth fill dam located at Latamber, Karak city, Pakistan. The study consists of carrying out seepage analysis, slope stability analysis, and Earthquake analysis of the dam for the existing dam geometry and do the same for modified geometry. Dams are massive as well as expensive hydraulic structure, therefore it needs proper attention. Additionally, this dam falls under zone 2B region of Pakistan, which is an earthquake-prone area and where ground accelerations range from 0.16g to 0.24g peak. So it should be deal with great care, as the failure of any dam can cause irreparable losses. Similarly, seepage as well as slope failure can also cause damages which can lead to failure of the dam. Therefore, keeping in view of the importance of dam construction and associated costs, our main focus is to carry out parametric study of newly constructed dam. GeoStudio software is used for this analysis in the study in which Seep/W is used for seepage analysis, Slope/w is used for Slope stability analysis and Quake/w is used for earthquake analysis. Based on the geometrical, hydrological and geotechnical data, Seepage and slope stability analysis of different proposed geometries of the dam are carried out along with the Seismic analysis. A rigorous analysis was carried out in 2-D limit equilibrium using finite element analysis. The seismic study began with the static analysis, continuing by the dynamic response analysis. The seismic analyses permitted evaluation of the overall patterns of the Latamber dam behavior in terms of displacements, stress, strain, and acceleration fields. Similarly, the seepage analysis allows evaluation of seepage through the foundation and embankment of the dam, while slope stability analysis estimates the factor of safety of the upstream and downstream of the dam. The results of the analysis demonstrate that among multiple geometries, Latamber dam is secure against seepage piping failure and slope stability (upstream and downstream) failure. Moreover, the dam is safe against any dynamic loading and no liquefaction has been observed while changing its geometry in permissible limits.

Keywords: earth-fill dam, finite element, liquefaction, seepage analysis

Procedia PDF Downloads 143
11916 Enterprise Risk Management: A Future Outlook

Authors: Ruchi Agarwal, Jake Ansell

Abstract:

Austerity impacts on all aspects of society. Companies into the future will have to be more capable of dealing with the risks they face. Enterprise Risk Management (ERM) has widely been accepted in recent years as an approach to manage risks within businesses. ERM attempts to tackle risk holistically with gains from opportunities in a managing risk and reduction in the risk of failure. The paper reviews merits and demerits of approaches to risk management in regard to antifragility. A qualitative study has investigated current practices and the problems with ERM implementation by interviewing over 25 chief risk officers and senior management. The findings indicate the gap in ERM description, understanding, and implementation. The paper suggests risk learning and expertise knowledge supports development of effective enterprise risk management by designing systems with inherent resilience.

Keywords: risk management, interviews, antifragility, failure

Procedia PDF Downloads 529
11915 Power Transformer Risk-Based Maintenance by Optimization of Transformer Condition and Transformer Importance

Authors: Kitti Leangkrua

Abstract:

This paper presents a risk-based maintenance strategy of a power transformer in order to optimize operating and maintenance costs. The methodology involves the study and preparation of a database for the collection the technical data and test data of a power transformer. An evaluation of the overall condition of each transformer is performed by a program developed as a result of the measured results; in addition, the calculation of the main equipment separation to the overall condition of the transformer (% HI) and the criteria for evaluating the importance (% ImI) of each location where the transformer is installed. The condition assessment is performed by analysis test data such as electrical test, insulating oil test and visual inspection. The condition of the power transformer will be classified from very poor to very good condition. The importance is evaluated from load criticality, importance of load and failure consequence. The risk matrix is developed for evaluating the risk of each power transformer. The high risk power transformer will be focused firstly. The computerized program is developed for practical use, and the maintenance strategy of a power transformer can be effectively managed.

Keywords: asset management, risk-based maintenance, power transformer, health index

Procedia PDF Downloads 282
11914 Earthquakes' Magnitude and Density Controls by Mechanical Stratigraphy in the Zagros, Iran

Authors: Asaad Pireh

Abstract:

The Zagros fold and thrust belt is one of the most active seismic zones of Iran where hosts many people and considerable oil and gas resources. The Zagros fold and thrust belt, based on its stratigraphy has been divided into three provinces. Mechanical stratigraphy of these provinces is different together. Statistical analyses all of earthquakes which has happened in the Zagros fold and thrust belt from 1964 up to December 2014, shows that strong earthquakes have occurred within the southeastern part of these subdivisions which has a smaller ratio of incompetent to competent thickness and in the northwestern part of these subdivisions which has a greater ratio of incompetent to competent thickness has occurred the weakest earthquakes. The southeastern part of the Zagros has a higher seismic risk and northwestern part of these fold belt have a lower seismic risk.

Keywords: earthquake, mechanical stratigraphy, seismic risk, Zagros

Procedia PDF Downloads 130
11913 Increase the Ductility of Tall Buildings Using Green Material Bamboo for Earthquake Zone

Authors: Shef Amir Arasy

Abstract:

In 2023, the world's population will be 7.8 billion, which has increased significantly in the last 20 years. Every country in the world is experiencing the impacts of climate change directly and indirectly. However, the community still needs to build massive infrastructure and buildings. The massive CO2 emissions which lead to climate change come from cement usage in construction activity. Bamboo is one of the most sustainable materials for reducing carbon emissions and releasing more than 30% oxygen compared to the mass of trees. Besides, bamboo harvest time is faster than other sustainable materials, around 3-4 years. Furthermore, Bamboo has a high tensile strength, which can provide ductility effectively to prevent damage to buildings during an earthquake. By the finite element method, this research analyzes bamboo configuration and connection for tall building structures under different earthquake frequencies and fire. The aim of this research is to provide proper design and connection of bamboo buildings that can be more reliable than concrete structures.

Keywords: bamboo, concrete, ductility, earthquake.

Procedia PDF Downloads 45
11912 Ambient Vibration Test and Numerical Modelling of Wind Turbine Towers including Soil Structure Interaction

Authors: Heba Kamal, Ghada Saudi

Abstract:

Due to The rapid expansion of energy and growing number of wind turbines construction in earthquake areas, a design method for simple and accurate evaluation of seismic load to ensure structural integrity is required. In Egypt, there are some appropriate places to build wind turbine towers lie in active seismically regions, so accurate analysis is necessary for prediction of seismic loads with consideration of intensity of the earthquake, soil and structural characteristics. In this research, seismic behavior of wind turbine towers Gamesa Type G52 in Zafarana Wind Farm Egypt is investigated using experimental work by ambient vibration test, and fully dynamic analysis based on time history from El Aqaba Earthquake 1995 using 3D by PLAXIS 3D software, including the soil structure interaction effect. The results obtained from dynamic analyses are discussed. From this study, it is concluded that, the fully dynamic seismic analysis based on used PLAXIS 3D with the aid of the full scale ambient vibration test gives almost good simulation for the seismic loads that can be applied to wind turbine tower design in Egypt.

Keywords: Wind turbine towers, Zafarana Wind Farm, Gamesa Type G52, ambient vibration test

Procedia PDF Downloads 188
11911 Identifying Psychosocial, Autonomic, and Pain Sensitivity Risk Factors of Chronic Temporomandibular Disorder by Using Ridge Logistic Regression and Bootstrapping

Authors: Haolin Li, Eric Bair, Jane Monaco, Quefeng Li

Abstract:

The temporomandibular disorder (TMD) is a series of musculoskeletal disorders ranging from jaw pain to chronic debilitating pain, and the risk factors for the onset and maintenance of TMD are still unclear. Prior researches have shown that the potential risk factors for chronic TMD are related to psychosocial factors, autonomic functions, and pain sensitivity. Using data from the Orofacial Pain: Prospective Evaluation and Risk Assessment (OPPERA) study’s baseline case-control study, we examine whether the risk factors identified by prior researches are still statistically significant after taking all of the risk measures into account in one single model, and we also compare the relative influences of the risk factors in three different perspectives (psychosocial factors, autonomic functions, and pain sensitivity) on the chronic TMD. The statistical analysis is conducted by using ridge logistic regression and bootstrapping, in which the performance of the algorithms has been assessed using extensive simulation studies. The results support most of the findings of prior researches that there are many psychosocial and pain sensitivity measures that have significant associations with chronic TMD. However, it is surprising that most of the risk factors of autonomic functions have not presented significant associations with chronic TMD, as described by a prior research.

Keywords: autonomic function, OPPERA study, pain sensitivity, psychosocial measures, temporomandibular disorder

Procedia PDF Downloads 161
11910 Seismic Hazard Study and Strong Ground Motion in Southwest Alborz, Iran

Authors: Fereshteh Pourmohammad, Mehdi Zare

Abstract:

The city of Karaj, having a population of 2.2 millions (est. 2022) is located in the South West of Alborz Mountain Belt in Northern Iran. The region is known to be a highly active seismic zone. This study is focused on the geological and seismological analyses within a radius of 200 km from the center of Karaj. There are identified five seismic zones and seven linear seismic sources. The maximum magnitude was calculated for the seismic zones. Scine tghe seismicity catalog is incomplete, we have used a parametric-historic algorithm and the Kijko and Sellevoll (1992) method was used to calculate seismicity parameters, and the return periods and the probability frequency of recurrence of the earthquake magnitude in each zone obtained for 475-years return period. According to the calculations, the highest and lowest earthquake magnitudes of 7.6 and 6.2 were respectively obtained in Zones 1 and 4. This result is a new and extremely important in view point of earthquake risk in a densely population city. The maximum strong horizontal ground motion for the 475-years return period 0.42g and for 2475-year return period 0.70g also the maximum strong vertical ground motion for 475-years return period 0.25g and 2475-years return period 0.44g was calculated using attenuation relationships. These acceleration levels are new, and are obtained to be about 25% higher than presented values in the Iranian building code.

Keywords: seismic zones, ground motion, return period, hazard analysis

Procedia PDF Downloads 82