Search results for: peace maintenance
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1853

Search results for: peace maintenance

1763 A New Mathematical Model for Scheduling Preventive Maintenance and Renewal Projects of Multi-Unit Systems; Application to Railway Track

Authors: Farzad Pargar

Abstract:

We introduce the preventive maintenance and renewal scheduling problem for a multi-unit system over a finite and discretized time horizon. Given the latest possible time for carrying out the next maintenance and renewal projects after the previous ones and considering several common set-up costs, the introduced scheduling model tries to minimize the cost of projects by grouping them and simultaneously finding the optimal balance between doing maintenance and renewal. We present a 0-1 pure integer linear programming that determines which projects should be performed together on which location and in which period (e.g., week or month). We consider railway track as a case for our study and test the performance of the proposed model on a set of test problems. The experimental results show that the proposed approach performs well.

Keywords: maintenance, renewal, scheduling, mathematical programming model

Procedia PDF Downloads 672
1762 Using Equipment Telemetry Data for Condition-Based maintenance decisions

Authors: John Q. Todd

Abstract:

Given that modern equipment can provide comprehensive health, status, and error condition data via built-in sensors, maintenance organizations have a new and valuable source of insight to take advantage of. This presentation will expose what these data payloads might look like and how they can be filtered, visualized, calculated into metrics, used for machine learning, and generate alerts for further action.

Keywords: condition based maintenance, equipment data, metrics, alerts

Procedia PDF Downloads 166
1761 Feature of Employment Injuries and Maintenance Works of Construction Machinery

Authors: Naoko Kanazawa, Tran Thi Bich Nguyet, Yoshiyuki Higuchi, Hideki Hamada

Abstract:

Construction machines’ condition is maintained with the regularly inspections, preventive maintenance and repairs by skillful and qualified engineers. If an accident occurs, there will be enormous influence such as human injuries, delays in the term of construction. In this paper, we revealed the characteristics such as inspection, maintenance and repair works for construction machines, and we also clarified the trends of employment injuries based on actual data by simple and cross tabulation methods, and investigated the relation with their works, injured body parts and accident types.

Keywords: construction machines, employment injuries, maintenance and repair, safety and health

Procedia PDF Downloads 288
1760 Political Transition in Nepal: Challenges and Limitations to Post-Conflict Peace-Building

Authors: Sourina Bej

Abstract:

Since the process of decolonization in 1940, several countries in South Asia have witnessed intra-state conflicts owing to ineffective political governance. The conflicts have remained protracted as the countries have failed to make a holistic transition to a democratic state. Nepal is one such South Asian country facing a turmultous journey from monarchy to republicanism. The paper aims to focus on the democratic transition in the context of Nepal’s political, legal and economic institutions. The presence of autocratic feudalistic and centralised state structure with entrenched socio-economic inequalities has resulted in mass uprising only to see the country slip back to the old order. Even a violent civil war led by the Maoists could not overhaul the political relations or stabilize the democratic space. The paper aims to analyse the multiple political, institutional and operational challenges in the implementation of the peace agreement with the Maoist. Looking at the historical background, the paper will examine the problematic nation-building that lies at the heart of fragile peace process in Nepal. Regional dynamics have played a big role in convoluting the peace-building. The new constitution aimed at conflict resolution brought to the open, deep seated hatred among different ethnic groups in Nepal. Apart from studying the challenges to the peace process and the role of external players like India and China in the political reconstruction, the paper will debate on a viable federal solution to the ethnic conflict in Nepal. If the current government fails to pass a constitution accepted by most ethnic groups, Nepal will remain on the brink of new conflict outbreaks.

Keywords: democratisation, ethnic conflict, Nepal, peace process

Procedia PDF Downloads 261
1759 Design of Low-Maintenance Sewer Pump Stations with High-Security Measures for Municipal Applications

Authors: H. V. Smit, V. H. J. de Wet

Abstract:

South African municipalities are dealing with aging and dilapidated infrastructure while faced with challenges in the form of expanding informal settlements, vandalism, theft, and a lack of maintenance which place even more pressure on existing infrastructure. The existing infrastructure was never designed to cater to these challenges, and this becomes evident when evaluating the current state of many municipal sewer pump stations. A need has thus arisen to develop a sewer pump station design concept that will address these challenges and allow for a long-term sustainable solution. This article deals with the design concepts which have been developed for sewer pump stations for an effective reduction in maintenance, improved grit handling, improvement to the operation and maintenance working conditions, and the adoption of high-security design philosophy.

Keywords: high security, low maintenance, municipal application, sewer pump station

Procedia PDF Downloads 84
1758 Military Role of Russia beyond Its National Boundary

Authors: Nipuli Gajanayake

Abstract:

The Russian military role beyond its national frontier has become a debatable hot topic in the international political arena. It’s advanced, and strategic responses in combating regional and international security problems have always been a factor to debate and criticize. Under such critical circumstances, Russia is attentive to play its military role according to the provisions of the Military Doctrine of the Russian Federation. Most importantly, the legal basis of the doctrine has also consisted with the generally recognized principles and norms of international law. Therefore, Russian international military assistances are pledged to accomplish international peace and security. The expansion of Russian military participation in the United Nations Peacekeeping operations, and military- political, and technical cooperation have largely evident the great effort of Russia in maintaining and restoring international peace and security. Moreover, the conflict management diplomacy and the development of dialogue with nation states to confront military risks and threats can also identify as a part of preserving international peace and security. In addition, Russia strives to strengthen the system of collective security with regional and international organizations through the legal framework of the Collective Security Treaty Organization (CSTO). Maintaining cooperative ties with the Commonwealth of Independent States (CIS), the Organization for Security and Cooperation in Europe (OSCE) and the Shanghai Cooperation Organization (SCO) have highlighted the Russian deliberation on maintaining regional peace and security. Nevertheless, the extension of cordial relations with nation states and providing of military assistances during tensions and conflicts on their territories can also underscore as Russians commitments on maintaining international peace and security. Observing and recognizing the disparity between the West portrayed terms like ‘illegal Russian interventions’ and the comprehensive reality behind the ‘Russian military assistances’ are important to understand. However, a lopsided vision or a perspective towards the Russian international military role would not present a clear understanding about its valued and also dedicated hard work on maintaining international peace and security.

Keywords: collective security, diplomacy, international military role of Russia, international peace and security

Procedia PDF Downloads 283
1757 Mobile Application Tool for Individual Maintenance Users on High-Rise Residential Buildings in South Korea

Authors: H. Cha, J. Kim, D. Kim, J. Shin, K. Lee

Abstract:

Since 1980's, the rapid economic growth resulted in so many aged apartment buildings in South Korea. Nevertheless, there is insufficient maintenance practice of buildings. In this study, to facilitate the building maintenance the authors classified the building defects into three levels according to their level of performance and developed a mobile application tool based on each level's appropriate feedback. The feedback structure consisted of 'Maintenance manual phase', 'Online feedback phase', 'Repair work phase of the specialty contractors'. In order to implement each phase the authors devised the necessary database for each phase and created a prototype system that can develop on its own. The authors expect that the building users can easily maintain their buildings by using this application.

Keywords: building defect, maintenance practice, mobile application, system algorithm

Procedia PDF Downloads 176
1756 Work demand and Prevalence of Work-Related Musculoskeletal Disorders: A Case Study of Pakistan Aviation Maintenance Workers

Authors: Muzamil Mahmood, Afshan Naseem, Muhammad Zeeshan Mirza, Yasir Ahmad, Masood Raza

Abstract:

The purpose of this research is to analyze how aviation maintenance workers’ characteristics and work demand affect their development of work-related musculoskeletal disorders (WMSDs). Guided by literature on task characteristics, work demand, and WMSDs, data is collected from 128 aviation maintenance workers of private and public airlines. Data is then analyzed through descriptive and inferential statistics. It is found that task characteristics have a significant positive effect on WMSDs and an increase in tasks performed by aviation maintenance workers leads to increase in WMSDs. Work demand did not have a significant effect on WMSDs. The task characteristics of aviation maintenance workers moderates the relationship between their work demand and WMSDs. This reveals that task characteristics of aviation maintenance workers enhance the effect of work demand on WMSDs. The task characteristics of aviation maintenance workers are challenging and unpredictable. Subsequently, WMSDs are prevalent among aviation maintenance workers. The work demand of aviation maintenance workers does not influence their development of WMSDs. Pakistan Civil Aviation Authority should minimize the intensity of tasks assigned to aviation maintenance workers by introducing work dynamisms such as task sharing, job rotation, and probably teleworking to enhance flexibility. Human Resource and Recruitment Department need to consider the ability and fitness levels of potential aviation maintenance workers during recruitment. In addition, regular physical activities and ergonomic policies should be put in place by the management of the Pakistan Civil Aviation Authority to reduce the incidences of WMSDs.

Keywords: work related musculoskeletal disorders, ergonomics, occupational health and safety, human factors

Procedia PDF Downloads 137
1755 An Appraisal of Maintenance Management Practices in Federal University Dutse and Jigawa State Polytechnic Dutse, Nigeria

Authors: Aminu Mubarak Sadis

Abstract:

This study appraised the maintenance management practice in Federal University Dutse and Jigawa State Polytechnic Dutse, in Nigeria. The Physical Planning, Works and Maintenance Departments of the two Higher Institutions (Federal University Dutse and Jigawa State Polytechnic) are responsible for production and maintenance management of their physical assets. Over–enrollment problem has been a common feature in the higher institutions in Nigeria, Data were collected by the administered questionnaires and subsequent oral interview to authenticate the completed questionnaires. Random sampling techniques was used in selecting 150 respondents across the various institutions (Federal University Dutse and Jigawa State Polytechnic Dutse). Data collected was analyzed using Statistical Package for Social Science (SPSS) and t-test statistical techniques The conclusion was that maintenance management activities are yet to be given their appropriate attention on functions of the university and polytechnic which are crucial to improving teaching, learning and research. The unit responsible for maintenance and managing facilities should focus on their stated functions and effect changes were possible.

Keywords: appraisal, maintenance management, university, Polytechnic, practices

Procedia PDF Downloads 224
1754 Developing Medium Term Maintenance Plan For Road Networks

Authors: Helen S. Ghali, Haidy S. Ghali, Salma Ibrahim, Ossama Hosny, Hatem S. Elbehairy

Abstract:

Infrastructure systems are essential assets in any community; accordingly, authorities aim to maximize its life span while minimizing the life cycle cost. This requires studying the asset conditions throughout its operation and forming a cost-efficient maintenance strategy plan. The objective of this study is to develop a highway management system that provides medium-term maintenance plans with the minimum life cycle cost subject to budget constraints. The model is applied to data collected for the highway network in India with the aim to output a 5-year maintenance plan strategy from 2019 till 2023. The main element considered is the surface coarse, either rigid or flexible pavement. The model outputs a 5-year maintenance plan for each segment given the budget constraint while maximizing the new pavement condition rating and minimizing its life cycle cost.

Keywords: infrastructure, asset management, optimization, maintenance plan

Procedia PDF Downloads 198
1753 Analyzing the Performance of Different Cost-Based Methods for the Corrective Maintenance of a System in Thermal Power Plants

Authors: Demet Ozgur-Unluakin, Busenur Turkali, S. Caglar Aksezer

Abstract:

Since the age of industrialization, maintenance has always been a very crucial element for all kinds of factories and plants. With today’s increasingly developing technology, the system structure of such facilities has become more complicated, and even a small operational disruption may return huge losses in profits for the companies. In order to reduce these costs, effective maintenance planning is crucial, but at the same time, it is a difficult task because of the complexity of systems. The most important aspect of correct maintenance planning is to understand the structure of the system, not to ignore the dependencies among the components and as a result, to model the system correctly. In this way, it will be better to understand which component improves the system more when it is maintained. Undoubtedly, proactive maintenance at a scheduled time reduces costs because the scheduled maintenance prohibits high losses in profits. But the necessity of corrective maintenance, which directly affects the situation of the system and provides direct intervention when the system fails, should not be ignored. When a fault occurs in the system, if the problem is not solved immediately and proactive maintenance time is awaited, this may result in increased costs. This study proposes various maintenance methods with different efficiency measures under corrective maintenance strategy on a subsystem of a thermal power plant. To model the dependencies between the components, dynamic Bayesian Network approach is employed. The proposed maintenance methods aim to minimize the total maintenance cost in a planning horizon, as well as to find the most appropriate component to be attacked on, which improves the system reliability utmost. Performances of the methods are compared under corrective maintenance strategy. Furthermore, sensitivity analysis is also applied under different cost values. Results show that all fault effect methods perform better than the replacement effect methods and this conclusion is also valid under different downtime cost values.

Keywords: dynamic Bayesian networks, maintenance, multi-component systems, reliability

Procedia PDF Downloads 107
1752 OAS and Interstate Dispute Resolution at the Beginning of the 21st Century: General Pattern and Peculiarities

Authors: Victor Jeifets, Liliia Khadorich

Abstract:

The paper describes the OAS role in dispute resolution. The authors make an attempt to identify a general pattern of the OAS activities within the peaceful settlement of interstate conflicts, in the beginning of 21st century, as well as to analyze some features of Honduras–Belize, Nicaragua–Honduras, Honduras–El Salvador, Costa-Rica–Nicaragua, Colombia–Ecuador cases.

Keywords: OAS, peace maintenance, border dispute, dispute resolution, peaceful settlement

Procedia PDF Downloads 475
1751 Road Maintenance Management Decision System Using Multi-Criteria and Geographical Information System for Takoradi Roads, Ghana

Authors: Eric Mensah, Carlos Mensah

Abstract:

The road maintenance backlogs created as a result of deferred maintenance especially in developing countries has caused considerable deterioration of many road assets. This is usually due to difficulties encountered in selecting and prioritising maintainable roads based on objective criteria rather than some political or other less important criteria. In order to ensure judicious use of limited resources for road maintenance, five factors were identified as the most important criteria for road management within the study area. This was based on the judgements of 40 experts. The results were further used to develop weightings using the Multi-Criteria Decision Process (MCDP) to analyse and select road alternatives according to maintenance goal. Using Geographical Information Systems (GIS), maintainable roads were grouped using the Jenk’s natural breaks to allow for further prioritised in order of importance for display on a dashboard of maps, charts, and tables. This reduces the problems of subjective maintenance and road selections, thereby reducing wastage of resources and easing the maintenance process through an object organised spatial decision support system.

Keywords: decision support, geographical information systems, multi-criteria decision process, weighted sum

Procedia PDF Downloads 359
1750 Aggressive Behavior Prevention: The Effect of Peace Education and Media Literacy towards Student's Understanding about Aggression

Authors: Dadang Gunawan, I. Dewa Ketut Kertawidana, Lufthi Noorfitriyani

Abstract:

For the last 5 years, there is the never-ending violent act and increased cases regarding aggressive behavior among high school students in Bogor, Indonesia. Those cases caused harm to many people, even death, and lead to the continuation circle of violence. This research was conducted to evaluate the effect of using peace education and media literacy in enhancing student’s understanding about aggression, as an effort to prevent aggressive behavior. In terms of methodology, this research was done by quasi-experiment with one group pretest and post-test design. A number of 38 students who were at risk of aggressive behavior from 3 vocational high school were involved to receive a 10 learning session about peace and media literacy. The aggression questionnaire was used to identify participants, supported by student’s record in school. To collect data, the questionnaire for measuring understanding about aggression has been developed and was used after the validity and reliability of this questionnaire tested. Post-test was carried out after the session ended. Data were analyzed using t-test. The finding result showed that the mean score of student’s understanding of aggression was increased, therefore learning session of peace education and media literacy is significantly effective to enhance student’s understanding of aggression. It also showed a meaningful difference of understanding between male and female student’s whereas female students have a better understanding of aggression.

Keywords: aggressive behavior prevention, aggression, media literacy, peace education, peacebuilding

Procedia PDF Downloads 167
1749 Comparison of Two Maintenance Policies for a Two-Unit Series System Considering General Repair

Authors: Seyedvahid Najafi, Viliam Makis

Abstract:

In recent years, maintenance optimization has attracted special attention due to the growth of industrial systems complexity. Maintenance costs are high for many systems, and preventive maintenance is effective when it increases operations' reliability and safety at a reduced cost. The novelty of this research is to consider general repair in the modeling of multi-unit series systems and solve the maintenance problem for such systems using the semi-Markov decision process (SMDP) framework. We propose an opportunistic maintenance policy for a series system composed of two main units. Unit 1, which is more expensive than unit 2, is subjected to condition monitoring, and its deterioration is modeled using a gamma process. Unit 1 hazard rate is estimated by the proportional hazards model (PHM), and two hazard rate control limits are considered as the thresholds of maintenance interventions for unit 1. Maintenance is performed on unit 2, considering an age control limit. The objective is to find the optimal control limits and minimize the long-run expected average cost per unit time. The proposed algorithm is applied to a numerical example to compare the effectiveness of the proposed policy (policy Ⅰ) with policy Ⅱ, which is similar to policy Ⅰ, but instead of general repair, replacement is performed. Results show that policy Ⅰ leads to lower average cost compared with policy Ⅱ. 

Keywords: condition-based maintenance, proportional hazards model, semi-Markov decision process, two-unit series systems

Procedia PDF Downloads 101
1748 On implementing Sumak Kawsay in Post Bellum Principles: The Reconstruction of Natural Damage in the Aftermath of War

Authors: Lisa Tragbar

Abstract:

In post-war scenarios, reconstruction is a principle towards creating a Just Peace in order to restore a stable post-war society. Just peace theorists explore normative behaviour after war, including the duties and responsibilities of different actors and peacebuilding strategies to achieve a lasting, positive peace. Environmental peace ethicists have argued for including the role of nature in the Ethics of War and Peace. This text explores the question of why and how to rethink the value of nature in post-war scenarios. The aim is to include the rights of nature within a maximalist account of reconstruction by highlighting sumak kawsay in the post-war period. Destruction of nature is usually considered collateral damage in war scenarios. Common universal standards for post-war reconstruction are restitution, compensation and reparation programmes, which is mostly anthropocentric approach. The problem of reconstruction in the aftermath of war is the instrumental value of nature. The responsibility to rebuild needs to be revisited within a non-anthropocentric context. There is an ongoing debate about a minimalist or maximalist approach to post-war reconstruction. While Michael Walzer argues for minimalist in-and-out interventions, Alex Bellamy argues for maximalist strategies such as the responsibility to protect, a UN-concept on how face mass atrocity crimes and how to reconstruct peace. While supporting the tradition of maximalist responsibility to rebuild, these normative post-Bellum concepts do not yet sufficiently consider the rights of nature in the aftermath of war. While reconstruction of infrastructures seems important and necessary, concepts that strengthen the intrinsic value of nature in post-bellum measures must also be included. Peace is not Just Peace without a thriving nature that provides the conditions and resources to live and guarantee human rights. Ecuador's indigenous philosophy of life can contribute to the restoration of nature after war by changing the perspective on the value of nature. The sumak kawsay includes the de-hierarchisation of humans and nature and the principle of reciprocity towards nature. Transferring this idea of life and interconnectedness to post-war reconstruction practices, post bellum perpetrators have restorative obligations not only to people but also to nature. This maximalist approach would include both a restitutive principle, by restoring the balance between humans and nature, and a retributive principle, by punishing the perpetrators through compensatory duties to nature. A maximalist approach to post-war reconstruction that takes into account the rights of nature expands the normative post-war questions to include a more complex field of responsibilities. After a war, Just Peace is restored once not only human rights but also the rights of nature are secured. A minimalist post-bellum approach to reconstruction does not locate future problems at their source and does not offer a solution for the inclusion of obligations to nature. There is a lack of obligations towards nature after a war, which can be changed through a different perspective: The indigenous philosophy of life provides the necessary principles for a comprehensive reconstruction of Just Peace.

Keywords: normative ethics, peace, post-war, sumak kawsay, applied ethics

Procedia PDF Downloads 63
1747 An Assessment of Airport Collaborative Decision-Making System Using Predictive Maintenance

Authors: Faruk Aras, Melih Inal, Tansel Cinar

Abstract:

The coordination of airport staff especially in the operations and maintenance departments is important for the airport operation. As a result, this coordination will increase the efficiency in all operation. Therefore, a Collaborative Decision-Making (CDM) system targets on improving the overall productivity of all operations by optimizing the use of resources and improving the predictability of actions. Enlarged productivity can be of major benefit for all airport operations. It also increases cost-efficiency. This study explains how predictive maintenance using IoT (Internet of Things), predictive operations and the statistical data such as Mean Time To Failure (MTTF) improves airport terminal operations and utilize airport terminal equipment in collaboration with collaborative decision making system/Airport Operation Control Center (AOCC). Data generated by the predictive maintenance methods is retrieved and analyzed by maintenance managers to predict when a problem is about to occur. With that information, maintenance can be scheduled when needed. As an example, AOCC operator would have chance to assign a new gate that towards to this gate all the equipment such as travellator, elevator, escalator etc. are operational if the maintenance team is in collaboration with AOCC since maintenance team is aware of the health of the equipment because of predictive maintenance methods. Applying predictive maintenance methods based on analyzing the health of airport terminal equipment dramatically reduces the risk of downtime by on time repairs. We can classify the categories as high priority calls for urgent repair action, as medium priority requires repair at the earliest opportunity, and low priority allows maintenance to be scheduled when convenient. In all cases, identifying potential problems early resulted in better allocation airport terminal resources by AOCC.

Keywords: airport, predictive maintenance, collaborative decision-making system, Airport Operation Control Center (AOCC)

Procedia PDF Downloads 345
1746 The UN Mediation in the Armed Conflict of Nepal and El Salvador: A Cross-Regional Comparative Perspective Study

Authors: Anu S. Krishna

Abstract:

The paper tries to analyse the UN involvement/intervention in the case of intra-state armed conflict of El Salvador and Nepal comparatively. The peace mission in El Salvador is considered to be the most successful missions of UN ever since it started involving in the peace-building activities. Meanwhile, in the armed conflict of South Asian country, Nepal, the result seemed to be disappointing in comparison with its counterpart. The study on this paper takes three variables as the success or failure of international mediation, i.e., a) signing of the peace agreement, b) disarmament/demobilization and c) constitutional mechanism. A significant amount of scholarship looks at the case of ONUSAL (United Nations Mission in El Salvador). Meanwhile, the armed conflict of Nepal and the role of UNMIN (United Nations Mediation in Nepal) are under researched so far. The paper thus tries to throw light on these cross-regional contexts that share certain similarities and dissimilarities in the nature of conflict. In addition, the international third-party involvement and their way of approaching both the cases differ, which again affected the mediation outcome. The paper tries to argue that, since the approach of the UN led international mediation in theses peace missions were contextual and varied from case to case, thus, finally affected the mediation outcome too.

Keywords: Nepal, UNMIN, El Salvador, ONUSAL, international mediation, armed conflict

Procedia PDF Downloads 378
1745 Reliability-Based Maintenance Management Methodology to Minimise Life Cycle Cost of Water Supply Networks

Authors: Mojtaba Mahmoodian, Joshua Phelan, Mehdi Shahparvari

Abstract:

With a large percentage of countries’ total infrastructure expenditure attributed to water network maintenance, it is essential to optimise maintenance strategies to rehabilitate or replace underground pipes before failure occurs. The aim of this paper is to provide water utility managers with a maintenance management approach for underground water pipes, subject to external loading and material corrosion, to give the lowest life cycle cost over a predetermined time period. This reliability-based maintenance management methodology details the optimal years for intervention, the ideal number of maintenance activities to perform before replacement and specifies feasible renewal options and intervention prioritisation to minimise the life cycle cost. The study was then extended to include feasible renewal methods by determining the structural condition index and potential for soil loss, then obtaining the failure impact rating to assist in prioritising pipe replacement. A case study on optimisation of maintenance plans for the Melbourne water pipe network is considered in this paper to evaluate the practicality of the proposed methodology. The results confirm that the suggested methodology can provide water utility managers with a reliable systematic approach to determining optimum maintenance plans for pipe networks.

Keywords: water pipe networks, maintenance management, reliability analysis, optimum maintenance plan

Procedia PDF Downloads 138
1744 Optimal Opportunistic Maintenance Policy for a Two-Unit System

Authors: Nooshin Salari, Viliam Makis, Jane Doe

Abstract:

This paper presents a maintenance policy for a system consisting of two units. Unit 1 is gradually deteriorating and is subject to soft failure. Unit 2 has a general lifetime distribution and is subject to hard failure. Condition of unit 1 of the system is monitored periodically and it is considered as failed when its deterioration level reaches or exceeds a critical level N. At the failure time of unit 2 system is considered as failed, and unit 2 will be correctively replaced by the next inspection epoch. Unit 1 or 2 are preventively replaced when deterioration level of unit 1 or age of unit 2 exceeds the related preventive maintenance (PM) levels. At the time of corrective or preventive replacement of unit 2, there is an opportunity to replace unit 1 if its deterioration level reaches the opportunistic maintenance (OM) level. If unit 2 fails in an inspection interval, system stops operating although unit 1 has not failed. A mathematical model is derived to find the preventive and opportunistic replacement levels for unit 1 and preventive replacement age for unit 2, that minimize the long run expected average cost per unit time. The problem is formulated and solved in the semi-Markov decision process (SMDP) framework. Numerical example is provided to illustrate the performance of the proposed model and the comparison of the proposed model with an optimal policy without opportunistic maintenance level for unit 1 is carried out.

Keywords: condition-based maintenance, opportunistic maintenance, preventive maintenance, two-unit system

Procedia PDF Downloads 183
1743 A Genetic Algorithm to Schedule the Flow Shop Problem under Preventive Maintenance Activities

Authors: J. Kaabi, Y. Harrath

Abstract:

This paper studied the flow shop scheduling problem under machine availability constraints. The machines are subject to flexible preventive maintenance activities. The nonresumable scenario for the jobs was considered. That is, when a job is interrupted by an unavailability period of a machine it should be restarted from the beginning. The objective is to minimize the total tardiness time for the jobs and the advance/tardiness for the maintenance activities. To solve the problem, a genetic algorithm was developed and successfully tested and validated on many problem instances. The computational results showed that the new genetic algorithm outperforms another earlier proposed algorithm.

Keywords: flow shop scheduling, genetic algorithm, maintenance, priority rules

Procedia PDF Downloads 457
1742 The Application of Maintenance Strategy in Energy Power Plant: A Case Study

Authors: Steven Vusmuzi Mashego, Opeyeolu Timothy Laseinde

Abstract:

This paper presents a case study on applying maintenance strategies observed in a turbo-generator at a coal power plant. Turbo generators are one of the primary and critical components in energy generation. It is essential to apply correct maintenance strategies and apply operational procedures accordingly. The maintenance strategies are implemented to ensure the high reliability of the equipment. The study was carried out at a coal power station which will transit to a cleaner energy source in the nearest future. The study is relevant as lessons learned in this system will support plans and operational models implemented when cleaner energy sources replace coal-powered turbines. This paper first outlines different maintenance strategies executed on the turbo-generator modules. Secondly, the impacts of human factors on a coal power station are discussed, and the findings prompted recommendations for future actions.

Keywords: maintenance strategies, turbo generator, operational error, human factor, electricity generation

Procedia PDF Downloads 91
1741 Inter Religion Harmony and World Peace: Theory from Shah Wali Ullah's Philosophy

Authors: Muhammad Usman Ghani

Abstract:

Religious tolerance is essential for the establishment of peace in the world. In the system created by Almighty Allah where a lot of diversity is found, still, this world holds unity itself. In today's world, human beings have been divided into clashes of civilizations or divided on the basis of religions or lingual differences. A religious scholar of Indo- Pak subcontinent describes four ethics, on the basis of which all religions of the world can unite. He says in his philosophy of religion that, there is a number of elements common in all religions but four are very common and they are: cleanliness, nobel deeds, relation to Almighty (existence of Almighty) and justice. He says that this universe also holds its integrity in itself. All humans are different in their attributes but to be a human being is common in them. Similarly, all species of the universe are different in their nature, but to be the creature of God is commonly shared by all of them.

Keywords: inter-religious relation, peace and harmony, unity, four common ethics/virtues

Procedia PDF Downloads 321
1740 Intelligent Platform for Photovoltaic Park Operation and Maintenance

Authors: Andreas Livera, Spyros Theocharides, Michalis Florides, Charalambos Anastassiou

Abstract:

A main challenge in the quest for ensuring quality of operation, especially for photovoltaic (PV) systems, is to safeguard the reliability and optimal performance by detecting and diagnosing potential failures and performance losses at early stages or before the occurrence through real-time monitoring, supervision, fault detection, and predictive maintenance. The purpose of this work is to present the functionalities and results related to the development and validation of a software platform for PV assets diagnosis and maintenance. The platform brings together proprietary hardware sensors and software algorithms to enable the early detection and prediction of the most common and critical faults in PV systems. It was validated using field measurements from operating PV systems. The results showed the effectiveness of the platform for detecting faults and losses (e.g., inverter failures, string disconnections, and potential induced degradation) at early stages, forecasting PV power production while also providing recommendations for maintenance actions. Increased PV energy yield production and revenue can be thus achieved while also minimizing operation and maintenance (O&M) costs.

Keywords: failure detection and prediction, operation and maintenance, performance monitoring, photovoltaic, platform, recommendations, predictive maintenance

Procedia PDF Downloads 26
1739 Presentation of the Model of Reliability of the Signaling System with Emphasis on Determining Best Time Schedule for Repairments and Preventive Maintenance in the Iranian Railway

Authors: Maziar Yazdani, Ahmad Khodaee, Fatemeh Hajizadeh

Abstract:

The purpose of this research was analysis of the reliability of the signaling system in the railway and planning repair and maintenance of its subsystems. For this purpose, it will be endeavored to introduce practical strategies for activities control and appropriate planning for repair and preventive maintenance by statistical modeling of reliability. Therefore, modeling, evaluation, and promotion of reliability of the signaling system appear very critical. Among the key goals of the railway is provision of quality service for passengers and this purpose is gained by increasing reliability, availability, maintainability and safety of (RAMS). In this research, data were analyzed, and the reliability of the subsystems and entire system was calculated and with emphasis on preservation of performance of each of the subsystems with a reliability of 80%, a plan for repair and preventive maintenance of the subsystems of the signaling system was introduced.

Keywords: reliability, modeling reliability, plan for repair and preventive maintenance, signaling system

Procedia PDF Downloads 157
1738 The Historical Framework of International Crime in International Criminal Law

Authors: Tahraoui Boualem

Abstract:

Researching the historical framework of international crime means examining the historical facts that have contributed to uncovering this serious crime affecting international interests, and the law by which the study of the subject of international crime is determined is international criminal law, which is a branch of public international law. In this context, the historical study of international crime means recognizing the existence of an international community governed by international law, which makes us acknowledge that ancient societies lacked such stable and recurring international relations. Therefore, an attempt to monitor international crime in those ancient societies is only to demonstrate a historical fact that those societies have known some features of this crime, and have contributed in one way or another to the development of international criminal law without defining its concept or legal nature. The international community has affirmed the principle of establishing peace, achieving security, and respecting human rights. As a basis for friendly relations between the people of the international community and in case of prejudice, such as the aggressors breaching the obligations imposed on them, whether in time of peace or war.

Keywords: historical framework, of international crime, peace or war., international law

Procedia PDF Downloads 75
1737 The Theory of Domination at the Bane of Conflict Resolution and Peace Building Processes in Cameroon

Authors: Nkatow Mafany Christian

Abstract:

According to UNHCR’s annual Database, humanitarian crises have globally been on the increase since the beginning of the 21st Century, especially in the Middle East and in Sub-Saharan Africa. Cameroon is one of the countries that has suffered tremendously from humanitarian challenges in recent years, especially with crises in the Far North, the East and its Two English-speaking Regions. These have been a result of failed mechanisms in conflict resolution peacebuilding by the government. The paper draws from this basic premise to argue that the failure to reach a consensus in order to curb internal conflicts has largely been due to the government’s attachment to the domineering attitude which emphasizes an imposition of peace terms by a superordinate (government) agency on the subordinate (aggrieved) entities. This has stalled peace efforts that have so far been engaged to address the dreaded armed conflicts in the North and South West Regions, leading to the persistence of the armed conflict. The paper exploits written, oral and online sources to sustain its argument. It suggests that an eclectic approach to resolving conflicts, which emphasizes open and frank dialogue as well as a review of the root causes, can go a long way not only to build trust but also to address the Anglophone-Cameroonian problems in Cameroon.

Keywords: conflict, conflict resolution, peace building, humanitarian crisis

Procedia PDF Downloads 47
1736 Predictive Maintenance Based on Oil Analysis Applicable to Transportation Fleets

Authors: Israel Ibarra Solis, Juan Carlos Rodriguez Sierra, Ma. del Carmen Salazar Hernandez, Isis Rodriguez Sanchez, David Perez Guerrero

Abstract:

At the present paper we try to explain the analysis techniques use for the lubricating oil in a maintenance period of a city bus (Mercedes Benz Boxer 40), which is call ‘R-24 route’, line Coecillo Centro SA de CV in Leon Guanajuato, to estimate the optimal time for the oil change. Using devices such as the rotational viscometer and the atomic absorption spectrometer, they can detect the incipient form when the oil loses its lubricating properties and, therefore, cannot protect the mechanical components of diesel engines such these trucks. Timely detection of lost property in the oil, it allows us taking preventive plan maintenance for the fleet.

Keywords: atomic absorption spectrometry, maintenance, predictive velocity rate, lubricating oils

Procedia PDF Downloads 546
1735 GIS Pavement Maintenance Selection Strategy

Authors: Mekdelawit Teferi Alamirew

Abstract:

As a practical tool, the Geographical information system (GIS) was used for data integration, collection, management, analysis, and output presentation in pavement mangement systems . There are many GIS techniques to improve the maintenance activities like Dynamic segmentation and weighted overlay analysis which considers Multi Criteria Decision Making process. The results indicated that the developed MPI model works sufficiently and yields adequate output for providing accurate decisions. Hence considering multi criteria to prioritize the pavement sections for maintenance, as a result of the fact that GIS maps can express position, extent, and severity of pavement distress features more effectively than manual approaches, lastly the paper also offers digitized distress maps that can help agencies in their decision-making processes.

Keywords: pavement, flexible, maintenance, index

Procedia PDF Downloads 41
1734 The Lightener of Love: The World Peace Religion

Authors: Abdul Razzaq

Abstract:

It is known that every human society throughout the world and throughout history, the various religions and their theologies, ethics, and traditions influence everything in their life, shaping socio-economic and political ideas, attitudes and institutions. It is observed that religious teachings and traditions shape how people respond to each other in their daily social inter-course and interaction in the community at large. The majorities of us preserves and protect our own religious beliefs and traditions as generally they symbolize our essential identities, theologically, historically, culturally, socially, and even politically. Our religious faiths symbolize our dignity as persons and our very souls as communities and individuals. It thus goes without saying that in our multi-racial and multi-religious society, the only way for us to live in peace and harmony is for us to live in peaceful co-existence. It is important for us to recognize, understand, accept and respect each other regardless of our respective belief. The history of interfaith is as ancient as the religions since men and women when not at war with their neighbors have always made an effort to understand them (not least because understanding is a strategy for defense, but also because for as long as there is dialogue wars are delayed).

Keywords: Islam, religion, peace, society

Procedia PDF Downloads 407