Search results for: maintenance plan
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 3301

Search results for: maintenance plan

3211 A Case Study on the Condition Monitoring of a Critical Machine in a Tyre Manufacturing Plant

Authors: Ramachandra C. G., Amarnath. M., Prashanth Pai M., Nagesh S. N.

Abstract:

The machine's performance level drops down over a period of time due to the wear and tear of its components. The early detection of an emergent fault becomes very vital in order to obtain uninterrupted production in a plant. Maintenance is an activity that helps to keep the machine's performance at an anticipated level, thereby ensuring the availability of the machine to perform its intended function. At present, a number of modern maintenance techniques are available, such as preventive maintenance, predictive maintenance, condition-based maintenance, total productive maintenance, etc. Condition-based maintenance or condition monitoring is one such modern maintenance technique in which the machine's condition or health is checked by the measurement of certain parameters such as sound level, temperature, velocity, displacement, vibration, etc. It can recognize most of the factors restraining the usefulness and efficacy of the total manufacturing unit. This research work is conducted on a Batch Mill in a tire production unit located in the Southern Karnataka region. The health of the mill is assessed using amplitude of vibration as a parameter of measurement. Most commonly, the vibration level is assessed using various points on the machine bearing. The normal or standard level is fixed using reference materials such as manuals or catalogs supplied by the manufacturers and also by referring vibration standards. The Rio-Vibro meter is placed in different locations on the batch-off mill to record the vibration data. The data collected are analyzed to identify the malfunctioning components in the batch off the mill, and corrective measures are suggested.

Keywords: availability, displacement, vibration, rio-vibro, condition monitoring

Procedia PDF Downloads 91
3210 Multi-Criteria Evolutionary Algorithm to Develop Efficient Schedules for Complex Maintenance Problems

Authors: Sven Tackenberg, Sönke Duckwitz, Andreas Petz, Christopher M. Schlick

Abstract:

This paper introduces an extension to the well-established Resource-Constrained Project Scheduling Problem (RCPSP) to apply it to complex maintenance problems. The problem is to assign technicians to a team which has to process several tasks with multi-level skill requirements during a work shift. Here, several alternative activities for a task allow both, the temporal shift of activities or the reallocation of technicians and tools. As a result, switches from one valid work process variant to another can be considered and may be selected by the developed evolutionary algorithm based on the present skill level of technicians or the available tools. An additional complication of the observed scheduling problem is that the locations of the construction sites are only temporarily accessible during a day. Due to intensive rail traffic, the available time slots for maintenance and repair works are extremely short and are often distributed throughout the day. To identify efficient working periods, a first concept of a Bayesian network is introduced and is integrated into the extended RCPSP with pre-emptive and non-pre-emptive tasks. Thereby, the Bayesian network is used to calculate the probability of a maintenance task to be processed during a specific period of the shift. Focusing on the domain of maintenance of the railway infrastructure in metropolitan areas as the most unproductive implementation process at construction site, the paper illustrates how the extended RCPSP can be applied for maintenance planning support. A multi-criteria evolutionary algorithm with a problem representation is introduced which is capable of revising technician-task allocations, whereas the duration of the task may be stochastic. The approach uses a novel activity list representation to ensure easily describable and modifiable elements which can be converted into detailed shift schedules. Thereby, the main objective is to develop a shift plan which maximizes the utilization of each technician due to a minimization of the waiting times caused by rail traffic. The results of the already implemented core algorithm illustrate a fast convergence towards an optimal team composition for a shift, an efficient sequence of tasks and a high probability of the subsequent implementation due to the stochastic durations of the tasks. In the paper, the algorithm for the extended RCPSP is analyzed in experimental evaluation using real-world example problems with various size, resource complexity, tightness and so forth.

Keywords: maintenance management, scheduling, resource constrained project scheduling problem, genetic algorithms

Procedia PDF Downloads 231
3209 Power Transformer Risk-Based Maintenance by Optimization of Transformer Condition and Transformer Importance

Authors: Kitti Leangkrua

Abstract:

This paper presents a risk-based maintenance strategy of a power transformer in order to optimize operating and maintenance costs. The methodology involves the study and preparation of a database for the collection the technical data and test data of a power transformer. An evaluation of the overall condition of each transformer is performed by a program developed as a result of the measured results; in addition, the calculation of the main equipment separation to the overall condition of the transformer (% HI) and the criteria for evaluating the importance (% ImI) of each location where the transformer is installed. The condition assessment is performed by analysis test data such as electrical test, insulating oil test and visual inspection. The condition of the power transformer will be classified from very poor to very good condition. The importance is evaluated from load criticality, importance of load and failure consequence. The risk matrix is developed for evaluating the risk of each power transformer. The high risk power transformer will be focused firstly. The computerized program is developed for practical use, and the maintenance strategy of a power transformer can be effectively managed.

Keywords: asset management, risk-based maintenance, power transformer, health index

Procedia PDF Downloads 306
3208 Production Plan and Technological Variants Optimization by Goal Programming Methods

Authors: Tunjo Perić, Franjo Bratić

Abstract:

In this paper the goal programming methodology for solving multiple objective problem of the technological variants and production plan optimization has been applied. The optimization criteria are determined and the multiple objective linear programming model for solving a problem of the technological variants and production plan optimization is formed and solved. Then the obtained results are analysed. The obtained results point out to the possibility of efficient application of the goal programming methodology in solving the problem of the technological variants and production plan optimization. The paper points out on the advantages of the application of the goal programming methodolohy compare to the Surrogat Worth Trade-off method in solving this problem.

Keywords: goal programming, multi objective programming, production plan, SWT method, technological variants

Procedia PDF Downloads 379
3207 Reliability Analysis of Construction Schedule Plan Based on Building Information Modelling

Authors: Lu Ren, You-Liang Fang, Yan-Gang Zhao

Abstract:

In recent years, the application of BIM (Building Information Modelling) to construction schedule plan has been the focus of more and more researchers. In order to assess the reasonable level of the BIM-based construction schedule plan, that is whether the schedule can be completed on time, some researchers have introduced reliability theory to evaluate. In the process of evaluation, the uncertain factors affecting the construction schedule plan are regarded as random variables, and probability distributions of the random variables are assumed to be normal distribution, which is determined using two parameters evaluated from the mean and standard deviation of statistical data. However, in practical engineering, most of the uncertain influence factors are not normal random variables. So the evaluation results of the construction schedule plan will be unreasonable under the assumption that probability distributions of random variables submitted to the normal distribution. Therefore, in order to get a more reasonable evaluation result, it is necessary to describe the distribution of random variables more comprehensively. For this purpose, cubic normal distribution is introduced in this paper to describe the distribution of arbitrary random variables, which is determined by the first four moments (mean, standard deviation, skewness and kurtosis). In this paper, building the BIM model firstly according to the design messages of the structure and making the construction schedule plan based on BIM, then the cubic normal distribution is used to describe the distribution of the random variables due to the collecting statistical data of the random factors influencing construction schedule plan. Next the reliability analysis of the construction schedule plan based on BIM can be carried out more reasonably. Finally, the more accurate evaluation results can be given providing reference for the implementation of the actual construction schedule plan. In the last part of this paper, the more efficiency and accuracy of the proposed methodology for the reliability analysis of the construction schedule plan based on BIM are conducted through practical engineering case.

Keywords: BIM, construction schedule plan, cubic normal distribution, reliability analysis

Procedia PDF Downloads 146
3206 Roadway Maintenance Management System

Authors: Chika Catherine Ayogu

Abstract:

Rehabilitation plays an important and integral part in the life of roadway rehabilitation management system. It is a systematic method for inspection and rating the roadway condition in a given area. The system performs a cost effective analysis of various maintenance and rehabilitation strategies. Finally the system prioritize and recommend roadway rehabilitation and maintenance to maximize results within a given budget amount. During execution of maintenance activity, the system also tracks labour, materials, equipment and cost for activities performed. The system implements physical assessment field inspection and rating of each street segment which is then entered into a database. The information is analyzed using a software, and provide recommendations and project future conditions. The roadway management system provides a deterioration curve for each segment based on input then assigns the most cost-effective maintenance strategy based on conditions, surface type and functional classification, and available budget. This paper investigates the roadway management system and its capabilities to assist in applying the right treatment to the right roadway at the right time so that expected service life of the roadway is extended as long as possible with acceptable cost.

Keywords: effectiveness, rehabilitation, roadway, software system

Procedia PDF Downloads 150
3205 Implementation of Enterprise Asset Management (E-AM) System at Oman Electricity Transmission Company

Authors: Omran Al Balushi, Haitham Al Rawahi

Abstract:

Enterprise Asset Management (eAM) has been implemented across different Generation, Transmission and Distribution subsidiaries in Nama Group companies. As part of Nama group, Oman Electricity Transmission Company (OETC) was the first company to implement this system. It was very important for OETC to implement and maintain such a system to achieve its business objectives and for effective operations, which will also support the delivery of the asset management strategy. Enterprise Asset Management (eAM) addresses the comprehensive asset maintenance requirements of Oman Electricity Transmission Company (OETC). OETC needs to optimize capacity and increase utilization, while lowering unit production. E-AM will enable OETC to adopt this strategy. Implementation of e-AM has improved operation performance with preventive and scheduled maintenance as well as it increased safety. Implementation of e-AM will also enable OETC to create optimal asset management strategy which will increase revenue and decrease cost by effectively monitoring operational data such as maintenance history and operation conditions. CMMS (Computerised Maintenance Management System) is the main software and the back-bone of e-AM system. It is used to provide an improved working practice to properly establish information and data flow related to maintenance activities. Implementation of e-AM system was one of the factors that supported OETC to achieve ISO55001 Certificate on fourth quarter of 2016. Also, full implementation of e-AM system will result in strong integration between CMMS and Geographical Information Systems (GIS) application and it will improve OETC to build a reliable maintenance strategy for all asset classes in its Transmission network. In this paper we will share our experience and knowledge of implementing such a system and how it supported OETC’s management to make decisions. Also we would highlight the challenges and difficulties that we encountered during the implementation of e-AM. Also, we will list some features and advantages of e-AM in asset management, preventive maintenance and maintenance cost management.

Keywords: CMMS, Maintenance Management, Asset Management, Maintenance Strategy

Procedia PDF Downloads 144
3204 Implementing a Strategy of Reliability Centred Maintenance (RCM) in the Libyan Cement Industry

Authors: Khalid M. Albarkoly, Kenneth S. Park

Abstract:

The substantial development of the construction industry has forced the cement industry, its major support, to focus on achieving maximum productivity to meet the growing demand for this material. Statistics indicate that the demand for cement rose from 1.6 billion metric tons (bmt) in 2000 to 4bmt in 2013. This means that the reliability of a production system needs to be at the highest level that can be achieved by good maintenance. This paper studies the extent to which the implementation of RCM is needed as a strategy for increasing the reliability of the production systems component can be increased, thus ensuring continuous productivity. In a case study of four Libyan cement factories, 80 employees were surveyed and 12 top and middle managers interviewed. It is evident that these factories usually breakdown more often than once per month which has led to a decline in productivity, they cannot produce more than 50% of their designed capacity. This has resulted from the poor reliability of their production systems as a result of poor or insufficient maintenance. It has been found that most of the factories’ employees misunderstand maintenance and its importance. The main cause of this problem is the lack of qualified and trained staff, but in addition, it has been found that most employees are not found to be motivated as a result of a lack of management support and interest. In response to these findings, it has been suggested that the RCM strategy should be implemented in the four factories. The paper shows the importance of considering the development of maintenance strategies through the implementation of RCM in these factories. The purpose of it would be to overcome the problems that could reduce the level of reliability of the production systems. This study could be a useful source of information for academic researchers and the industrial organisations which are still experiencing problems in maintenance practices.

Keywords: Libyan cement industry, reliability centred maintenance, maintenance, production, reliability

Procedia PDF Downloads 389
3203 Mitigation of High Voltage Equipment Design Deficiencies for Improved Operation and Maintenance

Authors: Riyad Awad, Abdulmohsen Alghadeer, Meshari Otaibi

Abstract:

Proper operation and maintenance (O&M) activities of high voltage equipment can lead to an increased asset lifecycle and maintain its integrity and reliability. Such a vital process is important to be proactively considered during equipment design and manufacturing phases by removing and eliminating any obstacles in the equipment which adversely affect the (O&M) activities. This paper presents a gap analysis pertaining to difficulties in performing operations and maintenance (O&M) high voltage electrical equipment, includes power transformers, switch gears, motor control center, disconnect switches and circuit breakers. The difficulties are gathered from field personnel, equipment design review comments, quality management system, and lessons learned database. The purpose of the gap analysis is to mitigate and prevent the (O&M) difficulties as early as possible in the design stage of the equipment lifecycle. The paper concludes with several recommendations and corrective actions for all identified gaps in order to reduce the cost (O&M) difficulties and improve the equipment lifecycle.

Keywords: operation and maintenance, high voltage equipment, equipment lifecycle, reduce the cost of maintenance

Procedia PDF Downloads 166
3202 Contents for the Maintenance and Troubleshooting of Anti-lock Braking System for Automobile Craftsmen in Nigeria

Authors: Arah Abubakar Saidu, Audu Rufai, Abdulkadir Mohammed, Ibrahim Yakubu Umar, Idris Abubakar Mohammed

Abstract:

The study determined the contents for the maintenance and troubleshooting of an anti-lock braking system for automobile craftsmen in Nigeria. Two research questions were raised and answered and two null hypotheses were formulated and tested at a .05 level of significance. The study adopted a descriptive survey research design. The study was conducted in Federal Capital Territory (FCT), Abuja, Kaduna, Kano, Lagos and Plateau States, Nigeria. The targeted population for the study was 99 consisting of all 43 non-teaching Subject Matter Experts (SMEs). The study utilized the whole population of the study. The instruments used for data collection were Anti-lock Braking System Maintenance and Troubleshooting Contents Questionnaire (ABSMTQ). Mean was used to analyze data that answered research questions and Z-test was used in testing the null hypotheses. Findings revealed, among others, that 81 items as content for the maintenance of ABS and 61 items as content for troubleshooting ABS for automobile craftsmen in Nigeria. Based on the findings of the study, the recommended, among others, that the National Board for Technical Education should include the contents for the maintenance and troubleshooting ABS in Motor Vehicle Mechanic Works curriculum used for training automobile craftsmen through the process of curriculum review in order to equip them with the competencies in troubleshooting and maintenance of ABS.

Keywords: anti-lock braking system, maintenance, troubleshooting, automobile craftsmen

Procedia PDF Downloads 88
3201 Productivity Improvement of Faffa Food Share Company Using a Computerized Maintenance Management System

Authors: Gadisa Alemayehu, Muralidhar Avvari, Atkilt Mulu G.

Abstract:

Since 1962 EC, the Faffa Food Share Company has been producing and supplying flour (famix) and value-added flour (baby food) in Ethiopia. It meets nearly all of the country's total flour demand, both for relief and commercial markets. However, it is incompetent in the international market due to a poor maintenance management system. The results of recorded documents and stopwatches revealed that frequent failure machines, as well as a poor maintenance management system, cause increased production downtimes, resulting in a 29.19 percent decrease in production from the planned production. As a result, the current study's goal is to recommend newly developed software for use in and as a Computerized Maintenance Management System (CMMS). As a result, the system increases machine reliability and decreases the frequency of equipment failure, reducing breakdown time and maintenance costs. The company's overall manufacturing performance improved by 4.45 percent, particularly after the implementation of the CMMS.

Keywords: CMMS, manufacturing performance, delivery, availability, flexibility, Faffa Food Share Company

Procedia PDF Downloads 136
3200 Reliability-Based Life-Cycle Cost Model for Engineering Systems

Authors: Reza Lotfalian, Sudarshan Martins, Peter Radziszewski

Abstract:

The effect of reliability on life-cycle cost, including initial and maintenance cost of a system is studied. The failure probability of a component is used to calculate the average maintenance cost during the operation cycle of the component. The standard deviation of the life-cycle cost is also calculated as an error measure for the average life-cycle cost. As a numerical example, the model is used to study the average life cycle cost of an electric motor.

Keywords: initial cost, life-cycle cost, maintenance cost, reliability

Procedia PDF Downloads 604
3199 Towards a Simulation Model to Ensure the Availability of Machines in Maintenance Activities

Authors: Maryam Gallab, Hafida Bouloiz, Youness Chater, Mohamed Tkiouat

Abstract:

The aim of this paper is to present a model based on multi-agent systems in order to manage the maintenance activities and to ensure the reliability and availability of machines just with the required resources (operators, tools). The interest of the simulation is to solve the complexity of the system and to find results without cost or wasting time. An implementation of the model is carried out on the AnyLogic platform to display the defined performance indicators.

Keywords: maintenance, complexity, simulation, multi-agent systems, AnyLogic platform

Procedia PDF Downloads 305
3198 Administrative and Legal Instruments of Disciplining Maintenance Debtors in Poland - A Critical Analysis of Their Effectiveness

Authors: Tomasz Kosicki

Abstract:

The subject of the presentation will be the administrative and legal instruments of disciplining maintenance debtors adopted by the Polish legislator, the substantive legal bases of which were adopted in the Act of 7 September 2007 on assistance to persons entitled to maintenance (Journal of Laws of 2022, item 1205). These provisions are complemented by procedural regulations resulting from the Act of 14 June 1960 - Code of Administrative Procedure (Journal of Laws of 2021, item 735, as amended). The first part of the paper will focus on the administrative proceedings regarding the recognition of the debtor as evading maintenance obligations. The initiation of this procedure ex officio is preceded by a number of actions by public administration bodies, including Conducting a maintenance interview with the debtor, during which his health and professional situation and the reasons for non-payment of maintenance are determined, Professional activation in a situation where the lack of payment of maintenance results from the lack of employment. The reasons for initiating the above-mentioned administrative proceedings ex officio will be indicated, taking into account the current views of the judicial decisions. The second part of the paper will focus on the instrument of retaining the driving license of the debtor, who was previously found to be evading maintenance. The author points out that the detention of the driving license is one of the types of administrative sanctions of a very severe nature. Doubts of a constitutional nature will also be highlighted, as well as those concerning the effectiveness of this legal instrument and the protection of the debtor's rights. The thesis will be presented that the administrative procedure for the retention of a driving license does not fulfill its role and especially does not affect the collection of maintenance obligations from debtors. All the considerations will be based on the current and most representative views of the literature on the subject and the jurisprudence of Polish administrative courts.

Keywords: maintenance debtor, administrative proceedings, detention of driving license, administrative sanction, polish administrative law, public administration

Procedia PDF Downloads 86
3197 A Quantitative Plan for Drawing Down Emissions to Attenuate Climate Change

Authors: Terry Lucas

Abstract:

Calculations are performed to quantify the potential contribution of each greenhouse gas emission reduction strategy. This approach facilitates the visualisation of the relative benefits of each, and it provides a potential baseline for the development of a plan of action that is rooted in quantitative evaluation. Emissions reductions are converted to potential de-escalation of global average temperature. A comprehensive plan is then presented which shows the potential benefits all the way out to year 2100. A target temperature de-escalation of 2oC was selected, but the plan shows a benefit of only 1.225oC. This latter disappointing result is in spite of new and powerful technologies introduced into the equation. These include nuclear fusion and alternative nuclear fission processes. Current technologies such as wind, solar and electric vehicles show surprisingly small constributions to the whole.

Keywords: climate change, emissions, drawdown, energy

Procedia PDF Downloads 131
3196 Optimal Tamping for Railway Tracks, Reducing Railway Maintenance Expenditures by the Use of Integer Programming

Authors: Rui Li, Min Wen, Kim Bang Salling

Abstract:

For the modern railways, maintenance is critical for ensuring safety, train punctuality and overall capacity utilization. The cost of railway maintenance in Europe is high, on average between 30,000 – 100,000 Euros per kilometer per year. In order to reduce such maintenance expenditures, this paper presents a mixed 0-1 linear mathematical model designed to optimize the predictive railway tamping activities for ballast track in the planning horizon of three to four years. The objective function is to minimize the tamping machine actual costs. The approach of the research is using the simple dynamic model for modelling condition-based tamping process and the solution method for finding optimal condition-based tamping schedule. Seven technical and practical aspects are taken into account to schedule tamping: (1) track degradation of the standard deviation of the longitudinal level over time; (2) track geometrical alignment; (3) track quality thresholds based on the train speed limits; (4) the dependency of the track quality recovery on the track quality after tamping operation; (5) Tamping machine operation practices (6) tamping budgets and (7) differentiating the open track from the station sections. A Danish railway track between Odense and Fredericia with 42.6 km of length is applied for a time period of three and four years in the proposed maintenance model. The generated tamping schedule is reasonable and robust. Based on the result from the Danish railway corridor, the total costs can be reduced significantly (50%) than the previous model which is based on optimizing the number of tamping. The different maintenance strategies have been discussed in the paper. The analysis from the results obtained from the model also shows a longer period of predictive tamping planning has more optimal scheduling of maintenance actions than continuous short term preventive maintenance, namely yearly condition-based planning.

Keywords: integer programming, railway tamping, predictive maintenance model, preventive condition-based maintenance

Procedia PDF Downloads 442
3195 Administrative and Legal Instruments of Disciplining Maintenance (alimony) Debtors in Poland - A Critical Analysis of their Effectiveness

Authors: Tomasz Kosicki

Abstract:

The subject of the presentation will be the administrative and legal instruments of disciplining maintenance debtors adopted by the Polish legislator, the substantive legal bases of which were adopted in the Act of 7 September 2007 on assistance to persons entitled to maintenance (Journal of Laws of 2022, item 1205). These provisions are complemented by procedural regulations resulting from the Act of 14 June 1960 - Code of Administrative Procedure (Journal of Laws of 2021, item 735, as amended). The first part of the paper will focus on the administrative proceedings regarding the recognition of the debtor as evading maintenance obligations. The initiation of this procedure ex officio is preceded by a number of actions by public administration bodies, including Conducting a maintenance interview with the debtor, during which his health and professional situation and the reasons for non-payment of maintenance are determined, Professional activation in a situation where the lack of payment of maintenance results from the lack of employment. The reasons for initiating the above-mentioned administrative proceedings ex officio will be indicated, taking into account the current views of the judicial decisions. The second part of the paper will focus on the instrument of retaining the driving license of the debtor, who was previously found to be evading maintenance. The author points out that the detention of the driving license is one of the types of administrative sanctions of a very severe nature. Doubts of a constitutional nature will also be highlighted, as well as those concerning the effectiveness of this legal instrument and the protection of the debtor's rights. The thesis will be presented that the administrative procedure for the retention of a driving license does not fulfill its role and especially does not affect the collection of maintenance obligations from debtors. All the considerations will be based on the current and most representative views of the literature on the subject and the jurisprudence of Polish administrative courts.

Keywords: maintenance debtor, administrative proceedings, detention of driving license, administrative sanction, polish administrative law, public administration

Procedia PDF Downloads 84
3194 Investigating the Effect of Study Plan and Homework on Student's Performance by Using Web Based Learning MyMathLab

Authors: Mohamed Chabi, Mahmoud I. Syam, Sarah Aw

Abstract:

In Summer 2012, the Foundation Program Unit of Qatar University has started implementing new ways of teaching Math by introducing MML (MyMathLab) as an innovative interactive tool to support standard teaching. In this paper, we focused on the effect of proper use of the Study Plan component of MML on student’s performance. Authors investigated the results of students of pre-calculus course during Fall 2013 in Foundation Program at Qatar University. The results showed that there is a strong correlation between study plan results and final exam results, also a strong relation between homework results and final exam results. In addition, the attendance average affected on the student’s results in general. Multiple regression is determined between passing rate dependent variable and study plan, homework as independent variable.

Keywords: MyMathLab, study plan, assessment, homework, attendance, correlation, regression

Procedia PDF Downloads 419
3193 A Study on the Current State and Policy Implications of Engineer Operated National Research Facility and Equipment in Korea

Authors: Chang-Yong Kim, Dong-Woo Kim, Whon-Hyun Lee, Yong-Joo Kim, Tae-Won Chung, Kyung-Mi Lee, Han-Sol Kim, Eun-Joo Lee, Euh Duck Jeong

Abstract:

In the past, together with the annual increase in investment on national R&D projects, the government’s budget investment in FE has steadily maintained. In the case of major developed countries, R&D and its supporting works are distinguished and professionalized in their own right, in so far as having a training system for facilities, equipment operation, and maintenance personnel. In Korea, however, research personnel conduct both research and equipment operation, leading to quantitative shortages of operational manpower and qualitative problems due to insecure employment such as maintenance issues or the loss of effectiveness of necessary equipment. Therefore, the purpose of this study was to identify the current status of engineer operated national research FE in Korea based on a 2017 survey results of domestic facilities and to suggest policy implications. A total of 395 research institutes that carried out national R&D projects and registered more than two FE since 2005 were surveyed on-line for two months. The survey showed that 395 non-profit research facilities were operating 45,155 pieces of equipment with 2,211 engineer operated national research FE, meaning that each engineer had to manage 21 items of FE. Among these, 43.9% of the workers were employed in temporary positions, including indefinite term contracts. Furthermore, the salary and treatment of the engineer personnel were relatively low compared to researchers. In short, engineers who exclusively focused on managing and maintaining FE play a very important role in increasing research immersion and obtaining highly reliable research results. Moreover, institutional efforts and government support for securing operators are severely lacking as domestic national R&D policies are mostly focused on researchers. The 2017 survey on FE also showed that 48.1% of all research facilities did not even employ engineers. In order to solve the shortage of the engineer personnel, the government will start the pilot project in 2012, and then only the 'research equipment engineer training project' from 2013. Considering the above, a national long-term manpower training plan that addresses the quantitative and qualitative shortage of operators needs to be established through a study of the current situation. In conclusion, the findings indicate that this should not only include a plan which connects training to employment but also measures the creation of additional jobs by re-defining and re-establishing operator roles and improving working conditions.

Keywords: engineer, Korea, maintenance, operation, research facilities and equipment

Procedia PDF Downloads 190
3192 A Two-Pronged Truncated Deferred Sampling Plan for Log-Logistic Distribution

Authors: Braimah Joseph Odunayo, Jiju Gillariose

Abstract:

This paper is aimed at developing a sampling plan that uses information from precedent and successive lots for lot disposition with a pretention that the life-time of a particular product assumes a Log-logistic distribution. A Two-pronged Truncated Deferred Sampling Plan (TTDSP) for Log-logistic distribution is proposed when the testing is truncated at a precise time. The best possible sample sizes are obtained under a given Maximum Allowable Percent Defective (MAPD), Test Suspension Ratios (TSR), and acceptance numbers (c). A formula for calculating the operating characteristics of the proposed plan is also developed. The operating characteristics and mean-ratio values were used to measure the performance of the plan. The findings of the study show that: Log-logistic distribution has a decreasing failure rate; furthermore, as mean-life ratio increase, the failure rate reduces; the sample size increase as the acceptance number, test suspension ratios and maximum allowable percent defective increases. The study concludes that the minimum sample sizes were smaller, which makes the plan a more economical plan to adopt when cost and time of production are costly and the experiment being destructive.

Keywords: consumers risk, mean life, minimum sample size, operating characteristics, producers risk

Procedia PDF Downloads 140
3191 Hearing Aids Maintenance Training for Hearing-Impaired Preschool Children with the Help of Motion Graphic Tools

Authors: M. Mokhtarzadeh, M. Taheri Qomi, M. Nikafrooz, A. Atashafrooz

Abstract:

The purpose of the present study was to investigate the effectiveness of using motion graphics as a learning medium on training hearing aids maintenance skills to hearing-impaired children. The statistical population of this study consisted of all children with hearing loss in Ahvaz city, at age 4 to 7 years old. As the sample, 60, whom were selected by multistage random sampling, were randomly assigned to two groups; experimental (30 children) and control (30 children) groups. The research method was experimental and the design was pretest-posttest with the control group. The intervention consisted of a 2-minute motion graphics clip to train hearing aids maintenance skills. Data were collected using a 9-question researcher-made questionnaire. The data were analyzed by using one-way analysis of covariance. Results showed that the training of hearing aids maintenance skills with motion graphics was significantly effective for those children. The results of this study can be used by educators, teachers, professionals, and parents to train children with disabilities or normal students.

Keywords: hearing aids, hearing aids maintenance skill, hearing impaired children, motion graphics

Procedia PDF Downloads 158
3190 Financial Modeling for Net Present Benefit Analysis of Electric Bus and Diesel Bus and Applications to NYC, LA, and Chicago

Authors: Jollen Dai, Truman You, Xinyun Du, Katrina Liu

Abstract:

Transportation is one of the leading sources of greenhouse gas emissions (GHG). Thus, to meet the Paris Agreement 2015, all countries must adopt a different and more sustainable transportation system. From bikes to Maglev, the world is slowly shifting to sustainable transportation. To develop a utility public transit system, a sustainable web of buses must be implemented. As of now, only a handful of cities have adopted a detailed plan to implement a full fleet of e-buses by the 2030s, with Shenzhen in the lead. Every change requires a detailed plan and a focused analysis of the impacts of the change. In this report, the economic implications and financial implications have been taken into consideration to develop a well-rounded 10-year plan for New York City. We also apply the same financial model to the other cities, LA and Chicago. We picked NYC, Chicago, and LA to conduct the comparative NPB analysis since they are all big metropolitan cities and have complex transportation systems. All three cities have started an action plan to achieve a full fleet of e-bus in the decades. Plus, their energy carbon footprint and their energy price are very different, which are the key factors to the benefits of electric buses. Using TCO (Total Cost Ownership) financial analysis, we developed a model to calculate NPB (Net Present Benefit) /and compare EBS (electric buses) to DBS (diesel buses). We have considered all essential aspects in our model: initial investment, including the cost of a bus, charger, and installation, government fund (federal, state, local), labor cost, energy (electricity or diesel) cost, maintenance cost, insurance cost, health and environment benefit, and V2G (vehicle to grid) benefit. We see about $1,400,000 in benefits for a 12-year lifetime of an EBS compared to DBS provided the government fund to offset 50% of EBS purchase cost. With the government subsidy, an EBS starts to make positive cash flow in 5th year and can pay back its investment in 5 years. Please remember that in our model, we consider environmental and health benefits, and every year, $50,000 is counted as health benefits per bus. Besides health benefits, the significant benefits come from the energy cost savings and maintenance savings, which are about $600,000 and $200,000 in 12-year life cycle. Using linear regression, given certain budget limitations, we then designed an optimal three-phase process to replace all NYC electric buses in 10 years, i.e., by 2033. The linear regression process is to minimize the total cost over the years and have the lowest environmental cost. The overall benefits to replace all DBS with EBS for NYC is over $2.1 billion by the year of 2033. For LA, and Chicago, the benefits for electrification of the current bus fleet are $1.04 billion and $634 million by 2033. All NPB analyses and the algorithm to optimize the electrification phase process are implemented in Python code and can be shared.

Keywords: financial modeling, total cost ownership, net present benefits, electric bus, diesel bus, NYC, LA, Chicago

Procedia PDF Downloads 50
3189 Study on Disaster Prevention Plan for an Electronic Industry in Thailand

Authors: S. Pullteap, M. Pathomsuriyaporn

Abstract:

In this article, a study of employee’s opinion to the factors that affect to the flood preventive and the corrective action plan in an electronic industry at the Sharp Manufacturing (Thailand) Co., Ltd. has been investigated. The surveys data of 175 workers and supervisors have, however, been selected for data analysis. The results is shown that the employees emphasize about the needs in a subsidy at the time of disaster at high levels of 77.8%, as the plan focusing on flood prevention of the rehabilitation equipment is valued at the intermediate level, which is 79.8%. Demonstration of the hypothesis has found that the different education levels has thus been affected to the needs factor at the flood disaster time. Moreover, most respondents give priority to flood disaster risk management factor. Consequently, we found that the flood prevention plan is valued at high level, especially on information monitoring, which is 93.4% for the supervisor item. The respondents largely assume that the flood will have impacts on the industry, up to 80%, thus to focus on flood management plans is enormous.

Keywords: flood prevention plan, flood event, electronic industrial plant, disaster, risk management

Procedia PDF Downloads 326
3188 A Review on Literatures in Management and Maintenance of WAQF Properties in Malaysia

Authors: Huraizah Arshad, Maizan Baba

Abstract:

Malaysia is the country that consists of high population of Muslim community with more than 60%; as reported in year 2014. The stability of economy allowed people to contribute towards ongoing charity such as waqf and infaq. Waqf is an important component of the Islamic economic instruments since it is beneficial to help those needy in the community. Although waqf had been implemented in Malaysia for many years, there is no specific framework on how to manage and maintain the waqf properties in effective and efficient practice. Thus, a comprehensive framework related to the management and maintenance of the waqf properties is crucial to ensure that the administration of the fund is fair within the community. The objective of this article is to examine the related literatures in administration, management and maintenance of waqf for the past ten (10) years. The methodology of this article is through qualitative research based on literature on waqf administration and management; waqf planning and development and the application of maintenance concept. Data from each articles related in this field were collected and statistically analyzed using the SPSS software. A variable such as authorship patterns, number of articles published and geographical affiliation are identified in this study. The general finding in this article shows that there are still limited number of articles and papers published by the researchers related to this field. Henceforth, this article provides significant suggestions and strategies for the future research on waqf administration, management and maintenance.

Keywords: Waqf, administration and management, maintenance, improvement, facilities management

Procedia PDF Downloads 402
3187 Trends in Use of Millings in Pavement Maintenance

Authors: Rafiqul Tarefder, Mohiuddin Ahmad, Mohammad Hossain

Abstract:

While milling materials from old pavement surface can be an important component of cost effective maintenance operation, their use in maintenance projects are not uniform and well documented. This study documents the different maintenance practices followed by four transportation districts of New Mexico Department of Transportation (NMDOT) in an attempt to find whether millings are being used in maintenance projects by those districts. Based on existing literature, a questionnaire was developed related to six common maintenance practices. NMDOT district personal were interviewed face to face to discuss and get answers to that questionnaire. It revealed that NMDOT districts mainly use chip seal and patching. Other maintenance procedures such as sand seal, scrub seal, slurry seal, and thin overlay have limited use. Two out of four participating districts do not have any documents on chip sealing; rather they employ the experiences of the chip seal crew. All districts use polymer modified high float emulsion (HFE100P) for chip seal with an application rate ranging from 0.4 to 0.56 gallons per square yard. Chip application rate varies from 15 to 40 lb/ square yard. State wide, the thickness of chip seal varies from 3/8" to 1" and life varies from 3 to 10 years. NMDOT districts mainly use three type of patching: pothole, dig-out and blade patch. Pothole patches are used for small potholes and during emergency, dig-out patches are used for all type of potholes sometimes after pothole patching, and blade patch is used when a significant portion of the pavement is damaged. Pothole patches last as low as three days whereas, blade patch lasts as long as 3 years. It was observed that all participating districts use millings in maintenance projects.

Keywords: chip seal, sand seal, scrub seal, slurry seal, overlay, patching, millings

Procedia PDF Downloads 342
3186 Factors Associated with Weight Loss Maintenance after an Intervention Program

Authors: Filipa Cortez, Vanessa Pereira

Abstract:

Introduction: The main challenge of obesity treatment is long-term weight loss maintenance. The 3 phases method is a weight loss program that combines a low carb and moderately high-protein diet, food supplements and a weekly one-to-one consultation with a certified nutritionist. Sustained weight control is the ultimate goal of phase 3. Success criterion was the minimum loss of 10% of initial weight and its maintenance after 12 months. Objective: The aim of this study was to identify factors associated with successful weight loss maintenance after 12 months at the end of 3 phases method. Methods: The study included 199 subjects that achieved their weight loss goal (phase 3). Weight and body mass index (BMI) were obtained at the baseline and every week until the end of the program. Therapeutic adherence was measured weekly on a Likert scale from 1 to 5. Subjects were considered in compliance with nutritional recommendation and supplementation when their classification was ≥ 4. After 12 months of the method, the current weight and number of previous weight-loss attempts were collected by telephone interview. The statistical significance was assumed at p-values < 0.05. Statistical analyses were performed using SPSS TM software v.21. Results: 65.3% of subjects met the success criterion. The factors which displayed a significant weight loss maintenance prediction were: greater initial percentage weight loss (OR=1.44) during the weight loss intervention and a higher number of consultations in phase 3 (OR=1.10). Conclusion: These findings suggest that the percentage weight loss during the weight loss intervention and the number of consultations in phase 3 may facilitate maintenance of weight loss after the 3 phases method.

Keywords: obesity, weight maintenance, low-carbohydrate diet, dietary supplements

Procedia PDF Downloads 150
3185 Investigating the Causes of Human Error-Induced Incidents in the Maintenance Operations of Petrochemical Industry by Using Human Factors Analysis and Classification System

Authors: Omid Kalatpour, Mohammadreza Ajdari

Abstract:

This article studied the possible causes of human error-induced incidents in the petrochemical industry maintenance activities by using Human Factors Analysis and Classification System (HFACS). The purpose of the study was anticipating and identifying these causes and proposing corrective and preventive actions. Maintenance department in a petrochemical company was selected for research. A checklist of human error-induced incidents was developed based on four HFACS main levels and nineteen sub-groups. Hierarchical task analysis (HTA) technique was used to identify maintenance activities and tasks. The main causes of possible incidents were identified by checklist and recorded. Corrective and preventive actions were defined depending on priority. Analyzing the worksheets of 444 activities in four levels of HFACS showed 37.6% of the causes were at the level of unsafe actions, 27.5% at the level of unsafe supervision, 20.9% at the level of preconditions for unsafe acts and 14% of the causes were at the level of organizational effects. The HFACS sub-groups showed errors (24.36%) inadequate supervision (14.89%) and violations (13.26%) with the most frequency. According to findings of this study, increasing the training effectiveness of operators and supervision improvement respectively are the most important measures in decreasing the human error-induced incidents in petrochemical industry maintenance.

Keywords: human error, petrochemical industry, maintenance, HFACS

Procedia PDF Downloads 242
3184 Advancing Power Network Maintenance: The Development and Implementation of a Robotic Cable Splicing Machine

Authors: Ali Asmari, Alex Symington, Htaik Than, Austin Caradonna, John Senft

Abstract:

This paper presents the collaborative effort between ULC Technologies and Con Edison in developing a groundbreaking robotic cable splicing machine. The focus is on the machine's design, which integrates advanced robotics and automation to enhance safety and efficiency in power network maintenance. The paper details the operational steps of the machine, including cable grounding, cutting, and removal of different insulation layers, and discusses its novel technological approach. The significant benefits over traditional methods, such as improved worker safety and reduced outage times, are highlighted based on the field data collected during the validation phase of the project. The paper also explores the future potential and scalability of this technology, emphasizing its role in transforming the landscape of power network maintenance.

Keywords: cable splicing machine, power network maintenance, electric distribution, electric transmission, medium voltage cable

Procedia PDF Downloads 66
3183 The Standardization of Colorado Schools to Offer Opportunity Through Equal Education

Authors: Heather Caldwell

Abstract:

In 1915, state superintendent, Mary C.C. Bradford initiated a state standardization plan in order to improve the quality of schools and the educational experience for all children in Colorado. This plan would change the schools, improving them and offering more opportunities for children, teachers, and the community. In a state where geography limited opportunity to make all schools equal and brought challenges to state school leaders to improve education throughout the state, the leadership prevailed and worked together with local schools and school leaders to make drastic improvements in the curriculum. This paper will discuss this plan and will highlight key contributions to this standardization plan that improved opportunities for all students in the state of Colorado through these educational initiatives.

Keywords: history of education, standardization, curriculum, state superintendent, women in education

Procedia PDF Downloads 53
3182 Future Housing Energy Efficiency Associated with the Auckland Unitary Plan

Authors: Bin Su

Abstract:

The draft Auckland Unitary Plan outlines the future land used for new housing and businesses with Auckland population growth over the next thirty years. According to Auckland Unitary Plan, over the next 30 years, the population of Auckland is projected to increase by one million, and up to 70% of total new dwellings occur within the existing urban area. Intensification will not only increase the number of median or higher density houses such as terrace house, apartment building, etc. within the existing urban area but also change mean housing design data that can impact building thermal performance under the local climate. Based on mean energy consumption and building design data, and their relationships of a number of Auckland sample houses, this study is to estimate the future mean housing energy consumption associated with the change of mean housing design data and evaluate housing energy efficiency with the Auckland Unitary Plan.

Keywords: Auckland Unitary Plan, building thermal design, housing design, housing energy efficiency

Procedia PDF Downloads 386