Search results for: mean time to failure
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 19993

Search results for: mean time to failure

19033 Management of Obstructive Hydrocephalus Secondary to a Posterior Fossa Tumor in Children: About 24 Cases Operated at the Central Hospital of Army

Authors: Hakim Derradji, M’Hammedi Yousra, Sabrou Abdelmalek, Tabet Nacer

Abstract:

Introduction: This is a retrospective study carried out at the Central Hospital of Army from 2017 to 2022. Its objective is to demonstrate the best surgical method for the management of obstructive hydrocephalus secondary to a posterior fossa tumor in children, in pre, per, and post-operative. Patients and Methods: During this period, 24 children (over 1 year old) were admitted for treatment of the posterior fossa tumor with obstructive secondary hydrocephalus and the majority of whom benefited from VCS followed by surgery and excision, the rest, received after evacuation from other hospital structures, were managed there beforehand with ventriculoperitoneal diversion or external drainage. We found that the way hydrocephalus is managed has implications for subsequent management, hence the need for this study to determine the effectiveness of different surgical procedures used in the treatment of hydrocephalus in these patients. The evaluation is made on the basis of revision rate, complications, survival, and radiological evaluation. Results: 6 patients (25%) received a ventriculoperitoneal shunt (VPD), 15 patients (62%) underwent a ventriculocysternostomy (VCS), and 3 patients (12.5%) received temporary ventricular drainage before or during tumor excision. The post-operative results were almost similar. Nevertheless, a high failure rate (25%) was observed. No deaths are recorded. In total, 75% of children who had a DVP were reoperated. The revision by VCS was performed, in addition to the 4 patients benefiting from a DVP, with one patient having received external drainage, and only one revision of a VCS was recorded. In the two patients who received external drainage, restoration of CSF outflow was observed following tumor resection. Conclusion: VCS is indicated in the first intention in the treatment of hydrocephalus secondary to a posterior fossa tumor, in view of the satisfactory results obtained and the high failure rate in DVP, especially with the presence of metastatic cells in the peritoneum, but can be considered as a second-line treatment.

Keywords: posterior fossa tumor, obstructive hydrocephalus, DVP, VCS

Procedia PDF Downloads 117
19032 Continuous-Time and Discrete-Time Singular Value Decomposition of an Impulse Response Function

Authors: Rogelio Luck, Yucheng Liu

Abstract:

This paper proposes the continuous-time singular value decomposition (SVD) for the impulse response function, a special kind of Green’s functions e⁻⁽ᵗ⁻ ᵀ⁾, in order to find a set of singular functions and singular values so that the convolutions of such function with the set of singular functions on a specified domain are the solutions to the inhomogeneous differential equations for those singular functions. A numerical example was illustrated to verify the proposed method. Besides the continuous-time SVD, a discrete-time SVD is also presented for the impulse response function, which is modeled using a Toeplitz matrix in the discrete system. The proposed method has broad applications in signal processing, dynamic system analysis, acoustic analysis, thermal analysis, as well as macroeconomic modeling.

Keywords: singular value decomposition, impulse response function, Green’s function , Toeplitz matrix , Hankel matrix

Procedia PDF Downloads 156
19031 Analysis of Tilting Cause of a Residential Building in Durres by the Use of Cptu Test

Authors: Neritan Shkodrani

Abstract:

On November 26, 2019, an earthquake hit the central western part of Albania. It was assessed as Mw 6.4. Its epicenter was located offshore north western Durrës, about 7 km north of the city. In this paper, the consequences of settlements of very soft soils have been discussed for the case of a residential building, mentioned as “K Building”, which was suffering a significant tilting after the earthquake. “KBuilding” is an RC framed building having 12+1 (basement) storiesand a floor area of 21000 m2. The construction of the building was completed in 2012. “KBuilding”, located in Durres city, suffered severe non-structural damage during November 26, 2019, Durrës Earthquake sequences. During the in-site inspections immediately after the earthquake, the general condition of the buildings, the presence of observable settlements on the ground, and the crack situation in the structure were determined, and damage inspection were performed. It was significant to note that the “K Building” presented tilting that might be attributed, as it was believed at the beginning, partially to the failure of the columns of the ground floor and partially to liquefaction phenomena, but it did not collapse. At the first moment was not clear if the foundation had a bearing capacity failure or the foundation failed because of the soil liquefaction. Geotechnical soil investigations by using CPTU test were executed, and their data are usedto evaluatebearing capacity, consolidation settlement of the mat foundation, and soil liquefaction since they were believed to be the main reasons of this building tilting.Geotechnical soil investigation consist in 5 (five) Static Cone Penetration tests with pore pressure measurement (piezocone test). They reached a penetration depth of 20.0 m to 30.0 mand, clearly shown the presence of very soft and organic soils in the soil profile of the site. Geotechnical CPT based analysis of bearing capacity, consolidation, and secondary settlement are applied, and results are reported for each test. These results shown very small values of allowable bearing capacity and very high values of consolidation and secondary settlements. Liquefaction analysis based on the data of CPTU tests and the characteristics of ground shaking of the mentioned earthquake has shown the possibility of liquefaction for some layers of the considered soil profile, but the estimated vertical settlements are at a small range and clearly shown that the main reason of the building tilting was not related to the consequences of liquefaction, but was an existing settlement caused from the applied bearing pressure of this building. All the CPTU tests were carried out on August 2021, almost two years after the November 26, 2019, Durrës Earthquake and when the building itself was demolished. After removing the mat foundation on September 2021, it was possible to carry out CPTU tests even on the footprint of the existing building, which made possible to observe the effects of long time applied of foundation bearing pressure to the consolidation on the considered soil profile.

Keywords: bearing capacity, cone penetration test, consolidation settlement, secondary settlement, soil liquefaction, etc

Procedia PDF Downloads 96
19030 The Modelling of Real Time Series Data

Authors: Valeria Bondarenko

Abstract:

We proposed algorithms for: estimation of parameters fBm (volatility and Hurst exponent) and for the approximation of random time series by functional of fBm. We proved the consistency of the estimators, which constitute the above algorithms, and proved the optimal forecast of approximated time series. The adequacy of estimation algorithms, approximation, and forecasting is proved by numerical experiment. During the process of creating software, the system has been created, which is displayed by the hierarchical structure. The comparative analysis of proposed algorithms with the other methods gives evidence of the advantage of approximation method. The results can be used to develop methods for the analysis and modeling of time series describing the economic, physical, biological and other processes.

Keywords: mathematical model, random process, Wiener process, fractional Brownian motion

Procedia PDF Downloads 358
19029 Real-Time Aerial Marine Surveillance System for Safe Navigation

Authors: Vinesh Thiruchelvam, Umar Mumtaz Chowdry, Sathish Kumar Selvaperumal

Abstract:

The prime purpose of the project is to provide a sophisticated system for surveillance specialized for the Port Authorities in the Maritime Industry. The current aerial surveillance does not have a wide dimensioning view. The channels of communication is shared and not exclusive allowing for communications errors or disturbance mainly due to traffic. The scope is to analyze the various aspects as real-time aerial and marine surveillance is one of the most important methods which could ensure the domain security of the sailors. The system will improve real time data as obtained for the controller base station. The key implementation will be based on camera speed, angle and adherence to a sustainable power utilization module.

Keywords: SMS, real time, GUI, maritime industry

Procedia PDF Downloads 498
19028 2D Numerical Analysis for Determination of the Effect of Bored Piles Constructed against the Landslide near Karabuk University Stadium

Authors: Dogan Cetin, Burak Turk, Mahmut Candan

Abstract:

Landslides cause remarkable damage and loss of human life every year around the world. They may be made more likely by factors such as earthquakes, heavy precipitation, and incorrect construction activities near or on slopes. The stadium of Karabük University is located at the bottom of a very high slope. After construction of the stadium, severe deformations were observed on the social activity area surrounding the stadium. Some inclinometers were placed behind the stadium to detect the possible landslide activity. According to measurements of the inclinometers, irregular soil movements were detected at depths between 20 m and 45 m. Also, significant heaves and settlements were observed behind the stadium walls located at the toe of the slope. The heaves indicate that the stadium walls were under threat of a significant landslide. After inclinometer readings and field observations, the potential failure geometry was estimated. The protection system was designed based on numerous numerical analysis performed by 2-D Plaxis software. After the design was completed, protective geotechnical work was started. Before the geotechnical work began, new inclinometers were installed to monitor earth movement during the work and afterward. The total horizontal length of the possible failure surface is 220 m. Geotechnical work included two-row-pile construction and three-row-pile construction on the slope. The bored piles were 120 cm in diameter for two-row-pile construction, and 150 cm in diameter for three-row-pile construction. Pile length is 31.30 m for two-row-pile construction and 31.40 m for three-row-pile construction. The distance between two-row-pile and three-row-pile construction is 60 m. With these bored piles, the landslide was divided into three parts. In this way, the earth's pressure was reduced. After a number of inclinometer readings, it was seen that deformation continued during the work, but after the work was done, the movement reversed, and total deformation stayed in mm dimension. It can be said that the protection work eliminated the possible landslide.

Keywords: landslide, landslide protection, inclinometer measurement, bored piles

Procedia PDF Downloads 146
19027 A Study for the Effect of Fire Initiated Location on Evacuation Success Rate

Authors: Jin A Ryu, Hee Sun Kim

Abstract:

As the number of fire accidents is gradually raising, many studies have been reported on evacuation. Previous studies have mostly focused on evaluating the safety of evacuation and the risk of fire in particular buildings. However, studies on effects of various parameters on evacuation have not been nearly done. Therefore, this paper aims at observing evacuation time under the effect of fire initiated location. In this study, evacuation simulations are performed on a 5-floor building located in Seoul, South Korea using the commercial program, Fire Dynamics Simulator with Evacuation (FDS+EVAC). Only the fourth and fifth floors are modeled with an assumption that fire starts in a room located on the fourth floor. The parameter for evacuation simulations is location of fire initiation to observe the evacuation time and safety. Results show that the location of fire initiation is closer to exit, the more time is taken to evacuate. The case having the nearest location of fire initiation to exit has the lowest ratio of successful occupants to the total occupants. In addition, for safety evaluation, the evacuation time calculated from computer simulation model is compared with the tolerable evacuation time according to code in Japan. As a result, all cases are completed within the tolerable evacuation time. This study allows predicting evacuation time under various conditions of fire and can be used to evaluate evacuation appropriateness and fire safety of building.

Keywords: fire simulation, evacuation simulation, temperature, evacuation safety

Procedia PDF Downloads 349
19026 Study of Natural Patterns on Digital Image Correlation Using Simulation Method

Authors: Gang Li, Ghulam Mubashar Hassan, Arcady Dyskin, Cara MacNish

Abstract:

Digital image correlation (DIC) is a contactless full-field displacement and strain reconstruction technique commonly used in the field of experimental mechanics. Comparing with physical measuring devices, such as strain gauges, which only provide very restricted coverage and are expensive to deploy widely, the DIC technique provides the result with full-field coverage and relative high accuracy using an inexpensive and simple experimental setup. It is very important to study the natural patterns effect on the DIC technique because the preparation of the artificial patterns is time consuming and hectic process. The objective of this research is to study the effect of using images having natural pattern on the performance of DIC. A systematical simulation method is used to build simulated deformed images used in DIC. A parameter (subset size) used in DIC can have an effect on the processing and accuracy of DIC and even cause DIC to failure. Regarding to the picture parameters (correlation coefficient), the higher similarity of two subset can lead the DIC process to fail and make the result more inaccurate. The pictures with good and bad quality for DIC methods have been presented and more importantly, it is a systematic way to evaluate the quality of the picture with natural patterns before they install the measurement devices.

Keywords: Digital Image Correlation (DIC), deformation simulation, natural pattern, subset size

Procedia PDF Downloads 419
19025 A Survey on the Supervision Experience of Full-Time Intern Counseling Psychologist

Authors: Szu-Fan Chen, Cheng-Tseng Lin, Ting-Chia Lien

Abstract:

This study mainly focuses on understanding the current supervision experience of full-time intern counseling psychologists in Taiwan. This study took 197 full-time intern counseling psychologists as the research subjects, including 146 women (74%) and 51 men (26%). In terms of internship sites, the largest number of internships are in school sites (59%), followed by community sites (30%), and fewer in medical fields or corporate sites (only 11%). In addition, a survey was conducted on whether the subjects had full-time jobs before full-time internship. 42% did not have full-time workers, and 48% had full-time workers. However, among those who had full-time workers, 28% were engaged in work related to psychological counseling. 20% are engaged in work unrelated to psychological counseling. In the sample of this study, each person interviewed on average 2.68 internship institutions in total, and the current internship unit is the 2.29th institution interviewed. All (100%) full-time intern psychologists have entered into individual internship contracts with internship institutions. In terms of professional supervisor candidates, a total of 178 (90%) supervisors were appointed by internal personnel of the institution, and a total of 19 (10%) were hired as supervisors from outside the institution. Regarding the form of supervision, it is mostly conducted through individual supervision (98%), and up to 60% is conducted through discussion of written/oral case reports. In terms of supervision satisfaction, 47% were very satisfied, 28% were satisfied, 18% were OK, and 6% were dissatisfied. It is worth noting that the results of this study show that full-time intern counseling psychologists said that they are under pressure to accept supervision (30%). It is recommended that the internship system should standardize the qualification review and evaluation of internship institutions to facilitate institutional control. Furthermore, the personal difficulties of full-time intern psychologists need to be discussed with the internship institution and supervisor from time to time to jointly assist them in completing their professional studies stably and successfully. Finally, it is recommended that future researchers can use the interview method provided by the author to strengthen their understanding of the supervision experience of full-time intern counseling psychologists, so that in the future, this study can provide relevant specific and feasible suggestions for counseling practitioners and future researchers' reference.

Keywords: full-time intern counseling psychologist, supervision experience, full-time intership, supervision

Procedia PDF Downloads 21
19024 Wait-Optimized Scheduler Algorithm for Efficient Process Scheduling in Computer Systems

Authors: Md Habibur Rahman, Jaeho Kim

Abstract:

Efficient process scheduling is a crucial factor in ensuring optimal system performance and resource utilization in computer systems. While various algorithms have been proposed over the years, there are still limitations to their effectiveness. This paper introduces a new Wait-Optimized Scheduler (WOS) algorithm that aims to minimize process waiting time by dividing them into two layers and considering both process time and waiting time. The WOS algorithm is non-preemptive and prioritizes processes with the shortest WOS. In the first layer, each process runs for a predetermined duration, and any unfinished process is subsequently moved to the second layer, resulting in a decrease in response time. Whenever the first layer is free or the number of processes in the second layer is twice that of the first layer, the algorithm sorts all the processes in the second layer based on their remaining time minus waiting time and sends one process to the first layer to run. This ensures that all processes eventually run, optimizing waiting time. To evaluate the performance of the WOS algorithm, we conducted experiments comparing its performance with traditional scheduling algorithms such as First-Come-First-Serve (FCFS) and Shortest-Job-First (SJF). The results showed that the WOS algorithm outperformed the traditional algorithms in reducing the waiting time of processes, particularly in scenarios with a large number of short tasks with long wait times. Our study highlights the effectiveness of the WOS algorithm in improving process scheduling efficiency in computer systems. By reducing process waiting time, the WOS algorithm can improve system performance and resource utilization. The findings of this study provide valuable insights for researchers and practitioners in developing and implementing efficient process scheduling algorithms.

Keywords: process scheduling, wait-optimized scheduler, response time, non-preemptive, waiting time, traditional scheduling algorithms, first-come-first-serve, shortest-job-first, system performance, resource utilization

Procedia PDF Downloads 91
19023 An Approach to the Assembly Line Balancing Problem with Uncertain Operation Time

Authors: Zhongmin Wang, Lin Wei, Hengshan Zhang, Tianhua Chen, Yimin Zhou

Abstract:

The assembly line balancing problems are signficant in mass production systems. In order to deal with the uncertainties that practically exist but barely mentioned in the literature, this paper develops a mathematic model with an optimisation algorithm to solve the assembly line balancing problem with uncertainty operation time. The developed model is able to work with a variable number of workstations under the uncertain environment, aiming to obtain the minimal number of workstation and minimal idle time for each workstation. In particular, the proposed approach first introduces the concept of protection time that closely works with the uncertain operation time. Four dominance rules and the mechanism of determining up and low bounds are subsequently put forward, which serve as the basis for the proposed branch and bound algorithm. Experimental results show that the proposed work verified on a benchmark data set is able to solve the uncertainties efficiently.

Keywords: assembly lines, SALBP-UOT, uncertain operation time, branch and bound algorithm.

Procedia PDF Downloads 171
19022 Surveying Apps in Dam Excavation

Authors: Ali Mohammadi

Abstract:

Whenever there is a need to dig the ground, the presence of a surveyor is required to control the map. In projects such as dams and tunnels, these controls are more important because any mistakes can increase the cost. Also, time is great importance in These projects have and one of the ways to reduce the drilling time is to use techniques that can reduce the mapping time in these projects. Nowadays, with the existence of mobile phones, we can design apps that perform calculations and drawing for us on the mobile phone. Also, if we have a device that requires a computer to access its information, by designing an app, we can transfer its information to the mobile phone and use it, so we will not need to go to the office.

Keywords: app, tunnel, excavation, dam

Procedia PDF Downloads 67
19021 Relationship between the Development of Sepsis, Systemic Inflammatory Response Syndrome and Body Mass Index among Adult Trauma Patients at University Hospital in Cairo

Authors: Mohamed Hendawy Mousa, Warda Youssef Mohamed Morsy

Abstract:

Background: Sepsis is a major cause of mortality and morbidity in trauma patients. Body mass index as an indicator of nutritional status was reported as a predictor of injury pattern and complications among critically ill injured patients. Aim: The aim of this study is to investigate the relationship between body mass index and the development of sepsis, systemic inflammatory response syndrome among adult trauma patients at emergency hospital - Cairo University. Research design: Descriptive correlational research design was utilized in the current study. Research questions: Q1. What is the body mass index profile of adult trauma patients admitted to the emergency hospital at Cairo University over a period of 6 months?, Q2. What is the frequency of systemic inflammatory response syndrome and sepsis among adult trauma patients admitted to the emergency hospital at Cairo University over a period of 6 months?, and Q3. What is the relationship between the development of sepsis, systemic inflammatory response syndrome and body mass index among adult trauma patients admitted to the emergency hospital at Cairo University over a period of 6 months?. Sample: A purposive sample of 52 adult male and female trauma patients with revised trauma score 10 to 12. Setting: The Emergency Hospital affiliated to Cairo University. Tools: Four tools were utilized to collect data pertinent to the study: Socio demographic and medical data tool, Systemic inflammatory response syndrome assessment tool, Revised Trauma Score tool, and Sequential organ failure assessment tool. Results: The current study revealed that, (61.5 %) of the studied subjects had normal body mass index, (25 %) were overweight, and (13.5 %) were underweight. 84.6% of the studied subjects had systemic inflammatory response syndrome and 92.3% were suffering from mild sepsis. No significant statistical relationship was found between body mass index and occurrence of Systemic inflammatory response syndrome (2= 2.89 & P = 0.23). However, Sequential organ failure assessment scores were affected significantly by body mass index was found mean of initial and last Sequential organ failure assessment score for underweight, normal and obese where t= 7.24 at p = 0.000, t= 16.49 at p = 0.000 and t= 9.80 at p = 0.000 respectively. Conclusion: Underweight trauma patients showed significantly higher rate of developing sepsis as compared to patients with normal body weight and obese. Recommendations: based on finding of this study the following are recommended: replication of the study on a larger probability sample from different geographical locations in Egypt; Carrying out of further studies in order to assess the other risk factors influencing trauma outcome and incidence of its complications; Establishment of standardized guidelines for managing underweight traumatized patients with sepsis.

Keywords: body mass index, sepsis, systemic inflammatory response syndrome, adult trauma

Procedia PDF Downloads 250
19020 Analytical Slope Stability Analysis Based on the Statistical Characterization of Soil Shear Strength

Authors: Bernardo C. P. Albuquerque, Darym J. F. Campos

Abstract:

Increasing our ability to solve complex engineering problems is directly related to the processing capacity of computers. By means of such equipments, one is able to fast and accurately run numerical algorithms. Besides the increasing interest in numerical simulations, probabilistic approaches are also of great importance. This way, statistical tools have shown their relevance to the modelling of practical engineering problems. In general, statistical approaches to such problems consider that the random variables involved follow a normal distribution. This assumption tends to provide incorrect results when skew data is present since normal distributions are symmetric about their means. Thus, in order to visualize and quantify this aspect, 9 statistical distributions (symmetric and skew) have been considered to model a hypothetical slope stability problem. The data modeled is the friction angle of a superficial soil in Brasilia, Brazil. Despite the apparent universality, the normal distribution did not qualify as the best fit. In the present effort, data obtained in consolidated-drained triaxial tests and saturated direct shear tests have been modeled and used to analytically derive the probability density function (PDF) of the safety factor of a hypothetical slope based on Mohr-Coulomb rupture criterion. Therefore, based on this analysis, it is possible to explicitly derive the failure probability considering the friction angle as a random variable. Furthermore, it is possible to compare the stability analysis when the friction angle is modelled as a Dagum distribution (distribution that presented the best fit to the histogram) and as a Normal distribution. This comparison leads to relevant differences when analyzed in light of the risk management.

Keywords: statistical slope stability analysis, skew distributions, probability of failure, functions of random variables

Procedia PDF Downloads 338
19019 Influence of Moringa Leaves Extract on the Response of Hb Molecule to Dose Rates’ Changes: II. Relaxation Time and Its Thermodynamic Driven State Functions

Authors: Mohamed M. M. Elnasharty, Azhar M. Elwan

Abstract:

Irradiation deposits energy through ionisation changing the bio-system’s net dipole, allowing the use of dielectric parameters and thermodynamic state functions related to these parameters as biophysical detectors to electrical inhomogeneity within the biosystem. This part is concerned with the effect of Moringa leaves extract, natural supplement, on the response of the biosystem to two different dose rates of irradiation. Having Hb molecule as a representative to the biosystem to be least invasive to the biosystem, dielectric measurements were used to extract the relaxation time of certain process found in the Hb spectrum within the indicated frequency window and the interrelated thermodynamic state functions were calculated from the deduced relaxation time. The results showed that relaxation time was decreased for both dose rates indicating a strong influence of Moringa on the response of biosystem and consequently Hb molecule. This influence was presented in the relaxation time and other parameters as well.

Keywords: activation energy, DC conductivity, dielectric relaxation, enthalpy change, Moringa leaves extract, relaxation time

Procedia PDF Downloads 147
19018 Geological and Geotechnical Approach for Stabilization of Cut-Slopes in Power House Area of Luhri HEP Stage-I (210 MW), India

Authors: S. P. Bansal, Mukesh Kumar Sharma, Ankit Prabhakar

Abstract:

Luhri Hydroelectric Project Stage-I (210 MW) is a run of the river type development with a dam toe surface powerhouse (122m long, 50.50m wide, and 65.50m high) on the right bank of river Satluj in Himachal Pradesh, India. The project is located in the inner lesser Himalaya between Dhauladhar Range in the south and higher Himalaya in the north in the seismically active region. At the project, the location river is confined within narrow V-shaped valleys with little or no flat areas close to the river bed. Nearly 120m high cut slopes behind the powerhouse are proposed from the powerhouse foundation level of 795m to ± 915m to accommodate the surface powerhouse. The stability of 120m high cut slopes is a prime concern for the reason of risk involved. The slopes behind the powerhouse will be excavated in mainly in augen gneiss, fresh to weathered in nature, and biotite rich at places. The foliation joints are favorable and dipping inside the hill. Two valleys dipping steeper joints will be encountered on the slopes, which can cause instability during excavation. Geological exploration plays a vital role in designing and optimization of cut slopes. SWEDGE software has been used to analyze the geometry and stability of surface wedges in cut slopes. The slopes behind powerhouse have been analyzed in three zones for stability analysis by providing a break in the continuity of cut slopes, which shall provide quite substantial relief for slope stabilization measure. Pseudo static analysis has been carried out for the stabilization of wedges. The results indicate that many large wedges are forming, which have a factor of safety less than 1. The stability measures (support system, bench width, slopes) have been planned so that no wedge failure may occur in the future.

Keywords: cut slopes, geotechnical investigations, Himalayan geology, surface powerhouse, wedge failure

Procedia PDF Downloads 117
19017 Piping Fragility Composed of Different Materials by Using OpenSees Software

Authors: Woo Young Jung, Min Ho Kwon, Bu Seog Ju

Abstract:

A failure of the non-structural component can cause significant damages in critical facilities such as nuclear power plants and hospitals. Historically, it was reported that the damage from the leakage of sprinkler systems, resulted in the shutdown of hospitals for several weeks by the 1971 San Fernando and 1994 North Ridge earthquakes. In most cases, water leakages were observed at the cross joints, sprinkler heads, and T-joint connections in piping systems during and after the seismic events. Hence, the primary objective of this study was to understand the seismic performance of T-joint connections and to develop an analytical Finite Element (FE) model for the T-joint systems of 2-inch fire protection piping system in hospitals subjected to seismic ground motions. In order to evaluate the FE models of the piping systems using OpenSees, two types of materials were used: 1) Steel 02 materials and 2) Pinching 4 materials. Results of the current study revealed that the nonlinear moment-rotation FE models for the threaded T-joint reconciled well with the experimental results in both FE material models. However, the system-level fragility determined from multiple nonlinear time history analyses at the threaded T-joint was slightly different. The system-level fragility at the T-joint, determined by Pinching 4 material was more conservative than that of using Steel 02 material in the piping system.

Keywords: fragility, t-joint, piping, leakage, sprinkler

Procedia PDF Downloads 303
19016 Residual Plastic Deformation Capacity in Reinforced Concrete Beams Subjected to Drop Weight Impact Test

Authors: Morgan Johansson, Joosef Leppanen, Mathias Flansbjer, Fabio Lozano, Josef Makdesi

Abstract:

Concrete is commonly used for protective structures and how impact loading affects different types of concrete structures is an important issue. Often the knowledge gained from static loading is also used in the design of impulse loaded structures. A large plastic deformation capacity is essential to obtain a large energy absorption in an impulse loaded structure. However, the structural response of an impact loaded concrete beam may be very different compared to a statically loaded beam. Consequently, the plastic deformation capacity and failure modes of the concrete structure can be different when subjected to dynamic loads; and hence it is not sure that the observations obtained from static loading are also valid for dynamic loading. The aim of this paper is to investigate the residual plastic deformation capacity in reinforced concrete beams subjected to drop weight impact tests. A test-series consisting of 18 simply supported beams (0.1 x 0.1 x 1.18 m, ρs = 0.7%) with a span length of 1.0 m and subjected to a point load in the beam mid-point, was carried out. 2x6 beams were first subjected to drop weight impact tests, and thereafter statically tested until failure. The drop in weight had a mass of 10 kg and was dropped from 2.5 m or 5.0 m. During the impact tests, a high-speed camera was used with 5 000 fps and for the static tests, a camera was used with 0.5 fps. Digital image correlation (DIC) analyses were conducted and from these the velocities of the beam and the drop weight, as well as the deformations and crack propagation of the beam, were effectively measured. Additionally, for the static tests, the applied load and midspan deformation were measured. The load-deformation relations for the beams subjected to an impact load were compared with 6 reference beams that were subjected to static loading only. The crack pattern obtained were compared using DIC, and it was concluded that the resulting crack formation depended much on the test method used. For the static tests, only bending cracks occurred. For the impact loaded beams, though, distinctive diagonal shear cracks also formed below the zone of impact and less wide shear cracks were observed in the region half-way to the support. Furthermore, due to wave propagation effects, bending cracks developed in the upper part of the beam during initial loading. The results showed that the plastic deformation capacity increased for beams subjected to drop weight impact tests from a high drop height of 5.0 m. For beams subjected to an impact from a low drop height of 2.5 m, though, the plastic deformation capacity was in the same order of magnitude as for the statically loaded reference beams. The beams tested were designed to fail due to bending when subjected to a static load. However, for the impact tested beams, one beam exhibited a shear failure at a significantly reduced load level when it was tested statically; indicating that there might be a risk of reduced residual load capacity for impact loaded structures.

Keywords: digital image correlation (DIC), drop weight impact, experiments, plastic deformation capacity, reinforced concrete

Procedia PDF Downloads 147
19015 Performance of Reinforced Concrete Wall with Opening Using Analytical Model

Authors: Alaa Morsy, Youssef Ibrahim

Abstract:

Earthquake is one of the most catastrophic events, which makes enormous harm to properties and human lives. As a piece of a safe building configuration, reinforced concrete walls are given in structures to decrease horizontal displacements under seismic load. Shear walls are additionally used to oppose the horizontal loads that might be incited by the impact of wind. Reinforced concrete walls in residential buildings might have openings that are required for windows in outside walls or for doors in inside walls or different states of openings due to architectural purposes. The size, position, and area of openings may fluctuate from an engineering perspective. Shear walls can encounter harm around corners of entryways and windows because of advancement of stress concentration under the impact of vertical or horizontal loads. The openings cause a diminishing in shear wall capacity. It might have an unfavorable impact on the stiffness of reinforced concrete wall and on the seismic reaction of structures. Finite Element Method using software package ‘ANSYS ver. 12’ becomes an essential approach in analyzing civil engineering problems numerically. Now we can make various models with different parameters in short time by using ANSYS instead of doing it experimentally, which consumes a lot of time and money. Finite element modeling approach has been conducted to study the effect of opening shape, size and position in RC wall with different thicknesses under axial and lateral static loads. The proposed finite element approach has been verified with experimental programme conducted by the researchers and validated by their variables. A very good correlation has been observed between the model and experimental results including load capacity, failure mode, and lateral displacement. A parametric study is applied to investigate the effect of opening size, shape, position on different reinforced concrete wall thicknesses. The results may be useful for improving existing design models and to be applied in practice, as it satisfies both the architectural and the structural requirements.

Keywords: Ansys, concrete walls, openings, out of plane behavior, seismic, shear wall

Procedia PDF Downloads 167
19014 Developing and integrated Clinical Risk Management Model

Authors: Mohammad H. Yarmohammadian, Fatemeh Rezaei

Abstract:

Introduction: Improving patient safety in health systems is one of the main priorities in healthcare systems, so clinical risk management in organizations has become increasingly significant. Although several tools have been developed for clinical risk management, each has its own limitations. Aims: This study aims to develop a comprehensive tool that can complete the limitations of each risk assessment and management tools with the advantage of other tools. Methods: Procedure was determined in two main stages included development of an initial model during meetings with the professors and literature review, then implementation and verification of final model. Subjects and Methods: This study is a quantitative − qualitative research. In terms of qualitative dimension, method of focus groups with inductive approach is used. To evaluate the results of the qualitative study, quantitative assessment of the two parts of the fourth phase and seven phases of the research was conducted. Purposive and stratification sampling of various responsible teams for the selected process was conducted in the operating room. Final model verified in eight phases through application of activity breakdown structure, failure mode and effects analysis (FMEA), healthcare risk priority number (RPN), root cause analysis (RCA), FT, and Eindhoven Classification model (ECM) tools. This model has been conducted typically on patients admitted in a day-clinic ward of a public hospital for surgery in October 2012 to June. Statistical Analysis Used: Qualitative data analysis was done through content analysis and quantitative analysis done through checklist and edited RPN tables. Results: After verification the final model in eight-step, patient's admission process for surgery was developed by focus discussion group (FDG) members in five main phases. Then with adopted methodology of FMEA, 85 failure modes along with its causes, effects, and preventive capabilities was set in the tables. Developed tables to calculate RPN index contain three criteria for severity, two criteria for probability, and two criteria for preventability. Tree failure modes were above determined significant risk limitation (RPN > 250). After a 3-month period, patient's misidentification incidents were the most frequent reported events. Each RPN criterion of misidentification events compared and found that various RPN number for tree misidentification reported events could be determine against predicted score in previous phase. Identified root causes through fault tree categorized with ECM. Wrong side surgery event was selected by focus discussion group to purpose improvement action. The most important causes were lack of planning for number and priority of surgical procedures. After prioritization of the suggested interventions, computerized registration system in health information system (HIS) was adopted to prepare the action plan in the final phase. Conclusion: Complexity of health care industry requires risk managers to have a multifaceted vision. Therefore, applying only one of retrospective or prospective tools for risk management does not work and each organization must provide conditions for potential application of these methods in its organization. The results of this study showed that the integrated clinical risk management model can be used in hospitals as an efficient tool in order to improve clinical governance.

Keywords: failure modes and effective analysis, risk management, root cause analysis, model

Procedia PDF Downloads 249
19013 An Estimating Equation for Survival Data with a Possibly Time-Varying Covariates under a Semiparametric Transformation Models

Authors: Yemane Hailu Fissuh, Zhongzhan Zhang

Abstract:

An estimating equation technique is an alternative method of the widely used maximum likelihood methods, which enables us to ease some complexity due to the complex characteristics of time-varying covariates. In the situations, when both the time-varying covariates and left-truncation are considered in the model, the maximum likelihood estimation procedures become much more burdensome and complex. To ease the complexity, in this study, the modified estimating equations those have been given high attention and considerations in many researchers under semiparametric transformation model was proposed. The purpose of this article was to develop the modified estimating equation under flexible and general class of semiparametric transformation models for left-truncated and right censored survival data with time-varying covariates. Besides the commonly applied Cox proportional hazards model, such kind of problems can be also analyzed with a general class of semiparametric transformation models to estimate the effect of treatment given possibly time-varying covariates on the survival time. The consistency and asymptotic properties of the estimators were intuitively derived via the expectation-maximization (EM) algorithm. The characteristics of the estimators in the finite sample performance for the proposed model were illustrated via simulation studies and Stanford heart transplant real data examples. To sum up the study, the bias for covariates has been adjusted by estimating density function for the truncation time variable. Then the effect of possibly time-varying covariates was evaluated in some special semiparametric transformation models.

Keywords: EM algorithm, estimating equation, semiparametric transformation models, time-to-event outcomes, time varying covariate

Procedia PDF Downloads 152
19012 Improving Cost and Time Control of Construction Projects Management Practices in Nigeria

Authors: Mustapha Yakubu, Ahmed Usman, Hashim Ambursa

Abstract:

This paper presents the findings of a research which sought to investigate techniques used to improve cost and time control of construction projects management practice in Nigeria. However, there is limited research on issues surrounding the practical usage of these techniques. Data were collected through a questionnaire distributed to construction experts through a survey conducted on the 100 construction organisations and 50 construction consultancy firms in the Nigeria aimed at identifying common project cost and time control practices and factors inhibiting effective project control in practice. The study reveals that despite the vast application of control techniques a high proportion of respondents still experienced cost and time overruns on a significant proportion of their projects. Analysis of the survey results concluded that more effort should be geared at the management of the identified top project control inhibiting factors. This paper has outlined some measures for mitigating these inhibiting factors so that the outcome of project time and cost control can be improved in practice.

Keywords: construction project, cost control, Nigeria, time control

Procedia PDF Downloads 313
19011 Subjective Probability and the Intertemporal Dimension of Probability to Correct the Misrelation Between Risk and Return of a Financial Asset as Perceived by Investors. Extension of Prospect Theory to Better Describe Risk Aversion

Authors: Roberta Martino, Viviana Ventre

Abstract:

From a theoretical point of view, the relationship between the risk associated with an investment and the expected value are directly proportional, in the sense that the market allows a greater result to those who are willing to take a greater risk. However, empirical evidence proves that this relationship is distorted in the minds of investors and is perceived exactly the opposite. To deepen and understand the discrepancy between the actual actions of the investor and the theoretical predictions, this paper analyzes the essential parameters used for the valuation of financial assets with greater attention to two elements: probability and the passage of time. Although these may seem at first glance to be two distinct elements, they are closely related. In particular, the error in the theoretical description of the relationship between risk and return lies in the failure to consider the impatience that is generated in the decision-maker when events that have not yet happened occur in the decision-making context. In this context, probability loses its objective meaning and in relation to the psychological aspects of the investor, it can only be understood as the degree of confidence that the investor has in the occurrence or non-occurrence of an event. Moreover, the concept of objective probability does not consider the inter-temporality that characterizes financial activities and does not consider the condition of limited cognitive capacity of the decision maker. Cognitive psychology has made it possible to understand that the mind acts with a compromise between quality and effort when faced with very complex choices. To evaluate an event that has not yet happened, it is necessary to imagine that it happens in your head. This projection into the future requires a cognitive effort and is what differentiates choices under conditions of risk and choices under conditions of uncertainty. In fact, since the receipt of the outcome in choices under risk conditions is imminent, the mechanism of self-projection into the future is not necessary to imagine the consequence of the choice and the decision makers dwell on the objective analysis of possibilities. Financial activities, on the other hand, develop over time and the objective probability is too static to consider the anticipatory emotions that the self-projection mechanism generates in the investor. Assuming that uncertainty is inherent in valuations of events that have not yet occurred, the focus must shift from risk management to uncertainty management. Only in this way the intertemporal dimension of the decision-making environment and the haste generated by the financial market can be cautioned and considered. The work considers an extension of the prospectus theory with the temporal component with the aim of providing a description of the attitude towards risk with respect to the passage of time.

Keywords: impatience, risk aversion, subjective probability, uncertainty

Procedia PDF Downloads 107
19010 Adhesive Bonded Joints Characterization and Crack Propagation in Composite Materials under Cyclic Impact Fatigue and Constant Amplitude Fatigue Loadings

Authors: Andres Bautista, Alicia Porras, Juan P. Casas, Maribel Silva

Abstract:

The Colombian aeronautical industry has stimulated research in the mechanical behavior of materials under different loading conditions aircrafts are generally exposed during its operation. The Calima T-90 is the first military aircraft built in the country, used for primary flight training of Colombian Air Force Pilots, therefore, it may be exposed to adverse operating situations such as hard landings which cause impact loads on the aircraft that might produce the impact fatigue phenomenon. The Calima T-90 structure is mainly manufactured by composites materials generating assemblies and subassemblies of different components of it. The main method of bonding these components is by using adhesive joints. Each type of adhesive bond must be studied on its own since its performance depends on the conditions of the manufacturing process and operating characteristics. This study aims to characterize the typical adhesive joints of the aircraft under usual loads. To this purpose, the evaluation of the effect of adhesive thickness on the mechanical performance of the joint under quasi-static loading conditions, constant amplitude fatigue and cyclic impact fatigue using single lap-joint specimens will be performed. Additionally, using a double cantilever beam specimen, the influence of the thickness of the adhesive on the crack growth rate for mode I delamination failure, as a function of the critical energy release rate will be determined. Finally, an analysis of the fracture surface of the test specimens considering the mechanical interaction between the substrate (composite) and the adhesive, provide insights into the magnitude of the damage, the type of failure mechanism that occurs and its correlation with the way crack propagates under the proposed loading conditions.

Keywords: adhesive, composites, crack propagation, fatigue

Procedia PDF Downloads 204
19009 “BUM629” Special Hybrid Reinforcement Materials for Mega Structures

Authors: Gautam, Arjun, V. R. Sharma

Abstract:

In the civil construction steel and concrete plays a different role but the same purposes dealing with the design of structures that support or resist loads. Concrete has been used in construction since long time from now. Being brittle and weak in tension, concrete is always reinforced with steel bars for the purposes in beams and columns etc. The paper deals with idea of special designed 3D materials which we named as “BUM629” to be placed/anchored in the structural member and mixed with concrete later on, so as to resist the developments of cracks due to shear failure , buckling,tension and compressive load in concrete. It had cutting edge technology through Draft, Analysis and Design the “BUM629”. The results show that “BUM629” has the great results in Mechanical application. Its material properties are design according to the need of structure; we apply the material such as Mild Steel and Magnesium Alloy. “BUM629” are divided into two parts one is applied at the middle section of concrete member where bending movements are maximum and the second part is laying parallel to vertical bars near clear cover, so we design this material and apply in Reinforcement of Civil Structures. “BUM629” is analysis and design for use in the mega structures like skyscrapers, dams and bridges.

Keywords: BUM629, magnesium alloy, cutting edge technology, mechanical application, draft, analysis and design, mega structures

Procedia PDF Downloads 384
19008 Powder Assisted Sheet Forming to Fabricate Ti Capsule Magnetic Hyperthermia Implant

Authors: Keigo Nishitani, Kohei Mizuta Mizuta, Kazuyoshi Kurita, Yukinori Taniguchi

Abstract:

To establish mass production process of Ti capsule which has Fe powder inside as magnetic hyperthermia implant, we assumed that Ti thin sheet can be drawn into a φ1.0 mm die hole through the medium of Fe Powder and becomes outer shell of capsule. This study discusses mechanism of powder assisted deep drawing process by both of numerical simulation and experiment. Ti thin sheet blank was placed on die, and was covered by Fe powder layer without pressurizing. Then upper punch was indented on the Fe powder layer, and the blank can be drawn into die cavity as pressurized powder particles were extruded into die cavity from behind of the drawn blank. Distinct Element Method (DEM) has been used to demonstrate the process. To identify bonding parameters on Fe particles which are cohesion, tensile bond stress and inter particle friction angle, axial and diametrical compression failure test of Fe powder compact was conducted. Several density ratios of powder compacts in range of 0.70 - 0.85 were investigated and relationship between mean stress and equivalent stress was calculated with consideration of critical state line which rules failure criterion in consolidation of Fe powder. Since variation of bonding parameters with density ratio has been experimentally identified, and good agreement has been recognized between several failure tests and its simulation, demonstration of powder assisted sheet forming by using DEM becomes applicable. Results of simulation indicated that indent/drawing length of Ti thin sheet is promoted by smaller Fe particle size, larger indent punch diameter, lower friction coefficient between die surface and Ti sheet and certain degrees of die inlet taper angle. In the deep drawing test, we have made die-set with φ2.4 mm punch and φ1.0 mm die bore diameter. Pure Ti sheet with 100 μm thickness, annealed at 650 deg. C has been tested. After indentation, indented/drawn capsule has been observed by microscope, and its length was measured to discuss the feasibility of this capsulation process. Longer drawing length exists on progressive loading pass comparing with the case of single stroke loading. It is expected that progressive loading has an advantage of which extrusion of powder particle into die cavity with Ti sheet is promoted since powder particle layer can be rebuilt while the punch is withdrawn from the layer in each loading steps. This capsulation phenomenon is qualitatively demonstrated by DEM simulation. Finally, we have fabricated Ti capsule which has Fe powder inside for magnetic hyperthermia cancer care treatment. It is concluded that suggested method is possible to use the manufacturing of Ti capsule implant for magnetic hyperthermia cancer care.

Keywords: metal powder compaction, metal forming, distinct element method, cancer care, magnetic hyperthermia

Procedia PDF Downloads 297
19007 Astronomical Panels of Measuring and Dividing Time in Ancient Egypt

Authors: Mohamed Saeed Ahmed Salman

Abstract:

The ancient Egyptians used the stars to measure time or, in a more precise sense, as one of the astronomical means of measuring time. These methods differed throughout the historical ages. They began with simple observations of observing astronomical phenomena and watching them, such as observing the movements of the stars in the sky. The year, to know the days, nights, and other means used to help set the time when the sky overcast, and so the researcher tries through archaeological evidence to demonstrate the knowledge of the ancient Egyptian stars of heaven, and movements through the first pre-history. It is not believed that the astronomical information possessed by the Egyptian was limited, and simple, it was reaching a level of almost optimal in terms of importance, and the goal he wanted to reach the ancient Egyptian, and also help him to know the time, and the passage of time; which ended in finally trying to find a system of timing and calculation of time. It was noted that there were signs that the stellar creed was known, and prosperous, especially since the pre-family ages, and this is evident on the inscriptions that come back to that period. The Egyptian realized that some of the stars remain visible at night, The ancient Egyptian was familiar with the daily journey of the stars. This is what was adopted in many paragraphs of the texts of the pyramids and its references to the rise of the deceased king of the heavenly world between the stars of the eternal sky. It was noted that the ancient Egyptian link between the doctrine of the star, we find that the public The lunar was known to the ancient Egyptians, and sang it for two years, and the stellar solar; but it was based on the appearance of the star Sirius, and this is the first means used to measure time and know the calendar stars.

Keywords: ancient Egyptian, astronomical panels, Egyptian, astronomical

Procedia PDF Downloads 22
19006 Increasing the Apparent Time Resolution of Tc-99m Diethylenetriamine Pentaacetic Acid Galactosyl Human Serum Albumin Dynamic SPECT by Use of an 180-Degree Interpolation Method

Authors: Yasuyuki Takahashi, Maya Yamashita, Kyoko Saito

Abstract:

In general, dynamic SPECT data acquisition needs a few minutes for one rotation. Thus, the time-activity curve (TAC) derived from the dynamic SPECT is relatively coarse. In order to effectively shorten the interval, between data points, we adopted a 180-degree interpolation method. This method is already used for reconstruction of the X-ray CT data. In this study, we applied this 180-degree interpolation method to SPECT and investigated its effectiveness.To briefly describe the 180-degree interpolation method: the 180-degree data in the second half of one rotation are combined with the 180-degree data in the first half of the next rotation to generate a 360-degree data set appropriate for the time halfway between the first and second rotations. In both a phantom and a patient study, the data points from the interpolated images fell in good agreement with the data points tracking the accumulation of 99mTc activity over time for appropriate region of interest. We conclude that data derived from interpolated images improves the apparent time resolution of dynamic SPECT.

Keywords: dynamic SPECT, time resolution, 180-degree interpolation method, 99mTc-GSA.

Procedia PDF Downloads 493
19005 Accurately Measuring Stress Using Latest Breathing Technology and Its Relationship with Academic Performance

Authors: Farshid Marbouti, Jale Ulas, Julia Thompson

Abstract:

The main sources of stress among college students are: changes in sleeping and eating habits, undertaking new responsibilities, and financial difficulties as the most common sources of stress, exams, meeting new people, career decisions, fear of failure, and pressure from parents, transition to university especially if it requires leaving home, working with people that they do not know, trouble with parents, and relationship with the opposite sex. The students use a variety of stress coping strategies, including talking to family and friends, leisure activities and exercising. The Yerkes–Dodson law indicates while a moderate amount of stress may be beneficial for performance, too high stress will result in weak performance. In other words, if students are too stressed, they are likely to have low academic performance. In a preliminary study conducted in 2017 with engineering students enrolled in three high failure rate classes, the majority of the students stated that they have high levels of stress mainly for academic, financial, or family-related reasons. As the second stage of the study, the main purpose of this research is to investigate the students’ level of stress, sources of stress, their relationship with student demographic background, students’ coping strategies, and academic performance. A device is being developed to gather data from students breathing patterns and measure their stress levels. In addition, all participants are asked to fill out a survey. The survey under development has the following categories: exam stressor, study-related stressors, financial pressures, transition to university, family-related stress, student response to stress, and stress management. After the data collection, Structural Equation Modeling (SEM) analysis will be conducted in order to identify the relationship among students’ level of stress, coping strategies, and academic performance.

Keywords: college student stress, coping strategies, academic performance, measuring stress

Procedia PDF Downloads 104
19004 Time Series Forecasting (TSF) Using Various Deep Learning Models

Authors: Jimeng Shi, Mahek Jain, Giri Narasimhan

Abstract:

Time Series Forecasting (TSF) is used to predict the target variables at a future time point based on the learning from previous time points. To keep the problem tractable, learning methods use data from a fixed-length window in the past as an explicit input. In this paper, we study how the performance of predictive models changes as a function of different look-back window sizes and different amounts of time to predict the future. We also consider the performance of the recent attention-based Transformer models, which have had good success in the image processing and natural language processing domains. In all, we compare four different deep learning methods (RNN, LSTM, GRU, and Transformer) along with a baseline method. The dataset (hourly) we used is the Beijing Air Quality Dataset from the UCI website, which includes a multivariate time series of many factors measured on an hourly basis for a period of 5 years (2010-14). For each model, we also report on the relationship between the performance and the look-back window sizes and the number of predicted time points into the future. Our experiments suggest that Transformer models have the best performance with the lowest Mean Average Errors (MAE = 14.599, 23.273) and Root Mean Square Errors (RSME = 23.573, 38.131) for most of our single-step and multi-steps predictions. The best size for the look-back window to predict 1 hour into the future appears to be one day, while 2 or 4 days perform the best to predict 3 hours into the future.

Keywords: air quality prediction, deep learning algorithms, time series forecasting, look-back window

Procedia PDF Downloads 154