Search results for: construction workers’ safety
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7822

Search results for: construction workers’ safety

6922 Investigation and Research on Construction Technology of Tenon and Mortise in Traditional Chinese Architecture

Authors: Liang Zhang

Abstract:

Chinese traditional architecture has developed a school of its own in the world. It has a different structure and construction technology from western architecture. Tenon and mortise structure and construction technology, as the key to the construction of traditional Chinese architecture, have been inherited for thousands of years by traditional craftsmen in various regions of China. However, the traditional architecture varies greatly in different times and regional cultures in China. It is still a lack of research whether this difference extends to mortise and tenon technology. In this study, we measured the mortise and tenon of traditional buildings in Fujian province, Yunnan province, and Northern China; Interviewed some old craftsmen about their traditional construction methods, And compared the today's traditional mortise and tenon technology with that of Song and Qing Dynasties. The results showed that although Chinese traditional architecture has the same origin, the mortise and tenon construction technology systems have been developed at different times, regions, and cultures. For example, tenon and mortise technology in Yunnan Province needs to ensure the ability of buildings to resist earthquakes, while that in Fujian Province needs to ensure the ability of buildings to withstand typhoons. People in different regions, cultures, and times have a different understanding of architectural aesthetics, and the evolution of tools also has different effects on mortise and tenon technology. This study explains the manifestations and causes of these differences. At the same time, due to the impact of modern architectural technology, mortise, and tenon, traditional technology is also rapidly disappearing. As a sorting and collection of mortise and tenon techniques of traditional Chinese architecture, this paper puts forward the corresponding traditional technology protection strategy, to guide the protection and maintenance of local traditional buildings.

Keywords: tenon and mortise, traditional Chinese architecture, traditional craftsmen, construction technology

Procedia PDF Downloads 133
6921 Big Data in Construction Project Management: The Colombian Northeast Case

Authors: Sergio Zabala-Vargas, Miguel Jiménez-Barrera, Luz VArgas-Sánchez

Abstract:

In recent years, information related to project management in organizations has been increasing exponentially. Performance data, management statistics, indicator results have forced the collection, analysis, traceability, and dissemination of project managers to be essential. In this sense, there are current trends to facilitate efficient decision-making in emerging technology projects, such as: Machine Learning, Data Analytics, Data Mining, and Big Data. The latter is the most interesting in this project. This research is part of the thematic line Construction methods and project management. Many authors present the relevance that the use of emerging technologies, such as Big Data, has taken in recent years in project management in the construction sector. The main focus is the optimization of time, scope, budget, and in general mitigating risks. This research was developed in the northeastern region of Colombia-South America. The first phase was aimed at diagnosing the use of emerging technologies (Big-Data) in the construction sector. In Colombia, the construction sector represents more than 50% of the productive system, and more than 2 million people participate in this economic segment. The quantitative approach was used. A survey was applied to a sample of 91 companies in the construction sector. Preliminary results indicate that the use of Big Data and other emerging technologies is very low and also that there is interest in modernizing project management. There is evidence of a correlation between the interest in using new data management technologies and the incorporation of Building Information Modeling BIM. The next phase of the research will allow the generation of guidelines and strategies for the incorporation of technological tools in the construction sector in Colombia.

Keywords: big data, building information modeling, tecnology, project manamegent

Procedia PDF Downloads 114
6920 Sewer Culvert Installation Method to Accommodate Underground Construction in an Urban Area with Narrow Streets

Authors: Osamu Igawa, Hiroshi Kouchiwa, Yuji Ito

Abstract:

In recent years, a reconstruction project for sewer pipelines has been progressing in Japan with the aim of renewing old sewer culverts. However, it is difficult to secure a sufficient base area for shafts in an urban area because many streets are narrow with a complex layout. As a result, construction in such urban areas is generally very demanding. In urban areas, there is a strong requirement for a safe, reliable and economical construction method that does not disturb the public’s daily life and urban activities. With this in mind, we developed a new construction method called the 'shield switching type micro-tunneling method' which integrates the micro-tunneling method and shield method. In this method, pipeline is constructed first for sections that are gently curved or straight using the economical micro-tunneling method, and then the method is switched to the shield method for sections with a sharp curve or a series of curves without establishing an intermediate shaft. This paper provides the information, features and construction examples of this newly developed method.

Keywords: micro-tunneling method, secondary lining applied RC segment, sharp curve, shield method, switching type

Procedia PDF Downloads 383
6919 A United Nations Safety Compliant Urban Vehicle Design

Authors: Marcelo R. G. Duarte, Marcilio Alves

Abstract:

Pedestrians are the fourth group among road traffic users that most suffer accidents. Their death rate is even higher than the motorcyclists group. This gives motivation for the development of an urban vehicle capable of complying with the United Nations Economic Commission for Europe pedestrian regulations. The conceptual vehicle is capable of transporting two passengers and small parcels for 100 km at a maximum speed of 90 km/h. This paper presents the design of this vehicle using the finite element method specially in connection with frontal crash test and car to pedestrian collision. The simulation is based in a human body FE.

Keywords: electric urban vehicle, finite element method, global human body model, pedestrian safety, road safety

Procedia PDF Downloads 169
6918 AI-Based Information System for Hygiene and Safety Management of Shared Kitchens

Authors: Jongtae Rhee, Sangkwon Han, Seungbin Ji, Junhyeong Park, Byeonghun Kim, Taekyung Kim, Byeonghyeon Jeon, Jiwoo Yang

Abstract:

The shared kitchen is a concept that transfers the value of the sharing economy to the kitchen. It is a type of kitchen equipped with cooking facilities that allows multiple companies or chefs to share time and space and use it jointly. These shared kitchens provide economic benefits and convenience, such as reduced investment costs and rent, but also increase the risk of safety management, such as cross-contamination of food ingredients. Therefore, to manage the safety of food ingredients and finished products in a shared kitchen where several entities jointly use the kitchen and handle various types of food ingredients, it is critical to manage followings: the freshness of food ingredients, user hygiene and safety and cross-contamination of cooking equipment and facilities. In this study, it propose a machine learning-based system for hygiene safety and cross-contamination management, which are highly difficult to manage. User clothing management and user access management, which are most relevant to the hygiene and safety of shared kitchens, are solved through machine learning-based methodology, and cutting board usage management, which is most relevant to cross-contamination management, is implemented as an integrated safety management system based on artificial intelligence. First, to prevent cross-contamination of food ingredients, we use images collected through a real-time camera to determine whether the food ingredients match a given cutting board based on a real-time object detection model, YOLO v7. To manage the hygiene of user clothing, we use a camera-based facial recognition model to recognize the user, and real-time object detection model to determine whether a sanitary hat and mask are worn. In addition, to manage access for users qualified to enter the shared kitchen, we utilize machine learning based signature recognition module. By comparing the pairwise distance between the contract signature and the signature at the time of entrance to the shared kitchen, access permission is determined through a pre-trained signature verification model. These machine learning-based safety management tasks are integrated into a single information system, and each result is managed in an integrated database. Through this, users are warned of safety dangers through the tablet PC installed in the shared kitchen, and managers can track the cause of the sanitary and safety accidents. As a result of system integration analysis, real-time safety management services can be continuously provided by artificial intelligence, and machine learning-based methodologies are used for integrated safety management of shared kitchens that allows dynamic contracts among various users. By solving this problem, we were able to secure the feasibility and safety of the shared kitchen business.

Keywords: artificial intelligence, food safety, information system, safety management, shared kitchen

Procedia PDF Downloads 49
6917 Self-Help Adaptation to Flooding in Low-Income Settlements in Chiang Mai, Thailand

Authors: Nachawit Tikul

Abstract:

This study aimed to determine low-income housing adaptations for flooding, which causes living problems and housing damage, and the results from improvement. Three low-income settlements in Chiang Mai which experienced different flood types, i.e. flash floods in Samukeepattana, drainage floods in Bansanku, and river floods in Kampangam, were chosen for the study. Almost all of the residents improved their houses to protect the property from flood damage by changing building materials to flood damage resistant materials for walls, floors, and other parts of the structure that were below the base of annual flood elevation. They could only build some parts of their own homes, so hiring skilled workers or contractors was still important. Building materials which have no need for any special tools and are easy to access and use for construction, as well as low cost, are selected for construction. The residents in the three slums faced living problems for only a short time and were able to cope with them. This may be due to the location of the three slums near the city where assistance is readily available. But the housing and the existence in the slums can endure only the regular floods and residence still have problems in unusual floods, which have been experienced 1-2 times during the past 10 years. The residents accept the need for evacuations and prepare for them. When faced with extreme floods, residence have evacuated to the nearest safe place such as schools and public building, and come back to repair the houses after the flood. These are the distinguishing characteristics of low-income living which can withstand serious situations due to the simple lifestyle. Therefore, preparation of living areas for use during severe floods and encouraging production of affordable flood resistant materials should be areas of concern when formulating disaster assistance policies for low income people.

Keywords: flooding, low-income settlement, housing, adaptation

Procedia PDF Downloads 223
6916 Development of a Work-Related Stress Management Program Guaranteeing Fitness-For-Duty for Human Error Prevention

Authors: Hyeon-Kyo Lim, Tong-Il Jang, Yong-Hee Lee

Abstract:

Human error is one of the most dreaded factors that may result in unexpected accidents, especially in nuclear power plants. For accident prevention, it is quite indispensable to analyze and to manage the influence of any factor which may raise the possibility of human errors. Out of lots factors, stress has been reported to have a significant influence on human performance. Therefore, this research aimed to develop a work-related stress management program which can guarantee Fitness-for-Duty (FFD) of the workers in nuclear power plants, especially those working in main control rooms. Major stress factors were elicited through literal surveys and classified into major categories such as demands, supports, and relationships. To manage those factors, a test and intervention program based on 4-level approaches was developed over the whole employment cycle including selection and screening of workers, job allocation, and job rotation. In addition, a managerial care program was introduced with the concept of Employee-Assistance-Program (EAP) program. Reviews on the program conducted by ex-operators in nuclear power plants showed responses in the affirmative, and suggested additional treatment to guarantee high performance of human workers, not in normal operations but also in emergency situations.

Keywords: human error, work performance, work stress, Fitness-For-Duty (FFD), Employee Assistance Program (EAP)

Procedia PDF Downloads 390
6915 Safeguarding the Construction Industry: Interrogating and Mitigating Emerging Risks from AI in Construction

Authors: Abdelrhman Elagez, Rolla Monib

Abstract:

This empirical study investigates the observed risks associated with adopting Artificial Intelligence (AI) technologies in the construction industry and proposes potential mitigation strategies. While AI has transformed several industries, the construction industry is slowly adopting advanced technologies like AI, introducing new risks that lack critical analysis in the current literature. A comprehensive literature review identified a research gap, highlighting the lack of critical analysis of risks and the need for a framework to measure and mitigate the risks of AI implementation in the construction industry. Consequently, an online survey was conducted with 24 project managers and construction professionals, possessing experience ranging from 1 to 30 years (with an average of 6.38 years), to gather industry perspectives and concerns relating to AI integration. The survey results yielded several significant findings. Firstly, respondents exhibited a moderate level of familiarity (66.67%) with AI technologies, while the industry's readiness for AI deployment and current usage rates remained low at 2.72 out of 5. Secondly, the top-ranked barriers to AI adoption were identified as lack of awareness, insufficient knowledge and skills, data quality concerns, high implementation costs, absence of prior case studies, and the uncertainty of outcomes. Thirdly, the most significant risks associated with AI use in construction were perceived to be a lack of human control (decision-making), accountability, algorithm bias, data security/privacy, and lack of legislation and regulations. Additionally, the participants acknowledged the value of factors such as education, training, organizational support, and communication in facilitating AI integration within the industry. These findings emphasize the necessity for tailored risk assessment frameworks, guidelines, and governance principles to address the identified risks and promote the responsible adoption of AI technologies in the construction sector.

Keywords: risk management, construction, artificial intelligence, technology

Procedia PDF Downloads 27
6914 Key External Causes of Poor Performance of Engineering and Technical Departments within Governmental Construction Projects in Saudi Arabia

Authors: Alaa A. Al-Harthi, Abdulrahman S. Bageis, Bingunath Ingirige

Abstract:

Poor levels of performance and low productivity were highlighted by many previous studies as a major cause of failure in the Saudi construction industry. This paper provides recommendations to address key external indicators that led to poor levels of performance and low productivity in Engineering and Technical Departments (ETDs) within the Saudi governmental agencies. The ETDs are client’s representative on behalf of the Saudi Ministries. This paper represents a part of an investigation which contained external and internal challenges that led to occurrence of the research problem. The paper is focusing on the external challenges which contain 14 indicators. These 14 external indicators had been examined carefully through comprehensive review of the literature then have been tested through quantitative and qualitative methods. 400 questionnaires were distributed to dozens of different bodies. The actual response rate was 47% completed responses. Four semi-structured interviews were conducted with senior practitioners from the Public Construction Sector. The finding showed that the 14 external indicators directly and/or indirectly influence the Public Construction Sector. It was noticed significantly that these indicators have prevented the ETDs from performing properly. It was also found that the 14 external indicators were constant with all kinds of Government Construction Projects in the Saudi context. Addressing the 14 external indicators requires to be planned over the long run which is responsible by relevant Saudi governmental authorities under the umbrella of the Saudi Council of Ministers. The study recommends that Project Management Office (PMO) should be considered in order to improve the performance of the ETDs.

Keywords: construction projects' performance, low engineering productivity, public construction sector

Procedia PDF Downloads 582
6913 Identification of Factors Affecting Labor Productivity in Construction Projects of Iran

Authors: Elham Dehghan, A. Shirzadi Javid, Mohsen Tadayon

Abstract:

Labor productivity is very important and gained special concerns among professionals in the construction industry, worldwide. Productivity improvements on labors achieve higher cost savings with minimal investment. Due to the fact that profit margins are small on construction projects, cost savings associated with productivity are crucial to become a successful contractor. This research program studies and highlights the factors affecting labor productivity in Iranian construction industry. A questionnaire was used to gather the relevant data from respondents who involve in managing various types of projects in wide areas in Iran. It involved ranking 57 predefined factors divided into 5 categories: Human/Labor; Financial; Management; Equipments/Materials and Environmental. Total 62 feedbacks were analyzed through the Relative Importance Index (RII) technique. The top ten factors affecting construction labor productivity in Iran are: 1) Professional capability of contractor project manager, 2) skills of contractor’s project management team, 3) professional capability of owner project manager, 4) professional capability of Consulting Project manager, 5) discipline working, 6) delay payments by the owner, 7) material shortages, 8) delays in delivery of materials, 9) turnover power of the owner, 10) poor site management. Recommendations have been made in the study to address these factors. The research has direct benefits to key stakeholders in Iranian construction industry.

Keywords: Iranian construction projects, labor, productivity, relative importance index

Procedia PDF Downloads 255
6912 Key Drivers for Nighttime Construction under the EPC Contract

Authors: Aditya Pal, S. Z. S. Tabish, Kumar Neeraj Jha

Abstract:

In the construction industry, engineering procurement and construction (EPC) projects are becoming increasingly prevalent; they provide clients with benefits such as decreased workload, streamlined execution, and a singular point of accountability. EPC projects entail round-the-clock operations, which calls for an analysis of the variables that impact productivity during nocturnal hours. The current body of research on the distinctions between daytime and nighttime construction lacks a comprehensive examination of nocturnal attributes. The objective of this research is to ascertain the critical factors that influence the productivity of nighttime construction by conducting site investigations and reviewing relevant literature. The influence of factors such as illumination conditions, equipment deployment, quality procedures, and government regulations on productivity is subject to careful examination. The studies rank the significance of these factors in accordance with the relative importance index (RII) and entropy weighted method (EWM). The primary determinants identified in the study are temperature (RII: 0.8444), weather conditions (RII: 0.8222), and material and apparatus maintenance (RII: 0.8222). The findings function as recommendations for project managers and EPC contractors to reduce setbacks and increase efficiency. By comparing the outcomes of EWM and RII, the most effective approach to resolving the most crucial characteristics is achieved.

Keywords: productivity, nighttime work, statistical methods, construction, entropy weighted method, relative importance indexing

Procedia PDF Downloads 21
6911 Evaluating Environmental Impact of End-of-Life Cycle Cases for Brick Walls and Aerated Autoclave Concrete Walls

Authors: Ann Mariya Jose, Ashfina T.

Abstract:

Construction and demolition waste is one of the rising concerns globally due to the amount of waste generated annually, the area taken up by landfills, and the adverse environmental impacts that follow. One of the primary causes of the rise in construction and demolition waste is a lack of facilities and knowledge for incorporating recycled materials into new construction. Bricks are a conventional material that has been used for construction for centuries, and Autoclave Aerated Concrete (AAC) blocks are a new emergent material in the market. This study evaluates the impact brick walls, and AAC block walls have on the environment using the tool One Click LCA, considering three End of Life (EoL) scenarios: the materials are landfilled, recycled, and reused in a new building. The final objective of the study is to evaluate the environmental impact caused by these two different walls on the environmental factors such as Global Warming Potential (GWP), Acidification Potential (AP), Eutrophication Potential (EP), Ozone Depletion Potential (ODP), and Photochemical Ozone Creation Potential (POCP). The findings revealed that the GWP caused by landfilling is 16 times higher in bricks and 22 times higher in AAC blocks when compared to the reuse of materials. The study recommends the effective use of AAC blocks in construction and reuse of the same to reduce the overall emissions to the environment.

Keywords: construction and demolition waste, environmental impact, life cycle impact assessment, material recycling

Procedia PDF Downloads 89
6910 Age at Menarche and Menopause among Bidi Workers Women of Sagar District of Central India

Authors: Arun Kumar

Abstract:

For the present study a total of 219 women, from urban and rural areas of Sagar district of central India were selected. The mean age at menarche of rural women was found 13.89±1.17 years and for urban women, it was 13.78±1.12 years. The difference between the mean age at menarche of urban and rural women was statistically insignificant (t=0.580, p≤0.05). Mean age at menopause among rural women was (47.4±4.92). The difference between the mean of urban and rural women was statistically insignificant (t=0.739 and p≤0.05). These findings indicate that rural women experience menopause at a later age as compared to their urban counterparts.

Keywords: menarche, menopause, urban, rural, Bidi workers

Procedia PDF Downloads 284
6909 Dynamic Risk Model for Offshore Decommissioning Using Bayesian Belief Network

Authors: Ahmed O. Babaleye, Rafet E. Kurt

Abstract:

The global oil and gas industry is beginning to witness an increase in the number of installations moving towards decommissioning. Decommissioning of offshore installations is a complex, costly and hazardous activity, making safety one of the major concerns. Among existing removal options, complete and partial removal options pose the highest risks. Therefore, a dynamic risk model of the accidents from the two options is important to assess the risks on an overall basis. In this study, a risk-based safety model is developed to conduct quantitative risk analysis (QRA) for jacket structure systems failure. Firstly, bow-tie (BT) technique is utilised to model the causal relationship between the system failure and potential accident scenarios. Subsequently, to relax the shortcomings of BT, Bayesian Belief Networks (BBNs) were established to dynamically assess associated uncertainties and conditional dependencies. The BBN is developed through a similitude mapping of the developed bow-tie. The BBN is used to update the failure probabilities of the contributing elements through diagnostic analysis, thus, providing a case-specific and realistic safety analysis method when compared to a bow-tie. This paper presents the application of dynamic safety analysis to guide the allocation of risk control measures and consequently, drive down the avoidable cost of remediation.

Keywords: Bayesian belief network, offshore decommissioning, dynamic safety model, quantitative risk analysis

Procedia PDF Downloads 265
6908 The SBO/LOCA Analysis of TRACE/SNAP for Kuosheng Nuclear Power Plant

Authors: J. R. Wang, H. T. Lin, Y. Chiang, H. C. Chen, C. Shih

Abstract:

Kuosheng Nuclear Power Plant (NPP) is located on the northern coast of Taiwan. Its nuclear steam supply system is a type of BWR/6 designed and built by General Electric on a twin unit concept. First, the methodology of Kuosheng NPP SPU (Stretch Power Uprate) safety analysis TRACE/SNAP model was developed in this research. Then, in order to estimate the safety of Kuosheng NPP under the more severe condition, the SBO (Station Blackout) + LOCA (Loss-of-Coolant Accident) transient analysis of Kuosheng NPP SPU TRACE/SNAP model was performed. Besides, the animation model of Kuosheng NPP was presented using the animation function of SNAP with TRACE/SNAP analysis results.

Keywords: TRACE, safety analysis, BWR/6, severe accident

Procedia PDF Downloads 690
6907 Female Sex Workers and Their Association with Self-Help Groups in Thane, Maharashtra, India: A Comparative Analysis in the Context of HIV Program Outcome

Authors: Awdhesh Yadav, P. S. Saravanamurthy, Shaikh Tayyaba, Uma Shah, Ashok Agarwal

Abstract:

Objectives: HIV interventions in India has leveraged Self-Help Group (SHG) as one of the key strategies under structural intervention to empower female sex workers (FSW) to reduce their risk exposure and vulnerability to STI/HIV. Understanding the role of SHGs in light of the evolving dynamics of sex work needs to be delved into to strategize HIV interventions among FSWs in India. This paper aims to study the HIV program outcome among the FSWs associated with SHGs and FSWs not associated with SHGs in Thane, Maharashtra. Study Design: This cross-sectional study, was undertaken from the Behavioral Tracking Survey (BTS) conducted among 503 FSWs in Thane in 2015. Two-stage probability based conventional sampling was done for selection of brothel and bar based FSWs, while Time Location Cluster (TLC) sampling was done for home, lodge and street-based sex workers. Methods: Bivariate and multivariate logistic regression were performed to compare and contrast between FSWs associated with SHG and those not associated with SHG with respect to the utilization of HIV related services by them. ‘Condom use’, ‘consistent condom use’, ‘contact with peer-educators’, ‘counseling sessions’ and ‘HIV testing’ were chosen as indicators on HIV service utilization. Results: 8% (38) of FSWs are registered with SHG; 92% aged ≥ 25 years, 47% illiterate, and 71% are currently married. The likelihood of utilizing HIV services including, knowledge on HIV/AIDS and its mode of transmission (OR:5.54; CI: 1.87-16.60; p < 0.05),accessed drop-in Centre (OR: 6.53; CI: 2.15-19.88; p < 0.10), heard about joint health camps (OR: 4.71; CI:2.12-10.46); p < 0.05), negotiated or stood up against police/broker/local goonda/clients (OR: 2.26; CI: 1.08-4.73; p < 0.05), turned away clients when they refused to use condom during sex (OR: 3.76; CI: 1.27-11.15; p < 0.05) and heard of ART (OR; 4.55; CI: 2.18-9.48; p < 0.01) were higher among FSWs associated with SHG in comparison to FSWs not associated with SHG. Conclusions: Considering the improved HIV program outcomes among FSWs associated with SHG; HIV interventions among FSWs could consider facilitating the formation of SHGs with FSWs as one of the key strategies to empower the community for ensuring better program outcomes.

Keywords: empowerment, female sex workers, HIV, Thane, self-help group

Procedia PDF Downloads 221
6906 Ranking of the Main Criteria for Contractor Selection Procedures on Major Construction Projects in Libya Using the Delphi Method

Authors: Othoman Elsayah, Naren Gupta, Binsheng Zhang

Abstract:

The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organizations and is central to the success of any construction project. Contractor selection (CS) is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be conducted prior to the award of contract, characterized by many factors such as: contactor’s skills, experience on similar projects, track- record in the industry, and financial stability. However, this paper evaluates the current state of knowledge in relation to contractor selection process and demonstrates the findings from the analysis of the data collected from the Delphi questionnaire survey. The survey was conducted with a group of 12 experts working in the Libyan construction industry (LCI). The paper starts by briefly explaining the general outline of the questionnaire including the survey participation rate, the different fields the experts came from, and the business titles of the participants. Then, the paper describes the tests used to determine when the experts had reached consensus. The paper is based on research which aims to develop rank contractor selection criteria with specific application to make construction projects in the Libyan context. The findings of this study will be utilized to establish the scope of work that will be used as part of a PhD research.

Keywords: contractor selection, Libyan construction industry, decision experts, Delphi technique

Procedia PDF Downloads 316
6905 A Development of Practice Guidelines for Surgical Safety Management to Reduce Undesirable Incidents from Surgical Services in the Operating Room of Songkhla Hospital, Thailand

Authors: Thitima Plejai

Abstract:

The practice in the operating room has been continually performed according to standards of services; however, undesirable incidents from surgical services are found such as surgical complications in the operating room. This participation action research aimed to develop practice guidelines for surgical safety management to reduce undesirable incidents from surgical services in the operating room of Songkhla Hospital. The target population was all 84 members of the multidisciplinary team who were involved in surgical services in the operating room consisting of 28 surgeons from five branches of surgery, 27 anesthetists and nurse anesthetists, and 29 surgical nurses. The data were collected through in-depth interviews, and non-participatory observations. The research instrument was tested by three experts, and the steps of the development consisted of four cycles, each consisting of assessment, planning, practice, practice reflection, and improvement until every step is practicable. The data were validated through triangulation research method, analyzed through content analysis and statistical analysis with number and percentage. The results of the development of practice guidelines surgical safety management to reduce undesirable incidents from surgical services could be concluded as follows. 1) The multidisciplinary team in surgery participated in the needs assessment for development of practice guidelines for surgical patient safety, and agreed on adapting the WHO Surgical Safety Checklists for use. 2) The WHO Surgical Safety Checklists was implemented, and meetings were held for the multidisciplinary team in surgery and the organizational risk committee to improve the practice guidelines to make them more practicable. 3) The multidisciplinary team consisting of surgeons from five branches of surgery, anesthetists, nurse anesthetists, surgical nurses, and the organizational risk committee announced policy on safety for surgical patients; the organizational risk committee designated the Surgical Safety Checklist as an instrument for surgical patient safety. The results of the safety management found that the surgical team members who could follow 100 percent of the guidelines were: professional nurses who checked patient identity and information before taking the patient to the operating room and kept complete records of data on the patients; surgical nurses who checked readiness of the patient before surgery; nurse anesthetists who assessed readiness before administering anesthetic drugs, and confirmed correctness of the patient; and circulating perioperative nurses who gave confirmation to the surgical team after completion of the surgery. The rates of undesirable incidents (surgical complications rates) before and after the implementation of the surgical safety management were 1.60 percent and 0.66 percent, respectively. The satisfaction of the surgery-related teams towards the use of the guidelines was 89 percent. The practice guidelines for surgical safety management to reduce undesirable incidents were taken as guidelines for surgical safety that the multidisciplinary team involved in the surgical process implemented correctly and in the same direction and clearly reduced undesirable incidents in surgical patients.

Keywords: practice guidelines, surgical safety management, reduce undesirable incidents, operating Room

Procedia PDF Downloads 283
6904 The HSBC Building in Shanghai: Diverse Styles of Ornament and the Construction of a Financial Empire

Authors: Lin Ji

Abstract:

The 1923 HSBC Building is one of the landmarks of Shanghai's Bund complex and is described as "one of the finest buildings from the Suez Canal to the Bering Strait". Mr George Leopold Wilson of Palmer&Turner and his design team combine the latest British design taste with Chinese elements and bring the high standard of London manufacturing to Shanghai. This paper reviews the establishment background and construction process of the Hongkong and Shanghai Bank Corporation in Shanghai, and analyzes the characteristics of various styles and ornament of HSBC. At the same time, using the research method of iconography, compared with Britain's exploration of modern design mode in the early 20th century, we can deeply understand how this "monument of world commerce and prosperity" realizes the identity construction of its financial empire in the Far East in the perfect combination of practicality and artistry.

Keywords: early 20-century Shanghai, the bund, the HSBC building, classical styles, ornament, identity construction

Procedia PDF Downloads 126
6903 Possible Endocrinal and Liver Enzymes Toxicities Associated with Long Term Exposure to Benzene in Saudi Arabia

Authors: Faizah Asiri, Mohammed Fathy, Saeed Alghamdi, Nahlah Ayoub, Faisal Asiri

Abstract:

Background: - The strategies for this study were based on the toxic effect of long-term inhalation of Benzene on hormones and liver enzymes and various parameters related to it. The following databases were searched: benzene, hepatotoxic, benzene metabolism, hormones, testosterone, hemotoxic, and prolonged exposure. A systematic strategy is designed to search the literature that links benzene with the multiplicity and different types of intoxication or the medical abbreviations of diseases relevant to benzene exposure. Evidence suggests that getting rid of inhaled gasoline is by exhalation. Absorbed benzene is metabolized by giving phenolic acid as well as meconic acid, followed by urinary excretion of conjugate sulfates and glucuronides. Materials and Methods :- This work was conducted in the Al-Khadra laboratory in Taif 2020/2021 and aimed to measure some of the possible endocrinal and liver toxicities associated with benzene's long-term exposure in Saudi Arabia at the station workers who are considered the most exposed category to gasoline. One hundred ten station workers were included in this study. They were divided into four patient groups according to the chronic exposure rate to benzene, one control group, and three other groups of exposures. As follows: patient Group 1 (controlled group), patient Group 2 (exposed less than 1y), patient Group 3 (exposed 1-5 y), patient Group 4 (more than 5). Each group is compared with blood sample parameters (ALT, FSH and Testosterone, TSH). Blood samples were drawn from the participants, and statistical tests were performed. Significant change (p≤0.05) was examined compared to the control group. Workers' exposure to benzene led to a significant change in hematological, hormonal, and hepatic factors compared to the control group. Results:- The results obtained a relationship between long-term exposure to benzene and a decrease in the level of testosterone and FSH hormones, including that it poses a toxic risk in the long term (p≤0.05) when compared to the control. We obtained results confirming that there is no significant coloration between years of exposure and TSH level (p≤0.05) when compared to the control. Conclusion:- We conclude that some hormones and liver enzymes are affected by chronic doses of benzene through inhalation after our study was on the group most exposed to benzene, which is gas station workers.

Keywords: toxicities, benzene, hormones, station workers

Procedia PDF Downloads 72
6902 Appraisal of the Nutritional Potential and Safety of Wild Vegetables of South Africa

Authors: Thozama Kwinana-Mandindi

Abstract:

The contribution made by wild edible plants to the livelihoods, food baskets and diets of the indigenous people, particularly among the rural dwellers is invaluable. These wild vegetables are among the non-conventional crops which are widely distributed throughout the wild regions in South Africa, indigenous communities have always exploited for micro-nutrient supply. They also supply significant complex, recently discovered compounds, naturally occurring phytonutrients. In order to protect and promote sustainable use of these plants for household food security, there is a need to better understand them through studies and innovations. Assessment of the wild edible plants’ safety is very key to the promotion as an agricultural product which can be utilised during dry seasons and periods of food scarcity to alleviate nutrient insecurity. Through the use of Scanning Electron Microscope (SEM) and energy dispersive X-ray spectroscopy (EDXS), the study is seen as the vital step in taking a holistic view of the value of the four most consumed wild vegetables in the Eastern Cape Province of South Africa as they were analysed for safety and appraised for components that can influence utilisation. Results indicate that they can be relied upon and cultivation be promoted.

Keywords: nature’s resource, wild vegetables, appraisal for safety, SEM

Procedia PDF Downloads 427
6901 Investigation of the Factors Influencing the Construction Planning Process Using Participant Observation Method

Authors: Ashokkumar Subbiah

Abstract:

This study investigates the impact of factors that influenced the success of construction planning for a major construction project in Qatar. An approach of participant observation is adopted which is informed by the principles of ethnography: one that reports the participants’ view of their world rather than imposing an artificial theoretical framework upon it. As participant observant, key factors were observed and identified that had an impact on the management and execution of the construction planning. It is found that a ‘shadow culture’ exists between the project participants which, it is argued, is only observable from the perspective of an embedded participant observer. The shadow culture acts to enable the management of the planning process, and its efficacy relates to the ‘quality’ of human inter-relationships amongst immediate stakeholders. Whilst this study uses the concept of shadow culture, it is treated as both a methodological stance and one of the findings of this research in the context of the major construction project in Qatar. The concept of shadow culture is not imposed upon the findings, but instead is used as a research tool: respondents report their own worldview and this is reported from the view of a participant observant in a manner that is understandable and useful to those who are not part of the construction project. The findings of this study identify similar factors influencing the planning process of the Qatar project, but the shadow culture predominantly influences these factors towards the failure of planning process. The research concludes by questioning the assumption that construction planning is a mechanistic process that has to be conducted solely by the planning team. Instead, it is a highly social phenomenon in which the seemingly mechanistic process is made workable by the quality of relationships that exist in the project. Drawing on this the final section provides a series of recommendations that may be helpful in enhancing the efficacy of project planning; these include better training/education at the pre-construction phase; recognition of the importance of shadow processes at management levels, and better appreciation of the impact of contract type and chosen procurement route.

Keywords: construction planning, participant observation, project participants, shadow culture

Procedia PDF Downloads 280
6900 Effect of Moisture Content Compaction in the Geometry Definition of Earth Dams

Authors: Julian B. García, Virginie Q. R. Pinto, André P. Assis

Abstract:

This paper presents numerical flow and slope stability simulations in three typical sections of earth dams built in tropical regions, two homogeneous with different slope inclinations, and the other one heterogeneous with impermeable core. The geotechnical material parameters used in this work were obtained from a lab testing of physical characterization, compaction, consolidation, variable load permeability and saturated triaxial type CD for compacted soil samples with standard proctor energy at optimum moisture content (23%), optimum moisture content + 2% and optimum moisture content +5%. The objective is to analyze the general behavior of earth dams built in rainy regions where optimum moisture is exceeded. The factor of safety is satisfactory for the three sections compacted in all moisture content during the stages of operation and end of construction. On The other hand, the rapid drawdown condition is the critical phase for homogeneus dams configuration, the factor of safety obtained were unsatisfactory. In general, the heterogeneous dam behavior is more efficient due to the fact that the slopes are made up of gravel, which favors the dissipation of pore pressures during the rapid drawdown. For the critical phase, the slopes should have lower inclinations of the upstream and downstream slopes to guarantee stability, although it increases the costs.

Keywords: earth dams, flow, moisture content, slope stability

Procedia PDF Downloads 172
6899 Real Time Adaptive Obstacle Avoidance in Dynamic Environments with Different D-S

Authors: Mohammad Javad Mollakazemi, Farhad Asadi

Abstract:

In this paper a real-time obstacle avoidance approach for both autonomous and non-autonomous dynamical systems (DS) is presented. In this approach the original dynamics of the controller which allow us to determine safety margin can be modulated. Different common types of DS increase the robot’s reactiveness in the face of uncertainty in the localization of the obstacle especially when robot moves very fast in changeable complex environments. The method is validated by simulation and influence of different autonomous and non-autonomous DS such as important characteristics of limit cycles and unstable DS. Furthermore, the position of different obstacles in complex environment is explained. Finally, the verification of avoidance trajectories is described through different parameters such as safety factor.

Keywords: limit cycles, nonlinear dynamical system, real time obstacle avoidance, safety margin

Procedia PDF Downloads 426
6898 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance

Authors: Ali Abdullah Albezaghi

Abstract:

This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.

Keywords: risk management practices, external risks, internal risks, project risks, project performance

Procedia PDF Downloads 117
6897 Exploring Strategies Used by Victims of Intimate Partner Violence to Increase Sense of Safety: A Systematic Review and Quantitative Study

Authors: Thomas Nally, Jane Ireland, Roxanne Khan, Philip Birch

Abstract:

Intimate Partner Violence (IPV), a significant societal problem, affects individuals worldwide. However, the strategies victims use to keep safe are under-researched. IPV is significantly under-reported, and services often are not able to be accessed by all victims. Thus they are likely to use their own strategies to manage their victimization before being able to seek support. Two studies were completed to understand these strategies. A systematic review of the literature and study completed with professionals who work with victims was undertaken to understand this area. In study one, a systematic review of the literature (n=61 papers), were analyzed using Thematic Analysis. The results indicated that victims use a large array of behaviors to increase their sense of safety and coping with emotions but also experience significant barriers to help-seeking. In study 2, sixty-nine professionals completed a measure exploring the likelihood and effectiveness of various victim strategies regarding increasing their sense of safety. Strategies included in the measure were obtained from those identified in study 1. Findings indicated that professionals perceived victims of IPV to be more likely to employ safety strategies and coping behaviors that may be ineffective but not help-seeking behaviors. Further, the responses were analyzed using Cluster Analysis. Safety strategies resulted in five clusters; perpetrator-directed strategies, prevention strategies, cognitive reappraisal, safety planning and avoidance strategies. Help-Seeking resulted in six clusters; information or practical support, abuse-related support, emotional support, secondary support and informal support. Finally, coping resulted in four clusters; emotional coping, self-directed coping, thought recording/change and cognitive coping. Both studies indicate that victims may use a variety of strategies to manage their safety besides seeking help. Professionals working with victims, using a strength-based approach, should understand what is used and is effective for victims who are unable to leave the relationships or access external support.

Keywords: intimate partner violence, help-seeking, professional support, victims, victim coping, victim safety

Procedia PDF Downloads 175
6896 Towards Sustainable Construction in the United Arab Emirates: Challenges and Opportunities

Authors: Yousef Alqaryouti, Mariam Al Suwaidi, Raed Mohmood AlKhuwaildi, Hind Kolthoum, Issa Youssef, Mohammed Al Imam

Abstract:

The UAE has experienced rapid economic growth due to its mature oil production industry, leading to a surge in urbanization and infrastructure development in the construction sector. Sustainable development practices are becoming increasingly important, and the UAE government has taken proactive measures to promote them, including the introduction of sustainable building codes, energy-efficient technologies, and renewable energy sources. Initiatives such as the Masdar City project and the Emirates Green Building Council further demonstrate the government's commitment to a cleaner and healthier environment. By adopting sustainable practices, the UAE can reduce its carbon footprint, lessen its reliance on fossil fuels, and achieve cost savings in the long run. The purpose of this paper is to conduct a thorough review of the current state of sustainability in the construction industry of the UAE. Our research methodology includes a local market survey and qualitative observational analysis of executed housing construction projects by the Mohammed Bin Rashid Housing Establishment. The market survey assesses eleven different challenging factors that affect sustainable construction project delivery. The qualitative observational research is based on data collected from three projects, including construction progress, bill of quantity, and construction program. The study concludes that addressing these challenges requires a collaborative team approach, incentivized contracts, traditional project management practices, an integrated project team, and an increase in sustainability awareness among stakeholders. The recommendations proposed in this study aim to promote and improve the application of sustainability in the UAE's construction industry for the future.

Keywords: sustainability, construction, challenges, opportunities, case study, market survey

Procedia PDF Downloads 39
6895 Role of Social Workers in Juvenile Justice Board as a Child Protection Mechanism for Children in Conflict with Law

Authors: Ida D. Souza, Lena Ashok

Abstract:

Every child has a fundamental right to be protected and it is only a safe, supported child who can effectively cope with difficult circumstances and lead a happy childhood. The vulnerability of children has increased due to emerging lifestyles, raising cost of living, higher expectations from adults, parental and care-giver stress /burn-out and a general raise in demand for services for children. A major area of concern is the rise of juvenile crimes in the overall crimes committed in the country. The UNCRC 1989 and JJ Act 2000 enables the structures to handle the juvenile children in care and concern in its real terms. One of the mechanisms to protect the children is the JJB a justice system. The aim is to hold a child culpable (guilty) for offence they committed, not through punishment, but counseling the child to understand their actions and persuade them away from such deviated activities in the future. The JJB consists of two social workers and a judicial magistrate and one of whom should be a woman. This study aims at understanding the role of social workers in best practices in deciding the best course of action for the rehabilitation of the child. Two case studies were carried out through in-depth interviews with the social worker member of the JJB of two Udupi and Mangalore districts. The best practices reported in which children are being allowed to express themselves in a child friendly environment and in the best interest of the child. The study highlighted team work to be very effective in understanding the child in their reformation.

Keywords: child protection, best practices, juvenile justice, reformation teamwork

Procedia PDF Downloads 354
6894 Financial Burden of Occupational Slip and Fall Incidences in Taiwan

Authors: Kai Way Li, Lang Gan

Abstract:

Slip &Fall are common in Taiwan. They could result in injuries and even fatalities. Official statistics indicate that more than 15% of all occupational incidences were slip/fall related. All the workers in Taiwan are required by the law to join the worker’s insurance program administered by the Bureau of Labor Insurance (BLI). The BLI is a government agency under the supervision of the Ministry of Labor. Workers claim with the BLI for insurance compensations when they suffer fatalities or injuries at work. Injuries statistics based on worker’s compensation claims were rarely studied. The objective of this study was to quantify the injury statistics and financial cost due to slip-fall incidences based on the BLI compensation records. Compensation records in the BLI during 2007 to 2013 were retrieved. All the original application forms, approval opinions, results for worker’s compensations were in hardcopy and were stored in the BLI warehouses. Xerox copies of the claims, excluding the personal information of the applicants (or the victim if passed away), were obtained. The content in the filing forms were coded in an Excel worksheet for further analyses. Descriptive statistics were performed to analyze the data. There were a total of 35,024 claims including 82 deaths, 878 disabilities, and 34,064 injuries/illnesses which were slip/fall related. It was found that the average losses for the death cases were 40 months. The total dollar amount for these cases paid was 86,913,195 NTD. For the disability cases, the average losses were 367.36 days. The total dollar amount for these cases paid was almost 2.6 times of those for the death cases (233,324,004 NTD). For the injury/illness cases, the average losses for the illness cases were 58.78 days. The total dollar amount for these cases paid was approximately 13 times of those of the death cases (1134,850,821 NTD). For the applicants/victims, 52.3% were males. There were more males than females for the deaths, disability, and injury/illness cases. Most (57.8%) of the female victims were between 45 to 59 years old. Most of the male victims (62.6%) were, on the other hand, between 25 to 39 years old. Most of the victims were in manufacturing industry (26.41%), next the construction industry (22.20%), and next the retail industry (13.69%). For the fatality cases, head injury was the main problem for immediate or eventual death (74.4%). For the disability case, foot (17.46%) and knee (9.05%) injuries were the leading problems. The compensation claims other than fatality and disability were mainly associated with injuries of the foot (18%), hand (12.87%), knee (10.42%), back (8.83%), and shoulder (6.77%). The slip/fall cases studied indicate that the ratios among the death, disability, and injury/illness counts were 1:10:415. The ratios of dollar amount paid by the BLI for the three categories were 1:2.6:13. Such results indicate the significance of slip-fall incidences resulting in different severity. Such information should be incorporated in to slip-fall prevention program in industry.

Keywords: epidemiology, slip and fall, social burden, workers’ compensation

Procedia PDF Downloads 307
6893 Overview of Time, Resource and Cost Planning Techniques in Construction Management Research

Authors: R. Gupta, P. Jain, S. Das

Abstract:

One way to approach construction scheduling optimization problem is to focus on the individual aspects of planning, which can be broadly classified as time scheduling, crew and resource management, and cost control. During the last four decades, construction planning has seen a lot of research, but to date, no paper had attempted to summarize the literature available under important heads. This paper addresses each of aspects separately, and presents the findings of an in-depth literature of the various planning techniques. For techniques dealing with time scheduling, the authors have adopted a rough chronological documentation. For crew and resource management, classification has been done on the basis of the different steps involved in the resource planning process. For cost control, techniques dealing with both estimation of costs and the subsequent optimization of costs have been dealt with separately.

Keywords: construction planning techniques, time scheduling, resource planning, cost control

Procedia PDF Downloads 468