Search results for: construction safety
6210 A Numerical Computational Method of MRI Static Magnetic Field for an Ergonomic Facility Design Guidelines
Authors: Sherine Farrag
Abstract:
Magnetic resonance imaging (MRI) presents safety hazards, with the general physical environment. The principal hazard of the MRI is the presence of static magnetic fields. Proper architectural design of MRI’s room ensure environment and health care staff safety. This research paper presents an easy approach for numerical computation of fringe static magnetic fields. Iso-gauss line of different MR intensities (0.3, 0.5, 1, 1.5 Tesla) was mapped and a polynomial function of the 7th degree was generated and tested. Matlab script was successfully applied for MRI SMF mapping. This method can be valid for any kind of commercial scanner because it requires only the knowledge of the MR scanner room map with iso-gauss lines. Results help to develop guidelines to guide healthcare architects to design of a safer Magnetic resonance imaging suite.Keywords: designing MRI suite, MRI safety, radiology occupational exposure, static magnetic fields
Procedia PDF Downloads 4856209 The Link between Migration Status and Occupational Health and Safety of Filipino Migrant Workers in South Korea
Authors: Lito M. Amit, Venecio U. Ultra, Young Woong Song
Abstract:
The purpose of this study was to document the prevalence and types of work-related health and safety problems among Filipino migrant workers and the link between their migration status and occupational health and safety (OHS) problems. We conducted a survey among 116 Filipino migrant workers who were both legal and undocumented. To assess the various forms of occupational health problems, we utilized the Korean occupational stress scale (KOSS), Nordic musculoskeletal questionnaire (NMQ) and a validated health and safety questionnaire. A focus group discussion (FGD) was also conducted to record relevant information that was limited by the questionnaires. Descriptive data were presented in frequency with percentages, mean, and standard deviation. Chi-square tests and logistic regression analyses were performed to estimate the degree of association between variables (p < 0.05). Among the eight subscales of KOSS, inadequate social support (2.48), organizational injustice (2.57), and lack of reward (2.52) were experienced by workers. There was a 44.83% prevalence of musculoskeletal disorders with arm/elbow having the highest rate, followed by shoulder and low back regions. Inadequate social support and discomfort in organizational climate and overall MSDs prevalence showed significant relationships with migration status (p < 0.05). There was a positive association between migration status and seven items under language and communication. A positive association was seen between migration status and some of the OHS problems of Filipino migrant workers in Korea. Undocumented workers in this study were seen to be more vulnerable to those stressors compared to those employed legally.Keywords: Filipino workers, migration status, occupational health and safety, undocumented workers
Procedia PDF Downloads 1326208 Concrete Compressive Strengths of Major Existing Buildings in Kuwait
Authors: Zafer Sakka, Husain Al-Khaiat
Abstract:
Due to social and economic considerations, owners all over the world desire to keep and use existing structures, including aging ones. However, these structures, especially those that are dear, need accurate condition assessment, and proper safety evaluation. More than half of the budget spent on construction activities in developed countries is related to the repair and maintenance of these reinforced concrete (R/C) structures. Also, periodical evaluation and assessment of relatively old concrete structures are vital and imperative. If the evaluation and assessment of structural components of a particular aging R/C structure reveal that repairs are essential for these components, these repairs should not be delayed. Delaying the repairs has the potential of losing serviceability of the whole structure and/or causing total failure and collapse of the structure. In addition, if repairs are delayed, the cost of maintenance will skyrocket as well. It can also be concluded from the above that the assessment of existing needs to receive more consideration and thought from the structural engineering societies and professionals. Ten major existing structures in Kuwait city that were constructed in the 1970s were assessed for structural reliability and integrity. Numerous concrete samples were extracted from the structural systems of the investigated buildings. This paper presents the results of the compressive strength tests that were conducted on the extracted cores. The results are compared for the buildings’ columns and beams elements and compared with the design strengths. The collected data were statistically analyzed. The average compressive strengths of the concrete cores that were extracted from the ten buildings had a large variation. The lowest average compressive strength for one of the buildings was 158 kg/cm². This building was deemed unsafe and economically unfeasible to be repaired; accordingly, it was demolished. The other buildings had an average compressive strengths fall in the range 215-317 kg/cm². Poor construction practices were the main cause for the strengths. Although most of the drawings and information for these buildings were lost during the invasion of Kuwait in 1990, however, information gathered indicated that the design strengths of the beams and columns for most of these buildings were in the range of 280-400 kg/cm². Following the study, measures were taken to rehabilitate the buildings for safety. The mean compressive strength for all cores taken from beams and columns of the ten buildings was 256.7 kg/cm². The values range was 139 to 394 kg/cm². For columns, the mean was 250.4 kg/cm², and the values ranged from 137 to 394 kg/cm². However, the mean compressive strength for the beams was higher than that of columns. It was 285.9 kg/cm², and the range was 181 to 383 kg/cm². In addition to the concrete cores that were extracted from the ten buildings, the 28-day compressive strengths of more than 24,660 concrete cubes were collected from a major ready-mixed concrete supplier in Kuwait. The data represented four different grades of ready-mix concrete (250, 300, 350, and 400 kg/cm²) manufactured between the year 2003 and 2018. The average concrete compressive strength for the different concrete grades (250, 300, 350 and 400 kg/cm²) was found to be 318, 382, 453 and 504 kg/cm², respectively, and the coefficients of variations were found to be 0.138, 0.140, 0.157 and 0.131, respectively.Keywords: concrete compressive strength, concrete structures, existing building, statistical analysis.
Procedia PDF Downloads 1166207 Control Mechanisms for Sprayer Used in Turkey
Authors: Huseyin Duran, Yesim Benal Oztekin, Kazim Kubilay Vursavus, Ilker Huseyin Celen
Abstract:
There are two main approaches to manufacturing, market and usage of plant protection machinery in Turkey. The first approach is called as ‘Product Safety Approach’ and could be summarized as minimum health and safety requirements of consumer needs on plant protection equipment and machinery products. The second approach is the practices related to the Plant Protection Equipment and Machinery Directive. Product safety approach covers the plant protection machinery product groups within the framework of a new approach directive, Machinery Safety Directive (2006/42 / AT). The new directive is in practice in our country by 03.03.2009, parallel to the revision of the EU Regulation on the Directive (03.03.2009 dated and numbered 27158 published in the Official Gazette). ‘Pesticide Application for Machines’ paragraph is added to the 2006/42 / EC Machinery Safety Directive, which is, in particular, reveals the importance of primary health care and product safety issue, explaining the safety requirements for machines used in the application of plant protection products. The Ministry of Science, Industry and Technology is the authorized organizations in our country for the publication and implementation of this regulation. There is a special regulation, carried out by Ministry of Food, Agriculture and Livestock General Directorate of Food and Control, on the manufacture and sale of plant protection machinery. This regulation, prepared based on 5996 Veterinary Services, Plant Health, Food and Feed Law, is ‘Regulation on Plant Protection Equipment and Machinery’ (published on 02.04.2011 whit number 27893 in the Official Gazette). The purposes of this regulation are practicing healthy and reliable crop production, the preparation, implementation and dissemination of the integrated pest management programs and projects for the development of human health and environmentally friendly pest control methods. This second regulation covers: approval, manufacturing, licensing of Plant Protection Equipment and Machinery; duties and responsibilities of the dealers; principles and procedures related to supply and control of the market. There are no inspection procedures for the application of currently used plant protection machinery in Turkey. In this study, content and application principles of all regulation approaches currently used in Turkey are summarized.Keywords: plant protection equipment and machinery, product safety, market surveillance, inspection procedures
Procedia PDF Downloads 2596206 Digital Architectural Practice as a Challenge for Digital Architectural Technology Elements in the Era of Digital Design
Authors: Ling Liyun
Abstract:
In the field of contemporary architecture, complex forms of architectural works continue to emerge in the world, along with some new terminology emerged: digital architecture, parametric design, algorithm generation, building information modeling, CNC construction and so on. Architects gradually mastered the new skills of mathematical logic in the form of exploration, virtual simulation, and the entire design and coordination in the construction process. Digital construction technology has a greater degree in controlling construction, and ensure its accuracy, creating a series of new construction techniques. As a result, the use of digital technology is an improvement and expansion of the practice of digital architecture design revolution. We worked by reading and analyzing information about the digital architecture development process, a large number of cases, as well as architectural design and construction as a whole process. Thus current developments were introduced and discussed in our paper, such as architectural discourse, design theory, digital design models and techniques, material selecting, as well as artificial intelligence space design. Our paper also pays attention to the representative three cases of digital design and construction experiment at great length in detail to expound high-informatization, high-reliability intelligence, and high-technique in constructing a humane space to cope with the rapid development of urbanization. We concluded that the opportunities and challenges of the shift existed in architectural paradigms, such as the cooperation methods, theories, models, technologies and techniques which were currently employed in digital design research and digital praxis. We also find out that the innovative use of space can gradually change the way people learn, talk, and control information. The past two decades, digital technology radically breaks the technology constraints of industrial technical products, digests the publicity on a particular architectural style (era doctrine). People should not adapt to the machine, but in turn, it’s better to make the machine work for users.Keywords: artificial intelligence, collaboration, digital architecture, digital design theory, material selection, space construction
Procedia PDF Downloads 1366205 An Investigation into the Current Implementation of Design-Build Contracts in the Kingdom of Saudi Arabia
Authors: Ibrahim A. Alhammad, Suleiman A. Al-Otaibi, Khalid S. Al-Gahtani, Naïf Al-Otaibi, Abdulaziz A. Bubshait
Abstract:
In the last decade, the use of project delivery system of design build engineering contracts is increasing in North America due to the reasons of reducing the project duration and minimizing costs. The shift from traditional approach of Design-Bid-Build to Design-Build contracts have been attributed to many factors such as evolution of the regulatory and legal frameworks governing the engineering contracts and improvement in integrating design and construction. The aforementioned practice of contracting is more appropriate in North America; yet, it may not be the case in Saudi Arabia where the traditional approach of construction contracting remains dominant. The authors believe there are number of factors related to the gaps in the level of sophistication of the engineering and management of the construction projects in both countries. A step towards improving the Saudi construction practice by adopting the new trend of construction contracting, this paper identifies the reasons why Design/Build form of contracting are not frequently utilized. A field survey, which includes the questionnaire addressing the research problem, is distributed to three main parties of the construction contracts: clients, consultants, and contractors. The analyzed collected data were statistically sufficient to finding the reasons of not adopting the new trend of good practice of deign build approach in Saudi Arabia. In addition, the reasons are: (1) lack of regulation and legal framework; (2) absence of clear criteria of the owner for the trade-off between competing contractors, (3) and lack of experience, knowledge and skill.Keywords: design built projects, Saudi Arabia, GCC, mega projects
Procedia PDF Downloads 2216204 Resource Leveling Optimization in Construction Projects of High Voltage Substations Using Nature-Inspired Intelligent Evolutionary Algorithms
Authors: Dimitrios Ntardas, Alexandros Tzanetos, Georgios Dounias
Abstract:
High Voltage Substations (HVS) are the intermediate step between production of power and successfully transmitting it to clients, making them one of the most important checkpoints in power grids. Nowadays - renewable resources and consequently distributed generation are growing fast, the construction of HVS is of high importance both in terms of quality and time completion so that new energy producers can quickly and safely intergrade in power grids. The resources needed, such as machines and workers, should be carefully allocated so that the construction of a HVS is completed on time, with the lowest possible cost (e.g. not spending additional cost that were not taken into consideration, because of project delays), but in the highest quality. In addition, there are milestones and several checkpoints to be precisely achieved during construction to ensure the cost and timeline control and to ensure that the percentage of governmental funding will be granted. The management of such a demanding project is a NP-hard problem that consists of prerequisite constraints and resource limits for each task of the project. In this work, a hybrid meta-heuristic method is implemented to solve this problem. Meta-heuristics have been proven to be quite useful when dealing with high-dimensional constraint optimization problems. Hybridization of them results in boost of their performance.Keywords: hybrid meta-heuristic methods, substation construction, resource allocation, time-cost efficiency
Procedia PDF Downloads 1526203 Possible Number of Dwelling Units Using Waste Plastic Bottle for Construction
Authors: Dibya Jivan Pati, Kazuhisa Iki, Riken Homma
Abstract:
Unlike other metro cities of India, Bhubaneswar–the capital city of Odisha, is expected to reach 1-million-mark population by now. The demands of dwelling unit requirement mostly among urban poor belonging to Economically Weaker section (EWS) and Low Income groups (LIG) is becoming a challenge due to high housing cost and rents. As a matter of fact, it’s also noted that, with increase in population, the solid waste generation also increases subsequently affecting the environment due to inefficiency in collection of waste by local government bodies. Methods of utilizing Solid Waste - especially in form of Plastic bottles, Glass bottles and Metal cans (PGM) are now widely used as an alternative material for construction of low-cost building by Non-Government Organizations (NGOs) in developing countries like India to help the urban poor afford a shelter. The application of disposed plastic bottle used in construction of single dwelling significantly reduces the overall cost of construction to as much as 14% compared to traditional construction material. Therefore, considering its cost-benefit result, it’s possible to provide housing to EWS and LIGs at an affordable price. In this paper, we estimated the quantity of plastic bottles generated in Bhubaneswar which further helped to estimate the possible number of single dwelling unit that can be constructed on yearly basis so as to refrain from further housing shortage. The estimation results will be practically used for planning and managing low-cost housing business by local government and NGOs.Keywords: construction, dwelling unit, plastic bottle, solid waste generation, groups
Procedia PDF Downloads 4756202 Hybrid Stainless Steel Girder for Bridge Construction
Authors: Tetsuya Yabuki, Yasunori Arizumi, Tetsuhiro Shimozato, Samy Guezouli, Hiroaki Matsusita, Masayuki Tai
Abstract:
The main object of this paper is to present the research results of the development of a hybrid stainless steel girder system for bridge construction undertaken at University of Ryukyu. In order to prevent the corrosion damage and reduce the fabrication costs, a hybrid stainless steel girder in bridge construction is developed, the stainless steel girder of which is stiffened and braced by structural carbon steel materials. It is verified analytically and experimentally that the ultimate strength of the hybrid stainless steel girder is equal to or greater than that of conventional carbon steel girder. The benefit of the life-cycle cost of the hybrid stainless steel girder is also shown.Keywords: smart structure, hybrid stainless steel members, ultimate strength, steel bridge, corrosion prevention
Procedia PDF Downloads 3796201 In-Depth Analysis of Involved Factors to Car-Motorcycle Accidents in Budapest City
Authors: Danish Farooq, Janos Juhasz
Abstract:
Car-motorcycle accidents have been observed higher in recent years, which caused mainly riders’ fatalities and serious injuries. In-depth crash investigation methods aim to investigate the main factors which are likely involved in fatal road accidents and injury outcomes. The main objective of this study is to investigate the involved factors in car-motorcycle accidents in Budapest city. The procedure included statistical analysis and data sampling to identify car-motorcycle accidents by dominant accident types based on collision configurations. The police report was used as a data source for specified accidents, and simulation models were plotted according to scale (M 1:200). Car-motorcycle accidents were simulated in Virtual Crash software for 5 seconds before the collision. The simulation results showed that the main involved factors to car-motorcycle accidents were human behavior and view obstructions. The comprehensive, in-depth analysis also found that most of the car drivers and riders were unable to perform collision avoidance manoeuvres before the collision. This study can help the traffic safety authorities to focus on simulated involved factors to solve road safety issues in car-motorcycle accidents. The study also proposes safety measures to improve safe movements among road users.Keywords: car motorcycle accidents, in-depth analysis, microscopic simulation, safety measures
Procedia PDF Downloads 1516200 The Development Practice and SystemConstruction of Low- Carbon City in China
Authors: Xu Xiao China, Xu Lei China
Abstract:
After the 1990s, the concept of urban sustainable development has been increasing attention in urban planning and urban design. High carbon city, not a sustainable city construction model, has become an important problem which restricts the sustainable development of the city. Therefore, low-carbon city construction is the urgent need to solve the problem, and China is one of the core areas of low-carbon city construction in the world. The research work of low-carbon cities were participated by the Chinese government and academic institutes on theory and practice since 2007, and nowadays it comes to a practice stage with six low-carbon pilot provinces and 36 low-carbon pilot cities identified. To achieve the low-carbon target, developing low-carbon energy, adopting non-pollution technique, constructing green buildings and adopting ecolife-style are suggest by the government. Meanwhile, besides a new standard system and a new eco-environmental status evaluation method, the government also established the Chinese urban development institute including the Low-Carbon City Group. Finally, we want to transform the modern industrial civilization into an ecological civilization and realize sustainable urban development.Keywords: low-carbon city, China, development practice, system construction, urban sustainability
Procedia PDF Downloads 5296199 An Analytical Survey of Construction Changes: Gaps and Opportunities
Authors: Ehsan Eshtehardian, Saeed Khodaverdi
Abstract:
This paper surveys the studies on construction change and reveals some of the potential future works. A full-scale investigation of change literature, including change definitions, types, causes and effects, and change management systems, is accomplished to explore some of the coming change trends. It is tried to pick up the critical works in each section to deduct a true timeline of construction changes. The findings show that leaping from best practice guides in late 1990s and generic process models in the early 2000s to very advanced modeling environments in the mid-2000s and the early 2010s have made gaps along with opportunities for change researchers in order to develop some more easy and applicable models. Another finding is that there is a compelling similarity between the change and risk prediction models. Therefore, integrating these two concepts, specifically from proactive management point of view, may lead to a synergy and help project teams avoid rework. Also, the findings show that exploitation of cause-effect relationship models, in order to facilitate the dispute resolutions, seems to be an interesting field for future works.Keywords: construction change, change management systems, dispute resolutions, change literature
Procedia PDF Downloads 2956198 Construction of Green Aggregates from Waste Processing
Authors: Fahad K. Alqahtani
Abstract:
Nowadays construction industry is developing means to incorporate waste products in concrete to ensure sustainability. To meet the need of construction industry, a synthetic aggregate was developed using optimized technique called compression moulding press technique. The manufactured aggregate comprises mixture of plastic, waste which acts as binder, together with by-product waste which acts as fillers. The physical properties and microstructures of the inert materials and the manufactured aggregate were examined and compared with the conventional available aggregates. The outcomes suggest that the developed aggregate has potential to be used as substitution of conventional aggregate due to its less weight and water absorption. The microstructure analysis confirmed the efficiency of the manufacturing process where the final product has the same mixture of binder and filler.Keywords: fly ash, plastic waste, quarry fine, red sand, synthetic aggregate
Procedia PDF Downloads 2326197 Factors Affecting Contractual Disputes in Construction ProJects in Sri Lanka
Authors: R. M. Rajapaksa
Abstract:
Construction industry is one of the key players in driving the economy of a country to achieve its prosperity. However, a dispute is one of the crucial factors which prevent the completion of construction contracts within the budgeted cost, scheduled time, and accepted quality. Disputes are inevitable in the construction contract. Accordingly, a study has been undertaken to identify the factors affecting contractual disputes in construction projects in Sri Lanka. The study was a mixed approach with major qualitative and minor quantitative. Qualitative study was set in the form of in-depth interviews with eighteen participants, and quantitative study was conducted using a questionnaire with twenty-four respondents from previously implemented projects by the National Water Supply & Drainage Board representing the employer, engineer and the Contractor to identify the factors affecting contractual disputes and to verify most critical factors respectively. Data analysis for qualitative and quantitative studies was carried out by means of transcribing, code & categorizeand average score methods, respectively. The study reveals that there are forty factors affecting the contractual disputes in construction contracts in Sri Lanka. The finding further illustrates that conflicting decisions by inexperience personnel in the higher position of the Employer, ambiguities resulting inadequate descriptions of the preliminary/general items in price schedule, unfair valuation and late confirmation of variations, unfair determination due to lack of experience of the Engineer/Consultant, under certification of progress payments, unfair grant of EOT & application of delay damages, unreasonable claims for variation of works, errors/discrepancies/ambiguities in the contract conditions and discrepancies & errors in designs & specifications are the most critical factors affecting contractual disputes. Finally, the study proposed remedial measures to most critical factors affecting contractual disputes.Keywords: dispute, contractual, factors, employer, engineer, contractor, construction projects
Procedia PDF Downloads 2186196 Post-occupancy Evaluation of Greenway Based on Multi-source data : A Case Study of Jincheng Greenway in Chengdu
Authors: Qin Zhu
Abstract:
Under the development concept of Park City, Tianfu Greenway system, as the basic and pre-configuration element of Chengdu Global Park construction, connects urban open space with linear and circular structures and undertakes and exerts the ecological, cultural and recreational functions of the park system. Chengdu greenway construction is in full swing. In the process of greenway planning and construction, the landscape effect of greenway on urban quality improvement is more valued, and the long-term impact of crowd experience on the sustainable development of greenway is often ignored. Therefore, it is very important to test the effectiveness of greenway construction from the perspective of users. Taking Jincheng Greenway in Chengdu as an example, this paper attempts to introduce multi-source data to construct a post-occupancy evaluation model of greenway and adopts behavior mapping method, questionnaire survey method, web text analysis and IPA analysis method to comprehensively evaluate the user 's behavior characteristics and satisfaction. According to the evaluation results, we can grasp the actual behavior rules and comprehensive needs of users so that the experience of building greenways can be fed back in time and provide guidance for the optimization and improvement of built greenways and the planning and construction of future greenways.Keywords: multi-source data, greenway, IPA analysis, post -occupancy evaluation (POE)
Procedia PDF Downloads 616195 Exploring the Implementation of Building Information Modelling Level 2 in the UK Construction Industry: The Case of Small and Medium-Sized Enterprises
Authors: Khaled Abu Awwad, Abdussalam Shibani, Michel Ghostin
Abstract:
In the last few years, building information modelling (BIM) has been acknowledged as a new technology capable of transforming the construction sector to a collaborated industry. The implementation of BIM in the United Kingdom (UK) construction sector has increased significantly in the last decade, particularly after the UK government mandated the use of BIM in all public projects by 2016. Despite this, there are many indicators that BIM implementation is the main concern for large companies, while small and medium-sized enterprises (SMEs) are lagging behind in adopting and implementing this new technology. This slow adoption of BIM leads to an uncompetitive disadvantage in public projects and possible private projects. On the other hand, there is limited research focusing on the implementation of BIM Level 2 within SMEs. Therefore, the aim of this study is to bridge this gap and provide a conceptual framework to aid SMEs in implementing BIM Level 2. This framework is a result of interpreting qualitative data obtained by conducting semi-structured interviews with BIM experts in the UK construction industry.Keywords: building information modelling, critical success factors, small and medium-sized enterprises, United Kingdom
Procedia PDF Downloads 2066194 Exploration and Evaluation of the Effect of Multiple Countermeasures on Road Safety
Authors: Atheer Al-Nuaimi, Harry Evdorides
Abstract:
Every day many people die or get disabled or injured on roads around the world, which necessitates more specific treatments for transportation safety issues. International road assessment program (iRAP) model is one of the comprehensive road safety models which accounting for many factors that affect road safety in a cost-effective way in low and middle income countries. In iRAP model road safety has been divided into five star ratings from 1 star (the lowest level) to 5 star (the highest level). These star ratings are based on star rating score which is calculated by iRAP methodology depending on road attributes, traffic volumes and operating speeds. The outcome of iRAP methodology are the treatments that can be used to improve road safety and reduce fatalities and serious injuries (FSI) numbers. These countermeasures can be used separately as a single countermeasure or mix as multiple countermeasures for a location. There is general agreement that the adequacy of a countermeasure is liable to consistent losses when it is utilized as a part of mix with different countermeasures. That is, accident diminishment appraisals of individual countermeasures cannot be easily added together. The iRAP model philosophy makes utilization of a multiple countermeasure adjustment factors to predict diminishments in the effectiveness of road safety countermeasures when more than one countermeasure is chosen. A multiple countermeasure correction factors are figured for every 100-meter segment and for every accident type. However, restrictions of this methodology incorporate a presumable over-estimation in the predicted crash reduction. This study aims to adjust this correction factor by developing new models to calculate the effect of using multiple countermeasures on the number of fatalities for a location or an entire road. Regression models have been used to establish relationships between crash frequencies and the factors that affect their rates. Multiple linear regression, negative binomial regression, and Poisson regression techniques were used to develop models that can address the effectiveness of using multiple countermeasures. Analyses are conducted using The R Project for Statistical Computing showed that a model developed by negative binomial regression technique could give more reliable results of the predicted number of fatalities after the implementation of road safety multiple countermeasures than the results from iRAP model. The results also showed that the negative binomial regression approach gives more precise results in comparison with multiple linear and Poisson regression techniques because of the overdispersion and standard error issues.Keywords: international road assessment program, negative binomial, road multiple countermeasures, road safety
Procedia PDF Downloads 2416193 Design and Development of Herbal Formulations: Challenges and Solutions
Authors: B. Sathyanarayana
Abstract:
As per the report of World Health Organization, more than 80% of world population uses medicines made from herbal and natural materials. They have stood the test of time for their safety, efficacy, cultural acceptability and lesser side effects. Quality assurance and control measures, such as national quality specification and standards for herbal materials, good manufacturing practices (GMP) for herbal medicines, labelling, and licensing schemes for manufacturing, imports and marketing, should be in place in every country where herbal medicines are regulated. These measures are vital for ensuring the safety and efficacy of herbal medicines. In the case of herbal products challenge begins at the stage of designing itself except the classical products. Selection of herbal ingredients, officinal parts to be used, proportions are vital. Once the formulation is designed one should take utmost care to produce the standardized product of assured quality and safety. Quality control measures should cover the validation of quality and identity of raw materials, in process control (as per SOP and GMP norms) and at the level of final product. Quality testing, safety and efficacy studies of the final product are required to ensure the safe and effective use of the herbal products in human beings. Medicinal plants being the materials of natural resource are subjected to great variation making it really difficult to fix quality standards especially in the case of polyherbal preparations. Manufacturing also needs modification according to the type of ingredients present. Hence, it becomes essential to develop Standard operative Procedure for a specific herbal product. Present paper throws a light on the challenges that are encountered during the design and development of herbal products.Keywords: herbal product, challenges, quality, safety, efficacy
Procedia PDF Downloads 5046192 Application of the EU Commission Waste Management Methodology Level(s) to a Construction and a Demolition in North-West Romania.
Authors: Valean Maria
Abstract:
Construction and demolition waste management is a timely topic, due to the urgency of its transition to sustainability. This sector is responsible for over a third of the waste generated in the E.U., while the legislation requires a proportion of at least 70% preparation for reuse and recycle, excluding backfilling. To this end, the E.U. Commission has provided the Level(s) methodology, allowing for the standardized planning and reporting of waste quantities across all levels of the construction process, from the architecture, to the demolition, from the estimation stage, to the actual measurements at the end of the operations. We applied Level(s) for the first time to the Romanian context, a developing E.U. country in which illegal dumping of contruction waste in nature and landfills, are still common practice. We performed the desk study of the buildings’ documents, followed by field studies of the sites, and finally the insertion and calculation of statistical data of the construction and demolition waste. We learned that Romania is far from the E.U. average in terms of the initial estimations of waste, with some numbers being higher, others lower, and that the price of evacuation to landfills is significantly lower in the developing country, a possible barrier to adopting the new regulations. Finally, we found that concrete is the predominant type waste, in terms of quantity as well as cost of disposal. Further directions of research are provided, such as mapping out all of the alternative facilities in the region and the calculation of the financial costs and of the CO2 footprint, for preparing and delivering waste sustainably, for a more sound and locally adapted model of waste management.Keywords: construction, waste, management, levels, EU
Procedia PDF Downloads 776191 Experimental Investigation on Correlation Between Permeability Variation and Sabkha Soil Salts Dissolution
Authors: Fahad A. Alotaibi
Abstract:
An increase in salt dissolution rate with continuous water flow is expected to lead to the progressive collapse of the soil structure. Evaluation of the relationship between soil salt dissolution and the variation of sabkha soil permeability in terms of type, rate, and quantity in order to assure construction safety in these environments. The current study investigates the relationship of soil permeability with the rate of dissolution of calcium (Ca2+), sulfate (SO4-2), chloride (CL−1), magnesium (Mg2+), sodium (Na+), and potassium (K+1) ions. Results revealed an increase in sabkha soil permeability with the rate of ions dissolution. This makes the efficiency of using a waterproofing stabilization agent in the reduction of sabkha salts dissolution the main criterion is selecting suitable stabilizing method.Keywords: sabkha, permeability, salts, dissolution
Procedia PDF Downloads 1076190 Research on the Ecological Impact Evaluation Index System of Transportation Construction Projects
Authors: Yu Chen, Xiaoguang Yang, Lin Lin
Abstract:
Traffic engineering construction is an important infrastructure for economic and social development. In the process of construction and operation, the ability to make a correct evaluation of the project's environmental impact appears to be crucial to the rational operation of existing transportation projects, the correct development of transportation engineering construction and the adoption of corresponding measures to scientifically carry out environmental protection work. Most of the existing research work on ecological and environmental impact assessment is limited to individual aspects of the environment and less to the overall evaluation of the environmental system; in terms of research conclusions, there are more qualitative analyses from the technical and policy levels, and there is a lack of quantitative research results and quantitative and operable evaluation models. In this paper, a comprehensive analysis of the ecological and environmental impacts of transportation construction projects is conducted, and factors such as the accessibility of data and the reliability of calculation results are comprehensively considered to extract indicators that can reflect the essence and characteristics. The qualitative evaluation indicators were screened using the expert review method, the qualitative indicators were measured using the fuzzy statistics method, the quantitative indicators were screened using the principal component analysis method, and the quantitative indicators were measured by both literature search and calculation. An environmental impact evaluation index system with the general objective layer, sub-objective layer and indicator layer was established, dividing the environmental impact of the transportation construction project into two periods: the construction period and the operation period. On the basis of the evaluation index system, the index weights are determined using the hierarchical analysis method, and the individual indicators to be evaluated are dimensionless, eliminating the influence of the original background and meaning of the indicators. Finally, the thesis uses the above research results, combined with the actual engineering practice, to verify the correctness and operability of the evaluation method.Keywords: transportation construction projects, ecological and environmental impact, analysis and evaluation, indicator evaluation system
Procedia PDF Downloads 1086189 Research the Causes of Defects and Injuries of Reinforced Concrete and Stone Construction
Authors: Akaki Qatamidze
Abstract:
Implementation of the project will be a step forward in terms of reliability in Georgia and the improvement of the construction and the development of construction. Completion of the project is expected to result in a complete knowledge, which is expressed in concrete and stone structures of assessing the technical condition of the processing. This method is based on a detailed examination of the structure, in order to establish the injuries and the elimination of the possibility of changing the structural scheme of the new requirements and architectural preservationists. Reinforced concrete and stone structures research project carried out in a systematic analysis of the important approach is to optimize the process of research and development of new knowledge in the neighboring areas. In addition, the problem of physical and mathematical models of rational consent, the main pillar of the physical (in-situ) data and mathematical calculation models and physical experiments are used only for the calculation model specification and verification. Reinforced concrete and stone construction defects and failures the causes of the proposed research to enhance the effectiveness of their maximum automation capabilities and expenditure of resources to reduce the recommended system analysis of the methodological concept-based approach, as modern science and technology major particularity of one, it will allow all family structures to be identified for the same work stages and procedures, which makes it possible to exclude subjectivity and addresses the problem of the optimal direction. It discussed the methodology of the project and to establish a major step forward in the construction trades and practical assistance to engineers, supervisors, and technical experts in the construction of the settlement of the problem.Keywords: building, reinforced concrete, expertise, stone structures
Procedia PDF Downloads 3366188 Nursing Professionals’ Perception of the Work Environment, Safety Climate and Job Satisfaction in the Brazilian Hospitals during the COVID-19 Pandemic
Authors: Ana Claudia de Souza Costa, Beatriz de Cássia Pinheiro Goulart, Karine de Cássia Cavalari, Henrique Ceretta Oliveira, Edineis de Brito Guirardello
Abstract:
Background: During the COVID-19 pandemic, nursing represents the largest category of health professionals who were on the front line. Thus, investigating the practice environment and the job satisfaction of nursing professionals during the pandemic becomes fundamental since it reflects on the quality of care and the safety climate. The aim of this study was to evaluate and compare the nursing professionals' perception of the work environment, job satisfaction, and safety climate of the different hospitals and work shifts during the COVID-19 pandemic. Method: This is a cross-sectional survey with 130 nursing professionals from public, private and mixed hospitals in Brazil. For data collection, was used an electronic form containing the personal and occupational variables, work environment, job satisfaction, and safety climate. The data were analyzed using descriptive statistics and ANOVA or Kruskal-Wallis tests according to the data distribution. The distribution was evaluated by means of the Shapiro-Wilk test. The analysis was done in the SPSS 23 software, and it was considered a significance level of 5%. Results: The mean age of the participants was 35 years (±9.8), with a mean time of 6.4 years (±6.7) of working experience in the institution. Overall, the nursing professionals evaluated the work environment as favorable; they were dissatisfied with their job in terms of pay, promotion, benefits, contingent rewards, operating procedures and satisfied with coworkers, nature of work, supervision, and communication, and had a negative perception of the safety climate. When comparing the hospitals, it was found that they did not differ in their perception of the work environment and safety climate. However, they differed with regard to job satisfaction, demonstrating that nursing professionals from public hospitals were more dissatisfied with their work with regard to promotion when compared to professionals from private (p=0.02) and mixed hospitals (p< 0.01) and nursing professionals from mixed hospitals were more satisfied than those from private hospitals (p= 0.04) with regard to supervision. Participants working in night shifts had the worst perception of the work environment related to nurse participation in hospital affairs (p= 0.02), nursing foundations for quality care (p= 0.01), nurse manager ability, leadership and support (p= 0.02), safety climate (p< 0.01), job satisfaction related to contingent rewards (p= 0.04), nature of work (p= 0.03) and supervision (p< 0.01). Conclusion: The nursing professionals had a favorable perception of the environment and safety climate but differed among hospitals regarding job satisfaction for the promotion and supervision domains. There was also a difference between the participants regarding the work shifts, being the night shifts, those with the lowest scores, except for satisfaction with operational conditions.Keywords: health facility environment, job satisfaction, patient safety, nursing
Procedia PDF Downloads 1586187 Interactive Planning of Suburban Apartment Buildings
Authors: J. Koiso-Kanttila, A. Soikkeli, A. Aapaoja
Abstract:
Construction in Finland is focusing increasingly on renovation instead of conventional new construction, and this trend will continue to grow in the coming years and decades. Renovation of the large number of suburban residential apartment buildings built in the 1960s and 1970s poses a particular challenge. However, renovation projects are demanding for the residents of these buildings, since they usually are uninitiated in construction issues. On the other hand, renovation projects generally apply the operating models of new construction. Nevertheless, the residents of an existing residential apartment building are some of the best experts on the site. Thus, in this research project we applied a relational model in developing and testing at case sites a planning process that employs interactive planning methods. Current residents, housing company managers, the city zoning manager, the contractor’s and prefab element supplier’s representatives, professional designers and researchers all took part in the planning. The entire interactive planning process progressed phase by phase as the participants’ and designers’ concerted discussion and ideation process, so that the end result was a renovation plan desired by the residents.Keywords: apartment building renovation, interactive planning, project alliance, user-orientedness
Procedia PDF Downloads 3856186 Structural Safety Assessment of Transmission Tower with High-Low Legs
Authors: Chi-Rung Jiang, Chun-Chung Chen, Sheng-Yuan Shiao, Fang-Yao Yeh
Abstract:
Transmission lines are essential for power systems which play a significant role in a city for the development of infrastructures. Once a tower on the transmission line is damaged or becomes unstable, small-scale transmission tower damage might cause a large-scale electric power failure, and consequently, the enormous economic losses will occur. This paper assesses the structural safety and considers the impact of earthquakes and winds, presents a preliminary study of transmission tower with high-low legs by building structural analysis models of towers. The result shows that the high-low legs towers do have some structural characteristics need to be considered, such as the length of the difference of high legs and low legs should be restricted and the deployment direction of legs must be carefully planned during the design of transmission towers. The outcome of this study is beneficial to power systems authorities.Keywords: power transition tower, structural analysis, high-low legs, safety assessment
Procedia PDF Downloads 2236185 Properties of Concrete with Wood Ashes in Construction Engineering
Authors: Piotr-Robert Lazik, Lena Teichmann, Harald Garrecht
Abstract:
Many concrete technologists are looking for a solution to replace fly ashes as a component that occurs as a major component of many types of concrete. The importance of such a component is clear -it saves cement and reduces the amount of CO₂ in the atmosphere that occurs during cement production. For example, the amount of cement in ultrahigh strength concrete (UHPC) is approximately 700-800 kg/m³ in normal concrete up to 350 kg/m³. For this reason, it is easy to follow that the use of components like fly ashes or wood ashes protect the environment. The newest investigations carried out at the University of Stuttgart have clearly shown that the use of wood ashes with appropriate pre-treatment in concrete has a positive effect. German-wide, there are hundreds of tons of wood ashes, which can be used in a wide range of construction materials. The strengths of the concrete with different types of cement and with wood ashes have given the same or, in some cases, better results than those with the use of fly ashes. There are many areas in building construction, where the clays of wood ashes can be used as a by-product. This does not only require a strength test but also, for example, an examination of structural-physical parameters. Especially the heat and moisture characteristics have an important role in times of energy-efficient construction. These are therefore determined and then compared with the characteristics of the concretes with fly ashes. The University of Stuttgart has decided to investigate the buildings' physical properties of different types of concrete with wood ashes to find their application in construction. After the examination of the buildings' physical properties in combination with strength tests, it is possible to determine in which field of civil engineering, this type of concrete can be used.Keywords: fly ashes, wood ashes, structural-physical parameters, UHPC
Procedia PDF Downloads 1466184 The Muhammad Cartoon Controversy in New Zealand Newspapers
Authors: Shah Nister Kabir
Abstract:
This study examines the construction of the controversy surrounding the cartoons of the Prophet Muhammad, as it appeared in three New Zealand newspapers; the Otago Daily Times (ODT), the New Zealand Herald (NZH) and the Press. It discursively argues that these mainstream newspapers promote the Orientalist perception of a clash of civilizations between Islam and the West in their news frame, but, in most cases, the perceived clash was not apparent in editorials. This study also argues that the uniformity in news frame conflicts with editorials’ construction of the issue. Furthermore, while the construction of the issue in news frame and editorials in the Press remained similar, the other two newspapers—the ODT and NZH—both contradict their own news frame in their editorials and contradict the editorials appearing in the Press.Keywords: clash of culture, discourse, Islam, media agenda, New Zealand, orientalism, the West
Procedia PDF Downloads 1976183 Networked Radar System to Increase Safety of Urban Railroad Crossing
Authors: Sergio Saponara, Luca Fanucci, Riccardo Cassettari, Ruggero Piernicola, Marco Righetto
Abstract:
The paper presents an innovative networked radar system for detection of obstacles in a railway level crossing scenario. This Monitoring System (MS) is able to detect moving or still obstacles within the railway level crossing area automatically, avoiding the need of human presence for surveillance. The MS is also connected to the National Railway Information and Signaling System to communicate in real-time the level crossing status. The architecture is compliant with the highest Safety Integrity Level (SIL4) of the CENELEC standard. The number of radar sensors used is configurable at set-up time and depends on how large the level crossing area can be. At least two sensors are expected and up four can be used for larger areas. The whole processing chain that elaborates the output sensor signals, as well as the communication interface, is fully-digital, was designed in VHDL code and implemented onto a Xilinx Virtex 6.Keywords: radar for safe mobility, railroad crossing, railway, transport safety
Procedia PDF Downloads 4826182 Research of Applicable Ground Reinforcement Method in Double-Deck Tunnel Junction
Authors: SKhan Park, Seok Jin Lee, Jong Sun Kim, Jun Ho Lee, Bong Chan Kim
Abstract:
Because of the large economic losses caused by traffic congestion in metropolitan areas, various studies on the underground network design and construction techniques has been performed various studies in the developed countries. In Korea, it has performed a study to develop a versatile double-deck of deep tunnel model. This paper is an introduction to develop a ground reinforcement method to enable the safe tunnel construction in the weakened pillar section like as junction of tunnel. Applicable ground reinforcement method in the weakened section is proposed and it is expected to verify the method by the field application tests.Keywords: double-deck tunnel, ground reinforcement, tunnel construction, weakened pillar section
Procedia PDF Downloads 4106181 Assessment of Occupational Health and Safety Conditions of Health Care Workers in Barangay Health Centers in a Selected City in Metro Manila
Authors: Deinzel R. Uezono, Vivien Fe F. Fadrilan-Camacho, Bianca Margarita L. Medina, Antonio Domingo R. Reario, Trisha M. Salcedo, Luke Wesley P. Borromeo
Abstract:
The environment of health care workers is considered one of the most hazardous settings due to the nature of their work. In developing countries especially, the Philippines, this continues to be overlooked in terms of programs and services on occupational health and safety (OHS). One possible reason for this is the existing information gap on OHS which limits data comparability and impairs effective monitoring and assessment of interventions. To address this gap, there is a need to determine the current conditions of Filipino health care workers in their workplace. This descriptive cross-sectional study assessed the occupational health and safety conditions of health care workers in barangay health centers in a selected city in Metro Manila, Philippines by: (1) determining the hazards present in the workplace; (2) determining the most common self-reported medical problems; and (3) describing the elements of an OHS system based on the six building blocks of health system. Assessment was done through walkthrough survey, self-administered questionnaire, and key informant interview. Data analysis was done using Epi Info 7 and NVivo 11. Results revealed different health hazards present in the workplace particularly biological hazards (exposure to sick patients and infectious specimens), physical hazards (inadequate space and/or lighting), chemical hazards (toxic reagents and flammable chemicals), and ergonomic hazards (activities requiring repetitive motion and awkward posture). Additionally, safety hazards (improper capping of syringe and lack of fire safety provisions) were also observed. Meanwhile, the most commonly self-reported chronic diseases among health care workers (N=336) were hypertension (20.24%, n=68) and diabetes (12.50%, n=42). Top commonly self-reported symptoms were colds (66.07%, n=222), coughs (63.10%, n=212), headache (55.65%, n=187), and muscle pain (50.60%, n=170) while other diseases were influenza (16.96%, n=57) and UTI (15.48%, n=52). In terms of the elements of the OHS system, a general policy on occupational health and safety was found to be lacking and in effect, an absence of health and safety committee overseeing the implementing and monitoring of the policy. No separate budget specific for OHS programs and services was also found to be a limitation. As a result, no OHS personnel and trainings/seminar were identified. No established information system for OHS was in place. In conclusion, health and safety hazards were observed to be present across the barangay health centers visited in a selected city in Metro Manila. Medical conditions identified as most commonly self-reported were hypertension and diabetes for chronic diseases; colds, coughs, headache, and muscle pain for medical symptoms; and influenza and UTI for other diseases. As for the elements of the occupational health and safety system, there was a lack in the general components of the six building blocks of the health system.Keywords: health hazards, occupational health and safety, occupational health and safety system, safety hazards
Procedia PDF Downloads 187