Search results for: construction site groundwater
5693 Final Account Closing in Construction Project: The Use of Supply Chain Management to Reduce the Delays
Authors: Zarabizan Zakaria, Syuhaida Ismail, Aminah Md. Yusof
Abstract:
Project management process starts from the planning stage up to the stage of completion (handover of buildings, preparation of the final accounts and the closing balance). This process is not easy to implement efficiently and effectively. The issue of delays in construction is a major problem for construction projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This is due to several factors, such as environments of construction technology, sophisticated design and customer demands that are constantly changing and influencing, either directly or indirectly, the practice of management. Among the identified influences are physical environment, social environment, information environment, political and moral atmosphere. Therefore, this paper is emerged to determine the problem and issues in the final account closing in construction projects, and it establishes the need to embrace Supply Chain Management (SCM) and then elucidates the need and strategies for the development of a delay reduction framework. At the same time, this paper provides effective measures to avoid or at least reduce the delay to the optimum level. Allowing problems in the closure declaration to occur without proper monitoring and control can leave negative impact on the cost and time of delivery to the end user. Besides, it can also affect the reputation or image of the agency/department that manages the implementation of a contract and consequently may reduce customer's trust towards the agencies/departments. It is anticipated that the findings reported in this paper could address root delay contributors and apply SCM tools for their mitigation for the better development of construction project.Keywords: final account closing, construction project, construction delay, supply chain management
Procedia PDF Downloads 3665692 Classification of Opaque Exterior Walls of Buildings from a Sustainable Point of View
Authors: Michelle Sánchez de León Brajkovich, Nuria Martí Audi
Abstract:
The envelope is one of the most important elements when one analyzes the operation of the building in terms of sustainability. Taking this into consideration, this research focuses on setting a classification system of the envelopes opaque systems, crossing the knowledge and parameters of construction systems with requirements in terms of sustainability that they may have, to have a better understanding of how these systems work with respect to their sustainable contribution to the building. Therefore, this paper evaluates the importance of the envelope design on the building sustainability. It analyses the parameters that make the construction systems behave differently in terms of sustainability. At the same time it explains the classification process generated from this analysis that results in a classification where all opaque vertical envelope construction systems enter.Keywords: sustainable, exterior walls, envelope, facades, construction systems, energy efficiency
Procedia PDF Downloads 5695691 Numerical Analysis of Rainfall-Induced Roadside Slope Failures and Their Stabilizing Solution
Authors: Muhammad Suradi, Sugiarto, Abdullah Latip
Abstract:
Many roadside slope failures occur during the rainy season, particularly in the period of extreme rainfall along Connecting National Road of Salubatu-Mambi, West Sulawesi, Indonesia. These occurrences cause traffic obstacles and endanger people along and around the road. Research collaboration between P2JN (National Road Construction Board) West Sulawesi Province, who authorize to supervise the road condition, and Ujung Pandang State Polytechnic (Applied University) was established to cope with the landslide problem. This research aims to determine factors triggering roadside slope failures and their optimum stabilizing solution. To achieve this objective, site observation and soil investigation were carried out to obtain parameters for analyses of rainfall-induced slope instability and reinforcement design using the SV Flux and SV Slope software. The result of this analysis will be taken into account for the next analysis to get an optimum design of the slope reinforcement. The result indicates some factors such as steep slopes, sandy soils, and unvegetated slope surface mainly contribute to the slope failures during intense rainfall. With respect to the contributing factors as well as construction material and technology, cantilever/butressing retaining wall becomes the optimum solution for the roadside slope reinforcement.Keywords: roadside slope, failure, rainfall, slope reinforcement, optimum solution
Procedia PDF Downloads 1055690 Scope of Implmenting Building Information Modeling in (Aec) Industry Firms in India
Authors: Padmini Raman
Abstract:
The architecture, engineering, and construction (AEC) industry is facing enormous technological and institutional changes and challenges including the information technology and appropriate application of sustainable practices. The engineer and architect must be able to handle with a rapid pace of technological change. BIM is a unique process of producing and managing a building by exploring a digital module before the actual project is constructed and later during its construction, facility operation and maintenance. BIM has been Adopted by construction contractors and architects in the western country mostly in US and UK to improve the planning and management of construction projects. In India, BIM is a basic stage of adoption only, several issues about data acquisition and management comes during the design formation and planning of a construction project due to the complexity, ambiguity, and fragmented nature of the Indian construction industry. This paper tells about the view a strategy for India’s AEC firms to successfully implement BIM in their current working processes. By surveying and collecting data about problems faced by these architectural firms, it will be analysed how to avoid those situations from rising and, thus, introducing BIM Capabilities in such firms in the most effective way. while this application is widely accepted throughout the industry in many countries for managing project information for cost control and facilities management.Keywords: AEC industry, building information module, Indian industry, new technology, BIM implementation in India
Procedia PDF Downloads 4455689 Seismic Soil-Pile Interaction Considering Nonlinear Soil Column Behavior in Saturated and Dry Soil Conditions
Authors: Mohammad Moeini, Mehrdad Ghyabi, Kiarash Mohtasham Dolatshahi
Abstract:
This paper investigates seismic soil-pile interaction using the Beam on Nonlinear Winkler Foundation (BNWF) approach. Three soil types are considered to cover all the possible responses, as well as nonlinear site response analysis using finite element method in OpenSees platform. Excitations at each elevation that are output of the site response analysis are used as the input excitation to the soil pile system implementing multi-support excitation method. Spectral intensities of acceleration show that the extent of the response in sand is more severe than that of clay, in addition, increasing the PGA of ground strong motion will affect the sandy soil more, in comparison with clayey medium, which is an indicator of the sensitivity of soil-pile systems in sandy soil.Keywords: BNWF method, multi-support excitation, nonlinear site response analysis, seismic soil-pile interaction
Procedia PDF Downloads 3945688 Challenges of Design, Cost and Surveying in Dams
Authors: Ali Mohammadi
Abstract:
The construction of Embankment dams is considered one of the most challenging construction projects, for which several main reasons can be mentioned. Excavation and embankment must be done in a large area, and its design is based on preliminary studies, but at the time of construction, it is possible that excavation does not match with the stability or slope of the rock, or the design is incomplete, and corrections should be made in order to be able to carry out excavation and embankment. Also, the progress of the work depends on the main factors, the lack of each of which can slow down the construction of the dams, and lead to an increase in costs, and control of excavations and embankments and calculations of their volumes are done in this collection. In the following, we will investigate three Embankment dams in Iran that faced these challenges and how they overcame these challenges. KHODA AFARIN on the Aras River between the two countries of IRAN and AZARBAIJAN, SIAH BISHEH PUMPED STORAGE on CHALUS River and GOTVAND on KARUN River are among the most important dams built in Iran.Keywords: section, data transfer, tunnel, free station
Procedia PDF Downloads 735687 Risk Management in Construction Projects
Authors: Mustafa Dogru, Ruveyda Komurlu
Abstract:
Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.Keywords: construction projects, construction management, project management, risk management
Procedia PDF Downloads 3195686 Variation in Water Utilization of Typical Desert Shrubs in a Desert-Oasis Ecotone
Authors: Hai Zhou, Wenzhi Zhao
Abstract:
Water is one of the most important factors limiting plant growth and development in desert ecosystems. In order to understand how desert shrubs cope with variation in water sources over time, it is important to understand plant–water relations in desert-oasis ecotone. We selected the typical desert shrubs: Nitraria sibirica, Calligonum mongolicum and Haloxylon ammodendron of 5-, 10-, 20- and 40-year old as the research species, to study the seasonal variation of plant water sources and response to precipitation in the desert-oasis ecotone of Linze, Northwestern China. We examined stable isotopic ratios of oxygen (δ18O) in stem water of desert shrubs as well as in precipitation, groundwater, and soil water in different soil layers and seasons to determine water sources for the shrubs. We found that the N. sibirica and H. ammodendron of 5-, 10-year old showed significant seasonal variation characteristics of δ18O value of stem water and water sources. However, the C. mongolicum and 20- and 40-year H. ammodendron main water sources were from deep soil water and groundwater, and less response to precipitation pulse. After 22.4 mm precipitation, the contribution of shallow soil water (0-50cm) to the use of N. sibirica increased from 6.7% to 36.5%; the C. mongolicum rarely use precipitation that were about 58.29% and 23.51%, absorbed from the deep soil water and groundwater; the contribution of precipitation to use of H. ammodendron had significantly differences among the four ages. The H. ammodendron of 5- and 10-year old about 86.3% and 42.5% water sources absorbed from the shallow soil water after precipitation. However, the contribution to 20- and 40-year old plant was less than 15%. So, the precipitation was one of the main water sources for desert shrubs, but the species showed different water utilization. We conclude that the main water source of the N. sibirica and H. ammodendron of 5-, 10-year was soil water recharged by precipitation, but the deeply rooted H. ammodendron of 20‐ and 40‐year‐old and the C. mongolicum have the ability to exploit a deep and reliable water source.Keywords: water use pattern, water resource, stable isotope, seasonal change, precipitation pulse
Procedia PDF Downloads 4295685 Optimisation Model for Maximising Social Sustainability in Construction Scheduling
Authors: Laura Florez
Abstract:
The construction industry is labour intensive, and the behaviour and management of workers have a direct impact on the performance of construction projects. One of the issues it currently faces is how to recruit and maintain its workers. Construction is known as an industry where workers face the problem of short employment durations, frequent layoffs, and periods of unemployment between jobs. These challenges not only creates pressures on the workers but also project managers have to constantly train new workers, face skills shortage, and uncertainty on the quality of the workers it will attract. To consider worker’s needs and project managers expectations, one practice that can be implemented is to schedule construction projects to maintain a stable workforce. This paper proposes a mixed integer programming (MIP) model to schedule projects with the objective of maximising social sustainability of construction projects, that is, maximise labour stability. Aside from the social objective, the model accounts for equipment and financial resources required by the projects during the construction phase. To illustrate how the solution strategy works, a construction programme comprised of ten projects is considered. The projects are scheduled to maximise labour stability while simultaneously minimising time and minimising cost. The tradeoff between the values in terms of time, cost, and labour stability allows project managers to consider their preferences and identify which solution best suits their needs. Additionally, the model determines the optimal starting times for each of the projects, working patterns for the workers, and labour costs. This model shows that construction projects can be scheduled to not only benefit the project manager, but also benefit current workers and help attract new workers to the industry. Due to its practicality, it can be a valuable tool to support decision making and assist construction stakeholders when developing schedules that include social sustainability factors.Keywords: labour stability, mixed-integer programming (MIP), scheduling, workforce management
Procedia PDF Downloads 2535684 Exploring the Role of Building Information Modeling for Delivering Successful Construction Projects
Authors: Muhammad Abu Bakar Tariq
Abstract:
Construction industry plays a crucial role in the progress of societies and economies. Furthermore, construction projects have social as well as economic implications, thus, their success/failure have wider impacts. However, the industry is lagging behind in terms of efficiency and productivity. Building Information Modeling (BIM) is recognized as a revolutionary development in Architecture, Engineering and Construction (AEC) industry. There are numerous interest groups around the world providing definitions of BIM, proponents describing its advantages and opponents identifying challenges/barriers regarding adoption of BIM. This research is aimed at to determine what actually BIM is, along with its potential role in delivering successful construction projects. The methodology is critical analysis of secondary data sources i.e. information present in public domain, which include peer reviewed journal articles, industry and government reports, conference papers, books, case studies etc. It is discovered that clash detection and visualization are two major advantages of BIM. Clash detection option identifies clashes among structural, architectural and MEP designs before construction actually commences, which subsequently saves time as well as cost and ensures quality during execution phase of a project. Visualization is a powerful tool that facilitates in rapid decision-making in addition to communication and coordination among stakeholders throughout project’s life cycle. By eliminating inconsistencies that consume time besides cost during actual construction, improving collaboration among stakeholders throughout project’s life cycle, BIM can play a positive role to achieve efficiency and productivity that consequently deliver successful construction projects.Keywords: building information modeling, clash detection, construction project success, visualization
Procedia PDF Downloads 2595683 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria
Authors: Nuruddeen Usman, Mohammad Sani
Abstract:
The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.Keywords: construction size, contracting system, direct labour, effect
Procedia PDF Downloads 4575682 Maintenance Work Order Management Tool (Desktop & Mobile Solution)
Authors: Haitham Al Rawahi
Abstract:
Oman Electricity Transmission Company (OETC) has implemented Computerized Maintenance Management System (CMMS), which is based on Oracle enterprise asset management model e-AM. This was implemented with cooperation of Nama Shared Services (NSS). CMMS is mainly used to create maintenance work orders with a preconfigured workflow of defined maintenance schedules/plans, required resources, and materials, obtaining shutdown approvals, completing maintenance activities, and closing the work orders. Furthermore, CMMS is also configured with asset failure classifications, asset hierarchy, asset maintenance activities, integration with spare inventories, etc. Since the year 2017, site engineer is working on CMMS by filling-in manually all related maintenance and inspection records on paper forms and then scanning and attaching it in CMMS for further analysis. Site engineer will finalize all paper works at site and then goes back to office to scan and attach it to work order in CMMS. This creates sub tasks for site engineer and makes it very difficult and lengthy process. Also, there is a significant risk for missing or deleted important fields on the paper due to usage of pen to fill the paper. In addition to that, site engineer may take time and days working outside of the office. therefore, OETC has decided to digitize these inspection and maintenance forms in one platform in CMMS, and it can be opened with both functionalities online and offline. The ArcGIS product formats or web-enabled solutions which has ability to access from mobile and desktop devices via arc map modules will be used too. The purpose of interlinking is to setup for maintenance and inspection forms to work orders in e-AM, which the site engineer has daily interactions with. This ArcGIS environment or tool is designed to link with e-AM, so when site engineer opens this application from the site and a window will take him through same ArcGIS. This window opens the maintenance forms and shows the required fields to fill-in and save the work through his mobile application. After saving his work with the availability of network (Off/In) line, notification will trigger to his line manager to review and take further actions (approve/reject/request more information). In this function, the user can see the assigned work orders to his departments as well as chart of all work orders with status. The approver has ability to see the statistics of all work.Keywords: e-AM, GIS, CMMS, integration
Procedia PDF Downloads 975681 Linguistic Symbols Principle Construction in Cultural Creative Product Design
Authors: Pei-Jun Xue, Ming-Yu Hsiao
Abstract:
Language is the emblem of a culture, representing the extension of cultural life. In addition, it is also an important tool for communication and message transmission. It carries not only information but also covers the self-conscious of the information constructor as well as the situational experiences of users from different backgrounds. Moreover, design can be regarded as a language, a dynamic process of coding and decoding. With the designers’ experiences in everyday life, they bring them into the products’ experiences. Considered from the aspects of atmosphere and the five senses, a designer should consider and reconsider how to communicate the messages effectively to suit the users’ needs. In the process of language learning, we should understand the construction behind it and the rules of the compositions of language codes. Regarding the understanding of the design of works or the form of product construction, it is necessary for us to understand the coding system during the process of product construction. The form (signifiers) and meanings (signified) of Chinese characters are closely related. At the same time, it is also a process of simplifying the complicated to the simple. This study discusses the chinese characters that used in the cultural symbols construction, and analysis of existing products by Peirce's semiotic triangles. Through people's cognition of Chinese characters and constitute method, help to understand the way of construction product symbol.Keywords: cultural-creative product design, cultural product, cultural symbols, linguistic symbols
Procedia PDF Downloads 4495680 Social Construction of Gender: Comparison of Gender Stereotypes among Bureaucrats and Non- Bureaucrats
Authors: Arshad Ali
Abstract:
This study aims to highlight the comparative patterns of social construction of gender among bureaucrats and non-bureaucrats. For the purpose of this study purposive sample of 8 respondents, including both male and female bureaucrats and non-bureaucrats, was collected from Gujranwala and Lahore. The measures for collecting data included an indigenous demographic information sheet and interview protocol related to gender roles, social construction of gender and managerial performance. The collected data was analyzed through the Nvivo version 11 and analysis reveals that there are diverse perceptions regarding male and female stereotyping among bureaucrats and non-bureaucrats, as different kinds of social environments lead to the modification of stereotypes. The research contributes to gender studies, specifically in the context of Pakistani society. There are very few studies available, and empirical data about Gender construction is scanty, so the study provides an impetus for future research. It is suggested that future research explore the phenomenon at a larger scale, including more respondents and another dimension, by keeping in view the socio-economic factors and policies of the government regarding the elimination of gender discrimination in Pakistan.Keywords: social construction, gender, bureaucrats, gender perception
Procedia PDF Downloads 755679 Improvement of Contractor’s Competitiveness through Sustainable Construction Practices in UAE
Authors: Sareh Rajabi, Taha Anjamrooz, Salwa Bheiry
Abstract:
Sustainability of construction projects is an important issue to be addressed since the sector will continue to be developed in the coming years, especially in developing countries. Thus, it is significant to discover approaches and solutions for improving sustainability. Currently, the construction industry is the largest consumer of natural resources. This is the same in other countries in the Gulf region, and the United Arab Emirates (UAE) has limited natural resources such as water, electricity, etc. Recently, the UAE has taken several actions in order to implement sustainable initiatives within its construction industry. Within the industry, the contractors’ role is significant in promoting sustainable development by taking the responsibility to minimize their negative impacts on the environment and society, and maximize their economic distribution. In this research, sustainability will be studied as an important key to bring competitive advantages to contracting organizations. The contractors should understand the need to improve their sustainable performance in order to expand their business competitiveness. Competitiveness at the construction project level refers to a contractor’s ability to compete for a project. There is less focus on how to improve contractors’ competitiveness by implementing sustainable construction practices. Based on an inclusive literature review on the relationship between sustainability performance and business competitiveness, this research will conduct a study of sustainable practice in the construction industry and the relationship between sustainability performance and business competitiveness in order to develop a framework for evaluating how contractors can improve their competitiveness in terms of more efficient processes, enhancements in productivity, and lower costs of compliance in order to reduce the initial project cost and obtain market opportunities in the UAE. The research findings will provide a framework that can be a useful guideline for contractors to develop their sustainability policy, strategy and practice for meeting the increased requirements for sustainable development in construction.Keywords: sustainable construction practice, sustainability, competitiveness, construction industry, contractors
Procedia PDF Downloads 1205678 A Comparative Analysis of Thermal Performance of Building Envelope Types over Time
Authors: Aram Yeretzian, Yaser Abunnasr, Zahraa Makki, Betina Abi Habib
Abstract:
Developments in architectural building typologies that are informed by prevalent construction techniques and socio-cultural practices generate different adaptations in the building envelope. While different building envelope types exhibit different climate responsive passive strategies, the individual and comparative thermal performance analysis resulting from these technologies is yet to be understood. This research aims to develop this analysis by selecting three building envelope types from three distinct building traditions by measuring the heat transmission in the city of Beirut. The three typical residential buildings are selected from the 1920s, 1940s, and 1990s within the same street to ensure similar climatic and urban conditions. Climatic data loggers are installed inside and outside of the three locations to measure indoor and outdoor temperatures, relative humidity, and heat flow. The analysis of the thermal measurements is complemented by site surveys on window opening, lighting, and occupancy in the three selected locations and research on building technology from the three periods. Apart from defining the U-value of the building envelopes, the collected data will help evaluate the indoor environments with respect to the thermal comfort zone. This research, thus, validates and contextualizes the role of building technologies in relation to climate responsive design.Keywords: architecture, wall construction, envelope performance, thermal comfort
Procedia PDF Downloads 2345677 Empirical Research on Preference for Conflict Resolution Styles of Owners and Contractors in China
Authors: Junqi Zhao, Yongqiang Chen
Abstract:
The preference for different conflict resolution styles are influenced by cultural background and power distance of two parties involving in conflict. This research put forward 7 hypotheses and tested the preference differences of the five conflict resolution styles between Chinese owner and contractor as well as the preference differences concerning the same style between two parties. The research sample includes 202 practitioners from construction enterprises in mainland China. Research result found that theories concerning conflict resolution styles could be applied in the Chinese construction industry. Some results of this research were not in line with former research, and this research also gave explanation to the differences from the characteristics of construction projects. Based on the findings, certain suggestions were made to serve as a guidance for managers to choose appropriate conflict resolution styles for a better handling of conflict.Keywords: Chinese owner and contractor, conflict, construction project, conflict resolution styles
Procedia PDF Downloads 5315676 Sustainable Engineering: Synergy of BIM and Environmental Assessment Tools in Hong Kong Construction Industry
Authors: Kwok Tak Kit
Abstract:
The construction industry plays an important role in environmental and carbon emissions as it consumes a huge amount of natural resources and energy. Sustainable engineering involves the process of planning, design, procurement, construction and delivery in which the whole building and construction process resulting from building and construction can be effectively and sustainability managed to achieve the use of natural resources. Implementation of sustainable technology development and innovation, adoption of the advanced construction process and facilitate the facilities management to implement the energy and waste control more accurately and effectively. Study and research in the relationship of BIM and environment assessment tools lack a clear discussion. In this paper, we will focus on the synergy of BIM technology and sustainable engineering in the AEC industry and outline the key factors which enhance the use of advanced innovation, technology and method and define the role of stakeholders to achieve zero-carbon emission toward the Paris Agreement to limit global warming to well below 2ᵒC above pre-industrial levels. A case study of the adoption of Building Information Modeling (BIM) and environmental assessment tools in Hong Kong will be discussed in this paper.Keywords: sustainability, sustainable engineering, BIM, LEED
Procedia PDF Downloads 1505675 Carbon Footprint of Road Project for Sustainable Development: Lessons Learnt from Traffic Management of a Developing Urban Centre
Authors: Sajjad Shukur Ullah, Syed Shujaa Safdar Gardezi
Abstract:
Road infrastructure plays a vital role in the economic activities of any economy. Besides derived benefits from these facilities, the utilization of extensive energy resources, fuels, and materials results in a negative impact on the environment in terms of carbon footprint; carbon footprint is the overall amount of greenhouse gas (GHG) generated from any action. However, this aspect of environmental impact from road structure is not seriously considered during such developments, thus undermining a critical factor of sustainable development, which usually remains unaddressed, especially in developing countries. The current work investigates the carbon footprint impact of a small road project (0.8 km, dual carriageway) initiated for traffic management in an urban centre. Life cycle assessment (LCA) with boundary conditions of cradle to the site has been adopted. The only construction phase of the life cycle has been assessed at this stage. An impact of 10 ktons-CO2 (6260 ton-CO2/km) has been assessed. The rigid pavement dominated the contributions as compared to a flexible component. Among the structural elements, the underpass works shared the major portion. Among the materials, the concrete and steel utilized for various structural elements resulted in more than 90% of the impact. The earth-moving equipment was dominant in operational carbon. The results have highlighted that road infrastructure projects pose serious threats to the environment during their construction and which need to be considered during the approval stages. This work provides a guideline for supporting sustainable development that could only be ensured when such endeavours are properly assessed by industry professionals and decide various alternative environmental conscious solutions for the future.Keywords: construction waste management, kiloton, life cycle assessment, rigid pavement
Procedia PDF Downloads 995674 Barriers to the Use of Factoring Accounts Receivables: Ghanaian Contractor’s Perception
Authors: E. Kissi, V. K. Acheamfour, J. J. Gyimah, T. Adjei-Kumi
Abstract:
Factoring accounts receivable is widely accepted as an alternative financing source and utilized in almost every industry that sells business-to-business or business-to-government. However, its patronage in the construction industry is very limited as some barriers hinder its application in the construction industry. This study aims at assessing the barriers to the use of factoring accounts receivables in the Ghanaian construction industry. The study adopted the sequential exploratory research method where structured and unstructured questionnaires were conveniently distributed to D1K1 and D2K2 construction firms in Ghana. Using the one-sample t-test and Kendall’s Coefficient of concordance data was analyzed. The most severe challenge concluded is the high cost of factoring patronage. Other critical challenges identified were low knowledge on factoring processes, inadequate access to information on factoring, and high risks involved in factoring. Hence, it is recommended that contractors should be made aware of the prospects of factoring of accounts receivables in the construction industry. This study serves as basis for further rigorous research into factoring of accounts receivables in the industry.Keywords: barriers, contractors, factoring accounts receivables, Ghanaian, perception
Procedia PDF Downloads 1325673 The Impact of Structural Empowerment on Risk Management Practices: A Case Study of Saudi Arabia Construction Small and Medium-Sized Enterprises
Authors: S. Alyami, S. Mohammad
Abstract:
These Risk management practices have a significant impact on construction SMEs. The effective utilisation of these practices depends on culture change in order to optimise decision making for critical activities within construction projects. Thus, successful implementation of empowerment strategies would enhance operational employees to participate in effective decision making. However, there remain many barriers to individuals and organisations within empowerment strategies that require empirical investigation before the industry can benefit from their implementation. Gaps in understanding the relationship between employee empowerment and risk management practices still exist. This research paper aims to examine the impact of the structural empowerment on risk management practices in construction SMEs. The questionnaire has been distributed to participants (162 employees) that involve projects and civil engineers within a case study from Saudi construction SMEs. Partial least squares based structural equation modeling (PLS-SEM) was utilised to perform analysis. The results reveal a positive relationship between empowerment and risk management practices. The study shows how structural empowerment contributes to operational employees in risk management practices through involving activities such as decision making, self-efficiency, and autonomy. The findings of this study will contribute to close the current gaps in the construction SMEs context.Keywords: construction SMEs, culture, decision making, empowerment, risk management
Procedia PDF Downloads 1195672 Treatment of Dredged Marine Sediments for Their Reuse in Road Construction
Authors: F. Ben Abdelghani, W. Maherezi
Abstract:
Dredging operations generate, each year, a great quantity of marine sediments. These raw materials can not be used in road construction without a specific treatment process. Sediments suitability tests has shown that most of studied sediments are not suitable to be used in road construction. In order to improve their compacity and their mechanical performance, addition of a granular material is recommended. The use of a dredged sand, to improve the granular mixture containing sediments, allows a better management of the two types of dredge materials (sand and sediment). In this study, a new road material containing dredged marine sediments and dredged sand is formulated and treated by adding various binders. Mechanical performance investigation of different mixtures by measuring Proctor-IPI values and simple compressive strengths is realized.Keywords: dredged sediments, suitability tests, road construction, hydraulic binder, mechanical performance
Procedia PDF Downloads 3625671 Sustainability in Retaining Wall Construction with Geosynthetics
Authors: Sateesh Kumar Pisini, Swetha Priya Darshini, Sanjay Kumar Shukla
Abstract:
This paper seeks to present a research study on sustainability in construction of retaining wall using geosynthetics. Sustainable construction is a way for the building and infrastructure industry to move towards achieving sustainable development, taking into account environmental, socioeconomic and cultural issues. Geotechnical engineering, being very resource intensive, warrants an environmental sustainability study, but a quantitative framework for assessing the sustainability of geotechnical practices, particularly at the planning and design stages, does not exist. In geotechnical projects, major economic issues to be addressed are in the design and construction of stable slopes and retaining structures within space constraints. In this paper, quantitative indicators for assessing the environmental sustainability of retaining wall with geosynthetics are compared with conventional concrete retaining wall through life cycle assessment (LCA). Geosynthetics can make a real difference in sustainable construction techniques and contribute to development in developing countries in particular. Their imaginative application can result in considerable cost savings over the use of conventional designs and materials. The acceptance of geosynthetics in reinforced retaining wall construction has been triggered by a number of factors, including aesthetics, reliability, simple construction techniques, good seismic performance, and the ability to tolerate large deformations without structural distress. Reinforced retaining wall with geosynthetics is the best cost-effective and eco-friendly solution as compared with traditional concrete retaining wall construction. This paper presents an analysis of the theme of sustainability applied to the design and construction of traditional concrete retaining wall and presenting a cost-effective and environmental solution using geosynthetics.Keywords: sustainability, retaining wall, geosynthetics, life cycle assessment
Procedia PDF Downloads 20605670 Affordable and Sustainable Housing Construction: Case Studies
Authors: Tony Rizk
Abstract:
Recent material advances and cost efficiencies are transforming the housing industry away from traditional lumber and gypsum material to alternate fiberboard material that is workable and resistant to fire, mold, and pest infestation. The use of these materials may add to the initial cost of construction. However, the life cycle (cradle to grave) cost of houses using these construction materials and methods are lower than the life cycle costs using traditional housing construction materials and methods. This paper will present four (4) case studies of sustainable house projects. Each project was designed and constructed using earthen-based, sustainable fiberboard material that is resistant to fire, mold, and infestation and fabricated at a very low material calorific value. These house projects have a living space ranging from 625 sq. ft. for an accessory dwelling unit and up to 3,200 sq. ft. 1-story and 2-story homes. For each case study, we will present the house engineering design and construction method, the initial construction costs, a summary of the life cycle costs, and a comparison to the life cycle cost of traditional housing available in the literature.Keywords: residential housing, sustainable housing, life cycle cost, fire resistance, mold, infestation resistance
Procedia PDF Downloads 1275669 The Fishery and Electricity Symbiosis Environment and Social Inspection in Taiwan: The Kaohsiung City Example
Authors: Bing-Shun Huang, Hung-Ju Chiu, Wen-Kai Hsieh, Hsiu-Chuan Lin, Ming-Lung Hung
Abstract:
Taiwan's solar photovoltaic target in 2025 is 20 GW, of which the fish-electricity symbiosis target is 4 GW. In the future, many solar photovoltaic installations may cause local environmental or social impacts. Therefore, the Taiwan government inspects the fish-electricity symbiosis to reduce the impact of solar photovoltaics on the local environment or society. This stuy takes the symbiosis of fishery and electricity in Kaohsiung City as an example to explore Taiwan's environmental and social inspection practices. It mainly analyzes the two aspects of environmental ecology and social economy. The results show that the environmental inspection is mainly through site surveys, ecological information mapping, on-site interviews, and public consultation meetings. Social inspection mainly includes document analysis, on-site interviews, site surveys, expert discussions, and public consultations to identify possible local problems. Although the government had recognized the local issues, the future status may also change. It is recommended that future photoelectric companies should reconfirm the current situation of development sites when applying for the installation and propose countermeasures to solve the problem.Keywords: taiwan, fish-electricity symbiosis, environment, society, inspection
Procedia PDF Downloads 2055668 Building Information Modeling Acting as Protagonist and Link between the Virtual Environment and the Real-World for Efficiency in Building Production
Authors: Cristiane R. Magalhaes
Abstract:
Advances in Information and Communication Technologies (ICT) have led to changes in different sectors particularly in architecture, engineering, construction, and operation (AECO) industry. In this context, the advent of BIM (Building Information Modeling) has brought a number of opportunities in the field of the digital architectural design process bringing integrated design concepts that impact on the development, elaboration, coordination, and management of ventures. The project scope has begun to contemplate, from its original stage, the third dimension, by means of virtual environments (VEs), composed of models containing different specialties, substituting the two-dimensional products. The possibility to simulate the construction process of a venture in a VE starts at the beginning of the design process offering, through new technologies, many possibilities beyond geometrical digital modeling. This is a significant change and relates not only to form, but also to how information is appropriated in architectural and engineering models and exchanged among professionals. In order to achieve the main objective of this work, the Design Science Research Method will be adopted to elaborate an artifact containing strategies for the application and use of ICTs from BIM flows, with pre-construction cut-off to the execution of the building. This article intends to discuss and investigate how BIM can be extended to the site acting as a protagonist and link between the Virtual Environments and the Real-World, as well as its contribution to the integration of the value chain and the consequent increase of efficiency in the production of the building. The virtualization of the design process has reached high levels of development through the use of BIM. Therefore it is essential that the lessons learned with the virtual models be transposed to the actual building production increasing precision and efficiency. Thus, this paper discusses how the Fourth Industrial Revolution has impacted on property developments and how BIM could be the propellant acting as the main fuel and link between the virtual environment and the real production for the structuring of flows, information management and efficiency in this process. The results obtained are partial and not definite up to the date of this publication. This research is part of a doctoral thesis development, which focuses on the discussion of the impact of digital transformation in the construction of residential buildings in Brazil.Keywords: building information modeling, building production, digital transformation, ICT
Procedia PDF Downloads 1225667 Area Exclosure as a Government Strategy to Restore Woody Plant Species Diversity: Case Study in Southern Ethiopia
Authors: Tsegaw Abebe, Temesgen Abebe
Abstract:
Land degradation is one of a serious environmental challenge in Ethiopia and is one of the major underlying causes for declining agricultural productivity. The Ethiopia government realized the significance of environmental restoration specifically on deforested and degraded land after the 1973 and 1984/85 major famines that struck the country. Among the various conservation strategies, the establishment of area exclosures have been regarded as an effective response to halt and reverse the problems of land degradation. There are limited studies in Ethiopia dealing how the conversion of free grazing lands and degraded lands by closures increase biomass accumulation. However, these studies are not sufficient to conclude about the strength of area closures to restore degraded vegetations at the diverse agro-ecological condition. The overall objective of this study was, therefore, to assess and evaluate the usefulness of area closure technique in enhancing rehabilitation of degraded ecosystem and thereby increase the natural capital in the study site (southern Ethiopia). Woody plant species were collected from area exclosure for eight year and adjacent degraded land with similar landscape positions using systematic sampling plot design technique. Woody species diversity was determined by Shannon diversity. Comparative assessment result of woody plant species analysis showed that the density of woody species in the exclosure and degraded site were 778 and 222 individuals per hectare, respectively. A total of 16 woody species, representing 12 families were recorded in the study site. Out of the 12 families, all were recorded in the exclosure while 5 were recorded in the degraded site. Out of the 16 species, 15 were recorded in the exclosure while six were in the degraded site. A total of 10 species were recorded in the exclosure, which were absent in the degraded site. Similarly, one species was recorded in the degraded site which was not present in the exclosure. The results showed that protecting of degraded site from human and animal disturbances promotes woody plant species regenerations and productivity Apart from increasing woody plant species, the local communities have benefited from the exclosure in the form of both products (grass harvesting) and services (ecological). Due to this reason the local communities have positive attitudes and contribute a lot for the success of enclosures in the study site. The present study clearly showed that area closure interventions should be oriented towards managing and improving the productivity of the degraded land, in such a way that both the need for conservation of biodiversity and environmental sustainability, and the demands of the local people for biomass resources can be achieved.Keywords: degraded land, exclosure, land restoration, woody vegetation
Procedia PDF Downloads 4275666 Assessing Project Performance through Work Sampling and Earned Value Analysis
Authors: Shobha Ramalingam
Abstract:
The majority of the infrastructure projects are affected by time overrun, resulting in project delays and subsequently cost overruns. Time overrun may vary from a few months to as high as five or more years, placing the project viability at risk. One of the probable reasons noted in the literature for this outcome in projects is due to poor productivity. Researchers contend that productivity in construction has only marginally increased over the years. While studies in the literature have extensively focused on time and cost parameters in projects, there are limited studies that integrate time and cost with productivity to assess project performance. To this end, a study was conducted to understand the project delay factors concerning cost, time and productivity. A case-study approach was adopted to collect rich data from a nuclear power plant project site for two months through observation, interviews and document review. The data were analyzed using three different approaches for a comprehensive understanding. Foremost, a root-cause analysis was performed on the data using Ishikawa’s fish-bone diagram technique to identify the various factors impacting the delay concerning time. Based on it, a questionnaire was designed and circulated to concerned executives, including project engineers and contractors to determine the frequency of occurrence of the delay, which was then compiled and presented to the management for a possible solution to mitigate. Second, a productivity analysis was performed on select activities, including rebar bending and concreting through a time-motion study to analyze product performance. Third, data on cost of construction for three years allowed analyzing the cost performance using earned value management technique. All three techniques allowed to systematically and comprehensively identify the key factors that deter project performance and productivity loss in the construction of the nuclear power plant project. The findings showed that improper planning and coordination between multiple trades, concurrent operations, improper workforce and material management, fatigue due to overtime were some of the key factors that led to delays and poor productivity. The findings are expected to act as a stepping stone for further research and have implications for practitioners.Keywords: earned value analysis, time performance, project costs, project delays, construction productivity
Procedia PDF Downloads 975665 Impacts Of Salinity on Co2 Turnover in Some Gefara Soils of Libya
Authors: Fathi Elyaagubi
Abstract:
Salinization is a major threat to the productivity of agricultural land. The Gefara Plain located in the northwest of Libya; comprises about 80% of the total agricultural activity. The high water requirements for the populations and agriculture are depleting the groundwater aquifer, resulting in intrusion of seawater in the first few kilometers along the coast. Due to increasing salinity in the groundwater used for irrigation, the soils of the Gefara Plain are becoming increasingly saline. This research paper investigated the sensitivity of these soils to increased salinity using Co2 evolution as an integrating measure of soil function. Soil was collected from four sites located in the Gefara Plain, Almaya, Janzur, Gargaresh and Tajura. Soil collected from Tajura had the highest background salinity, and Janzur had the highest organic matter content. All of the soils had relatively low organic matter content, ranging between 0.49-%1.25. The cumulative rate of 14CO2 of added 14C-labelled Lolium shoots (Lolium perenne L.) to soils was decreased under effects of water containing different concentrations of NaCl at 20, 50, 70, 90, 150, and 200 mM compared to the control at any time of incubation in four sites.Keywords: soil salinity, gefara plain, organic matter, 14C-labelled lolium shoots
Procedia PDF Downloads 2215664 An Integrated Framework for Engaging Stakeholders in the Circular Economy Processes Using Building Information Modeling and Virtual Reality
Authors: Erisasadat Sahebzamani, Núria Forcada, Francisco Lendinez
Abstract:
Global climate change has become increasingly problematic over the past few decades. The construction industry has contributed to greenhouse gas emissions in recent decades. Considering these issues and the high demand for materials in the construction industry, Circular Economy (CE) is considered necessary to keep materials in the loop and extend their useful lives. By providing tangible benefits, Construction 4.0 facilitates the adoption of CE by reducing waste, updating standard work, sharing knowledge, and increasing transparency and stability. This study aims to present a framework for integrating CE and digital tools like Building Information Modeling (BIM) and Virtual Reality (VR) to examine the impact on the construction industry based on stakeholders' perspectives.Keywords: circular economy, building information modeling, virtual reality, stakeholder engagement
Procedia PDF Downloads 111