Search results for: investment project
5665 Encouraging the Development of Scientific Literacy in Early Childhood Institutions: Croatian Experience
Authors: L. Vujičić, Ž. Ivković, Ž. Boneta
Abstract:
There is a widespread belief in everyday discourse that science subjects (physics, chemistry and biology) are, along with math, the most difficult school subjects in the education of an individual. This assumption is usually justified by the following facts: low GPA in these subjects, the number of pupils who fail these subjects is high in comparison to other subjects, and the number of pupils interested in continuing their studies in the fields with a focus on science subjects is lower compared to non-science-oriented fields. From that perspective, the project: “Could it be different? How do children explore it?” becomes extremely interesting because it is focused on young children and on the introduction of new methods, with aim of arousing interest in scientific literacy development in 10 kindergartens by applying the methodology of an action research, with an ethnographic approach. We define scientific literacy as a process of encouraging and nurturing the research and explorative spirit in children, as well as their natural potential and abilities that represent an object of scientific research: to learn about exploration by conducting exploration. Upon project completion, an evaluation questionnaire was created for the parents of the children who had participated in the project, as well as for those whose children had not been involved in the project. The purpose of the first questionnaire was to examine the level of satisfaction with the project implementation and its outcomes among those parents whose children had been involved in the project (N=142), while the aim of the second questionnaire was to find out how much the parents of the children not involved (N=154) in this activity were interested in this topic.Keywords: documenting, early childhood education, evaluation questionnaire for parents, scientific literacy development
Procedia PDF Downloads 2535664 Educational Experience and the Investigation Results: Creation of New Healthy Products
Authors: G. Espinosa Garza, I. Loera, N. Antonyan
Abstract:
In the last decades, teaching in particular engineering subjects is going through a significative problem. A quick evaluation of the entrepreneurial surroundings makes it more difficult for students to identify the course contents with real situations related with their future professions. Proposing teaching through challenges or problem-based projects, and real-life situations is turning into an important challenge for any university-level educator. The objective of this work is to present the educational experience and the investigation results taken through the Project Viability course, done by a group of professors and students from the Technologic of Monterrey. Currently, in Mexico, the orange peels are considered a dispose and they are not being utilized as an alternative to create subproducts. However, there is a great opportunity in its use as a raw material with the goal to originate the waste from the local citric firms or business. The project challenge consisted in the development of edible products from the orange peel with the intention to generate new healthy products. With this project, apart from the obtainment of the original results, the accomplishment consisted in creating a learning atmosphere, where students together with the professors were able to plan, evaluate, and implement the project related with the creative, innovative, and sustainable processes with the goal to apply it in the development of local solutions. In the present article, the pedagogic methodologies that allowed to carry out this project will be discussed.Keywords: engineering subjects, learning project, orange peel, sustainable process
Procedia PDF Downloads 2895663 Evaluating Construction Project Outcomes: Synergy Through the Evolution of Digital Innovation and Strategic Management
Authors: Mirindi Derrick, Mirindi Frederic, Oluwakemi Oshineye
Abstract:
Abstract: The ongoing high rate of construction project failures worldwide is often blamed on the difficulties of managing stakeholders. This highlights the crucial role of strategic management (SM) in achieving project success. This study investigates how integrating digital tools into the SM framework can effectively address stakeholder-related challenges. This work specifically focuses on the impact of evolving digital tools, such as Project Management Software (PMS) (e.g., Basecamp and Wrike), Building Information Modeling (BIM) (e.g., Tekla BIMsight and Autodesk Navisworks), Virtual and Augmented Reality (VR/AR) (e.g., Microsoft HoloLens), drones and remote monitoring, and social media and Web-Based platforms, in improving stakeholder engagement and project outcomes. Through existing literature with examples of failed projects, the study highlights how the evolution of digital tools will serve as facilitators within the strategic management process. These tools offer benefits such as real-time data access, enhanced visualization, and more efficient workflows to mitigate stakeholder challenges in construction projects. The findings indicate that integrating digital tools with SM principles effectively addresses stakeholder challenges, resulting in improved project outcomes and stakeholder satisfaction. The research advocates for a combined approach that embraces both strategic management and digital innovation to navigate the complex stakeholder landscape in construction projects.Keywords: strategic management, digital tools, virtual and augmented reality, stakeholder management, building information modeling, project management software
Procedia PDF Downloads 495662 A Method for Allocation of Smart Intersections Using Traffic Information
Authors: Sang-Tae Ji, Jeong-Woo Park, Jun-Ho Park, Kwang-Woo Nam
Abstract:
This study aims is to suggest the basic factors by considering the priority of intersection in the diffusion project of Smart intersection. Busan Metropolitan City is conducting a smart intersection project for efficient traffic management. The smart intersection project aims to make breakthrough improvement of the intersection congestion by optimizing the signal system using CCTV (closed-circuit television camera) image analysis technology. This study investigated trends of existing researches and analyzed by setting three things of traffic volume, characteristics of intersection road, and whether or not to conduct the main arterial road as factors for selecting new intersection when spreading smart intersection. Using this, we presented the priority of the newly installed intersection through the present situation and analysis for the Busan Metropolitan City which is the main destination of the spreading project of the smart intersection. The results of this study can be used as a consideration in the implementation of smart intersection business.Keywords: CCTV, GIS, ICT, Smart City, smart intersection
Procedia PDF Downloads 3865661 Risk Based Building Information Modeling (BIM) for Urban Infrastructure Transportation Project
Authors: Debasis Sarkar
Abstract:
Building Information Modeling (BIM) is a holistic documentation process for operational visualization, design coordination, estimation and project scheduling. BIM software defines objects parametrically and it is a tool for virtual reality. Primary advantage of implementing BIM is the visual coordination of the building structure and systems such as Mechanical, Electrical and Plumbing (MEP) and it also identifies the possible conflicts between the building systems. This paper is an attempt to develop a risk based BIM model which would highlight the primary advantages of application of BIM pertaining to urban infrastructure transportation project. It has been observed that about 40% of the Architecture, Engineering and Construction (AEC) companies use BIM but primarily for their outsourced projects. Also, 65% of the respondents agree that BIM would be used quiet strongly for future construction projects in India. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors and building service providers (MEP). Integration of risk management along with BIM would provide enhanced co-ordination, collaboration and high probability of successful completion of the complex infrastructure transportation project within stipulated time and cost frame.Keywords: building information modeling (BIM), infrastructure transportation, project risk management, underground metro rail
Procedia PDF Downloads 3105660 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector
Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan
Abstract:
Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making
Procedia PDF Downloads 3285659 Calendar Anomalies in Islamic Frontier Markets
Authors: Aslam Faheem, Hunjra Ahmed Imran, Tayachi Tahar, Verhoeven Peter, Tariq Yasir
Abstract:
We investigate the evidence of three risk-adjusted calendar anomalies in eight frontier markets. Our sample consists of the daily closing prices of their stock indices for the period of January 2006 to September 2019. We categorize the data with respect to day-of-the-week, Lunar calendar and Islamic calendar. Using Morgan Stanley Capital International (MSCI) eight Markets Index as our proxy of the market portfolio, most of the frontier markets tested exhibit calendar seasonality. We confirm that systematic risk varies with respect to day-of-the-week, Lunar months and Islamic months. After consideration of time-varying risk and applying Bonferroni correction, few frontier markets exhibit profitable investment opportunities from calendar return anomalies for active investment managers.Keywords: asset pricing, frontier markets, market efficiency, Islamic calendar effects, Islamic stock markets
Procedia PDF Downloads 1665658 Practices in Planning, Design and Construction of Head Race Tunnel of a Hydroelectric Project
Authors: M. S. Thakur, Mohit Shukla
Abstract:
A channel/tunnel, which carries the water to the penstock/pressure shaft is called headrace tunnel (HRT). It is necessary to know the general topography, geology of the area, state of stress and other mechanical properties of the strata. For this certain topographical and geological investigations, in-situ and laboratory tests, and observations are required to be done. These investigations play an important role in a tunnel design as these help in deciding the optimum layout, shape and size and support requirements of the tunnel. The paper includes inputs from Nathpa Jhakri Hydeoelectric project which is India’s highest capacity (1500 MW) operating hydroelectric project. The paper would help the design engineers with various new concepts and preparedness against geological surprises.Keywords: tunnelling, geology, HRT, rockmass
Procedia PDF Downloads 2555657 An Alternative to Resolve Land use Conflicts: the Rétköz Lake Project
Authors: Balázs Kulcsár
Abstract:
Today, there is no part of the world that does not bear the mark of man in some way. This process seems unstoppable. So perhaps the best thing we can do is to touch that handprint gently and with the utmost care. There are multiple uses for the same piece of land, the coordination of which requires careful and sustainable spatial planning. The case study of the Rétközlake in north-eastern Hungary illustrates a habitat rehabilitation project in which a number of human uses were coordinated with the conservation and restoration of the natural environment. Today, the good condition of the habitat can only be maintained artificially, but the project has paid particular attention to finding a sustainable solution. The rehabilitation of Lake Rétköz is considered good practice in resolving land-use conflicts.Keywords: sustainability, ecosystem service, land use conflict, landscape utilization
Procedia PDF Downloads 1675656 Two-Tier Mudarabah in Islamic Banks: Fiqh Transformation in Business
Authors: Ahmad Dahlan, Aries Indrianto
Abstract:
Conceptually, mudarabah is the practice of fiqh (jurisprudence) in the bank institutions business that became the basis of the economic development model of modern Islamic financial system. In mudarabah, profit and loss sharing mechanism are integrated between mudarabah on liability side (funding) with mudarabah on the asset side (financing). Islamic (Sharia) Bank is positioned as an intermediary institution like investment manager, although the bank is also involved in direct investment based on bank equity. In practice, mudarabah cannot be done as much as effective at financing because the dominance of debt-financing products. This is a major criticism among experts and Islamic banks practitioners. Ironically, the criticism gets less attention by practitioners of Islamic banks due to many factors. The epistemologies of Islamic banks prioritize shareholder values than stakeholder values, and social culture that has not been ready with the mudarabah totally.Keywords: two tier mudarabah, intermediary institution, shareholder value, stakeholder value
Procedia PDF Downloads 1685655 Human Talent Management: A Research Agenda
Authors: Mehraj Udin Ganaie, Mohammad Israrul Haque
Abstract:
The purpose of this paper is to enhance the theoretical and conceptual understanding of human talent management (HTM). With the help of extensive review of existing literature, we proposed a conceptual framework and few propositions to elucidate the influential relationship of competency focus, talent pooling, talent investment, and talenting orientation with value creation of a firm. It is believed that human talent management model will enhance the understanding of talent management orientation among practitioners and academicians. Practitioners will be able to align HTM orientation with business strategy wisely to yield better value for business (Shareholders, Employees, Owners, Customers, agents, and other stakeholders). Future research directions will explain how human talent management researchers will work on the integration of relationship and contribute towards the maturity of talent management by further exploring and validating the model empirically to enhance the body of knowledge.Keywords: talent management orientation, competency focus, talent pooling, talent investment, talenting orientation
Procedia PDF Downloads 3845654 Possibilities of Output Technology the Project ADAPTIV for Use in Infrared Camouflage
Authors: Jiří Barta, Teodor Baláž, Tomáš Ludík, Jiří. F. Urbánek
Abstract:
This article deals with the outputs of project acronym ADAPTIV of Czech Defence Research Project. This Project solved tends to adaptive camouflage. The camouflage is concealment by means of disguise. Perceptive interface between recipient and camouflaged object is visualized by means of textile modular screens. Screens special light semi-permeability enables front/ back projection with nearly identical light parameters. Information permeability, towards illusion creation, must be controlled by the camouflage provider by means sophisticated and mastered illusion with perfect scenarios. The project ADAPTIV was primarily funded with the maximum possible use of COTS (Commercial-Off-The-Shelf) principle asks special definition of feasibility conditions, especially recipient space position. This paper deals with uses the ADAPTIV output with name DATAsam with modification for infrared camouflage. It is focused on active camouflage in infrared spectrum of emissivity at <8;14> μm for laboratory conditions. The main chapter provides basic experiments and testing physical properties needed for camouflage in infrared environment. The evaluation experiments revealed the possibility of use case in various types of camouflage.Keywords: camouflage, ADAPTIV, infrared camouflage, computer-aided, COTS
Procedia PDF Downloads 4175653 Qualitative Evaluation of the Morris Collection Conservation Project at the Sainsbury Centre of Visual Arts in the Context of Agile, Lean and Hybrid Project Management Approaches
Authors: Maria Ledinskaya
Abstract:
This paper examines the Morris Collection Conservation Project at the Sainsbury Centre for Visual Arts in the context of Agile, Lean, and Hybrid project management. It is part case study and part literature review. To date, relatively little has been written about non-traditional project management approaches in heritage conservation. This paper seeks to introduce Agile, Lean, and Hybrid project management concepts from business, software development, and manufacturing fields to museum conservation, by referencing their practical application on a recent museum-based conservation project. The Morris Collection Conservation Project was carried out in 2019-2021 in Norwich, UK, and concerned the remedial conservation of around 150 Abstract Constructivist artworks bequeathed to the Sainsbury Centre for Visual Arts by private collectors Michael and Joyce Morris. The first part introduces the chronological timeline and key elements of the project. It describes a medium-size conservation project of moderate complexity, which was planned and delivered in an environment with multiple known unknowns – unresearched collection, unknown condition and materials, unconfirmed budget. The project was also impacted by the unknown unknowns of the COVID-19 pandemic, such as indeterminate lockdowns, and the need to accommodate social distancing and remote communications. The author, a staff conservator at the Sainsbury Centre who acted as project manager on the Morris Collection Conservation Project, presents an incremental, iterative, and value-based approach to managing a conservation project in an uncertain environment. Subsequent sections examine the project from the point of view of Traditional, Agile, Lean, and Hybrid project management. The author argues that most academic writing on project management in conservation has focussed on a Traditional plan-driven approach – also known as Waterfall project management – which has significant drawbacks in today’s museum environment, due to its over-reliance on prediction-based planning and its low tolerance to change. In the last 20 years, alternative Agile, Lean and Hybrid approaches to project management have been widely adopted in software development, manufacturing, and other industries, although their recognition in the museum sector has been slow. Using examples from the Morris Collection Conservation Project, the author introduces key principles and tools of Agile, Lean, and Hybrid project management and presents a series of arguments on the effectiveness of these alternative methodologies in museum conservation, as well as the ethical and practical challenges to their implementation. These project management approaches are discussed in the context of consequentialist, relativist, and utilitarian developments in contemporary conservation ethics, particularly with respect to change management, bespoke ethics, shared decision-making, and value-based cost-benefit conservation strategy. The author concludes that the Morris Collection Conservation Project had multiple Agile and Lean features which were instrumental to the successful delivery of the project. These key features are identified as distributed decision making, a co-located cross-disciplinary team, servant leadership, focus on value-added work, flexible planning done in shorter sprint cycles, light documentation, and emphasis on reducing procedural, financial, and logistical waste. Overall, the author’s findings point largely in favour of a Hybrid model which combines traditional and alternative project processes and tools to suit the specific needs of the project.Keywords: project management, conservation, waterfall, agile, lean, hybrid
Procedia PDF Downloads 995652 The Effect of Tax Evasion and Avoidance on Somalia’s Economy
Authors: Mohamed Salad Ahmed
Abstract:
This study explores the impact of tax evasion and avoidance on the economy of Somalia. Somalia's economy is largely informal and cash-based, making it challenging to accurately assess the extent of tax evasion and avoidance. However, it is widely recognized that these practices have significant negative effects on the economy, including reduced government revenue, an uneven playing field for businesses, corruption, and a lack of access to international aid and investment. The study focuses on identifying strategies and solutions to reduce tax evasion and avoidance and increase revenue collection. This includes improving the government's capacity to enforce tax laws and regulations, creating a more transparent and accountable tax system, and increasing public awareness of the importance of paying taxes. By addressing these issues, Somalia can improve its economic stability and enhance its ability to provide essential public services, reduce poverty, and promote growth and development. Tax evasion and avoidance have a significant negative impact on the economy of Somalia. The informal nature of the country's economy and the difficulty in accurately assessing the extent of tax evasion and avoidance make it challenging to address these issues effectively. The lack of government revenue resulting from tax evasion and avoidance makes it difficult for the government to fund essential services, leading to a decline in the quality of public services and hindering economic growth. Tax evasion and avoidance also create an uneven playing field for businesses, discourage investment, contribute to corruption, and undermine the rule of law. Additionally, tax evasion and avoidance can make it more difficult for Somalia to access international aid and investment. Addressing these issues will require a concerted effort by the government to strengthen tax collection and enforcement, as well as by the international community to provide technical assistance and support. This abstract highlights the importance of addressing tax evasion and avoidance in Somalia and the potential benefits of doing so.Keywords: tax evasion, tax avoidance, Somalia economy, revenue collection, informal economy, corruption economic growth, investment, tax policy, tax administration, governance, private sector
Procedia PDF Downloads 105651 Readiness Analysis of Indonesian Accountants
Authors: Lisa Listiana
Abstract:
ASEAN leader agreed to accelerate ASEAN Economic Community (AEC) implementation by 2015. The AEC Blueprint has set up obligations for its members to follow which include the establishment of (a) free trade in goods, according to ASEAN Free Trade Area: AFTA, (b) free trade in services, according to ASEAN Framework Agreement on Services: AFAS, (c) free trade in investment, according to ASEAN Comprehensive Investment Agreement: ACIA, (d) free capital flow, and (e) free flow of skilled labors. Consequently, these obligations bring both challenges and opportunities for its members. As accountant is included in the coverage of 8 skilled labors, the readiness of accounting profession to embrace AEC 2015 is pivotal. If Indonesian accountants do not accelerate their learning effort, the knowledge gap between Indonesian accountants and their international colleagues will only be worsened. This paper aims to analyze the current progress of AEC preparation and its challenges and opportunities for Indonesian accountants, and also to propose recommendation as necessary.Keywords: AEC, ASEAN, readiness, Indonesian accountants
Procedia PDF Downloads 4365650 Assessing Project Performance through Work Sampling and Earned Value Analysis
Authors: Shobha Ramalingam
Abstract:
The majority of the infrastructure projects are affected by time overrun, resulting in project delays and subsequently cost overruns. Time overrun may vary from a few months to as high as five or more years, placing the project viability at risk. One of the probable reasons noted in the literature for this outcome in projects is due to poor productivity. Researchers contend that productivity in construction has only marginally increased over the years. While studies in the literature have extensively focused on time and cost parameters in projects, there are limited studies that integrate time and cost with productivity to assess project performance. To this end, a study was conducted to understand the project delay factors concerning cost, time and productivity. A case-study approach was adopted to collect rich data from a nuclear power plant project site for two months through observation, interviews and document review. The data were analyzed using three different approaches for a comprehensive understanding. Foremost, a root-cause analysis was performed on the data using Ishikawa’s fish-bone diagram technique to identify the various factors impacting the delay concerning time. Based on it, a questionnaire was designed and circulated to concerned executives, including project engineers and contractors to determine the frequency of occurrence of the delay, which was then compiled and presented to the management for a possible solution to mitigate. Second, a productivity analysis was performed on select activities, including rebar bending and concreting through a time-motion study to analyze product performance. Third, data on cost of construction for three years allowed analyzing the cost performance using earned value management technique. All three techniques allowed to systematically and comprehensively identify the key factors that deter project performance and productivity loss in the construction of the nuclear power plant project. The findings showed that improper planning and coordination between multiple trades, concurrent operations, improper workforce and material management, fatigue due to overtime were some of the key factors that led to delays and poor productivity. The findings are expected to act as a stepping stone for further research and have implications for practitioners.Keywords: earned value analysis, time performance, project costs, project delays, construction productivity
Procedia PDF Downloads 975649 Development of an Index for Asset Class in Ex-Ante Portfolio Management
Authors: Miang Hong Ngerng, Noor Diyana Jasme, May Jin Theong
Abstract:
Volatile market environment is inevitable. Fund managers are struggling to choose the right strategy to survive and overcome uncertainties and adverse market movement. Therefore, finding certainty in the mist of uncertainty future is one of the key performance objectives for fund managers. Current available theoretical results are not practical due to strong reliance on the investment assumption made. This paper is to identify the component that can be forecasted in Ex-ante setting which is the realistic situation facing a fund manager in the actual execution of asset allocation in portfolio management. Partial lease square method was used to generate an index with 10 years accounting data from 191 companies listed in KLSE. The result shows that the index reflects the inner nature of the business and up to 30% of the stock return can be explained by the index.Keywords: active portfolio management, asset allocation ex-ante investment, asset class, partial lease square
Procedia PDF Downloads 2695648 Faults in the Projects, Deviation in the Cost
Authors: S. Ahmed, P. Dlask, B. Hasan
Abstract:
There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.Keywords: construction projects, building, cost, estimating costs, delay, overrun
Procedia PDF Downloads 2945647 Effects of Exhibition Firms' Resource Investment Behavior on Their Booth Staffs' Role Perceptions, Goal Acceptance and Work Effort during the Exhibition Period
Authors: Po-Chien Li
Abstract:
Despite the extant literature has hosted a wide-range of knowledge about trade shows, this knowledge base deserves to be further expanded and extended because there exist many unclear issues and overlooked topics. One area that needs much research attention is regarding the behavior and performance of booth workers at the exhibition site. Booth staffs play many key roles in interacting with booth visitors. Their exhibiting-related attitudes and motivations might have significant consequences on a firm’s exhibition results. However, to date, little research, if any, has studied how booth workers are affected and behave in the context of trade fair. The primary purpose of the current study is to develop and test a research model, derived from role theory and resource-based viewpoint, that depicts the effects of a firm’s pre-exhibition resource investment behavior on booth staff’s role perceptions and work behavior during the exhibition period. The author collects data with two survey questionnaires at two trade shows in 2016. One questionnaire is given to the booth head of an exhibiting company, asking about the firm’s resource commitment behavior prior to the exhibition period. In contrast, another questionnaire is provided for a booth worker of the same firm, requesting the individual staff to report his/her own role perceptions, degree of exhibition goal acceptance, and level of work effort during the exhibition period. The study has utilized the following analytic methods, including descriptive statistics, exploratory factor analysis, reliability analysis, and regression analysis. The results of a set of regression analyses show that a firm’s pre-exhibition resource investment behavior has significant effects on a booth staff’s exhibiting perceptions and attitudes. Specifically, an exhibitor’s resource investment behavior has impacts on the factors of booth staff’s role clarity and role conflict. In addition, a booth worker’s role clarity is related to the degree of exhibition goal acceptance, but his/her role conflict is not. Finally, a booth worker’s exhibiting effort is significantly related to the individual’s role clarity, role conflict and goal acceptance. In general, the major contribution of the current research is that it offers insight into and early evidence on the links between an exhibiting firm’s resource commitment behavior and the work perceptions and attitudes of booth staffs during the exhibition period. The current research’s results can benefit the extant literature of exhibition marketing.Keywords: exhibition resource investment, role perceptions, goal acceptance, work effort
Procedia PDF Downloads 2175646 Towards Positive Identity Construction for Japanese Non-Native English Language Teachers
Authors: Yumi Okano
Abstract:
The low level of English proficiency among Japanese people has been a problem for a long time. Japanese non-native English language teachers, under social or ideological constraints, feel a gap between government policy and their language proficiency and cannot maintain high self-esteem. This paper focuses on current Japanese policies and the social context in which teachers are placed and examines the measures necessary for their positive identity formation from a macro-meso-micro perspective. Some suggestions for achieving this are: 1) Teachers should free themselves from the idea of native speakers and embrace local needs and accents, 2) Teachers should be involved in student discussions as facilitators and individuals so that they can be good role models for their students, and 3) Teachers should invest in their classrooms. 4) Guidelines and training should be provided to help teachers gain confidence. In addition to reducing the workload to make more time available, 5) expanding opportunities for investment outside the classroom into the real world is necessary.Keywords: language teacher identity, native speakers, government policy, critical pedagogy, investment
Procedia PDF Downloads 1035645 Exploring Behavioural Biases among Indian Investors: A Qualitative Inquiry
Authors: Satish Kumar, Nisha Goyal
Abstract:
In the stock market, individual investors exhibit different kinds of behaviour. Traditional finance is built on the notion of 'homo economics', which states that humans always make perfectly rational choices to maximize their wealth and minimize risk. That is, traditional finance has concern for how investors should behave rather than how actual investors are behaving. Behavioural finance provides the explanation for this phenomenon. Although finance has been studied for thousands of years, behavioural finance is an emerging field that combines the behavioural or psychological aspects with conventional economic and financial theories to provide explanations on how emotions and cognitive factors influence investors’ behaviours. These emotions and cognitive factors are known as behavioural biases. Because of these biases, investors make irrational investment decisions. Besides, the emotional and cognitive factors, the social influence of media as well as friends, relatives and colleagues also affect investment decisions. Psychological factors influence individual investors’ investment decision making, but few studies have used qualitative methods to understand these factors. The aim of this study is to explore the behavioural factors or biases that affect individuals’ investment decision making. For the purpose of this exploratory study, an in-depth interview method was used because it provides much more exhaustive information and a relaxed atmosphere in which people feel more comfortable to provide information. Twenty investment advisors having a minimum 5 years’ experience in securities firms were interviewed. In this study, thematic content analysis was used to analyse interview transcripts. Thematic content analysis process involves analysis of transcripts, coding and identification of themes from data. Based on the analysis we categorized the statements of advisors into various themes. Past market returns and volatility; preference for safe returns; tendency to believe they are better than others; tendency to divide their money into different accounts/assets; tendency to hold on to loss-making assets; preference to invest in familiar securities; tendency to believe that past events were predictable; tendency to rely on the reference point; tendency to rely on other sources of information; tendency to have regret for making past decisions; tendency to have more sensitivity towards losses than gains; tendency to rely on own skills; tendency to buy rising stocks with the expectation that this rise will continue etc. are some of the major concerns showed by experts about investors. The findings of the study revealed 13 biases such as overconfidence bias, disposition effect, familiarity bias, framing effect, anchoring bias, availability bias, self-attribution bias, representativeness, mental accounting, hindsight bias, regret aversion, loss aversion and herding bias/media biases present in Indian investors. These biases have a negative connotation because they produce a distortion in the calculation of an outcome. These biases are classified under three categories such as cognitive errors, emotional biases and social interaction. The findings of this study may assist both financial service providers and researchers to understand the various psychological biases of individual investors in investment decision making. Additionally, individual investors will also be aware of the behavioural biases that will aid them to make sensible and efficient investment decisions.Keywords: financial advisors, individual investors, investment decisions, psychological biases, qualitative thematic content analysis
Procedia PDF Downloads 1695644 A Neural Network Classifier for Identifying Duplicate Image Entries in Real-Estate Databases
Authors: Sergey Ermolin, Olga Ermolin
Abstract:
A Deep Convolution Neural Network with Triplet Loss is used to identify duplicate images in real-estate advertisements in the presence of image artifacts such as watermarking, cropping, hue/brightness adjustment, and others. The effects of batch normalization, spatial dropout, and various convergence methodologies on the resulting detection accuracy are discussed. For comparative Return-on-Investment study (per industry request), end-2-end performance is benchmarked on both Nvidia Titan GPUs and Intel’s Xeon CPUs. A new real-estate dataset from San Francisco Bay Area is used for this work. Sufficient duplicate detection accuracy is achieved to supplement other database-grounded methods of duplicate removal. The implemented method is used in a Proof-of-Concept project in the real-estate industry.Keywords: visual recognition, convolutional neural networks, triplet loss, spatial batch normalization with dropout, duplicate removal, advertisement technologies, performance benchmarking
Procedia PDF Downloads 3385643 Decision-Making Tool for Planning the Construction of Infrastructure Projects
Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs
Abstract:
The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.Keywords: infrastructure, modularization, decision support, decision-making
Procedia PDF Downloads 605642 Strategy in Practice: Strategy Development, Strategic Error and Project Delivery
Authors: Nipun Agarwal, David Paul, Fareed Un Din
Abstract:
Strategy development and implementation is the key to an organization’s success in today’s competitive marketplace. Many organizations develop excellent strategy but are unable to implement this strategy in order to succeed. The difference between strategic goals and its implementation is called strategic error. Strategic error occurs when an organization does not have structures in place to implement their strategy. Strategy implementation happens through projects and having a project management method that provides certainty and agility will help an organization become more competitive in implementing strategy. Numerous project management methods exist in theory and practice. However, projects mainly used the Waterfall method in the past that provides certainty in terms of budget, delivery date and resourcing. It is common practice now to utilise Agile based methods. However, Agile based methods do not provide specific deadlines and budgets. But provide agility in product design and project delivery, which is useful to companies. Both Waterfall and Agile methods in some forms are the opposites of each other. Executive management prefer agility in delivery projects as the competitive landscape changes frequently. However, they also appreciate certainty in the projects being able to quantify budgets, deadlines and resources that is harder for an Agile based method to provide. This paper attempts to develop a hybrid project management method that attempts to merge these Waterfall and Agile methods to provide the positives from both these approaches.Keywords: strategy, project management, strategy implementation, agile
Procedia PDF Downloads 1165641 An Analysis of Critical Success Factors of Six Sigma Implementation in Pakistani SMEs
Authors: Zanjbeel Tabassum
Abstract:
The main purpose of any economic investment is to get profit at the end. As the investment in large organizations bears complexities, investors are influenced to invest in small or medium enterprises. With the increase of global competition in terms of quality and productivity, these small and medium-sized enterprises (SMEs) are trying to convert to modern production practices using Six Sigma. But this concept is still lacking in Pakistani SMEs. There are some critical success factors which influence the successful implementation of Six Sigma. Through this paper, an attempt has been made to identify various CSF for successful implementation of Six Sigma in Pakistani SMEs with the help of a structured survey. On the basis of responses to the questionnaire, factor analysis is performed on the selected critical success factors (from literature) to prioritize the critical factors and those are rated by calculating descriptive statistics. This paper will provide a base for Pakistani SMEs and future researchers working in six sigma implementation and help them to prepare a road map to eradicate the hurdles in six sigma implementation.Keywords: critical success factors, SMEs, Six Sigma, CSF
Procedia PDF Downloads 2785640 Simulation of Government Management Model to Increase Financial Productivity System Using Govpilot
Authors: Arezou Javadi
Abstract:
The use of algorithmic models dependent on software calculations and simulation of new government management assays with the help of specialized software had increased the productivity and efficiency of the government management system recently. This has caused the management approach to change from the old bitch & fix model, which has low efficiency and less usefulness, to the capable management model with higher efficiency called the partnership with resident model. By using Govpilot TM software, the relationship between people in a system and the government was examined. The method of two tailed interaction was the outsourcing of a goal in a system, which is formed in the order of goals, qualified executive people, optimal executive model, and finally, summarizing additional activities at the different statistical levels. The results showed that the participation of people in a financial implementation system with a statistical potential of P≥5% caused a significant increase in investment and initial capital in the government system with maximum implement project in a smart government.Keywords: machine learning, financial income, statistical potential, govpilot
Procedia PDF Downloads 885639 Simulation of Government Management Model to Increase Financial Productivity System Using Govpilot
Authors: Arezou Javadi
Abstract:
The use of algorithmic models dependent on software calculations and simulation of new government management assays with the help of specialized software had increased the productivity and efficiency of the government management system recently. This has caused the management approach to change from the old bitch & fix model, which has low efficiency and less usefulness, to the capable management model with higher efficiency called the partnership with resident model. By using Govpilot TM software, the relationship between people in a system and the government was examined. The method of two tailed interaction was the outsourcing of a goal in a system, which is formed in the order of goals, qualified executive people, optimal executive model, and finally, summarizing additional activities at the different statistical levels. The results showed that the participation of people in a financial implementation system with a statistical potential of P≥5% caused a significant increase in investment and initial capital in the government system with maximum implement project in a smart government.Keywords: machine learning, financial income, statistical potential, govpilot
Procedia PDF Downloads 705638 Building Information Modeling and Its Application in the State of Kuwait
Authors: Michael Gerges, Ograbe Ahiakwo, Martin Jaeger, Ahmad Asaad
Abstract:
Recent advances of Building Information Modeling (BIM) especially in the Middle East have increased remarkably. Dubai has been taking a lead on this by making it mandatory for BIM to be adopted for all projects that involve complex architecture designs. This is because BIM is a dynamic process that assists all stakeholders in monitoring the project status throughout different project phases with great transparency. It focuses on utilizing information technology to improve collaboration among project participants during the entire life cycle of the project from the initial design, to the supply chain, resource allocation, construction and all productivity requirements. In view of this trend, the paper examines the extent of applying BIM in the State of Kuwait, by exploring practitioners’ perspectives on BIM, especially their perspectives on main barriers and main advantages. To this end structured interviews were carried out based on questionnaires and with a range of different construction professionals. The results revealed that practitioners perceive improved communication and mitigated project risks by encouraged collaboration between project participants. However, it was also observed that the full implementation of BIM in the State of Kuwait requires concerted efforts to make clients demanding BIM, counteract resistance to change among construction professionals and offer more training for design team members. This paper forms part of an on-going research effort on BIM and its application in the State of Kuwait and it is on this basis that further research on the topic is proposed.Keywords: building information modeling, BIM, construction industry, Kuwait
Procedia PDF Downloads 3785637 Improved Regression Relations Between Different Magnitude Types and the Moment Magnitude in the Western Balkan Earthquake Catalogue
Authors: Anila Xhahysa, Migena Ceyhan, Neki Kuka, Klajdi Qoshi, Damiano Koxhaj
Abstract:
The seismic event catalog has been updated in the framework of a bilateral project supported by the Central European Investment Fund and with the extensive support of Global Earthquake Model Foundation to update Albania's national seismic hazard model. The earthquake catalogue prepared within this project covers the Western Balkan area limited by 38.0° - 48°N, 12.5° - 24.5°E and includes 41,806 earthquakes that occurred in the region between 510 BC and 2022. Since the moment magnitude characterizes the earthquake size accurately and the selected ground motion prediction equations for the seismic hazard assessment employ this scale, it was chosen as the uniform magnitude scale for the catalogue. Therefore, proxy values of moment magnitude had to be obtained by using new magnitude conversion equations between the local and other magnitude types to this unified scale. The Global Centroid Moment Tensor Catalogue was considered the most authoritative for moderate to large earthquakes for moment magnitude reports; hence it was used as a reference for calibrating other sources. The best fit was observed when compared to some regional agencies, whereas, with reports of moment magnitudes from Italy, Greece and Turkey, differences were observed in all magnitude ranges. For teleseismic magnitudes, to account for the non-linearity of the relationships, we used the exponential model for the derivation of the regression equations. The obtained regressions for the surface wave magnitude and short-period body-wave magnitude show considerable differences with Global Earthquake Model regression curves, especially for low magnitude ranges. Moreover, a conversion relation was obtained between the local magnitude of Albania and the corresponding moment magnitude as reported by the global and regional agencies. As errors were present in both variables, the Deming regression was used.Keywords: regression, seismic catalogue, local magnitude, tele-seismic magnitude, moment magnitude
Procedia PDF Downloads 695636 Composite Distributed Generation and Transmission Expansion Planning Considering Security
Authors: Amir Lotfi, Seyed Hamid Hosseini
Abstract:
During the recent past, due to the increase of electrical energy demand and governmental resources constraints in creating additional capacity in the generation, transmission, and distribution, privatization, and restructuring in electrical industry have been considered. So, in most of the countries, different parts of electrical industry like generation, transmission, and distribution have been separated in order to create competition. Considering these changes, environmental issues, energy growth, investment of private equity in energy generation units and difficulties of transmission lines expansion, distributed generation (DG) units have been used in power systems. Moreover, reduction in the need for transmission and distribution, the increase of reliability, improvement of power quality, and reduction of power loss have caused DG to be placed in power systems. On the other hand, considering low liquidity need, private investors tend to spend their money for DGs. In this project, the main goal is to offer an algorithm for planning and placing DGs in order to reduce the need for transmission and distribution network.Keywords: planning, transmission, distributed generation, power security, power systems
Procedia PDF Downloads 480