Search results for: industrial technology research projects
32082 Patterns and Effects of International Trade in Technology: Firm-Level Evidence
Authors: Heeyong Noh, Seongryong Kang, Sungjoo Lee
Abstract:
As the world becomes increasingly interconnected, firms have tried to explore market opportunities not only in the domestic market but also abroad. In particular, transactions of intangible assets in the global market now take on great importance. Accordingly, technology transfer activities such as patent licensing, copyright transfer, or workforce trainings which are considered significant to leverage an organization’s internal capabilities, are occurring more frequently and briskly across the world than ever before. Though a number of studies have addressed the issues regarding technology transfer, most of them have focused on university-industry technology transfer. Of course, some have investigated international technology transfer phenomenon but used patent citations data as a proxy. In order to understand the phenomena more clearly, it would be necessary to collect and analyze data that can measure technology transfer activities between firms more directly. Therefore, this study aims to examine the patterns of international trade in technology by employing data about international technology in-licensing activities in Korean firms. We also investigate the effect of international technology in-licensing strategy on a firm’s innovation performance. The research findings are expected to help R&D managers understand how firms have absorbed technological knowledge from foreign firms in the form of licensing and further develop effective international collaboration strategies. In addition, significant implications can be offered for political decision-making regarding technology trade within increasing international interconnections.Keywords: international technology trade, technology trade effect, technology transfer, R&D managers
Procedia PDF Downloads 37832081 A Constructionist View of Projects, Social Media and Tacit Knowledge in a College Classroom: An Exploratory Study
Authors: John Zanetich
Abstract:
Designing an educational activity that encourages inquiry and collaboration is key to engaging students in meaningful learning. Educational Information and Communications Technology (EICT) plays an important role in facilitating cooperative and collaborative learning in the classroom. The EICT also facilitates students’ learning and development of the critical thinking skills needed to solve real world problems. Projects and activities based on constructivism encourage students to embrace complexity as well as find relevance and joy in their learning. It also enhances the students’ capacity for creative and responsible real-world problem solving. Classroom activities based on constructivism offer students an opportunity to develop the higher–order-thinking skills of defining problems and identifying solutions. Participating in a classroom project is an activity for both acquiring experiential knowledge and applying new knowledge to practical situations. It also provides an opportunity for students to integrate new knowledge into a skill set using reflection. Classroom projects can be developed around a variety of learning objects including social media, knowledge management and learning communities. The construction of meaning through project-based learning is an approach that encourages interaction and problem-solving activities. Projects require active participation, collaboration and interaction to reach the agreed upon outcomes. Projects also serve to externalize the invisible cognitive and social processes taking place in the activity itself and in the student experience. This paper describes a classroom project designed to elicit interactions by helping students to unfreeze existing knowledge, to create new learning experiences, and then refreeze the new knowledge. Since constructivists believe that students construct their own meaning through active engagement and participation as well as interactions with others. knowledge management can be used to guide the exchange of both tacit and explicit knowledge in interpersonal interactions between students and guide the construction of meaning. This paper uses an action research approach to the development of a classroom project and describes the use of technology, social media and the active use of tacit knowledge in the college classroom. In this project, a closed group Facebook page becomes the virtual classroom where interaction is captured and measured using engagement analytics. In the virtual learning community, the principles of knowledge management are used to identify the process and components of the infrastructure of the learning process. The project identifies class member interests and measures student engagement in a learning community by analyzing regular posting on the Facebook page. These posts are used to foster and encourage interactions, reflect a student’s interest and serve as reaction points from which viewers of the post convert the explicit information in the post to implicit knowledge. The data was collected over an academic year and was provided, in part, by the Google analytic reports on Facebook and self-reports of posts by members. The results support the use of active tacit knowledge activities, knowledge management and social media to enhance the student learning experience and help create the knowledge that will be used by students to construct meaning.Keywords: constructivism, knowledge management, tacit knowledge, social media
Procedia PDF Downloads 21532080 The Effect of TQM Implementation on Bahrain Industrial Performance
Authors: Bader Al-Mannai, Saad Sulieman, Yaser Al-Alawi
Abstract:
Research studies worldwide undoubtedly demonstrated that the implementation of Total Quality Management (TQM) program can improve organizations competitive abilities and provide strategic quality advances. However, limited empirical studies and research are directed to measure the effectiveness of TQM implementation on the industrial and manufacturing organizations performance. Accordingly, this paper is aimed at discussing “the degree of TQM implementation in Bahrain industries and its effect on their performance”. The paper will present the measurement indicators and success factors that were used to assess the degree of TQM implementation in Bahrain industry, and the main performance indicators that were affected by TQM implementation. The adopted research methodology in this study was a survey that was based on self-completion questionnaire. The sample population represented the industrial and manufacturing organizations in Bahrain. The study led to the identification of the operational and strategic measurement indicators and success factors that assist organizations in realizing successful TQM implementation and performance improvement. Furthermore, the research analysis confirmed a positive and significant relationship between the examined performance indicators in Bahrain industry and TQM implementation. In conclusion the investigation of the relationship revealed that the implementation of TQM program has resulted into remarkable improvements on workforce, sales performance, and quality performance indicators in Bahrain industry.Keywords: performance indicators, success factors, TQM implementation, Bahrain
Procedia PDF Downloads 55232079 Subcontractor Development Practices and Processes: A Conceptual Model for LEED Projects
Authors: Andrea N. Ofori-Boadu
Abstract:
The purpose is to develop a conceptual model of subcontractor development practices and processes that strengthen the integration of subcontractors into construction supply chain systems for improved subcontractor performance on Leadership in Energy and Environmental Design (LEED) certified building projects. The construction management of a LEED project has an important objective of meeting sustainability certification requirements. This is in addition to the typical project management objectives of cost, time, quality, and safety for traditional projects; and, therefore increases the complexity of LEED projects. Considering that construction management organizations rely heavily on subcontractors, poor performance on complex projects such as LEED projects has been largely attributed to the unsatisfactory preparation of subcontractors. Furthermore, the extensive use of unique and non-repetitive short term contracts limits the full integration of subcontractors into construction supply chains and hinders long-term cooperation and benefits that could enhance performance on construction projects. Improved subcontractor development practices are needed to better prepare and manage subcontractors, so that complex objectives can be met or exceeded. While supplier development and supply chain theories and practices for the manufacturing sector have been extensively investigated to address similar challenges, investigations in the construction sector are not that obvious. Consequently, the objective of this research is to investigate effective subcontractor development practices and processes to guide construction management organizations in their development of a strong network of high performing subcontractors. Drawing from foundational supply chain and supplier development theories in the manufacturing sector, a mixed interpretivist and empirical methodology is utilized to assess the body of knowledge within literature for conceptual model development. A self-reporting survey with five-point Likert scale items and open-ended questions is administered to 30 construction professionals to estimate their perceptions of the effectiveness of 37 practices, classified into five subcontractor development categories. Data analysis includes descriptive statistics, weighted means, and t-tests that guide the effectiveness ranking of practices and categories. The results inform the proposed three-phased LEED subcontractor development program model which focuses on preparation, development and implementation, and monitoring. Highly ranked LEED subcontractor pre-qualification, commitment, incentives, evaluation, and feedback practices are perceived as more effective, when compared to practices requiring more direct involvement and linkages between subcontractors and construction management organizations. This is attributed to unfamiliarity, conflicting interests, lack of trust, and resource sharing challenges. With strategic modifications, the recommended practices can be extended to other non-LEED complex projects. Additional research is needed to guide the development of subcontractor development programs that strengthen direct involvement between construction management organizations and their network of high performing subcontractors. Insights from this present research strengthen theoretical foundations to support future research towards more integrated construction supply chains. In the long-term, this would lead to increased performance, profits and client satisfaction.Keywords: construction management, general contractor, supply chain, sustainable construction
Procedia PDF Downloads 11032078 Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review
Authors: A. Aljohani, D. Moore, D. D. Ahiaga-Dagbui
Abstract:
Cost overruns are endemic in the delivery of construction projects. The problem is global. It occurs irrespective of type and size of the project, its location, procurement method or client. The size of overruns can be as high as 200% in some cases. Projects thus unfortunately often make the news headlines, not for their immense socio-economic contribution to society, but for being poorly procured. In Saudi Arabia, two-thirds of construction projects are publicly procured by the Saudi government, which has been invested Billions of dollars in infrastructure projects each year as part of an ambitious strategic development agenda to shift from mainly oil dependency to multi-source dependency. However, reports show that about 3,000 public projects face diverse issues related to time and cost overrun. As part of an on-going study to develop a framework for effective public procurement for the Saudi Arabian construction industry, this paper reports the initial findings of the causes of cost overruns in the context of the Gulf State. It also evaluates the interface between some of the front-end loading issues in public procurement in Saudi and their effects on project performance. A systematic review of the existing literature on construction cost overruns, with focus on the Saudi Arabian construction industry has been used. One of the initial findings is that a fixed-price contract is usually used by the client in an attempt to transfer all financial risks to the contractors. This has the unintended consequence of creating a turbulent environment for the delivery of the project which leads to project abandonment by contractors, poor quality of work and substantial rework. Further work is being undertaken to empirically verify the initial findings reported in this paper and their generalizability for the construction industry as a whole.Keywords: cost overrun, public procurement, Saudi Arabia, construction projects
Procedia PDF Downloads 27032077 Videoconference Technology: An Attractive Vehicle for Challenging and Changing Tutors Practice in Open and Distance Learning Environment
Authors: Ramorola Mmankoko Ziphorah
Abstract:
Videoconference technology represents a recent experiment of technology integration into teaching and learning in South Africa. Increasingly, videoconference technology is commonly used as a substitute for the traditional face-to-face approaches to teaching and learning in helping tutors to reshape and change their teaching practices. Interestingly, though, some studies point out that videoconference technology is commonly used for knowledge dissemination by tutors and not so much for the actual teaching of course content in Open and Distance Learning context. Though videoconference technology has become one of the dominating technologies available among Open and Distance Learning institutions, it is not clear that it has been used as effectively to bridge the learning distance in time, geography, and economy. While tutors are prepared theoretically, in most tutor preparation programs, on the use of videoconference technology, there are still no practical guidelines on how they should go about integrating this technology into their course teaching. Therefore, there is an urgent need to focus on tutor development, specifically on their capacities and skills to use videoconference technology. The assumption is that if tutors become competent in the use of the videoconference technology for course teaching, then their use in Open and Distance Learning environment will become more commonplace. This is the imperative of the 4th Industrial Revolution (4IR) on education generally. Against the current vacuum in the practice of using videoconference technology for course teaching, the current study proposes a qualitative phenomenological approach to investigate the efficacy of videoconferencing as an approach to student learning. Using interviews and observation data from ten participants in Open and Distance Learning institution, the author discusses how dialogue and structure interacted to provide the participating tutors with a rich set of opportunities to deliver course content. The findings to this study highlight various challenges experienced by tutors when using videoconference technology. The study suggests tutor development programs on their capacity and skills and on how to integrate this technology with various teaching strategies in order to enhance student learning. The author argues that it is not merely the existence of the structure, namely the videoconference technology, that provides the opportunity for effective teaching, but that is the interactions, namely, the dialogue amongst tutors and learners that make videoconference technology an attractive vehicle for challenging and changing tutors practice.Keywords: open distance learning, transactional distance, tutor, videoconference
Procedia PDF Downloads 12832076 Students' Perception of Virtual Learning Environment (VLE) Skills in Setting up the Simulator Welding Technology
Authors: Mohd Afif Md Nasir, Faizal Amin Nur Yunus, Jamaluddin Hashim, Abd Samad Hassan Basari, A. Halim Sahelan
Abstract:
The aim of this study is to identify the suitability of Virtual Learning Environment (VLE) in welding simulator application towards Computer-Based Training (CBT) in developing skills upon new students at the Advanced Technology Training Center (ADTEC), Batu Pahat, Johor, Malaysia and GIATMARA, Batu Pahat, Johor, Malaysia. The purpose of the study is to create a computer-based skills development approach in welding technology among new students in ADTEC and GIATMARA, as well as cultivating the elements of general skills among them. This study is also important in elevating the number of individual knowledge workers (K-workers) working in manufacturing industry in order to achieve a national vision which is to be an industrial nation in the year of 2020. The design of the study is a survey type of research which uses questionnaires as the instruments and 136 students from ADTEC and GIATMARA were interviewed. Descriptive analysis is used to identify the frequency and mean values. The findings of the study shows that the welding technology skills have developed in the students as a result of the application of VLE simulator at a high level and the respondents agreed that the skills could be embedded through the application of the VLE simulator. In summary, the VLE simulator is suitable in welding skills development training in terms of exposing new students with the relevant characteristics of welding skills and at the same time spurring the students’ interest towards learning more about the skills.Keywords: computer-based training (CBT), knowledge workers (K-workers), virtual learning environment, welding simulator, welding technology
Procedia PDF Downloads 34832075 Design of a Professional Development Framework in Teaching and Learning for Engineering Educators
Authors: Orla McConnell, Cormac MacMahon, Jen Harvey
Abstract:
Ireland’s national professional development framework for those who teach in higher education, aims to provide guidance and leadership in the planning, developing and engaging in professional development practices. A series of pilot projects have been initiated to help explore the framework’s likely utility and acceptance by educators and their institutions. These projects require engagement with staff in the interpretation and adaption of the framework within their working contexts. The purpose of this paper is to outline the development of one such project with engineering educators at three Institutes of Technology seeking designation as a technological university. The initiative aims to gain traction in the acceptance of the framework with the engineering education community by linking core and discipline-specific teaching and learning competencies with professional development activities most valued by engineering educators. Informed by three strands of literature: professional development in higher education; engineering education; and teaching and learning training provisions, the project begins with a survey of all those involved in teaching and learning in engineering across the three institutes. Based on engagement with key stakeholders, subsequent qualitative research informs the contextualization of the national framework for discipline-specific and institutional piloting. The paper concludes by exploring engineering educator perceptions of the national framework’s utility based on their engagement with the pilot process. Feedback from the pilot indicates that there is a significant gap between the professional development needs of engineering educators and the current professional development provision in teaching and learning.Keywords: engineering education, pilot, professional development, teaching and learning
Procedia PDF Downloads 32932074 Distance Education Technologies for Empowerment and Equity in an Information Technology Environment
Authors: Leila Goosen, Toppie N. Mukasa-Lwanga
Abstract:
The purpose of this paper relates to exploring academics’ use of distance education technologies for empowerment and equity in an Information Technology environment. Literature was studied on academics’ technology use towards effective teaching and meaningful learning in a distance education Information Technology environment. Main arguments presented center on formulating and situating significant concepts within an appropriate theoretical and conceptual framework, including those related to distance education, throughput and other measures of academic efficiency. The research design, sampling, data collection instrument and the validity and reliability thereof, as well as the data analysis method used is described. The paper discusses results related to academics’ use of technology towards effective teaching and meaningful learning in a distance education Information Technology environment. Conclusions are finally presented on the way in which this paper makes a significant and original contribution regarding academics’ use of technology towards effective teaching and meaningful learning in a distance education Information Technology environment.Keywords: distance, education, technologies, Information Technology Environment
Procedia PDF Downloads 52332073 Ranking of the Main Criteria for Contractor Selection Procedures on Major Construction Projects in Libya Using the Delphi Method
Authors: Othoman Elsayah, Naren Gupta, Binsheng Zhang
Abstract:
The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organizations and is central to the success of any construction project. Contractor selection (CS) is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be conducted prior to the award of contract, characterized by many factors such as: contactor’s skills, experience on similar projects, track- record in the industry, and financial stability. However, this paper evaluates the current state of knowledge in relation to contractor selection process and demonstrates the findings from the analysis of the data collected from the Delphi questionnaire survey. The survey was conducted with a group of 12 experts working in the Libyan construction industry (LCI). The paper starts by briefly explaining the general outline of the questionnaire including the survey participation rate, the different fields the experts came from, and the business titles of the participants. Then, the paper describes the tests used to determine when the experts had reached consensus. The paper is based on research which aims to develop rank contractor selection criteria with specific application to make construction projects in the Libyan context. The findings of this study will be utilized to establish the scope of work that will be used as part of a PhD research.Keywords: contractor selection, Libyan construction industry, decision experts, Delphi technique
Procedia PDF Downloads 33232072 Digital Transformation and Environmental Disclosure in Industrial Firms: The Moderating Role of the Top Management Team
Authors: Yongxin Chen, Min Zhang
Abstract:
As industrial enterprises are the primary source of national pollution, environmental information disclosure is a crucial way to demonstrate to stakeholders the work they have done in fulfilling their environmental responsibilities and accepting social supervision. In the era of the digital economy, many companies, actively embracing the opportunities that come with digital transformation, have begun to apply digital technology to information collection and disclosure within the enterprise. However, less is known about the relationship between digital transformation and environmental disclosure. This study investigates how enterprise digital transformation affects environmental disclosure in 643 Chinese industrial companies, according to information processing theory. What is intriguing is that the depth (size) and breadth (diversity) of environmental disclosure linearly increase with the rise in the collection, processing, and analytical capabilities in the digital transformation process. However, the volume of data will grow exponentially, leading to a marginal increase in the economic and environmental costs of utilizing, storing, and managing data. In our empirical findings, linearly increasing benefits and marginal costs create a unique inverted U-shaped relationship between the degree of digital transformation and environmental disclosure in the Chinese industrial sector. Besides, based on the upper echelons theory, we also propose that the top management team with high stability and managerial capabilities will invest more effort and expense into improving environmental disclosure quality, lowering the carbon footprint caused by digital technology, maintaining data security etc. In both these contexts, the increasing marginal cost curves would become steeper, weakening the inverted U-shaped slope between DT and ED.Keywords: digital transformation, environmental disclosure, the top management team, information processing theory, upper echelon theory
Procedia PDF Downloads 14232071 Empirical Study of Correlation between the Cost Performance Index Stability and the Project Cost Forecast Accuracy in Construction Projects
Authors: Amin AminiKhafri, James M. Dawson-Edwards, Ryan M. Simpson, Simaan M. AbouRizk
Abstract:
Earned value management (EVM) has been introduced as an integrated method to combine schedule, budget, and work breakdown structure (WBS). EVM provides various indices to demonstrate project performance including the cost performance index (CPI). CPI is also used to forecast final project cost at completion based on the cost performance during the project execution. Knowing the final project cost during execution can initiate corrective actions, which can enhance project outputs. CPI, however, is not constant during the project, and calculating the final project cost using a variable index is an inaccurate and challenging task for practitioners. Since CPI is based on the cumulative progress values and because of the learning curve effect, CPI variation dampens and stabilizes as project progress. Although various definitions for the CPI stability have been proposed in literature, many scholars have agreed upon the definition that considers a project as stable if the CPI at 20% completion varies less than 0.1 from the final CPI. While 20% completion point is recognized as the stability point for military development projects, construction projects stability have not been studied. In the current study, an empirical study was first conducted using construction project data to determine the stability point for construction projects. Early findings have demonstrated that a majority of construction projects stabilize towards completion (i.e., after 70% completion point). To investigate the effect of CPI stability on cost forecast accuracy, the correlation between CPI stability and project cost at completion forecast accuracy was also investigated. It was determined that as projects progress closer towards completion, variation of the CPI decreases and final project cost forecast accuracy increases. Most projects were found to have 90% accuracy in the final cost forecast at 70% completion point, which is inlined with findings from the CPI stability findings. It can be concluded that early stabilization of the project CPI results in more accurate cost at completion forecasts.Keywords: cost performance index, earned value management, empirical study, final project cost
Procedia PDF Downloads 15632070 Project Time and Quality Management during Construction
Authors: Nahed Al-Hajeri
Abstract:
Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time
Procedia PDF Downloads 24232069 A Thematic Analysis on the Drivers of Community Participation for River Restoration Projects, the Case of Kerala, India
Authors: Alvin Manuel Vazhayil, Chaozhong Tan, Karl M. Wantzen
Abstract:
As local community participation in river restoration projects is increasingly recognized to be crucial for sustainable outcomes, researchers are exploring factors that motivate community participation globally. In India, while there is consensus in literature on the importance of community engagement in river restoration projects, research on what drives local communities to participate is limited, especially given the societal and economic challenges common in the Global South. This study addresses this gap by exploring the drivers of community participation in the local river restoration initiatives of the "Now Let Me Flow" campaign in Kerala, India. The project aimed to restore 87,000 kilometers of streams through the middle-ground governance approach that integrated bottom-up community efforts with top-down governmental support. The fieldwork involved interviews with 26 key agents, including local leaders, policy practitioners, politicians, and environmental activists associated with the project, and the collection of secondary data from 12 documents including project reports and news articles. The data was analyzed in NVivo (NVivo 11 Plus for Windows, version 11.3.0.773) using thematic analysis which included two cycles of systematic coding. The findings reveal two main drivers influencing community participation: top-down actions from local governments, and bottom-up drivers within the community. The study highlights the importance of local stakeholder collaboration, support of local governments, and local community engagement in successful river restoration projects. These findings are consistent with other empirical studies on participatory environmental problem-solving globally. The results offer crucial insights for policymakers and governments to better design and implement effective and sustainable participatory river restoration projects.Keywords: community initiatives, drivers of participation, environmental governance, river restoration
Procedia PDF Downloads 2632068 Re-Development and Lost Industrial History: Darling Harbour of Sydney
Authors: Ece Kaya
Abstract:
Urban waterfront re-development is a well-established phenomenon internationally since 1960s. In cities throughout the world, old industrial waterfront land is being redeveloped into luxury housing, offices, tourist attractions, cultural amenities and shopping centres. These developments are intended to attract high-income residents, tourists and investors to the city. As urban waterfronts are iconic places for the cities and catalyst for further development. They are often referred as flagship project. In Sydney, the re-development of industrial waterfront has been exposed since 1980s with Darling Harbour Project. Darling Harbour waterfront used to be the main arrival and landing place for commercial and industrial shipping until 1970s. Its urban development has continued since the establishment of the city. It was developed as a major industrial and goods-handling precinct in 1812. This use was continued by the mid-1970s. After becoming a redundant industrial waterfront, the area was ripe for re-development in 1984. Darling Harbour is now one of the world’s fascinating waterfront leisure and entertainment destinations and its transformation has been considered as a success story. It is a contradictory statement for this paper. Data collection was carried out using an extensive archival document analysis. The data was obtained from Australian Institute of Architects, City of Sydney Council Archive, Parramatta Heritage Office, Historic Houses Trust, National Trust, and University of Sydney libraries, State Archive, State Library and Sydney Harbour Foreshore Authority Archives. Public documents, primarily newspaper articles and design plans, were analysed to identify possible differences in motives and to determine the process of implementation of the waterfront redevelopments. It was also important to obtain historical photographs and descriptions to understand how the waterfront had been altered. Sites maps in different time periods have been identified to understand what kind of changes happened on the urban landscape and how the developments affected areas. Newspaper articles and editorials have been examined in order to discover what aspects of the projects reflected the history and heritage. The thematic analysis of the archival data helped determine Darling Harbour is a historically important place as it had represented a focal point for Sydney's industrial growth and the cradle of industrial development in European Australia. It has been found that the development area was designated in order to be transformed to a place for tourist, education, recreational, entertainment, cultural and commercial activities and as a result little evidence remained of its industrial past. This paper aims to discuss the industrial significance of Darling Harbour and to explain the changes on its industrial landscape. What is absent now is the layer of its history that creates the layers of meaning to the place so its historic industrial identity is effectively lost.Keywords: historical significance, industrial heritage, industrial waterfront, re-development
Procedia PDF Downloads 30132067 A Literature Review on Sustainability Appraisal Methods for Highway Infrastructure Projects
Authors: S. Kaira, S. Mohamed, A. Rahman
Abstract:
Traditionally, highway infrastructure projects are initiated based on their economic benefits, thereafter environmental, social and governance impacts are addressed discretely for the selected project from a set of pre-determined alternatives. When opting for cost-benefit analysis (CBA), multi-criteria decision-making (MCDM) has been used as the default assessment tool. But this tool has been critiqued as it does not mimic the real-world dynamic environment. Indeed, it is because of the fact that public sector projects like highways have to experience intense exposure to dynamic environments. Therefore, it is essential to appreciate the impacts of various dynamic factors (factors that change or progress with the system) on project performance. Thus, this paper presents various sustainability assessment tools that have been globally developed to determine sustainability performance of infrastructure projects during the design, procurement and commissioning phase. Indeed, identification of the current gaps in the available assessment methods provides a potential to add prominent part of knowledge in the field of ‘road project development systems and procedures’ that are generally used by road agencies.Keywords: dynamic impact factors, micro and macro factors, sustainability assessment framework, sustainability performance
Procedia PDF Downloads 13932066 Prioritization Assessment of Housing Development Risk Factors: A Fuzzy Hierarchical Process-Based Approach
Authors: Yusuf Garba Baba
Abstract:
The construction industry and housing subsector are fraught with risks that have the potential of negatively impacting on the achievement of project objectives. The success or otherwise of most construction projects depends to large extent on how well these risks have been managed. The recent paradigm shift by the subsector to use of formal risk management approach in contrast to hitherto developed rules of thumb means that risks must not only be identified but also properly assessed and responded to in a systematic manner. The study focused on identifying risks associated with housing development projects and prioritisation assessment of the identified risks in order to provide basis for informed decision. The study used a three-step identification framework: review of literature for similar projects, expert consultation and questionnaire based survey to identify potential risk factors. Delphi survey method was employed in carrying out the relative prioritization assessment of the risks factors using computer-based Analytical Hierarchical Process (AHP) software. The results show that 19 out of the 50 risks significantly impact on housing development projects. The study concludes that although significant numbers of risk factors have been identified as having relevance and impacting to housing construction projects, economic risk group and, in particular, ‘changes in demand for houses’ is prioritised by most developers as posing a threat to the achievement of their housing development objectives. Unless these risks are carefully managed, their effects will continue to impede success in these projects. The study recommends the adoption and use of the combination of multi-technique identification framework and AHP prioritization assessment methodology as a suitable model for the assessment of risks in housing development projects.Keywords: risk management, risk identification, risk analysis, analytic hierarchical process
Procedia PDF Downloads 11832065 An Investigation into Enablers and Barriers of Reverse Technology Transfer
Authors: Nirmal Kundu, Chandan Bhar, Visveswaran Pandurangan
Abstract:
Technology is the most valued possession for a country or an organization. The economic development depends not on stock of technology but on the capabilities how the technology is being exploited. The technology transfer is the best way how the developing countries have an access to state-of- the-art technology. Traditional technology transfer is a unidirectional phenomenon where technology is transferred from developed to developing countries. But now there is a change of wind. There is a general agreement that global shift of economic power is under way from west to east. As China and India are making the transition from users to producers, and producers to innovators, this has increasing important implications on economy, technology and policy of global trade. As a result, Reverse technology transfer has become a phenomenon and field of study in technology management. The term “Reverse Technology Transfer” is not well defined. Initially the concept of Reverse technology transfer was associated with the phenomenon of “Brain drain” from developing to developed countries. In the second phase, Reverse Technology Transfer was associated with the transfer of knowledge and technology from subsidiaries to multinationals. Finally, time has come now to extend the concept of reverse technology transfer to two different organizations or countries related or unrelated by traditional technology transfer but the transfer or has essentially received the technology through traditional mode of technology transfer. The objective of this paper is to study; 1) the present status of Reverse technology transfer, 2) the factors which are the enablers and barriers of Reverse technology transfer and 3) how the reverse technology transfer strategy can be integrated in the technology policy of a country which will give the countries an economic boost. The research methodology used in this study is a combination of literature review, case studies and key informant interviews. The literature review includes both published as well as unpublished sources of literature. In case study, attempt has been made to study the records of reverse technology transfer that have been occurred in developing countries. In case of key informant interviews, informal telephonic discussions have been carried out with the key executives of the organizations (industry, university and research institutions) who are actively engaged in the process of technology transfer- traditional as well as reverse. Reverse technology transfer is possible only by creating technological capabilities. Following four important enablers coupled with government active and aggressive action can help to build technology base to reach to the goal of Reverse technology transfer 1) Imitation to innovation, 2) Reverse engineering, 3) Collaborative R & D approach, and 4) Preventing reverse brain drain. The barriers that come in the way are the mindset of over dependence, over subordination and parent–child attitude (not adult attitude). Exploitation of these enablers and overcoming the barriers of reverse technology transfer, the developing countries like India and China can prove that going “reverse” is the best way to move forward and again establish themselves as leader of the future world.Keywords: barriers of reverse technology transfer, enablers of reverse technology transfer, knowledge transfer, reverse technology transfer, technology transfer
Procedia PDF Downloads 39932064 Five Years Analysis and Mitigation Plans on Adjustment Orders Impacts on Projects in Kuwait's Oil and Gas Sector
Authors: Rawan K. Al-Duaij, Salem A. Al-Salem
Abstract:
Projects, the unique and temporary process of achieving a set of requirements have always been challenging; Planning the schedule and budget, managing the resources and risks are mostly driven by a similar past experience or the technical consultations of experts in the matter. With that complexity of Projects in Scope, Time, and execution environment, Adjustment Orders are tools to reflect changes to the original project parameters after Contract signature. Adjustment Orders are the official/legal amendments to the terms and conditions of a live Contract. Reasons for issuing Adjustment Orders arise from changes in Contract scope, technical requirement and specification resulting in scope addition, deletion, or alteration. It can be as well a combination of most of these parameters resulting in an increase or decrease in time and/or cost. Most business leaders (handling projects in the interest of the owner) refrain from using Adjustment Orders considering their main objectives of staying within budget and on schedule. Success in managing the changes results in uninterrupted execution and agreed project costs as well as schedule. Nevertheless, this is not always practically achievable. In this paper, a detailed study through utilizing Industrial Engineering & Systems Management tools such as Six Sigma, Data Analysis, and Quality Control were implemented on the organization’s five years records of the issued Adjustment Orders in order to investigate their prevalence, and time and cost impact. The analysis outcome revealed and helped to identify and categorize the predominant causations with the highest impacts, which were considered most in recommending the corrective measures to reach the objective of minimizing the Adjustment Orders impacts. Data analysis demonstrated no specific trend in the AO frequency in past five years; however, time impact is more than the cost impact. Although Adjustment Orders might never be avoidable; this analysis offers’ some insight to the procedural gaps, and where it is highly impacting the organization. Possible solutions are concluded such as improving project handling team’s coordination and communication, utilizing a blanket service contract, and modifying the projects gate system procedures to minimize the possibility of having similar struggles in future. Projects in the Oil and Gas sector are always evolving and demand a certain amount of flexibility to sustain the goals of the field. As it will be demonstrated, the uncertainty of project parameters, in adequate project definition, operational constraints and stringent procedures are main factors resulting in the need for Adjustment Orders and accordingly the recommendation will be to address that challenge.Keywords: adjustment orders, data analysis, oil and gas sector, systems management
Procedia PDF Downloads 16332063 Internet of Things (IoT): An Analysis of Cost, Benefits, Risks and Enablers
Authors: Shwadhin Sharma, Monica Perez, Vinita Patel, Tyler Kuwatani, Siobhan Scott
Abstract:
The purpose of this research is to explain and analyze why the Internet of Things (IoT) is an emerging technology trend. The aspects of this research paper include an overview of IoT, what research has already been done, the benefits, implications, and our own perspectives on the trend in order to thoroughly analyze how the trend of IoT will make an impact on society. Through the identification of what makes IoT important, it is concluded that IoT will have a tremendous impact for the whole world. Technology is never going to go away, it is going to get smarter and have the potential to change the world.Keywords: internet of things, enablers of IoT, cost of IoT, benefits of IoT
Procedia PDF Downloads 35632062 Dynamical Characteristics of Interaction between Water Droplet and Aerosol Particle in Dedusting Technology
Authors: Ding Jue, Li Jiahua, Lei Zhidi, Weng Peifen, Li Xiaowei
Abstract:
With the rapid development of national modern industry, people begin to pay attention to environmental pollution and harm caused by industrial dust. Based on above, a numerical study on the dedusting technology of industrial environment was conducted. The dynamic models of multicomponent particles collision and coagulation, breakage and deposition are developed, and the interaction of water droplet and aerosol particle in 2-Dimension flow field was researched by Eulerian-Lagrangian method and Multi-Monte Carlo method. The effects of the droplet scale, movement speed of droplet and the flow field structure on scavenging efficiency were analyzed. The results show that under the certain condition, 30μm of droplet has the best scavenging efficiency. At the initial speed 1m/s of droplets, droplets and aerosol particles have more time to interact, so it has a better scavenging efficiency for the particle.Keywords: water droplet, aerosol particle, collision and coagulation, multi-monte carlo method
Procedia PDF Downloads 30632061 The Determinant Factors of Technology Adoption for Improving Firm’s Performance; Toward a Conceptual Model
Authors: Zainal Arifin, Avanti Fontana
Abstract:
Considering that TOE framework is the most useful instrument for studying technology adoption in firm context, this paper will analyze the influence of technological, organizational and environmental (TOE) factors to the Dynamic capabilities (DCs) associated with technology adoption strategy for improving the firm’s performance. Focusing on the determinant factors of technology adoption at the firm level, the study will contribute to the broader study of resource base view (RBV) and dynamic capability (DC). There is no study connecting directly the TOE factors to the DCs, this paper proposes technology adoption as a functional competence/capability which mediates a relationship between technology adoptions with firm’s performance. The study wants to show a conceptual model of the indirect effects of DCs at the firm level, which can be key predictors of firm performance in dynamic business environment. The results of this research is mostly relevant to top corporate executives (BOD) or top management team (TMT) who seek to provide some supporting ‘hardware’ content and condition such as technological factors, organizational factors, environmental factors, and to improve firm's ‘software ‘ ability such as adaptive capability, absorptive capability and innovative capability, in order to achieve a successful technology adoption in organization. There are also mediating factors which are elaborated at this paper; timing and external network. A further research for showing its empirical results is highly recommended.Keywords: technology adoption, TOE framework, dynamic capability, resources based view
Procedia PDF Downloads 33232060 The Role of People and Data in Complex Spatial-Related Long-Term Decisions: A Case Study of Capital Project Management Groups
Authors: Peter Boyes, Sarah Sharples, Paul Tennent, Gary Priestnall, Jeremy Morley
Abstract:
Significant long-term investment projects can involve complex decisions. These are often described as capital projects, and the factors that contribute to their complexity include budgets, motivating reasons for investment, stakeholder involvement, interdependent projects, and the delivery phases required. The complexity of these projects often requires management groups to be established involving stakeholder representatives; these teams are inherently multidisciplinary. This study uses two university campus capital projects as case studies for this type of management group. Due to the interaction of projects with wider campus infrastructure and users, decisions are made at varying spatial granularity throughout the project lifespan. This spatial-related context brings complexity to the group decisions. Sensemaking is the process used to achieve group situational awareness of a complex situation, enabling the team to arrive at a consensus and make a decision. The purpose of this study is to understand the role of people and data in the complex spatial related long-term decision and sensemaking processes. The paper aims to identify and present issues experienced in practical settings of these types of decision. A series of exploratory semi-structured interviews with members of the two projects elicit an understanding of their operation. From two stages of thematic analysis, inductive and deductive, emergent themes are identified around the group structure, the data usage, and the decision making within these groups. When data were made available to the group, there were commonly issues with the perception of veracity and validity of the data presented; this impacted the ability of group to reach consensus and, therefore, for decisions to be made. Similarly, there were different responses to forecasted or modelled data, shaped by the experience and occupation of the individuals within the multidisciplinary management group. This paper provides an understanding of further support required for team sensemaking and decision making in complex capital projects. The paper also discusses the barriers found to effective decision making in this setting and suggests opportunities to develop decision support systems in this team strategic decision-making process. Recommendations are made for further research into the sensemaking and decision-making process of this complex spatial-related setting.Keywords: decision making, decisions under uncertainty, real decisions, sensemaking, spatial, team decision making
Procedia PDF Downloads 13132059 Quality Culture Framework Proposal for Libyan Industrial Companies
Authors: Mostafa Ahmed Shokshok
Abstract:
Libyan industrial companies face many challenges in today's competitive market. Quality management culture approaches is one of these challenges which may furnish the road to the Libyan industrial companies to effectively empower their employees and improve their ability to respond to the international competition. The primary objective of this paper is to design a practical approach to guide Libyan industrial companies toward successful quality culture implementation.Keywords: TQM, quality culture, Libyan manufacturing industries, quality framework
Procedia PDF Downloads 41632058 Accelerating Sustainable Urban Transition Through Green Technology Innovation and Clean Energy to Achieve Net Zero Emissions
Authors: Emma Serwaa Obobisa
Abstract:
Urbanization has become the focus for challenging goals relating to environmental performance, such as carbon neutrality. Green technological innovation and clean energy are considered the prominent factors in reducing emissions and achieving sustainable cities. Through the application of a fixed effect model, generalized method of moments, and quantile-on-quantile regression, this study explores the role of green technology innovation and clean energy in accelerating the sustainable urban transition towards net zero emissions in developing countries while controlling for nonrenewable energy consumption, and economic growth. The long-run results show that green technology innovation and renewable energy consumption reduce CO₂ emissions from urban residential buildings. In contrast, economic growth and nonrenewable energy consumption increase CO₂ emissions. This study proposes a consistent technique for encouraging green technological innovation and renewable energy projects in developing countries where the role of innovation in achieving carbon neutrality is still understudied.Keywords: green technology innovation, renewable energy, urbanization, net zero emissions
Procedia PDF Downloads 3432057 Quantitative Analysis of Three Sustainability Pillars for Water Tradeoff Projects in Amazon
Authors: Taha Anjamrooz, Sareh Rajabi, Hasan Mahmmud, Ghassan Abulebdeh
Abstract:
Water availability, as well as water demand, are not uniformly distributed in time and space. Numerous extra-large water diversion projects are launched in Amazon to alleviate water scarcities. This research utilizes statistical analysis to examine the temporal and spatial features of 40 extra-large water diversion projects in Amazon. Using a network analysis method, the correlation between seven major basins is measured, while the impact analysis method is employed to explore the associated economic, environmental, and social impacts. The study unearths that the development of water diversion in Amazon has witnessed four stages, from a preliminary or initial period to a phase of rapid development. It is observed that the length of water diversion channels and the quantity of water transferred have amplified significantly in the past five decades. As of 2015, in Amazon, more than 75 billion m³ of water was transferred amidst 12,000 km long channels. These projects extend over half of the Amazon Area. The River Basin E is currently the most significant source of transferred water. Through inter-basin water diversions, Amazon gains the opportunity to enhance the Gross Domestic Product (GDP) by 5%. Nevertheless, the construction costs exceed 70 billion US dollars, which is higher than any other country. The average cost of transferred water per unit has amplified with time and scale but reduced from western to eastern Amazon. Additionally, annual total energy consumption for pumping exceeded 40 billion kilowatt-hours, while the associated greenhouse gas emissions are assessed to be 35 million tons. Noteworthy to comprehend that ecological problems initiated by water diversion influence the River Basin B and River Basin D. Due to water diversion, more than 350 thousand individuals have been relocated, away from their homes. In order to enhance water diversion sustainability, four categories of innovative measures are provided for decision-makers: development of water tradeoff projects strategies, improvement of integrated water resource management, the formation of water-saving inducements, and pricing approach, and application of ex-post assessment.Keywords: sustainability, water trade-off projects, environment, Amazon
Procedia PDF Downloads 12932056 Current Status and Future Trends of Mechanized Fruit Thinning Devices and Sensor Technology
Authors: Marco Lopes, Pedro D. Gaspar, Maria P. Simões
Abstract:
This paper reviews the different concepts that have been investigated concerning the mechanization of fruit thinning as well as multiple working principles and solutions that have been developed for feature extraction of horticultural products, both in the field and industrial environments. The research should be committed towards selective methods, which inevitably need to incorporate some kinds of sensor technology. Computer vision often comes out as an obvious solution for unstructured detection problems, although leaves despite the chosen point of view frequently occlude fruits. Further research on non-traditional sensors that are capable of object differentiation is needed. Ultrasonic and Near Infrared (NIR) technologies have been investigated for applications related to horticultural produce and show a potential to satisfy this need while simultaneously providing spatial information as time of flight sensors. Light Detection and Ranging (LIDAR) technology also shows a huge potential but it implies much greater costs and the related equipment is usually much larger, making it less suitable for portable devices, which may serve a purpose on smaller unstructured orchards. Portable devices may serve a purpose on these types of orchards. In what concerns sensor methods, on-tree fruit detection, major challenge is to overcome the problem of fruits’ occlusion by leaves and branches. Hence, nontraditional sensors capable of providing some type of differentiation should be investigated.Keywords: fruit thinning, horticultural field, portable devices, sensor technologies
Procedia PDF Downloads 13932055 Technology Assessment: Exploring Possibilities to Encounter Problems Faced by Intellectual Property through Blockchain
Authors: M. Ismail, E. Grifell-Tatjé, A. Paz
Abstract:
A significant discussion on the topic of blockchain as a solution to the issues of intellectual property highlights the relevance that this topic holds. Some experts label this technology as destructive since it holds immense potential to change course of traditional practices. The extent and areas to which this technology can be of use are still being researched. This paper provides an in-depth review on the intellectual property and blockchain technology. Further it explores what makes blockchain suitable for intellectual property, the practical solutions available and the support different governments are offering. This paper further studies the framework of universities in context of its outputs and how can they be streamlined using blockchain technology. The paper concludes by discussing some limitations and future research question.Keywords: blockchain, decentralization, open innovation, intellectual property, patents, university-industry relationship
Procedia PDF Downloads 18532054 Education Quality Development for Excellence Performance with Higher Education by Using COBIT 5
Authors: Kemkanit Sanyanunthana
Abstract:
The purpose of this research is to study the management system of information technology which supports the education of five private universities in Thailand, according to the case studies which have been developing their qualities and standards of management and education by service provision of information technology to support the excellence performance. The concept to connect information technology with a suitable system has been created by information technology administrators for development, as a system that can be used throughout the organizations to help reach the utmost benefits of using all resources. Hence, the researcher as a person who has been performing these duties within higher education is interested to do this research by selecting the Control Objective for Information and Related Technology 5 (COBIT 5) for the Malcolm Baldrige National Quality Award (MBNQA) of America, or the National Award which applies the concept of Total Quality Management (TQM) to the organization evaluation. Such evaluation is called the Education Criteria for Performance Excellence (EdPEx) focuses on studying and comparing education quality development for excellent performance using COBIT 5 in terms of information technology to study the problems and obstacles of the investigation process for an information technology system, which is considered as an instrument to drive all organizations to reach the excellence performance of the information technology, and to be the model of evaluation and analysis of the process to be in accordance with the strategic plans of the information technology in the universities. This research is conducted in the form of descriptive and survey research according to the case studies. The data collection were carried out by using questionnaires through the administrators working related to the information technology field, and the research documents related to the change management as the main study. The research can be concluded that the performance based on the APO domain process (ALIGN, PLAN AND ORGANISE) of the COBIT 5 standard frame, which emphasizes concordant governance and management of strategic plans for the organizations, could reach only 95%. This might be because of some restrictions such as organizational cultures; therefore, the researcher has studied and analyzed the management of information technology in universities as a whole, under the organizational structures, to reach the performance in accordance with the overall APO domain which would affect the determined strategic plans to be able to develop based on the excellence performance of information technology, and to apply the risk management system at the organizational level into every performance process which would develop the work effectiveness for the resources management of information technology to reach the utmost benefits.
Keywords: COBIT5, APO, EdPEx Criteria, MBNQA
Procedia PDF Downloads 32632053 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects
Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry
Abstract:
Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry
Procedia PDF Downloads 194