6792 Developing an Automated Protocol for the Wristband Extraction Process Using Opentrons
Authors: Tei Kim, Brooklynn McNeil, Kathryn Dunn, Douglas I. Walker
Abstract:
To better characterize the relationship between complex chemical exposures and disease, our laboratory uses an approach that combines low-cost, polydimethylsiloxane (silicone) wristband samplers that absorb many of the chemicals we are exposed to with untargeted high-resolution mass spectrometry (HRMS) to characterize 1000’s of chemicals at a time. In studies with human populations, these wristbands can provide an important measure of our environment: however, there is a need to use this approach in large cohorts to study exposures associated with the disease. To facilitate the use of silicone samplers in large scale population studies, the goal of this research project was to establish automated sample preparation methods that improve throughput, robustness, and scalability of analytical methods for silicone wristbands. Using the Opentron OT2 automated liquid platform, which provides a low-cost and opensource framework for automated pipetting, we created two separate workflows that translate the manual wristband preparation method to a fully automated protocol that requires minor intervention by the operator. These protocols include a sequence generation step, which defines the location of all plates and labware according to user-specified settings, and a transfer protocol that includes all necessary instrument parameters and instructions for automated solvent extraction of wristband samplers. These protocols were written in Python and uploaded to GitHub for use by others in the research community. Results from this project show it is possible to establish automated and open source methods for the preparation of silicone wristband samplers to support profiling of many environmental exposures. Ongoing studies include deployment in longitudinal cohort studies to investigate the relationship between personal chemical exposure and disease.Keywords: bioinformatics, automation, opentrons, research
Procedia PDF Downloads 1156791 Managing Organizational Change for a Transformation Project: The Billing and Customer Relationship Management Journey
Authors: Sharifah I. N. A. Syed Azmi, Nazarina Mohd Nasir
Abstract:
The Billing & Customer Relationship Management (BCRM) project is an important enabler towards realizing customer experience transformation. It involves technological shifts for future scalability, revision of multiple business processes and adoption of change by the users and impacted employees. This massive transition, if not managed properly, may result in the decline of business performance due to productivity drop. Organizational change management is an essential element in BCRM project implementation to ensure the system is well understood and embraced by all stakeholders. In order to move impacted employees from unaware state or denial mode to full-acceptance mindset and committing themselves in using the new system, their involvement in the whole change process starting from the initial stage is imperative. Through the BCRM Change Management Plan, a holistic approach was taken whereby the strategy and program for five key components namely executive sponsorship, continuous communication, process change readiness, organizational readiness and individual readiness were all carefully established. Roles of the project sponsor, change agents, change ambassadors and community of practice (CoP) were clearly defined in gaining high commitment and support across the entire organization. Continuous communication and engagement initiatives throughout project implementation have been carried out to reach all stakeholders. The business readiness was constantly monitored and assessed including effectiveness of end-user training, thorough review of process documentation and completion of roles realignment exercise.Keywords: BCRM, change management, organizational change, transformation project
Procedia PDF Downloads 1416790 Applications of Building Information Modeling (BIM) in Knowledge Sharing and Management in Construction
Authors: Shu-Hui Jan, Shih-Ping Ho, Hui-Ping Tserng
Abstract:
Construction knowledge can be referred to and reused among involved project managers and job-site engineers to alleviate problems on a construction job-site and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology to provide sharing of construction knowledge by using the Building Information Modeling (BIM) approach. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format, and facilitation of easy updating and transfer of information in the 3D BIM environment. Using the BIM approach, project managers and engineers can gain knowledge related to 3D BIM and obtain feedback provided by job-site engineers for future reference. This study addresses the application of knowledge sharing management in the construction phase of construction projects and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to verify the proposed methodology and demonstrate the effectiveness of sharing knowledge in the BIM environment. The combined results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM approach and web technology.Keywords: construction knowledge management, building information modeling, project management, web-based information system
Procedia PDF Downloads 3526789 The Mineral and Petroleum Sectors of Papua New Guinea: An Overview
Authors: James Wapyer, Simon A. Kawagle
Abstract:
The current downturn in the metal and oil prices has significantly affected the mineral and petroleum sectors of Papua New Guinea. The sectors have not grown substantially in the last three years compared to previous years. Resources of several projects have not been proved up as well as feasibility studies not undertaken on advanced projects. In the 2012-2015 periods, however, development licences for four projects have been granted - the Solwara-1 project in the Manus Basin, the Woodlark project, the Crater Mountains project and the Stanley gas-condensate project. There has been some progress on three advanced projects – Frieda River copper-gold porphyry, Mount Kare gold, and the Wafi-Golpu projects. The oilfields are small by world standard but have been high rates of production. The developments of liquefied natural gas projects are progressing well and the first LNG project with ExxonMobil and partners shipped its first cargo in May 2014, the second with Total and partners involving Elk-Antelope gas-condensate fields is in its development stage, and the third with Horizon Oil and partners involving gas fields in the western Papuan basin is in the planning stage. Significantly, in the years 2012-2015, the country has exported liquefied natural gas, nickel, cobalt and chromium, and has granted exploration licences for iron-sands and coal measures for the first time.Keywords: exploration, mineral, Papua New Guinea, petroleum
Procedia PDF Downloads 2706788 The Advancement of Environmental Impact Assessment for 5th Transmission Natural Gas Pipeline Project in Thailand
Authors: Penrug Pengsombut, Worawut Hamarn, Teerawuth Suwannasri, Kittiphong Songrukkiat, Kanatip Ratanachoo
Abstract:
PTT Public Company Limited or simply PTT has played an important role in strengthening national energy security of the Kingdom of Thailand by transporting natural gas to customers in power, industrial and commercial sectors since 1981. PTT has been constructing and operating natural gas pipeline system of over 4,500-km network length both onshore and offshore laid through different area classifications i.e., marine, forest, agriculture, rural, urban, and city areas. During project development phase, an Environmental Impact Assessment (EIA) is conducted and submitted to the Office of Natural Resources and Environmental Policy and Planning (ONEP) for approval before project construction commencement. Knowledge and experiences gained and revealed from EIA in the past projects definitely are developed to further advance EIA study process for newly 5th Transmission Natural Gas Pipeline Project (5TP) with approximately 415 kilometers length. The preferred pipeline route is selected and justified by SMARTi map, an advance digital one-map platform with consists of multiple layers geographic and environmental information. Sensitive area impact focus (SAIF) is a practicable impact assessment methodology which appropriate for a particular long distance infrastructure project such as 5TP. An environmental modeling simulation is adopted into SAIF methodology for impact quantified in all sensitive areas whereas other area along pipeline right-of-ways is typically assessed as an impact representative. Resulting time and cost deduction is beneficial to project for early start.Keywords: environmental impact assessment, EIA, natural gas pipeline, sensitive area impact focus, SAIF
Procedia PDF Downloads 4086787 A Case Study in Using the Can-Sized Satellite Platforms for Interdisciplinary Problem-Based Learning in Aeronautical and Electronic Engineering
Authors: Michael Johnson, Vincenzo Oliveri
Abstract:
This work considers an interdisciplinary Problem-Based Learning (PBL) project developed by lecturers from the Aeronautical and Electronic and Computer Engineering departments at the University of Limerick. This “CANSAT” project utilises the CanSat can-sized satellite platform in order to allow students from aeronautical and electronic engineering to engage in a mixed format (online/face-to-face), interdisciplinary PBL assignment using a real-world platform and application. The project introduces students to the design, development, and construction of the CanSat system over the course of a single semester, enabling student(s) to apply their aeronautical and technical skills/capabilities to the realisation of a working CanSat system. In this case study, the CanSat kits are used to pivot the real-world, discipline-relevant PBL goal of designing, building, and testing the CanSat system with payload(s) from a traditional module-based setting to an online PBL setting. Feedback, impressions, benefits, and challenges identified through the semester are presented. Students found the project to be interesting and rewarding, with the interdisciplinary nature of the project appealing to them. Challenges and difficulties encountered are also addressed, with solutions developed between the students and facilitators to overcoming these discussed.Keywords: problem-based learning, interdisciplinary, engineering, CanSATs
Procedia PDF Downloads 1296786 Encouraging Skills and Entrepreneurial Spirit to Improve Employability of Young Artists
Authors: Olga Lasaga, Carmen Parra
Abstract:
Within the EU 'New Skills for New Jobs' initiative, the art and music sector is considered one of the most vulnerable. Its graduates are faced with the threat of the dole or of not finding work in the sector in which they trained. In this regard, an increasing number of students are graduating every year from European Conservatories and Fine Arts Centres, while the number of job opportunities in this sector has stagnated or decreased. Moreover, the traditional teaching of these institutes does not favour the acquisition of basic skills, such as team building, entrepreneurship, marketing, website design and the design of events, which are among the most important facets of project management and are precisely those aspects that are often most related to the improvement of employability in the art world. To remedy this situation, the results of the European Erasmus+ OMEGA project (Opening More Employment Gates for Art and Music Students) are presented. The OMEGA project aims to increase the employability of art and music students by equipping them with additional skills needed for the search for work. As a result of this project, a manual has been created, a pilot course has been designed and taught, and a comparative study has been conducted on the state of play of the participating countries.Keywords: artists, employability, entrepreneurship, musicians, skills
Procedia PDF Downloads 2436785 MEET (Maximise the Erasmus Experience Together): Gains, Challenges and Proposals
Authors: Susana Olmos, Catherine Spencer
Abstract:
Every year our School in DIT (Dublin Institute of Technology) hosts approximately 80 Erasmus students from partner universities across Europe. Our own students are required to spend a compulsory 3rd year abroad on study and/or work placements. This is an extremely rewarding experience for all of the students, however, it can also be a challenging one. With this in mind, we started a project which aimed to make this transition as easy and productive as possible. The project, which is called MEET: Maximise the Erasmus Experience Together, focuses on the students’ own active engagement in learning and preparation – outside of the classroom –and their own self-directed pursuit of opportunities to develop their confidence and preparedness, which would work as an important foundation for the transformative learning that study abroad implies. We focussed on creating more structured opportunities where Erasmus students from our partner universities (currently studying at DIT) and our second-year students could interact and learn from each other, and in so doing improve both their language and intercultural skills. Our experience so far has been quite positive and we have seen how students taking part in this project have developed as autonomous learners as well as enhanced both their linguistic and intercultural knowledge. As the linguistic element of our project was one of our main priorities, we asked the students to keep a reflective diary on the activities that were organised by the group in the TL. Also, we use questionnaires as well as personal interviews to assess their development. However, there are challenges and proposals we would make to bring this project forward for the near future.Keywords: erasmus, intercultural competence, linguistic competence, extra curriculum activities
Procedia PDF Downloads 3786784 Lapped Gussets Joints in Compression
Authors: K. R. Tshunza, A. Elvin, A. Gabremmeskel
Abstract:
Final results of an extensive laboratory research program on “lapped gusset joints in compression” are presented. The investigation was carried out at the Heavy structures laboratory at the University of the Witwatersrand in Johannesburg, South Africa. A proposed, relatively easy to use analytical equation was found to be reasonably adequate in determining the global compressive capacity of lapped gussets joints under compressive load. A wide range of lapped mild steel plates of varying slenderness, welded on 219*10 and 127*6 Mild steel circular hollow sections of 1m length were tested in compression and the formula was validated with experimental results. The investigation show that the connection’s capacity is controlled by flexure due to the eccentricity between the plates that are connected side to side.Keywords: compression, eccentricity, lapped gussets joints, moment resistance
Procedia PDF Downloads 3086783 Effects of Macrophyte Vallisneria asiatica Biomasses on the Algae Community
Authors: Caixia Kang, Takahiro Kuba, Aimin Hao, Yasushi Iseri, Chunjie Li, Zhenjia Zhang
Abstract:
To improve the water quality of lakes and control algae blooms, The effects of Vallisneria asiatica which is one of aquatic plants spread over Lake Taihu. With different biomasses on the water quality and algae communities were researched. The results indicated that V. asiatica could control an excess of Microcystis spp. When the V. asiatica biomass was larger than 50g in the tank with 30L solution in the laboratory, Planktonic and epiphytic algae responded differently to V. asiatica. The presence of macrophyte V. asiatica in eutrophic waters has a positive effect on algae compositions because of different sensitivities of algae species to allelopathic substances released by macrophyte V. asiatica. That is, V. asiatica could inhibit the growth of Microcystis spp. effectively and was benefited to the diatom on the condition in the laboratory.Keywords: algae bloom, algae community, Microcystis spp., Vallisneria asiatica
Procedia PDF Downloads 3816782 Drawing, Design and Building Information Modelling (BIM): Embedding Advanced Digital Tools in the Academy Programs for Building Engineers and Architects
Authors: Vittorio Caffi, Maria Pignataro, Antonio Cosimo Devito, Marco Pesenti
Abstract:
This paper deals with the integration of advanced digital design and modelling tools and methodologies, known as Building Information Modelling, into the traditional Academy educational programs for building engineers and architects. Nowadays, the challenge the Academy has to face is to present the new tools and their features to the pupils, making sure they acquire the proper skills in order to leverage the potential they offer also for the other courses embedded in the educational curriculum. The syllabus here presented refers to the “Drawing for building engineering”, “2D and 3D laboratory” and “3D modelling” curricula of the MSc in Building Engineering of the Politecnico di Milano. Such topics, included since the first year in the MSc program, are fundamental to give the students the instruments to master the complexity of an architectural or building engineering project with digital tools, so as to represent it in its various forms.Keywords: BIM, BIM curricula, computational design, digital modelling
Procedia PDF Downloads 6696781 Evaluation of Symptoms, Laboratory Findings, and Natural History of IgE Mediated Wheat Allergy
Authors: Soudeh Tabashi, Soudabeh Fazeli Dehkordy, Masood Movahedi, Nasrin Behniafard
Abstract:
Introduction: Food allergy has increased in three last decades. Since wheat is one of the major constituents of daily meal in many regions throughout the world, wheat allergy is one of the most important allergies ranking among the 8 most common types of food allergies. Our information about epidemiology and etiology of food allergies are limited. Therefore, in this study we sought to evaluate the symptoms and laboratory findings in children with wheat allergy. Materials and methods: There were 23 patients aged up to 18 with the diagnosis of IgE mediated wheat allergy that were included enrolled in this study. Using a questionnaire .we collected their information and organized them into 4 groups categories of: demographic data identification, signs and symptoms, comorbidities, and laboratory data. Then patients were followed up for 6 month and their lab data were compared together. Results: Most of the patients (82%) presented the symptoms of wheat allergy in the first year of their life. The skin and the respiratory system were the most commonly involved organs with an incidence of 86% and 78% respectively. Most of the patients with wheat allergy were also sensitive to the other type of foods and their sensitivity to egg were most common type (47%). in 57% of patients, IgE levels were decreased during the 6 month follow-up period. Conclusion: We do not have enough information about data on epidemiology and response to therapy of wheat allergy and to best of our knowledge no study has addressed this issue in Iran so far. This study is the first source of information about IgE mediated wheat allergy in Iran and It can provide an opening for future studies about wheat allergy and its treatments.Keywords: wheat allergy, food allergy, IgE, food allergy
Procedia PDF Downloads 1946780 HEXAFLY-INT Project: Design of a High Speed Flight Experiment
Authors: S. Di Benedetto, M. P. Di Donato, A. Rispoli, S. Cardone, J. Riehmer, J. Steelant, L. Vecchione
Abstract:
Thanks to a coordinated funding by the European Space Agency (ESA) and the European Commission (EC) within the 7th framework program, the High-Speed Experimental Fly Vehicles – International (HEXAFLY-INT) project is aimed at the flight validation of hypersonics technologies enabling future trans-atmospheric flights. The project, which is currently involving partners from Europe, Russian Federation and Australia operating under ESA/ESTEC coordination, will achieve the goal of designing, manufacturing, assembling and flight testing an unpowered high speed vehicle in a glider configuration by 2018. The main technical challenges of the project are specifically related to the design of the vehicle gliding configuration and to the complexity of integrating breakthrough technologies with standard aeronautical technologies, e.g. high temperature protection system and airframe cold structures. Also, the sonic boom impact, which is one of the environmental challenges of the high speed flight, will be assessed. This paper provides a comprehensive and detailed update on all the current projects activities carried out to date on both the vehicle and mission design.Keywords: design, flight testing, HEXAFLY-INT, hypersonics
Procedia PDF Downloads 4686779 Critical Success Factors Influencing Construction Project Performance for Different Objectives: Procurement Phase
Authors: Samart Homthong, Wutthipong Moungnoi
Abstract:
Critical success factors (CSFs) and the criteria to measure project success have received much attention over the decades and are among the most widely researched topics in the context of project management. However, although there have been extensive studies on the subject by different researchers, to date, there has been little agreement on the CSFs. The aim of this study is to identify the CSFs that influence the performance of construction projects, and determine their relative importance for different objectives across five stages in the project life cycle. A considerable literature review was conducted that resulted in the identification of 179 individual factors. These factors were then grouped into nine major categories. A questionnaire survey was used to collect data from three groups of respondents: client representatives, consultants, and contractors. Out of 164 questionnaires distributed, 93 were returned, yielding a response rate of 56.7%. Using the mean score, relative importance index, and weighted average method, the top 10 critical factors for each category were identified. The agreement of survey respondents on those categorised factors were analysed using Spearman’s rank correlation. A one-way analysis of variance was then performed to determine whether the mean scores among the various groups of respondents were statistically significant. The findings indicate the most CSFs in each category in procurement phase are: proper procurement programming of materials (time), stability in the price of materials (cost), and determining quality in the construction (quality). They are then followed by safety equipment acquisition and maintenance (health and safety), budgeting allowed in a contractual arrangement for implementing environmental management activities (environment), completeness of drawing documents (productivity), accurate measurement and pricing of bill of quantities (risk management), adequate communication among the project team (human resource), and adequate cost control measures (client satisfaction). An understanding of CSFs would help all interested parties in the construction industry to improve project performance. Furthermore, the results of this study would help construction professionals and practitioners take proactive measures for effective project management.Keywords: critical success factors, procurement phase, project life cycle, project performance
Procedia PDF Downloads 1836778 Feasibility Studies in Public Construction Projects in South Africa: Barriers and Implications
Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke
Abstract:
The practice of feasibility studies plays a huge role in the success of construction projects. Feasibility studies according to several research should be the reason for embarking on any project. However, it has been discovered that in South Africa (SA), feasibility studies are mainly done in the private sector construction but skipped in the construction of most public projects. Hence, this study aims to evaluate the barriers to feasibility studies practice in public projects and the implications. A survey design was adopted. A total number of One hundred and fifty (150) questionnaires were administered to Quantity Surveyors, Construction managers, Construction project managers, Project managers, Architects and Civil and Structural engineers in Guateng Province, SA and ninety (90) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that political interference and corruption are the most significant barriers to feasibility studies practice in the public construction projects in SA, while late project completion, poor quality infrastructure are among the implication of not conducting feasibility studies in SA public projects. Therefore, the study recommends the development of a framework for public projects execution that will reduce the interference of the political class in the country, that way the risk of late project completion and poor quality infrastructure will be mitigated.Keywords: arriers, feasibility studies, public construction, South Africa.
Procedia PDF Downloads 896777 Project Paulina: A Human-Machine Interface for Individuals with Limited Mobility and Conclusions from Research and Development
Authors: Radoslaw Nagay
Abstract:
The Paulina Project aims to address the challenges faced by immobilized individuals, such as those with multiple sclerosis, muscle dystrophy, or spinal cord injuries, by developing a flexible hardware and software solution. This paper presents the research and development efforts of our team, which commenced in 2019 and is now in its final stage. Recognizing the diverse needs and limitations of individuals with limited mobility, we conducted in-depth testing with a group of 30 participants. The insights gained from these tests led to the complete redesign of the system. Our presentation covers the initial project ideas, observations from in-situ tests, and the newly developed system that is currently under construction. Moreover, in response to the financial constraints faced by many disabled individuals, we propose an affordable business model for the future commercialization of our invention. Through the Paulina Project, we strive to empower immobilized individuals, providing them with greater independence and improved quality of life.Keywords: UI, human-machine interface, social inclusion, multiple sclerosis, muscular dystrophy, spinal cord injury, quadriplegic
Procedia PDF Downloads 706776 A Prediction of Electrical Cost for High-Rise Building Construction
Authors: Picha Sriprachan
Abstract:
The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.Keywords: high-rise building construction, electrical cost, construction phase, architectural phase
Procedia PDF Downloads 3906775 Learning Model Applied to Cope with Professional Knowledge Gaps in Final Project of Information System Students
Authors: Ilana Lavy, Rami Rashkovits
Abstract:
In this study, we describe Information Systems students' learning model which was applied by students in order to cope with professional knowledge gaps in the context of their final project. The students needed to implement a software system according to specifications and design they have made beforehand. They had to select certain technologies and use them. Most of them decided to use programming environments that were learned during their academic studies. The students had to cope with various levels of knowledge gaps. For that matter they used learning strategies that were organized by us as a learning model which includes two phases each suitable for different learning tasks. We analyze the learning model, describing advantages and shortcomings as perceived by the students, and provide excerpts to support our findings.Keywords: knowledge gaps, independent learner skills, self-regulated learning, final project
Procedia PDF Downloads 4786774 Liquefaction Assessment of Marine Soil in Western Yemen Region Based on Laboratory and Field Tests
Authors: Monalisha Nayak, T. G. Sitharam
Abstract:
Liquefaction is a major threat for sites consists of or on sandy soil. But this present study concentrates on the behavior of fine soil under cyclic loading. This paper presents the study of liquefaction susceptibility of marine silty clay to clayey silt for an offshore site near western Yemen. The submerged and loose sediment condition of marine soil of an offshore site can favour liquefaction during earthquakes. In this regard, the liquefaction susceptibility of the site was carried out based on both field test results and laboratory test results. From field test results of seismic cone penetration test (SCPT), liquefaction susceptibility was assessed considering normalized cone tip resistance, and normalized friction ratio and results give an idea regarding both cyclic mobility and flow liquefaction. Laboratory cyclic triaxial tests were also conducted on saturated undisturbed and remoulded sample to study the effect of cyclic loading on strength and strain characteristics. Liquefaction susceptibility of the marine soft soil was also carried out based on index properties like grain size distribution, natural moisture content and liquid limit of soil.Keywords: index properties, liquefaction, marine soil, seismic cone penetration test (SCPT)
Procedia PDF Downloads 2326773 Design and Implementation of a Monitoring System Using Arduino and MATLAB
Authors: Jonas P. Reges, Jessyca A. Bessa, Auzuir R. Alexandria
Abstract:
The research came up with the need of monitoring them of temperature and relative moisture in past work that enveloped the study of a greenhouse located in the Research and Extension Unit(UEPE). This research brought several unknowns that were resolved from bibliographical research. Based on the studies performed were found some monitoring methods, including the serial communication between the arduino and matlab which showed a great option due to the low cost. The project was conducted in two stages, the first, an algorithm was developed to the Arduino and Matlab, and second, the circuits were assembled and performed the monitoring tests the following variables: moisture, temperature, and distance. During testing it was possible to momentarily observe the change in the levels of monitored variables. The project showed satisfactory results, such as: real-time verification of the change of state variables, the low cost of acquisition of the prototype, possibility of easy change of programming for the execution of monitoring of other variables. Therefore, the project showed the possibility of monitoring through software and hardware that have easy programming and can be used in several areas. However, it is observed also the possibility of improving the project from a remote monitoring via Bluetooth or web server and through the control of monitored variables.Keywords: automation, monitoring, programming, arduino, matlab
Procedia PDF Downloads 5156772 Occurrence of the fall armyworm, Spodoptera frugiperda (J. E. Smith) (Lepidoptera, Noctuidae), on Maize in Katsina State, Nigeria and preliminary study of its Developmental Characteristics under Laboratory Conditions
Authors: Ibrahim Sani, Suleiman Mohammed., Salisu Sulaiman, Aminu Musa
Abstract:
The fall army worm (FAW), Spodoptera frugiperda (J. E. Smith) (Lepidoptera, Noctuidae) has recently become one of the major threats to maize production in the world. It is native to tropical and subtropical America and began to spread to many African and a few Asian Countries. A survey for the observation of infestation and collection of fall armyworm was conducted in field planted with maize in the northern part of Katsina state. Eggs and immature stages were collected, place in a plastic container and brought to the laboratory for observation and study of developmental stages. FAW was identified based on the morphological characteristics, i.e. the “Y” inverted shape on the head capsule and the patterns of black spots on the abdominal segments (square and trapezoidal forms). Different growing stage of maize are affected by fall armyworm, but the damage is greatest during the early growing phase of corn. Heavy infestation on the leaves also cause defoliation. Four developmental stages (eggs larvae, pupae and adults) of the FAW were studied when fed with young corn under laboratory conditions. Furthermore, effective scouting or monitoring of FAW could be practice at early stage of growth of maize.Keywords: infestation, katsina, maize, fall armyworm
Procedia PDF Downloads 746771 Priority Sites for Deforested and Degraded Mountain Restoration Projects in North Korea
Authors: Koo Ja-Choon, Seok Hyun-Deok, Park So-Hee
Abstract:
Even though developed countries have supported aid projects for restoring degraded and deforested mountain, recent North Korean authorities announced that North Korean forest is still very serious. Last 12 years, more than 16 thousand ha of forest were destroyed. Most of previous researches concluded that food and fuel problems should be solved for preventing people from deforesting and degrading forest in North Korea. It means that mountain restoration projects such as A/R(afforestation/reforestation) and REDD(Reducing Emissions from Deforestation and Forest Degradation) project should be implemented with the agroforestry and the forest tending project. Because agroforestry and the forest tending can provide people in the project area with foods and fuels, respectively. Especially, Agroforestry has been operated well with the support of Swiss agency of Development and cooperation since 2003. This paper aims to find the priority sites for mountain restoration project where all types of projects including agroforesty can be implemented simultaneously. We tried to find the primary counties where the areas of these activities were distributed widely and evenly. Recent spatial data of 186 counties representing altitude, gradient and crown density were collected from World Forest Watch. These 3 attributes were used to determine the type of activities; A/R, REDD, Agroforestry and forest tending project. Finally, we calculated the size of 4 activities in 186 counties by using GIS technique. Result shows that Chongjin in Hamgyeongbuk-do, Hoeryong in Hamgyeongbuk-do and Tongchang in Pyeonganbuk-do are on the highest priority of counties. Most of feasible counties whose value of richness and uniformity were greater than the average were located near the eastern coast of North Korea. South Korean government has not supported any aid projects in North Korea since 2010. Recently, South Korea is trying to continue the aid projects for North Korea. Forest project which is not affected by the political situation between North- and South- Korea can be considered as a priority activities. This result can be used when South Korean government determine the priority sites for North Korean mountain restoration project in near future.Keywords: agroforestry, forest restoration project, GIS, North Korea, priority
Procedia PDF Downloads 3196770 Conflict of the Thai-Malaysian Gas Pipeline Project
Authors: Nopadol Burananuth
Abstract:
This research was aimed to investigate (1) the relationship among local social movements, non-governmental Organization activities and state measures deployment; and (2) the effects of local social movements, non-governmental Organization activities, and state measures deployment on conflict of local people towards the Thai-Malaysian gas pipeline project. These people included 1,000 residents of the four districts in Songkhla province. The methods of data analysis consist of multiple regression analysis. The results of the analysis showed that: (1) local social movements depended on information, and mass communication; deployment of state measures depended on compromise, coordination, and mass communication; and (2) the conflict of local people depended on mobilization, negotiation, and campaigning for participation of people in the project. Thus, it is recommended that to successfully implement any government policy, consideration must be paid to the conflict of local people, mobilization, negotiation, and campaigning for people’s participation in the project.Keywords: conflict, NGO activities, social movements, state measures
Procedia PDF Downloads 3226769 Characterization of Copper Slag and Jarofix Waste Materials for Road Construction
Authors: V. K. Arora, V. G. Havanagi, A. K. Sinha
Abstract:
Copper slag and Jarofix are waste materials, generated during the manufacture of copper and zinc respectively, which have potential for utility in embankment and road construction. Accordingly, a research project was carried out to study the characteristics of copper slag and Jarofix to utilize in the construction of road. In this study, copper slag and Jarofix were collected from Tuticorin, State of Tamil Nadu and Hindustan Zinc Ltd., Chittorgarh, Rajasthan state, India respectively. These materials were investigated for their physical, chemical, and geotechnical characteristics. The materials were collected from the disposal area and laboratory investigations were carried out to study its feasibility for use in the construction of embankment and sub grade layers of road pavement. This paper presents the results of physical, chemical and geotechnical characteristics of copper slag and Jarofix. It was concluded that copper slag and Jarofix may be utilized in the construction of road.Keywords: copper slag, Jarofix waste, material, road construction
Procedia PDF Downloads 4466768 Evaluation of the Improve Vacuum Blood Collection Tube for Laboratory Tests
Authors: Yoon Kyung Song, Seung Won Han, Sang Hyun Hwang, Do Hoon Lee
Abstract:
Laboratory tests is a significant part for the diagnosis, prognosis, treatment of diseases. Blood collection is a simple process, but can be a potential cause of pre-analytical errors. Vacuum blood collection tubes used to collect and store the blood specimens is necessary for accurate test results. The purpose of this study was to validate Improve serum separator tube(SST) (Guanzhou Improve Medical Instruments Co., Ltd, China) for routine clinical chemistry laboratory testing. Blood specimens were collected from 100 volunteers in three different serum vacuum tubes (Greiner SST , Becton Dickinson SST , Improve SST). The specimens were evaluated for 16 routine chemistry tests using TBA-200FR NEO (Toshiba Medical Co. JAPAN). The results were statistically analyzed by paired t-test and Bland-Altman plot. For stability test, the initial results for each tube were compared with results of 72 hours preserved specimens. Their clinical availability was evaluated by biological Variation of Ricos data bank. Paired t-test analysis revealed that AST, ALT, K, Cl showed statistically same results but calcium (CA), phosphorus(PHOS), glucose(GLU), BUN, uric acid(UA), cholesterol(CHOL), total protein(TP), albumin(ALB), total bilirubin(TB), ALP, creatinine(CRE), sodium(NA) were different(P < 0.05) between Improve SST and Greiner SST. Also, CA, PHOS, TP, TB, AST, ALT, NA, K, Cl showed statistically the same results but GLU, BUN, UA, CHOL, ALB, ALP, CRE were different between Improve SST and Becton Dickinson SST. All statistically different cases were clinically acceptable by biological Variation of Ricos data bank. Improve SST tubes showed satisfactory results compared with Greiner SST and Becton Dickinson SST. We concluded that the tubes are acceptable for routine clinical chemistry laboratory testing.Keywords: blood collection, Guanzhou Improve, SST, vacuum tube
Procedia PDF Downloads 2446767 The Impact of Project Management Approaches in Enhancing Entrepreneurial Growth: A Study Using the Theory of Planned Behaviour as a Lens to Understand
Authors: Akunna Agunwah, Kevin Gallimore, Kathryn Kinnmond
Abstract:
Entrepreneurship and project management are widely associated and seen as a vehicle for economic growth, but are studied separately. A few authors have considered the interconnectivity existing between these two fields, but relatively little empirical data currently exist in the literature. The purpose of the present empirical study is to explore whether successful entrepreneurs utilise project management approaches in enhancing enterprise growth by understanding the working practices and experiences of the entrepreneurs’ using the Theory of Planned Behaviour (TPB) as a lens. In order to understand those experiences, ten successful entrepreneurs in various business sectors in the North West of England were interviewed through a face-to-face semi-structured interview method. The collected audio tape-recorded data was transcribed and analysed using the deductive thematic technique (qualitative approach). The themes were viewed through the lens of Theory of Planned Behaviour to identify the three intentional antecedents (attitude, subjective norms, and perceived behavioural control) and to understand how they relate to the project management approaches (Planning, execution, and monitoring). The findings are twofold, the first evidence of the three intentional antecedents, which make up Theory of Planned Behaviour was present. Secondly, the analysis of project management approaches themes (planning, execution, and monitoring) using the lens of the theory of planned behaviour shows evidence of the three intentional antecedents. There were more than one intentional antecedents found in a particular project management theme, which indicates that the entrepreneur does utilise these approaches without categorising them into definite themes. However, the entrepreneur utilised these intentional antecedents as processes to enhanced business growth. In conclusion, the work presented here showed a way of understanding the interconnectivity between entrepreneurship and project management towards enhancing enterprise growth by examining the working practices and experiences of the successful entrepreneurs in the North-West England.Keywords: business growth, entrepreneurship, project management approaches, theory of planned behaviour
Procedia PDF Downloads 2056766 Gingival Myiasis of Dog Caused by Wohlfahrtia magnifica, Garmsar, Iran
Authors: Keivan Jamshidi
Abstract:
Myiasis is defined as the infestation of living tissues of vertebrates by larvae of flies. Gingival myiasis is an uncommon type of myiasis. In oral inspection of a death dog (Garmsar, Iran) for routine training postmortem investigation, gingival myiasis was found. Only one larva was removed from the lesions and sent to a parasitology laboratory for identification. For histopathological studies, affected area of the gingiva was cut and placed in 10% formalin, and then sent to pathology laboratory. On parasitological examination the causative agent of this condition was found as larva of Wohlfahrtia magnifica. Histopathological examination of the injured gingiva showed hyperplasia of squamous epithelial tissue and acanthosis in mucosal membrane, hyperemia and infiltration of mononuclear cells and eosinophils into lamina propria. The present report seems to be the first report of gingival myiasis in dog in Iran.Keywords: Wohlfahrtia magnifica, gingiva, myiasis, dog
Procedia PDF Downloads 5666765 Synthesizing an Artificial Loess for Geotechnical Investigations of Collapsible Soil Behavior
Authors: Hamed Sadeghi, Pouya A. Panahi, Hamed Nasiri, Mohammad Sadeghi
Abstract:
Collapsible soils like loess comprise an important category of problematic soils for construction purposes and sustainable development. As a result, research on both geological and geotechnical aspects of this type of soil have been in progress for decades. However, considerable natural variability in physical properties of in-situ loess strata even in a single block sample challenges the fundamental laboratory investigations. The reason behind this is that it is somehow impossible to remove the effect of a specific factor like void ratio from fair comparisons to come with a reliable conclusion. In order to cope with this limitation, two types of artificially made dispersive and calcareous loess are introduced which can be easily reproduced in any soil mechanics laboratory provided that all its compositions are known and controlled. The collapse potential is explored for a variety of soil water salinity and lime content and comparisons are made against the natural soil behavior. Trends are reported for the influence of pore water salinity on collapse potential under different osmotic flow conditions. The most important advantage of artificial loess is the ease of controlling cementing agent content like calcite or dispersive potential for studying their influence on mechanical soil behavior.Keywords: artificial loess, unsaturated soils, collapse potential, dispersive clays, laboratory tests
Procedia PDF Downloads 1966764 Introducing Principles of Land Surveying by Assigning a Practical Project
Authors: Introducing Principles of Land Surveying by Assigning a Practical Project
Abstract:
A practical project is used in an engineering surveying course to expose sophomore and junior civil engineering students to several important issues related to the use of basic principles of land surveying. The project, which is the design of a two-lane rural highway to connect between two arbitrary points, requires students to draw the profile of the proposed highway along with the existing ground level. Areas of all cross-sections are then computed to enable quantity computations between them. Lastly, Mass-Haul Diagram is drawn with all important parts and features shown on it for clarity. At the beginning, students faced challenges getting started on the project. They had to spend time and effort thinking of the best way to proceed and how the work would flow. It was even more challenging when they had to visualize images of cut, fill and mixed cross sections in three dimensions before they can draw them to complete the necessary computations. These difficulties were then somewhat overcome with the help of the instructor and thorough discussions among team members and/or between different teams. The method of assessment used in this study was a well-prepared-end-of-semester questionnaire distributed to students after the completion of the project and the final exam. The survey contained a wide spectrum of questions from students' learning experience when this course development was implemented to students' satisfaction of the class instructions provided to them and the instructor's competency in presenting the material and helping with the project. It also covered the adequacy of the project to show a sample of a real-life civil engineering application and if there is any excitement added by implementing this idea. At the end of the questionnaire, students had the chance to provide their constructive comments and suggestions for future improvements of the land surveying course. Outcomes will be presented graphically and in a tabular format. Graphs provide visual explanation of the results and tables, on the other hand, summarize numerical values for each student along with some descriptive statistics, such as the mean, standard deviation, and coefficient of variation for each student and each question as well. In addition to gaining experience in teamwork, communications, and customer relations, students felt the benefit of assigning such a project. They noticed the beauty of the practical side of civil engineering work and how theories are utilized in real-life engineering applications. It was even recommended by students that such a project be exercised every time this course is offered so future students can have the same learning opportunity they had.Keywords: land surveying, highway project, assessment, evaluation, descriptive statistics
Procedia PDF Downloads 2296763 Statistical Analysis of the Main Causes of Delay Factors of Infrastructure Projects
Authors: Seyed Ali Mohammadiborna, Mehdi Ravanshadnia
Abstract:
Project delays usually detrimentally affect perceptions of project success and can in some instances, result in increased costs and other time-related damages to project stakeholders. One of the realities in the national infrastructure projects is that since the primary stakeholders are state-affiliated, the delay factors of the projects have not been seriously taken into account despite the importance of on-time completion of projects. Project postponement has different economic and social consequences and leads to the technical and economic infeasibility of the infrastructure projects in the form of reduced productivity and exploitation capacity. The present study aimed at investigating delay factors of Iranian national infrastructure projects according to regulatory reports of the Plan and Budget Organization (BPO) of Iran. The present study scrutinized the influence of each of the factors that caused delays in national Iranian infrastructure projects according to the supervision reports of the planning and budget organization in 8 years. For this purpose, the study analyzed the information regarding the impact of 12 key delay factors causing delays in average 4867 projects per year in all provinces. The said factors were classified into the three groups of executive, credit, and financial and environmental-procurement factors.Keywords: delays, infrastructure, projects, regulatory
Procedia PDF Downloads 137