4948 Practices in Planning, Design and Construction of Head Race Tunnel of a Hydroelectric Project

Authors: M. S. Thakur, Mohit Shukla

Abstract:

A channel/tunnel, which carries the water to the penstock/pressure shaft is called headrace tunnel (HRT). It is necessary to know the general topography, geology of the area, state of stress and other mechanical properties of the strata. For this certain topographical and geological investigations, in-situ and laboratory tests, and observations are required to be done. These investigations play an important role in a tunnel design as these help in deciding the optimum layout, shape and size and support requirements of the tunnel. The paper includes inputs from Nathpa Jhakri Hydeoelectric project which is India’s highest capacity (1500 MW) operating hydroelectric project. The paper would help the design engineers with various new concepts and preparedness against geological surprises.

Keywords: tunnelling, geology, HRT, rockmass

Procedia PDF Downloads 236
4947 An Alternative to Resolve Land use Conflicts: the Rétköz Lake Project

Authors: Balázs Kulcsár

Abstract:

Today, there is no part of the world that does not bear the mark of man in some way. This process seems unstoppable. So perhaps the best thing we can do is to touch that handprint gently and with the utmost care. There are multiple uses for the same piece of land, the coordination of which requires careful and sustainable spatial planning. The case study of the Rétközlake in north-eastern Hungary illustrates a habitat rehabilitation project in which a number of human uses were coordinated with the conservation and restoration of the natural environment. Today, the good condition of the habitat can only be maintained artificially, but the project has paid particular attention to finding a sustainable solution. The rehabilitation of Lake Rétköz is considered good practice in resolving land-use conflicts.

Keywords: sustainability, ecosystem service, land use conflict, landscape utilization

Procedia PDF Downloads 142
4946 Analysis Mechanized Boring (TBM) of Tehran Subway Line 7

Authors: Shahin Shabani, Pouya Pourmadadi

Abstract:

Tunnel boring machines (TBMs) have been used for the construction of various tunnels for mining projects for the purpose of access, conveyance of ore and waste, drainage, exploration, water supply and water diversion. Several mining projects have seen the successful and economic beneficial use of TBMs, and there is an increasing awareness of the benefits of TBMs for mining projects. Key technical considerations for the use of TBMs for the construction of tunnels for mining projects include geological issues (rock type, rock alteration, rock strength, rock abrasivity, durability, ground water inflows), depth of cover and the potential for overstressing/rockbursts, site access and terrain, portal locations, TBM constraints, minimum tunnel size, tunnel support requirements, contractor and labor experience, and project schedule demands. This study focuses on tunnelling mining, with the goal to develop methods and tools to be used to gain understanding of these processes, and to analyze metro of Tehran. The Metro Line 7 of Tehran is one of the Longest (26 Km) and deepest (27m) of projects that’s under implementation. Because of major differences like passing under all geotechnical layers of the town and encountering part of it with underground water table and also using mechanized excavation system, is one of special metro projects.

Keywords: TBM, tunnel boring machines economic, metro, line 7

Procedia PDF Downloads 370
4945 Possibilities of Output Technology the Project ADAPTIV for Use in Infrared Camouflage

Authors: Jiří Barta, Teodor Baláž, Tomáš Ludík, Jiří. F. Urbánek

Abstract:

This article deals with the outputs of project acronym ADAPTIV of Czech Defence Research Project. This Project solved tends to adaptive camouflage. The camouflage is concealment by means of disguise. Perceptive interface between recipient and camouflaged object is visualized by means of textile modular screens. Screens special light semi-permeability enables front/ back projection with nearly identical light parameters. Information permeability, towards illusion creation, must be controlled by the camouflage provider by means sophisticated and mastered illusion with perfect scenarios. The project ADAPTIV was primarily funded with the maximum possible use of COTS (Commercial-Off-The-Shelf) principle asks special definition of feasibility conditions, especially recipient space position. This paper deals with uses the ADAPTIV output with name DATAsam with modification for infrared camouflage. It is focused on active camouflage in infrared spectrum of emissivity at <8;14> μm for laboratory conditions. The main chapter provides basic experiments and testing physical properties needed for camouflage in infrared environment. The evaluation experiments revealed the possibility of use case in various types of camouflage.

Keywords: camouflage, ADAPTIV, infrared camouflage, computer-aided, COTS

Procedia PDF Downloads 402
4944 Qualitative Evaluation of the Morris Collection Conservation Project at the Sainsbury Centre of Visual Arts in the Context of Agile, Lean and Hybrid Project Management Approaches

Authors: Maria Ledinskaya

Abstract:

This paper examines the Morris Collection Conservation Project at the Sainsbury Centre for Visual Arts in the context of Agile, Lean, and Hybrid project management. It is part case study and part literature review. To date, relatively little has been written about non-traditional project management approaches in heritage conservation. This paper seeks to introduce Agile, Lean, and Hybrid project management concepts from business, software development, and manufacturing fields to museum conservation, by referencing their practical application on a recent museum-based conservation project. The Morris Collection Conservation Project was carried out in 2019-2021 in Norwich, UK, and concerned the remedial conservation of around 150 Abstract Constructivist artworks bequeathed to the Sainsbury Centre for Visual Arts by private collectors Michael and Joyce Morris. The first part introduces the chronological timeline and key elements of the project. It describes a medium-size conservation project of moderate complexity, which was planned and delivered in an environment with multiple known unknowns – unresearched collection, unknown condition and materials, unconfirmed budget. The project was also impacted by the unknown unknowns of the COVID-19 pandemic, such as indeterminate lockdowns, and the need to accommodate social distancing and remote communications. The author, a staff conservator at the Sainsbury Centre who acted as project manager on the Morris Collection Conservation Project, presents an incremental, iterative, and value-based approach to managing a conservation project in an uncertain environment. Subsequent sections examine the project from the point of view of Traditional, Agile, Lean, and Hybrid project management. The author argues that most academic writing on project management in conservation has focussed on a Traditional plan-driven approach – also known as Waterfall project management – which has significant drawbacks in today’s museum environment, due to its over-reliance on prediction-based planning and its low tolerance to change. In the last 20 years, alternative Agile, Lean and Hybrid approaches to project management have been widely adopted in software development, manufacturing, and other industries, although their recognition in the museum sector has been slow. Using examples from the Morris Collection Conservation Project, the author introduces key principles and tools of Agile, Lean, and Hybrid project management and presents a series of arguments on the effectiveness of these alternative methodologies in museum conservation, as well as the ethical and practical challenges to their implementation. These project management approaches are discussed in the context of consequentialist, relativist, and utilitarian developments in contemporary conservation ethics, particularly with respect to change management, bespoke ethics, shared decision-making, and value-based cost-benefit conservation strategy. The author concludes that the Morris Collection Conservation Project had multiple Agile and Lean features which were instrumental to the successful delivery of the project. These key features are identified as distributed decision making, a co-located cross-disciplinary team, servant leadership, focus on value-added work, flexible planning done in shorter sprint cycles, light documentation, and emphasis on reducing procedural, financial, and logistical waste. Overall, the author’s findings point largely in favour of a Hybrid model which combines traditional and alternative project processes and tools to suit the specific needs of the project.

Keywords: project management, conservation, waterfall, agile, lean, hybrid

Procedia PDF Downloads 84
4943 Assessing Project Performance through Work Sampling and Earned Value Analysis

Authors: Shobha Ramalingam

Abstract:

The majority of the infrastructure projects are affected by time overrun, resulting in project delays and subsequently cost overruns. Time overrun may vary from a few months to as high as five or more years, placing the project viability at risk. One of the probable reasons noted in the literature for this outcome in projects is due to poor productivity. Researchers contend that productivity in construction has only marginally increased over the years. While studies in the literature have extensively focused on time and cost parameters in projects, there are limited studies that integrate time and cost with productivity to assess project performance. To this end, a study was conducted to understand the project delay factors concerning cost, time and productivity. A case-study approach was adopted to collect rich data from a nuclear power plant project site for two months through observation, interviews and document review. The data were analyzed using three different approaches for a comprehensive understanding. Foremost, a root-cause analysis was performed on the data using Ishikawa’s fish-bone diagram technique to identify the various factors impacting the delay concerning time. Based on it, a questionnaire was designed and circulated to concerned executives, including project engineers and contractors to determine the frequency of occurrence of the delay, which was then compiled and presented to the management for a possible solution to mitigate. Second, a productivity analysis was performed on select activities, including rebar bending and concreting through a time-motion study to analyze product performance. Third, data on cost of construction for three years allowed analyzing the cost performance using earned value management technique. All three techniques allowed to systematically and comprehensively identify the key factors that deter project performance and productivity loss in the construction of the nuclear power plant project. The findings showed that improper planning and coordination between multiple trades, concurrent operations, improper workforce and material management, fatigue due to overtime were some of the key factors that led to delays and poor productivity. The findings are expected to act as a stepping stone for further research and have implications for practitioners.

Keywords: earned value analysis, time performance, project costs, project delays, construction productivity

Procedia PDF Downloads 84
4942 Faults in the Projects, Deviation in the Cost

Authors: S. Ahmed, P. Dlask, B. Hasan

Abstract:

There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.

Keywords: construction projects, building, cost, estimating costs, delay, overrun

Procedia PDF Downloads 277
4941 Decision-Making Tool for Planning the Construction of Infrastructure Projects

Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs

Abstract:

The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.

Keywords: infrastructure, modularization, decision support, decision-making

Procedia PDF Downloads 37
4940 Strategy in Practice: Strategy Development, Strategic Error and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Strategy development and implementation is the key to an organization’s success in today’s competitive marketplace. Many organizations develop excellent strategy but are unable to implement this strategy in order to succeed. The difference between strategic goals and its implementation is called strategic error. Strategic error occurs when an organization does not have structures in place to implement their strategy. Strategy implementation happens through projects and having a project management method that provides certainty and agility will help an organization become more competitive in implementing strategy. Numerous project management methods exist in theory and practice. However, projects mainly used the Waterfall method in the past that provides certainty in terms of budget, delivery date and resourcing. It is common practice now to utilise Agile based methods. However, Agile based methods do not provide specific deadlines and budgets. But provide agility in product design and project delivery, which is useful to companies. Both Waterfall and Agile methods in some forms are the opposites of each other. Executive management prefer agility in delivery projects as the competitive landscape changes frequently. However, they also appreciate certainty in the projects being able to quantify budgets, deadlines and resources that is harder for an Agile based method to provide. This paper attempts to develop a hybrid project management method that attempts to merge these Waterfall and Agile methods to provide the positives from both these approaches.

Keywords: strategy, project management, strategy implementation, agile

Procedia PDF Downloads 94
4939 Building Information Modeling and Its Application in the State of Kuwait

Authors: Michael Gerges, Ograbe Ahiakwo, Martin Jaeger, Ahmad Asaad

Abstract:

Recent advances of Building Information Modeling (BIM) especially in the Middle East have increased remarkably. Dubai has been taking a lead on this by making it mandatory for BIM to be adopted for all projects that involve complex architecture designs. This is because BIM is a dynamic process that assists all stakeholders in monitoring the project status throughout different project phases with great transparency. It focuses on utilizing information technology to improve collaboration among project participants during the entire life cycle of the project from the initial design, to the supply chain, resource allocation, construction and all productivity requirements. In view of this trend, the paper examines the extent of applying BIM in the State of Kuwait, by exploring practitioners’ perspectives on BIM, especially their perspectives on main barriers and main advantages. To this end structured interviews were carried out based on questionnaires and with a range of different construction professionals. The results revealed that practitioners perceive improved communication and mitigated project risks by encouraged collaboration between project participants. However, it was also observed that the full implementation of BIM in the State of Kuwait requires concerted efforts to make clients demanding BIM, counteract resistance to change among construction professionals and offer more training for design team members. This paper forms part of an on-going research effort on BIM and its application in the State of Kuwait and it is on this basis that further research on the topic is proposed.

Keywords: building information modeling, BIM, construction industry, Kuwait

Procedia PDF Downloads 359
4938 BIM Application Research Based on the Main Entrance and Garden Area Project of Shanghai Disneyland

Authors: Ying Yuken, Pengfei Wang, Zhang Qilin, Xiao Ben

Abstract:

Based on the main entrance and garden area (ME&G) project of Shanghai Disneyland, this paper introduces the application of BIM technology in this kind of low-rise comprehensive building with complex facade system, electromechanical system and decoration system. BIM technology is applied to the whole process of design, construction and completion of the whole project. With the construction of BIM application framework of the whole project, the key points of BIM modeling methods of different systems and the integration and coordination of BIM models are elaborated in detail. The specific application methods of BIM technology in similar complex low-rise building projects are sorted out. Finally, the paper summarizes the benefits of BIM technology application, and puts forward some suggestions for BIM management mode and practical application of similar projects in the future.

Keywords: BIM, complex low-rise building, BIM modeling, model integration and coordination, 3D scanning

Procedia PDF Downloads 150
4937 Analyzing Software Testing Phase in Agile Project Management: The Case of Jordan

Authors: Ghaleb Y. Abbasi, Satanay Alhiary

Abstract:

This paper focused on software testing phase of activities, types, techniques, teams and methods under agile project management (APM) in the Jordanian software industry. The effect of using agile principles and practices on testing process in software development life cycle (SDLC) was analyzed in order to create full view of the agile testing aspects such as phases, levels, types, methods, team and customers. Qualitative and quantitative research methods were utilized to cover earlier literature and collect data via web survey and short interviews in Jordanian software companies. Results indicated that agile testing had positive influence on quality of product, team performance, and customer satisfaction with a rate above 80%. APM is a powerful practice of moving software project forward in current markets with a rate above 51% by early involvement of testing activities in development.

Keywords: agile project management, software development life cycle, agile methods, agile testing, software testing

Procedia PDF Downloads 438
4936 Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U. A. E.

Authors: Firas Mohamad Al-Sabek

Abstract:

The Purpose of the paper is to examine the most critical and important factor which will affect the implementation of Total Quality Management (TQM) in the construction industry in the United Arab Emirates. It also examines the most effected Project outcome from implementing TQM. A framework was also proposed depending on the literature studies. The method used in this paper is a quantitative study. A survey with a sample of 60 respondents was created and distributed in a construction company in Abu Dhabi, which includes 15 questions to examine the most critical factor that will affect the implementation of TQM in addition to the most effected project outcome from implementing TQM. The survey showed that management commitment is the most important factor in implementing TQM in a construction company. Also it showed that Project cost is most effected outcome from the implementation of TQM. Management commitment is very important for implementing TQM in any company. If the management loose interest in quality then everyone in the organization will do so. The success of TQM will depend mostly on the top of the pyramid. Also cost is reduced and money is saved when the project team implement TQM. While if no quality measures are present within the team, the project will suffer a commercial failure. Based on literature, more factors can be examined and added to the model. In addition, more construction companies could be surveyed in order to obtain more accurate results. Also this study could be conducted outside the United Arab Emirates for further enchantment.

Keywords: construction project, total quality management, management commitment, cost, theoretical framework

Procedia PDF Downloads 406
4935 Building Information Modeling Implementation for Managing an Extra Large Governmental Building Renovation Project

Authors: Pornpote Nusen, Manop Kaewmoracharoen

Abstract:

In recent years, there was an observable shift in fully developed countries from constructing new buildings to modifying existing buildings. The issue was that although an effective instrument like BIM (Building Information Modeling) was well developed for constructing new buildings, it was not widely used to renovate old buildings. BIM was accepted as an effective means to overcome common managerial problems such as project delay, cost overrun, and poor quality of the project life cycle. It was recently introduced in Thailand and rarely used in a renovation project. Today, in Thailand, BIM is mostly used for creating aesthetic 3D models and quantity takeoff purposes, though it can be an effective tool to use as a project management tool in planning and scheduling. Now the governmental sector in Thailand begins to recognize the uses of using BIM to manage a construction project, but the knowledge about the BIM implementation to governmental construction projects is underdeveloped. Further studies need to be conducted to maximize its advantages for the governmental sector. An educational extra large governmental building of 17,000 square-meters was used in this research. It is currently under construction for a two-year renovation project. BIM models of the building for the exterior and interior areas were created for the whole five floors. Then 4D BIM with combination of 3D BIM plus time was created for planning and scheduling. Three focus groups had been done with executive committee, contractors, and officers of the building to discuss the possibility of usage and usefulness of BIM approach over the traditional process. Several aspects were discussed in the positive sides, especially several foreseen problems, such as the inadequate accessibility of ways, the altered ceiling levels, the impractical construction plan created through a traditional approach, and the lack of constructability information. However, for some parties, the cost of BIM implementation was a concern, though, this study believes, its uses outweigh the cost.

Keywords: building information modeling, extra large building, governmental building renovation, project management, renovation, 4D BIM

Procedia PDF Downloads 134
4934 Project Risk Assessment of the Mining Industry of Ghana

Authors: Charles Amoatey

Abstract:

The issue of risk in the mining industry is a global phenomenon and the Ghanaian mining industry is not exempted. The main purpose of this study is to identify the critical risk factors affecting the mining industry. The study takes an integrated view of the mining industry by examining the contribution of various risk factors to mining project failure in Ghana. A questionnaire survey was conducted to solicit the critical risk factors from key mining practitioners. About 80 respondents from 11 mining firms participated in the survey. The study identified 22 risk factors contributing to mining project failure in Ghana. The five most critical risk factors based on both probability of occurrence and impact were: (1) unstable commodity prices, (2) inflation/exchange rate, (3) land degradation, (4) high cost of living and (5) government bureaucracy for obtaining licenses. Furthermore, the study found that risk assessment in the mining sector has a direct link with mining project sustainability. Mitigation measures for addressing the identified risk factors were discussed. The key findings emphasize the need for a comprehensive risk management culture in the entire mining industry.

Keywords: risk, assessment, mining, Ghana

Procedia PDF Downloads 430
4933 Integrated Clean Development Mechanism and Risk Management Approach for Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Clean development mechanism (CDM) can act as an effective instrument for mitigating climate change. This mechanism can effectively reduce the emission of CO2 and other green house gases (GHG). Construction of a mega infrastructure project like underground corridor construction for metro rail operation involves in consumption of substantial quantity of concrete which consumes huge quantity of energy consuming materials like cement and steel. This paper is an attempt to develop an integrated clean development mechanism and risk management approach for sustainable development for an underground corridor metro rail project in India during its construction phase. It was observed that about 35% reduction in CO2 emission can be obtained by adding fly ash as a part replacement of cement. The reduced emission quantity of CO2 which is of the quantum of about 21,646.36 MT would result in cost savings of approximately INR 8.5 million (USD 1,29,878).But construction and operation of such infrastructure projects of the present era are subject to huge risks and uncertainties throughout all the phases of the project, thus reducing the probability of successful completion of the project within stipulated time and cost frame. Thus, an integrated approach of combining CDM with risk management would enable the metro rail authorities to develop a sustainable risk mitigation measure framework to ensure more cost and energy savings and lesser time and cost over-run.

Keywords: clean development mechanism (CDM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 462
4932 Using Design Sprint For Software Engineering Undergraduate Student Projects: A Method Paper

Authors: Sobhani U. Pilapitiya, Tharanga Peiris

Abstract:

Software Engineering curriculums generally consist of industry-based practices such as project-based learning (PBL) which mainly focuses on efficient and innovative product development. These approaches can be tailored and used in project-based modules in software engineering curriculums. However, there are very limited attempts in the area especially related to the Sri Lankan context. This paper describes a tailored pedagogical approach and its results of using design sprint which can be used for project-based modules in SE curriculums. A controlled group of second-year software engineering students was selected for the study. The study results indicate that 100% of students agreed that the Design Sprint approach is effective in group-based projects and 83% of students stated that it minimized the re-work compared to traditional project approaches. The tailored process was effective, easy to implement and produced desired results at the end of the session while providing students an enjoyable experience.

Keywords: design sprint, PBL, software engineering, curriculum

Procedia PDF Downloads 183
4931 Optimal Cropping Pattern in an Irrigation Project: A Hybrid Model of Artificial Neural Network and Modified Simplex Algorithm

Authors: Safayat Ali Shaikh

Abstract:

Software has been developed for optimal cropping pattern in an irrigation project considering land constraint, water availability constraint and pick up flow constraint using modified Simplex Algorithm. Artificial Neural Network Models (ANN) have been developed to predict rainfall. AR (1) model used to generate 1000 years rainfall data to train the ANN. Simulation has been done with expected rainfall data. Eight number crops and three types of soil class have been considered for optimization model. Area under each crop and each soil class have been quantified using Modified Simplex Algorithm to get optimum net return. Efficacy of the software has been tested using data of large irrigation project in India.

Keywords: artificial neural network, large irrigation project, modified simplex algorithm, optimal cropping pattern

Procedia PDF Downloads 188
4930 Methodology of the Turkey’s National Geographic Information System Integration Project

Authors: Buse A. Ataç, Doğan K. Cenan, Arda Çetinkaya, Naz D. Şahin, Köksal Sanlı, Zeynep Koç, Akın Kısa

Abstract:

With its spatial data reliability, interpretation and questioning capabilities, Geographical Information Systems make significant contributions to scientists, planners and practitioners. Geographic information systems have received great attention in today's digital world, growing rapidly, and increasing the efficiency of use. Access to and use of current and accurate geographical data, which are the most important components of the Geographical Information System, has become a necessity rather than a need for sustainable and economic development. This project aims to enable sharing of data collected by public institutions and organizations on a web-based platform. Within the scope of the project, INSPIRE (Infrastructure for Spatial Information in the European Community) data specifications are considered as a road-map. In this context, Turkey's National Geographic Information System (TUCBS) Integration Project supports sharing spatial data within 61 pilot public institutions as complied with defined national standards. In this paper, which is prepared by the project team members in the TUCBS Integration Project, the technical process with a detailed methodology is explained. In this context, the main technical processes of the Project consist of Geographic Data Analysis, Geographic Data Harmonization (Standardization), Web Service Creation (WMS, WFS) and Metadata Creation-Publication. In this paper, the integration process carried out to provide the data produced by 61 institutions to be shared from the National Geographic Data Portal (GEOPORTAL), have been trying to be conveyed with a detailed methodology.

Keywords: data specification, geoportal, GIS, INSPIRE, Turkish National Geographic Information System, TUCBS, Turkey's national geographic information system

Procedia PDF Downloads 128
4929 Remote Wireless Communications Lab in Real Time

Authors: El Miloudi Djelloul

Abstract:

Technology nowadays enables the remote access to laboratory equipment and instruments via Internet. This is especially useful in engineering education, where students can conduct laboratory experiment remotely. Such remote laboratory access can enable student to use expensive laboratory equipment, which is not usually available to students. In this paper, we present a method of creating a Web-based Remote Laboratory Experimentation in the master degree course “Wireless Communications Systems” which is part of “ICS (Information and Communication Systems)” and “Investment Management in Telecommunications” curriculums. This is done within the RIPLECS Project and the NI2011 FF005 Research Project “Implementation of Project-Based Learning in an Interdisciplinary Master Program”.

Keywords: remote access, remote laboratory, wireless telecommunications, external antenna-switching controller board (EASCB)

Procedia PDF Downloads 496
4928 Quantitative Risk Analysis for Major Subsystems and Project Success of a Highthrouput Satellite

Authors: Ibrahim Isa Ali (Pantami), Abdu Jaafaru Bambale, Abimbola Alale, Danjuma Ibrahim Ndihgihdah, Muhammad Alkali, Adamu Idris Umar, Babadoko Dantala Mohammed, Moshood Kareem Olawole

Abstract:

This paper dwells on the risk management required for High throughput Satellite (HTS) project, and major subsystems that pertains to the improved performance and reliability of the spacecraft. The paper gives a clear picture of high‐throughput satellites (HTS) and the associated technologies with performances as they align and differ with the traditional geostationary orbit or Geosynchronous Equatorial Orbit (GEO) Communication Satellites. The paper also highlights critical subsystems and processes in project conceptualization and execution. The paper discusses the configuration of the payload. The need for optimization of resources for the HTS project and successful integration of critical subsystems for spacecraft requires implementation of risk analysis and mitigation from the preliminary design stage; Assembly, Integration and Test (AIT); Launch and in-orbit- Management stage.

Keywords: AIT, HTS, in-orbit management, optimization

Procedia PDF Downloads 79
4927 Developing Islamic Module Project for Preschool Teachers Using Modified Delphi Technique

Authors: Mazeni Ismail, Nurul Aliah, Hasmadi Hassan

Abstract:

The purpose of this study is to gather the consensus of experts regarding the use of moral guidance amongst preschool teachers vis-a-vis the Islamic Project module (I-Project Module). This I-Project Module seeks to provide pertinent data on the assimilation of noble values in subject-matter teaching. To obtain consensus for the various components of the module, the Modified Delphi technique was used to develop the module. 12 subject experts from various educational fields of Islamic education, early childhood education, counselling and language fully participated in the development of this module. The Modified Delphi technique was administered in two mean cycles. The standard deviation value derived from questionnaires completed by the participating panel of experts provided the value of expert consensus reached. This was subsequently analyzed using SPSS version 22. Findings revealed that the panel of experts reached a discernible degree of agreement on five topics outlined in the module, viz; content (mean value 3.36), teaching strategy (mean value 3.28), programme duration (mean value 3.0), staff involved and attention-grabbing strategy of target group participating in the value program (mean value 3.5), and strategy to attract attention of target group to utilize i-project (mean value 3.0). With regard to the strategy to attract the attention of the target group, the experts proposed for creative activities to be added in order to enhance teachers’ creativity.

Keywords: Modified Delphi Technique, Islamic project, noble values, teacher moral guidance

Procedia PDF Downloads 166
4926 A Relational Case-Based Reasoning Framework for Project Delivery System Selection

Authors: Yang Cui, Yong Qiang Chen

Abstract:

An appropriate project delivery system (PDS) is crucial to the success of a construction project. Case-based reasoning (CBR) is a useful support for PDS selection. However, the traditional CBR approach represents cases as attribute-value vectors without taking relations among attributes into consideration, and could not calculate the similarity when the structures of cases are not strictly same. Therefore, this paper solves this problem by adopting the relational case-based reasoning (RCBR) approach for PDS selection, considering both the structural similarity and feature similarity. To develop the feature terms of the construction projects, the criteria and factors governing PDS selection process are first identified. Then, feature terms for the construction projects are developed. Finally, the mechanism of similarity calculation and a case study indicate how RCBR works for PDS selection. The adoption of RCBR in PDS selection expands the scope of application of traditional CBR method and improves the accuracy of the PDS selection system.

Keywords: relational cased-based reasoning, case-based reasoning, project delivery system, PDS selection

Procedia PDF Downloads 412
4925 The Cost of Innovation in Software Development Projects

Authors: Mihai Liviu Despa

Abstract:

The paper tackles the topic of determining the cost of innovation in software development projects. Innovation can be achieved either in a planned or unplanned manner. The paper approaches the scenarios were innovation is planned for. As a starting point an innovative software development project is analyzed. The project is depicted step by step as it was implemented, from inception to delivery. Costs that are proprietary to innovation in software development are isolated based on the author’s personal experience in managing the above mentioned project. Innovation costs components identified by the author are then validated using open discussions with software development professionals and projects managers on LinkedIn groups. In order to receive relevant feedback only groups that focus on software development and innovation management are targeted. Additional innovation cost components suggested by software development professionals and projects managers are also considered. Based on the identified cost components an indicator is built. The indicator is meant to formalize the process of determining the cost of innovation in a software development project. The indicator aggregates all the innovation cost components that are identified in the research process. The process of calculating each cost component is also described. Conclusions are formulated and new related research topics are submitted for debate.

Keywords: innovation cost, IT project management, software development, innovation management

Procedia PDF Downloads 436
4924 Investigation of the Factors Influencing the Construction Planning Process Using Participant Observation Method

Authors: Ashokkumar Subbiah

Abstract:

This study investigates the impact of factors that influenced the success of construction planning for a major construction project in Qatar. An approach of participant observation is adopted which is informed by the principles of ethnography: one that reports the participants’ view of their world rather than imposing an artificial theoretical framework upon it. As participant observant, key factors were observed and identified that had an impact on the management and execution of the construction planning. It is found that a ‘shadow culture’ exists between the project participants which, it is argued, is only observable from the perspective of an embedded participant observer. The shadow culture acts to enable the management of the planning process, and its efficacy relates to the ‘quality’ of human inter-relationships amongst immediate stakeholders. Whilst this study uses the concept of shadow culture, it is treated as both a methodological stance and one of the findings of this research in the context of the major construction project in Qatar. The concept of shadow culture is not imposed upon the findings, but instead is used as a research tool: respondents report their own worldview and this is reported from the view of a participant observant in a manner that is understandable and useful to those who are not part of the construction project. The findings of this study identify similar factors influencing the planning process of the Qatar project, but the shadow culture predominantly influences these factors towards the failure of planning process. The research concludes by questioning the assumption that construction planning is a mechanistic process that has to be conducted solely by the planning team. Instead, it is a highly social phenomenon in which the seemingly mechanistic process is made workable by the quality of relationships that exist in the project. Drawing on this the final section provides a series of recommendations that may be helpful in enhancing the efficacy of project planning; these include better training/education at the pre-construction phase; recognition of the importance of shadow processes at management levels, and better appreciation of the impact of contract type and chosen procurement route.

Keywords: construction planning, participant observation, project participants, shadow culture

Procedia PDF Downloads 279
4923 Correlation between Funding and Publications: A Pre-Step towards Future Research Prediction

Authors: Ning Kang, Marius Doornenbal

Abstract:

Funding is a very important – if not crucial – resource for research projects. Usually, funding organizations will publish a description of the funded research to describe the scope of the funding award. Logically, we would expect research outcomes to align with this funding award. For that reason, we might be able to predict future research topics based on present funding award data. That said, it remains to be shown if and how future research topics can be predicted by using the funding information. In this paper, we extract funding project information and their generated paper abstracts from the Gateway to Research database as a group, and use the papers from the same domains and publication years in the Scopus database as a baseline comparison group. We annotate both the project awards and the papers resulting from the funded projects with linguistic features (noun phrases), and then calculate tf-idf and cosine similarity between these two set of features. We show that the cosine similarity between the project-generated papers group is bigger than the project-baseline group, and also that these two groups of similarities are significantly different. Based on this result, we conclude that the funding information actually correlates with the content of future research output for the funded project on the topical level. How funding really changes the course of science or of scientific careers remains an elusive question.

Keywords: natural language processing, noun phrase, tf-idf, cosine similarity

Procedia PDF Downloads 229
4922 Ecorium: The Ecological Project in Montevideo Uruguay

Authors: Chettou Souhaila, Soufi Omar, Roumia Mohammed Ammar

Abstract:

Protecting the environment is to preserve the survival and future of humanity. Indeed, the environment is our source of food and drinking water, the air is our source of oxygen, the climate allows our survival and biodiversity are a potential drug reservoir. Preserving the environment is, therefore, a matter of survival. The objective of this project is to familiarize the general public with environmental problems not only with the theme of environmental protection, but also with the concept of biodiversity in different ecosystems. For it, the aim of our project was to create the Ecorium which is a place that preserves many species of plants of different ecosystems, schools, malls, buildings, offices, ecological transports, gardens, and many familial activities that participated in the ecosystems development, strategic biodiversity and sustainable development.

Keywords: ecological system, ecorium, environment, sustainable development

Procedia PDF Downloads 314
4921 Gender-Based Violence Public Art Projects: An Analysis of the Value of Including Social Justice Topics in Tertiary Courses

Authors: F. Saptouw

Abstract:

This paper will examine the value of introducing social justice issues into the tertiary fine art curriculum at a first-year level. The paper will present detail of the conceptual impetus and the logistics related to the execution of a collaborative teaching project. The cohort of students was registered for the Fine Art Foundation course at the Michaelis School of Fine Art at the University of Cape Town. The course is dedicated to the development of critical thinking, communication skills, and varied approaches to knowledge construction within the first-year cohort. A core component of the course is the examination of the representation of gender, identity, politics, and power. These issues are examined within a range of public and private representations like art galleries, museum spaces, and contemporary popular culture. This particular project was a collaborative project with the Office of Inclusivity and Change, and the project leaders were Fabian Saptouw and Gabriel Khan. The paper will conclude by presenting an argument for the importance of such projects within the tertiary environment.

Keywords: art, education, gender-based violence, social responsiveness

Procedia PDF Downloads 121
4920 Psychological Factors Affecting Breastfeeding: An Exploratory Study among Breastfeeding Moms

Authors: Marwa Abdussalam

Abstract:

Breastfeeding is a unique emotional bond between a mother and their offspring. Though breastfeeding may be natural, it is not something mothers are born with; some still struggle to breastfeed their babies. Various factors can influence the breastfeeding experience, such as the mode of delivery, the mother’s health condition, proper latching, etc. In addition, psychological factors have been known to influence breastfeeding ability, duration, and milk supply. Some mothers struggle to breastfeed their babies because they perceive they have a low milk supply and or don’t have the ability to breastfeed their babies. Most of these perceptions result either from their own past experience or from the ‘comments’ of their caregivers. So, it is of utmost essential to understand such psychological factors affecting breastfeeding so that necessary steps can be taken to educate breastfeeding mothers. The study explored the role of psychological factors that affect breastfeeding. Data were collected from fifteen breastfeeding mothers using a semi-structured interview schedule. A total of 10 questions were included in the interview schedule. Questions were sequenced in a funnel pattern, beginning with open-ended questions and then moving on to close-ended questions. Data were analyzed using Braun and Clarke’s Thematic Analysis technique. This technique involves identifying the codes, generating themes, naming them, and finally reviewing them. Results indicated that breastfeeding self-efficacy perceived insufficient milk supply, and lack of knowledge were the psychological factors affecting breastfeeding. The results of this study can be used to help mothers who are struggling with breastfeeding by developing interventions aimed at improving breastfeeding self-efficacy.

Keywords: breastfeeding, breastfeeding self-efficacy, perceived insufficient milk supply, Thematic Analysis

Procedia PDF Downloads 92
4919 Equality in Higher Education: A Library and Learning Collaborative Project to Support Teachers

Authors: Ika Jorum

Abstract:

The aim of this collaborative project was to develop library support that contributes in a long-term way to a technical university’s work on increased equality in education. The background was an assessment made by the Higher Education Authority that showed the need for improvement regarding equality in several programs at the university. The university’s Vice President for equality and Vice President for sustainability announced funds for projects that supported the improvement of equality in education. The library was granted funding for a one-year project that aimed both to support teachers in order to embed equality in education and to support the library staff and improve the organization’s own work. The part of the project that was directed to teachers was performed as activities in different areas and forms, such as acquisition and collections, teaching, exhibitions and book discussions. Besides the activities and support that was offered to teachers, the education team had journal clubs in order to develop and embed equality in their own teaching. The part that was directed to library staff and management was performed as workshops in collaboration with Equality Office in order to identify areas where the library could make improvements on work with equality and inclusion. The expectation was that the activities would be well attended since the project team had got indications that the content would be relevant. The outcome of this project was that some activities turned out to be more attended than others and what is expected to be found relevant, for example, a workshop on information searching from a gender and equality perspective for teachers, might still not attract participants. On the other hand, Ph.D. students and students participated in the book discussions and wanted them to continue after the project had ended. Results will be shared both on what was successful and what was challenging. Some reflections will be given on what can be done to attract participants to activities in the area of gender equality that is most likely relevant for the expected attendants and how results from a project on gender equality can be integrated into an organization’s daily work.

Keywords: equality, higher education, critical information literacy, collaboration

Procedia PDF Downloads 59