Search results for: projects funding
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 2563

Search results for: projects funding

2263 Contributing to Accuracy of Bid Cost Estimate in Construction Projects

Authors: Abdullah Alhomidan

Abstract:

This study is conducted to identify the main factors affecting accuracy of pretender cost estimate in building construction projects in Saudi Arabia from owners’ perspective. 44 factors affecting pretender cost estimate were identified through literature review and discussion with some construction experts. The results show that the top important factors affecting pretender cost estimate accuracy are: level of competitors in the tendering, material price changes, communications with suppliers, communications with client, and estimating method used.

Keywords: cost estimate, accuracy, pretender, estimating, bid estimate

Procedia PDF Downloads 536
2262 Incentivize Contracting Partners of Public Projects

Authors: Sai On Cheung, Qiuwen Ma, Fong Chung Lee

Abstract:

Due to increased project complexity and technological advancement in the last decade, the designers and contractors are expected to put more efforts to achieve project goals. To render extra efforts from the agents, incentivization has become one of the primary strategies for the client. Despite increased academia interest in the design of incentive strategies, there is still a need for discussion about the underlying motivations and favourable conditions to make incentives effective. Therefore, this study focuses on the effects of motivations and favourable conditions for the use of incentives in public projects. Questionnaire survey is used as the data collection tool. The questionnaire survey was piloted through interviews with professionals from Hong Kong public sector. A total of 100 responses were collected for this survey. Accountability and organizational effectiveness were found to be the prime objectives of incentives installed by public clients. Furthermore, a list of favourable conditions for incentivization and its consequent effects on cost, schedule, risk and public opinions were identified. To conclude, this study analyses the means and ends of the use of incentives in public projects in Hong Kong.

Keywords: incentives, public accountability, project effectiveness, public opinions

Procedia PDF Downloads 37
2261 Balanced Scorecard (BSC) Project : A Methodological Proposal for Decision Support in a Corporate Scenario

Authors: David de Oliveira Costa, Miguel Ângelo Lellis Moreira, Carlos Francisco Simões Gomes, Daniel Augusto de Moura Pereira, Marcos dos Santos

Abstract:

Strategic management is a fundamental process for global companies that intend to remain competitive in an increasingly dynamic and complex market. To do so, it is necessary to maintain alignment with their principles and values. The Balanced Scorecard (BSC) proposes to ensure that the overall business performance is based on different perspectives (financial, customer, internal processes, and learning and growth). However, relying solely on the BSC may not be enough to ensure the success of strategic management. It is essential that companies also evaluate and prioritize strategic projects that need to be implemented to ensure they are aligned with the business vision and contribute to achieving established goals and objectives. In this context, the proposition involves the incorporation of the SAPEVO-M multicriteria method to indicate the degree of relevance between different perspectives. Thus, the strategic objectives linked to these perspectives have greater weight in the classification of structural projects. Additionally, it is proposed to apply the concept of the Impact & Probability Matrix (I&PM) to structure and ensure that strategic projects are evaluated according to their relevance and impact on the business. By structuring the business's strategic management in this way, alignment and prioritization of projects and actions related to strategic planning are ensured. This ensures that resources are directed towards the most relevant and impactful initiatives. Therefore, the objective of this article is to present the proposal for integrating the BSC methodology, the SAPEVO-M multicriteria method, and the prioritization matrix to establish a concrete weighting of strategic planning and obtain coherence in defining strategic projects aligned with the business vision. This ensures a robust decision-making support process.

Keywords: MCDA process, prioritization problematic, corporate strategy, multicriteria method

Procedia PDF Downloads 45
2260 Measurement of Project Success in Construction Using Performance Indices

Authors: Annette Joseph

Abstract:

Background: The construction industry is dynamic in nature owing to the increasing uncertainties in technology, budgets, and development processes making projects more complex. Thus, predicting project performance and chances of its likely success has become difficult. The goal of all parties involved in construction projects is to successfully complete it on schedule, within planned budget and with the highest quality and in the safest manner. However, the concept of project success has remained ambiguously defined in the mind of the construction professionals. Purpose: This paper aims to study the analysis of a project in terms of its performance and measure the success. Methodology: The parameters for evaluating project success and the indices to measure success/performance of a project are identified through literature study. Through questionnaire surveys aimed at the stakeholders in the projects, data is collected from two live case studies (an ongoing and completed project) on the overall performance in terms of its success/failure. Finally, with the help of SPSS tool, the data collected from the surveys are analyzed and applied on the selected performance indices. Findings: The score calculated by using the indices and models helps in assessing the overall performance of the project and interpreting it to find out whether the project will be a success or failure. This study acts as a reference for firms to carry out performance evaluation and success measurement on a regular basis helping projects to identify the areas which are performing well and those that require improvement. Originality & Value: The study signifies that by measuring project performance; a project’s deviation towards success/failure can be assessed thus helping in suggesting early remedial measures to bring it on track ensuring that a project will be completed successfully.

Keywords: project, performance, indices, success

Procedia PDF Downloads 165
2259 Risk Analysis in Off-Site Construction Manufacturing in Small to Medium-Sized Projects

Authors: Atousa Khodadadyan, Ali Rostami

Abstract:

The objective of off-site construction manufacturing is to utilise the workforce and machinery in a controlled environment without external interference for higher productivity and quality. The usage of prefabricated components can save up to 14% of the total energy consumption in comparison with the equivalent number of cast-in-place ones. Despite the benefits of prefabrication construction, its current project practices encompass technical and managerial issues. Building design, precast components’ production, logistics, and prefabrication installation processes are still mostly discontinued and fragmented. Furthermore, collaboration among prefabrication manufacturers, transportation parties, and on-site assemblers rely on real-time information such as the status of precast components, delivery progress, and the location of components. From the technical point of view, in this industry, geometric variability is still prevalent, which can be caused during the transportation or production of components. These issues indicate that there are still many aspects of prefabricated construction that can be developed using disruptive technologies. Practical real-time risk analysis can be used to address these issues as well as the management of safety, quality, and construction environment issues. On the other hand, the lack of research about risk assessment and the absence of standards and tools hinder risk management modeling in prefabricated construction. It is essential to note that no risk management standard has been established explicitly for prefabricated construction projects, and most software packages do not provide tailor-made functions for this type of projects.

Keywords: project risk management, risk analysis, risk modelling, prefabricated construction projects

Procedia PDF Downloads 150
2258 Quantitative Analysis of Three Sustainability Pillars for Water Tradeoff Projects in Amazon

Authors: Taha Anjamrooz, Sareh Rajabi, Hasan Mahmmud, Ghassan Abulebdeh

Abstract:

Water availability, as well as water demand, are not uniformly distributed in time and space. Numerous extra-large water diversion projects are launched in Amazon to alleviate water scarcities. This research utilizes statistical analysis to examine the temporal and spatial features of 40 extra-large water diversion projects in Amazon. Using a network analysis method, the correlation between seven major basins is measured, while the impact analysis method is employed to explore the associated economic, environmental, and social impacts. The study unearths that the development of water diversion in Amazon has witnessed four stages, from a preliminary or initial period to a phase of rapid development. It is observed that the length of water diversion channels and the quantity of water transferred have amplified significantly in the past five decades. As of 2015, in Amazon, more than 75 billion m³ of water was transferred amidst 12,000 km long channels. These projects extend over half of the Amazon Area. The River Basin E is currently the most significant source of transferred water. Through inter-basin water diversions, Amazon gains the opportunity to enhance the Gross Domestic Product (GDP) by 5%. Nevertheless, the construction costs exceed 70 billion US dollars, which is higher than any other country. The average cost of transferred water per unit has amplified with time and scale but reduced from western to eastern Amazon. Additionally, annual total energy consumption for pumping exceeded 40 billion kilowatt-hours, while the associated greenhouse gas emissions are assessed to be 35 million tons. Noteworthy to comprehend that ecological problems initiated by water diversion influence the River Basin B and River Basin D. Due to water diversion, more than 350 thousand individuals have been relocated, away from their homes. In order to enhance water diversion sustainability, four categories of innovative measures are provided for decision-makers: development of water tradeoff projects strategies, improvement of integrated water resource management, the formation of water-saving inducements, and pricing approach, and application of ex-post assessment.

Keywords: sustainability, water trade-off projects, environment, Amazon

Procedia PDF Downloads 109
2257 Artificial Intelligence in Art and Other Sectors: Selected Aspects of Mutual Impact

Authors: Justyna Minkiewicz

Abstract:

Artificial Intelligence (AI) applied in the arts may influence the development of AI knowledge in other sectors and then also impact mutual collaboration with the artistic environment. Hence this collaboration may also impact the development of art projects. The paper will reflect the qualitative research outcomes based on in-depth (IDI) interviews within the marketing sector in Poland and desk research. Art is a reflection of the spirit of our times. Moreover, now we are experiencing a significant acceleration in the development of technologies and their use in various sectors. The leading technologies that contribute to the development of the economy, including the creative sector, embrace technologies such as artificial intelligence, blockchain, extended reality, voice processing, and virtual beings. Artificial intelligence is one of the leading technologies developed for several decades, which is currently reaching a high level of interest and use in various sectors. However, the conducted research has shown that there is still low awareness of artificial intelligence and its wide application in various sectors. The study will show how artists use artificial intelligence in their art projects and how it can be translated into practice within the business. At the same time, the paper will raise awareness of the need for businesses to be inspired by the artistic environment. The research proved that there is still a need to popularize knowledge about this technology which is crucial for many sectors. Art projects are tools to develop knowledge and awareness of society and also various sectors. At the same time, artists may benefit from such collaboration. The paper will include selected aspects of mutual relations, areas of possible inspiration, and possible transfers of technological solutions. Those are AI applications in creative industries such as advertising and film, image recognition in art, and projects from different sectors.

Keywords: artificial intelligence, business, art, creative industry, technology

Procedia PDF Downloads 70
2256 Digital Transformation in Developing Countries, A Study into Building Information Modelling Adoption in Thai Design and Engineering Small- and Medium-Sizes Enterprises

Authors: Prompt Udomdech, Eleni Papadonikolaki, Andrew Davies

Abstract:

Building information modelling (BIM) is the major technological trend amongst built environment organisations. Digitalising businesses and operations, BIM brings forth a digital transformation in any built environment industry. The adoption of BIM presents challenges for organisations, especially small- and medium-sizes enterprises (SMEs). The main problem for built-environment SMEs is the lack of project actors with adequate BIM competences. The research highlights learning in projects as the key and explores into the learning of BIM in projects of designers and engineers within Thai design and engineering SMEs. The study uncovers three impeding attributes, which are: a) lack of English proficiency; b) unfamiliarity with digital technologies; and c) absence of public standards. This research expands on the literature on BIM competences and adoption.

Keywords: BIM competences and adoption, digital transformation, learning in projects, SMEs, and developing built environment industry

Procedia PDF Downloads 114
2255 Integrating Lessons in Sustainable Development and Sustainability in Undergraduate Education: The CLASIC Way

Authors: Intan Azura Mokhtar, Yaacob Ibrahim

Abstract:

In recent years, learning about sustainable development and sustainability has become an increasingly significant component in universities’ degree programmes and curricula. As the world comes together and races to fulfil the 17 United Nations’ sustainable development goals (SDGs) by the year 2030, our educational curricula and landscapes simultaneously evolve to integrate lessons and opportunities for sustainable development and sustainability to redefine our university education and set the trajectory for our young people to take the lead in co-creating solutions for a better world. In this paper, initiatives and projects that revolved around themes of sustainable development and sustainability in a young university in Singapore are discussed. These initiatives and projects were curated by a new centre in the university that focuses on community leadership, social innovation, and service learning and was led by the university’s academic staff. The university’s undergraduate students were also involved in these initiatives and projects and played an active role in reaching out to and engaging members of different segments of the community – to better understand their needs and concerns and to co-create with them relevant and sustainable solutions that generate positive social impact.

Keywords: singapore, sustainable development, sustainability, undergraduate education

Procedia PDF Downloads 68
2254 Health Sector Budgetary Allocations and Their Implications on Health Service Delivery and Universal Health Coverage in Uganda

Authors: Richard Ssempala, Francis Kintu, Christine K. Tashobya

Abstract:

Funding for health remains a key constraint facing many developing countries, Uganda inclusive. Uganda’s health sector budget to the national budgetary allocation has stagnated between 8.2% to 10% over the years. Using data collected from different government documents, we sought to establish the implications of the budget allocation over the period (FY2010/11-2018/19) on health services delivery in Uganda to inform policymakers specifically Members of Parliament who are critical in making sectorial allocation on the steps they can adapt to change the terrain of health financing in Uganda. Findings revealed that the contribution of public funding to the health sector is low (15.7%) with private sources (42.6%) and donors contributing much more, with the bulk of private funds, are out of pocket. The study further revealed that low budget allocation had been manifested in inadequate and poorly motivated health workers, essential drug stock-outs that ultimately contribute to poor access to services, catastrophic health expenditures, and high morbidity rates. We recommend for a substantial and sustained increase in the government health budget, optimizing the available resources by addressing wastages, prioritizing health promotion, prevention and finally, institutionalizing the National Health Insurance Scheme.

Keywords: budget allocations, universal health coverage, health service delivery, Uganda

Procedia PDF Downloads 145
2253 Exploring the Implementation of Building Information Modelling Level 2 in the UK Construction Industry: The Case of Small and Medium-Sized Enterprises

Authors: Khaled Abu Awwad, Abdussalam Shibani, Michel Ghostin

Abstract:

In the last few years, building information modelling (BIM) has been acknowledged as a new technology capable of transforming the construction sector to a collaborated industry. The implementation of BIM in the United Kingdom (UK) construction sector has increased significantly in the last decade, particularly after the UK government mandated the use of BIM in all public projects by 2016. Despite this, there are many indicators that BIM implementation is the main concern for large companies, while small and medium-sized enterprises (SMEs) are lagging behind in adopting and implementing this new technology. This slow adoption of BIM leads to an uncompetitive disadvantage in public projects and possible private projects. On the other hand, there is limited research focusing on the implementation of BIM Level 2 within SMEs. Therefore, the aim of this study is to bridge this gap and provide a conceptual framework to aid SMEs in implementing BIM Level 2. This framework is a result of interpreting qualitative data obtained by conducting semi-structured interviews with BIM experts in the UK construction industry.

Keywords: building information modelling, critical success factors, small and medium-sized enterprises, United Kingdom

Procedia PDF Downloads 183
2252 Onco@Home: Comparing the Costs, Revenues, and Patient Experience of Cancer Treatment at Home with the Standard of Care

Authors: Sarah Misplon, Wim Marneffe, Johan Helling, Jana Missiaen, Inge Decock, Dries Myny, Steve Lervant, Koen Vaneygen

Abstract:

The aim of this study was twofold. First, we investigated whether the current funding from the national health insurance (NHI) of home hospitalization (HH) for oncological patients is sufficient in Belgium. Second, we compared patient’s experiences and preferences of HH to the standard of care (SOC). Two HH models were examined in three Belgian hospitals and three home nursing organizations. In a first HH model, the blood draw and monitoring prior to intravenous therapy were performed by a trained home nurse at the patient’s home the day before the visit to the day hospital. In a second HH model, the administration of two subcutaneous treatments was partly provided at home instead of in the hospital. Therefore, we conducted (1) a bottom-up micro-costing study to compare the costs and revenues for the providers (hospitals and home care organizations), and (2) a cross-sectional survey to compare patient’s experiences and preferences of the SOC group and the HH group. Our results show that HH patients prefer HH and none of them wanted to return to SOC, although the satisfaction of patients was not significantly different between the two categories. At the same time, we find that costs associated to HH are higher overall. Comparing revenues with costs, we conclude that the current funding from NHI of HH for oncological patients is insufficient.

Keywords: cost analysis, health insurance, preference, home hospitalization

Procedia PDF Downloads 97
2251 Lessons Learned from Interlaboratory Noise Modelling in Scope of Environmental Impact Assessments in Slovenia

Authors: S. Cencek, A. Markun

Abstract:

Noise assessment methods are regularly used in scope of Environmental Impact Assessments for planned projects to assess (predict) the expected noise emissions of these projects. Different noise assessment methods could be used. In recent years, we had an opportunity to collaborate in some noise assessment procedures where noise assessments of different laboratories have been performed simultaneously. We identified some significant differences in noise assessment results between laboratories in Slovenia. We estimate that despite good input Georeferenced Data to set up acoustic model exists in Slovenia; there is no clear consensus on methods for predictive noise methods for planned projects. We analyzed input data, methods and results of predictive noise methods for two planned industrial projects, both were done independently by two laboratories. We also analyzed the data, methods and results of two interlaboratory collaborative noise models for two existing noise sources (railway and motorway). In cases of predictive noise modelling, the validations of acoustic models were performed by noise measurements of surrounding existing noise sources, but in varying durations. The acoustic characteristics of existing buildings were also not described identically. The planned noise sources were described and digitized differently. Differences in noise assessment results between different laboratories have ranged up to 10 dBA, which considerably exceeds the acceptable uncertainty ranged between 3 to 6 dBA. Contrary to predictive noise modelling, in cases of collaborative noise modelling for two existing noise sources the possibility to perform the validation noise measurements of existing noise sources greatly increased the comparability of noise modelling results. In both cases of collaborative noise modelling for existing motorway and railway, the modelling results of different laboratories were comparable. Differences in noise modeling results between different laboratories were below 5 dBA, which was acceptable uncertainty set up by interlaboratory noise modelling organizer. The lessons learned from the study were: 1) Predictive noise calculation using formulae from International standard SIST ISO 9613-2: 1997 is not an appropriate method to predict noise emissions of planned projects since due to complexity of procedure they are not used strictly, 2) The noise measurements are important tools to minimize noise assessment errors of planned projects and should be in cases of predictive noise modelling performed at least for validation of acoustic model, 3) National guidelines should be made on the appropriate data, methods, noise source digitalization, validation of acoustic model etc. in order to unify the predictive noise models and their results in scope of Environmental Impact Assessments for planned projects.

Keywords: environmental noise assessment, predictive noise modelling, spatial planning, noise measurements, national guidelines

Procedia PDF Downloads 211
2250 The Relationship between Procurement Strategies and Sustainability Outcomes: A Systematic Literature Review

Authors: Cathy T. Mpanga Kowet, Aghaegbuna Obinna U. Ozumba

Abstract:

This study examined and identified the inconsistencies, relationships, gaps and recurring themes in literature regarding the relationship between procurement strategies employed in the construction projects for sustainable buildings and realization of sustainability goals. A systematic literature review of studies on the relationship between various procurement strategies and attainment of sustainability outcomes was conducted. Using specific terms, papers published between 2002 and 2018 were identified and screened according to an inclusion and exclusion criteria. Current findings reveal that, although the attainment of sustainability goals is achievable with both traditional and contemporary procurement strategies, only projects delivered using modern procurement strategies are capable of meeting and exceeding targeted sustainability objectives. However, traditional procurement strategy remains the preferred method for most green building construction projects. The results suggest implications for decision makers in considering the impact of selected procurement strategies on targeted sustainability goals, in the early stages of sustainable building construction projects. The study shows that there is a gap between the reported appropriate procurement strategies and what is being practiced currently. Theoretically, the study expands on the literature on adoption and diffusion of contemporary procurement strategies, by consolidating existing studies to highlight the current gaps. While the study is at the literature review stage, deductions will serve as basis for field work involving empirical data.

Keywords: green buildings construction, procurement method, procurement strategy, sustainability objectives, sustainability outcomes

Procedia PDF Downloads 139
2249 Study of Human Position in Architecture with Contextual Approach

Authors: E. Zarei, M. Bazaei, A. seifi, A. Keshavarzi

Abstract:

Contextuallism has been always the main component of urban science. It not only has great direct and indirect impact on behaviors, events and interactions, but also is one of the basic factors of an urban values and identity. Nowadays there might be some deficiencies in the cities. In the theories of environment designing, humanistic orientations with the focus on culture and cultural variables would enable us to transfer information. To communicate with the context in which human lives, he needs some common memories, understandable symbols and daily activities in that context. The configuration of a place can impact on human’s behaviors. The goal of this research is to review 7 projects in different parts of the world with various usages and some factors such as ‘sense of place’, ‘sense of belonging’ and ‘social and cultural relations’ will be discussed in these projects. The method used for research in this project is descriptive- analytic. Library information and Internet are the main sources of gathering information and the method of reasoning used in this project is inductive. The consequence of this research will be some data in the form of tables that has been extracted from mentioned projects.

Keywords: contextuallism with humanistic approach, sense of place, sense of belonging, social and cultural relations

Procedia PDF Downloads 370
2248 Cross Project Software Fault Prediction at Design Phase

Authors: Pradeep Singh, Shrish Verma

Abstract:

Software fault prediction models are created by using the source code, processed metrics from the same or previous version of code and related fault data. Some company do not store and keep track of all artifacts which are required for software fault prediction. To construct fault prediction model for such company, the training data from the other projects can be one potential solution. The earlier we predict the fault the less cost it requires to correct. The training data consists of metrics data and related fault data at function/module level. This paper investigates fault predictions at early stage using the cross-project data focusing on the design metrics. In this study, empirical analysis is carried out to validate design metrics for cross project fault prediction. The machine learning techniques used for evaluation is Naïve Bayes. The design phase metrics of other projects can be used as initial guideline for the projects where no previous fault data is available. We analyze seven data sets from NASA Metrics Data Program which offer design as well as code metrics. Overall, the results of cross project is comparable to the within company data learning.

Keywords: software metrics, fault prediction, cross project, within project.

Procedia PDF Downloads 312
2247 Participatory Monitoring Strategy to Address Stakeholder Engagement Impact in Co-creation of NBS Related Project: The OPERANDUM Case

Authors: Teresa Carlone, Matteo Mannocchi

Abstract:

In the last decade, a growing number of International Organizations are pushing toward green solutions for adaptation to climate change. This is particularly true in the field of Disaster Risk Reduction (DRR) and land planning, where Nature-Based Solutions (NBS) had been sponsored through funding programs and planning tools. Stakeholder engagement and co-creation of NBS is growing as a practice and research field in environmental projects, fostering the consolidation of a multidisciplinary socio-ecological approach in addressing hydro-meteorological risk. Even thou research and financial interests are constantly spread, the NBS mainstreaming process is still at an early stage as innovative concepts and practices make it difficult to be fully accepted and adopted by a multitude of different actors to produce wide scale societal change. The monitoring and impact evaluation of stakeholders’ participation in these processes represent a crucial aspect and should be seen as a continuous and integral element of the co-creation approach. However, setting up a fit for purpose-monitoring strategy for different contexts is not an easy task, and multiple challenges emerge. In this scenario, the Horizon 2020 OPERANDUM project, designed to address the major hydro-meteorological risks that negatively affect European rural and natural territories through the co-design, co-deployment, and assessment of Nature-based Solution, represents a valid case study to test a monitoring strategy from which set a broader, general and scalable monitoring framework. Applying a participative monitoring methodology, based on selected indicators list that combines quantitative and qualitative data developed within the activity of the project, the paper proposes an experimental in-depth analysis of the stakeholder engagement impact in the co-creation process of NBS. The main focus will be to spot and analyze which factors increase knowledge, social acceptance, and mainstreaming of NBS, promoting also a base-experience guideline to could be integrated with the stakeholder engagement strategy in current and future similar strongly collaborative approach-based environmental projects, such as OPERANDUM. Measurement will be carried out through survey submitted at a different timescale to the same sample (stakeholder: policy makers, business, researchers, interest groups). Changes will be recorded and analyzed through focus groups in order to highlight causal explanation and to assess the proposed list of indicators to steer the conduction of similar activities in other projects and/or contexts. The idea of the paper is to contribute to the construction of a more structured and shared corpus of indicators that can support the evaluation of the activities of involvement and participation of various levels of stakeholders in the co-production, planning, and implementation of NBS to address climate change challenges.

Keywords: co-creation and collaborative planning, monitoring, nature-based solution, participation & inclusion, stakeholder engagement

Procedia PDF Downloads 89
2246 Integrated Information System on Human Resource Management in Project-Based Organizations

Authors: Akbar Farahani, Afsaneh Hassani, Peyman M. Farkhondeh

Abstract:

Human Resource Management as one of the core processes of the project-based companies, despite its key role in the success and competitive advantage, is relatively unknown. In the project-based companies, due to the accelerated movement of knowledge in the work activities and the temporary nature of the project, the need to develop mechanisms for achieving optimal management of this issues is very challenging. Approach to human resource management in these companies evolves with goals, strategies, and operational processes. Therefore, the need for appropriate tools to facilitate implementation of the optimized human resource management in the project is more than before,Which currently with the development of information technology and modern communication, appropriate to address the optimal approach for dynamic management of human resources in the project have been provided.This is done by using the referral system implemented in Mahab GCE that provides 1: the ability to use humans in projects without geographic limitation and 2:information on the activities and outcomes of referrals.Furthermore, by using this system, recording the lessons learned after any particular activity on projects,accessing quantitative information, procedures, documentation of learned practices that have been stored in the data base as well as using them in future projects is provided.

Keywords: human resource management, project base company, ERP, referrals system

Procedia PDF Downloads 446
2245 Identification of Factors Affecting Labor Productivity in Construction Projects of Iran

Authors: Elham Dehghan, A. Shirzadi Javid, Mohsen Tadayon

Abstract:

Labor productivity is very important and gained special concerns among professionals in the construction industry, worldwide. Productivity improvements on labors achieve higher cost savings with minimal investment. Due to the fact that profit margins are small on construction projects, cost savings associated with productivity are crucial to become a successful contractor. This research program studies and highlights the factors affecting labor productivity in Iranian construction industry. A questionnaire was used to gather the relevant data from respondents who involve in managing various types of projects in wide areas in Iran. It involved ranking 57 predefined factors divided into 5 categories: Human/Labor; Financial; Management; Equipments/Materials and Environmental. Total 62 feedbacks were analyzed through the Relative Importance Index (RII) technique. The top ten factors affecting construction labor productivity in Iran are: 1) Professional capability of contractor project manager, 2) skills of contractor’s project management team, 3) professional capability of owner project manager, 4) professional capability of Consulting Project manager, 5) discipline working, 6) delay payments by the owner, 7) material shortages, 8) delays in delivery of materials, 9) turnover power of the owner, 10) poor site management. Recommendations have been made in the study to address these factors. The research has direct benefits to key stakeholders in Iranian construction industry.

Keywords: Iranian construction projects, labor, productivity, relative importance index

Procedia PDF Downloads 238
2244 Modelling Suspended Solids Transport in Dammam (Saudi Arabia) Coastal Areas

Authors: Hussam Alrabaiah

Abstract:

Some new projects (new proposed harbor, recreational projects) are considered in the eastern coasts of Dammam city, Saudi Arabia. Dredging operations would significantly alter coast hydrological and sediment transport processes. It is important that the project areas must keep flushing the fresh sea water in and out with good water quality parameters, which are currently facing increased pressure from urbanization and navigation requirements in conjunction with industrial developments. A suspended solids or sediments are expected to affect the flora and fauna in that area. Governing advection-diffusion equations are considered to understand the consequences of such projects. A numerical modeling study is developed to study the effect of dredging and, in particular, the suspended sediments concentrations (mg/L) changed in the region. The results were obtained using finite element method using an in-house or commercial software. Results show some consistency with data observed in that region. Recommendations based on results could be formulated for decision makers to protect the environment in the long term.

Keywords: finite element, method, suspended solids transport, advection-diffusion

Procedia PDF Downloads 259
2243 The Work System Method for Designing Knowledge Mobilization Projects

Authors: Chihab Benmoussa

Abstract:

Could the Work System Approach (WSA) function as a framework for designing high-impact knowledge mobilization systems? This paper put forward arguments in favor of the applicability of WSA for knowledge mobilization design based on evidences from a practical research. Normative approaches for practitioners are highly needed especially in the field of knowledge management (KM), given the abysmal rate of disappointment and failure of KM projects. The paper contrasts knowledge management and knowledge mobilization, presents the WSA and showed how the WSA’s concepts and ideas fit with the approach adopted by a multinational company in designing a successful knowledge mobilization initiative.

Keywords: knowledge management, knowledge mobilizations, work system method

Procedia PDF Downloads 496
2242 Energy Enterprise Information System for Strategic Decision-Making

Authors: Woosik Jang, Seung H. Han, Seung Won Baek, Chan Young Park

Abstract:

Natural gas (NG) is a local energy resource that exists in certain countries, and most NG producers operate within unstable governments. Moreover, about 90% of the liquefied natural gas (LNG) market is governed by a small number of international oil companies (IOCs) and national oil companies (NOCs), market entry of second movers is extremely limited. To overcome these barriers, project viability should be assessed based on limited information at the project screening perspective. However, there have been difficulties at the early stages of projects as follows: (1) What factors should be considered? (2) How many experts are needed to make a decision? and (3) How to make an optimal decision with limited information? To answer these questions, this research suggests a LNG project viability assessment model based on the Dempster-Shafer theory (DST). Total of 11 indices for the gas field analysis and 23 indices for the market environment analysis are identified that reflect unique characteristics of LNG industry. Moreover, the proposed model evaluates LNG projects based on questionnaire survey and it provides not only quantified results but also uncertainty level of results based on DST. Consequently, the proposed model as a systematic framework can support the decision-making process from the gas field projects using quantitative results, and it is developed to a stand-alone system to enhance the practical usability. It is expected to improve the decision-making quality and opportunity in LNG projects for enterprise through informed decision.

Keywords: project viability, LNG project, enterprise information system, Dempster-Shafer Theory, strategic decision-making

Procedia PDF Downloads 233
2241 Selection of Social and Sustainability Criteria for Public Investment Project Evaluation in Developing Countries

Authors: Pintip Vajarothai, Saad Al-Jibouri, Johannes I. M. Halman

Abstract:

Public investment projects are primarily aimed at achieving development strategies to increase national economies of scale and overall improvement in a country. However, experience shows that public projects, particularly in developing countries, struggle or fail to fulfill the immediate needs of local communities. In many cases, the reason for that is that projects are selected in a subjective manner and that a major part of the problem is related to the evaluation criteria and techniques used. The evaluation process is often based on a broad strategic economic effects rather than real benefits of projects to society or on the various needs from different levels (e.g. national, regional, local) and conditions (e.g. long-term and short-term requirements). In this paper, an extensive literature review of the types of criteria used in the past by various researchers in project evaluation and selection process is carried out and the effectiveness of such criteria and techniques is discussed. The paper proposes substitute social and project sustainability criteria to improve the conditions of local people and in particular the disadvantaged groups of the communities. Furthermore, it puts forward a way for modelling the interaction between the selected criteria and the achievement of the social goals of the affected community groups. The described work is part of developing a broader decision model for public investment project selection by integrating various aspects and techniques into a practical methodology. The paper uses Thailand as a case to review what and how the various evaluation techniques are currently used and how to improve the project evaluation and selection process related to social and sustainability issues in the country. The paper also uses an example to demonstrates how to test the feasibility of various criteria and how to model the interaction between projects and communities. The proposed model could be applied to other developing and developed countries in the project evaluation and selection process to improve its effectiveness in the long run.

Keywords: evaluation criteria, developing countries, public investment, project selection methodology

Procedia PDF Downloads 253
2240 An Exploratory Study of Changing Organisational Practices of Third-Sector Organisations in Mandated Corporate Social Responsibility in India

Authors: Avadh Bihari

Abstract:

Corporate social responsibility (CSR) has become a global parameter to define corporates' ethical and responsible behaviour. It was a voluntary practice in India till 2013, driven by various guidelines, which has become a mandate since 2014 under the Companies Act, 2013. This has compelled the corporates to redesign their CSR strategies by bringing in structures, planning, accountability, and transparency in their processes with a mandate to 'comply or explain'. Based on the author's M.Phil. dissertation, this paper presents the changes in organisational practices and institutional mechanisms of third-sector organisations (TSOs) with the theoretical frameworks of institutionalism and co-optation. It became an interesting case as India is the only country to have a law on CSR, which is not only mandating the reporting but the spending too. The space of CSR in India is changing rapidly and affecting multiple institutions, in the context of the changing roles of the state, market, and TSOs. Several factors such as stringent regulation on foreign funding, mandatory CSR pushing corporates to look out for NGOs, and dependency of Indian NGOs on CSR funds have come to the fore almost simultaneously, which made it an important area of study. Further, the paper aims at addressing the gap in the literature on the effects of mandated CSR on the functioning of TSOs through the empirical and theoretical findings of this study. The author had adopted an interpretivist position in this study to explore changes in organisational practices from the participants' experiences. Data were collected through in-depth interviews with five corporate officials, eleven officials from six TSOs, and two academicians, located at Mumbai and Delhi, India. The findings of this study show the legislation has institutionalised CSR, and TSOs get co-opted in the process of implementing mandated CSR. Seventy percent of the corporates implement their CSR projects through TSOs in India; this has affected the organisational practices of TSOs to a large extent. They are compelled to recruit expert workforce, create new departments for monitoring & evaluation, communications, and adopt management practices of project implementation from corporates. These are attempts to institutionalise the TSOs so that they can produce calculated results as demanded by corporates. In this process, TSOs get co-opted in a struggle to secure funds and lose their autonomy. The normative, coercive, and mimetic isomorphisms of institutionalism come into play as corporates are mandated to take up CSR, thereby influencing the organisational practices of TSOs. These results suggest that corporates and TSOs require an understanding of each other's work culture to develop mutual respect and work towards the goal of sustainable development of the communities. Further, TSOs need to retain their autonomy and understanding of ground realities without which they become an extension of the corporate-funder. For a successful CSR project, engagement beyond funding is required from corporate, through their involvement and not interference. CSR-led community development can be structured by management practices to an extent, but cannot overshadow the knowledge and experience of TSOs.

Keywords: corporate social responsibility, institutionalism, organisational practices, third-sector organisations

Procedia PDF Downloads 92
2239 The Governance of Net-Zero Emission Urban Bus Transitions in the United Kingdom: Insight from a Transition Visioning Stakeholder Workshop

Authors: Iraklis Argyriou

Abstract:

The transition to net-zero emission urban bus (ZEB) systems is receiving increased attention in research and policymaking throughout the globe. Most studies in this area tend to address techno-economic aspects and the perspectives of a narrow group of stakeholders, while they largely overlook analysis of current bus system dynamics. This offers limited insight into the types of ZEB governance challenges and opportunities that are encountered in real-world contexts, as well as into some of the immediate actions that need to be taken to set off the transition over the longer term. This research offers a multi-stakeholder perspective into both the technical and non-technical factors that influence ZEB transitions within a particular context, the UK. It does so by drawing from a recent transition visioning stakeholder workshop (June 2023) with key public, private and civic actors of the urban bus transportation system. Using NVivo software to qualitatively analyze the workshop discussions, the research examines the key technological and funding aspects, as well as the short-term actions (over the next five years), that need to be addressed for supporting the ZEB transition in UK cities. It finds that ZEB technology has reached a mature stage (i.e., high efficiency of batteries, motors and inverters), but important improvements can be pursued through greater control and integration of ZEB technological components and systems. In this regard, telemetry, predictive maintenance and adaptive control strategies pertinent to the performance and operation of ZEB vehicles have a key role to play in the techno-economic advancement of the transition. Yet, more pressing gaps were identified in the current ZEB funding regime. Whereas the UK central government supports greater ZEB adoption through a series of grants and subsidies, the scale of the funding and its fragmented nature do not match the needs for a UK-wide transition. Funding devolution arrangements (i.e., stable funding settlement deals between the central government and the devolved administrations/local authorities), as well as locally-driven schemes (i.e., congestion charging/workplace parking levy), could then enhance the financial prospects of the transition. As for short-term action, three areas were identified as critical: (1) the creation of whole value chains around the supply, use and recycling of ZEB components; (2) the ZEB retrofitting of existing fleets; and (3) integrated transportation that prioritizes buses as a first-choice, convenient and reliable mode while it simultaneously reduces car dependency in urban areas. Taken together, the findings point to the need for place-based transition approaches that create a viable techno-economic ecosystem for ZEB development but at the same time adopt a broader governance perspective beyond a ‘net-zero’ and ‘bus sectoral’ focus. As such, multi-actor collaborations and the coordination of wider resources and agency, both vertically across institutional scales and horizontally across transport, energy and urban planning, become fundamental features of comprehensive ZEB responses. The lessons from the UK case can inform a broader body of empirical contextual knowledge of ZEB transition governance within domestic political economies of public transportation.

Keywords: net-zero emission transition, stakeholders, transition governance, UK, urban bus transportation

Procedia PDF Downloads 53
2238 Assessment of Investment Programs in Agriculture in Georgia

Authors: M. Chavleishvili

Abstract:

The paper presents the analysis of the current situation of agricultural development in Georgia. The investment environment that supports development of the agricultural sector is evaluated and the key priorities are identified. The analysis of the projects already implemented with state and EU support, as well as those that are being currently implemented is presented. The policy and the programs supporting development of agricultural sector are analyzed. Based on an analysis of the evaluations of experts and the primary accounting documents, the outcomes of investment programs, their advantages and disadvantages, are studied. Through identifying investment programs in the agricultural sector of Georgia, corresponding conclusions are made, based on which some recommendations are developed.

Keywords: agriculture, investments, investment programs, projects

Procedia PDF Downloads 336
2237 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 225
2236 Investigation of the Effect of Plasticization Temperature on Polymer Thin Film Stability through Spin Coating Process

Authors: Bilge Bozdogan, Selda T. Sendogdular, Levent Sendogdular

Abstract:

We report a technique to control chain conformation during the plasticization process to achieve homogeneous and stable thin films, which allows to reduce post-process annealing times along with enhanced properties like controlled irreversible adsorbed layer (Guiselin brushes) formation. In this study, spin coating temperature was considered as a parameter; hence, all equipment, including the spin coater, substrate, vials, and the solution, was kept inside the same heated fume hood where solution was spin-coated after the temperature was stabilized at a desired value. AFM and SEM results revealed severe difference for solid and air interface between ambient and temperature-controlled samples, which suggest that enthalpic contribution dynamically helps to control film stability in a way where chain entanglements and conformational restrictions are avoided before film growing and allowing to control grafting density through spin coating temperature. The adsorbed layer was also characterized with SEM and Raman-spectroscopy technique right after seeding the adsorbed layer with gold nanoparticles. Stabilized gold nanoparticles and their surface distribution manifest the existence of a controllable polymer brush structure. Acknowledgments: This study was funded by Erciyes University Scientific Research Projects (BAP) Funding(Project ID:10058)

Keywords: chain stability, Guiselin brushes, polymer thin film, spin coating temperature

Procedia PDF Downloads 190
2235 Contractual Complexity and Contract Parties' Opportunistic Behavior in Construction Projects: In a Contractual Function View

Authors: Mengxia Jin, Yongqiang Chen, Wenqian Wang, Yu Wang

Abstract:

The complexity and specificity of construction projects have made common opportunism phenomenon, and contractual governance for opportunism has been a topic of considerable ongoing research. Based on TCE, the research distinguishes control and coordination as different functions of the contract to investigate their complexity separately. And in a nuanced way, the dimensionality of contractual control is examined. Through the analysis of motivation and capability of strong or weak form opportunism, the framework focuses on the relationship between the complexity of above contractual dimensions and different types of opportunistic behavior and attempts to verify the possible explanatory mechanism. The explanatory power of the research model is evaluated in the light of empirical evidence from questionnaires. We collect data from Chinese companies in the construction industry, and the data collection is still in progress. The findings will speak to the debate surrounding the effects of contract complexity on opportunistic behavior. This nuanced research will derive implications for research on the role of contractual mechanisms in dealing with inter-organizational opportunism and offer suggestions for curbing contract parties’ opportunistic behavior in construction projects.

Keywords: contractual complexity, contractual control, contractual coordinatio, opportunistic behavior

Procedia PDF Downloads 361
2234 Constructability Driven Engineering in Oil and Gas Projects

Authors: Srikanth Nagarajan, P. Parthasarathy, Frits Lagers

Abstract:

Lower crude oil prices increased the pressure on oil and gas projects. Being competitive becomes very important and critical for the success in any industry. Increase in size of the project multiplies the magnitude of the issue. Timely completion of projects within the budget and schedule is very important for any project to succeed. A simple idea makes a larger impact on the total cost of the plant. In this robust world, the phases of engineering right from licensing technology, feed, different phases of detail engineering, procurement and construction has been so much compressed that they overlap with each other. Hence constructability techniques have become very important. Here in this paper, the focus will be on how these techniques can be implemented and reduce cost with the help of a case study. Constructability is a process driven by the need to impact project’s construction phase resulting in improved project delivery, costs and schedule. In construction phase of one of our fast-track mega project, it was noticed that there was an opportunity to reduce significant amount of cost and schedule by implementing Constructability study processes. In this case study, the actual methodology adopted during engineering and construction and the way for doing it better by implementing Constructability techniques with collaborative engineering efforts will be explained.

Keywords: being competitive, collaborative engineering, constructability, cost reduction

Procedia PDF Downloads 384