5649 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance

Authors: Ali Abdullah Albezaghi

Abstract:

This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.

Keywords: risk management practices, external risks, internal risks, project risks, project performance

Procedia PDF Downloads 115
5648 Neuropsychological Deficits in Drug-Resistant Epilepsy

Authors: Timea Harmath-Tánczos

Abstract:

Drug-resistant epilepsy (DRE) is defined as the persistence of seizures despite at least two syndrome-adapted antiseizure drugs (ASD) used at efficacious daily doses. About a third of patients with epilepsy suffer from drug resistance. Cognitive assessment has a crucial role in the diagnosis and clinical management of epilepsy. Previous studies have addressed the clinical targets and indications for measuring neuropsychological functions; best to our knowledge, no studies have examined it in a Hungarian therapy-resistant population. To fill this gap, we investigated the Hungarian diagnostic protocol between 18 and 65 years of age. This study aimed to describe and analyze neuropsychological functions in patients with drug-resistant epilepsy and identify factors associated with neuropsychology deficits. We perform a prospective case-control study comparing neuropsychological performances in 50 adult patients and 50 healthy individuals between March 2023 and July 2023. Neuropsychological functions were examined in both patients and controls using a full set of specific tests (general performance level, motor functions, attention, executive facts., verbal and visual memory, language, and visual-spatial functions). Potential risk factors for neuropsychological deficit were assessed in the patient group using a multivariate analysis. The two groups did not differ in age, sex, dominant hand and level of education. Compared with the control group, patients with drug-resistant epilepsy showed worse performance on motor functions and visuospatial memory, sustained attention, inhibition and verbal memory. Neuropsychological deficits could therefore be systematically detected in patients with drug-resistant epilepsy in order to provide neuropsychological therapy and improve quality of life. The analysis of the classical and complex indices of the special neuropsychological tasks presented in the presentation can help in the investigation of normal and disrupted memory and executive functions in the DRE.

Keywords: drug-resistant epilepsy, Hungarian diagnostic protocol, memory, executive functions, cognitive neuropsychology

Procedia PDF Downloads 56
5647 Executive Deficits in Non-Clinical Hoarders

Authors: Thomas Heffernan, Nick Neave, Colin Hamilton, Gill Case

Abstract:

Hoarding is the acquisition of and failure to discard possessions, leading to excessive clutter and significant psychological/emotional distress. From a cognitive-behavioural approach, excessive hoarding arises from information-processing deficits, as well as from problems with emotional attachment to possessions and beliefs about the nature of possessions. In terms of information processing, hoarders have shown deficits in executive functions, including working memory, planning, inhibitory control, and cognitive flexibility. However, this previous research is often confounded by co-morbid factors such as anxiety, depression, or obsessive-compulsive disorder. The current study adopted a cognitive-behavioural approach, specifically assessing executive deficits and working memory in a non-clinical sample of hoarders, compared with non-hoarders. In this study, a non-clinical sample of 40 hoarders and 73 non-hoarders (defined by The Savings Inventory-Revised) completed the Adult Executive Functioning Inventory, which measures working memory and inhibition, Dysexecutive Questionnaire-Revised, which measures general executive function and the Hospital Anxiety and Depression Scale, which measures mood. The participant sample was made up of unpaid young adult volunteers who were undergraduate students and who completed the questionnaires on a university campus. The results revealed that, after observing no differences between hoarders and non-hoarders on age, sex, and mood, hoarders reported significantly more deficits in inhibitory control and general executive function when compared with non-hoarders. There was no between-group difference on general working memory. This suggests that non-clinical hoarders have a specific difficulty with inhibition-control, which enables you to resist repeated, unwanted urges. This might explain the hoarder’s inability to resist urges to buy and keep items that are no longer of any practical use. These deficits may be underpinned by general executive function deficiencies.

Keywords: hoarding, memory, executive, deficits

Procedia PDF Downloads 173
5646 Serial Position Curves under Compressively Expanding and Contracting Schedules of Presentation

Authors: Priya Varma, Denis John McKeown

Abstract:

Psychological time, unlike physical time, is believed to be ‘compressive’ in the sense that the mental representations of a series of events may be internally arranged with ever decreasing inter-event spacing (looking back from the most recently encoded event). If this is true, the record within immediate memory of recent events is severely temporally distorted. Although this notion of temporal distortion of the memory record is captured within some theoretical accounts of human forgetting, notably temporal distinctiveness accounts, the way in which the fundamental nature of the distortion underpins memory and forgetting broadly is barely recognised or at least directly investigated. Our intention here was to manipulate the spacing of items for recall in order to ‘reverse’ this supposed natural compression within the encoding of the items. In Experiment 1 three schedules of presentation (expanding, contracting and fixed irregular temporal spacing) were created using logarithmic spacing of the words for both free and serial recall conditions. The results of recall of lists of 7 words showed statistically significant benefits of temporal isolation, and more excitingly the contracting word series (which we may think of as reversing the natural compression within the mental representation of the word list) showed best performance. Experiment 2 tested for effects of active verbal rehearsal in the recall task; this reduced but did not remove the benefits of our temporal scheduling manipulation. Finally, a third experiment used the same design but with Chinese characters as memoranda, in a further attempt to subvert possible verbal maintenance of items. One change to the design here was to introduce a probe item following the sequence of items and record response times to this probe. Together the outcomes of the experiments broadly support the notion of temporal compression within immediate memory.

Keywords: memory, serial position curves, temporal isolation, temporal schedules

Procedia PDF Downloads 198
5645 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: dynamic planning, cost, time, performance, project management

Procedia PDF Downloads 456
5644 Project Progress Prediction in Software Devlopment Integrating Time Prediction Algorithms and Large Language Modeling

Authors: Dong Wu, Michael Grenn

Abstract:

Managing software projects effectively is crucial for meeting deadlines, ensuring quality, and managing resources well. Traditional methods often struggle with predicting project timelines accurately due to uncertain schedules and complex data. This study addresses these challenges by combining time prediction algorithms with Large Language Models (LLMs). It makes use of real-world software project data to construct and validate a model. The model takes detailed project progress data such as task completion dynamic, team Interaction and development metrics as its input and outputs predictions of project timelines. To evaluate the effectiveness of this model, a comprehensive methodology is employed, involving simulations and practical applications in a variety of real-world software project scenarios. This multifaceted evaluation strategy is designed to validate the model's significant role in enhancing forecast accuracy and elevating overall management efficiency, particularly in complex software project environments. The results indicate that the integration of time prediction algorithms with LLMs has the potential to optimize software project progress management. These quantitative results suggest the effectiveness of the method in practical applications. In conclusion, this study demonstrates that integrating time prediction algorithms with LLMs can significantly improve the predictive accuracy and efficiency of software project management. This offers an advanced project management tool for the industry, with the potential to improve operational efficiency, optimize resource allocation, and ensure timely project completion.

Keywords: software project management, time prediction algorithms, large language models (LLMS), forecast accuracy, project progress prediction

Procedia PDF Downloads 57
5643 The Urban Project: Metropolization Tool and Sustainability Vector - Case of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad, Chouabbia Khedidja

Abstract:

Cities grow, large or small; they seek to gain a place in the market competition, which talks to sell a product that is the city itself. The metropolis are large cities enjoying a legal status and assets providing their dominions elements on a territory larger than their range, do not escape this situation. Thus, the search for promising tool metropolises better development and durability meet the challenges as economic, social and environmental is timely. The urban project is a new way to build the city; it is involved in the metropolises of two ways, either to manage the crisis and to meet the internal needs of the metropolis, or by creating a regional attractiveness with their potential. This communication will address the issue of urban project as a tool that has and should find a place in the panoply of existing institutional tools. Based on the example of the modernization project of the metropolis of eastern Algeria "Constantine", we will examine what the urban project can bring to a city, the extent of its impact but also the relationship between the visions actors so metropolization a success.

Keywords: urban project, metropolis, institutional tools, Constantine

Procedia PDF Downloads 389
5642 The Differences and Similarities in Neurocognitive Deficits in Mild Traumatic Brain Injury and Depression

Authors: Boris Ershov

Abstract:

Depression is the most common mood disorder experienced by patients who have sustained a traumatic brain injury (TBI) and is associated with poorer cognitive functional outcomes. However, in some cases, similar cognitive impairments can also be observed in depression. There is not enough information about the features of the cognitive deficit in patients with TBI in relation to patients with depression. TBI patients without depressive symptoms (TBInD, n25), TBI patients with depressive symptoms (TBID, n31), and 28 patients with bipolar II disorder (BP) were included in the study. There were no significant differences in participants in respect to age, handedness and educational level. The patients clinical status was determined by using Montgomery–Asberg Depression Rating Scale (MADRS). All participants completed a cognitive battery (The Brief Assessment of Cognition in Affective Disorders (BAC-A)). Additionally, the Rey–Osterrieth Complex Figure (ROCF) was used to assess visuospatial construction abilities and visual memory, as well as planning and organizational skills. Compared to BP, TBInD and TBID showed a significant impairments in visuomotor abilities, verbal and visual memory. There were no significant differences between BP and TBID groups in working memory, speed of information processing, problem solving. Interference effect (cognitive inhibition) was significantly greater in TBInD and TBID compared to BP. Memory bias towards mood-related information in BP and TBID was greater in comparison with TBInD. These results suggest that depressive symptoms are associated with impairments some executive functions in combination at decrease of speed of information processing.

Keywords: bipolar II disorder, depression, neurocognitive deficits, traumatic brain injury

Procedia PDF Downloads 333
5641 Concept to Enhance the Project Success and Promote the Implementation of Success Factors in Infrastructure Projects

Authors: A. Elbaz, K. Spang

Abstract:

Infrastructure projects are often subjected to delays and cost overruns and mistakenly described as unsuccessful projects. These projects have many peculiarities such as public attention, impact on the environment, subjected to special regulations, etc. They also deal with several stakeholders with different motivations and face unique risks. With this in mind we need to reconsider our approach to manage them, define their success factors and implement these success factors. Infrastructure projects are not only lacking a unified meaning of project success or a definition of success factors, but also a clear method to implement these factors. This paper investigates this gap and introduces a concept to implement success factors in an efficient way, taking into consideration the specific characteristics of infrastructure projects. This concept consists of six enablers such as project organization, project team, project management workflow, contract management, communication and knowledge transfer and project documentations. These enablers allow other success factors to be efficiently implemented in projects. In conclusion, this paper provides project managers as well as company managers with a tool to define and implement success factors efficiently in their projects, along with upgrading their assets for the coming projects. This tool consists of processes and validated checklists to ensure the best use of company resources and knowledge. Due to the special features of infrastructure projects this tool will be tested in the German infrastructure market. However, it is meant to be adaptable to other markets and industries.

Keywords: infrastructure projects, operative success factors, project success, success factors, transportation projects

Procedia PDF Downloads 100
5640 Math Anxiety Effects on Complex Addition: An ERP Study

Authors: María Isabel Núñez-Peña, Macarena Suárez Pellicioni

Abstract:

In the present study, we used event-related potentials (ERP) to address the question of whether high (HMA) and low math-anxious (LMA) individuals differ on a complex addition verification task, which involved both carrying and non-carrying additions. ERPs were recorded while seventeen HMA and seventeen LMA individuals performed the verification task. Groups did not differ in trait anxiety or gender distribution. Participants were presented with two-digit additions and were asked to decide whether the proposed solution was correct or incorrect. Behavioral data showed a significant Carrying x Proposed solution x Group interaction for accuracy, showing that carrying additions were more error prone than non-carrying ones for both groups, although the difference non-carrying minus carrying was larger for the HMA group. As for ERPs, a P2 component larger in HMA individuals than in their LMA peers was found both for carrying and non-carrying additions. The P2 was followed by a sustained negative slow wave at parietal positions. Because the negative slow waves are thought to reflect the updating of working memory, these results give support to the relationship among working memory, math performance and math anxiety.

Keywords: math anxiety, carrying, working memory, P2

Procedia PDF Downloads 429
5639 A Reading Attempt of the Urban Memory of Jordan University of Science and Technology Campus by Cognitive Mapping

Authors: Bsma Adel Bany Mohammad

Abstract:

The University campuses are a small city containing basic city functions such as educational spaces, accommodations, services and transportation. They are spaces of functional and social life with different activities, different occupants. The campus designed and transformed like cities so both experienced and memorized in same way. Campus memory is the ability of individuals to maintain and reveal the spatial components of designed physical spaces, which form the understandings, experiences, sensations of the environment in all. ‘Cognitive mapping’ is used to decode the physical interaction and emotional relationship between individuals and the city; Cognitive maps are created graphically using geometric and verbal elements on paper by remembering the images of the Urban Environment. In this study, to determine the emotional urban identity belonging to Jordan University of science and technology Campus, architecture students Asked to identify the areas they interact with in the campus by drawing a cognitive map. ‘Campus memory items’ are identified by analyzing the cognitive maps of the campus, then the spatial identity result of such data. The analysis based on the five basic elements of Lynch: paths, districts, edges, nodes, and landmarks. As a result of this analysis, it found that Spatial Identity constructed by the shared elements of the maps. The memory of most students listed the gates structure- which is a large desirable structure, located at the main entrances within the campus defined as major landmarks, then the square spaces defined as nodes, in addition to both stairs and corridors defined as paths. Finally, the districts, edges of educational buildings and service spaces are listed correspondingly in cognitive maps. Findings suggest that the spatial identity of the campus design is related mainly to the gates structures, squares and stairs.

Keywords: cognitive maps, university campus, urban memory, identity

Procedia PDF Downloads 133
5638 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus

Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis

Abstract:

Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.

Keywords: BIM, project management, project monitoring, UAV

Procedia PDF Downloads 288
5637 Appraisal of Transaction Cost in South African Construction Projects

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.

Keywords: construction projects, project cost, South Africa, transaction cost

Procedia PDF Downloads 81
5636 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 340
5635 Pavement Quality Evaluation Using Intelligent Compaction Technology: Overview of Some Case Studies in Oklahoma

Authors: Sagar Ghos, Andrew E. Elaryan, Syed Ashik Ali, Musharraf Zaman, Mohammed Ashiqur Rahman

Abstract:

Achieving desired density during construction is an important indicator of pavement quality. Insufficient compaction often compromises pavement performance and service life. Intelligent compaction (IC) is an emerging technology for monitoring compaction quality during the construction of asphalt pavements. This paper aims to provide an overview of findings from four case studies in Oklahoma involving the compaction quality of asphalt pavements, namely SE 44th St project (Project 1) and EOC Turnpike project (Project 2), Highway 92 project (Project 3), and 108th Avenue project (Project 4). For this purpose, an IC technology, the intelligent compaction analyzer (ICA), developed at the University of Oklahoma, was used to evaluate compaction quality. Collected data include GPS locations, roller vibrations, roller speed, the direction of movement, and temperature of the asphalt mat. The collected data were analyzed using a widely used software, VETA. The average densities for Projects 1, 2, 3 and 4, were found as 89.8%, 91.50%, 90.7% and 87.5%, respectively. The maximum densities were found as 94.6%, 95.8%, 95.9%, and 89.7% for Projects 1, 2, 3, and 4, respectively. It was observed that the ICA estimated densities correlated well with the field core densities. The ICA results indicated that at least 90% of the asphalt mats were subjected to at least two roller passes. However, the number of passes required to achieve the desired density (94% to 97%) differed from project to project depending on the underlying layer. The results of these case studies show both opportunities and challenges in using IC for monitoring compaction quality during construction in real-time.

Keywords: asphalt pavement construction, density, intelligent compaction, intelligent compaction analyzer, intelligent compaction measure value

Procedia PDF Downloads 138
5634 The Effects of Cardiovascular Risk on Age-Related Cognitive Decline in Healthy Older Adults

Authors: A. Badran, M. Hollocks, H. Markus

Abstract:

Background: Common risk factors for cardiovascular disease are associated with age-related cognitive decline. There has been much interest in treating modifiable cardiovascular risk factors in the hope of reducing cognitive decline. However, there is currently no validated neuropsychological test to assess the subclinical cognitive effects of vascular risk. The Brief Memory and Executive Test (BMET) is a clinical screening tool, which was originally designed to be sensitive and specific to Vascular Cognitive Impairment (VCI), an impairment characterised by decline in frontally-mediated cognitive functions (e.g. Executive Function and Processing Speed). Objective: To cross-sectionally assess the validity of the BMET as a measure of the subclinical effects of vascular risk on cognition, in an otherwise healthy elderly cohort. Methods: Data from 346 participants (57 ± 10 years) without major neurological or psychiatric disorders were included in this study, gathered as part of a previous multicentre validation study for the BMET. Framingham Vascular Age was used as a surrogate measure of vascular risk, incorporating several established risk factors. Principal Components Analysis of the subtests was used to produce common constructs: an index for Memory and another for Executive Function/Processing Speed. Univariate General Linear models were used to relate Vascular Age to performance on Executive Function/Processing Speed and Memory subtests of the BMET, adjusting for Age, Premorbid Intelligence and Ethnicity. Results: Adverse vascular risk was associated with poorer performance on both the Memory and Executive Function/Processing Speed indices, adjusted for Age, Premorbid Intelligence and Ethnicity (p=0.011 and p<0.001, respectively). Conclusions: Performance on the BMET reflects the subclinical effects of vascular risk on cognition, in age-related cognitive decline. Vascular risk is associated with decline in both Executive Function/Processing Speed and Memory groups of subtests. Future studies are needed to explore whether treating vascular risk factors can effectively reduce age-related cognitive decline.

Keywords: age-related cognitive decline, vascular cognitive impairment, subclinical cerebrovascular disease, cognitive aging

Procedia PDF Downloads 449
5633 Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices: Construction Proceedings and Validation

Authors: Cristina Costa-Lobo, Sandra Fernandes, Miguel Magalhães, José Dinis-Carvalho, Alfredo Regueiro, Ana Carvalho

Abstract:

This paper is a report on the findings of the construction and the validation of a questionnaire monetized in a portuguese higher education context with undergraduate students. The Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices consists of six scales: Critical appraisal of the project, Developed Learning and Skills, Teamwork, Teacher and Tutor Roles, Evaluation of Student Performance, and Project Effectiveness as a Teaching-Learning Methodology. The proceedings of its construction are analyzed, and the validity and internal consistency analysis are described. Findings indicate good indicators of validity, good fidelity and an interpretable factorial structure.

Keywords: entrepreneurship project, higher education, psychopedagogical practices, teacher and tutor roles

Procedia PDF Downloads 363
5632 The Mashishing Marking Memories Project: A Culture-Centered Approach to Participation

Authors: Nongcebo Ngcobo

Abstract:

This research explores the importance of including a multitude of voices in the cultural heritage narrative, particularly in South Africa. The Mashishing project is an extension of and builds on the existing ‘Biesje Poort project’ which is a rock art project that was funded by the National Heritage Council in 2010 - 2013. Hence, the Mashishing marking memories project applies comparable Biesje Poort project objectives, though in a different geographical area. The wider project objectives are to transfer skills, promote social cohesion and empowerment, and lastly to add to the knowledge base of the Mashishing region and the repository of the local museum in the Lydenburg museum. This study is located in the Mashishing area, in Mpumalanga, South Africa. In this area, there were no present multi-vocal heritage projects. This research assesses the Mashishing marking memories project through the culture-centered approach for communication for social change, which examines the impact that the diverse participants have on the operations of the Mashishing project and also investigates whether the culturally diverse participants facilitates or hinders effective participation within the project. Key findings of this research uncovered the significance of participation and diverse voices in the cultural heritage field. Furthermore, this study highlights how unequal power relations affect effective participation. As a result, this study encourages the importance of bringing the researcher and the participant in a safe space to facilitate mutual learning. It also encourages an exchange of roles, where the researcher shifts from being an authoritarian figure to being in the role of a listener.

Keywords: culture, heritage, participation, social change

Procedia PDF Downloads 104
5631 Optimizing Design Works in Construction Consultant Company: A Knowledge-Based Application

Authors: Phan Nghiem Vu, Le Tuan Vu, Ta Quang Tai

Abstract:

The optimal construction design used during the execution of a construction project is a key factor in determining high productivity and customer satisfaction, however, this management process sometimes is carried out without care and the systematic method that it deserves, bringing negative consequences. This study proposes a knowledge management (KM) approach that will enable the intelligent use of experienced and acknowledged engineers to improve the management of construction design works for a project. Then a knowledge-based application to support this decision-making process is proposed and described. To define and design the system for the application, semi-structured interviews were conducted within five construction consulting organizations with the purpose of studying the way that the method’ optimizing process is implemented in practice and the knowledge supported with it. A system of an optimizing construction design works (OCDW) based on knowledge was developed then validated with construction experts. The OCDW was liked as a valuable tool for construction design works’ optimization, by supporting organizations to generate a corporate memory on this issue, reducing the reliance on individual knowledge and also the subjectivity of the decision-making process. The benefits are described as provided by the performance support system, reducing costs and time, improving product design quality, satisfying customer requirements, expanding the brand organization.

Keywords: optimizing construction design work, construction consultant organization, knowledge management, knowledge-based application

Procedia PDF Downloads 111
5630 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 291
5629 Use of Hierarchical Temporal Memory Algorithm in Heart Attack Detection

Authors: Tesnim Charrad, Kaouther Nouira, Ahmed Ferchichi

Abstract:

In order to reduce the number of deaths due to heart problems, we propose the use of Hierarchical Temporal Memory Algorithm (HTM) which is a real time anomaly detection algorithm. HTM is a cortical learning algorithm based on neocortex used for anomaly detection. In other words, it is based on a conceptual theory of how the human brain can work. It is powerful in predicting unusual patterns, anomaly detection and classification. In this paper, HTM have been implemented and tested on ECG datasets in order to detect cardiac anomalies. Experiments showed good performance in terms of specificity, sensitivity and execution time.

Keywords: cardiac anomalies, ECG, HTM, real time anomaly detection

Procedia PDF Downloads 204
5628 Improving Internal Efficiency of Local Universities and Colleges: Asseessing the Impact of the 085 Project in Shanghai

Authors: Qing Hui Wang, You Lin Fang, Min Chen

Abstract:

In 2003 the percentage of students in Shanghai taking part in tertiary education reached 53% of the age cohort, which is at the universal level according to Trow's typology. This achievement led to a conscientious effort by the government to improve internal efficiency of local universities and colleges through a series of programs, the most important of which is the 085 Project. This paper considers the effects of the 085 Project- the 5 initiatives launched in 2008 on increasing the investment to improve institutional overall visibilities, teaching excellence, knowledge innovation, faculty development as well as internationalization. Using the approach of ERC (a theory of equality, reciprocity, and competition) model, it was found that the initiatives helped the lower tier universities and colleges make full play in the aspects of strategic planning and identifying themselves. It was also found that the rate of growth of social resources for universities as a whole increased more quickly after the implementation of the 085 Project.

Keywords: 085 Project, impact, internal efficiency, local universities and colleges

Procedia PDF Downloads 448
5627 “Voiceless Memory” and Holodomor (Great Famine): The Power of Oral History to Challenge Official Historical Discourse

Authors: Tetiana Boriak

Abstract:

The study is called to test correlation between official sources, preserved in the archives, and “unofficial” oral history regarding the Great Famine of 1932–1933 in Ukraine. The research shows poor preservation of the sources, being deliberately destroyed by the totalitarian regime. It involves analysis of five stages of Holodomor oral history development. It is oral history that provides the mechanism of mass killing. The research proves that using only one type of historical sources leads to a certain line of reading history of the Holodomor, while usage of both types provides in-depth insight in the history of the famine.

Keywords: the Holodomor (the Great Famine), oral history, historical source, historical memory, totalitarianism.

Procedia PDF Downloads 92
5626 Contractor Selection by Using Analytical Network Process

Authors: Badr A. Al-Jehani

Abstract:

Nowadays, contractor selection is a critical activity of the project owner. Selecting the right contractor is essential to the project manager for the success of the project, and this cab happens by using the proper selecting method. Traditionally, the contractor is being selected based on his offered bid price. This approach focuses only on the price factor and forgetting other essential factors for the success of the project. In this research paper, the Analytic Network Process (ANP) method is used as a decision tool model to select the most appropriate contractor. This decision-making method can help the clients who work in the construction industry to identify contractors who are capable of delivering satisfactory outcomes. Moreover, this research paper provides a case study of selecting the proper contractor among three contractors by using ANP method. The case study identifies and computes the relative weight of the eight criteria and eleven sub-criteria using a questionnaire.

Keywords: contractor selection, project management, decision-making, bidding

Procedia PDF Downloads 77
5625 A Comparative Analysis of Safety Orientation and Safety Performance in Organizations: A Project Management Perspective

Authors: Dina Alfreahat, Zoltan Sebestyen

Abstract:

Safety is considered as one of the project’s success factors. Poor safety management may result in accidents that impact human, economic, and legal issues. Therefore, it is necessary to consider safety and health as a project success factor along with other project success factors, such as time, cost, and quality. Organizations have a knowledge deficit of the implementation of long-term safety practices, and due to cost control, safety problems tend to receive the least priority. They usually assume that safety management involves expenditures unrelated to production goals, thereby considering it unnecessary for profitability and competitiveness. The purpose of this study is to introduce, analysis and identify the correlation between the orientation of the public safety procedures of an organization and the public safety standards applied in the project. Therefore, the authors develop the process and collect the possible mathematical-statistical tools supporting the previously mentioned goal. The result shows that the adoption of management to safety is a major factor in implementing the safety standard in the project and thereby improving safety performance. It may take time and effort to adopt the mindset of safety orientation service development, but at the same time, the higher organizational investment in safety and health programs will contribute to the loyalty of staff to safety compliance.

Keywords: project management perspective, safety orientation, safety performance, safety standards

Procedia PDF Downloads 155
5624 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 364
5623 Signs-Only Compressed Row Storage Format for Exact Diagonalization Study of Quantum Fermionic Models

Authors: Michael Danilov, Sergei Iskakov, Vladimir Mazurenko

Abstract:

The present paper describes a high-performance parallel realization of an exact diagonalization solver for quantum-electron models in a shared memory computing system. The proposed algorithm contains a storage format for efficient computing eigenvalues and eigenvectors of a quantum electron Hamiltonian matrix. The results of the test calculations carried out for 15 sites Hubbard model demonstrate reduction in the required memory and good multiprocessor scalability, while maintaining performance of the same order as compressed row storage.

Keywords: sparse matrix, compressed format, Hubbard model, Anderson model

Procedia PDF Downloads 382
5622 The Academic Achievement of Writing via Project-Based Learning

Authors: Duangkamol Thitivesa

Abstract:

This paper focuses on the use of project work as a pretext for applying the conventions of writing, or the correctness of mechanics, usage, and sentence formation, in a content-based class in a Rajabhat University. Its aim was to explore to what extent the student teachers’ academic achievement of the basic writing features against the 70% attainment target after the use of project is. The organization of work around an agreed theme in which the students reproduce language provided by texts and instructors is expected to enhance students’ correct writing conventions. The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of achievement test and student writing works. The scores in the summative achievement test were analyzed by mean score, standard deviation, and percentage. It was found that the student teachers do more achieve of practicing mechanics and usage, and less in sentence formation. The students benefited from the exposure to texts during conducting the project; however, their automaticity of how and when to form phrases and clauses into simple/complex sentences had room for improvement.

Keywords: project-based learning, project work, writing conventions, academic achievement

Procedia PDF Downloads 314
5621 Enhancing Construction Project Management through Cognitive Science and Neuroimaging: A Comprehensive Literature Review

Authors: Krishna Kisi, Tulio Sulbaran

Abstract:

This literature review offers valuable insights into integrating cognitive science and neuroimaging with project management practices, presenting a crucial resource for leadership within the construction industry. This paper highlights the significant benefits of applying interdisciplinary approaches to enhance project management effectiveness and project outcomes by exploring the intricate connections between cognitive processes, decision-making, and project management. Key findings emphasize the critical role of cognitive status in determining the performance and project outcomes of construction workers, underlining the necessity for leadership to prioritize cognitive well-being and mental health as central components of project management strategies. The review identifies a gap in current practices, particularly the need for more objective tools for assessing cognitive status within the construction sector, and proposes the adoption of neuroimaging technologies to bridge this gap. The study highlights how integrating cognitive psychology and neuroscience clarifies decision-making processes, aiding leaders in comprehending the mental constraints and biases that influence project decisions. By integrating neuroscientific insights with traditional management practices, leaders can enhance their strategies for training, team dynamics, and risk assessment, ultimately leading to more informed, efficient, and productive construction project management. This comprehensive literature review underscores the importance of adopting an interdisciplinary approach to leadership and management within high-risk industries. It provides a foundation for construction project managers to leverage cognitive science and neuroimaging advancements to improve efficiency, productivity, and decision-making in construction projects' complex and dynamic environments.

Keywords: decision making, literature review, neuroimaging, project management

Procedia PDF Downloads 25
5620 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis

Authors: Tharaki S. Hettiarachchi

Abstract:

Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.

Keywords: construction, framework development, project management, sustainability

Procedia PDF Downloads 39