Search results for: entrepreneurship project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5365

Search results for: entrepreneurship project

5065 The Relationship of Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance

Authors: P. F. Wong, H. Salleh, F. A. Rahim

Abstract:

The adoption of building information modeling (BIM) is increasing in the construction industry. However, quantity surveyors are slow in adoption compared to other professions due to lack of awareness of the BIM’s potential in their profession. It is still unclear on how BIM application can enhance quantity surveyors’ work performance and project performance. The aim of this research is to identify the capabilities of BIM in quantity surveying practices and examine the relationship between BIM capabilities and project performance. Questionnaire survey and interviews were adopted for data collection. Literature reviews identified there are eleven BIM capabilities in quantity surveying practice. Questionnaire results showed that there are several BIM capabilities significantly correlated with project performance in time, cost and quality aspects and the results were validated through interviews. These findings show that BIM has the capabilities to enhance quantity surveyors’ performances and subsequently improved project performance.

Keywords: Building Information Modeling (BIM), quantity surveyors, capability, project performance

Procedia PDF Downloads 353
5064 The Views of Teachers, Students and Parents on the FATIH Project

Authors: Şemsettin Şahin, Ahmet Oğuz Aktürk, İsmail Çelik

Abstract:

This study investigated the views of teachers, students and students' parents on the FATIH (Movement of Enhancing Opportunities and Improving Technology) Project, which was put into service by the Ministry of National Education in cooperation with the Ministry of Transportation in Turkey in November 2010 for the purpose of increasing students' success and planned to be completed within 5 years. The study group consisted of teachers employed in a pilot school in the province of Karaman in central Turkey included within the scope of the FATIH Project, students attending this school and parents whose children are students in that school. The research data were collected through forms developed by the researchers to determine the views of teachers, students and students' parents on the FATIH Project. The descriptive analysis method, one of the qualitative research methods, was used in the study. An analysis of the data revealed that a large majority of the teachers and the students believed that if computers were used to serve their set purpose, then they could make considerable contributions to education. A large majority of the students' parents, on the other hand, regard the use of computers in education as a great opportunity for the students. The views of the teachers, students and students' parents on the FATIH Project usually overlap. Most of the participants in the study pointed out that the FATIH Project was intended to use technology effectively in education. Moreover, each individual participant described their role in the FATIH Project in accordance with their relative position and stated that they could perform whatever was expected of them for the effective and efficient use and progress of the project. The views of the participants regarding the FATİH Project vary according to the kind of the participants.

Keywords: education, FATIH project, technology, students

Procedia PDF Downloads 430
5063 Study of Incubation Centres and Its Role in Fostering Entrepreneurship in India with Special Reference to Centres Set up in IIMs/IITs

Authors: Kalpeshkumar L. Gupta, Shivali Rathore

Abstract:

India is home to over 30 crore rural poor, aware of the criticality of the situation that has made to come with an innovative business idea. Entrepreneurship in India is on the verge of explosive growth and which is actually need of an hour for employment generation, poverty elevation at grass root through developmental intervention. India economic progress has started from the development of its small and medium scale enterprises to ensure that the sectors continues to stay competitive and achieve sustained growth in the era of global economy many incubators centers has been established with the mission to give the encouragement to many innovative ideas. If we define an Incubator, it is simply an enclosed apparatus in which premature small babies are placed and which provides a controlled and protective environment for their care this gives them a chance to adjust to outside environment, and grow stronger before they face the outside world. In a similar way the startup entrepreneur’s business idea is incubated in the incubation centers. Entrepreneurship has been conventionally rated as risky career, to break the myth and to augment the supply of new entrepreneurs through education; research training the incubation centers has been established, their goal is to help create and grow young businesses by providing them with necessary support and financial and technical services. The startup companies spend on an average two years in a business incubator during which numerous benefits like funding, office space, equipment’s etc. is provided by the incubators to the startup business. Present paper will study the background, role, objectives of different incubators set up in Indian Institute of Management (IIMs) and Indian Institute of Technology (IITs) for our study.

Keywords: incubation centres, entrepreneurship, Indian Institute of Management, Indian Institute of Technology

Procedia PDF Downloads 248
5062 Correlation between Entrepreneur's Perception of Human Resource Function and Company's Growth

Authors: Ivan Todorović, Stefan Komazec, Jelena Anđelković-Labrović, Ondrej Jaško, Miha Marič

Abstract:

Micro, small and medium enterprises (MSME) are important factors of the economy in each country. Recent years have brought increased number and higher sophistication of scientific research related to numerous aspects of entrepreneurship. Various authors try to find the positive correlation between entrepreneur's personal characteristics, skills and knowledge on one hand, and company growth and success of small business on the other hand. Different models recognize staff as one of the key elements in every organizational system. Human resource (HR) function is present in almost all large companies, despite the geographical location or industry. Small and medium enterprises also often have separate positions or even departments for HR administration. However, in early stages of organizational life cycle human resources are usually managed by the founder, entrepreneur. In this paper we want to question whether the companies where founder, entrepreneur, recognizes the significance of human capital in the organization and understands the importance of HR management have higher growth rate and better business results. The findings of this research can be implemented in practice, but also in the academia, for improving the curricula related to the MSME and entrepreneurship.

Keywords: entrepreneurship, MSME, micro small and medium enterprises, company growth, human resources, HR management

Procedia PDF Downloads 342
5061 An Assessment of Entrepreneurial Landscape in Sub-Saharan Africa

Authors: Abubakar Salisu Garba

Abstract:

The objective of the paper is to highlight the nature of entrepreneurial activities in the Sub Sahara Africa. Five countries in the Sub Sahara African that are participating in Global Entrepreneurship Monitor (GEM) research have been studied to understand the types of entrepreneurial activities and their socio-economic implications in the region. The importance of entrepreneurial activities in boosting socio-economic development has been recognized not only in developing countries, but across the entire global economies. Some people believe that the wealth and poverty of developing countries is associated with nature and type of entrepreneurial activity. Policy makers are not only concern about the rate of business start up, but the growth and development of those starts up is of paramount importance to the development of the country’s economy. Although, the supply of entrepreneurs is essential, sometimes it does not really matters in boosting economic performance. What is more important is having high impact entrepreneurs who could make meaningful contribution to the economy. High growth oriented entrepreneurs are more stable and contribute greatly in enhancing the economic performance. When entrepreneurs are facing difficulties in sustaining and growing their businesses, it may be unlikely for entrepreneurship to reduce unemployment and poverty. Inadequate financial supports, insufficient infrastructure, lack of enforcing laws protecting the right of entrepreneurs are some of the problems making business environment difficult in Sub-Saharan Africa.

Keywords: entrepreneurship, entrepreneurial activity, job creation, poverty reduction, Sub-Saharan Africa

Procedia PDF Downloads 407
5060 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 389
5059 Mobile Cloud Application in Design Build Bridge Construction

Authors: Meng Sun, Bin Wei

Abstract:

In the past decades, design-build has become a more popular project delivery system especially for the large scaled infrastructure project in North America. It provides a one-stop shopping system for the client therefore improves the efficiency of construction, and reduces the risks and overall cost for the clients. Compared to the project with traditional delivery method, design-build project requires contractor and designer to work together efficiently to deliver the best-value solutions through the construction process. How to facilitate a solid integration and efficient interaction between contractor and designer often affects the schedule, budget and quality of the construction therefore becomes a key factor to the success of a design-build project. This paper presents a concept of using modern mobile cloud technology to provide an integrated solution during the design-build construction. It uses mobile cloud architecture to provide a platform for real-time field progress, change request approval, job progress log, and project time entry with devices integration for field information and communications. The paper uses a real filed change notice as an example to demonstrate how mobile cloud technology applies in a design-build project and how it can improve the project efficiency.

Keywords: cloud, design-build, field change notice, mobile application

Procedia PDF Downloads 237
5058 Managing Early Stakeholder Involvement at the Early Stages of a Building Project Life Cycle

Authors: Theophilus O. Odunlami, Hasan Haroglu, Nader Saleh-Matter

Abstract:

The challenges facing the construction industry are often worsened by the compounded nature of projects coupled with the complexity of key stakeholders involved at different stages of the project. Projects are planned to achieve outlined benefits in line with the business case; however, a lack of effective management of key stakeholders can result in unrealistic delivery aspirations, unnecessary re-works, and overruns. The aim of this study is to examine the early stages of a project lifecycle and investigate the stakeholder management and involvement processes and their impact on the successful delivery of the project. The research engaged with conventional construction organisations and project personnel and stakeholders on diverse projects, using a research strategy to analyse existing project case studies, narrative enquiries, interviews, and surveys using a combined qualitative, quantitative, and mixed method of analysis. Research findings have shown that the involvement of stakeholders at different levels during the early stages has pronounced effects on project delivery; it helps to forge synergy and promotes a clear understanding of individual responsibilities, strengths, and weaknesses. This has often fostered a positive sense of productive collaboration right through the early stages of the project. These research findings intend to contribute to the development of a process framework for stakeholder and project team involvement in the early stages of a project. This framework will align with the selection criteria for stakeholders, contractors, and resources, ultimately contributing to the successful completion of projects. The primary question addressed in this study is stakeholder involvement and management of the early stages of a building project life cycle impacts project delivery. Findings showed that early-stage stakeholder involvement and collaboration between project teams and contractors significantly contribute to project success. However, a strong and healthy communication strategy would be required to maintain the flow of value-added ideas among stakeholders at the early stages to benefit the project at the execution stage.

Keywords: early stages, project lifecycle, stakeholders, decision-making strategy, project framework

Procedia PDF Downloads 89
5057 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria

Authors: Nuruddeen Usman, Mohammad Sani

Abstract:

The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.

Keywords: construction size, contracting system, direct labour, effect

Procedia PDF Downloads 445
5056 The Impact of Entrepreneur to Develop Economy in Indonesia

Authors: Alif Nur Irvan, M. Varaby Wahyu

Abstract:

Indonesia is a country that have a lot of natural resources and as one of the most populous people in the world. In the last few years, the world economic is growing rapid, and then Indonesia must be able to develop his economy like the other country. The number of graduates in Indonesia always increase every year and the employment in Indonesia is getting decreased, this situation leads to rise unemployment in Indonesia. Limited employment makes people look for the ways to live decently. From this situation, entrepreneurs become an alternative in Indonesia to develop the economy. Being an entrepreneur means being able to find opportunities to utilize existing resources to take advantage of these opportunities. With the increasing number of entrepreneurs in Indonesia can increase employment, improve the quality of life, income distribution, utilize and mobilize resources to improve national productivity, and improve the welfare of government. The main sources for economic growth are the investments that improve the quality of capital or human resources, which in turn managed to increase the quantity of productive resources and can raise the productivity of all resources through new discoveries, innovations, creativity and technological progress. This paper is talking about the topic, discussions, and it offers the solutions to support entrepreneurs in Indonesia, and also talk about entrepreneurial problems that occurred in Indonesia, and the right solution to solve the problems of entrepreneurship in Indonesia and also discusses the role of government to support entrepreneurship to encourage the economy in Indonesia.

Keywords: entrepreneurship, economy, employment, government

Procedia PDF Downloads 272
5055 Entrepreneurship Success in Jordan

Authors: Atef Aladwan

Abstract:

This research will focus on stimulating greater freedom and facilitating small and medium-sized enterprises (SMEs) in Jordan to create jobs, as it is emerging as a key development issue. It will highlight the importance of integrating SMEs into development strategies. Jordan has potentially a large market for its products as a result of proximity to developed country markets, signing of various free trades agreements with European countries, cheap energy sources and vast sovereign funds willing to invest in the development of local enterprises. It is beginning to be accepted by governments that SMEs rather than government need to be the main player in domestic economic activity, especially as providers of employment opportunities, and hence generators of sources of income for many households. To foster SME development, it is generally recognised that reforms are needed in Jordan in order to bring about a more globally competitive and business-friendly environment.

Keywords: SMEs, competitiveness, entrepreneurship, jordan, development

Procedia PDF Downloads 407
5054 The Social Enterprise Model And Its Beneficiaries

Authors: Lorryn Williams

Abstract:

This study will explore how the introduction of the for-profit social enterprise model affects the real lives of the individuals and communities that this model aims to help in South Africa. The congruence between organisational need construction and the real needs of beneficiaries, and whether the adoption of a profit driven model, such as social entrepreneurship, supports or discards these needs is key to answering the former question. By making use of qualitative methods, the study aims to collect empirical evidence that either supports the social entrepreneurship approach when compared to other programs such as vocational training programs or rejects it as less beneficial. It is the objective of this research to provide an answer to the question of whether the social enterprise model of conducting charity leaves the beneficiaries of non-profit organisations in a generally better or worse off position. The study will specifically explore the underlying assumptions the social entrepreneurship model makes, since the assumptions made concerning the uplifting effects it has on its beneficiaries may produce either real or assumed change for beneficiaries. The meaning of social cohesion and social capital for these organisations, the construction of beneficiary dependence and independence, the consideration of formal and informal economies beneficiaries engage in, and the extent to which sustainability is used as a brand, will be investigated. Through engaging the relevant literature, experts in the field of non-profit donorship and need implementation, organisations who have both adopted social enterprise programs and not, and most importantly, the beneficiaries themselves, it will be possible to provide answers to questions this study aims to answer.

Keywords: social enterprise, beneficiaries, profit driven model, non-profit organizations

Procedia PDF Downloads 130
5053 Critical Activity Effect on Project Duration in Precedence Diagram Method

Authors: Salman Ali Nisar, Koshi Suzuki

Abstract:

Precedence Diagram Method (PDM) with its additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activities provides more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in PDM network will have anomalous effect on critical path. Researchers have proposed some classification of critical activity effects. In this paper, we do further study on classifications of critical activity effect and provide more information in detailed. Furthermore, we determine the maximum amount of time for each class of critical activity effect by which the project managers can control the dynamic feature (shortening/lengthening) of critical activities and project duration more efficiently.

Keywords: construction project management, critical path method, project scheduling, precedence diagram method

Procedia PDF Downloads 500
5052 Measuring Entrepreneurship Intentions among Nigerian University Graduates: A Structural Equation Modeling Technique

Authors: Eunice Oluwakemi Chukwuma-Nwuba

Abstract:

Nigeria is a developing country with an increasing rate of graduate unemployment. This has triggered successive government administrations to promote the variety of programmes to address the situation. However, none of these efforts yielded the desired outcome. Accordingly, in 2006 the government included entrepreneurship module in the curriculum of universities as a compulsory general programme for all undergraduate courses. This is in the hope that the programme will help to promote entrepreneurial mind-set and new venture creation among graduates and as a result reduce the rate of graduate unemployment. The study explores the effectiveness of entrepreneurship education in promoting entrepreneurship. This study is significant in view of the endemic graduate unemployment in Nigeria and the social consequences such as youth restiveness and militancy. It is guided by the theory of planned behaviour. It employed the two-stage structural equation modelling (AMOS) to model entrepreneurial intentions as a function of innovative teaching methods, traditional teaching methods and culture Personal attitude and subjective norm are proposed to mediate the relationships between the exogenous and the endogenous variables. The first stage was tested using multi-group confirmatory factor analysis (MGCFA) framework to confirm that the two groups assign the same meaning to the scale items and to obtain goodness-of-fit indices. The multi-group confirmatory factor analysis included the tests of configural, metric and scalar invariance. With the attainment of full configural invariance and partial metric and scalar invariance, the second stage – the structural model was applied hypothesising that, the entrepreneurial intentions of graduates (respondents who have participated in the compulsory entrepreneurship programme) will be higher than those of undergraduates (respondents who are yet to participate in the programme). The study uses the quasi-experimental design. The samples comprised 409 graduates (experimental group) and 402 undergraduates (control group) from six federal universities in Nigeria. Our findings suggest that personal attitude is positively related with entrepreneurial intentions, largely confirming prior literature. However, unlike previous studies, our results indicate that subjective norm has significant direct and indirect impact on entrepreneurial intentions indicating that reference people of the participants have important roles to play in their decision to be entrepreneurial. Furthermore, unlike the assertions in prior studies, the result suggests that traditional teaching methods have indirect effect on entrepreneurial intentions supporting that since personal characteristics can change in an educational situation, an education purposively directed at entrepreneurship might achieve similar results if not better. This study has implication for practice and theory. The research extends to the theoretical understanding of the formation of entrepreneurial intentions and explains the role of the reference others in relation to how graduates perceive entrepreneurship. Further, the study adds to the body of knowledge on entrepreneurship education in Nigeria universities and provides a developing country perspective. It proposes further research in the exploration of entrepreneurship education and entrepreneurial intentions of graduates from across the country’s universities as necessary and imperative.

Keywords: entrepreneurship education, entrepreneurial intention, structural equation modeling, theory of planned behaviour

Procedia PDF Downloads 245
5051 Investigating the Effects of Managerial Competencies on Organizational Performance through the Mediating Role of Entrepreneurship and Social Capital

Authors: Nader Chavoshi Boroujeni, Naser Chavoshi Boroujeni

Abstract:

Considering the importance of managerial competencies on organizational performance as well as the role of social capital and entrepreneurship as mediator parameters affecting organizational performance, this study attempts to examine the impact carefully. In this regard, Isfahan Science and Technology Town (ISTT) as an effective and knowledge generator company that has a great effect on improving organizational performances of many other companies such as Knowledge-Based Companies (KBCs) activing in the ISTT's site was selected as statistical population. According to coordination with the Department of Development and Technology of ISTT, all employees of ISTT and active KBCs were selected as sample. Then, to analyze the variables a standard and self-made questionnaire containing 98 questions was designed and distributed. Of the 350 questionnaires distributed, 319 questionnaires were collected that 313 cases were confirmed and analyzed. To confirm the reliability of questionnaire, the Leader professor and two other professors approved it. Cronbach's alpha coefficient was used to validate the questionnaire that all coefficient was between 0/7 and 0/95. So, the validity was confirmed. After descriptive study population, the normality of distribution was investigated with Kolmogorov-Smirnov test. Finally, the results obtained from the questionnaires were analyzed by Amos software that all hypotheses were confirmed.

Keywords: managerial competencies, personnel organizational performance, entrepreneurship, social capital

Procedia PDF Downloads 258
5050 Development of Verification System of Workspace Clashes Between Construction Activities

Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.

Keywords: BIM, workspace, confliction, visualization

Procedia PDF Downloads 390
5049 Macroeconomic Measure of Projectification: An Empirical Study of Pakistani Economy

Authors: Shafaq Rana, Hina Ansar

Abstract:

Projectification is an emerging phenomenon in Western economies. The projects have become the key driver of the economic actions. The impact of projectification is understudy for over a decade. A methodology was developed to measure the degree of projectification at economical level, which was later adapted to measure the degree of projectification in Germany, Norway, and Iceland; and compared the differences in these project societies, considering their industrial structure, organizational size, and the share of project work. Using the same methodology, this study aims to provide empirical evidence of the project work in the context of Pakistan –a developing nation, keeping into consideration the macroeconomic measures, qualitative and quantitative measures of the project i/c GDP, monetary measures, and project success. The research includes a qualitative pre-study to define these macro-measures in the country-specific context and a quantitative study to measure the project work w.r.t hours working in the organizations on projects. The outcome of this study provides the key data on the projectification in a developing economy, which will help industry practitioners and decision-makers to examine the consequences of projectification and strategize, respectively. This study also provides a foundation for further research in individual sectors of the country while exploring different macroeconomic questions, including the effect of projectification on project productivity, income effects, and labor market.

Keywords: developing economy, Pakistan, project work, projectification

Procedia PDF Downloads 105
5048 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: project marketing, risk management, tendering, project management, turn-key projects

Procedia PDF Downloads 314
5047 Integrated Information System on Human Resource Management in Project-Based Organizations

Authors: Akbar Farahani, Afsaneh Hassani, Peyman M. Farkhondeh

Abstract:

Human Resource Management as one of the core processes of the project-based companies, despite its key role in the success and competitive advantage, is relatively unknown. In the project-based companies, due to the accelerated movement of knowledge in the work activities and the temporary nature of the project, the need to develop mechanisms for achieving optimal management of this issues is very challenging. Approach to human resource management in these companies evolves with goals, strategies, and operational processes. Therefore, the need for appropriate tools to facilitate implementation of the optimized human resource management in the project is more than before,Which currently with the development of information technology and modern communication, appropriate to address the optimal approach for dynamic management of human resources in the project have been provided.This is done by using the referral system implemented in Mahab GCE that provides 1: the ability to use humans in projects without geographic limitation and 2:information on the activities and outcomes of referrals.Furthermore, by using this system, recording the lessons learned after any particular activity on projects,accessing quantitative information, procedures, documentation of learned practices that have been stored in the data base as well as using them in future projects is provided.

Keywords: human resource management, project base company, ERP, referrals system

Procedia PDF Downloads 465
5046 Critical Success Factors for Sustainable Smart City Project in India

Authors: Debasis Sarkar

Abstract:

Development of a Smart City would depend upon the development of its infrastructure in a smart way. Primarily based on the ideology of the fourth industrial revolution a Smart City project should have Smart governance, smart health care, smart building, smart transportation, smart mobility, smart energy, smart technology and smart citizen. Considering the Indian scenario of current state of cities in India, it has become very essential to decide the specific parameters which would govern the development of a Smart City project. It has been observed that there are significant parameters beyond Information and Communication Technology (ICT), which govern the development of a Smart City project. This paper is an attempt to identify the Critical Success Factors (CSF) which are significantly responsible for the development of a Smart City project in Western India. Responses to questionnaire survey were analyzed on basis of Likert scale. They were further critically evaluated with help of Factor Comparison Method (FCM) and Analytical Hierarchy Process (AHP). The project authorities need to incorporate Building Information Modeling (BIM) to make the smart city project more collaborative. To make the project more sustainable, use of flyash in the concrete used, reduced usage of cement and steel, use of alternate fuels like biodiesel is recommended.

Keywords: analytical hierarchical process, building information modeling, critical success factors, factor comparison method

Procedia PDF Downloads 239
5045 Engaging Mature Learners through Video Case Studies

Authors: Jacqueline Mary Jepson

Abstract:

This article provides a case study centred on the development of 13 video episodes which have been created to enhance student engagement with a post graduate online course in Project Management. The student group was unique as their online course needed to provide for asynchronistic learning and an adult learning pedagogy. In addition, students had come from a wide range professional backgrounds, with some having no Project Management experience, while others had 20 years or more. Students had to gain an understanding of an advanced body of knowledge and the course needed to achieve the academic requirements to qualify individuals to apply their learning in a range of contexts for professional practice and scholarship. To achieve this, a 13 episode case study was developed along with supportive learning materials based on the relocation of a zoo. This unique project provided a learning environment where the project could evolve over each video episode demonstrating the application of Project Management methodology which was then tied into the learning outcomes for the course and the assessment tasks. Discussion forums provided a way for students to converse and demonstrate their own understanding of content and how Project Management methodology can be applied.

Keywords: project management, adult learning, video case study, asynchronistic education

Procedia PDF Downloads 326
5044 The Comparative Study of Attitudes toward Entrepreneurial Intention between ASEAN and Europe: An Analysis Using GEM Data

Authors: Suchart Tripopsakul

Abstract:

This paper uses data from the Global Entrepreneurship Monitor (GEM) to investigate the difference of attitudes towards entrepreneurial intention (EI). EI is generally assumed to be the single most relevant predictor of entrepreneurial behavior. The aim of this paper is to examine a range of attitudes effect on individual’s intent to start a new venture. A cross-cultural comparison between Asia and Europe is used to further investigate the possible differences between potential entrepreneurs from these distinct national contexts. The empirical analysis includes a GEM data set of 10 countries (n = 10,306) which was collected in 2013. Logistic regression is used to investigate the effect of individual’s attitudes on EI. Independent variables include individual’s perceived capabilities, the ability to recognize business opportunities, entrepreneurial network, risk perceptions as well as a range of socio-cultural attitudes. Moreover, a cross-cultural comparison of the model is conducted including six ASEAN (Malaysia, Indonesia, Philippines, Singapore, Vietnam and Thailand) and four European nations (Spain, Sweden, Germany, and the United Kingdom). The findings support the relationship between individual’s attitudes and their entrepreneurial intention. Individual’s capability, opportunity recognition, networks and a range of socio-cultural perceptions all influence EI significantly. The impact of media attention on entrepreneurship and was found to influence EI in ASEAN, but not in Europe. On the one hand, Fear of failure was found to influence EI in Europe, but not in ASEAN. The paper develops and empirically tests attitudes toward Entrepreneurial Intention between ASEAN and Europe. Interestingly, fear of failure was found to have no significant effect in ASEAN, and the impact of media attention on entrepreneurship and was found to influence EI in ASEAN. Moreover, the resistance of ASEAN entrepreneurs to the otherwise high rates of fear of failure and high impact of media attention are proposed as independent variables to explain the relatively high rates of entrepreneurial activity in ASEAN as reported by GEM. The paper utilizes a representative sample of 10,306 individuals in 10 countries. A range of attitudes was found to significantly influence entrepreneurial intention. Many of these perceptions, such as the impact of media attention on entrepreneurship can be manipulated by government policy. The paper also suggests strategies by which Asian economy in particular can benefit from their apparent high impact of media attention on entrepreneurship.

Keywords: an entrepreneurial intention, attitude, GEM, ASEAN and Europe

Procedia PDF Downloads 291
5043 BIM Application and Construction Schedule Simulation for the Horizontal Work Area

Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang

Abstract:

The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.

Keywords: BIM, 4D CAD, linear 4D simulation, VR

Procedia PDF Downloads 387
5042 Challenges of Women Entrepreneurs: Interview Findings on Cultural Differences of Three Women Business Owners in New York, Dubai and Athens

Authors: Joanna Konstantinou

Abstract:

The aim of the study is to present the challenges faced by women SME owners in developing resilient businesses. Qualitative research methods will be used through semi-structured interviews to present the cases of women entrepreneurs in Athens, Dubai, and New York. The conclusions and findings of the study will focus on the challenges faced by women entrepreneurs which can be attributed to cultural and contextual differences. Moreover, the study intends to identify these differences and the causes to which they can be potentially attributed so that these cases will serve as the ground of lessons to learn in order to highlight enablers of women entrepreneurship. Finally, the study will provide valuable insight to cultural perspectives and their impact on the development of female entrepreneurship.

Keywords: women, entrepreneurs, culture, SMEs

Procedia PDF Downloads 282
5041 Enhancing Project Performance Forecasting using Machine Learning Techniques

Authors: Soheila Sadeghi

Abstract:

Accurate forecasting of project performance metrics is crucial for successfully managing and delivering urban road reconstruction projects. Traditional methods often rely on static baseline plans and fail to consider the dynamic nature of project progress and external factors. This research proposes a machine learning-based approach to forecast project performance metrics, such as cost variance and earned value, for each Work Breakdown Structure (WBS) category in an urban road reconstruction project. The proposed model utilizes time series forecasting techniques, including Autoregressive Integrated Moving Average (ARIMA) and Long Short-Term Memory (LSTM) networks, to predict future performance based on historical data and project progress. The model also incorporates external factors, such as weather patterns and resource availability, as features to enhance the accuracy of forecasts. By applying the predictive power of machine learning, the performance forecasting model enables proactive identification of potential deviations from the baseline plan, which allows project managers to take timely corrective actions. The research aims to validate the effectiveness of the proposed approach using a case study of an urban road reconstruction project, comparing the model's forecasts with actual project performance data. The findings of this research contribute to the advancement of project management practices in the construction industry, offering a data-driven solution for improving project performance monitoring and control.

Keywords: project performance forecasting, machine learning, time series forecasting, cost variance, earned value management

Procedia PDF Downloads 30
5040 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 103
5039 Defining the Push and Pull Factors to Adopt Health Information Technologies by Health Entrepreneurs

Authors: Elaheh Ezami, Behzad Mohammadian, Elham Aznab

Abstract:

Health service design will need to change due to bringing in new digital health tools. This highlights the importance of innovation in adopting Health Information Technology (HIT). It can be argued that innovation in the health sector correlates with entrepreneurship. Various reasons exist for health entrepreneurs to advocate increased investment in HIT to compensate for shortcomings in the health sector and improve the quality of healthcare. Furthermore, every innovative program presents challenges and motivations for entrepreneurs that may distract or encourage the adoption of technology. Our study used a systematic literature review to identify relevant articles that defined the frustrations and promotions of using health information technology in organizations or enterprises. A meta-analysis of the articles was conducted to identify the factors driving or pulling entrepreneurs to use HIT.

Keywords: health information technology, health entrepreneurship, health enterprise, health entrepreneurs' innovation

Procedia PDF Downloads 99
5038 Familiarity with Engineering Project Management And Their Duties In Projects

Authors: Mokhtar Nikgoo

Abstract:

Today's industrial world has undergone tremendous changes in certain periods. These changes are called environmental changes. And they have a direct impact on organizations and bodies. Therefore, the importance of knowing these changes is clear. This importance has caused the manufacturing organizations to move towards multiple products and constantly change and expand their system. This research tries to show how the organization moves in this category by defining the basic steps of implementing a project. One of the most important features of a hard-to-order production organization is the definition of different production projects from different customers. Therefore, the lack of sufficient understanding of the type of work causes the project to be defined for the organization in question, and the managers of the organization (in every organizational level) are constantly involved with different projects. In the implementation of the production project of the aforementioned organizations, directing the facilities and people of the organization towards the implementation of the project is of particular importance. Therefore, it is felt necessary to define the project manager and his basic duties. Considering the importance of this topic, the project chapter deals with project management and its importance and examines all the different issues in that category from the perspective of implementation. A project includes certain activities of the organization that require the use of different resources and all the activities of the organization in order to implement the project with defined facilities and at the designated times. Project management is planning, organizing and controlling the organization's resources for a short-term goal that has been created for short-term and medium-term goals and objectives. Project management has the important task of centering and integrating (coordinating) task and line managers. In other words, project management requires having a strong and appropriate relationship with the internal people of the system to carry out the assigned activities and must have a general and technical knowledge related to various activities in the project environment. It seems that everything with project management in It is communication. One of the characteristics of production organizations under the order is the relationship between the customer (customers) and the organization until the completion of the defined project. Due to the nature of the work, it is necessary for a person to establish this relationship between the client and the organization's people and to establish this relationship in such a way that it does not cause a lack of coordination in the organization's activities. Therefore, project management has a very important role at this stage, because the relationship between the client and his organization will be any problems and problems and points of view that the client has, he must inform the management so that he can implement the cases with its analysis and special processes. To be transferred to other departments and line managers.

Keywords: project management, crisis management, project delays bill, project duration

Procedia PDF Downloads 38
5037 Female Entrepreneurship in Egypt: Barriers and Challenges in the Aftermath of the Arab Spring

Authors: Kate Ebere Maduforo

Abstract:

Examining the constraints faced by female entrepreneurs is an important subject which most literature on female entrepreneurship is centered on. However, the majority of the existing literature has focused on studying female entrepreneurs in developed societies. Recently, a sense of urgency that has emerged in trying to understand the challenges and motivations of female entrepreneurs in developing countries. The arousal of such interest has been attributed to women entrepreneurs in developing countries being identified as catalysts of economic development at a national level and champions of poverty eradication at the domestic level. This paper, therefore, examines the peculiar constraints faced by women-owned businesses in the mist of political chaos and instability. In this case, the issues experienced by female entrepreneurs in Egypt during the aftermath of the Arab Spring is the focus. Using the logit and probit regression models, data from the World Bank Middle East North Africa Enterprise Survey (MENA ES) are analyzed. The results identified that female entrepreneurs still lack business funding through financial institutions, but get significant funding assistance from family, friends, and money lenders. In addition, women-owned businesses promote and hire mostly women. Female entrepreneurs showed a preference for an impartial judicial system as a contributor to business growth.

Keywords: female entrepreneurship, development, Middle East, developing countries

Procedia PDF Downloads 109
5036 Analyzing the Effectiveness of Communication Practices and Processes within Project-Based Firms

Authors: Paul Saah, Charles Mbohwa, Nelson Sizwe Madonsela

Abstract:

The capacity to deliver projects on schedule, within budget, and to the pleasure of the client depends on effective communication, which is the lifeblood of project-based businesses. In order to pinpoint areas for development and shed light on the crucial role that communication plays in project success, the aim of this study is to evaluate the efficacy of communication practises and processes inside project-based organisations. In order to analyse concepts and get a greater grasp of their theoretical basis, this study's methodology combines a careful review of the relevant literature with a conceptual analysis of the subject. Data from a varied sample of project-based businesses spanning all industries and sizes were collected via document analysis. The relationship between communication practises, and processes were investigated in connection to key performance measures such as project outcomes, client satisfaction, and team dynamics. According to the study's findings, project-based businesses that adopt effective communication practises, and procedures experience a reduction in unfavourable experiences, stronger integration, and coordination, clarity of purpose, and practises that can hasten problem resolution. However, failing to adopt effective communication practises and procedures in project-based company result in counter issues, including project derailment from the schedule, failure to meet goals, inefficient use of existing resources, and failure to meet organisational goals. Therefore, optimising their communication practises, and procedures are crucial for sustainable growth and competitive advantage as project-based enterprises continue to play a crucial part in today's dynamic business scene.

Keywords: effective communication, project-based firms, communication practices, project success, communication strategies

Procedia PDF Downloads 52