Search results for: manufacturing facility
2683 Manufacturing Facility Location Selection: A Numercal Taxonomy Approach
Authors: Seifoddini Hamid, Mardikoraeem Mahsa, Ghorayshi Roya
Abstract:
Manufacturing facility location selection is an important strategic decision for many industrial corporations. In this paper, a new approach to the manufacturing location selection problem is proposed. In this approach, cluster analysis is employed to identify suitable manufacturing locations based on economic, social, environmental, and political factors. These factors are quantified using the existing real world data.Keywords: manufacturing facility, manufacturing sites, real world data
Procedia PDF Downloads 5642682 The Impact of Artificial Intelligence on Digital Factory
Authors: Mona Awad Wanis Gad
Abstract:
The method of factory making plans has changed loads, in particular, whilst it's miles approximately making plans the factory building itself. Factory making plans have the venture of designing merchandise, plants, tactics, organization, regions, and the construction of a factory. Ordinary restructuring is turning into greater essential for you to preserve the competitiveness of a manufacturing unit. Regulations in new regions, shorter lifestyle cycles of product and manufacturing era, in addition to a VUCA global (Volatility, Uncertainty, Complexity and Ambiguity) cause extra common restructuring measures inside a factory. A digital factory model is the planning foundation for rebuilding measures and turns into a critical device. Furthermore, digital building fashions are increasingly being utilized in factories to help facility management and manufacturing processes. First, exclusive styles of digital manufacturing unit fashions are investigated, and their residences and usabilities to be used instances are analyzed. Within the scope of research are point cloud fashions, building statistics fashions, photogrammetry fashions, and those enriched with sensor information are tested. It investigated which digital fashions permit a simple integration of sensor facts and in which the variations are. In the end, viable application areas of virtual manufacturing unit models are determined by a survey, and the respective digital manufacturing facility fashions are assigned to the application areas. Ultimately, an application case from upkeep is selected and implemented with the assistance of the best virtual factory version. It is shown how a completely digitalized preservation process can be supported by a digital manufacturing facility version by offering facts. Among different functions, the virtual manufacturing facility version is used for indoor navigation, facts provision, and display of sensor statistics. In summary, the paper suggests a structuring of virtual factory fashions that concentrates on the geometric representation of a manufacturing facility building and its technical facilities. A practical application case is proven and implemented. For that reason, the systematic selection of virtual manufacturing facility models with the corresponding utility cases is evaluated.Keywords: augmented reality, digital factory model, factory planning, restructuring digital factory model, photogrammetry, factory planning, restructuring building information modeling, digital factory model, factory planning, maintenance
Procedia PDF Downloads 402681 Facility Data Model as Integration and Interoperability Platform
Authors: Nikola Tomasevic, Marko Batic, Sanja Vranes
Abstract:
Emerging Semantic Web technologies can be seen as the next step in evolution of the intelligent facility management systems. Particularly, this considers increased usage of open source and/or standardized concepts for data classification and semantic interpretation. To deliver such facility management systems, providing the comprehensive integration and interoperability platform in from of the facility data model is a prerequisite. In this paper, one of the possible modelling approaches to provide such integrative facility data model which was based on the ontology modelling concept was presented. Complete ontology development process, starting from the input data acquisition, ontology concepts definition and finally ontology concepts population, was described. At the beginning, the core facility ontology was developed representing the generic facility infrastructure comprised of the common facility concepts relevant from the facility management perspective. To develop the data model of a specific facility infrastructure, first extension and then population of the core facility ontology was performed. For the development of the full-blown facility data models, Malpensa and Fiumicino airports in Italy, two major European air-traffic hubs, were chosen as a test-bed platform. Furthermore, the way how these ontology models supported the integration and interoperability of the overall airport energy management system was analyzed as well.Keywords: airport ontology, energy management, facility data model, ontology modeling
Procedia PDF Downloads 4492680 Improving Automotive Efficiency through Lean Management Tools: A Case Study
Authors: Raed El-Khalil, Hussein Zeaiter
Abstract:
Managing and improving efficiency in the current highly competitive global automotive industry demands that companies adopt leaner and more flexible systems. During the past 20 years the domestic automotive industry in North America has been focusing on establishing new management strategies in order to meet market demands. 98The lean management process also known as Toyota Manufacturing Process (TPS) or lean manufacturing encompasses tools and techniques that were established in order to provide the best quality product with the fastest lead time at the lowest cost. The following paper presents a study that focused on improving labor efficiency at one of the Big Three (Ford, GM, Chrysler LLC) domestic automotive facility in North America. The objective of the study was to utilize several lean management tools in order to optimize the efficiency and utilization levels at the “Pre-Marriage” chassis area in a truck manufacturing and assembly facility. Utilizing three different lean tools (i.e. Standardization of work, 7 Wastes, and 5S) this research was able to improve efficiency by 51%, utilization by 246%, and reduce operations by 14%. The return on investment calculated based on the improvements made was 284%.Keywords: lean manufacturing, standardized work, operation efficiency, utilization
Procedia PDF Downloads 5222679 Dynamic Cellular Remanufacturing System (DCRS) Design
Authors: Tariq Aljuneidi, Akif Asil Bulgak
Abstract:
Remanufacturing may be defined as the process of bringing used products to “like-new” functional state with warranty to match, and it is one of the most popular product end-of-life scenarios. An efficient remanufacturing network lead to an efficient design of sustainable manufacturing enterprise. In remanufacturing network, products are collected from the customer zone, disassembled and remanufactured at a suitable remanufacturing facility. In this respect, another issue to consider is how the returned product to be remanufactured, in other words, what is the best layout for such facility. In order to achieve a sustainable manufacturing system, Cellular Manufacturing System (CMS) designs are highly recommended, CMSs combine high throughput rates of line layouts with the flexibility offered by functional layouts (job shop). Introducing the CMS while designing a remanufacturing network will benefit the utilization of such a network. This paper presents and analyzes a comprehensive mathematical model for the design of Dynamic Cellular Remanufacturing Systems (DCRSs). In this paper, the proposed model is the first one to date that consider CMS and remanufacturing system simultaneously. The proposed DCRS model considers several manufacturing attributes such as multi-period production planning, dynamic system reconfiguration, duplicate machines, machine capacity, available time for workers, worker assignments, and machine procurement, where the demand is totally satisfied from a returned product. A numerical example is presented to illustrate the proposed model.Keywords: cellular manufacturing system, remanufacturing, mathematical programming, sustainability
Procedia PDF Downloads 3792678 Impact of Facility Disruptions on Demand Allocation Strategies in Reliable Facility Location Models
Authors: Abdulrahman R. Alenezi
Abstract:
This research investigates the effects of facility disruptions on-demand allocation within the context of the Reliable Facility Location Problem (RFLP). We explore two distinct scenarios: one where primary and backup facilities can fail simultaneously and another where such simultaneous failures are not possible. The RFLP model is tailored to reflect these scenarios, incorporating different approaches to transportation cost calculations. Utilizing a Lagrange relaxation method, the model achieves high efficiency, yielding an average optimality gap of 0.1% within 12.2 seconds of CPU time. Findings indicate that primary facilities are typically sited closer to demand points than backup facilities. In cases where simultaneous failures are prohibited, demand points are predominantly assigned to the nearest available facility. Conversely, in scenarios permitting simultaneous failures, demand allocation may prioritize factors beyond mere proximity, such as failure rates. This study highlights the critical influence of facility reliability on strategic location decisions, providing insights for enhancing resilience in supply chain networks.Keywords: reliable supply chain network, facility location problem, reliable facility location model, LaGrange relaxation
Procedia PDF Downloads 282677 Energy Consumption Forecast Procedure for an Industrial Facility
Authors: Tatyana Aleksandrovna Barbasova, Lev Sergeevich Kazarinov, Olga Valerevna Kolesnikova, Aleksandra Aleksandrovna Filimonova
Abstract:
We regard forecasting of energy consumption by private production areas of a large industrial facility as well as by the facility itself. As for production areas the forecast is made based on empirical dependencies of the specific energy consumption and the production output. As for the facility itself implementation of the task to minimize the energy consumption forecasting error is based on adjustment of the facility’s actual energy consumption values evaluated with the metering device and the total design energy consumption of separate production areas of the facility. The suggested procedure of optimal energy consumption was tested based on the actual data of core product output and energy consumption by a group of workshops and power plants of the large iron and steel facility. Test results show that implementation of this procedure gives the mean accuracy of energy consumption forecasting for winter 2014 of 0.11% for the group of workshops and 0.137% for the power plants.Keywords: energy consumption, energy consumption forecasting error, energy efficiency, forecasting accuracy, forecasting
Procedia PDF Downloads 4462676 Supply Chain Design: Criteria Considered in Decision Making Process
Authors: Lenka Krsnakova, Petr Jirsak
Abstract:
Prior research on facility location in supply chain is mostly focused on improvement of mathematical models. It is due to the fact that supply chain design has been for the long time the area of operational research that underscores mainly quantitative criteria. Qualitative criteria are still highly neglected within the supply chain design research. Facility location in the supply chain has become multi-criteria decision-making problem rather than single criteria decision due to changes of market conditions. Thus, both qualitative and quantitative criteria have to be included in the decision making process. The aim of this study is to emphasize the importance of qualitative criteria as key parameters of relevant mathematical models. We examine which criteria are taken into consideration when Czech companies decide about their facility location. A literature review on criteria being used in facility location decision making process creates a theoretical background for the study. The data collection was conducted through questionnaire survey. Questionnaire was sent to manufacturing and business companies of all sizes (small, medium and large enterprises) with the representation in the Czech Republic within following sectors: automotive, toys, clothing industry, electronics and pharmaceutical industry. Comparison of which criteria prevail in the current research and which are considered important by companies in the Czech Republic is made. Despite the number of articles focused on supply chain design, only minority of them consider qualitative criteria and rarely process supply chain design as a multi-criteria decision making problem. Preliminary results of the questionnaire survey outlines that companies in the Czech Republic see the qualitative criteria and their impact on facility location decision as crucial. Qualitative criteria as company strategy, quality of working environment or future development expectations are confirmed to be considered by Czech companies. This study confirms that the qualitative criteria can significantly influence whether a particular location could or could not be right place for a logistic facility. The research has two major limitations: researchers who focus on improving of mathematical models mostly do not mention criteria that enter the model. Czech supply chain managers selected important criteria from the group of 18 available criteria and assign them importance weights. It does not necessarily mean that these criteria were taken into consideration when the last facility location was chosen, but how they perceive that today. Since the study confirmed the necessity of future research on how qualitative criteria influence decision making process about facility location, the authors have already started in-depth interviews with participating companies to reveal how the inclusion of qualitative criteria into decision making process about facility location influence the company´s performance.Keywords: criteria influencing facility location, Czech Republic, facility location decision-making, qualitative criteria
Procedia PDF Downloads 3262675 Testing a Flexible Manufacturing System Facility Production Capacity through Discrete Event Simulation: Automotive Case Study
Authors: Justyna Rybicka, Ashutosh Tiwari, Shane Enticott
Abstract:
In the age of automation and computation aiding manufacturing, it is clear that manufacturing systems have become more complex than ever before. Although technological advances provide the capability to gain more value with fewer resources, sometimes utilisation of the manufacturing capabilities available to organisations is difficult to achieve. Flexible manufacturing systems (FMS) provide a unique capability to manufacturing organisations where there is a need for product range diversification by providing line efficiency through production flexibility. This is very valuable in trend driven production set-ups or niche volume production requirements. Although FMS provides flexible and efficient facilities, its optimal set-up is key in achieving production performance. As many variables are interlinked due to the flexibility provided by the FMS, analytical calculations are not always sufficient to predict the FMS’ performance. Simulation modelling is capable of capturing the complexity and constraints associated with FMS. This paper demonstrates how discrete event simulation (DES) can address complexity in an FMS to optimise the production line performance. A case study of an automotive FMS is presented. The DES model demonstrates different configuration options depending on prioritising objectives: utilisation and throughput. Additionally, this paper provides insight into understanding the impact of system set-up constraints on the FMS performance and demonstrates the exploration into the optimal production set-up.Keywords: discrete event simulation, flexible manufacturing system, capacity performance, automotive
Procedia PDF Downloads 3272674 User Satisfaction Survey Based Facility Performance Evaluation
Authors: Gopikrishnan Seshadhri, V. M. Topkar
Abstract:
Facility management post occupation is a facet that has gained tremendous ground in the recent times. While the efficiency of expenditure and utilization of all types of resources are monitored to ensure timely completion with minimum cost and acceptable quality during construction phase, value for money comes out only when the facility performs satisfactorily post occupation, meeting aspirations and expectations of users of the facility. It is more so for the public facilities. Due to the paradigm shift in focus to outcome based performance evaluation, user satisfaction obtained mainly through questionnaires has become the single important criterion in performance evaluation. Questionnaires presently being used to gauge user satisfaction being subjective, the feedback obtained do not necessarily reflect actual performance. Hence, there is a requirement of developing a survey instrument that can gauge user satisfaction as objectively as possible and truly reflects the ground reality. A near correct picture of actual performance of the built facility from the user point of view will enable facility managers to address pertinent issues. This paper brings out the need for an effective survey instrument that will elicit more objective user response. It also lists steps involved in formulation of such an instrument.Keywords: facility performance evaluation, attributes, attribute descriptors, user satisfaction surveys, statistical methods, performance indicators
Procedia PDF Downloads 2912673 Framework for Improving Manufacturing "Implicit Competitiveness" by Enhancing Monozukuri Capability
Authors: Takahiro Togawa, Nguyen Huu Phuc, Shigeyuki Haruyama, Oke Oktavianty
Abstract:
Our research focuses on a framework which analyses the relationship between product/process architecture, manufacturing organizational capability and manufacturing "implicit competitiveness" in order to improve manufacturing implicit competitiveness. We found that 1) there is a relationship between architecture-based manufacturing organizational capability and manufacturing implicit competitiveness, and 2) analysis and measures conducted in manufacturing organizational capability proved effective to improve manufacturing implicit competitiveness.Keywords: implicit competitiveness, QCD, organizational capacity, architectural strategy
Procedia PDF Downloads 2902672 A Review of the Run to Run (R to R) Control in the Manufacturing Processes
Authors: Khalil Aghapouramin, Mostafa Ranjbar
Abstract:
Run- to- Run (R2 R) control was developed in order to monitor and control different semiconductor manufacturing processes based upon the fundamental engineering frameworks. This technology allows rectification in the optimum direction. This control always had a significant potency in which was appeared in a variety of processes. The term run to run refers to the case where the act of control would take with the aim of getting batches of silicon wafers which produced in a manufacturing process. In the present work, a brief review about run-to-run control investigated which mainly is effective in the manufacturing process.Keywords: Run-to-Run (R2R) control, manufacturing, process in engineering, manufacturing controls
Procedia PDF Downloads 4972671 A Survey of Discrete Facility Location Problems
Authors: Z. Ulukan, E. Demircioğlu,
Abstract:
Facility location is a complex real-world problem which needs a strategic management decision. This paper provides a general review on studies, efforts and developments in Facility Location Problems which are classical optimization problems having a wide-spread applications in various areas such as transportation, distribution, production, supply chain decisions and telecommunication. Our goal is not to review all variants of different studies in FLPs or to describe very detailed computational techniques and solution approaches, but rather to provide a broad overview of major location problems that have been studied, indicating how they are formulated and what are proposed by researchers to tackle the problem. A brief, elucidative table based on a grouping according to “General Problem Type” and “Methods Proposed” used in the studies is also presented at the end of the work.Keywords: discrete location problems, exact methods, heuristic algorithms, single source capacitated facility location problems
Procedia PDF Downloads 4722670 Multi-Criteria Decision Making Approaches for Facility Planning Problem Evaluation: A Survey
Authors: Ahmed M. El-Araby, Ibrahim Sabry, Ahmed El-Assal
Abstract:
The relationships between the industrial facilities, the capacity available for these facilities, and the costs involved are the main factors in deciding the correct selection of a facility layout. In general, an issue of facility layout is considered to be an unstructured problem of decision-making. The objective of this work is to provide a survey that describes the techniques by which a facility planning problem can be solved and also the effect of these techniques on the efficiency of the layout. The multi-criteria decision making (MCDM) techniques can be classified according to the previous researches into three categories which are the use of single MCDM, combining two or more MCDM, and the integration of MCDM with another technique such as genetic algorithms (GA). This paper presents a review of different multi-criteria decision making (MCDM) techniques that have been proposed in the literature to pick the most suitable layout design. These methods are particularly suitable to deal with complex situations, including various criteria and conflicting goals which need to be optimized simultaneously.Keywords: facility layout, MCDM, GA, literature review
Procedia PDF Downloads 2062669 Layout Optimization of a Start-up COVID-19 Testing Kit Manufacturing Facility
Authors: Poojan Vora, Hardik Pancholi, Sanket Tajane, Harsh Shah, Elias Keedy
Abstract:
The global COVID-19 pandemic has affected the industry drastically in many ways. Even though the vaccine is being distributed quickly and despite the decreasing number of positive cases, testing is projected to remain a key aspect of the ‘new normal’. Improving existing plant layout and improving safety within the facility are of great importance in today’s industries because of the need to ensure productivity optimization and reduce safety risks. In practice, it is essential for any manufacturing plant to reduce nonvalue adding steps such as the movement of materials and rearrange similar processes. In the current pandemic situation, optimized layouts will not only increase safety measures but also decrease the fixed cost per unit manufactured. In our case study, we carefully studied the existing layout and the manufacturing steps of a new Texas start-up company that manufactures COVID testing kits. The effects of production rate are incorporated with the computerized relative allocation of facilities technique (CRAFT) algorithm to improve the plant layout and estimate the optimization parameters. Our work reduces the company’s material handling time and increases their daily production. Real data from the company are used in the case study to highlight the importance of colleges in fostering small business needs and improving the collaboration between college researchers and industries by using existing models to advance best practices.Keywords: computerized relative allocation of facilities technique, facilities planning, optimization, start-up business
Procedia PDF Downloads 1392668 Automated Method Time Measurement System for Redesigning Dynamic Facility Layout
Authors: Salam Alzubaidi, G. Fantoni, F. Failli, M. Frosolini
Abstract:
The dynamic facility layout problem is a really critical issue in the competitive industrial market; thus, solving this problem requires robust design and effective simulation systems. The sustainable simulation requires inputting reliable and accurate data into the system. So this paper describes an automated system integrated into the real environment to measure the duration of the material handling operations, collect the data in real-time, and determine the variances between the actual and estimated time schedule of the operations in order to update the simulation software and redesign the facility layout periodically. The automated method- time measurement system collects the real data through using Radio Frequency-Identification (RFID) and Internet of Things (IoT) technologies. Hence, attaching RFID- antenna reader and RFID tags enables the system to identify the location of the objects and gathering the time data. The real duration gathered will be manipulated by calculating the moving average duration of the material handling operations, choosing the shortest material handling path, and then updating the simulation software to redesign the facility layout accommodating with the shortest/real operation schedule. The periodic simulation in real-time is more sustainable and reliable than the simulation system relying on an analysis of historical data. The case study of this methodology is in cooperation with a workshop team for producing mechanical parts. Although there are some technical limitations, this methodology is promising, and it can be significantly useful in the redesigning of the manufacturing layout.Keywords: dynamic facility layout problem, internet of things, method time measurement, radio frequency identification, simulation
Procedia PDF Downloads 1222667 A Prioritisation Guide for More Sustainable Manufacturing Processes
Authors: Cansu Kandemir, Marco Franchino
Abstract:
To attain sustainability goals, the manufacturing industries must assess and improve their processes, adopt the latest technologies, and ensure minimal environmental impact. Ongoing debates claim that the definition of sustainability and its assessment is vague. Companies struggle with understanding which processes they should prioritise and necessitate a methodology to aid decision-making. For that reason, our investigation focused on defining a prioritisation guide to help to manufacture engineers identify areas of a facility to prioritise de-carbonisation efforts based on existing sources of data. The authors at the University of Sheffield Advanced Manufacturing Research Centre (AMRC) worked with a range of major businesses, including Food and Drink (Moy Park), Automotive (Nissan), Aerospace and Defence (BAE, Meggitt, Leonardo, and GKN) and Technology (Accenture and Intellium AI). Collected information has been integrated into a prioritisation guide framework that helps process comparison and decision-making. The framework developed in this study aims to ensure that companies have guidance on where to focus their efforts whilst striving to fulfil their environmental and societal obligations.Keywords: decision making, sustainability, carbon emissions, manufacturing
Procedia PDF Downloads 622666 Sustainable Manufacturing Framework for Small and Medium Enterprises
Authors: Rajan Deglurkar
Abstract:
The research carried out in this piece of work is on 'Framework of Sustainable Manufacturing for Small and Medium Enterprises'. It consists of elucidation of concepts about sustainable manufacturing and sustainable product development with critical review performed on seven techniques of sustainable manufacturing. The work also covers the survey about critical review of awareness in the market with respect to the manufacturers and the consumers. The factors and challenges for sustainable manufacturing implementation are reviewed and simple framework is constructed for the small and medium enterprise for successful implementation of sustainable manufacturing and sustainable product.Keywords: sustainable development, sustainable manufacturing, resource efficiency, framework for sustainable manufacturing
Procedia PDF Downloads 5172665 Mathematical Modeling and Algorithms for the Capacitated Facility Location and Allocation Problem with Emission Restriction
Authors: Sagar Hedaoo, Fazle Baki, Ahmed Azab
Abstract:
In supply chain management, network design for scalable manufacturing facilities is an emerging field of research. Facility location allocation assigns facilities to customers to optimize the overall cost of the supply chain. To further optimize the costs, capacities of these facilities can be changed in accordance with customer demands. A mathematical model is formulated to fully express the problem at hand and to solve small-to-mid range instances. A dedicated constraint has been developed to restrict emissions in line with the Kyoto protocol. This problem is NP-Hard; hence, a simulated annealing metaheuristic has been developed to solve larger instances. A case study on the USA-Canada cross border crossing is used.Keywords: emission, mixed integer linear programming, metaheuristic, simulated annealing
Procedia PDF Downloads 3102664 Designing the First Oil Tanker Shipyard Facility in Kuwait
Authors: Fatma Al Abdullah, Shahad Al Ameer, Ritaj Jaragh, Fatimah Khajah, Rawan Qambar, Amr Nounou
Abstract:
Kuwait currently manufactures its tankers in foreign countries. Oil tankers play a role in the supply chain of the oil industry. Therefore, with Kuwait’s sufficient financial resources, the country should secure itself strategically in order to protect its oil industry to sustain economic development. The purpose of this report is designing an oil tankers’ shipyard facility. Basing the shipyard facility in Kuwait will have great economic rewards. The shipbuilding industry directly enhances the industrial chain in terms of new job and business opportunities as well as educational fields. Heavy Engineering Industries & Shipbuilding Co. K.S.C. (HEISCO) was chosen as a host due to benefits that will result from HEISCO’s existing infrastructure and expertise to reduce cost. The Facility Design methodology chosen has been used because it covers all aspects needed for the report. The oil tanker market is witnessing a shift from crude tankers to product tankers. Therefore the Panamax tanker (product tanker) was selected to be manufactured in the facility. The different departments needed in shipyards were identified based on studying different global shipyards. Technologies needed to build ships helped in the process design. It was noticed that ships are engineer to order. The new layout development of the proposed shipyard is currently in progress. A feasibility study will be conducted to ensure the success of the facility after developing the shipyard’s layout.Keywords: oil tankers, shipbuilding, shipyard, facility design, Kuwait
Procedia PDF Downloads 4672663 Distributed Manufacturing (DM)- Smart Units and Collaborative Processes
Authors: Hermann Kuehnle
Abstract:
Developments in ICT totally reshape manufacturing as machines, objects and equipment on the shop floors will be smart and online. Interactions with virtualizations and models of a manufacturing unit will appear exactly as interactions with the unit itself. These virtualizations may be driven by providers with novel ICT services on demand that might jeopardize even well established business models. Context aware equipment, autonomous orders, scalable machine capacity or networkable manufacturing unit will be the terminology to get familiar with in manufacturing and manufacturing management. Such newly appearing smart abilities with impact on network behavior, collaboration procedures and human resource development will make distributed manufacturing a preferred model to produce. Computing miniaturization and smart devices revolutionize manufacturing set ups, as virtualizations and atomization of resources unwrap novel manufacturing principles. Processes and resources obey novel specific laws and have strategic impact on manufacturing and major operational implications. Mechanisms from distributed manufacturing engaging interacting smart manufacturing units and decentralized planning and decision procedures already demonstrate important effects from this shift of focus towards collaboration and interoperability.Keywords: autonomous unit, networkability, smart manufacturing unit, virtualization
Procedia PDF Downloads 5262662 An Advanced Method of Minimizing Unforeseen Disruptions within a Manufacturing System: A Case Study of Amico, South Africa
Authors: Max Moleke
Abstract:
Manufacturing industries are faced with different types of problems. One of the most important role of controlling and monitoring a production process is to actually determine how to deal with unforeseen disruption when they arise. A majority of manufacturing tern to spend huge amount of money in order to meet up with their customers requirements and demand but due to instabilities within the manufacturing process, this objectives and goals are difficult to be achieved. In this research, we have developed a feedback control system that can minimize instability within the manufacturing system in order to boost the system output and productivity.Keywords: disruption, scheduling, manufacturing, instability
Procedia PDF Downloads 3282661 Effect of the Workpiece Position on the Manufacturing Tolerances
Authors: Rahou Mohamed , Sebaa Fethi, Cheikh Abdelmadjid
Abstract:
Manufacturing tolerancing is intended to determine the intermediate geometrical and dimensional states of the part during its manufacturing process. These manufacturing dimensions also serve to satisfy not only the functional requirements given in the definition drawing but also the manufacturing constraints, for example geometrical defects of the machine, vibration, and the wear of the cutting tool. The choice of positioning has an important influence on the cost and quality of manufacture. To avoid this problem, a two-step approach have been developed. The first step is dedicated to the determination of the optimum position. As for the second step, a study was carried out for the tightening effect on the tolerance interval.Keywords: dispersion, tolerance, manufacturing, position
Procedia PDF Downloads 3382660 A Risk Management Approach for Nigeria Manufacturing Industries
Authors: Olaniyi O. Omoyajowo
Abstract:
To be successful in today’s competitive global environment, manufacturing industry must be able to respond quickly to changes in technology. These changes in technology introduce new risks and hazards. The management of risk/hazard in a manufacturing process recommends method through which the success rate of an organization can be increased. Thus, there is a continual need for manufacturing industries to invest significant amount of resources in risk management, which in turn optimizes the production output and profitability of any manufacturing industry (if implemented properly). To help improve the existing risk prevention and mitigation practices in Small and Medium Enterprise (SME) in Nigeria Manufacturing Industries (NMI), the researcher embarks on this research to develop a systematic Risk Management process.Keywords: manufacturing management, risk, risk management, SMEs
Procedia PDF Downloads 4032659 A Feasibility Study of Crowdsourcing Data Collection for Facility Maintenance Management
Authors: Mohamed Bin Alhaj, Hexu Liu, Mohammed Sulaiman, Osama Abudayyeh
Abstract:
An effective facility maintenance management (FMM) system plays a crucial role in improving the quality of services and maintaining the facility in good condition. Current FMM heavily relies on the quality of the data collection function of the FMM systems, at times resulting in inefficient FMM decision-making. The new technology-based crowdsourcing provides great potential to improve the current FMM practices, especially in terms of timeliness and quality of data. This research aims to investigate the feasibility of using new technology-driven crowdsourcing for FMM and highlight its opportunities and challenges. A survey was carried out to understand the human, data, system, geospatial, and automation characteristics of crowdsourcing for an educational campus FMM via social networks. The survey results were analyzed to reveal the challenges and recommendations for the implementation of crowdsourcing for FMM. This research contributes to the body of knowledge by synthesizing the challenges and opportunities of using crowdsourcing for facility maintenance and providing a road map for applying crowdsourcing technology in FMM. In future work, a conceptual framework will be proposed to support data-driven FMM using social networks.Keywords: crowdsourcing, facility maintenance management, social networks
Procedia PDF Downloads 1752658 Application of VE in Healthcare Services: An Overview of Healthcare Facility
Authors: Safeer Ahmad, Pratheek Sudhakran, M. Arif Kamal, Tarique Anwar
Abstract:
In Healthcare facility designing, Efficient MEP services are very crucial because the built environment not only affects patients and family but also Healthcare staff and their outcomes. This paper shall cover the basics of Value engineering and its different phases that can be implemented to the MEP Designing stage for Healthcare facility optimization, also VE can improve the product cost the unnecessary costs associated with healthcare services. This paper explores Healthcare facility services and their Value engineering Job plan for the successful application of the VE technique by conducting a Workshop with end-users, designing team and associate experts shall be carried out using certain concepts, tools, methods and mechanism developed to achieve the purpose of selecting what is actually appropriate and ideal among many value engineering processes and tools that have long proven their ability to enhance the value by following the concept of Total quality management while achieving the most efficient resources allocation to satisfy the key functions and requirements of the project without sacrificing the targeted level of service for all design metrics. Detail study has been discussed with analysis been carried out by this process to achieve a better outcome, Various tools are used for the Analysis of the product at different phases used, at the end the results obtained after implementation of techniques are discussed.Keywords: value engineering, healthcare facility, design, services
Procedia PDF Downloads 1992657 A Clustering-Sequencing Approach to the Facility Layout Problem
Authors: Saeideh Salimpour, Sophie-Charlotte Viaux, Ahmed Azab, Mohammed Fazle Baki
Abstract:
The Facility Layout Problem (FLP) is key to the efficient and cost-effective operation of a system. This paper presents a hybrid heuristic- and mathematical-programming-based approach that divides the problem conceptually into those of clustering and sequencing. First, clusters of vertically aligned facilities are formed, which are later on sequenced horizontally. The developed methodology provides promising results in comparison to its counterparts in the literature by minimizing the inter-distances for facilities which have more interactions amongst each other and aims at placing the facilities with more interactions at the centroid of the shop.Keywords: clustering-sequencing approach, mathematical modeling, optimization, unequal facility layout problem
Procedia PDF Downloads 3332656 Current Practices of Permitted Daily Exposure (PDE) Calculation and Selection
Authors: Annie Ramanbhai Mecwan
Abstract:
Cleaning validation in a pharmaceutical manufacturing facility is documented evidence that a cleaning process has effectively removed contaminants, residues from previous drug products and cleaning agents below a pre-defined threshold from the reusable tools and parts of equipment. In shared manufacturing facilities more than one drug product is prepared. After cleaning of reusable tools and parts of equipment after one drug product manufacturing, there are chances that some residues of drug substance from previously manufactured drug products may be retained on the equipment and can carried forward to the next drug product and thus cause cross-contamination. Health-based limits through the derivation of a safe threshold value called permitted daily exposure (PDE) for the residues of drug substances should be employed to identify the risks posed at these manufacturing facilities. The PDE represents a substance-specific dose that is unlikely to cause an adverse effect if an individual is exposed to or below this dose every day for a lifetime. There are different practices to calculate PDE. Data for all APIs in the public domain are considered to calculate PDE value though, company to company may vary the final PDE value based on different toxicologist’s perspective or their subjective evaluation. Hence, Regulatory agencies should take responsibility for publishing PDE values for all APIs as it is done for elemental PDEs. This will harmonize the PDE values all over the world and prevent the unnecessary load on manufacturers for cleaning validationKeywords: active pharmaceutical ingredient, good manufacturing practice, NOAEL, no observed adverse effect level, permitted daily exposure
Procedia PDF Downloads 912655 Systematic Mapping Study of Digitization and Analysis of Manufacturing Data
Authors: R. Clancy, M. Ahern, D. O’Sullivan, K. Bruton
Abstract:
The manufacturing industry is currently undergoing a digital transformation as part of the mega-trend Industry 4.0. As part of this phase of the industrial revolution, traditional manufacturing processes are being combined with digital technologies to achieve smarter and more efficient production. To successfully digitally transform a manufacturing facility, the processes must first be digitized. This is the conversion of information from an analogue format to a digital format. The objective of this study was to explore the research area of digitizing manufacturing data as part of the worldwide paradigm, Industry 4.0. The formal methodology of a systematic mapping study was utilized to capture a representative sample of the research area and assess its current state. Specific research questions were defined to assess the key benefits and limitations associated with the digitization of manufacturing data. Research papers were classified according to the type of research and type of contribution to the research area. Upon analyzing 54 papers identified in this area, it was noted that 23 of the papers originated in Germany. This is an unsurprising finding as Industry 4.0 is originally a German strategy with supporting strong policy instruments being utilized in Germany to support its implementation. It was also found that the Fraunhofer Institute for Mechatronic Systems Design, in collaboration with the University of Paderborn in Germany, was the most frequent contributing Institution of the research papers with three papers published. The literature suggested future research directions and highlighted one specific gap in the area. There exists an unresolved gap between the data science experts and the manufacturing process experts in the industry. The data analytics expertise is not useful unless the manufacturing process information is utilized. A legitimate understanding of the data is crucial to perform accurate analytics and gain true, valuable insights into the manufacturing process. There lies a gap between the manufacturing operations and the information technology/data analytics departments within enterprises, which was borne out by the results of many of the case studies reviewed as part of this work. To test the concept of this gap existing, the researcher initiated an industrial case study in which they embedded themselves between the subject matter expert of the manufacturing process and the data scientist. Of the papers resulting from the systematic mapping study, 12 of the papers contributed a framework, another 12 of the papers were based on a case study, and 11 of the papers focused on theory. However, there were only three papers that contributed a methodology. This provides further evidence for the need for an industry-focused methodology for digitizing and analyzing manufacturing data, which will be developed in future research.Keywords: analytics, digitization, industry 4.0, manufacturing
Procedia PDF Downloads 1132654 A Bi-Objective Model to Optimize the Total Time and Idle Probability for Facility Location Problem Behaving as M/M/1/K Queues
Authors: Amirhossein Chambari
Abstract:
This article proposes a bi-objective model for the facility location problem subject to congestion (overcrowding). Motivated by implementations to locate servers in internet mirror sites, communication networks, one-server-systems, so on. This model consider for situations in which immobile (or fixed) service facilities are congested (or queued) by stochastic demand to behave as M/M/1/K queues. We consider for this problem two simultaneous perspectives; (1) Customers (desire to limit times of accessing and waiting for service) and (2) Service provider (desire to limit average facility idle-time). A bi-objective model is setup for facility location problem with two objective functions; (1) Minimizing sum of expected total traveling and waiting time (customers) and (2) Minimizing the average facility idle-time percentage (service provider). The proposed model belongs to the class of mixed-integer nonlinear programming models and the class of NP-hard problems. In addition, to solve the model, controlled elitist non-dominated sorting genetic algorithms (Controlled NSGA-II) and controlled elitist non-dominated ranking genetic algorithms (NRGA-I) are proposed. Furthermore, the two proposed metaheuristics algorithms are evaluated by establishing standard multiobjective metrics. Finally, the results are analyzed and some conclusions are given.Keywords: bi-objective, facility location, queueing, controlled NSGA-II, NRGA-I
Procedia PDF Downloads 584