4246 An Approach for Data Analysis, Evaluation and Correction: A Case Study from Man-Made River Project in Libya
Authors: Nasser M. Amaitik, Nabil A. Alfagi
Abstract:
The world-s largest Pre-stressed Concrete Cylinder Pipe (PCCP) water supply project had a series of pipe failures which occurred between 1999 and 2001. This has led the Man-Made River Authority (MMRA), the authority in charge of the implementation and operation of the project, to setup a rehabilitation plan for the conveyance system while maintaining the uninterrupted flow of water to consumers. At the same time, MMRA recognized the need for a long term management tool that would facilitate repair and maintenance decisions and enable taking the appropriate preventive measures through continuous monitoring and estimation of the remaining life of each pipe. This management tool is known as the Pipe Risk Management System (PRMS) and now in operation at MMRA. Both the rehabilitation plan and the PRMS require the availability of complete and accurate pipe construction and manufacturing data This paper describes a systematic approach of data collection, analysis, evaluation and correction for the construction and manufacturing data files of phase I pipes which are the platform for the PRMS database and any other related decision support system.Keywords: Asbuilt, History, IMD, MMRA, PDBMS & PRMS
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 20184245 Critical Success Factors Influencing Construction Project Performance for Different Objectives: Procurement Phase
Authors: Samart Homthong, Wutthipong Moungnoi
Abstract:
Critical success factors (CSFs) and the criteria to measure project success have received much attention over the decades and are among the most widely researched topics in the context of project management. However, although there have been extensive studies on the subject by different researchers, to date, there has been little agreement on the CSFs. The aim of this study is to identify the CSFs that influence the performance of construction projects, and determine their relative importance for different objectives across five stages in the project life cycle. A considerable literature review was conducted that resulted in the identification of 179 individual factors. These factors were then grouped into nine major categories. A questionnaire survey was used to collect data from three groups of respondents: client representatives, consultants, and contractors. Out of 164 questionnaires distributed, 93 were returned, yielding a response rate of 56.7%. Using the mean score, relative importance index, and weighted average method, the top 10 critical factors for each category were identified. The agreement of survey respondents on those categorised factors were analysed using Spearman’s rank correlation. A one-way analysis of variance was then performed to determine whether the mean scores among the various groups of respondents were statistically significant. The findings indicate the most CSFs in each category in procurement phase are: proper procurement programming of materials (time), stability in the price of materials (cost), and determining quality in the construction (quality). They are then followed by safety equipment acquisition and maintenance (health and safety), budgeting allowed in a contractual arrangement for implementing environmental management activities (environment), completeness of drawing documents (productivity), accurate measurement and pricing of bill of quantities (risk management), adequate communication among the project team (human resource), and adequate cost control measures (client satisfaction). An understanding of CSFs would help all interested parties in the construction industry to improve project performance. Furthermore, the results of this study would help construction professionals and practitioners take proactive measures for effective project management.
Keywords: Critical success factors, procurement phase, project life cycle, project performance.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 22434244 Multi-Hazard Risk Assessment and Management in Tourism Industry- A Case Study from the Island of Taiwan
Authors: Chung-Hung Tsai
Abstract:
Global environmental changes lead to increased frequency and scale of natural disaster, Taiwan is under the influence of global warming and extreme weather. Therefore, the vulnerability was increased and variability and complexity of disasters is relatively enhanced. The purpose of this study is to consider the source and magnitude of hazard characteristics on the tourism industry. Using modern risk management concepts, integration of related domestic and international basic research, this goes beyond the Taiwan typhoon disaster risk assessment model and evaluation of loss. This loss evaluation index system considers the impact of extreme weather, in particular heavy rain on the tourism industry in Taiwan. Consider the extreme climate of the compound impact of disaster for the tourism industry; we try to make multi-hazard risk assessment model, strategies and suggestions. Related risk analysis results are expected to provide government department, the tourism industry asset owners, insurance companies and banking include tourist disaster risk necessary information to help its tourism industry for effective natural disaster risk management.
Keywords: Tourism industry, extreme weather, multi-hazard, vulnerability analysis, loss exceeding probability, risk management.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 38304243 The Capacity Building in the Natural Disaster Management of Thailand
Authors: Eakarat Boonreang
Abstract:
The past two decades, Thailand faced the natural disasters, for instance, Gay typhoon in 1989, tsunami in 2004, and huge flood in 2011. The disaster management in Thailand was improved both structure and mechanism for cope with the natural disaster since 2007. However, the natural disaster management in Thailand has various problems, for examples, cooperation between related an organizations have not unity, inadequate resources, the natural disaster management of public sectors not proactive, people has not awareness the risk of the natural disaster, and communities did not participate in the natural disaster management. Objective of this study is to find the methods for capacity building in the natural disaster management of Thailand. The concept and information about the capacity building and the natural disaster management of Thailand were reviewed and analyzed by classifying and organizing data. The result found that the methods for capacity building in the natural disaster management of Thailand should be consist of 1) link operation and information in the natural disaster management between nation, province, local and community levels, 2) enhance competency and resources of public sectors which relate to the natural disaster management, 3) establish proactive natural disaster management both planning and implementation, 4) decentralize the natural disaster management to local government organizations, 5) construct public awareness in the natural disaster management to community, 6) support Community Based Disaster Risk Management (CBDRM) seriously, and 7) emphasis on participation in the natural disaster management of all stakeholders.
Keywords: Capacity Building, Community Based Disaster Risk Management, Natural Disaster Management, Thailand.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 32474242 Project Management in Student Satellite Projects: A University – Industry Collaboration View
Authors: Muhammad Fiaz, Naqvi Najam Abbas, Baseerat Rizwan, Yang Naiding
Abstract:
This research contribution propels the idea of collaborating environment for the execution of student satellite projects in the backdrop of project management principles. The recent past has witnessed a technological shift in the aerospace industry from the big satellite projects to the small spacecrafts especially for the earth observation and communication purposes. This vibrant shift has vitalized the academia and industry to share their resources and to create a win-win paradigm of mutual success and technological development along with the human resource development in the field of aerospace. Small student satellites are the latest jargon of academia and more than 100 CUBESAT projects have been executed successfully all over the globe and many new student satellite projects are in the development phase. The small satellite project management requires the application of specific knowledge, skills, tools and techniques to achieve the defined mission requirements. The Authors have presented the detailed outline for the project management of student satellites and presented the role of industry to collaborate with the academia to get the optimized results in academic environment.
Keywords: Project Management, Academia-Industry Collaboration, Satellite, Aerospace
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26214241 The Reason of Principles of Construction Engineering and Management Being Necessary for Contracting Firms and Their Projects Managers
Authors: Mamoon Mousa Atout
Abstract:
The industries of construction are in continuous growth not only in Middle East rejoin but almost all over the world. For the last fifteen years, big expansion and increase of different types of projects has been observed. Many infrastructural projects have been developed, high rise buildings, big shopping malls, power sub-stations, roads, bridges, schools, universities and developing many of new cities with full and complete facilities. The growth and enlargement of the mentioned developed projects has been accomplished through many international and local contracting organizations. Senior management of these organizations depend on their qualified and experienced team whom are aware of the implications of project management, construction management, engineering management and resource management during tendering till final completion of the project. This research aims to find out why reasons of principles of construction engineering and management are necessary for contracting firms and their managers. Principles of construction management help contracting organizations to accomplish and deliver projects without delay. This can be maintained by establishing guidelines’ details for updating the adopted system of construction management that they have through qualified and experienced project managers. The research focuses on benefits of other essential skills of projects planning, monitoring and control. Defining roles and responsibilities of contractor project managers during tendering and execution is a part of the investigated factors that will be analyzed. Other skills like optimizing and utilizing the obtainable project resources to deliver the project within time, cost and quality will be also investigated to find out how these factors are affecting the performance of contracting firms, projects managers and projects. The conclusion of the research will help senior management team and the contractors project managers about the benefits of implications and benefits construction management system and its effect upon the performance and knowledge of contract values that they have, and the optimal profit margin of the firm it.
Keywords: Construction management, contracting firms, project managers, planning processes, roles and responsibilities.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 17374240 Tools and Techniques in Risk Assessment in Public Risk Management Organisations
Authors: Atousa Khodadadyan, Gabe Mythen, Hirbod Assa, Beverley Bishop
Abstract:
Risk assessment and the knowledge provided through this process is a crucial part of any decision-making process in the management of risks and uncertainties. Failure in assessment of risks can cause inadequacy in the entire process of risk management, which in turn can lead to failure in achieving organisational objectives as well as having significant damaging consequences on populations affected by the potential risks being assessed. The choice of tools and techniques in risk assessment can influence the degree and scope of decision-making and subsequently the risk response strategy. There are various available qualitative and quantitative tools and techniques that are deployed within the broad process of risk assessment. The sheer diversity of tools and techniques available to practitioners makes it difficult for organisations to consistently employ the most appropriate methods. This tools and techniques adaptation is rendered more difficult in public risk regulation organisations due to the sensitive and complex nature of their activities. This is particularly the case in areas relating to the environment, food, and human health and safety, when organisational goals are tied up with societal, political and individuals’ goals at national and international levels. Hence, recognising, analysing and evaluating different decision support tools and techniques employed in assessing risks in public risk management organisations was considered. This research is part of a mixed method study which aimed to examine the perception of risk assessment and the extent to which organisations practise risk assessment’ tools and techniques. The study adopted a semi-structured questionnaire with qualitative and quantitative data analysis to include a range of public risk regulation organisations from the UK, Germany, France, Belgium and the Netherlands. The results indicated the public risk management organisations mainly use diverse tools and techniques in the risk assessment process. The primary hazard analysis; brainstorming; hazard analysis and critical control points were described as the most practiced risk identification techniques. Within qualitative and quantitative risk analysis, the participants named the expert judgement, risk probability and impact assessment, sensitivity analysis and data gathering and representation as the most practised techniques.
Keywords: Decision-making, public risk management organisations, risk assessment, tools and techniques.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16474239 Production Structures of Energy Based on Water Force, Its Infrastructure Protection, and Possible Causes of Failure
Authors: Gabriela-Andreea Despescu, Mădălina-Elena Mavrodin, Gheorghe Lăzăroiu, Florin Adrian Grădinaru
Abstract:
The purpose of this paper is to contribute to the enhancement of a hydroelectric plant protection by coordinating protection measures / existing security and introducing new measures under a risk management process. In addition, plan identifies key critical elements of a hydroelectric plant, from its level vulnerabilities and threats it is subjected to in order to achieve the necessary protection measures to reduce the level of risk.Keywords: Critical infrastructure, risk analysis, critical infrastructure protection, vulnerability, risk management, turbine, Impact analysis.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 15644238 Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U.A.E
Authors: Firas Mohamad Al-Sabek
Abstract:
The purpose of the paper is to examine the most critical and important factor which will affect the implementation of Total Quality Management (TQM) in the construction industry in the United Arab Emirates. It also examines the most effected Project outcome from implementing TQM. A framework was also proposed depending on the literature studies. The method used in this paper is a quantitative study. A survey with a sample of 60 respondents was created and distributed in a construction company in Abu Dhabi, which includes 15 questions to examine the most critical factor that will affect the implementation of TQM in addition to the most effected project outcome from implementing TQM. The survey showed that management commitment is the most important factor in implementing TQM in a construction company. Also it showed that Project cost is most effected outcome from the implementation of TQM. Management commitment is very important for implementing TQM in any company. If the management loose interest in quality then everyone in the organization will do so. The success of TQM will depend mostly on the top of the pyramid. Also cost is reduced and money is saved when the project team implement TQM. While if no quality measures are present within the team, the project will suffer a commercial failure. Based on literature, more factors can be examined and added to the model. In addition, more construction companies could be surveyed in order to obtain more accurate results. Also this study could be conducted outside the United Arab Emirates for further enchantment.Keywords: Construction project, total quality management, management commitment, cost, theoretical framework.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 40694237 Financial Portfolio Optimization in Turkish Electricity Market via Value at Risk
Authors: F. Gökgöz, M. E. Atmaca
Abstract:
Electricity has an indispensable role in human daily life, technological development and economy. It is a special product or service that should be instantaneously generated and consumed. Sources of the world are limited so that effective and efficient use of them is very important not only for human life and environment but also for technological and economic development. Competitive electricity market is one of the important way that provides suitable platform for effective and efficient use of electricity. Besides benefits, it brings along some risks that should be carefully managed by a market player like Electricity Generation Company. Risk management is an essential part in market players’ decision making. In this paper, risk management through diversification is applied with the help of Value at Risk methods for case studies. Performance of optimal electricity sale solutions are measured and the portfolio performance has been evaluated via Sharpe-Ratio, and compared with conventional approach. Biennial historical electricity price data of Turkish Day Ahead Market are used to demonstrate the approach.Keywords: Electricity market, portfolio optimization, risk management, Sharpe ratio, value at risk.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 10524236 Genetic Algorithms Multi-Objective Model for Project Scheduling
Authors: Elsheikh Asser
Abstract:
Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multiobjective model for project scheduling considering different scenarios such as least cost, least time, and target time.
Keywords: Genetic algorithms, Time-cost trade-off.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 23274235 Paradigm of Digital Twin Application in Project Management in Architecture, Engineering and Construction
Authors: Kwok Tak Kit
Abstract:
With the growing trend of adoption of advanced technologies like, building information modeling, artificial intelligence, wireless network, the collaboration and integration of these technologies into digital twin become more prominent in architecture, engineering and construction (AEC) industry in view of the nature and scale of AEC industry which efficiently adopted the digital twin. Digital twin is provided to be effective for AEC professions for design and project management. The digital concept is continuously developing and it is vital for AEC professionals and other stakeholders to understand the digital twin concept and the adoption of various advanced building technologies related to the AEC industry. This paper is to review the application of digital twins application in project management in AEC industry and highlight the challenge of AEC partitioners faced by the revolution of technologies including digital twins and building information modelling (BIM) for further research and future study.
Keywords: Digital Twin, AEC, building information modeling, project management, internet of things.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 9264234 Waste Generation in Iranian Building Industry: Addressing a Theory
Authors: Golnaz Moghimi, Alireza Afsharghotli, Alireza Rezaei
Abstract:
Construction waste has been gradually increased as a result of upsizing construction projects which are occurred within the lifecycle of buildings. Since waste management is a major priority and has profound impacts on the volume of waste generated in construction stage, the majority of efforts have been attempted to reuse, recycle and reduce waste. However, there is still room to study on lack of sufficient knowledge about waste management in construction industry. This paper intends to provide an insight into the effect of project management knowledge areas on waste management solely on construction stage. To this end, a survey among Iranian building construction industry contractors was conducted to identify the effectiveness of project management knowledge areas on three jobsite key factors including ‘Site activity’, ‘Training’, and ‘Awareness’. As a result, four management disciplines were identified as most influential ones on amount of construction waste. These disciplines were Project Cost Management, Quality Management, Human Resource Management, and Integration Management. Based on the research findings, a new model was presented to develop effective construction waste strategies.Keywords: Awareness, PMBOK, site activity, training, waste management.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 12374233 Application of Process Approach to Evaluate the Information Security Risk and its Implementation in an Iranian Private Bank
Authors: Isa Nakhai Kamal Abadi, Esmaeel Saberi, Ehsan Mirjafari
Abstract:
Every organization is continually subject to new damages and threats which can be resulted from their operations or their goal accomplishment. Methods of providing the security of space and applied tools have been widely changed with increasing application and development of information technology (IT). From this viewpoint, information security management systems were evolved to construct and prevent reiterating the experienced methods. In general, the correct response in information security management systems requires correct decision making, which in turn requires the comprehensive effort of managers and everyone involved in each plan or decision making. Obviously, all aspects of work or decision are not defined in all decision making conditions; therefore, the possible or certain risks should be considered when making decisions. This is the subject of risk management and it can influence the decisions. Investigation of different approaches in the field of risk management demonstrates their progress from quantitative to qualitative methods with a process approach.
Keywords: Risk Management, Information Security, Methodology, Probability.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 15304232 Supply Chain Risk Management (SCRM): A Simplified Alternative for Implementing SCRM for Small and Medium Enterprises
Authors: Paul W. Murray, Marco Barajas
Abstract:
Recent changes in supply chains, especially globalization and collaboration, have created new risks for enterprises of all sizes. A variety of complex frameworks, often based on enterprise risk management strategies have been presented under the heading of Supply Chain Risk Management (SCRM). The literature on promotes the benefits of a robust SCRM strategy; however, implementing SCRM is difficult and resource demanding for Large Enterprises (LEs), and essentially out of reach for Small & Medium Enterprises (SMEs). This research debunks the idea that SCRM is necessary for all enterprises and instead proposes a simple and effective Vendor Selection Template (VST). Empirical testing and a survey of supply chain practitioners provide a measure of validation to the VST. The resulting VSTis a valuable contribution because is easy to use, provides practical results, and is sufficiently flexible to be universally applied to SMEs.
Keywords: Multiple Regression Analysis, Supply Chain Management, Risk Assessment, Vendor Selection.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 28424231 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method
Abstract:
The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.
Keywords: Construction project management, critical path method, project scheduling, precedence diagram method.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14774230 Health Risk Assessment of PET Bottles in GCC
Authors: M. M. Mortula
Abstract:
Bottle water is getting very popular all through the world; especially in the gulf countries as the main source of drinking water. However, concerns over leaching of toxic chemicals are increasing. In this study, a health risk assessment was conducted in accordance with the guidelines indicated by United States Environmental Protection Agency (USEPA). It is conducted based on leaching of Diethyl Phthalate (DEP) from Polyethylene terephthalate (PET). The toxicity and exposure assessment of diethyl phthalate was conducted to characterize its risk on human health. Risk management is also discussed.Keywords: Toxicity, diethyl phthalate, PET, risk Assessment.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 41524229 Applications of Building Information Modeling (BIM) in Knowledge Sharing and Management in Construction
Authors: Shu-Hui Jan, Shih-Ping Ho, Hui-Ping Tserng
Abstract:
Construction knowledge can be referred to and reused among involved project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology to provide sharing of construction knowledge by using the Building Information Modeling (BIM) approach. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format, and facilitation of easy updating and transfer of information in the 3D BIM environment. Using the BIM approach, project managers and engineers can gain knowledge related to 3D BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management in the construction phase of construction projects and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to verify the proposed methodology and demonstrate the effectiveness of sharing knowledge in the BIM environment. The combined results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM approach and web technology.
Keywords: Construction knowledge management, building information modeling, project management, web-based information system.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 43524228 Study of the Effect of Project Management on Manufacturing and Production Projects
Authors: S.B. Ahmadi, Z. Moradpour, Gh. Liaghat
Abstract:
In this article the accumulated results out of the effects and length of the manufacture and production projects in the university and research standard have been settled with the usefulness definition of the process of project management for the accessibility to the proportional pattern in the “time and action" stages. Studies show that many problems confronted by the researchers in these projects are connected to the non-profiting of: 1) autonomous timing for gathering the educational theme, 2) autonomous timing for planning and pattern, presenting before the construction, and 3) autonomous timing for manufacture and sample presentation from the output. The result of this study indicates the division of every manufacture and production projects into three smaller autonomous projects from its kind, budget and autonomous expenditure, shape and order of the stages for the management of these kinds of projects. In this case study real result are compared with theoretical results.Keywords: Project management, Manufacturing, production.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16734227 Risks and Mitigation Measures in Build-Operate-Transfer Projects
Authors: Syed Kamarul Bakri Syed Ahmad Bokharey, Kalaikumar Vallyutham, Narayanan Sambu Potty, Nabilah Abu Bakar
Abstract:
Infrastructure investments are important in developing countries, it will not only help to foster the economic growth of a nation, but it will also act as a platform in which new forms of partnership and collaboration can be developed mainly in East Asian countries. Since the last two decades, many infrastructure projects had been completed through build-operate-transfer (BOT) type of procurement. The developments of BOT have attracted participation of local and foreign private sector investor to secure funding and to deliver projects on time, within the budget and to the required specifications. Private sectors are preferred by the government in East Asia to participate in BOT projects due to lack of public funding. The finding has resulted that the private sector or promoter of the BOT projects is exposed to multiple risks which have been discussed in this paper. Effective risk management methods and good managerial skills are required in ensuring the success of the project. The review indicated that mitigation measures should be employed by the promoter throughout the concession period and support from the host government is also required in ensuring the success of the BOT project.Keywords: BOT project, risks management, concessionaire, consortium.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 82064226 Model of MSD Risk Assessment at Workplace
Authors: K. Sekulová, M. Šimon
Abstract:
This article focuses on upper-extremity musculoskeletal disorders risk assessment model at workplace. In this model are used risk factors that are responsible for musculoskeletal system damage. Based on statistic calculations the model is able to define what risk of MSD threatens workers who are under risk factors. The model is also able to say how MSD risk would decrease if these risk factors are eliminated.
Keywords: Ergonomics, musculoskeletal disorders, occupational diseases, risk factors.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 20574225 Features of Formation and Development of Possessory Risk Management Systems of Organization in the Russian Economy
Authors: Mikhail V. Khachaturyan, Inga A. Koryagina, Maria Nikishova
Abstract:
The study investigates the impact of the ongoing financial crisis, started in the 2nd half of 2014, on marketing budgets spent by Fast-moving consumer goods companies. In these conditions, special importance is given to efficient possessory risk management systems. The main objective for establishing and developing possessory risk management systems for FMCG companies in a crisis is to analyze the data relating to the external environment and consumer behavior in a crisis. Another important objective for possessory risk management systems of FMCG companies is to develop measures and mechanisms to maintain and stimulate sales. In this regard, analysis of risks and threats which consumers define as the main reasons affecting their level of consumption become important. It is obvious that in crisis conditions the effective risk management systems responsible for development and implementation of strategies for consumer demand stimulation, as well as the identification, analysis, assessment and management of other types of risks of economic security will be the key to sustainability of a company. In terms of financial and economic crisis, the problem of forming and developing possessory risk management systems becomes critical not only in the context of management models of FMCG companies, but for all the companies operating in other sectors of the Russian economy. This study attempts to analyze the specifics of formation and development of company possessory risk management systems. In the modern economy, special importance among all the types of owner’s risks has the risk of reduction in consumer activity. This type of risk is common not only for the consumer goods trade. Study of consumer activity decline is especially important for Russia due to domestic market of consumer goods being still in the development stage, despite its significant growth. In this regard, it is especially important to form and develop possessory risk management systems for FMCG companies. The authors offer their own interpretation of the process of forming and developing possessory risk management systems within owner’s management models of FMCG companies as well as in Russian economy in general. Proposed methods and mechanisms of problem analysis of formation and development of possessory risk management systems in FMCG companies and the results received can be helpful for researchers interested in problems of consumer goods market development in Russia and overseas.
Keywords: FMCG companies, marketing budget, risk management, owner, Russian economy, organization, formation, development, system.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 11014224 Banking Risk Management between the Prudential and the Operational Approaches
Authors: Mustapha Achibane, Imane Allam
Abstract:
Since the nineties, all Moroccan banking institutions have to respect an arsenal of prudential ratios. The respect of these prudential measures aims to ensure the financial system stability. In order to do so, regulatory authorities tried to reduce the financial and operational risks incurred by the banking entities. Meanwhile, regulatory authorities demanded a balance sheet management work from banks. They also asked them to establish a management control system to manage operational risk, as well as an effort in terms of incurred risk-based commitments. Therefore, the prudential approach has a macroeconomic nature and it is presented as a determinant of the operational, microeconomic approach. This operational approach takes the form of a strategy that each banking entity must develop to manage the different banking risks. This study seeks to analyze the problem of risk management between the prudential and the operational approaches. It was processed through a literature review followed by an analysis of the Moroccan banking sector’s performance. At first, we will reconcile the inductive logic and then, the analytical one. The first approach consists of analyzing the phenomenon from a normative and conceptual perspective, while the second one will consist of considering the Moroccan banking system and analyzing the behavior of Moroccan banking entities in terms of risk management and performance. The results identified a favorable growth in terms of performance, despite the huge provisioning effort made to meet the international standards and the harmonization of the regulations.
Keywords: Banking performance, financial intermediation, operational approach, prudential standards, risk management.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 6414223 An Intelligent System Framework for Generating Activity List of a Project Using WBS Mind map and Semantic Network
Authors: H. Iranmanesh, M. Madadi
Abstract:
Work Breakdown Structure (WBS) is one of the most vital planning processes of the project management since it is considered to be the fundamental of other processes like scheduling, controlling, assigning responsibilities, etc. In fact WBS or activity list is the heart of a project and omission of a simple task can lead to an irrecoverable result. There are some tools in order to generate a project WBS. One of the most powerful tools is mind mapping which is the basis of this article. Mind map is a method for thinking together and helps a project manager to stimulate the mind of project team members to generate project WBS. Here we try to generate a WBS of a sample project involving with the building construction using the aid of mind map and the artificial intelligence (AI) programming language. Since mind map structure can not represent data in a computerized way, we convert it to a semantic network which can be used by the computer and then extract the final WBS from the semantic network by the prolog programming language. This method will result a comprehensive WBS and decrease the probability of omitting project tasks.Keywords: Expert System, Mind map, Semantic network, Work breakdown structure,
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26094222 Developing a Multiagent Based Decision Support System for Realtime Multi-Risk Disaster Management
Authors: D. Moser, D. Pinto, A. Cipriano
Abstract:
A Disaster Management System (DMS) is very important for countries with multiple disasters, such as Chile. In the world (also in Chile)different disasters (earthquakes, tsunamis, volcanic eruption, fire or other natural or man-made disasters) happen and have an effect on the population. It is also possible that two or more disasters occur at the same time. This meansthata multi-risk situation must be mastered. To handle such a situation a Decision Support System (DSS) based on multiagents is a suitable architecture. The most known DMSs are concernedwith only a singledisaster (sometimes thecombination of earthquake and tsunami) and often with a particular disaster. Nevertheless, a DSS helps for a better real-time response. Analyze the existing systems in the literature and expand them for multi-risk disasters to construct a well-organized system is the proposal of our work. The here shown work is an approach of a multi-risk system, which needs an architecture and well defined aims. In this moment our study is a kind of case study to analyze the way we have to follow to create our proposed system in the future.
Keywords: Decision Support System, Disaster Management System, Multi-Risk, Multiagent System.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26154221 Identifying Mitigation Plans in Reducing Usability Risk Using Delphi Method
Authors: Jayaletchumi T. Sambantha Moorthy, Suhaimi bin Ibrahim, Mohd Naz’ri Mahrin
Abstract:
Most quality models have defined usability as a significant factor that leads to improving product acceptability, increasing user satisfaction, improving product reliability, and also financially benefitting companies. Usability is also the best factor that balances both the technical and human aspects of a software product, which is an important aspect in defining quality during software development process. A usability risk consist risk factors that could impact the usability of a software product thereby contributing to negative user experiences and causing a possible software product failure. Hence, it is important to mitigate and reduce usability risks in the software development process itself. By managing possible usability risks in software development process, failure of software product could be reduced. Therefore, this research uses the Delphi method to identify mitigation plans for reducing potential usability risks. The Delphi method is conducted with seven experts from the field of risk management and software development.
Keywords: Usability, Usability Risk, Risk Management, Risk Mitigation, Delphi Method.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 22284220 Study on Various Measures for Flood in Specific Region: A Case Study of the 2008 Lao Flood
Authors: Douangmala Kounsana, Toru Takahashi
Abstract:
In recent years, the number of natural disasters in Laos has a trend to increase, especially the disaster of flood. To make a flood plan risk management in the future, it is necessary to understand and analyze the characteristics of the rainfall and Mekong River level data. To reduce the damage, this paper presents the flood risk analysis in Luangprabang and Vientiane, the prefecture of Laos. In detail, the relationship between the rainfall and the Mekong River level has evaluated and appropriate countermeasure for flood was discussed.
Keywords: Lao flood, Mekong river, rainfall, risk management.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 18394219 Empirical Study on Causes of Project Delays
Authors: Khan Farhan Rafat, Riaz Ahmed
Abstract:
Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.Keywords: Causes of construction project delays, construction industry, construction management, power distance.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 31214218 Security Risk Analysis Based on the Policy Formalization and the Modeling of Big Systems
Authors: Luc Cessieux, French Navy, Adrien Derock, DCNS/IMATH
Abstract:
Security risk models have been successful in estimating the likelihood of attack for simple security threats. However, modeling complex system and their security risk is even a challenge. Many methods have been proposed to face this problem. Often difficult to manipulate, and not enough all-embracing they are not as famous as they should with administrators and deciders. We propose in this paper a new tool to model big systems on purpose. The software, takes into account attack threats and security strength.
Keywords: Security, risk management, threat, modelization.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 13244217 Sustainability: An Ethical Approach Towards Project Business Success
Authors: G. S. Dangayach
Abstract:
For any country the project management has been a vital part for its development. The highly competitive business world has created tremendous pressure on the project managers to achieve success. The pressure is derived from survival and profit building in business organizations which compels the project managers to pursue unethical practices. As a result unethical activities in business projects can be found easily where situations or issues arise due to dubious business practice, high corruption, or absolute violation of the law. The recent spur on Commonwealth games to be organized in New Delhi indicates towards the same. It has been seen that the project managers mainly focus on cost, time, and quality rather than social impact and long term effects of the project. Surprisingly the literature as well as the practitioner-s perspective also does not identify the role of ethics in project success. This paper identifies ethics as the fourth most important dimension in the project based organizations. The paper predicts that the approach of considering ethics will result in sustainability of the project. It will increase satisfaction and loyalty of the customers as well as create harmony, trust, brotherhood, values and morality among the team members. This paper is conceptual in nature as inadequate literature exists linking the project success with an ethical approach.Keywords: Ethics, Loyalty, Morality, Project success
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2769