Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Risks and Mitigation Measures in Build-Operate-Transfer Projects
Authors: Syed Kamarul Bakri Syed Ahmad Bokharey, Kalaikumar Vallyutham, Narayanan Sambu Potty, Nabilah Abu Bakar
Abstract:
Infrastructure investments are important in developing countries, it will not only help to foster the economic growth of a nation, but it will also act as a platform in which new forms of partnership and collaboration can be developed mainly in East Asian countries. Since the last two decades, many infrastructure projects had been completed through build-operate-transfer (BOT) type of procurement. The developments of BOT have attracted participation of local and foreign private sector investor to secure funding and to deliver projects on time, within the budget and to the required specifications. Private sectors are preferred by the government in East Asia to participate in BOT projects due to lack of public funding. The finding has resulted that the private sector or promoter of the BOT projects is exposed to multiple risks which have been discussed in this paper. Effective risk management methods and good managerial skills are required in ensuring the success of the project. The review indicated that mitigation measures should be employed by the promoter throughout the concession period and support from the host government is also required in ensuring the success of the BOT project.Keywords: BOT project, risks management, concessionaire, consortium.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1061669
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 8214References:
[1] World Bank, (2008) PPI Database . Available from: http://ppi.worldbank.org/explore/ppi_exploreRegion.aspx?regionID=2( Accessed on 17 January 2010 )
[2] T. Merna and C. Njiru, Financing Infrastructure Projects. Thomas Telford, London, 2002
[3] T. Merna and F. Al-Thani, Corporate risk management: An organizational perspective. Wiley, London, 2005
[4] J. Raftery, Risk analysis in project management. E&FN Spon, London, 1994
[5] C.B. Chapmen, Risk in investment, procurement and performance in construction. E&FN Spon, Chapman & Hall, London, 1991
[6] N.J. Smith, Appraisal, risk and uncertainty. Thomas Telford, London, 2003
[7] C. Walker and A.J. Smith, Privatized infrastructures: the BOT approach. Thomas Telford, London, 1996
[8] J. Delmon, BOO/BOT projects: A commercial and contractual guide. Sweet & Maxwell Limited, London, 2000
[9] T.M. Zayed, and L.M. Chang, "Prototype Model for build-operatetransfer risk assessment." Journal of Management Engineering, 18 (1), p. 7-16, 2002
[10] T. Merna, "Financial risk in the procurement of capital and infrastructure projects." International Journal of Project and Business Risk Management, 2(3), p. 256-270, 1998
[11] L. Bing, R.L.K. Tiong, W.W. Fan and D.A.S. Chew, "Risk management in international construction joint ventures." Journal of Construction Engineering and Management, 125(2), p. 277-284, 1999
[12] S.Q. Wang, R.L.K. Tiong, S.K. Ting and D. Ashley, (2000), "Foreign exchange and revenue risk: analysis of key contract clauses in China-s BOT project." Construction Management and Economics, 18(3), p. 311- 320, 2000
[13] S.Q. Wang, R.L.K. Tiong, S.K. Ting and D. Ashley, "Evaluation and management of foreign exchange and revenue risks in China-s BOT project." Construction Management and Economics, 18(2), p. 197-207, 2000
[14] A. Wibowo, A., "Valuing guarantees in a BOT project." Engineering, Construction and Architectural Management, 11(6), p. 395-403, 2004
[15] S.M. Levy, Build operate transfer: paving the way for tomorrow-s infrastructure, John Wiley & Sins Inc. Canada, 1996
[16] K.C. Lam, and W.S. Chow, "The significance of Financial risks in BOT procurement Building." Building Research and Information, 27(2), p. 84-94, 1999
[17] Y.Y.L. Florence and H. Linda, "Risks faced by Singapore firms when undertaking construction projects in India." International Journal of Project Management, 24(3), p. 261-270, 2006
[18] J.E. Schaufelberger and I. Wipadapisut, "Alternate financing strategies for build-operate-transfer projects." Journal of Construction Engineering and Mangement, 129(2), p. 205-213, 2003
[19] S. Ye and R.L.K. Tiong, "Effects of concession period design on completion risk management of BOT projects." Journal of Construction Management and Economics, 21(5), p. 471-482, 2003
[20] K.T., Yeo and R.L.K Tiong, "Positive management of differences for risk reduction in BOT projects-." International Journal of Project Management, 18(4), p. 257-265, 2000
[21] R.L.K. Tiong, "BOT projects: risks and securities." Construction Management and Economics, 8(3), p. 315-328, 1990
[22] M.F. Dallas, Value and risk management: A guide to best practice. Blackwell Publishing, Singapore, 2006