@article{(Open Science Index):https://publications.waset.org/pdf/9999947, title = {Genetic Algorithms Multi-Objective Model for Project Scheduling}, author = {Elsheikh Asser}, country = {}, institution = {}, abstract = {Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multiobjective model for project scheduling considering different scenarios such as least cost, least time, and target time. }, journal = {International Journal of Civil and Environmental Engineering}, volume = {8}, number = {12}, year = {2014}, pages = {1446 - 1449}, ee = {https://publications.waset.org/pdf/9999947}, url = {https://publications.waset.org/vol/96}, bibsource = {https://publications.waset.org/}, issn = {eISSN: 1307-6892}, publisher = {World Academy of Science, Engineering and Technology}, index = {Open Science Index 96, 2014}, }