Search results for: stakeholders of project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6293

Search results for: stakeholders of project

6203 Analyzing the Mission Drift of Social Business: Case Study of Restaurant Providing Professional Training to At-Risk Youth

Authors: G. Yanay-Ventura, H. Desivilya Syna, K. Michael

Abstract:

Social businesses are based on the idea that an enterprise can be established for the sake of profit and, at the same time, with the aim of fulfilling social goals. Yet, the question of how these goals can be integrated in practice to derive parallel benefit in both realms still needs to be examined. Particularly notable in this context is the ‘governance challenge’ of social businesses, meaning the danger of the mission drifts from the social goal in the pursuit of good business. This study is based on an evaluation study of a social business that operates as a restaurant providing professional training to at-risk youth. The evaluation was based on the collection of a variety of data through interviews with stakeholders in the enterprise (directors and managers, business partners, social partners, and position holders in the restaurant and the social enterprise), a focus group consisting of the youth receiving the professional training, observations of the restaurant’s operation, and analysis of the social enterprise’s primary documents. The evaluation highlighted significant strengths of the social enterprise, including reaching relatively fast business sustainability, effective management of the restaurant, stable employment of the restaurant staff, and effective management of the social project. The social enterprise and business management have both enjoyed positive evaluations from a variety of stakeholders. Clearly, the restaurant was deemed by all a promising young business. However, the social project suffered from a 90% dropout rate among the youth entering its ranks, extreme monthly fluctuation in the number of youths participating, and a distinct minority of the youth who have succeeded in completing their training period. Possible explanations of the high dropout rate included the small number of cooks, which impeded the effectiveness of the training process and the provision of advanced cooking skills; lack of clarity regarding the essence and the elements of training; and lack of a meaningful peer group for the youth engaged in the program. Paradoxically, despite the stakeholders’ great appreciation for the social enterprise, the challenge of governability was also formidable, revealing a tangible risk of mission drift in the reduction of the social enterprise’s target population and a breach of the commitment made to the youth with regard to practical training. The risk of mission drifts emerged as a hidden and evasive issue for the stakeholders, who revealed a deep appreciation for the management and the outcomes of the social enterprise. The challenge of integration, therefore, requires an in-depth examination of how to maintain a successful business without hindering the achievement of the social goal. The study concludes that clear conceptualization of the training process and its aims, increased cooks’ participation in the social project, and novel conceptions with regard to the evaluation of success could serve to benefit the youth and impede mission drift.

Keywords: evaluation study, management, mission drift, social business

Procedia PDF Downloads 88
6202 A Multi-agent System Framework for Stakeholder Analysis of Local Energy Systems

Authors: Mengqiu Deng, Xiao Peng, Yang Zhao

Abstract:

The development of local energy systems requires the collective involvement of different actors from various levels of society. However, the stakeholder analysis of local energy systems still has been under-developed. This paper proposes an multi-agent system (MAS) framework to facilitate the development of stakeholder analysis of local energy systems. The framework takes into account the most influencing stakeholders, including prosumers/consumers, system operators, energy companies and government bodies. Different stakeholders are modeled based on agent architectures for example the belief-desire-intention (BDI) to better reflect their motivations and interests in participating in local energy systems. The agent models of different stakeholders are then integrated in one model of the whole energy system. An illustrative case study is provided to elaborate how to develop a quantitative agent model for different stakeholders, as well as to demonstrate the practicability of the proposed framework. The findings from the case study indicate that the suggested framework and agent model can serve as analytical instruments for enhancing the government’s policy-making process by offering a systematic view of stakeholder interconnections in local energy systems.

Keywords: multi-agent system, BDI agent, local energy systems, stakeholders

Procedia PDF Downloads 46
6201 Value Analysis Dashboard in Supply Chain Management, Real Case Study from Iran

Authors: Seyedehfatemeh Golrizgashti, Seyedali Dalil

Abstract:

The goal of this paper is proposing a supply chain value dashboard in home appliance manufacturing firms to create more value for all stakeholders via balanced scorecard approach. Balanced scorecard is an effective approach that managers have used to evaluate supply chain performance in many fields but there is a lack of enough attention to all supply chain stakeholders, improving value creation and, defining correlation between value indicators and performance measuring quantitatively. In this research the key stakeholders in home appliance supply chain, value indicators with respect to create more value for stakeholders and the most important metrics to evaluate supply chain value performance based on balanced scorecard approach have been selected via literature review. The most important indicators based on expert’s judgment acquired by in survey focused on creating more value for. Structural equation modelling has been used to disclose relations between value indicators and balanced scorecard metrics. The important result of this research is identifying effective value dashboard to create more value for all stakeholders in the supply chain via balanced scorecard approach and based on an empirical study covering ten home appliance manufacturing firms in Iran. Home appliance manufacturing firms can increase their stakeholder's satisfaction by using this value dashboard.

Keywords: supply chain management, balanced scorecard, value, structural modeling, stakeholders

Procedia PDF Downloads 315
6200 Preventing Violent Extremism through Augmenting Community Resilience and Empowering Community Members in Swat

Authors: Dr. Muhammad Idris Idris, Dr. Said Saeed Saeed

Abstract:

Terrorism is the chronic issue of the hour. It is the disciplined practice of vicious activities like assassinating, slaughtering, mutilating, and frightening of the innocents to attain religious, fiscal, and political goals and to question the authority of the government. Leaders of the world promised to transform the planet by empowering community members and building community resilience (CR) against terrorism. This study concentrates to explore building community resilience against terrorism and empowering community members and implement strategies for strengthening community resilience. For data collection a mixed methods methodology will be used. Means, STD deviation, Pearson correlation, and thematic analysis will be employed to analyze the gathered data. The findings of the study will be interpreted and recommendations will be furnished accordingly. Study results will be disseminated to all concerned through conferences and seminar sessions. It is predicted that after the completion, the project team will be in a robust position to start writing the report that concentrates on strengthening community resilience, which is the crucial goal of this project. The publication will contribute effectively to all stakeholders and society, particularly to the lower rungs of social order. Moreover, it is expected that this project will contribute to future research in the domain of community resilience. This project will also reveal the remarkable potential of archival research on community resilience.

Keywords: Violent Extremism, community Role, community resilience, community empowerment, Leadership role

Procedia PDF Downloads 115
6199 Engineering Graduates' Employability in the Eyes of Stakeholders: Based on the Survey to 6 Universities and 20 Enterprises in China

Authors: Cui Jun

Abstract:

By surveying 536 engineering graduates and 232 employers of 6 research-based universities and 20 enterprises in China, this research aims to reveal the perceptions and expectations of engineering curriculum and graduates’ employability by stakeholders. Variation was seen by university and sometimes by engineering major. Overall, however, the satisfaction with courses that promote employability is not high by graduates, and there is a gap between employers’ satisfaction and their expectation. Importantly, students’ satisfaction degree of the curricula enhancing employability and employers’ satisfaction degree of graduates’ employability are significantly lower than employers’ expectation value. Therefore, engineering curriculum reform must take the stakeholders’ demand into account and integrate employability into curricula. These findings provide the empirical basis for the curriculum reform of the National Excellent Engineers Education Program (NE3P) in China.

Keywords: engineering education, employability of graduates, stakeholders, survey

Procedia PDF Downloads 346
6198 Classification of Construction Projects

Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside

Abstract:

To address construction project requirements and specifications, scholars and practitioners need to establish a taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.

Keywords: project classification, project definition rating index (PDRI), risk, project goals alignment

Procedia PDF Downloads 650
6197 Construction Time - Cost Trade-Off Analysis Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram, G. C. S. Reddy

Abstract:

Time and cost are the two critical objectives of construction project management and are not independent but intricately related. Trade-off between project duration and cost are extensively discussed during project scheduling because of practical relevance. Generally when the project duration is compressed, the project calls for an increase in labor and more productive equipments, which increases the cost. Thus, the construction time-cost optimization is defined as a process to identify suitable construction activities for speeding up to attain the best possible savings in both time and cost. As there is hidden tradeoff relationship between project time and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of compressing the schedule. Different combinations of duration and cost for the activities associated with the project determine the best set in the time-cost optimization. Therefore, the contractors need to select the best combination of time and cost to perform each activity, all of which will ultimately determine the project duration and cost. In this paper, the fuzzy set theory is used to model the uncertainties in the project environment for time-cost trade off analysis.

Keywords: fuzzy sets, uncertainty, qualitative factors, decision making

Procedia PDF Downloads 618
6196 Collaborative Managerial Practices of Heads of Educational Institutions: Principals and Students Perspective

Authors: Nasir Ahmed

Abstract:

The study was designed to explore the managerial practices of secondary school principals in collaboration with different school stakeholder’s i.e. Teachers, students and school councils. The population of the study comprised 41 principals of government secondary schools, 249 Secondary school teachers (SSTs), 3360 students of 10th class and 300 members of the school councils of government secondary schools (both boys and girls) in Wazirabad, Pakistan. 50 percentage principals, 40 percentage SSTs, 3 percentage students and 15% members of the school councils were taken as a sample of the study. Data was collected through different four-questionnaire design on a five point rating scale. The questionnaires for teachers, students, and school councils were developed to see their involvement in school management. The questionnaire for the secondary school principals was designed to find out to see their perceptions about the involvement of these stakeholders in school’s management. The results of the students indicated that, the remaining stakeholders were not cooperating with the school management. It was recommended that all the stakeholders be provided equal opportunities to take an active part in the school management. This may be based on a formal mechanism for the collaborative efforts of all the stakeholders.

Keywords: collaboration, management, school stakeholders, school councils, managerial practices

Procedia PDF Downloads 251
6195 Agile Project Management: A Real Application in a Multi-Project Research and Development Center

Authors: Aysegul Sarac

Abstract:

The aim of this study is to analyze the impacts of integrating agile development principles and practices, in particular to reduce project lead time in a multi-project environment. We analyze Arçelik Washing Machine R&D Center in which multiple projects are conducted by shared resources. In the first part of the study, we illustrate the current waterfall model system by using a value stream map. We define all activities starting from the first idea of the project to the customer and measure process time and lead time of projects. In the second part of the study we estimate potential improvements and select a set of these improvements to integrate agile principles. We aim to develop a future state map and analyze the impacts of integrating lean principles on project lead time. The main contribution of this study is that we analyze and integrate agile product development principles in a real multi-project system.

Keywords: agile project management, multi project system, project lead time, product development

Procedia PDF Downloads 275
6194 Hybrid Project Management Model Based on Lean and Agile Approach

Authors: Fatima-Zahra Eddoug, Jamal Benhra, Rajaa Benabbou

Abstract:

Several project management models exist in the literature and the most used ones are the hybrids for their multiple advantages. Our objective in this paper is to analyze the existing models, which are based on the Lean and Agile approaches and to propose a novel framework with the convenient tools that will allow efficient management of a general project. To create the desired framework, we were based essentially on 7 existing models. Only the Scrum tool among the agile tools was identified by several authors to be appropriate for project management. In contrast, multiple lean tools were proposed in different phases of the project.

Keywords: agility, hybrid project management, lean, scrum

Procedia PDF Downloads 106
6193 Sustainability Index for REDD-Plus Implementation in Central Kalimantan, Indonesia

Authors: Febrina Natalia, Noriyuki Tanaka, Mitsuru Osaki

Abstract:

Sustainability Index for REDD-plus implementation was constructed to evaluate the sustainability of different communities in 5 villages (Taruna Jaya, Tumbang Nusa, Marang, Terantang, and Seragam Jaya) in Central Kalimantan, Indonesia based on the main objectives of REDD-plus project (reducing emission from deforestation and forest degradation, increasing carbon stock, preserving biodiversity and sustaining forest management). This index was separately composed of 3 different components; (1) ecology, (2) economy, and (3) society. The index of sustainability was determined into four categories; 3,3-4,0 (excellent), 2,5-3,2 (good), 1,8-2,4 (fair), and 1,0-1,7 (poor). Overall, this technique aims to assist all stakeholders and local government in particular in providing information of villages’ sustainability index before implementing REDD-plus project that the assistance and benefits given to villages will be beneficial, effective and efficient.

Keywords: central kalimantan, Indonesia, REDD-plus, sustainability index

Procedia PDF Downloads 414
6192 Analysis of Minimizing Investment Risks in Power and Energy Business Development by Combining Total Quality Management and International Financing Institutions Project Management Tools

Authors: M. Radunovic

Abstract:

Region of Southeastern Europe has a substantial energy resource potential and is witnessing an increasing rate of power and energy project investments. This comes as a result of countries harmonizing their legal framework and market regulations to conform the ones of European Union, enabling direct private investments. Funding in the power and energy market in this region originates from various resources and investment entities, including commercial and institutional ones. Risk anticipation and assessment is crucial to project success, especially given the long exploitation period of project in power and energy domain, as well as the wide range of stakeholders involved. This paper analyzes the possibility of combined application of tools used in total quality management and international financing institutions for project planning, execution and evaluation, with the goal of anticipating, assessing and minimizing the risks that might occur in the development and execution phase of a power and energy project in the market of southeastern Europe. History of successful project management and investments both in the industry and institutional sector provides sufficient experience, guidance and internationally adopted tools to provide proper project assessment for investments in power and energy. Business environment of southeastern Europe provides immense potential for developing power and engineering projects of various magnitudes, depending on stakeholders’ interest. Diversification on investment sources provides assurance that there is interest and commitment to invest in this market. Global economic and political developments will be intensifying the pace of investments in the upcoming period. The proposed approach accounts for key parameters that contribute to the sustainability and profitability of a project which include technological, educational, social and economic gaps between the southeastern European region and western Europe, market trends in equipment design and production on a global level, environment friendly approach to renewable energy sources as well as conventional power generation systems, and finally the effect of the One Belt One Road Initiative led by People’s Republic of China to the power and energy market of this region in the upcoming period on a long term scale. Analysis will outline the key benefits of the approach as well as the accompanying constraints. Parallel to this it will provide an overview of dominant threats and opportunities in present and future business environment and their influence to the proposed application. Through concrete examples, full potential of this approach will be presented along with necessary improvements that need to be implemented. Number of power and engineering projects being developed in southeastern Europe will be increasing in the upcoming period. Proper risk analysis will lead to minimizing project failures. The proposed successful combination of reliable project planning tools from different investment areas can prove to be beneficial in the future power and engineering investments, and guarantee their sustainability and profitability.

Keywords: capital investments, lean six sigma, logical framework approach, logical framework matrix, one belt one road initiative, project management tools, quality function deployment, Southeastern Europe, total quality management

Procedia PDF Downloads 91
6191 Empirical Study for the Project and the Project Management Dimensions Comparison between SMEs and Large Companies

Authors: Amina Oukennou, Zitouni Beidouri, Otmane Bouksour

Abstract:

Small to Medium-sized enterprises are a very important component of the economy. They are present in the whole industries all over the world. They are considered as the engine for future growth in the economy. Project management is an economical international factor impacting all types of enterprises including the SMEs. This paper has the aim of measuring the weight of using projects and project management in Moroccan SMEs in comparison with the large companies. The study is based on interviews with experts: project managers, managers, directors, and consultants. They were asked questions measuring the weight of using projects, the level of using project management, and the resources employed. Eighteen Moroccan companies from a range of industries and sizes were consulted. All the companies consider projects as a key element in their strategy. Most of them affirm the great usefulness of the approach 'project', especially for the external activities. The main differences lie in the duration and the size of used projects. Despite the commonly shared idea about the importance of the project management, the interviewed persons believe that the project management knowledge has the same importance or less than the technical knowledge. All the companies affirm the need for a simpler version of project management. The content varies from one company to another.

Keywords: project dimension, project management, small to medium-sized entreprise, Morocco

Procedia PDF Downloads 283
6190 Project Management Agile Model Based on Project Management Body of Knowledge Guideline

Authors: Mehrzad Abdi Khalife, Iraj Mahdavi

Abstract:

This paper presents the agile model for project management process. For project management process, the Project Management Body of Knowledge (PMBOK) guideline has been selected as platform. Combination of computational science and artificial intelligent methodology has been added to the guideline to transfer the standard to agile project management process. The model is the combination of practical standard, computational science and artificial intelligent. In this model, we present communication model and protocols to keep process agile. Here, we illustrate the collaboration man and machine in project management area with artificial intelligent approach.

Keywords: artificial intelligent, conceptual model, man-machine collaboration, project management, standard

Procedia PDF Downloads 312
6189 Analysis of Delays during Initial Phase of Construction Projects and Mitigation Measures

Authors: Sunaitan Al Mutairi

Abstract:

A perfect start is a key factor for project completion on time. The study examined the effects of delayed mobilization of resources during the initial phases of the project. This paper mainly highlights the identification and categorization of all delays during the initial construction phase and their root cause analysis with corrective/control measures for the Kuwait Oil Company oil and gas projects. A relatively good percentage of the delays identified during the project execution (Contract award to end of defects liability period) attributed to mobilization/preliminary activity delays. Data analysis demonstrated significant increase in average project delay during the last five years compared to the previous period. Contractors had delays/issues during the initial phase, which resulted in slippages and progressively increased, resulting in time and cost overrun. Delays/issues not mitigated on time during the initial phase had very high impact on project completion. Data analysis of the delays for the past five years was carried out using trend chart, scatter plot, process map, box plot, relative importance index and Pareto chart. Construction of any project inside the Gathering Centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. Delay affects completion of projects and compromises quality, schedule and budget of project deliverables. Works executed as per plan during the initial phase and start-up duration of the project construction activities resulted in minor slippages/delays in project completion. In addition, there was a good working environment between client and contractor resulting in better project execution and management. Mainly, the contractor was on the front foot in the execution of projects, which had minimum/no delays during the initial and construction period. Hence, having a perfect start during the initial construction phase shall have a positive influence on the project success. Our research paper studies each type of delay with some real example supported by statistic results and suggests mitigation measures. Detailed analysis carried out with all stakeholders based on impact and occurrence of delays to have a practical and effective outcome to mitigate the delays. The key to improvement is to have proper control measures and periodic evaluation/audit to ensure implementation of the mitigation measures. The focus of this research is to reduce the delays encountered during the initial construction phase of the project life cycle.

Keywords: construction activities delays, delay analysis for construction projects, mobilization delays, oil & gas projects delays

Procedia PDF Downloads 286
6188 Integration of Building Information Modeling Framework for 4D Constructability Review and Clash Detection Management of a Sewage Treatment Plant

Authors: Malla Vijayeta, Y. Vijaya Kumar, N. Ramakrishna Raju, K. Satyanarayana

Abstract:

Global AEC (architecture, engineering, and construction) industry has been coined as one of the most resistive domains in embracing technology. Although this digital era has been inundated with software tools like CAD, STADD, CANDY, Microsoft Project, Primavera etc. the key stakeholders have been working in siloes and processes remain fragmented. Unlike the yesteryears’ simpler project delivery methods, the current projects are of fast-track, complex, risky, multidisciplinary, stakeholder’s influential, statutorily regulative etc. pose extensive bottlenecks in preventing timely completion of projects. At this juncture, a paradigm shift surfaced in construction industry, and Building Information Modeling, aka BIM, has been a panacea to bolster the multidisciplinary teams’ cooperative and collaborative work leading to productive, sustainable and leaner project outcome. Building information modeling has been integrative, stakeholder engaging and centralized approach in providing a common platform of communication. A common misconception that BIM can be used for building/high rise projects in Indian Construction Industry, while this paper discusses of the implementation of BIM processes/methodologies in water and waste water industry. It elucidates about BIM 4D planning and constructability reviews of a Sewage Treatment Plant in India. Conventional construction planning and logistics management involves a blend of experience coupled with imagination. Even though the excerpts or judgments or lessons learnt gained from veterans might be predictive and helpful, but the uncertainty factor persists. This paper shall delve about the case study of real time implementation of BIM 4D planning protocols for one of the Sewage Treatment Plant of Dravyavati River Rejuvenation Project in India and develops a Time Liner to identify logistics planning and clash detection. With this BIM processes, we shall find that there will be significant reduction of duplication of tasks and reworks. Also another benefit achieved will be better visualization and workarounds during conception stage and enables for early involvement of the stakeholders in the Project Life cycle of Sewage Treatment Plant construction. Moreover, we have also taken an opinion poll of the benefits accrued utilizing BIM processes versus traditional paper based communication like 2D and 3D CAD tools. Thus this paper concludes with BIM framework for Sewage Treatment Plant construction which will achieve optimal construction co-ordination advantages like 4D construction sequencing, interference checking, clash detection checking and resolutions by primary engagement of all key stakeholders thereby identifying potential risks and subsequent creation of risk response strategies. However, certain hiccups like hesitancy in adoption of BIM technology by naïve users and availability of proficient BIM trainers in India poses a phenomenal impediment. Hence the nurture of BIM processes from conception, construction and till commissioning, operation and maintenance along with deconstruction of a project’s life cycle is highly essential for Indian Construction Industry in this digital era.

Keywords: integrated BIM workflow, 4D planning with BIM, building information modeling, clash detection and visualization, constructability reviews, project life cycle

Procedia PDF Downloads 92
6187 Sustainable Tourism a Challenge to Competitivity: OBSERVE Project

Authors: Rui Lança, Elisa Silva, Fátima Farinha, Miguel José Oliveira, Manuel Duarte Pinheiro, Cátia Miguel

Abstract:

Tourism has a great potential to bring up progress across the Sustainable Development Goals (SDGs). If well managed and monitored, the tourism sector can create quality jobs, reduce poorness and offer incentives for environmental preservation, helping on the transition towards more inclusive and resilient economies. However, without proper safeguards and investments, expansion of the tourism market will increase pressure on biodiversity and the ecosystems on which the livelihoods of local communities depend. Competitivity is a key dimension in tourism, sustainable tourism challenge new dimensions to competitivity, namely environmental, social, institutional and economic achieve a medium and long-term competitivity. It is undoubtedly clear on the tourism sector, the importance of the region sustainability in the current touristic destinations offer. The basis of a tourism region prosperity will depend on /of it. The OBSERVE project intends to be an instrument for monitoring and evaluating the sustainability levels of the Algarve region. Its main objective is to provide environmental, economic, social-cultural and institutional indicators to support the decision-making process for a sustainable growth of the region. The project´s main goal is a digital portal with the most relevant indicators to allow evaluating and communicating the performance of the region in a sustainable growth perspective. This paper presents the OBSERVE project and highlights the potential contribution to a broad perspective of competitivity and its contribution for different stakeholders and the touristic value chain. Limitations and opportunities are also discussed.

Keywords: sustainable tourism, competitivity, OBSERVE project, Algarve region

Procedia PDF Downloads 115
6186 Four-dimensional (4D) Decoding Information Presented in Reports of Project Progress in Developing Countries

Authors: Vahid Khadjeh Anvary, Hamideh Karimi Yazdi

Abstract:

Generally, the tool of comparison between performance of each stage in the life of a project, is the number of project progress during that period, which in most cases is only determined as one-dimensional with referring to one of three factors (physical, time, and financial). In many projects in developing countries there are controversies on accuracy and the way of analyzing progress report of projects that hinders getting definitive and engineering conclusions on the status of project.Identifying weakness points of this kind of one-dimensional look on project and determining a reliable and engineering approach for multi-dimensional decoding information receivable from project is of great importance in project management.This can be a tool to help identification of hidden diseases of project before appearing irreversible symptoms that are usually delays or increased costs of execution. The method used in this paper is defining and evaluating a hypothetical project as an example analyzing different scenarios and numerical comparison of them along with related graphs and tables. Finally, by analyzing different possible scenarios in the project, possibility or impossibility of predicting their occurrence is examine through the evidence.

Keywords: physical progress, time progress, financial progress, delays, critical path

Procedia PDF Downloads 346
6185 Collaboration with Governmental Stakeholders in Positioning Reputation on Value

Authors: Zeynep Genel

Abstract:

The concept of reputation in corporate development comes to the fore as one of the most frequently discussed topics in recent years. Many organizations, which make worldwide investments, make effort in order to adapt themselves to the topics within the scope of this concept and to promote the name of the organization through the values that might become prominent. The stakeholder groups are considered as the most important actors determining the reputation. Even, the effect of stakeholders is not evaluated as a direct factor; it is signed as indirect effects of their perception are a very strong on ultimate reputation. It is foreseen that the parallelism between the projected reputation and the perceived c reputation, which is established as a result of communication experiences perceived by the stakeholders, has an important effect on achieving these objectives. In assessing the efficiency of these efforts, the opinions of stakeholders are widely utilized. In other words, the projected reputation, in which the positive and/or negative reflections of corporate communication play effective role, is measured through how the stakeholders perceptively position the organization. From this perspective, it is thought that the interaction and cooperation of corporate communication professionals with different stakeholder groups during the reputation positioning efforts play significant role in achieving the targeted reputation or in sustainability of this value. The governmental stakeholders having intense communication with mass stakeholder groups are within the most effective stakeholder groups of organization. The most important reason of this is that the organizations, regarding which the governmental stakeholders have positive perception, inspire more confidence to the mass stakeholders. At this point, the organizations carrying out joint projects with governmental stakeholders in parallel with sustainable communication approach come to the fore as the organizations having strong reputation, whereas the reputation of organizations, which fall behind in this regard or which cannot establish the efficiency from this aspect, is thought to be perceived as weak. Similarly, the social responsibility campaigns, in which the governmental stakeholders are involved and which play efficient role in strengthening the reputation, are thought to draw more attention. From this perspective, the role and effect of governmental stakeholders on the reputation positioning is discussed in this study. In parallel with this objective, it is aimed to reveal perspectives of seven governmental stakeholders towards the cooperation in reputation positioning. The sample group representing the governmental stakeholders is examined under the lights of results obtained from in-depth interviews with the executives of different ministries. It is asserted that this study, which aims to express the importance of stakeholder participation in corporate reputation positioning especially in Turkey and the effective role of governmental stakeholders in strong reputation, might provide a new perspective on measuring the corporate reputation, as well as establishing an important source to contribute to the studies in both academic and practical domains.

Keywords: collaborative communications, reputation management, stakeholder engagement, ultimate reputation

Procedia PDF Downloads 196
6184 The Relevance of Intellectual Capital: An Analysis of Spanish Universities

Authors: Yolanda Ramirez, Angel Tejada, Agustin Baidez

Abstract:

In recent years, the intellectual capital reporting in higher education institutions has been acquiring progressive importance worldwide. Intellectual capital approaches becomes critical at universities, mainly due to the fact that knowledge is the main output as well as input in these institutions. Universities produce knowledge, either through scientific and technical research (the results of investigation, publications, etc.) or through teaching (students trained and productive relationships with their stakeholders). The purpose of the present paper is to identify the intangible elements about which university stakeholders demand most information. The results of a study done at Spanish universities are used to see which groups of universities have stakeholders who are more proactive to the disclosure of intellectual capital.

Keywords: intellectual capital, universities, Spain, cluster analysis

Procedia PDF Downloads 478
6183 Rapid Strategic Consensus Building in Land Readjustment in Kabul

Authors: Nangialai Yousufzai, Eysosiyas Etana, Ikuo Sugiyama

Abstract:

Kabul population has been growing continually since 2001 and reaching six million in 2025 due to the rapid inflow from the neighboring countries. As a result of the population growth, lack of living facilities supported by infrastructure services is becoming serious in social and economic aspects. However, about 70% of the city is still occupied illegally and the government has little information on the infrastructure demands. To improve this situation, land readjustment is one of the powerful development tools, because land readjustment does not need a high governmental budget of itself. Instead, the method needs cooperation between stakeholders such as landowners, developers and a local government. So it is becoming crucial for both government and citizens to implement land readjustment for providing tidy urban areas with enough public services to realize more livable city as a whole. On the contrary, the traditional land readjustment tends to spend a long time until now to get consensus on the new plan between stakeholders. One of the reasons is that individual land area (land parcel) is decreased due to the contribution to public such as roads/parks/squares for improving the urban environment. The second reason is that the new plan is difficult for dwellers to imagine new life after the readjustment. Because the paper-based plan is made by an authority not for dwellers but for specialists to precede the project. This paper aims to shorten the time to realize quick consensus between stakeholders. The first improvement is utilizing questionnaire(s) to assess the demand and preference of the landowners. The second one is utilizing 3D model for dwellers to visualize the new environment easily after the readjustment. In additions, the 3D model is reflecting the demand and preference of the resident so that they could select a land parcel according to their sense value of life. The above-mentioned two improvements are carried out after evaluating total land prices of the new plans to select for maximizing the project value. The land price forecasting formula is derived from the current market ones in Kabul. Finally, it is stressed that the rapid consensus-building of land readjustment utilizing ICT and open data analysis is essential to redevelop slums and illegal occupied areas in Kabul.

Keywords: land readjustment, consensus building, land price formula, 3D simulation

Procedia PDF Downloads 307
6182 The Successful in Construction Project via Effectiveness of Project Team

Authors: Zarabizan Zakaria, Hayati Zainal

Abstract:

The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.

Keywords: project team, leadership, construction project, project successful

Procedia PDF Downloads 146
6181 Minimizing Vehicular Traffic via Integrated Land Use Development: A Heuristic Optimization Approach

Authors: Babu Veeregowda, Rongfang Liu

Abstract:

The current traffic impact assessment methodology and environmental quality review process for approval of land development project are conventional, stagnant, and one-dimensional. The environmental review policy and procedure lacks in providing the direction to regulate or seek alternative land uses and sizes that exploits the existing or surrounding elements of built environment (‘4 D’s’ of development – Density, Diversity, Design, and Distance to Transit) or smart growth principles which influence the travel behavior and have a significant effect in reducing vehicular traffic. Additionally, environmental review policy does not give directions on how to incorporate urban planning into the development in ways such as incorporating non-motorized roadway elements such as sidewalks, bus shelters, and access to community facilities. This research developed a methodology to optimize the mix of land uses and sizes using the heuristic optimization process to minimize the auto dependency development and to meet the interests of key stakeholders. A case study of Willets Point Mixed Use Development in Queens, New York, was used to assess the benefits of the methodology. The approved Willets Point Mixed Use project was based on maximum envelop of size and land use type allowed by current conventional urban renewal plans. This paper will also evaluate the parking accumulation for various land uses to explore the potential for shared parking to further optimize the mix of land uses and sizes. This research is very timely and useful to many stakeholders interested in understanding the benefits of integrated land uses and its development.

Keywords: traffic impact, mixed use, optimization, trip generation

Procedia PDF Downloads 187
6180 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 233
6179 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 394
6178 Need for a National Newborn Screening Programme in India: Pilot Study Data

Authors: Sudheer Moorkoth, Leslie Edward Lewis, Pragna Rao

Abstract:

Newborn screening (NBS) is a part of routine newborn care in many countries worldwide to detect early any rare treatable conditions and inborn errors of metabolism (IEM). India has not started this program yet. In an attempt to understand the challenges in implementing a national newborn screening program in India, we initiated a pilot newborn screening project funded by the Government of Canada. Along with initiating the newborn screening at Kasturba Hospital, Manipal in South India, for screening six disorders (Congenital Hypothyroidism(CH), Congenital Adrenal Hyperplasia (CAH), Galactosemia, Biotinidase deficiency, Glucose-6-Phosphate Dehydrogenase deficiency (G-6PD) and Phenylketonurea), we also studied the awareness of various stakeholders on the newborn screening. In a period of nine months from August 2017 to March 2018 we could screen 1915 newborns (999 male and 916 female). The result showed that there were seven babies screened positive. This interim result points to an incidence rate of 1 in 270 children for these rare disorders collectively. This includes three confirmed cases of CH, two cases of G-6PD deficiency, and one case each for Galctosemia and CAH. A questionnaire based study to understand the awareness among various stakeholders revealed that there is little awareness among parents, adolescents and anganwadi workers (public health worker). The interim data points to the need for a national newborn screening programme in India. There is also an immediate need to undertake large-scale awareness programme to create knowledge on NBS among the various stakeholders.

Keywords: awareness, inborn errors of metabolism (IEM), newborn screening, rare disease

Procedia PDF Downloads 215
6177 Spanish University Governance Reporting

Authors: Agustin Baidez, Yolanda Ramirez

Abstract:

There is currently a growing interest in the improvement of university governance and the disclosure of information on governance processes as an essential part of the transparency and accountability of universities. This paper aims to examine the extent and quality of voluntary corporate governance disclosure by public Spanish universities on their websites in relation to information need of stakeholders. The results of this study show that Spanish university stakeholders attach great importance to the disclosure of specific information on aspects of corporate governance. However, the quality of disclosed information on university governance in public Spanish universities websites is in the middle level. In order to satisfy the information needs of university stakeholders, Spanish universities can be recommended to focus on reporting higher quality information on university autonomy in financing, autonomy in management, autonomy regarding student selection and assessment, degree of consanguinity of executive directors, report on assigned public funding based on results, and management reports.

Keywords: university, governance, transparency, stakeholders

Procedia PDF Downloads 19
6176 Initiating the Provision of Adolescent Reproductive Health Information and Services (ARHIS) to Communities in Quezon City, Beginning with District 2

Authors: Erickson Bernardo, Caridad Pineda

Abstract:

The project Adolescent Reproductive Health Information and Services (ARHIS) is a nine-month pilot project which intends to bridge the existing gap between reproductive health information and services, particularly with regard to family planning and HIV, among adolescent boys and girls aged 10-19 years in the 2nd Congressional District of Quezon City, in the Philippines. It aims to increase adolescents' and young people's awareness about their reproductive health concerns and at the same time make a wide range of reproductive health (RH) services accessible and available to them. A number of methodologies were utilized in the implementation of the project. At the onset, a baseline survey was conducted by community mobilizers to gather a situational analysis of adolescents' and young people's issues and concerns. The results of this survey were then presented in a multi-stakeholders' meeting to gather community support and foster their involvement. Further, interactive learning sessions (ILS) on a variety of reproductive health topics, among young people, parents and community leaders based on the results of the baseline survey was conducted. With regard to reproductive health service provision, both facility-based delivery and conduct of outreach activities were employed. In the span of nine months, the project was able to yield the following results: • A total of 521 adolescents and youth (AY) were reached by ILS on puberty, responsible relationships, teenage pregnancy, family planning, as well as HIV & AIDS. • A total of 218 parents and community leaders were informed of AY RH-related issues and concerns. • More than 350 AYs availed of a wide range of FP services including pills – both combined oral and progestin-only, and progestin-only injectables and implants. • More than 380 AYs availed of condoms as means of STI and HIV prevention. A noble initiative of the project is the utilization of a "condom distributor", a youth leader who has been educated about STI and HIV prevention as well as correct condom use, as the focal point for condom access in the community. • A total of 25 young people, parents, and community leaders were identified as ARHIS champions who have been instrumental in the achievement of project deliverables through their dedication and commitment to support the project. The concept of adolescent sexual and reproductive health (ASRH) remains to be a major challenge in the Philippine context. This is due to the fact that majority of Filipinos are still not keen on discussing issues and concerns related to ASRH, albeit the alarming number of teenage pregnancies and the rapid increase of HIV cases among 15- 24 year olds. In addition, Republic Act 10354 or the Responsible Parenthood and Reproductive Health Act of 2012, requires minor adolescents to present a written parental consent prior to accessing RH services. However, with the involvement and support of parents and key community stakeholders, these barriers may be addressed. The project has demonstrated how adolescents and young people yearn for reproductive health information and services.

Keywords: adolescent sexual reproductive health, barriers to access, reproductive health information and services, teenage pregnancies

Procedia PDF Downloads 149
6175 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 129
6174 An Investigation on Opportunities and Obstacles on Implementation of Building Information Modelling for Pre-fabrication in Small and Medium Sized Construction Companies in Germany: A Practical Approach

Authors: Nijanthan Mohan, Rolf Gross, Fabian Theis

Abstract:

The conventional method used in the construction industries often resulted in significant rework since most of the decisions were taken onsite under the pressure of project deadlines and also due to the improper information flow, which results in ineffective coordination. However, today’s architecture, engineering, and construction (AEC) stakeholders demand faster and accurate deliverables, efficient buildings, and smart processes, which turns out to be a tall order. Hence, the building information modelling (BIM) concept was developed as a solution to fulfill the above-mentioned necessities. Even though BIM is successfully implemented in most of the world, it is still in the early stages in Germany, since the stakeholders are sceptical of its reliability and efficiency. Due to the huge capital requirement, the small and medium-sized construction companies are still reluctant to implement BIM workflow in their projects. The purpose of this paper is to analyse the opportunities and obstacles to implementing BIM for prefabrication. Among all other advantages of BIM, pre-fabrication is chosen for this paper because it plays a vital role in creating an impact on time as well as cost factors of a construction project. The positive impact of prefabrication can be explicitly observed by the project stakeholders and participants, which enables the breakthrough of the skepticism factor among the small scale construction companies. The analysis consists of the development of a process workflow for implementing prefabrication in building construction, followed by a practical approach, which was executed with two case studies. The first case study represents on-site prefabrication, and the second was done for off-site prefabrication. It was planned in such a way that the first case study gives a first-hand experience for the workers at the site on the BIM model so that they can make much use of the created BIM model, which is a better representation compared to the traditional 2D plan. The main aim of the first case study is to create a belief in the implementation of BIM models, which was succeeded by the execution of offshore prefabrication in the second case study. Based on the case studies, the cost and time analysis was made, and it is inferred that the implementation of BIM for prefabrication can reduce construction time, ensures minimal or no wastes, better accuracy, less problem-solving at the construction site. It is also observed that this process requires more planning time, better communication, and coordination between different disciplines such as mechanical, electrical, plumbing, architecture, etc., which was the major obstacle for successful implementation. This paper was carried out in the perspective of small and medium-sized mechanical contracting companies for the private building sector in Germany.

Keywords: building information modelling, construction wastes, pre-fabrication, small and medium sized company

Procedia PDF Downloads 83