Search results for: shoreline management plans
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 9856

Search results for: shoreline management plans

9826 The Role of Management Information Systems in the Strategic Management of Institutions of Higher Education

Authors: Szilvia Vincze, Zoltán Bács

Abstract:

It has become increasingly important for institutions of higher education as well to use available resources as effectively as possible for the implementation of the institution’s strategic plans and, at the same time, to ensure a stable future. This is the responsibility of the management and administration of the institution. Having access to complete and comprehensive information is indispensable for making dynamic and well-founded decisions that consider the realization of objectives to be primary and that manage possibly emerging risks, etc. The present paper introduces the role of Management Information Systems (MIS) at the University of Debrecen, one of the largest institutions of higher education in Hungary, and also discusses the utilization of this and associated information systems in management functions.

Keywords: management information system (MIS), higher education, Hungary, strategy formulation

Procedia PDF Downloads 471
9825 Reliability Qualification Test Plan Derivation Method for Weibull Distributed Products

Authors: Ping Jiang, Yunyan Xing, Dian Zhang, Bo Guo

Abstract:

The reliability qualification test (RQT) is widely used in product development to qualify whether the product meets predetermined reliability requirements, which are mainly described in terms of reliability indices, for example, MTBF (Mean Time Between Failures). It is widely exercised in product development. In engineering practices, RQT plans are mandatorily referred to standards, such as MIL-STD-781 or GJB899A-2009. But these conventional RQT plans in standards are not preferred, as the test plans often require long test times or have high risks for both producer and consumer due to the fact that the methods in the standards only use the test data of the product itself. And the standards usually assume that the product is exponentially distributed, which is not suitable for a complex product other than electronics. So it is desirable to develop an RQT plan derivation method that safely shortens test time while keeping the two risks under control. To meet this end, for the product whose lifetime follows Weibull distribution, an RQT plan derivation method is developed. The merit of the method is that expert judgment is taken into account. This is implemented by applying the Bayesian method, which translates the expert judgment into prior information on product reliability. Then producer’s risk and the consumer’s risk are calculated accordingly. The procedures to derive RQT plans are also proposed in this paper. As extra information and expert judgment are added to the derivation, the derived test plans have the potential to shorten the required test time and have satisfactory low risks for both producer and consumer, compared with conventional test plans. A case study is provided to prove that when using expert judgment in deriving product test plans, the proposed method is capable of finding ideal test plans that not only reduce the two risks but also shorten the required test time as well.

Keywords: expert judgment, reliability qualification test, test plan derivation, producer’s risk, consumer’s risk

Procedia PDF Downloads 93
9824 “Friction Surfaces” of Airport Emergency Plan

Authors: Jakub Kraus, Vladimír Plos, Peter Vittek

Abstract:

This article focuses on the issue of airport emergency plans, which are documents describing reactions to events with impact on aviation safety or aviation security. The article specifically focuses on the use and creation of emergency plans, where could be found a number of disagreements between different stakeholders, for which the airport emergency plan applies. Those are the friction surfaces of interfaces, which is necessary to identify and ensure them smooth process to avoid dangerous situations or delay.

Keywords: airport emergency plan, aviation safety, aviation security, comprehensive management system, friction surfaces of airport emergency plan, interfaces of processes

Procedia PDF Downloads 489
9823 Dynamic Conformal Arc versus Intensity Modulated Radiotherapy for Image Guided Stereotactic Radiotherapy of Cranial Lesion

Authors: Chor Yi Ng, Christine Kong, Loretta Teo, Stephen Yau, FC Cheung, TL Poon, Francis Lee

Abstract:

Purpose: Dynamic conformal arc (DCA) and intensity modulated radiotherapy (IMRT) are two treatment techniques commonly used for stereotactic radiosurgery/radiotherapy of cranial lesions. IMRT plans usually give better dose conformity while DCA plans have better dose fall off. Rapid dose fall off is preferred for radiotherapy of cranial lesions, but dose conformity is also important. For certain lesions, DCA plans have good conformity, while for some lesions, the conformity is just unacceptable with DCA plans, and IMRT has to be used. The choice between the two may not be apparent until each plan is prepared and dose indices compared. We described a deviation index (DI) which is a measurement of the deviation of the target shape from a sphere, and test its functionality to choose between the two techniques. Method and Materials: From May 2015 to May 2017, our institute has performed stereotactic radiotherapy for 105 patients treating a total of 115 lesions (64 DCA plans and 51 IMRT plans). Patients were treated with the Varian Clinac iX with HDMLC. Brainlab Exactrac system was used for patient setup. Treatment planning was done with Brainlab iPlan RT Dose (Version 4.5.4). DCA plans were found to give better dose fall off in terms of R50% (R50% (DCA) = 4.75 Vs R50% (IMRT) = 5.242) while IMRT plans have better conformity in terms of treatment volume ratio (TVR) (TVR(DCA) = 1.273 Vs TVR(IMRT) = 1.222). Deviation Index (DI) is proposed to better facilitate the choice between the two techniques. DI is the ratio of the volume of a 1 mm shell of the PTV and the volume of a 1 mm shell of a sphere of identical volume. DI will be close to 1 for a near spherical PTV while a large DI will imply a more irregular PTV. To study the functionality of DI, 23 cases were chosen with PTV volume ranged from 1.149 cc to 29.83 cc, and DI ranged from 1.059 to 3.202. For each case, we did a nine field IMRT plan with one pass optimization and a five arc DCA plan. Then the TVR and R50% of each case were compared and correlated with the DI. Results: For the 23 cases, TVRs and R50% of the DCA and IMRT plans were examined. The conformity for IMRT plans are better than DCA plans, with majority of the TVR(DCA)/TVR(IMRT) ratios > 1, values ranging from 0.877 to1.538. While the dose fall off is better for DCA plans, with majority of the R50%(DCA)/ R50%(IMRT) ratios < 1. Their correlations with DI were also studied. A strong positive correlation was found between the ratio of TVRs and DI (correlation coefficient = 0.839), while the correlation between the ratio of R50%s and DI was insignificant (correlation coefficient = -0.190). Conclusion: The results suggest DI can be used as a guide for choosing the planning technique. For DI greater than a certain value, we can expect the conformity for DCA plans to become unacceptably great, and IMRT will be the technique of choice.

Keywords: cranial lesions, dynamic conformal arc, IMRT, image guided radiotherapy, stereotactic radiotherapy

Procedia PDF Downloads 210
9822 Soil and Environmental Management Awareness as Professional Competency of the Agricultural Extension Officers for Their Plans Implementation

Authors: Muhammad Zafarullah Khan

Abstract:

Agricultural Extension Officers’ (AEOs) competency level in soil and environmental management awareness is important for interacting with farming communities of different types of soil. Questionnaire was developed for all AEOs for data collection to know the present position and needed position of competency on Likert scale from 01-05 by assigning very low (01) and very high (05). Wide gap was found in competency of suitability of various soil types for horticultural and agronomic crops and reclamation of saline soil. We observed that suitability ranking of various soil types for horticultural crops (Diff. = 1.21), agronomic crops (Diff. = 1.20) and soil borne diseases (Diff. = 1.19) were the top three important competencies where training or improvement is needed. To better fill this gap we recommend that professional qualification of AEOs should be enhanced and training opportunities should be provided to them particularly to deal with soil and environmental management awareness. Thus training opportunities may increase their competency and will add highly skilled manpower to the system for sustainable development to protect environment. It is therefore, recommended that AEOs may be provided pre and in service trainings of soil environmental management in order to equip them with a capacity to work with farming community effectively to boost the living standard of farming community and alleviate poverty for environmental protection.

Keywords: professional competency, agricultural extension officers, soil and environmental management awareness, plans implementation

Procedia PDF Downloads 363
9821 The Project Management for Quality Services in Special Education Schools

Authors: Aysegul Salikutluk, Zehra Altinay, Gokmen Dagli, Fahriye Altinay

Abstract:

The aim of the study is to reveal the performance of special education schools as regards the service quality and management within the school culture. The project management and school climate are the fundamental elements for the quality in organisations. Having strategic plans, activities and funded projects improve service quality and satisfaction for the families who have children with disabilities. The research has qualitative nature, self-reports were used to examine the perceptions of teachers upon project management and school climate for service quality. The results show that special education schools' teachers are aware of essence of school climate and flow of communication for service quality and project management.

Keywords: disability, education, service quality, project management

Procedia PDF Downloads 230
9820 Integrated Coastal Management for the Sustainable Development of Coastal Cities: The Case of El-Mina, Tripoli, Lebanon

Authors: G. Ghamrawi, Y. Abunnasr, M. Fawaz, S. Yazigi

Abstract:

Coastal cities are constantly exposed to environmental degradation and economic regression fueled by rapid and uncontrolled urban growth as well as continuous resource depletion. This is the case of the City of Mina in Tripoli (Lebanon), where lack of awareness to preserve social, ecological, and historical assets, coupled with the increasing development pressures, are threatening the socioeconomic status of the city residents, the quality of life and accessibility to the coast. To address these challenges, a holistic coastal urban design and planning approach was developed to analyze the environmental, political, legal, and socioeconomic context of the city. This approach aims to investigate the potential of balancing urban development with the protection and enhancement of cultural, ecological, and environmental assets under an integrated coastal zone management approach (ICZM). The analysis of Mina's different sectors adopted several tools that include direct field observation, interviews with stakeholders, analysis of available data, historical maps, and previously proposed projects. The findings from the analysis were mapped and graphically represented, allowing the recognition of character zones that become the design intervention units. Consequently, the thesis proposes an urban, city-scale intervention that identifies 6 different character zones (the historical fishing port, Abdul Wahab island, the abandoned Port Said, Hammam el Makloub, the sand beach, and the new developable area) and proposes context-specific design interventions that capitalize on the main characteristics of each zone. Moreover, the intervention builds on the institutional framework of ICZM as well as other studies previously conducted for the coast and adopts nature-based solutions with hybrid systems for providing better environmental design solutions for developing the coast. This enables the realization of an all-inclusive, well-connected shoreline with easy and free access towards the sea; a developed shoreline with an active local economy, and an improved urban environment.

Keywords: blue green infrastructure, coastal cities, hybrid solutions, integrated coastal zone management, sustainable development, urban planning

Procedia PDF Downloads 122
9819 Municipal Asset Management Planning 2.0 – A New Framework For Policy And Program Design In Ontario

Authors: Scott R. Butler

Abstract:

Ontario, Canada’s largest province, is in the midst of an interesting experiment in mandated asset management planning for local governments. At the beginning of 2021, Ontario’s 444 municipalities were responsible for the management of 302,864 lane kilometers of roads that have a replacement cost of $97.545 billion CDN. Roadways are by far the most complex, expensive, and extensive assets that a municipality is responsible for overseeing. Since adopting Ontario Regulation 588/47: Asset Management Planning for Municipal Infrastructure in 2017, the provincial government has established prescriptions for local road authorities regarding asset category and levels of service being provided. This provincial regulation further stipulates that asset data such as extent, condition, and life cycle costing are to be captured in manner compliant with qualitative descriptions and technical metrics. The Ontario Good Roads Association undertook an exercise to aggregate the road-related data contained within the 444 asset management plans that municipalities have filed with the provincial government. This analysis concluded that collectively Ontario municipal roadways have a $34.7 billion CDN in deferred maintenance. The ill-state of repair of Ontario municipal roads has lasting implications for province’s economic competitiveness and has garnered considerable political attention. Municipal efforts to address the maintenance backlog are stymied by the extremely limited fiscal parameters municipalities must operate within in Ontario. Further exacerbating the program are provincially designed programs that are ineffective, administratively burdensome, and not necessarily aligned with local priorities or strategies. This paper addresses how municipal asset management plans – and more specifically, the data contained in these plans – can be used to design innovative policy frameworks, flexible funding programs, and new levels of service that respond to these funding challenges, as well as emerging issues such as local economic development and climate change. To fully unlock the potential that Ontario Regulation 588/17 has imposed will require a resolute commitment to data standardization and horizontal collaboration between municipalities within regions.

Keywords: transportation, municipal asset management, subnational policy design, subnational funding program design

Procedia PDF Downloads 66
9818 Short-Term Operation Planning for Energy Management of Exhibition Hall

Authors: Yooncheol Lee, Jeongmin Kim, Kwang Ryel Ryu

Abstract:

This paper deals with the establishment of a short-term operational plan for an air conditioner for efficient energy management of exhibition hall. The short-term operational plan is composed of a time series of operational schedules, which we have searched using genetic algorithms. Establishing operational schedule should be considered the future trends of the variables affecting the exhibition hall environment. To reflect continuously changing factors such as external temperature and occupant, short-term operational plans should be updated in real time. But it takes too much time to evaluate a short-term operational plan using EnergyPlus, a building emulation tool. For that reason, it is difficult to update the operational plan in real time. To evaluate the short-term operational plan, we designed prediction models based on machine learning with fast evaluation speed. This model, which was created by learning the past operational data, is accurate and fast. The collection of operational data and the verification of operational plans were made using EnergyPlus. Experimental results show that the proposed method can save energy compared to the reactive control method.

Keywords: exhibition hall, energy management, predictive model, simulation-based optimization

Procedia PDF Downloads 308
9817 Education Quality Development for Excellence Performance with Higher Education by Using COBIT 5

Authors: Kemkanit Sanyanunthana

Abstract:

The purpose of this research is to study the management system of information technology which supports the education of five private universities in Thailand, according to the case studies which have been developing their qualities and standards of management and education by service provision of information technology to support the excellence performance. The concept to connect information technology with a suitable system has been created by information technology administrators for development, as a system that can be used throughout the organizations to help reach the utmost benefits of using all resources. Hence, the researcher as a person who has been performing these duties within higher education is interested to do this research by selecting the Control Objective for Information and Related Technology 5 (COBIT 5) for the Malcolm Baldrige National Quality Award (MBNQA) of America, or the National Award which applies the concept of Total Quality Management (TQM) to the organization evaluation. Such evaluation is called the Education Criteria for Performance Excellence (EdPEx) focuses on studying and comparing education quality development for excellent performance using COBIT 5 in terms of information technology to study the problems and obstacles of the investigation process for an information technology system, which is considered as an instrument to drive all organizations to reach the excellence performance of the information technology, and to be the model of evaluation and analysis of the process to be in accordance with the strategic plans of the information technology in the universities. This research is conducted in the form of descriptive and survey research according to the case studies. The data collection were carried out by using questionnaires through the administrators working related to the information technology field, and the research documents related to the change management as the main study. The research can be concluded that the performance based on the APO domain process (ALIGN, PLAN AND ORGANISE) of the COBIT 5 standard frame, which emphasizes concordant governance and management of strategic plans for the organizations, could reach only 95%. This might be because of some restrictions such as organizational cultures; therefore, the researcher has studied and analyzed the management of information technology in universities as a whole, under the organizational structures, to reach the performance in accordance with the overall APO domain which would affect the determined strategic plans to be able to develop based on the excellence performance of information technology, and to apply the risk management system at the organizational level into every performance process which would develop the work effectiveness for the resources management of information technology to reach the utmost benefits. 

Keywords: COBIT5, APO, EdPEx Criteria, MBNQA

Procedia PDF Downloads 298
9816 Effect of Modulation Factors on Tomotherapy Plans and Their Quality Analysis

Authors: Asawari Alok Pawaskar

Abstract:

This study was aimed at investigating quality assurance (QA) done with IBA matrix, the discrepan­cies observed for helical tomotherapy plans. A selection of tomotherapy plans that initially failed the with Matrix process was chosen for this investigation. These plans failed the fluence analysis as assessed using gamma criteria (3%, 3 mm). Each of these plans was modified (keeping the planning constraints the same), beamlets rebatched and reoptimized. By increasing and decreasing the modula­tion factor, the fluence in a circumferential plane as measured with a diode array was assessed. A subset of these plans was investigated using varied pitch values. Factors for each plan that were examined were point doses, fluences, leaf opening times, planned leaf sinograms, and uniformity indices. In order to ensure that the treatment constraints remained the same, the dose-volume histograms (DVHs) of all the modulated plans were compared to the original plan. It was observed that a large increase in the modulation factor did not significantly improve DVH unifor­mity, but reduced the gamma analysis pass rate. This also increased the treatment delivery time by slowing down the gantry rotation speed which then increases the maximum to mean non-zero leaf open time ratio. Increasing and decreasing the pitch value did not substantially change treatment time, but the delivery accuracy was adversely affected. This may be due to many other factors, such as the complexity of the treatment plan and site. Patient sites included in this study were head and neck, breast, abdomen. The impact of leaf tim­ing inaccuracies on plans was greater with higher modulation factors. Point-dose measurements were seen to be less susceptible to changes in pitch and modulation factors. The initial modulation factor used by the optimizer, such that the TPS generated ‘actual’ modulation factor within the range of 1.4 to 2.5, resulted in an improved deliverable plan.

Keywords: dose volume histogram, modulation factor, IBA matrix, tomotherapy

Procedia PDF Downloads 147
9815 Application of Strategic Management Tools

Authors: Abenezer Nigussie

Abstract:

Strategic control practice is a critical exercise, as it provides a sturdy influence towards firms or production partners to achieve the full implementation of effective predetermined plans. The importance of strategic control in a company is often measured by observing the relationship between strategic management and organizational performance. The conventional philosophy of strategic control in academia and the industry places significant emphasis on the ability to plan and execute initiatives. In contrast, the same emphasis on strategic management has received less attention in the housing industry. Although the pressures of project performance can often obscure the wider social, economic, and professional context in which strategic management is undertaken, it is these broad contextual areas that make strategic control a vital issue for construction businesses. Rapidly changing social and technological issues are creating an informed environment that will appear very different in the coming decades from what is experienced in today’s companies. Construction project activity is not adequately led by strategic management tools; projects are mostly executed through simple plans and schedules. The issues that this thesis addresses and solves involve the successful accompaniment of the construction project process through these strategic management tools. The second important aspect is an evaluation of project activity, which is mostly done through simple economic and technical valuation. However, during this research, effective strategic management tools are evaluated and suggested for the assessment of project activities. The research introduces a study of the current strategic management practices of construction companies and also presents the concept of strategic management and the areas that companies need to address to compete in the global market. A summary of an industry survey is documented along with the historical research that prompted the investigation of these topics with a focus on the implementation of tools. Strategic management is a concept that concerns making decisions and taking corrective actions to achieve the future goals and objectives of a company. The objective of this paper is to review the practice of strategic management in construction companies. Questionnaires were distributed to major construction companies listed under categories of each project capable of specifying the complete expression of strategic management tools. Findings of the research showed that the majority of development companies practice strategic management tools in the process and implementation of each tool.

Keywords: strategic management, management, analysis, project management

Procedia PDF Downloads 34
9814 Forecasting Solid Waste Generation in Turkey

Authors: Yeliz Ekinci, Melis Koyuncu

Abstract:

Successful planning of solid waste management systems requires successful prediction of the amount of solid waste generated in an area. Waste management planning can protect the environment and human health, hence it is tremendously important for countries. The lack of information in waste generation can cause many environmental and health problems. Turkey is a country that plans to join European Union, hence, solid waste management is one of the most significant criteria that should be handled in order to be a part of this community. Solid waste management system requires a good forecast of solid waste generation. Thus, this study aims to forecast solid waste generation in Turkey. Artificial Neural Network and Linear Regression models will be used for this aim. Many models will be run and the best one will be selected based on some predetermined performance measures.

Keywords: forecast, solid waste generation, solid waste management, Turkey

Procedia PDF Downloads 471
9813 Finding the Optimal Meeting Point Based on Travel Plans in Road Networks

Authors: Mohammad H. Ahmadi, Vahid Haghighatdoost

Abstract:

Given a set of source locations for a group of friends, and a set of trip plans for each group member as a sequence of Categories-of-Interests (COIs) (e.g., restaurant), and finally a specific COI as a common destination that all group members will gather together, in Meeting Point Based on Trip Plans (MPTPs) queries our goal is to find a Point-of-Interest (POI) from different COIs, such that the aggregate travel distance for the group is minimized. In this work, we considered two cases for aggregate function as Sum and Max. For solving this query, we propose an efficient pruning technique for shrinking the search space. Our approach contains three steps. In the first step, it prunes the search space around the source locations. In the second step, it prunes the search space around the centroid of source locations. Finally, we compute the intersection of all pruned areas as the final refined search space. We prove that the POIs beyond the refined area cannot be part of optimal answer set. The paper also covers an extensive performance study of the proposed technique.

Keywords: meeting point, trip plans, road networks, spatial databases

Procedia PDF Downloads 158
9812 Availability of TB Infection Control Plans at Rural Hospitals of South Africa

Authors: Takalani Tshitangano

Abstract:

Background: In Limpopo province the rate of new tuberculosis (TB) cases increase daily. The Infection Control (IC) plan is one of the essential actions for TB IC. This study aimed to establish the availability of these plans at health care facilities. Objectives: The objectives were to explore and describe the awareness and knowledge of health care workers (HCWs) of the availability and content of TB IC plan; and to identity the role of infection control committees from the perspective of HCWs. Method: A qualitative approach using a cross-sectional descriptive design was adopted. The target population was all HCWs from the seven hospitals of Vhembe district. A purposive sampling approach was used to select 57 participants. The approval to conduct this study was obtained from the relevant authorities and participants. Data were collected through seven focus group discussions comprising five to 10 members. An unstructured discussion guide was used to collect data, and an open-coding method was used to analyse the data. Lincoln and Guba’s criteria ensured trustworthiness of the study findings. Results: Findings revealed that HCWs were not aware of the availability and the information contained in the TB IC plans. No person was designated as TB IC officer at hospital level. There was lack of a TB IC Committee and teams as well as ineffective utilisation of those that did exist. Conclusions: It was concluded that if the TB IC plans are not available at health care facilities, then the TB IC practices implemented by HCWs vary, resulting in TB nosocomial infection transmission. It was recommended that the World Health Organisation’s TB IC plans be adopted and implemented in Vhembe district.

Keywords: health care workers' awareness, health care workers' knowledge, availability of TB infection control plans, rural hospitals

Procedia PDF Downloads 192
9811 Tide Contribution in the Flood Event of Jeddah City: Mathematical Modelling and Different Field Measurements of the Groundwater Rise

Authors: Aïssa Rezzoug

Abstract:

This paper is aimed to bring new elements that demonstrate the tide caused the groundwater to rise in the shoreline band, on which the urban areas occurs, especially in the western coastal cities of the Kingdom of Saudi Arabia like Jeddah. The reason for the last events of Jeddah inundation was the groundwater rise in the city coupled at the same time to a strong precipitation event. This paper will illustrate the tide participation in increasing the groundwater level significantly. It shows that the reason for internal groundwater recharge within the urban area is not only the excess of the water supply coming from surrounding areas, due to the human activity, with lack of sufficient and efficient sewage system, but also due to tide effect. The research study follows a quantitative method to assess groundwater level rise risks through many in-situ measurements and mathematical modelling. The proposed approach highlights groundwater level, in the urban areas of the city on the shoreline band, reaching the high tide level without considering any input from precipitation. Despite the small tide in the Red Sea compared to other oceanic coasts, the groundwater level is considerably enhanced by the tide from the seaside and by the freshwater table from the landside of the city. In these conditions, the groundwater level becomes high in the city and prevents the soil to evacuate quickly enough the surface flow caused by the storm event, as it was observed in the last historical flood catastrophe of Jeddah in 2009.

Keywords: flood, groundwater rise, Jeddah, tide

Procedia PDF Downloads 85
9810 Analysis of the Contribution of Coastal and Marine Physical Factors to Oil Slick Movement: Case Study of Misrata, Libya

Authors: Abduladim Maitieg, Mark Johnson

Abstract:

Developing a coastal oil spill management plan for the Misratah coast is the motivating factor for building a database for coastal and marine systems and energy resources. Wind direction and speed, currents, bathymetry, coastal topography and offshore dynamics influence oil spill deposition in coastal water. Therefore, oceanographic and climatological data can be used to understand oil slick movement and potential oil deposits on shoreline area and the behaviour of oil spill trajectories on the sea surface. The purpose of this study is to investigate the effects of the coastal and marine physical factors under strong wave conditions and various bathymetric and coastal topography gradients in the western coastal area of Libya on the movement of oil slicks. The movement of oil slicks was computed using a GNOME simulation model based on current and wind speed/direction. The results in this paper show that (1) Oil slick might reach the Misratah shoreline area in two days in the summer and winter. Seasons. (2 ) The North coast of Misratah is the potential oil deposit area on the Misratah coast. (3) Tarball pollution was observed along the North coast of Misratah. (4) Two scenarios for the summer and the winter season were run, along the western coast of Libya . (5) The eastern coast is at a lower potential risk due to the influence of wind and current energy in the Gulf of Sidra. (6) The Misratah coastline is more vulnerable to oil spill movement in the summer than in winter seasons. (7) Oil slick takes from 2 to 5 days to reach the saltmarsh in the eastern Misratah coast. (8) Oil slick moves 300 km in 30 days from the spill resource location near the Libyan western border to the Misratah coast.(9) Bathymetric features have a profound effect on oil spill movement. (9)Oil dispersion simulations using GNOME are carried out taking into account high-resolution wind and current data.

Keywords: oil spill movement, coastal and marine physical factors, coast area, Libyan

Procedia PDF Downloads 199
9809 Effects of the Macro-Scale Investments/Projects to Planning System in Izmir

Authors: Neslihan Karatas, Sibel Ecemis Kilic

Abstract:

This paper aims to examine macro-scale plans and projects/investments which have been prepared for İzmir since The Republican Period. Macro projects that were proposed by central government, local government, industry and urban actors such as the chamber of commerce will be discussed and these projects and its reflections to the city's macro scale planning decisions will be evaluated based on existing development. Effects of macro plans, the related private and public investments, the developments of unplanned/specific projects to the current city form will be discussed. The factors and plans which determine urban form and the problems caused by unanticipated/uncontrolled developments will be evaluated. The proposals will be developed about more efficient planning process.

Keywords: Izmir, macro projects, macro investments, planning

Procedia PDF Downloads 565
9808 Identifying Mitigation Plans in Reducing Usability Risk Using Delphi Method

Authors: Jayaletchumi T. Sambantha Moorthy, Suhaimi bin Ibrahim, Mohd Naz’ri Mahrin

Abstract:

Most quality models have defined usability as a significant factor that leads to improving product acceptability, increasing user satisfaction, improving product reliability, and also financially benefiting companies. Usability is also the best factor that acts as a balance for both the technical and human aspects of a software product, which is an important aspect in defining quality during software development process. A usability risk can be defined as a potential usability risk factor that a chosen action or activity may lead to a possible loss or an undesirable outcome. This could impact the usability of a software product thereby contributing to negative user experiences and causing a possible software product failure. Hence, it is important to mitigate and reduce usability risks in the software development process itself. By managing possible involved usability risks in software development process, failure of software product could be reduced. Therefore, this research uses the Delphi method to identify mitigation plans to reduce potential usability risks. The Delphi method is conducted with seven experts from the field of risk management and software development.

Keywords: usability, usability risk, risk management, risk mitigation, delphi study

Procedia PDF Downloads 437
9807 Reliability-Based Maintenance Management Methodology to Minimise Life Cycle Cost of Water Supply Networks

Authors: Mojtaba Mahmoodian, Joshua Phelan, Mehdi Shahparvari

Abstract:

With a large percentage of countries’ total infrastructure expenditure attributed to water network maintenance, it is essential to optimise maintenance strategies to rehabilitate or replace underground pipes before failure occurs. The aim of this paper is to provide water utility managers with a maintenance management approach for underground water pipes, subject to external loading and material corrosion, to give the lowest life cycle cost over a predetermined time period. This reliability-based maintenance management methodology details the optimal years for intervention, the ideal number of maintenance activities to perform before replacement and specifies feasible renewal options and intervention prioritisation to minimise the life cycle cost. The study was then extended to include feasible renewal methods by determining the structural condition index and potential for soil loss, then obtaining the failure impact rating to assist in prioritising pipe replacement. A case study on optimisation of maintenance plans for the Melbourne water pipe network is considered in this paper to evaluate the practicality of the proposed methodology. The results confirm that the suggested methodology can provide water utility managers with a reliable systematic approach to determining optimum maintenance plans for pipe networks.

Keywords: water pipe networks, maintenance management, reliability analysis, optimum maintenance plan

Procedia PDF Downloads 122
9806 Artificial Intelligence Aided Improvement in Canada's Supply Chain Management

Authors: Mohammad Talebi

Abstract:

Supply chain administration could be a concern for all the countries within the world, whereas there's no special approach towards supportability. Generally, for one decade, manufactured insights applications in keen supply chains have found a key part. In this paper, applications of artificial intelligence in supply chain management have been clarified, and towards Canadian plans for smart supply chain management (SCM), a few notes have been suggested. A hierarchical framework for smart SCM might provide a great roadmap for decision-makers to find the most appropriate approach toward smart SCM. Within the system of decision-making, all the levels included in the accomplishment of smart SCM are included. In any case, more considerations are got to be paid to available and needed infrastructures.

Keywords: smart SCM, AI, SSCM, procurement

Procedia PDF Downloads 64
9805 Sector-Wide Collaboration to Reduce Food Waste

Authors: Carolyn Cameron

Abstract:

Stop Food Waste Australia is working with the industry to co-design sector action plans to prevent and reduce food waste across the supply chain. We are a public-private partnership, funded in 2021 by the Australian national government under the 2017 National Food Waste Strategy. Our partnership has representatives from all levels of government, industry associations from farm to fork, and food rescue groups. Like many countries, Australia has adopted the Sustainable Development Goal (SDG) target of 12.3 to halve food waste by 2030. A seminal 2021 study, the National Food Waste Feasibility Report, developed a robust national baseline, illustrating hotspots in commodities and across the supply chain. This research found that the consumption stages – households, food service, and institutions - account for over half of all food waste, and 22% of food produced never leaves the farm gate. Importantly the study found it is feasible for Australia to meet SDG 12.3, but it will require unprecedented action by governments, industry, and the community. Sector Action Plans (Plan) are one of the four main initiatives of Stop Food Waste Australia, including a voluntary commitment, a coordinated food waste communications hub, and robust monitoring and reporting framework. These plans provide a systems-based approach to reducing food loss and waste while realising multiple benefits for supply chain partners and other collaborators. Each plan is being co-designed with the key stakeholders most able to directly control or influence the root cause(s) of food waste hotspots and to take action to reduce or eliminate food waste in their value chain.  The initiatives in the Plans are fit-for-purpose, reflecting current knowledge and recognising priorities may refocus over time. To date, sector action plans have been developed with the Food Rescue, Cold Chain, Bread and Bakery, and Dairy Sectors. Work is currently underway on Meat and Horticulture, and we are also developing supply-chain stage plans for food services and institutions. The study will provide an overview of Australia’s food waste baseline and challenges, the important role of sector action plans in reducing food waste, and case studies of implementation outcomes.

Keywords: co-design, horticulture, sector action plans, voluntary

Procedia PDF Downloads 101
9804 The Flood Disaster Management of Communities in Ubon Ratchathani Province, Thailand

Authors: Eakarat Boonreang, Anothai Harasarn

Abstract:

The objectives of this study are to investigate the flood disaster management capacity of communities in Ubon Ratchathani province, Thailand, and to recommend the sustainable flood management approaches of communities in Ubon Ratchathani province, Thailand. The selected population consisted of the community leaders and committees, the executives of local administrative organizations, and the head of Ubon Ratchathani provincial office of disaster prevention and mitigation. The data was collected by in-depth interview, focus group, and observation. The data was analyzed and classified in order to determine the communities’ capacity in flood disaster management. The results revealed that communities’ capacity were as follows, before flood disaster, the community leaders held a meeting with the community committees in order to plan disaster response and determined evacuation routes, and the villagers moved their belongings to higher places and prepared vehicles for evacuation. During flood disaster, the communities arranged motorboats for transportation and villagers evacuated to a temporary evacuation center. Moreover, the communities asked for survival bags, motorboats, emergency toilets, and drinking water from the local administrative organizations and the 22nd Military Circle. After flood disaster, the villagers cleaned and fixed their houses and also collaborated in cleaning the temple, school, and other places in the community. The recommendation approaches for sustainable flood disaster management consisted of structural measures, such as the establishment of reservoirs and building higher houses, and non-structural measures such as raising awareness and fostering self-reliance, establishing disaster management plans, rehearsal of disaster response procedures every year, and transferring disaster knowledge among younger generations. Moreover, local administrative organizations should formulate strategic plans that focus on disaster management capacity building at the community level, particularly regarding non-structural measures. Ubon Ratchathani provincial offices of disaster prevention and mitigation should continually monitor and evaluate the outcomes of community based disaster risk management program, including allocating more flood disaster management-related resources among local administrative organizations and communities.

Keywords: capacity building, community based disaster risk management, flood disaster management, Thailand

Procedia PDF Downloads 143
9803 Risk Assessment for International Investment: A Standardized Approach to Identify Risk, Risk Appetite, Risk Rating, Risk Treatment and Mitigation Plans

Authors: Pui Yong Leo, Normy Maziah Mohd Said

Abstract:

Change of global economy landscape and business environment has led to companies’ decision to go global and enter international markets. As the companies go beyond the comfort zone (i.e. investing in the home country), it is important to ensure a comprehensive risk assessment is carried out. This paper describes a standardized approach for international investment, ensuring identification of risk, risk appetite, risk rating, risk treatment and mitigation plans for respective international investment proposal. The standardized approach is divided into three (3) stages as follows: Stage 1 – Preliminary Risk profiling; with the objective to gauge exposure to countries and high level risk factors as first level assessment. Stage 2 – Risk Parameters; with the objective to define risk appetite for the international investment from the perspective of likelihood and impact. Stage 3 – Detailed Risk Assessments; with the objectives to assess in detail any triggered elements from Stage 1, and project specific risks. The final output will include the mitigation plans for the identified risks for the total investment. Example will be given in this paper to show how comprehensive risk assessment is carried out for an international investment in power energy sector.

Keywords: international investment, mitigation plans, risk appetite, risk assessment

Procedia PDF Downloads 346
9802 Dosimetric Comparison of Conventional Optimization Methods with Inverse Planning Simulated Annealing Technique

Authors: Shraddha Srivastava, N. K. Painuly, S. P. Mishra, Navin Singh, Muhsin Punchankandy, Kirti Srivastava, M. L. B. Bhatt

Abstract:

Various optimization methods used in interstitial brachytherapy are based on dwell positions and dwell weights alteration to produce dose distribution based on the implant geometry. Since these optimization schemes are not anatomy based, they could lead to deviations from the desired plan. This study was henceforth carried out to compare anatomy-based Inverse Planning Simulated Annealing (IPSA) optimization technique with graphical and geometrical optimization methods in interstitial high dose rate brachytherapy planning of cervical carcinoma. Six patients with 12 CT data sets of MUPIT implants in HDR brachytherapy of cervical cancer were prospectively studied. HR-CTV and organs at risk (OARs) were contoured in Oncentra treatment planning system (TPS) using GYN GEC-ESTRO guidelines on cervical carcinoma. Three sets of plans were generated for each fraction using IPSA, graphical optimization (GrOPT) and geometrical optimization (GOPT) methods. All patients were treated to a dose of 20 Gy in 2 fractions. The main objective was to cover at least 95% of HR-CTV with 100% of the prescribed dose (V100 ≥ 95% of HR-CTV). IPSA, GrOPT, and GOPT based plans were compared in terms of target coverage, OAR doses, homogeneity index (HI) and conformity index (COIN) using dose-volume histogram (DVH). Target volume coverage (mean V100) was found to be 93.980.87%, 91.341.02% and 85.052.84% for IPSA, GrOPT and GOPT plans respectively. Mean D90 (minimum dose received by 90% of HR-CTV) values for IPSA, GrOPT and GOPT plans were 10.19 ± 1.07 Gy, 10.17 ± 0.12 Gy and 7.99 ± 1.0 Gy respectively, while D100 (minimum dose received by 100% volume of HR-CTV) for IPSA, GrOPT and GOPT plans was 6.55 ± 0.85 Gy, 6.55 ± 0.65 Gy, 4.73 ± 0.14 Gy respectively. IPSA plans resulted in lower doses to the bladder (D₂

Keywords: cervical cancer, HDR brachytherapy, IPSA, MUPIT

Procedia PDF Downloads 156
9801 Identifying the Structural Components of Old Buildings from Floor Plans

Authors: Shi-Yu Xu

Abstract:

The top three risk factors that have contributed to building collapses during past earthquake events in Taiwan are: "irregular floor plans or elevations," "insufficient columns in single-bay buildings," and the "weak-story problem." Fortunately, these unsound structural characteristics can be directly identified from the floor plans. However, due to the vast number of old buildings, conducting manual inspections to identify these compromised structural features in all existing structures would be time-consuming and prone to human errors. This study aims to develop an algorithm that utilizes artificial intelligence techniques to automatically pinpoint the structural components within a building's floor plans. The obtained spatial information will be utilized to construct a digital structural model of the building. This information, particularly regarding the distribution of columns in the floor plan, can then be used to conduct preliminary seismic assessments of the building. The study employs various image processing and pattern recognition techniques to enhance detection efficiency and accuracy. The study enables a large-scale evaluation of structural vulnerability for numerous old buildings, providing ample time to arrange for structural retrofitting in those buildings that are at risk of significant damage or collapse during earthquakes.

Keywords: structural vulnerability detection, object recognition, seismic capacity assessment, old buildings, artificial intelligence

Procedia PDF Downloads 51
9800 Forest Polices and Management in Nigeria: Are Households Willing to Pay for Forest Management?

Authors: A. O. Arowolo, M. U. Agbonlahor, P. A. Okuneye, A. E. Obayelu

Abstract:

Nigeria is rich with abundant resources with an immense contribution of the forest resource to her economic development and to the livelihood of the rural populace over the years. However, this important resource has continued to shrink because it is not sustainably used, managed or conserved. The loss of forest cover has far reaching consequences on regional, national and global economy as well as the environment. This paper reviewed the Nigeria forest management policies, the challenges and willingness to pay (WTP) for management of the community forests in Ogun State, Nigeria. Data for the empirical investigation were obtained using a cross-section survey of 160 rural households by multistage sampling technique. The WTP was assessed by the Dichotomous Choice Contingent Valuation. One major findings is that, the Nigerian forest reserves is established in order to conserve and manage forest resources but has since been neglected while the management plans are either non-existent or abandoned. Also, the free areas termed the community forests where people have unrestricted access to exploit are fast diminishing in both contents and scale. The mean WTP for sustainable management of community forests in the study area was positive with a value of ₦389.04/month. The study recommends policy measures aimed at participatory forest management plan which will include the rural communities in the management of community forests. This will help ensure sustainable management of forest resources as well as improve the welfare of the rural households.

Keywords: forests, management, WTP, Nigeria

Procedia PDF Downloads 357
9799 Adoption of Noise and Vibration Management Tools for Major Infrastructure Projects in Sydney, Australia

Authors: Adrian Morris, Rodney Phillips, Mattia Tabacchi

Abstract:

Minimizing construction noise and vibration impacts is a key challenge for major infrastructure projects in urban environments. Before commencing construction works, Construction Noise and Vibration Management Plan (CNVMP) and Construction Noise and Vibration Impact Statements (CNVIS) are required to be prepared and submitted to the relevant government authorities for review and approval. However, the assessment of potential impacts from work activities at pre-approval stage may be inaccurate as works methodology and scheduling are yet to be determined. In response, noise and vibration management tools have been developed to refine and supplement the CNVIS as works progress. These tools have been successfully implemented in major infrastructure projects allowing contractors to plan and assess construction works in a cost effective and timely manner. As a result, noise and vibration management tools have been incorporated into management plans and are increasingly required by regulators.

Keywords: noise management, environmental noise, infrastructure projects, construction, vibration, cost effective

Procedia PDF Downloads 97
9798 Development of Management Model for Promoting Sustainable Tourism of Rajabhat Universities in Thailand

Authors: Weera Weerasophon

Abstract:

This research paper is to study the development of a management model for promoting sustainable tourism of Rajabhat universities in Thailand. Mixed Method Research is applied under the said topic. The researcher has developed a management model to promote sustainable tourism. The objectives of the research are 1) to study the readiness in management sustainable tourism of Rajabhat universities in Thailand 2) to develop a management model for promoting sustainable tourism of those universities. The process of this research is organized in two steps according to the objectives. The results of the research are as in the following: 1. Rajabhat universities have the readiness in management for promoting sustainable tourism. The universities can be developed to be sustainable tourist attraction under the admistrators who have vision and realize the importance of tourism, eager to promote sustainable tourism of the universities by specifying obvious policy plans and management. 2. The management model for promoting sustainable tourism of Rajabhat universities is consisted of the main following factors : 2.1 Master plan and policy, 2.2 Rajabhat universities organization management and personnel administration, 2.3 Assignment and authority, leadership, 2.4 Join network, 2.5 Assurance of quality and controlling, 2.6 Budget management, 2.7 Human Resources management, 2.8 Alliance and co-ordination, 2.9 Tool of marketing. There are also other communal factors for promoting sustainable tourism. They are: local communities, local communities, tourism activities, government and private sectors, communicative technology system, history, tourist attractive, art and culture, internal and external environment including local wisdom heritage. The management model for promoting sustainable tourism can be concluded from these main and communal factors mentioned above.

Keywords: tourism, sustainable tourism, management, Rajabhat University

Procedia PDF Downloads 383
9797 Usage of Military Continuity Management System for Supporting of Emergency Management

Authors: Radmila Hajkova, Jiri Palecek, Hana Malachova, Alena Oulehlova

Abstract:

Ensuring of continuity of business is the basic strategy of every company. Continuity of organization activities includes comprehensive procedures that help in solving unexpected situations of natural and anthropogenic character (for example flood, blaze, economic situations). Planning of continuity operations is a process that helps identify critical processes and implement plans for the security and recovery of key processes. The aim of this article demonstrates application of system approach to managing business continuity called business continuity management systems in military issues. This article describes the life cycle of business continuity management which is based on the established cycle PDCA (plan-do-check-act). After this is carried out by activities which are making by the University of Defence during activation of forces and means of the Integrated rescue system in case of emergencies - accidents at a nuclear power plant in Czech republic. Activities of various stages of deployment earmarked forces and resources are managed and evaluated by using MCMS application (military continuity management system).

Keywords: business continuity management system, emergency management, military, nuclear safety

Procedia PDF Downloads 429