9140 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 374
9139 Effect of Building Construction Sizes on Project Delivery Methods in Nigeria

Authors: Nuruddeen Usman, Mohammad Sani

Abstract:

The performance of project delivery methods has been an issue of concern to various stakeholders in the construction industry. The contracting system of project delivery is the traditional system used in the delivery of most public projects in Nigeria. The direct labor system is used most times as an alternative to the traditional system. There were so many complain about the performance of contracting system and the suitability of direct labor as an alternative to the delivery of public projects. Therefore, this paper is aimed at investigating the effect of project size on the project delivery methods in the completed public buildings. Questionnaires were self-administered to managerial staff in the study area and analyzed using descriptive statistics. The findings reveals that contracting system was choosing for large size building construction project delivery with higher frequency (F) of 40 (76.9%) against direct labor with 12 (23.1%). While the small size project, the result revealed a frequency (F) of 26 (50%) for contracting system and direct labor system respectively. Base on the research findings, the contracting system, was recommended for all sizes of building construction project delivery while direct labor system can only use as an alternative for small size building construction projects delivery.

Keywords: construction size, contracting system, direct labour, effect

Procedia PDF Downloads 433
9138 Political Views and Information and Communication Technology (ICT) in Tertiary Institutions in Achieving the Millennium Development Goals (MDGS)

Authors: Perpetual Nwakaego Ibe

Abstract:

The Millennium Development Goals (MDGs), were an integrated project formed to eradicate many unnatural situations the citizens of the third world country may found themselves in. The MDGs, to be a sustainable project for the future depends 100% on the actions of governments, multilateral institutions and civil society. This paper first looks at the political views on the MDGs and relates it to the current electoral situations around the country by underlining the drastic changes over the few months. The second part of the paper presents ICT in tertiary institutions as one of the solutions in terms of the success of the MDGs. ICT is vital in all phases of educational process and development of the cloud connectivity is an added advantage of Information and Communication Technology (ICT) for sharing a common data bank for research purposes among UNICEF, RED CROSS, NPS, INEC, NMIC, and WHO. Finally, the paper concludes with areas that needs twigging and recommendations for the tertiary institutions committed to delivering an ambitious set of goals. A combination of observation, and document materials for data gathering was employed as the methodology for carrying out this research.

Keywords: MDG, ICT, data bank, database

Procedia PDF Downloads 178
9137 The Impact of the Business Process Reengineering on the Practices of the Human Resources Management in the Franco Tunisian Company-Network

Authors: Nesrine Bougarech, Habib Affes

Abstract:

This research lays the emphasis on the business process reengineering (BPR) which consists in radically altering the organizational processes through the optimal use of information technology (IT) to attain major enhancements in terms of quality, performance and productivity. A survey of the business process reengineering (BPR) was carried out in three French groups and their subsidiaries in Tunisia. The data collected were qualitatively analyzed in an attempt to test the main indicators of the success of a business process reengineering project (BPR) and to compare the importance of these indicators in the context of France versus Tunisia. The study corroborates that the respect of the inherent principles of the business process reengineering (BPR) and the diversity of the human resources involved in the project can lead to better productivity, higher quality of the goods or services and lower cost. Additionally, our results mirror the extent to which the respect of the principles and the diversity of resources are more important in the French companies than in their Tunisian subsidiaries.

Keywords: business process reengineering (BPR), human resources management (HRM), information technology (IT), management

Procedia PDF Downloads 384
9136 Critical Activity Effect on Project Duration in Precedence Diagram Method

Authors: Salman Ali Nisar, Koshi Suzuki

Abstract:

Precedence Diagram Method (PDM) with its additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activities provides more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in PDM network will have anomalous effect on critical path. Researchers have proposed some classification of critical activity effects. In this paper, we do further study on classifications of critical activity effect and provide more information in detailed. Furthermore, we determine the maximum amount of time for each class of critical activity effect by which the project managers can control the dynamic feature (shortening/lengthening) of critical activities and project duration more efficiently.

Keywords: construction project management, critical path method, project scheduling, precedence diagram method

Procedia PDF Downloads 484
9135 Cable De-Commissioning of Legacy Accelerators at CERN

Authors: Adya H. Uluwita, Fernando B. D. S. Pedrosa, Georgi M. Georgiev, Raoul Masterson

Abstract:

CERN is an international organisation funded by 23 countries which provides the particle physics community with excellence in particle accelerators and other related facilities. Founded in 1954, CERN has a wide range of accelerators that allow groundbreaking science to be conducted. Accelerators bring particles to high levels of energy and make them collide with each other or with fixed targets, creating specific conditions that are of high interest to physicists. A chain of accelerators is used to ramp up the energy of particles and eventually inject them into the largest and most recent one of them: the Large Hadron Collider (LHC). Among this chain of machines is, for instance, the Proton Synchrotron, which was started in 1959 and is still in operation. These machines, called "injectors”, keep evolving over time, as well as the related infrastructure. Massive decommissioning of obsolete cables started in 2015 at CERN in the frame of the so-called "injectors de-cabling project phase 1". Its goal was to replace aging cables and remove unused ones, freeing space for new cables necessary for upgrades and consolidation campaigns. To proceed with the de-cabling, a project coordination team was assembled. The start of this project phase led to the investigation of legacy cables throughout the organisation. The identification of cables stacked during half a century proved to be arduous. Phase 1 of the injectors de-cabling was implemented for three years with success after overcoming some difficulties. Phase 2, which started 3 years later, focused on improving safety and structure with the introduction of a quality assurance procedure. This paper discusses the implementation of this quality assurance procedure throughout phase 2 of the project and the transition between the two phases. Over hundreds of kilometres of cable were removed in the injectors complex at CERN from 2015 to 2023.

Keywords: CERN, de-cabling, injectors, quality assurance procedure

Procedia PDF Downloads 34
9134 Sub-Optimum Safety Performance of a Construction Project: A Multilevel Exploration

Authors: Tas Yong Koh, Steve Rowlinson, Yuzhong Shen

Abstract:

In construction safety management, safety climate has long been linked to workers' safety behaviors and performance. For this reason, safety climate concept and tools have been used as heuristics to diagnose a range of safety-related issues by some progressive contractors in Hong Kong and elsewhere. However, as a diagnostic tool, safety climate tends to treat the different components of the climate construct in a linear fashion. Safety management in construction projects, in reality, is a multi-faceted and multilevel phenomenon that resembles a complex system. Hence, understanding safety management in construction projects requires not only the understanding of safety climate but also the organizational-systemic nature of the phenomenon. Our involvement, diagnoses, and interpretations of a range of safety climate-related issues which culminated in the project’s sub-optimum safety performance in an infrastructure construction project have brought about such revelation. In this study, a range of data types had been collected from various hierarchies of the project site organization. These include the frontline workers and supervisors from the main and sub-contractors, and the client supervisory personnel. Data collection was performed through the administration of safety climate questionnaire, interviews, observation, and document study. The findings collectively indicate that what had emerged in parallel of the seemingly linear climate-based exploration is the exposition of the organization-systemic nature of the phenomenon. The results indicate the negative impacts of climate perceptions mismatch, insufficient work planning, and risk management, mixed safety leadership, workforce negative attributes, lapsed safety enforcement and resources shortages collectively give rise to the project sub-optimum safety performance. From the dynamic causation and multilevel perspective, the analyses show that the individual, group, and organizational levels issues are interrelated and these interrelationships are linked to negative safety climate. Hence the adoption of both perspectives has enabled a fuller understanding of the phenomenon of safety management that point to the need for an organizational-systemic intervention strategy. The core message points to the fact that intervention at an individual level will only meet with limited success if the risks embedded in the higher levels in group and project organization are not addressed. The findings can be used to guide the effective development of safety infrastructure by linking different levels of systems in a construction project organization.

Keywords: construction safety management, dynamic causation, multilevel analysis, safety climate

Procedia PDF Downloads 152
9133 Development of Verification System of Workspace Clashes Between Construction Activities

Authors: Hyeon-Seung Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

Recently, the use of Building Information Modeling (BIM) in public construction works has become mandatory in some countries and it is anticipated that BIM will be applied to the actual field of civil engineering projects. However, the BIM system is still focused on the architectural project and the design phase. Because the civil engineering project is linear type project and is focused on the construction phase comparing with architectural project, 3D simulation is difficult to visualize them. This study suggests a method and a prototype system to solve workspace conflictions among construction activities using BIM simulation tool.

Keywords: BIM, workspace, confliction, visualization

Procedia PDF Downloads 378
9132 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: project marketing, risk management, tendering, project management, turn-key projects

Procedia PDF Downloads 304
9131 Spectrum of Causative Pathogens and Resistance Rates to Antibacterial Agents in Bacterial Prostatitis

Authors: kamran Bhatti

Abstract:

Objective: To evaluate spectrum and resistance rates to antibacterial agents in causative pathogens of bacterial prostatitis in patients from Southern Europe, the Middle East, and Africa. Materials: 1027 isolates from cultures of urine or expressed prostatic secretion, post-massage urine or seminal fluid, or urethral samples were considered. Results: Escherichia coli (32%) and Enterococcus spp. (21%) were the most common isolates. Other Gram-negative, Gram-positive, and atypical pathogens accounted for 22%, 20%, and 5%, respectively. Resistance was <15% for piperacillin/tazobactam and carbapenems (both Gram-negative and -positive pathogens); <5% for glycopeptides against Gram-positive; 7%, 14%, and 20% for aminoglycosides, fosfomycin, and macrolides against Gram-negative pathogens, respectively; 10% for amoxicillin/clavulanate against Gram-positive pathogens; <20% for cephalosporins and fluoroquinolones against to Gram-negative pathogens (higher against Gram-positive pathogens); none for macrolides against atypical pathogens, but 20% and 27% for fluoroquinolones and tetracyclines. In West Africa, the resistance rates were generally higher, although the highest rates for ampicillin, cephalosporins, and fluoroquinolones were observed in the Gulf area. Lower rates were observed in Southeastern Europe. Conclusions: Resistance to antibiotics is a health problem requiring local health authorities to combat this phenomenon. Knowledge of the spectrum of pathogens and antibiotic resistance rates is crucial to assess local guidelines for the treatment of prostatitis.

Keywords: enterobacteriacae; escherichia coli, gram-positive pathogens, antibiotic, bacterial prostatitis, resistance

Procedia PDF Downloads 40
9130 Radical Technological Innovation - Comparison of a Critical Success Factors Framework with Existing Literature

Authors: Florian Wohlfeil, Orestis Terzidis, Louisa Hellmann

Abstract:

Radical technological innovations enable companies to reach strong market positions and are thus desirable. On the other hand, the innovation process is related to significant costs and risks. Hence, the knowledge of the factors that influence success is crucial for technology driven companies. In a previous study, we have developed a conceptual framework of 25 Critical Success Factors for radical technological innovations and mapped them to four main categories: Technology, Organization, Market, and Process. We refer to it as the Technology-Organization-Market-Process (TOMP) framework. Taking the TOMP framework as a reference model, we conducted a structured and focused literature review of eleven standard books on the topic of radical technological innovation. With this approach, we aim to evaluate, expand, and clarify the set of Critical Success Factors detailed in the TOMP framework. Overall, the set of factors and their allocation to the main categories of the TOMP framework could be confirmed. However, the factor organizational home is not emphasized and discussed in most of the reviewed literature. On the other hand, an additional factor that has not been part of the TOMP framework is described to be important – strategy fit. Furthermore, the factors strategic alliances and platform strategy appear in the literature but in a different context compared to the reference model.

Keywords: Critical Success Factors, radical technological innovation, TOMP framework, innovation process

Procedia PDF Downloads 633
9129 Foreign Exchange Volatilities and Stock Prices: Evidence from London Stock Exchange

Authors: Mahdi Karazmodeh, Pooyan Jafari

Abstract:

One of the most interesting topics in finance is the relation between stock prices and exchange rates. During the past decades different stock markets in different countries have been the subject of study for researches. The volatilities of exchange rates and its effect on stock prices during the past 10 years have continued to be an attractive research topic. The subject of this study is one of the most important indices, FTSE 100. 20 firms with the highest market capitalization in 5 different industries are chosen. Firms are included in oil and gas, mining, pharmaceuticals, banking and food related industries. 5 different criteria have been introduced to evaluate the relationship between stock markets and exchange rates. Return of market portfolio, returns on broad index of Sterling are also introduced. The results state that not all firms are sensitive to changes in exchange rates. Furthermore, a Granger Causality test has been run to observe the route of changes between stock prices and foreign exchange rates. The results are consistent, to some level, with the previous studies. However, since the number of firms is not large, it is suggested that a larger number of firms being used to achieve the best results. However results showed that not all firms are affected by foreign exchange rates changes. After testing Granger Causality, this study found out that in some industries (oil and gas, pharmaceuticals), changes in foreign exchange rate will not cause any changes in stock prices (or vice versa), however, in banking sector the situation was different. This industry showed more reaction to these changes. The results are similar to the ones with Richards and Noel, where a variety of firms in different industries were evaluated.

Keywords: stock prices, foreign exchange rate, exchange rate exposure, Granger Causality

Procedia PDF Downloads 423
9128 Engaging Mature Learners through Video Case Studies

Authors: Jacqueline Mary Jepson

Abstract:

This article provides a case study centred on the development of 13 video episodes which have been created to enhance student engagement with a post graduate online course in Project Management. The student group was unique as their online course needed to provide for asynchronistic learning and an adult learning pedagogy. In addition, students had come from a wide range professional backgrounds, with some having no Project Management experience, while others had 20 years or more. Students had to gain an understanding of an advanced body of knowledge and the course needed to achieve the academic requirements to qualify individuals to apply their learning in a range of contexts for professional practice and scholarship. To achieve this, a 13 episode case study was developed along with supportive learning materials based on the relocation of a zoo. This unique project provided a learning environment where the project could evolve over each video episode demonstrating the application of Project Management methodology which was then tied into the learning outcomes for the course and the assessment tasks. Discussion forums provided a way for students to converse and demonstrate their own understanding of content and how Project Management methodology can be applied.

Keywords: project management, adult learning, video case study, asynchronistic education

Procedia PDF Downloads 313
9127 BIM Application and Construction Schedule Simulation for the Horizontal Work Area

Authors: Hyeon-Seong Kim, Sang-Mi Park, Seul-Gi Kim, Seon-Ju Han, Leen-Seok Kang

Abstract:

The use of BIM, including 4D CAD system, in a construction project is gradually increasing. Since the building construction works repeatedly in the vertical space, it is relatively easy to confirm the interference effect when applying the BIM, but the interference effect for the civil engineering project is relatively small because the civil works perform non-repetitive processes in the horizontal space. For this reason, it is desirable to apply BIM to the construction phase when applying BIM to the civil engineering project, and the most active BIM tool applied to the construction phase is the 4D CAD function for the schedule management. This paper proposes the application procedure of BIM by the construction phase of civil engineering project and a linear 4D CAD construction methodology suitable for the civil engineering project in which linear work is performed.

Keywords: BIM, 4D CAD, linear 4D simulation, VR

Procedia PDF Downloads 373
9126 A Student Centered Learning Environment in Engineering Education: Design and a Longitudinal Study of Impact

Authors: Tom O'Mahony

Abstract:

This article considers the design of a student-centered learning environment in engineering education. The learning environment integrates a number of components, including project-based learning, collaborative learning, two-stage assignments, active learning lectures, and a flipped-classroom. Together these elements place the individual learner and their learning at the center of the environment by focusing on understanding, enhancing relevance, applying learning, obtaining rich feedback, making choices, and taking responsibility. The evolution of this environment from 2014 to the present day is outlined. The impact of this environment on learners and their learning is evaluated via student questionnaires that consist of both open and closed-ended questions. The closed questions indicate that students found the learning environment to be really interesting and enjoyable (rated as 4.7 on a 5 point scale) and encouraged students to adopt a deep approach towards studying the course materials (rated as 4.0 on a 5 point scale). A content analysis of the open-ended questions provides evidence that the project, active learning lectures, and flipped classroom all contribute to the success of this environment. Furthermore, this analysis indicates that the two-stage assessment process, in which feedback is provided between a draft and final assignment, is the key component and the dominant theme. A limitation of the study is the small class size (less than 20 learners per year), but, to some degree, this is compensated for by the longitudinal nature of the study.

Keywords: deep approaches, formative assessment, project-based learning, student-centered learning

Procedia PDF Downloads 90
9125 A Case Study to Observe How Students’ Perception of the Possibility of Success Impacts Their Performance in Summative Exams

Authors: Rochelle Elva

Abstract:

Faculty in Higher Education today are faced with the challenge of convincing their students of the importance of learning and mastery of skills. This is because most students often have a single motivation -to get high grades. If it appears that this goal will not be met, they lose their motivation, and their academic efforts wane. This is true even for students in the competitive fields of STEM, including Computer Science majors. As educators, we have to understand our students and leverage what motivates them to achieve our learning outcomes. This paper presents a case study that utilizes cognitive psychology’s Expectancy Value Theory and Motivation Theory to investigate the effect of sustained expectancy for success on students’ learning outcomes. In our case study, we explore how students’ motivation and persistence in their academic efforts are impacted by providing them with an unexpected possible path to success that continues to the end of the semester. The approach was tested in an undergraduate computer science course with n = 56. The results of the study indicate that when presented with the real possibility of success, despite existing low grades, both low and high-scoring students persisted in their efforts to improve their performance. Their final grades were, on average, one place higher on the +/-letter grade scale, with some students scoring as high as three places above their predicted grade.

Keywords: expectancy for success and persistence, motivation and performance, computer science education, motivation and performance in computer science

Procedia PDF Downloads 57
9124 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 73
9123 Familiarity with Engineering Project Management And Their Duties In Projects

Authors: Mokhtar Nikgoo

Abstract:

Today's industrial world has undergone tremendous changes in certain periods. These changes are called environmental changes. And they have a direct impact on organizations and bodies. Therefore, the importance of knowing these changes is clear. This importance has caused the manufacturing organizations to move towards multiple products and constantly change and expand their system. This research tries to show how the organization moves in this category by defining the basic steps of implementing a project. One of the most important features of a hard-to-order production organization is the definition of different production projects from different customers. Therefore, the lack of sufficient understanding of the type of work causes the project to be defined for the organization in question, and the managers of the organization (in every organizational level) are constantly involved with different projects. In the implementation of the production project of the aforementioned organizations, directing the facilities and people of the organization towards the implementation of the project is of particular importance. Therefore, it is felt necessary to define the project manager and his basic duties. Considering the importance of this topic, the project chapter deals with project management and its importance and examines all the different issues in that category from the perspective of implementation. A project includes certain activities of the organization that require the use of different resources and all the activities of the organization in order to implement the project with defined facilities and at the designated times. Project management is planning, organizing and controlling the organization's resources for a short-term goal that has been created for short-term and medium-term goals and objectives. Project management has the important task of centering and integrating (coordinating) task and line managers. In other words, project management requires having a strong and appropriate relationship with the internal people of the system to carry out the assigned activities and must have a general and technical knowledge related to various activities in the project environment. It seems that everything with project management in It is communication. One of the characteristics of production organizations under the order is the relationship between the customer (customers) and the organization until the completion of the defined project. Due to the nature of the work, it is necessary for a person to establish this relationship between the client and the organization's people and to establish this relationship in such a way that it does not cause a lack of coordination in the organization's activities. Therefore, project management has a very important role at this stage, because the relationship between the client and his organization will be any problems and problems and points of view that the client has, he must inform the management so that he can implement the cases with its analysis and special processes. To be transferred to other departments and line managers.

Keywords: project management, crisis management, project delays bill, project duration

Procedia PDF Downloads 28
9122 Forecasting Age-Specific Mortality Rates and Life Expectancy at Births for Malaysian Sub-Populations

Authors: Syazreen N. Shair, Saiful A. Ishak, Aida Y. Yusof, Azizah Murad

Abstract:

In this paper, we forecast age-specific Malaysian mortality rates and life expectancy at births by gender and ethnic groups including Malay, Chinese and Indian. Two mortality forecasting models are adopted the original Lee-Carter model and its recent modified version, the product ratio coherent model. While the first forecasts the mortality rates for each subpopulation independently, the latter accounts for the relationship between sub-populations. The evaluation of both models is performed using the out-of-sample forecast errors which are mean absolute percentage errors (MAPE) for mortality rates and mean forecast errors (MFE) for life expectancy at births. The best model is then used to perform the long-term forecasts up to the year 2030, the year when Malaysia is expected to become an aged nation. Results suggest that in terms of overall accuracy, the product ratio model performs better than the original Lee-Carter model. The association of lower mortality group (Chinese) in the subpopulation model can improve the forecasts of high mortality groups (Malay and Indian).

Keywords: coherent forecasts, life expectancy at births, Lee-Carter model, product-ratio model, mortality rates

Procedia PDF Downloads 194
9121 A Spatial Approach to Model Mortality Rates

Authors: Yin-Yee Leong, Jack C. Yue, Hsin-Chung Wang

Abstract:

Human longevity has been experiencing its largest increase since the end of World War II, and modeling the mortality rates is therefore often the focus of many studies. Among all mortality models, the Lee–Carter model is the most popular approach since it is fairly easy to use and has good accuracy in predicting mortality rates (e.g., for Japan and the USA). However, empirical studies from several countries have shown that the age parameters of the Lee–Carter model are not constant in time. Many modifications of the Lee–Carter model have been proposed to deal with this problem, including adding an extra cohort effect and adding another period effect. In this study, we propose a spatial modification and use clusters to explain why the age parameters of the Lee–Carter model are not constant. In spatial analysis, clusters are areas with unusually high or low mortality rates than their neighbors, where the “location” of mortality rates is measured by age and time, that is, a 2-dimensional coordinate. We use a popular cluster detection method—Spatial scan statistics, a local statistical test based on the likelihood ratio test to evaluate where there are locations with mortality rates that cannot be described well by the Lee–Carter model. We first use computer simulation to demonstrate that the cluster effect is a possible source causing the problem of the age parameters not being constant. Next, we show that adding the cluster effect can solve the non-constant problem. We also apply the proposed approach to mortality data from Japan, France, the USA, and Taiwan. The empirical results show that our approach has better-fitting results and smaller mean absolute percentage errors than the Lee–Carter model.

Keywords: mortality improvement, Lee–Carter model, spatial statistics, cluster detection

Procedia PDF Downloads 147
9120 Indicators for Success of Obesity Reduction Programs in Adolescents; Body Composition and Body Mass Index: Evaluating a School-Based Health Promotion Project in Iran after 12 Weeks of Intervention

Authors: Saeid Doaei

Abstract:

Background: Obesity in adolescence is a primary risk factor for obesity in adulthood. The objective of this study was the assessment of the effect of a comprehensive lifestyle intervention on different anthropometric indices in 12 to 16 years old boy adolescents. Methods: 96 adolescent boys of two schools of District 5 of Tehran have participated in this study. The schools were randomly assigned as intervention school (n=53) and control school (n=43). The height and weight of students were measured with a calibrated tape line and digital scale respectively and their BMI were calculated. The amounts of body fat percent (BF) and body muscle (BM) percent were determined by Bio Impedance Analyzer (BIA) considering the age, gender and height of students at baseline and after intervention. The intervention was implemented in the intervention school, according to the Ottawa charter principles. Results: 12 weeks of intervention decreased body fat percent in the intervention group in comparison with the control group (decreased by 1.81 % in the intervention group and increased by .39 % in the control group, P < .01). However, weight, BMI and BM did not change significantly. Conclusion: The result of this study showed that the implementation of comprehensive intervention in obese adolescents may improve the body composition, although these changes may not be reflected in BMI. It is possible that BMI is not a good indicator in assessment of the success of obesity management intervention.

Keywords: obesity, childhood, BMI, nutrition

Procedia PDF Downloads 240
9119 Governing Ecosystem Services for Poverty Reduction: Empirical Evidences from Purulia District, India

Authors: Soma Sarkar

Abstract:

A number of authors have recently argued that there are strong links between ecosystem services and sustainable development, particularly development efforts that aim to reduce rural poverty. We see two distinct routes by which the science of ecosystem services can contribute to both nature conservation and sustainable development. First, a thorough accounting of ecosystem services and a better understanding of how and at what rates ecosystems produce these services can be used to motivate payment for nature conservation. At least part of the generated funds can be used to compensate people who suffer lost economic opportunities to protect these services. For example, if rural poor are asked to take actions that reduce farm productivity to protect and regulate water supply, those farmers could be compensated for the reduced productivity they experience. When the benefits of natural ecosystems are explicitly quantified, those benefits are more valued both by the people who directly interact with the ecosystems and the governmental and other agencies that would have to pay for substitute sources of these services if these ecosystems should become impaired. Appreciating the value of ecosystem services can motivate increased conservation investment to prevent having to pay for substitutes later. This approach could be characterized as a ‘‘government investment’’ approach because the payments will generally come from beneficiaries outside of the local area, and a governmental or other agency is typically responsible for collecting and redistributing the funds. Second, a focus on the conservation of ecosystem services could improve the success of projects that attempt to both conserve nature and improve the welfare of the rural poor by fostering markets for the goods and services that local people produce or extract from ecosystems. These projects could be characterized as more ‘‘community based’’ because the goal is to foster the more organic, or grassroots, development of cottage industries, such as ecotourism, or the production of non-timber forest products, that are enhanced by better protection of local ecosystems. Using this framework, we discuss the factors that may have contributed to failure or success for several projects in the district of Purulia, one of the most backward districts of India and inhabited by indigenous group of people. A large majority of people in this district are dependent on environment based incomes for their sustenance. The erosion of natural resource base owing to poor governance in the district has led to the reductions in the household incomes of these people. The scale of our analysis is local or project level. The plight of poor has little to do with the production functions of ecosystem services. But for rural poor, at the local level, the status of ecosystem services can make a big difference in their daily lives.

Keywords: ecosystem services, governance, rural poor, community based natural resource management

Procedia PDF Downloads 345
9118 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance

Authors: Ali Abdullah Albezaghi

Abstract:

This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.

Keywords: risk management practices, external risks, internal risks, project risks, project performance

Procedia PDF Downloads 101
9117 Mental Vulnerability and Coping Strategies as a Factor for Academic Success for Pupils with Special Education Needs

Authors: T. Dubayova

Abstract:

Slovak, as well as foreign authors, believe that the influence of non-cognitive factors on a student's academic success or failure is unquestionable. The aim of this paper is to establish a link between the mental vulnerability and coping strategies used by 4th grade elementary school students in dealing with stressful situations and their academic performance, which was used as a simple quantitative indicator of academic success. The research sample consists of 320 students representing the standard population and 60 students with special education needs (SEN), who were assessed by the Strengths and Difficulties Questionnaire (SDQ) by their teachers and the Children’s Coping Strategies Checklist (CCSC-R1) filled in by themselves. Students with SEN recorded an extraordinarily high frequency of mental vulnerability (34.5 %) than students representing the standard population (7 %). The poorest academic performance of students with SEN was associated with the avoidance behavior displayed during stressful situations. Students of the standard population did not demonstrate this association. Students with SEN are more likely to display mental health problems than students of the standard population. This may be caused by the accumulation of and frequent exposure to situations that they perceive as stressful.

Keywords: coping, mental vulnerability, pupil with special education needs, school performance, school success

Procedia PDF Downloads 327
9116 Impact of Protean Career Attitude on Career Success with the Mediating Effect of Career Insight

Authors: Prabhashini Wijewantha

Abstract:

This study looks at the impact of protean career attitude of employees on their career success and next it looks at the mediation effect of career insights on the above relationship. Career success is defined as the accomplishment of desirable work related outcomes at any point in person’s work experiences over time and it comprises of two sub variables, namely, career satisfaction and perceived employability. Protean career attitude was measured using the eight items from the Self Directedness subscale of the Protean Career Attitude scale developed by Briscoe and Hall, where as career satisfaction was measured by the three item scale developed by Martine, Eddleston, and Veiga. Perceived employability was also evaluated using three items and career insight was measured using fourteen items that were adapted and used by De Vos and Soens. Data were collected from a sample of 300 mid career executives in Sri Lanka deploying the survey strategy and data were analyzed using the SPSS and AMOS software version 20.0. A preliminary analysis of data was initially performed where data were screened and reliability and validity were ensured. Next a simple regression analysis was performed to test the direct impact of protean career attitude on career success and the hypothesis was supported. The Baron and Kenney’s four steps, three regressions approach for mediator testing was used to calculate the mediation effect of career insight on the above relationship and a partial mediation was supported by the data. Finally theoretical and practical implications are discussed.

Keywords: career success, career insight, mid career MBAs, protean career attitude

Procedia PDF Downloads 332
9115 Role of HRM Practices on Business Success: The Case of Small and Medium Enterprises (SMEs)

Authors: Asma Dill

Abstract:

The aim of this study is to explore the role of HRM practices in SMEs success. The role of HRM practices in large enterprises is relatively known, on the other hand, small and medium enterprises (SMEs) companies have not been greatly studied in relation to the HRM practices in the past. Although, there is a lack of literature and empirical research in this area, several studies in the recent years emphasized on the importance of the HRM practices for the success of the SMEs. This study finds out relationship of HRM practices and SMESs performances. The objective is to analyze significant impacts of HRM practices (training, performance appraisal, compensation and employee development) on SMEs success, to determine whether SMEs recognize the importance of HRM practices in their businesses. To carry out this research a survey research strategy was followed. The sample frame for this study consisted of firms that belong to the services and commerce sector, employing at least 50 employees. The final research sample consisted of questionnaires. Descriptive statistical methods have been used during quantitative analysis to explore the relations. The findings of the study revealed that HRM practices have a significant influence on the performance of SMEs, and the better the HRM practice, the higher the performance of the SMEs. HRM practices, including, training, compensation, performance appraisal and employee development, have been found to be significantly and positively related to business success. Outcome of the study will provide useful guidelines to the business organizations. This study contributes to knowledge by providing insights on the impact of HRM practices on SMEs performance.

Keywords: compensation, employee performance, HRM practices, training

Procedia PDF Downloads 153
9114 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: dynamic planning, cost, time, performance, project management

Procedia PDF Downloads 443
9113 Project Progress Prediction in Software Devlopment Integrating Time Prediction Algorithms and Large Language Modeling

Authors: Dong Wu, Michael Grenn

Abstract:

Managing software projects effectively is crucial for meeting deadlines, ensuring quality, and managing resources well. Traditional methods often struggle with predicting project timelines accurately due to uncertain schedules and complex data. This study addresses these challenges by combining time prediction algorithms with Large Language Models (LLMs). It makes use of real-world software project data to construct and validate a model. The model takes detailed project progress data such as task completion dynamic, team Interaction and development metrics as its input and outputs predictions of project timelines. To evaluate the effectiveness of this model, a comprehensive methodology is employed, involving simulations and practical applications in a variety of real-world software project scenarios. This multifaceted evaluation strategy is designed to validate the model's significant role in enhancing forecast accuracy and elevating overall management efficiency, particularly in complex software project environments. The results indicate that the integration of time prediction algorithms with LLMs has the potential to optimize software project progress management. These quantitative results suggest the effectiveness of the method in practical applications. In conclusion, this study demonstrates that integrating time prediction algorithms with LLMs can significantly improve the predictive accuracy and efficiency of software project management. This offers an advanced project management tool for the industry, with the potential to improve operational efficiency, optimize resource allocation, and ensure timely project completion.

Keywords: software project management, time prediction algorithms, large language models (LLMS), forecast accuracy, project progress prediction

Procedia PDF Downloads 51
9112 Tension-Free Vaginal Tape Secur (TVT Secur) versus Tension-Free Vaginal Tape-Obturator (TVT-O) from inside to outside in Surgical Management of Genuine Stress Urinary Incontinence

Authors: Ibrahim Mohamed Ibrahim Hassanin, Hany Hassan Mostafa, Mona Mohamed Shaban, Ahlam El Said Kamel

Abstract:

Background: New so-called minimally invasive devices have been developed to limit groin pain after sling placement for treatment of stress urinary incontinence (SUI) to minimize the risk of postoperative pain and organ perforation. A new generation of suburethral slings was described that avoided skin incision to pull out and tension the sling. Evaluation of this device through prospective short-term series has shown controversial results compared with other tension-free techniques. The aim of this study is to compare success rates and complications for tension-free vaginal tape secur (TVT secur) and trans-obturator sub urethral tape inside-out technique (TVT-O) for treatment of stress urinary incontinence (SUI). Materials and Methods: Fifty patients with genuine SUI were divided into two groups: group S (n=25) were operated upon using (TVT secur) and group O (n=25) were operated upon using trans-obturator suburethral tape inside-out technique (TVT-O). Success rate, quality of life and postoperative complications such as groin pain, urgency, urine retention and vaginal tape erosion were reported in both groups at one, three, and six months after surgery. Results: As regards objective cure rate at one, three, six months intervals; there was a significant difference between group S (56%, 64%, and 60%), and group O (80%, 88%, and 88%) respectively (P <0.05). As regards subjective cure rate at one, three, six months intervals; there was a significant difference between group S (44%, 44%, and 48%), and group O (76%, 80%, and 80%) respectively (P <0.05). Quality of life (QoL) parameters improved significantly in cured patients with no difference between both groups. As regards complications, group O had a higher frequency of complications than group S; groin pain (12% vs 12% p= 0.05), urgency (4% (1 case) vs 0%), urine retention (8% (2 cases) vs 0%), vaginal tape erosion (4% (1 case) vs 0%). No cases were complicated with wound infection. Conclusion: Compared to TVT secur, TVT-O showed higher subjective and objective cure rates after six months but higher rate of complications. Both techniques were comparable as regards improvement of quality of life after surgery.

Keywords: stress urinary incontinence, trans-vaginal tape-obturator, TVT Secur, TVT-O

Procedia PDF Downloads 338
9111 The Success and Failure of the Solicitor General When the U.S. Government Appears as a Direct Party before the U.S. Supreme Court

Authors: Joseph Ignagni, Rebecca Deen

Abstract:

This paper analyzes the extent to which the U.S. Supreme Court votes to support the position of the United States in cases where the government is a party to the litigation. This study considers the relationship between the Solicitor General’s Office and the U.S. Supreme Court. The Solicitor General has the unique position of being the representative of the Executive Branch and the U.S. government before the Supreme Court. While a great deal of research has looked at the Solicitor General’s success as a “friend of the court,” far less has considered this relationship when the U.S. is a direct party in the litigation. This paper investigates the success rate of the Solicitor General’s Office in these cases. We find that there is considerable variation in the U.S. government’s success rate before the Court depending on the issue, Supreme Court leadership, the ideological direction of the Court and whether the U.S. approached the Court as a petitioner or respondent. We conduct our analysis on the Court’s decisions from 1953-2009. This study adds to our understanding of checks and balances, separation of powers, and inter-institutional relationships between the branches of the federal government of the United States.

Keywords: U.S. president, solicitor general, U.S. Supreme Court, separation of power, checks and balances

Procedia PDF Downloads 333