Search results for: infrastructure asset management
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 10832

Search results for: infrastructure asset management

10802 Degradation Model for UK Railway Drainage System

Authors: Yiqi Wu, Simon Tait, Andrew Nichols

Abstract:

Management of UK railway drainage assets is challenging due to the large amounts of historical assets with long asset life cycles. A major concern for asset managers is to maintain the required performance economically and efficiently while complying with the relevant regulation and legislation. As the majority of the drainage assets are buried underground and are often difficult or costly to examine, it is important for asset managers to understand and model the degradation process in order to foresee the upcoming reduction in asset performance and conduct proactive maintenance accordingly. In this research, a Markov chain approach is used to model the deterioration process of rail drainage assets. The study is based on historical condition scores and characteristics of drainage assets across the whole railway network in England, Scotland, and Wales. The model is used to examine the effect of various characteristics on the probabilities of degradation, for example, the regional difference in probabilities of degradation, and how material and shape can influence the deterioration process for chambers, channels, and pipes.

Keywords: deterioration, degradation, markov models, probability, railway drainage

Procedia PDF Downloads 191
10801 Infrastructure Project Management and Implementation: A Case Study Of the Mokolo-Crocodile Water Augmentation Project in South Africa

Authors: Elkington Sibusiso Mnguni

Abstract:

The Mokolo-Crocodile Water Augmentation Project (MCWAP) is located in the Limpopo Province in the northern-western part of South Africa. Its purpose is to increase water supply by 30 million cubic meters per year to meet current and future demand for users, including power stations, mining houses, and the local municipality in the Lephalale area. This paper documents the planning and implementation aspects of the MCWAP infrastructure project. The study will add to the body of knowledge with respect to bulk water infrastructure development in water-scarce regions. The method used to gather and collate relevant data and information was the desktop study. The key finding was that the project was successfully completed in 2015 using conventional project management and construction methods. The project is currently being operated and maintained by the National Department of Water and Sanitation.

Keywords: construction, contract management, infrastructure project, project management

Procedia PDF Downloads 269
10800 Determinant Elements for Useful Life in Airports

Authors: Marcelo Müller Beuren, José Luis Duarte Ribeiro

Abstract:

Studies point that Brazilian large airports are not managing their assets efficiently. Therefore, organizations seek improvements to raise their asset’s productivity. Hence, identification of assets useful life in airports becomes an important subject, since its accuracy leads to better maintenance plans and technological substitution, contribution to airport services management. However, current useful life prediction models do not converge in terms of determinant elements used, as they are particular to the studied situation. For that reason, the main objective of this paper is to identify the determinant elements for a useful life of major assets in airports. With that purpose, a case study was held in the key airport of the south of Brazil trough historical data analysis and specialist interview. This paper concluded that most of the assets useful life are determined by technical elements, maintenance cost, and operational costs, while few presented influence of technological obsolescence. As a highlight, it was possible to identify the determinant elements to be considered by a model which objective is to identify the useful life of airport’s major assets.

Keywords: airports, asset management, asset useful life

Procedia PDF Downloads 491
10799 Importance of Infrastucture Delivery and Management in South Africa

Authors: Onyeka Nkwonta, Theo Haupt, Karana Padayachee

Abstract:

This study aims primarily to identify potential causes of the bottlenecks in the public sector that affect delivery and formulate evidence-based interventions to improve delivery and management of infrastructure projects. An initial literature review was carried out on infrastructural development and delivery in South Africa, with the aim to formulate evidence-based interventions to improve delivery within the sector. The infrastructure delivery management model was developed to map out best practice delivery processes. These will become the backbone on which improvement initiatives that will be developed within participating stakeholders. The model will, in turn, support a range of methodologies, including the risk system and a knowledge management framework. It will also look at key challenges facing departments with the ability to ensure knowledge and skills transfer at various sectors. The research is limited because the findings were based on existing literature. This study adopted an indirect approach for infrastructure management by focussing on the challenges faced and approaches adopted to overcome these challenges. This may narrow the consideration of some of the viewpoints, thereby limiting the richness of experience available to this research.

Keywords: infrastructure, management, challenges, South Africa

Procedia PDF Downloads 106
10798 Decision Framework for Cross-Border Railway Infrastructure Projects

Authors: Dimitrios J. Dimitriou, Maria F. Sartzetaki

Abstract:

Transport infrastructure assets are key components of the national asset portfolio. The decision to invest in a new infrastructure in transports could take from a few years to some decades. This is mainly because of the need to reserve and spent many capitals, the long payback period, the number of the stakeholders involved in decision process and –many times- the investment and business risks are high. Therefore, the decision assessment framework is an essential challenge linked with the key decision factors meet the stakeholder expectations highlighting project trade-offs, financial risks, business uncertainties and market limitations. This paper examines the decision process for new transport infrastructure projects in cross border regions, where a wide range of stakeholders with different expectation is involved. According to a consequences analysis systemic approach, the relationship of transport infrastructure development, economic system development and stakeholder expectation is analyzed. Adopting the on system of system methodological approach, the decision making framework, variables, inputs and outputs are defined, highlighting the key shareholder’s role and expectations. The application provides the methodology outputs presenting the proposed decision framework for a strategic railway project in north Greece deals with the upgrade of the existing railway corridor connecting Greece, Turkey and Bulgaria.

Keywords: decision making, system of system, cross-border, infrastructure project

Procedia PDF Downloads 284
10797 Assets and Health: Examining the Asset-Building Theoretical Framework and Psychological Distress

Authors: Einav Srulovici, Michal Grinstein-Weiss, George Knafl, Linda Beeber, Shawn Kneipp, Barbara Mark

Abstract:

Background: The asset-building theoretical framework (ABTF) is acknowledged as the most complete framework thus far for depicting the relationships between asset accumulation (the stock of a household’s saved resources available for future investment) and health outcomes. Although the ABTF takes into consideration the reciprocal relationship between asset accumulation and health, no ABTF based study has yet examined this relationship. Therefore, the purpose of this study was to test the ABTF and psychological distress, focusing on the reciprocal relationship between assets accumulation and psychological distress. Methods: The study employed longitudinal data from 6,295 families from the 2001 and 2007 Panel Study of Income Dynamics data sets. Structural equation modeling (SEM) was used to test the reciprocal relationship between asset accumulation and psychological distress. Results: In general, the data displayed a good fit to the model. The longitudinal SEM found that asset accumulation significantly increased with a decreased in psychological distress over time, while psychological distress significantly increased with an increase in asset accumulation over time, confirming the existence of the hypothesized reciprocal relationship. Conclusions: Individuals who are less psychological distressed might have more energy to engage in activities, such as furthering their education or obtaining better jobs that are in turn associated with greater asset accumulation, while those who have greater assets may invest those assets in riskier investments, resulting in increased psychological distress. The confirmation of this reciprocal relationship highlights the importance of conducting longitudinal studies and testing the reciprocal relationship between asset accumulation and other health outcomes.

Keywords: asset-building theoretical framework, psychological distress, structural equation modeling, reciprocal relationship

Procedia PDF Downloads 352
10796 The Development of Asset Valuation Techniques for Government Business Enterprises in Australia

Authors: Malcolm Abbott, Angela Tan-Kantoor

Abstract:

The purpose of this paper is to look at the varieties of ways in which regulators have undertaken asset valuations in Australia of government business enterprises as part of utility regulation. Regulation of the monopoly elements, through use of a building block approach, led to a need to estimate regulated asset bases. This development has had an influence on the manner in which Australian companies (both government and privately owned ones) have valued assets for the purpose of financial reporting. As the regulators in Australia did not always use a consistent approach it had meant that a variety of ways have been used to value the assets of government owned enterprises, and meant a varied impact on asset valuation more generally.

Keywords: sset valuation, regulation, government business enterprises

Procedia PDF Downloads 278
10795 Strategic Asset Allocation Optimization: Enhancing Portfolio Performance Through PCA-Driven Multi-Objective Modeling

Authors: Ghita Benayad

Abstract:

Asset allocation, which affects the long-term profitability of portfolios by distributing assets to fulfill a range of investment objectives, is the cornerstone of investment management in the dynamic and complicated world of financial markets. This paper offers a technique for optimizing strategic asset allocation with the goal of improving portfolio performance by addressing the inherent complexity and uncertainty of the market through the use of Principal Component Analysis (PCA) in a multi-objective modeling framework. The study's first section starts with a critical evaluation of conventional asset allocation techniques, highlighting how poorly they are able to capture the intricate relationships between assets and the volatile nature of the market. In order to overcome these challenges, the project suggests a PCA-driven methodology that isolates important characteristics influencing asset returns by decreasing the dimensionality of the investment universe. This decrease provides a stronger basis for asset allocation decisions by facilitating a clearer understanding of market structures and behaviors. Using a multi-objective optimization model, the project builds on this foundation by taking into account a number of performance metrics at once, including risk minimization, return maximization, and the accomplishment of predetermined investment goals like regulatory compliance or sustainability standards. This model provides a more comprehensive understanding of investor preferences and portfolio performance in comparison to conventional single-objective optimization techniques. While applying the PCA-driven multi-objective optimization model to historical market data, aiming to construct portfolios better under different market situations. As compared to portfolios produced from conventional asset allocation methodologies, the results show that portfolios optimized using the proposed method display improved risk-adjusted returns, more resilience to market downturns, and better alignment with specified investment objectives. The study also looks at the implications of this PCA technique for portfolio management, including the prospect that it might give investors a more advanced framework for navigating financial markets. The findings suggest that by combining PCA with multi-objective optimization, investors may obtain a more strategic and informed asset allocation that is responsive to both market conditions and individual investment preferences. In conclusion, this capstone project improves the field of financial engineering by creating a sophisticated asset allocation optimization model that integrates PCA with multi-objective optimization. In addition to raising concerns about the condition of asset allocation today, the proposed method of portfolio management opens up new avenues for research and application in the area of investment techniques.

Keywords: asset allocation, portfolio optimization, principle component analysis, multi-objective modelling, financial market

Procedia PDF Downloads 18
10794 Contrasting Infrastructure Sharing and Resource Substitution Synergies Business Models

Authors: Robin Molinier

Abstract:

Industrial symbiosis (I.S) rely on two modes of cooperation that are infrastructure sharing and resource substitution to obtain economic and environmental benefits. The former consists in the intensification of use of an asset while the latter is based on the use of waste, fatal energy (and utilities) as alternatives to standard inputs. Both modes, in fact, rely on the shift from a business-as-usual functioning towards an alternative production system structure so that in a business point of view the distinction is not clear. In order to investigate the way those cooperation modes can be distinguished, we consider the stakeholders' interplay in the business model structure regarding their resources and requirements. For infrastructure sharing (following economic engineering literature) the cost function of capacity induces economies of scale so that demand pooling reduces global expanses. Grassroot investment sizing decision and the ex-post pricing strongly depends on the design optimization phase for capacity sizing whereas ex-post operational cost sharing minimizing budgets are less dependent upon production rates. Value is then mainly design driven. For resource substitution, synergies value stems from availability and is at risk regarding both supplier and user load profiles and market prices of the standard input. Baseline input purchasing cost reduction is thus more driven by the operational phase of the symbiosis and must be analyzed within the whole sourcing policy (including diversification strategies and expensive back-up replacement). Moreover, while resource substitution involves a chain of intermediate processors to match quality requirements, the infrastructure model relies on a single operator whose competencies allow to produce non-rival goods. Transaction costs appear higher in resource substitution synergies due to the high level of customization which induces asset specificity, and non-homogeneity following transaction costs economics arguments.

Keywords: business model, capacity, sourcing, synergies

Procedia PDF Downloads 149
10793 Production Structures of Energy Based on Water Force, Its Infrastructure Protection, and Possible Causes of Failure

Authors: Gabriela-Andreea Despescu, Mădălina-Elena Mavrodin, Gheorghe Lăzăroiu, Florin Adrian Grădinaru

Abstract:

The purpose of this paper is to contribute to the enhancement of a hydroelectric plant protection by coordinating protection measures and existing security and introducing new measures under a risk management process. Also, the plan identifies key critical elements of a hydroelectric plant, from its level vulnerabilities and threats it is subjected to in order to achieve the necessary protection measures to reduce the level of risk.

Keywords: critical infrastructure, risk analysis, critical infrastructure protection, vulnerability, risk management, turbine, impact analysis

Procedia PDF Downloads 512
10792 Numerical Simulation of Wishart Diffusion Processes

Authors: Raphael Naryongo, Philip Ngare, Anthony Waititu

Abstract:

This paper deals with numerical simulation of Wishart processes for a single asset risky pricing model whose volatility is described by Wishart affine diffusion processes. The multi-factor specification of volatility will make the model more flexible enough to fit the stock market data for short or long maturities for better returns. The Wishart process is a stochastic process which is a positive semi-definite matrix-valued generalization of the square root process. The aim of the study is to model the log asset stock returns under the double Wishart stochastic volatility model. The solution of the log-asset return dynamics for Bi-Wishart processes will be obtained through Euler-Maruyama discretization schemes. The numerical results on the asset returns are compared to the existing models returns such as Heston stochastic volatility model and double Heston stochastic volatility model

Keywords: euler schemes, log-asset return, infinitesimal generator, wishart diffusion affine processes

Procedia PDF Downloads 342
10791 Assessment of the Simulation Programs Usable to Support Decision Making Processes of the Critical Infrastructure Emergency Management

Authors: Jiří Barta, Oldřich Svoboda

Abstract:

This article deals with the issue of practical training of the management staff during emergency events in the frame of critical infrastructure. Critical infrastructure represents one of the possible targets of destructive activities as well as operational accidents and incidents which can seriously influence the functioning of the system of ensuring the basic needs of the inhabitants. Therefore, protection of critical infrastructure and training of the staff in dealing with emergencies becomes a broadly discussed topic. Nowadays, the market offers a wide range of simulation tools which proclaim that they are suitable for practical training of management staff and completing their tasks. Another group of programs declares that they are not primarily designed for this type of simulations. However, after some minor adaptations, for example by adding or changing users‘ roles, they are able to fulfil the needs of practical training as well as the process of emergency simulation. This paper characterises and selects simulators and programs for simulating emergency events.

Keywords: computer simulation, Symos´97, simulation software, harmful substances, Konstruktivní simulace, SIMEX

Procedia PDF Downloads 229
10790 Fair Value Implementation of Financial Asset: Evidence in Indonesia’s Banking Sector

Authors: Alhamdi Alfi Fajri

Abstract:

The purpose of this study is to analyze and to give empirical proof about the effect of fair value implementation on financial asset against information asymmetry in Indonesia’s banking sector. This research tested the effect of fair value implementation on financial asset based on Statement of Financial Accounting Standard (PSAK) No. 55 and the fair value reliability measurement based on PSAK No. 60 against level of information asymmetry. The scope of research is Indonesia’s banking sector. The test’s result shows that the use of fair value based on PSAK No. 55 is significantly associated with information asymmetry. This positive relation is higher than the amortized cost implementation on financial asset. In addition, the fair value hierarchy based on PSAK No. 60 is significantly associated with information asymmetry. This research proves that the more reliable measurement of fair value on financial asset, the more observable fair value measurement and reduces level of information asymmetry.

Keywords: fair value, PSAK No. 55, PSAK No. 60, information asymmetry, bank

Procedia PDF Downloads 314
10789 Directors’ Liability for Losses Incurred in the Management of PT Merpati Nusantara Airlines, Persero

Authors: Eny Suastuti

Abstract:

This paper is about state’s capital equity in establishing State-owned Company (PT Merpati Persero). Under private law regime, PT Merpati Persero equity is a state asset allocated separately from the State Budget. Consequently, it is no longer a state asset; rather, it becomes a part of company assets. The adoption of Act No. 17 of 2003 on State Finance, Act No. 31 of 1999, which is amended by Act No. 20 of 2001 on Eradication of Corrupt Practices, Act No. 15 of 2004 on Auditing, Management, and Accountability of State Finance, and Act No. 15 of 2006 Audit Board raises legal issues of whether State-owned Company’s (PT Merpati Persero) loss may be deemed as loss on state finance made by the Directors of PT Merpati Persero, which implication leads to corrupt practices conducted by the Directors. The principle of civil law states that state assets are separated from the state budget is not a government asset. Therefore the case of a lease agreement 2 (two) units of Boeing 737-400 and Boeing 737-500 between PT Merpati Nusantara Airlines with companies Third Stone Aircraft Leasing Group (TALG) the United States cannot be prosecuted under Articles 2 and 3 of Act No. 31 of 1999 Jo Act No. 20 of 2001 on Eradication of Corrupt Practices (Law PTPK). From this paper, three things are found. First, state’s capital equity, which has been allocated separately from state assets in establishing the PT Merpati Perserois not state asset; rather, it is company’s asset. Second, in the case of mismanagement leading to company loss, the Directors of PT Merpati Persero may not be charged with committing corrupt practice as prescribed in Articles 2 and 3 of Corrupt Practices Eradication Law. Third, misperception has been made by judicial practices since the courts consider loss in certain transaction made by Directors of PT Merpati Persero to be loss of state finance whose implication is applicability of Articles 2 and 3 of Corrupt Practices Eradication Law.

Keywords: corrupt practice, loss, state's capital equity, state finance (PT Merpati Persero)

Procedia PDF Downloads 236
10788 Development of a Value Evaluation Model of Highway Box-Girder Bridge

Authors: Hao Hsi Tseng

Abstract:

Taiwan’s infrastructure is gradually deteriorating, while resources for maintenance and replacement are increasingly limited, raising the urgent need for methods for maintaining existing infrastructure within constrained budgets. Infrastructure value evaluation is used to enhance the efficiency of infrastructure maintenance work, allowing administrators to quickly assess the maintenance needs and performance by observing variation in infrastructure value. This research establishes a value evaluation model for Taiwan’s highway box girder bridges. The operating mechanism and process of the model are illustrated in a practical case.

Keywords: box girder bridge, deterioration, infrastructure, maintenance, value evaluation

Procedia PDF Downloads 163
10787 A Case Study Approach to the Rate the Eco Sensitivity of Green Infrastructure Solutions

Authors: S. Saroop, D. Allopi

Abstract:

In the area of civil infrastructure, there is an urgent need to apply technologies that deliver infrastructure sustainably in a way that is cost-effective. Civil engineering projects can have a significant impact on ecological and social systems if not correctly planned, designed and implemented. It can impact climate change by addressing the issue of flooding and sustainability. Poor design choices now can result in future generations to live in a climate with depleted resources and without green spaces. The objectives of the research study were to rate the sensitivity of various greener infrastructure technologies that can be used in township infrastructure, at the various stages of the project. This paper discusses the Green Township Infrastructure Design Toolkit, that is used to rate the sustainability of infrastructure service projects. Various case studies were undertaken on a range of infrastructure projects to test the sensitivity of various design solution against sustainability criteria. The Green reporting tools ensure efficient, economical and sustainable provision of infrastructure services.

Keywords: eco-efficiency, green infrastructure, green technology, infrastructure design, sustainable development

Procedia PDF Downloads 353
10786 Concept to Enhance the Project Success and Promote the Implementation of Success Factors in Infrastructure Projects

Authors: A. Elbaz, K. Spang

Abstract:

Infrastructure projects are often subjected to delays and cost overruns and mistakenly described as unsuccessful projects. These projects have many peculiarities such as public attention, impact on the environment, subjected to special regulations, etc. They also deal with several stakeholders with different motivations and face unique risks. With this in mind we need to reconsider our approach to manage them, define their success factors and implement these success factors. Infrastructure projects are not only lacking a unified meaning of project success or a definition of success factors, but also a clear method to implement these factors. This paper investigates this gap and introduces a concept to implement success factors in an efficient way, taking into consideration the specific characteristics of infrastructure projects. This concept consists of six enablers such as project organization, project team, project management workflow, contract management, communication and knowledge transfer and project documentations. These enablers allow other success factors to be efficiently implemented in projects. In conclusion, this paper provides project managers as well as company managers with a tool to define and implement success factors efficiently in their projects, along with upgrading their assets for the coming projects. This tool consists of processes and validated checklists to ensure the best use of company resources and knowledge. Due to the special features of infrastructure projects this tool will be tested in the German infrastructure market. However, it is meant to be adaptable to other markets and industries.

Keywords: infrastructure projects, operative success factors, project success, success factors, transportation projects

Procedia PDF Downloads 88
10785 Asset Pricing Model: A Quality Paradigm

Authors: Urmi Khatri

Abstract:

Capital asset pricing model (CAPM) draws a direct relationship between the risk and the expected rate of return. There was a criticism on the beta and the assumptions of CAPM, as they are not applicable in the real world. Fama French Three Factor Model and Fama French Five Factor Model have given different factors, which have an impact on the return of any asset like size, value, investment and profitability. This study proposes to see Capital Asset pricing Model through the lenses of the quality aspect. In the study, the six factors are studied. The Fama French Five Factor Model and addition of the quality dimension are studied. Here, Graham’s seven quality and quantity criteria are measured to determine the score of the sample firms. Thus, this study tries to check the model fit. The beta coefficient of the quality dimension and the R square value is seen to determine validity of the proposed model. The sample is drawn from the firms listed on Indian Stock Exchange (BSE). For the study, only nonfinancial firms are been selected. The time period of the study is from January 1999 to December 2019. Hence, the primary objective of the study is to check how robust the model becomes after giving the quality dimension to the capital asset pricing model in addition to the size, value, profitability and investment.

Keywords: asset pricing model, CAPM, Graham’s score, G-score, multifactor model, quality

Procedia PDF Downloads 132
10784 Application of Griddization Management to Construction Hazard Management

Authors: Lingzhi Li, Jiankun Zhang, Tiantian Gu

Abstract:

Hazard management that can prevent fatal accidents and property losses is a fundamental process during the buildings’ construction stage. However, due to lack of safety supervision resources and operational pressures, the conduction of hazard management is poor and ineffective in China. In order to improve the quality of construction safety management, it is critical to explore the use of information technologies to ensure that the process of hazard management is efficient and effective. After exploring the existing problems of construction hazard management in China, this paper develops the griddization management model for construction hazard management. First, following the knowledge grid infrastructure, the griddization computing infrastructure for construction hazards management is designed which includes five layers: resource entity layer, information management layer, task management layer, knowledge transformation layer and application layer. This infrastructure will be as the technical support for realizing grid management. Second, this study divides the construction hazards into grids through city level, district level and construction site level according to grid principles. Last, a griddization management process including hazard identification, assessment and control is developed. Meanwhile, all stakeholders of construction safety management, such as owners, contractors, supervision organizations and government departments, should take the corresponding responsibilities in this process. Finally, a case study based on actual construction hazard identification, assessment and control is used to validate the effectiveness and efficiency of the proposed griddization management model. The advantage of this designed model is to realize information sharing and cooperative management between various safety management departments.

Keywords: construction hazard, griddization computing, grid management, process

Procedia PDF Downloads 242
10783 Planning Railway Assets Renewal with a Multiobjective Approach

Authors: João Coutinho-Rodrigues, Nuno Sousa, Luís Alçada-Almeida

Abstract:

Transportation infrastructure systems are fundamental in modern society and economy. However, they need modernizing, maintaining, and reinforcing interventions which require large investments. In many countries, accumulated intervention delays arise from aging and intense use, being magnified by financial constraints of the past. The decision problem of managing the renewal of large backlogs is common to several types of important transportation infrastructures (e.g., railways, roads). This problem requires considering financial aspects as well as operational constraints under a multidimensional framework. The present research introduces a linear programming multiobjective model for managing railway infrastructure asset renewal. The model aims at minimizing three objectives: (i) yearly investment peak, by evenly spreading investment throughout multiple years; (ii) total cost, which includes extra maintenance costs incurred from renewal backlogs; (iii) priority delays related to work start postponements on the higher priority railway sections. Operational constraints ensure that passenger and freight services are not excessively delayed from having railway line sections under intervention. Achieving a balanced annual investment plan, without compromising the total financial effort or excessively postponing the execution of the priority works, was the motivation for pursuing the research which is now presented. The methodology, inspired by a real case study and tested with real data, reflects aspects of the practice of an infrastructure management company and is generalizable to different types of infrastructure (e.g., railways, highways). It was conceived for treating renewal interventions in infrastructure assets, which is a railway network may be rails, ballasts, sleepers, etc.; while a section is under intervention, trains must run at reduced speed, causing delays in services. The model cannot, therefore, allow for an accumulation of works on the same line, which may cause excessively large delays. Similarly, the lines do not all have the same socio-economic importance or service intensity, making it is necessary to prioritize the sections to be renewed. The model takes these issues into account, and its output is an optimized works schedule for the renewal project translatable in Gantt charts The infrastructure management company provided all the data for the first test case study and validated the parameterization. This case consists of several sections to be renewed, over 5 years and belonging to 17 lines. A large instance was also generated, reflecting a problem of a size similar to the USA railway network (considered the largest one in the world), so it is not expected that considerably larger problems appear in real life; an average of 25 years backlog and ten years of project horizon was considered. Despite the very large increase in the number of decision variables (200 times as large), the computational time cost did not increase very significantly. It is thus expectable that just about any real-life problem can be treated in a modern computer, regardless of size. The trade-off analysis shows that if the decision maker allows some increase in max yearly investment (i.e., degradation of objective ii), solutions improve considerably in the remaining two objectives.

Keywords: transport infrastructure, asset renewal, railway maintenance, multiobjective modeling

Procedia PDF Downloads 121
10782 Using a GIS-Based Method for Green Infrastructure Accessibility of Different Socio-Economic Groups in Auckland, New Zealand

Authors: Jing Ma, Xindong An

Abstract:

Green infrastructure, the most important aspect of improving the quality of life, has been a crucial element of the liveability measurement. With demanding of more liveable urban environment from increasing population in city area, access to green infrastructure in walking distance should be taken into consideration. This article exemplifies the study on accessibility measurement of green infrastructure in central Auckland (New Zealand), using network analysis tool on the basis of GIS, to verify the accessibility levels of green infrastructure. It analyses the overall situation of green infrastructure and draws some conclusions on the city’s different levels of accessibility according to the categories and facilities distribution, which provides valuable references and guidance for the future facility improvement in planning strategies.

Keywords: quality of life, green infrastructure, GIS, accessibility

Procedia PDF Downloads 245
10781 The Use of Crisis Workplace Technology to Protect Communication Processes of Critical Infrastructure

Authors: Jiri Barta, Jiří F. Urbanek

Abstract:

This paper deals with a protection of the national and European infrastructure. It is issue nowadays. The paper deals with the perspectives and possibilities of "smart solutions" to critical infrastructure protection. The research project deals with computers aided technologies are used from the perspective of new, better protection of selected infrastructure objects. Protection is focused on communication and information channels. These communication and information channels are very important for the functioning of the system of protection of critical infrastructure elements.

Keywords: interoperability, communication systems, controlling proces, critical infrastructure, crisis workplaces, continuity

Procedia PDF Downloads 258
10780 Requirements for a Shared Management of State-Owned Building in the Archaeological Park of Pompeii

Authors: Maria Giovanna Pacifico

Abstract:

Maintenance, in Italy, is not yet a consolidated practice despite the benefits that could come from. Among the main reasons, there are the lack of financial resources and personnel in the public administration and a general lack of knowledge about how to activate and to manage a prevented and programmed maintenance. The experimentation suggests that users and tourists could be involved in the maintenance process from the knowledge phase to the monitoring ones by using mobile devices. The goal is to increase the quality of Facility Management for cultural heritage, prioritizing usage needs, and limiting interference between the key stakeholders. The method simplifies the consolidated procedures for the Information Systems, avoiding a loss in terms of quality and amount of information by focusing on the users' requirements: management economy, user safety, accessibility, and by receiving feedback information to define a framework that will lead to predictive maintenance. This proposal was designed to be tested in the Archaeological Park of Pompeii on the state property asset.

Keywords: asset maintenance, key stakeholders, Pompeii, user requirement

Procedia PDF Downloads 93
10779 Multi-Scale Green Infrastructure: An Integrated Literature Review

Authors: Panpan Feng

Abstract:

The concept of green infrastructure originated in Europe and the United States. It aims to ensure smart growth of urban and rural ecosystems and achieve sustainable urban and rural ecological, social, and economic development by combining it with gray infrastructure in traditional planning. Based on the literature review of the theoretical origin, value connotation, and measurement methods of green infrastructure, this study summarizes the research content of green infrastructure at different scales from the three spatial levels of region, city, and block and divides it into functional dimensions, spatial dimension, and strategic dimension. The results show that in the functional dimension, from region-city-block, the research on green infrastructure gradually shifts from ecological function to social function. In the spatial dimension, from region-city-block, the research on the spatial form of green infrastructure has shifted from two-dimensional to three-dimensional, and the spatial structure of green infrastructure has shifted from single ecological elements to multiple composite elements. From a strategic perspective, green infrastructure research is more of a spatial planning tool based on land management, environmental livability and ecological psychology, providing certain decision-making support.

Keywords: green infrastructure, multi-scale, social and ecological functions, spatial strategic decision-making tools

Procedia PDF Downloads 20
10778 Peril´s Environment of Energetic Infrastructure Complex System, Modelling by the Crisis Situation Algorithms

Authors: Jiří F. Urbánek, Alena Oulehlová, Hana Malachová, Jiří J. Urbánek Jr.

Abstract:

Crisis situations investigation and modelling are introduced and made within the complex system of energetic critical infrastructure, operating on peril´s environments. Every crisis situations and perils has an origin in the emergency/ crisis event occurrence and they need critical/ crisis interfaces assessment. Here, the emergency events can be expected - then crisis scenarios can be pre-prepared by pertinent organizational crisis management authorities towards their coping; or it may be unexpected - without pre-prepared scenario of event. But the both need operational coping by means of crisis management as well. The operation, forms, characteristics, behaviour and utilization of crisis management have various qualities, depending on real critical infrastructure organization perils, and prevention training processes. An aim is always - better security and continuity of the organization, which successful obtainment needs to find and investigate critical/ crisis zones and functions in critical infrastructure organization models, operating in pertinent perils environment. Our DYVELOP (Dynamic Vector Logistics of Processes) method is disposables for it. Here, it is necessary to derive and create identification algorithm of critical/ crisis interfaces. The locations of critical/ crisis interfaces are the flags of crisis situation in organization of critical infrastructure models. Then, the model of crisis situation will be displayed at real organization of Czech energetic crisis infrastructure subject in real peril environment. These efficient measures are necessary for the infrastructure protection. They will be derived for peril mitigation, crisis situation coping and for environmentally friendly organization survival, continuity and its sustainable development advanced possibilities.

Keywords: algorithms, energetic infrastructure complex system, modelling, peril´s environment

Procedia PDF Downloads 376
10777 Public Health Infrastructure Resilience in the Face of Natural Disasters in Rwanda

Authors: Jessy Rugeyo, William Donner

Abstract:

This research delves into the resilience of Rwanda's public health infrastructure amidst natural disasters, a critical issue given that the Northern Province alone has witnessed no fewer than 1500 cases of disaster ranging from floods and landslides in the last five years, with more than 200 people killed and thousands of homes destroyed, according to MINEMA. In an era where climate change escalates the frequency and intensity of such disasters, fortifying the resilience of public health systems is paramount. This study offers a comprehensive analysis of the existing state of Rwanda's public health infrastructure and its ability to manage such crises. Employing a mix of literature review, case studies, and policy analysis, the study discerns key vulnerabilities and brings to light the intricacies of disaster management in Rwanda. Case studies centered around past natural disasters in Rwanda provide critical insights into the strengths and weaknesses of the existing disaster response mechanisms. A thorough critique of related disaster management and public health infrastructure policies reveals areas of commendable practice, along with gaps calling for policy enhancements. Findings guide the proposition of targeted strategies to bolster the resilience of Rwanda's public health infrastructure. This research serves as a significant contribution to the domains of disaster studies and public health, offering valuable insights for policymakers, public health and disaster management professionals in Rwanda and similar contexts. It presents actionable recommendations for improvement, underscoring the potential for enhancing Rwanda's disaster management capacity. By advocating for the strengthening of public health infrastructure resilience, the research highlights the potential for improved public health outcomes following natural disasters, thereby showcasing significant implications for public health and disaster management in the country, particularly in the face of a changing climate.

Keywords: public health infrastructure, disaster resilience, natural disaster, disaster management, emergency preparedness, health policy

Procedia PDF Downloads 53
10776 Zero-Knowledge Proof-of-Reserve: A Confidential Approach to Cryptocurrency Asset Verification

Authors: Sam Ng, Lewis Leighton, Sam Atkinson, Carson Yan, Landan Hu, Leslie Cheung, Brian Yap, Kent Lung, Ketat Sarakune

Abstract:

This paper introduces a method for verifying cryptocurrency reserves that balances the need for both transparency and data confidentiality. Our methodology employs cryptographic techniques, including Merkle Trees, Bulletproof, and zkSnark, to verify that total assets equal or exceed total liabilities, represented by customer funds. Importantly, this verification is achieved without disclosing sensitive information such as the total asset value, customer count, or cold wallet addresses. We delve into the construction and implementation of this methodology. While the system is robust and scalable, we also identify areas for potential enhancements to improve its efficiency and versatility. As the digital asset landscape continues to evolve, our approach provides a solid foundation for ensuring continued trust and security in digital asset platforms.

Keywords: cryptocurrency, crypto-currency, proof-of-reserve, por, zero-knowledge, ZKP

Procedia PDF Downloads 42
10775 Preliminary Investigation of Hospital Buildings Maintenance Management in Malaysia

Authors: Christtestimony Oluwafemi Jesumoroti, AbdulLateef Ashola Olanrewaju, Khor Soo Cheen

Abstract:

The worth of buildings is known by the quality of the maintenance imbibe in them. Maintenance management being carried out in the hospitals has a direct impact on the performance of the hospital buildings, environment, and sustainable infrastructure, and as such, there is a need to give it adequate attention. The media and reports on hospital buildings maintenance management in Malaysia were not favorable. Hospital buildings in Malaysia need to have proper structure for maintenance management and sustainability as this will enhance the good infrastructure for users and the entire nation. The paper reports the preliminary results of the determinants of maintenance in hospital buildings. To achieve the aim of this research, a survey questionnaire was administered to the users of the hospital buildings. The findings of the study revealed that there are lack of maintenance standard, use of poor quality components and materials, Improper response time, Poor complaint reporting system. Hence, the influent of rework, thorough responsibilities of quality performance of hospital buildings, and others are the results of the investigations.

Keywords: sustainable infrastructure, optimum performance, implementation, key performance indicators, maintenance policies

Procedia PDF Downloads 124
10774 Component-Based Approach in Assessing Sewer Manholes

Authors: Khalid Kaddoura, Tarek Zayed

Abstract:

Sewer networks are constructed to protect the communities and the environment from any contact with the sewer mediums. Pipelines, being laterals or sewer mains, and manholes form the huge underground infrastructure in every urban city. Due to the sewer networks importance, the infrastructure asset management field has extensive advancement in condition assessment and rehabilitation decision models. However, most of the focus was devoted to pipelines giving little attention toward manholes condition assessment. In fact, recent studies started to emerge in this area to preserve manholes from any malfunction. Therefore, the main objective of this study is to propose a condition assessment model for sewer manholes. The model divides the manhole into several components and determines the relative importance weight of each component using the Analytic Network Process (ANP) decision-making method. Later, the condition of the manhole is computed by aggregating the condition of each component with its corresponding weight. Accordingly, the proposed assessment model will enable decision-makers to have a final index suggesting the overall condition of the manhole and a backward analysis to check the condition of each component. Consequently, better decisions are made pertinent to maintenance, rehabilitation, and replacement actions.

Keywords: Analytic Network Process (ANP), condition assessment, decision-making, manholes

Procedia PDF Downloads 325
10773 Untapped Market of Islamic Pension Fund: Muslim Attitude and Expectation

Authors: Yunice Karina Tumewang

Abstract:

As we have seen, the number of Muslim and their awareness toward financial products and services that conform to Islamic principles are growing rapidly today. Thus, it makes the market environment potentially beneficial for Shari-compliant funds with the expanding prospective client base. However, over the last decade, only small portion of this huge potential market has been covered by the established Islamic asset management firms. This study aims to examine the factors of this untapped market particularly in the demand side. This study will use the qualitative method with primary data through a questionnaire distributed to 500 samples of Muslim population. It will shed light on Muslim attitudes and expectations toward Sharia-compliant retirement planning and pensions. It will also help to raise the awareness of market players to see Islamic pension fund as a promising industry in the foreseeable future.

Keywords: Islamic marketing, Islamic finance, Islamic asset management, Islamic pension fund

Procedia PDF Downloads 310