Search results for: facility configuration
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1713

Search results for: facility configuration

1713 Analysis of Spatial Disparities of Population for Delicate Configuration of Public Service Facilities:Case of Gongshu District, Hangzhou, China

Authors: Ruan Yi-Chen, Li Wang-Ming, Fang Yuan

Abstract:

With the rapid growth of urbanization in China in recent years, public services are in short supply because of expanding population and limitation of financial support, which makes delicate configuration of public service facilities to become a trend in urban planning. Besides, the facility configuration standard implemented in China is equal to the whole the urban area without considering internal differences in it. Therefore, this article focuses on population Spatial disparities analysis in order to optimize facility configuration in communities of main city district. The used data, including population of 93 communities during 2010 to 2015, comes from GongShu district, Hangzhou city, PRC. Through the analysis of population data, especially the age structure of those communities, the communities finally divided into 3 types. Obviously, urban public service facilities allocation situation directly affect the quality of residents common lives, which turns out that deferent kinds of communities with deferent groups of citizens will have divergences in facility demanding. So in the end of the article, strategies of facility configuration will be proposed based on the population analysis in order to optimize the quantity and location of facilities with delicacy.

Keywords: delicacy, facility configuration, population spatial disparities, urban area

Procedia PDF Downloads 354
1712 A Methodology for Optimisation of Water Containment Systems

Authors: Amir Hedjripour

Abstract:

The required dewatering configuration for a contaminated sediment dam is discussed to meet no-spill criteria for a defined Average Recurrence Interval (ARI). There is an option for the sediment dam to pump the contaminated water to another storage facility before its capacity is exceeded. The system is subjected to a range of storm durations belonging to the design ARI with concurrent dewatering to the other storage facility. The model is set up in 1-minute time intervals and temporal patterns of storm events are used to de-segregate the total storm depth into partial durations. By running the model for selected storm durations, the maximum water volume in the dam is recorded as the critical volume, which indicates the required storage capacity for that storm duration. Runoff from upstream catchment and the direct rainfall over the dam open area are calculated by taking into account the time of concentration for the catchment. Total 99 different storm durations from 5 minutes to 72 hours were modelled together with five dewatering scenarios from 50 l/s to 500 l/s. The optimised dam/pump configuration is selected by plotting critical points for all cases and storage-dewatering envelopes. A simple economic analysis is also presented in the paper using Present-Value (PV) analysis to assist with the financial evaluation of each configuration and selection of the best alternative.

Keywords: contaminated water, optimisation, pump, sediment dam

Procedia PDF Downloads 329
1711 Facility Data Model as Integration and Interoperability Platform

Authors: Nikola Tomasevic, Marko Batic, Sanja Vranes

Abstract:

Emerging Semantic Web technologies can be seen as the next step in evolution of the intelligent facility management systems. Particularly, this considers increased usage of open source and/or standardized concepts for data classification and semantic interpretation. To deliver such facility management systems, providing the comprehensive integration and interoperability platform in from of the facility data model is a prerequisite. In this paper, one of the possible modelling approaches to provide such integrative facility data model which was based on the ontology modelling concept was presented. Complete ontology development process, starting from the input data acquisition, ontology concepts definition and finally ontology concepts population, was described. At the beginning, the core facility ontology was developed representing the generic facility infrastructure comprised of the common facility concepts relevant from the facility management perspective. To develop the data model of a specific facility infrastructure, first extension and then population of the core facility ontology was performed. For the development of the full-blown facility data models, Malpensa and Fiumicino airports in Italy, two major European air-traffic hubs, were chosen as a test-bed platform. Furthermore, the way how these ontology models supported the integration and interoperability of the overall airport energy management system was analyzed as well.

Keywords: airport ontology, energy management, facility data model, ontology modeling

Procedia PDF Downloads 413
1710 Investigation into Micro-Grids with Renewable Energy Sources for Use as High Reliability Electrical Power Supply in a Nuclear Facility

Authors: Gerard R. Lekhema, Willie A Cronje, Ian Korir

Abstract:

The objective of this research work is to investigate the use of a micro-grid system to improve the reliability and availability of emergency electrical power in a nuclear facility. The nuclear facility is a safety-critical application that requires reliable electrical power for safe startup, operation and normal or emergency shutdown conditions. The majority of the nuclear facilities around the world utilize diesel generators as emergency power supply during loss of offsite power events. This study proposes the micro-grid system with distributed energy sources and energy storage systems for use as emergency power supply. The systems analyzed include renewable energy sources, decay heat recovery system and large scale energy storage system. The configuration of the micro-grid system is realized with guidelines of nuclear safety standards and requirements. The investigation results presented include performance analysis of the micro-grid system in terms of reliability and availability.

Keywords: emergency power supply, micro-grid, nuclear facility, renewable energy sources

Procedia PDF Downloads 368
1709 Physics of Decision for Polling Place Management: A Case Study from the 2020 USA Presidential Election

Authors: Nafe Moradkhani, Frederick Benaben, Benoit Montreuil, Ali Vatankhah Barenji, Dima Nazzal

Abstract:

In the context of the global pandemic, the practical management of the 2020 presidential election in the USA was a strong concern. To anticipate and prepare for this election accurately, one of the main challenges was to confront (i) forecasts of voter turnout, (ii) capacities of the facilities and, (iii) potential configuration options of resources. The approach chosen to conduct this anticipative study consists of collecting data about forecasts and using simulation models to work simultaneously on resource allocation and facility configuration of polling places in Fulton County, Georgia’s largest county. A polling place is a dedicated facility where voters cast their ballots in elections using different devices. This article presents the results of the simulations of such places facing pre-identified potential risks. These results are oriented towards the efficiency of these places according to different criteria (health, trust, comfort). Then a dynamic framework is introduced to describe risks as physical forces perturbing the efficiency of the observed system. Finally, the main benefits and contributions resulting from this simulation campaign are presented.

Keywords: performance, decision support, simulation, artificial intelligence, risk management, election, pandemics, information system

Procedia PDF Downloads 124
1708 Energy Consumption Forecast Procedure for an Industrial Facility

Authors: Tatyana Aleksandrovna Barbasova, Lev Sergeevich Kazarinov, Olga Valerevna Kolesnikova, Aleksandra Aleksandrovna Filimonova

Abstract:

We regard forecasting of energy consumption by private production areas of a large industrial facility as well as by the facility itself. As for production areas the forecast is made based on empirical dependencies of the specific energy consumption and the production output. As for the facility itself implementation of the task to minimize the energy consumption forecasting error is based on adjustment of the facility’s actual energy consumption values evaluated with the metering device and the total design energy consumption of separate production areas of the facility. The suggested procedure of optimal energy consumption was tested based on the actual data of core product output and energy consumption by a group of workshops and power plants of the large iron and steel facility. Test results show that implementation of this procedure gives the mean accuracy of energy consumption forecasting for winter 2014 of 0.11% for the group of workshops and 0.137% for the power plants.

Keywords: energy consumption, energy consumption forecasting error, energy efficiency, forecasting accuracy, forecasting

Procedia PDF Downloads 402
1707 Managing Configuration Management in Different Types of Organizations

Authors: Dilek Bilgiç

Abstract:

Configuration Management (CM) is a discipline assuring the consistency between product information the reality all along the product lifecycle. Although the extensive benefits of this discipline, such as the direct impact on increasing return on investment, reducing lifecycle costs, are realized by most organizations. It is worth evaluating that CM functions might be successfully implemented in some organized anarchies. This paper investigates how to manage ambiguity in CM processes as an opportunity within an environment that has different types of complexities and choice arenas. It is not explained how to establish a configuration management organization in a company; more specifically, it is analyzed how to apply configuration management processes when different types of streams exist. From planning to audit, all the CM functions may provide different organization learning opportunities when those applied with the right leadership methods.

Keywords: configuration management, leadership, organizational analysis, organized anarchy, cm process, organizational learning, organizational maturity, configuration status accounting, leading innovation, change management

Procedia PDF Downloads 187
1706 Identification of Configuration Space Singularities with Local Real Algebraic Geometry

Authors: Marc Diesse, Hochschule Heilbronn

Abstract:

We address the question of identifying the configuration space singularities of linkages, i.e., points where the configuration space is not locally a submanifold of Euclidean space. Because the configuration space cannot be smoothly parameterized at such points, these singularity types have a significantly negative impact on the kinematics of the linkage. It is known that Jacobian methods do not provide sufficient conditions for the existence of CS-singularities. Herein, we present several additional algebraic criteria that provide the sufficient conditions. Further, we use those criteria to analyze certain classes of planar linkages. These examples will also show how the presented criteria can be checked using algorithmic methods.

Keywords: linkages, configuration space-singularities, real algebraic geometry, analytic geometry

Procedia PDF Downloads 115
1705 User Satisfaction Survey Based Facility Performance Evaluation

Authors: Gopikrishnan Seshadhri, V. M. Topkar

Abstract:

Facility management post occupation is a facet that has gained tremendous ground in the recent times. While the efficiency of expenditure and utilization of all types of resources are monitored to ensure timely completion with minimum cost and acceptable quality during construction phase, value for money comes out only when the facility performs satisfactorily post occupation, meeting aspirations and expectations of users of the facility. It is more so for the public facilities. Due to the paradigm shift in focus to outcome based performance evaluation, user satisfaction obtained mainly through questionnaires has become the single important criterion in performance evaluation. Questionnaires presently being used to gauge user satisfaction being subjective, the feedback obtained do not necessarily reflect actual performance. Hence, there is a requirement of developing a survey instrument that can gauge user satisfaction as objectively as possible and truly reflects the ground reality. A near correct picture of actual performance of the built facility from the user point of view will enable facility managers to address pertinent issues. This paper brings out the need for an effective survey instrument that will elicit more objective user response. It also lists steps involved in formulation of such an instrument.

Keywords: facility performance evaluation, attributes, attribute descriptors, user satisfaction surveys, statistical methods, performance indicators

Procedia PDF Downloads 259
1704 Configuration as a Service in Multi-Tenant Enterprise Resource Planning System

Authors: Mona Misfer Alshardan, Djamal Ziani

Abstract:

Enterprise resource planning (ERP) systems are the organizations tickets to the global market. With the implementation of ERP, organizations can manage and coordinate all functions, processes, resources and data from different departments by a single software. However, many organizations consider the cost of traditional ERP to be expensive and look for alternative affordable solutions within their budget. One of these alternative solutions is providing ERP over a software as a service (SaaS) model. This alternative could be considered as a cost effective solution compared to the traditional ERP system. A key feature of any SaaS system is the multi-tenancy architecture where multiple customers (tenants) share the system software. However, different organizations have different requirements. Thus, the SaaS developers accommodate each tenant’s unique requirements by allowing tenant-level customization or configuration. While customization requires source code changes and in most cases a programming experience, the configuration process allows users to change many features within a predefined scope in an easy and controlled manner. The literature provides many techniques to accomplish the configuration process in different SaaS systems. However, the nature and complexity of SaaS ERP needs more attention to the details regarding the configuration process which is merely described in previous researches. Thus, this research is built on strong knowledge regarding the configuration in SaaS to define specifically the configuration borders in SaaS ERP and to design a configuration service with the consideration of the different configuration aspects. The proposed architecture will ensure the easiness of the configuration process by using wizard technology. Also, the privacy and performance are guaranteed by adopting the databases isolation technique.

Keywords: configuration, software as a service, multi-tenancy, ERP

Procedia PDF Downloads 371
1703 A Numerical Investigation of Flow Maldistribution in Inlet Header Configuration of Plate Fin Heat Exchanger

Authors: Appasaheb Raul

Abstract:

Numerical analysis of a plate fin heat exchanger accounting for the effect of fluid flow maldistribution on the inlet header configuration of the heat exchanger is investigated. It is found that the flow maldistribution is very significant in normal to the flow direction. Various inlet configuration has been studied for various Reynolds Number. By the study, a modified header configuration is proposed and simulated. The two-dimensional parameters are used to evaluate the flow non-uniformity in the header, global flow maldistribution parameter (Sg), and Velocity Ratio (θ). A series of velocity vectors and streamline graphs at different cross-section are achieved and studied qualitatively with experimental results in the literature. The numerical result indicates that the flow maldistribution is serious in the conventional header while in the improved configuration less maldistribution occurs. The flow maldistribution parameter (Sg) and velocity ratio (θ) is reduced in improved configuration. The vortex decreases compared to that of the conventional configuration so the energy and pressure loss is reduced. The improved header can effectively enhance the efficiency of plate fin heat exchanger and uniformity of flow distribution.

Keywords: global flow maldistribution parameter, Sg, velocity ratio, plate fin heat exchanger, fluent 14.5

Procedia PDF Downloads 485
1702 Manufacturing Facility Location Selection: A Numercal Taxonomy Approach

Authors: Seifoddini Hamid, Mardikoraeem Mahsa, Ghorayshi Roya

Abstract:

Manufacturing facility location selection is an important strategic decision for many industrial corporations. In this paper, a new approach to the manufacturing location selection problem is proposed. In this approach, cluster analysis is employed to identify suitable manufacturing locations based on economic, social, environmental, and political factors. These factors are quantified using the existing real world data.

Keywords: manufacturing facility, manufacturing sites, real world data

Procedia PDF Downloads 537
1701 A Survey of Discrete Facility Location Problems

Authors: Z. Ulukan, E. Demircioğlu,

Abstract:

Facility location is a complex real-world problem which needs a strategic management decision. This paper provides a general review on studies, efforts and developments in Facility Location Problems which are classical optimization problems having a wide-spread applications in various areas such as transportation, distribution, production, supply chain decisions and telecommunication. Our goal is not to review all variants of different studies in FLPs or to describe very detailed computational techniques and solution approaches, but rather to provide a broad overview of major location problems that have been studied, indicating how they are formulated and what are proposed by researchers to tackle the problem. A brief, elucidative table based on a grouping according to “General Problem Type” and “Methods Proposed” used in the studies is also presented at the end of the work.

Keywords: discrete location problems, exact methods, heuristic algorithms, single source capacitated facility location problems

Procedia PDF Downloads 431
1700 Multi-Criteria Decision Making Approaches for Facility Planning Problem Evaluation: A Survey

Authors: Ahmed M. El-Araby, Ibrahim Sabry, Ahmed El-Assal

Abstract:

The relationships between the industrial facilities, the capacity available for these facilities, and the costs involved are the main factors in deciding the correct selection of a facility layout. In general, an issue of facility layout is considered to be an unstructured problem of decision-making. The objective of this work is to provide a survey that describes the techniques by which a facility planning problem can be solved and also the effect of these techniques on the efficiency of the layout. The multi-criteria decision making (MCDM) techniques can be classified according to the previous researches into three categories which are the use of single MCDM, combining two or more MCDM, and the integration of MCDM with another technique such as genetic algorithms (GA). This paper presents a review of different multi-criteria decision making (MCDM) techniques that have been proposed in the literature to pick the most suitable layout design. These methods are particularly suitable to deal with complex situations, including various criteria and conflicting goals which need to be optimized simultaneously.

Keywords: facility layout, MCDM, GA, literature review

Procedia PDF Downloads 166
1699 Designing the First Oil Tanker Shipyard Facility in Kuwait

Authors: Fatma Al Abdullah, Shahad Al Ameer, Ritaj Jaragh, Fatimah Khajah, Rawan Qambar, Amr Nounou

Abstract:

Kuwait currently manufactures its tankers in foreign countries. Oil tankers play a role in the supply chain of the oil industry. Therefore, with Kuwait’s sufficient financial resources, the country should secure itself strategically in order to protect its oil industry to sustain economic development. The purpose of this report is designing an oil tankers’ shipyard facility. Basing the shipyard facility in Kuwait will have great economic rewards. The shipbuilding industry directly enhances the industrial chain in terms of new job and business opportunities as well as educational fields. Heavy Engineering Industries & Shipbuilding Co. K.S.C. (HEISCO) was chosen as a host due to benefits that will result from HEISCO’s existing infrastructure and expertise to reduce cost. The Facility Design methodology chosen has been used because it covers all aspects needed for the report. The oil tanker market is witnessing a shift from crude tankers to product tankers. Therefore the Panamax tanker (product tanker) was selected to be manufactured in the facility. The different departments needed in shipyards were identified based on studying different global shipyards. Technologies needed to build ships helped in the process design. It was noticed that ships are engineer to order. The new layout development of the proposed shipyard is currently in progress. A feasibility study will be conducted to ensure the success of the facility after developing the shipyard’s layout.

Keywords: oil tankers, shipbuilding, shipyard, facility design, Kuwait

Procedia PDF Downloads 423
1698 An Owen Value for Cooperative Games with Pairwise a Priori Incompatibilities

Authors: Jose M. Gallardo, Nieves Jimenez, Andres Jimenez-Losada, Esperanza Lebron

Abstract:

A game with a priori incompatibilities is a triple (N,v,g) where (N,v) is a cooperative game, and (N,g) is a graph which establishes initial incompatibilities between some players. In these games, the negotiation has two stages. In the first stage, players can only negotiate with others with whom they are compatible. In the second stage, the grand coalition will be formed. We introduce a value for these games. Given a game with a priori incompatibility (N,v,g), we consider the family of coalitions without incompatibility relations among their players. This family is a normal set system or coalition configuration Ig. Therefore, we can assign to each game with a priori incompatibilities (N,v,g) a game with coalition configuration (N,v, Ig). Now, in order to obtain a payoff vector for (N,v,g), it suffices to calculate a payoff vector for (N,v, Ig). To this end, we apply a value for games with coalition configuration. In our case, we will use the dual configuration value, which has been studied in the literature. With this method, we obtain a value for games with a priori incompatibilities, which is called the Owen value for a priori incompatibilities. We provide a characterization of this value.

Keywords: cooperative game, game with coalition configuration, graph, independent set, Owen value, Shapley value

Procedia PDF Downloads 101
1697 A Feasibility Study of Crowdsourcing Data Collection for Facility Maintenance Management

Authors: Mohamed Bin Alhaj, Hexu Liu, Mohammed Sulaiman, Osama Abudayyeh

Abstract:

An effective facility maintenance management (FMM) system plays a crucial role in improving the quality of services and maintaining the facility in good condition. Current FMM heavily relies on the quality of the data collection function of the FMM systems, at times resulting in inefficient FMM decision-making. The new technology-based crowdsourcing provides great potential to improve the current FMM practices, especially in terms of timeliness and quality of data. This research aims to investigate the feasibility of using new technology-driven crowdsourcing for FMM and highlight its opportunities and challenges. A survey was carried out to understand the human, data, system, geospatial, and automation characteristics of crowdsourcing for an educational campus FMM via social networks. The survey results were analyzed to reveal the challenges and recommendations for the implementation of crowdsourcing for FMM. This research contributes to the body of knowledge by synthesizing the challenges and opportunities of using crowdsourcing for facility maintenance and providing a road map for applying crowdsourcing technology in FMM. In future work, a conceptual framework will be proposed to support data-driven FMM using social networks.

Keywords: crowdsourcing, facility maintenance management, social networks

Procedia PDF Downloads 131
1696 Application of VE in Healthcare Services: An Overview of Healthcare Facility

Authors: Safeer Ahmad, Pratheek Sudhakran, M. Arif Kamal, Tarique Anwar

Abstract:

In Healthcare facility designing, Efficient MEP services are very crucial because the built environment not only affects patients and family but also Healthcare staff and their outcomes. This paper shall cover the basics of Value engineering and its different phases that can be implemented to the MEP Designing stage for Healthcare facility optimization, also VE can improve the product cost the unnecessary costs associated with healthcare services. This paper explores Healthcare facility services and their Value engineering Job plan for the successful application of the VE technique by conducting a Workshop with end-users, designing team and associate experts shall be carried out using certain concepts, tools, methods and mechanism developed to achieve the purpose of selecting what is actually appropriate and ideal among many value engineering processes and tools that have long proven their ability to enhance the value by following the concept of Total quality management while achieving the most efficient resources allocation to satisfy the key functions and requirements of the project without sacrificing the targeted level of service for all design metrics. Detail study has been discussed with analysis been carried out by this process to achieve a better outcome, Various tools are used for the Analysis of the product at different phases used, at the end the results obtained after implementation of techniques are discussed.

Keywords: value engineering, healthcare facility, design, services

Procedia PDF Downloads 160
1695 A Clustering-Sequencing Approach to the Facility Layout Problem

Authors: Saeideh Salimpour, Sophie-Charlotte Viaux, Ahmed Azab, Mohammed Fazle Baki

Abstract:

The Facility Layout Problem (FLP) is key to the efficient and cost-effective operation of a system. This paper presents a hybrid heuristic- and mathematical-programming-based approach that divides the problem conceptually into those of clustering and sequencing. First, clusters of vertically aligned facilities are formed, which are later on sequenced horizontally. The developed methodology provides promising results in comparison to its counterparts in the literature by minimizing the inter-distances for facilities which have more interactions amongst each other and aims at placing the facilities with more interactions at the centroid of the shop.

Keywords: clustering-sequencing approach, mathematical modeling, optimization, unequal facility layout problem

Procedia PDF Downloads 303
1694 Obtaining High-Dimensional Configuration Space for Robotic Systems Operating in a Common Environment

Authors: U. Yerlikaya, R. T. Balkan

Abstract:

In this research, a method is developed to obtain high-dimensional configuration space for path planning problems. In typical cases, the path planning problems are solved directly in the 3-dimensional (D) workspace. However, this method is inefficient in handling the robots with various geometrical and mechanical restrictions. To overcome these difficulties, path planning may be formalized and solved in a new space which is called configuration space. The number of dimensions of the configuration space comes from the degree of freedoms of the system of interest. The method can be applied in two ways. In the first way, the point clouds of all the bodies of the system and interaction of them are used. The second way is performed via using the clearance function of simulation software where the minimum distances between surfaces of bodies are simultaneously measured. A double-turret system is held in the scope of this study. The 4-D configuration space of a double-turret system is obtained in these two ways. As a result, the difference between these two methods is around 1%, depending on the density of the point cloud. The disparity between the two forms steadily decreases as the point cloud density increases. At the end of the study, in order to verify 4-D configuration space obtained, 4-D path planning problem was realized as 2-D + 2-D and a sample path planning is carried out with using A* algorithm. Then, the accuracy of the configuration space is proved using the obtained paths on the simulation model of the double-turret system.

Keywords: A* algorithm, autonomous turrets, high-dimensional C-space, manifold C-space, point clouds

Procedia PDF Downloads 119
1693 SVID: Structured Vulnerability Intelligence for Building Deliberated Vulnerable Environment

Authors: Wenqing Fan, Yixuan Cheng, Wei Huang

Abstract:

The diversity and complexity of modern IT systems make it almost impossible for internal teams to find vulnerabilities in all software before the software is officially released. The emergence of threat intelligence and vulnerability reporting policy has greatly reduced the burden on software vendors and organizations to find vulnerabilities. However, to prove the existence of the reported vulnerability, it is necessary but difficult for security incident response team to build a deliberated vulnerable environment from the vulnerability report with limited and incomplete information. This paper presents a structured, standardized, machine-oriented vulnerability intelligence format, that can be used to automate the orchestration of Deliberated Vulnerable Environment (DVE). This paper highlights the important role of software configuration and proof of vulnerable specifications in vulnerability intelligence, and proposes a triad model, which is called DIR (Dependency Configuration, Installation Configuration, Runtime Configuration), to define software configuration. Finally, this paper has also implemented a prototype system to demonstrate that the orchestration of DVE can be automated with the intelligence.

Keywords: DIR triad model, DVE, vulnerability intelligence, vulnerability recurrence

Procedia PDF Downloads 97
1692 A Bi-Objective Model to Optimize the Total Time and Idle Probability for Facility Location Problem Behaving as M/M/1/K Queues

Authors: Amirhossein Chambari

Abstract:

This article proposes a bi-objective model for the facility location problem subject to congestion (overcrowding). Motivated by implementations to locate servers in internet mirror sites, communication networks, one-server-systems, so on. This model consider for situations in which immobile (or fixed) service facilities are congested (or queued) by stochastic demand to behave as M/M/1/K queues. We consider for this problem two simultaneous perspectives; (1) Customers (desire to limit times of accessing and waiting for service) and (2) Service provider (desire to limit average facility idle-time). A bi-objective model is setup for facility location problem with two objective functions; (1) Minimizing sum of expected total traveling and waiting time (customers) and (2) Minimizing the average facility idle-time percentage (service provider). The proposed model belongs to the class of mixed-integer nonlinear programming models and the class of NP-hard problems. In addition, to solve the model, controlled elitist non-dominated sorting genetic algorithms (Controlled NSGA-II) and controlled elitist non-dominated ranking genetic algorithms (NRGA-I) are proposed. Furthermore, the two proposed metaheuristics algorithms are evaluated by establishing standard multiobjective metrics. Finally, the results are analyzed and some conclusions are given.

Keywords: bi-objective, facility location, queueing, controlled NSGA-II, NRGA-I

Procedia PDF Downloads 551
1691 Altasreef: Automated System of Quran Verbs for Urdu Language

Authors: Haq Nawaz, Muhammad Amjad Iqbal, Kamran Malik

Abstract:

"Altasreef" is an automated system available for Web and Android users which provide facility to the users to learn the Quran verbs. It provides the facility to the users to practice the learned material and also provide facility of exams of Arabic verbs variation focusing on Quran text. Arabic is a highly inflectional language. Almost all of its words connect to roots of three, four or five letters which approach the meaning of all their inflectional forms. In Arabic, a verb is formed by inserting the consonants into one of a set of verb patterns. Suffixes and prefixes are then added to generate the meaning of number, person, and gender. The active/passive voice and perfective aspect and other patterns are than generated. This application is designed for learners of Quranic Arabic who already have learn basics of Arabic conjugation. Application also provides the facility of translation of generated patterns. These translations are generated with the help of rule-based approach to give 100% results to the learners.

Keywords: NLP, Quran, Computational Linguistics, E Learning

Procedia PDF Downloads 131
1690 Analysis of Operation System Reorganization for Load Balancing of Parcel Sorting

Authors: J. H. Lee

Abstract:

As the internet and smartphone use increases, the E-Commerce is constantly growing. Therefore, the parcel is increasing continuously every year. If the larger amount than the processing capacity of the current facilities is received, they do not process, and the delivery quality becomes low. In this paper, therefore, we analyze comparatively at the cost perspective between the case of building a new facility for the increasing parcel volumes and the case of reorganizing the current operating system. We propose the optimal discount policy per parcel by calculating the construction cost of new automated facility and manual facilities until the construction of the new automated facility, and discount price.

Keywords: system reorganization, load balancing, parcel sorting, discount policy

Procedia PDF Downloads 237
1689 Resolving Increased Water-Cut in South and East Kuwait Areas through Water Knock-Out Facility Project

Authors: Sunaitan Al Mutairi, Kumar Vallatharasu, Batool Ismaeel

Abstract:

The Water Knock-Out (WKO) facility project is to handle the undesirable impact of the increasing water production rate in South and East Kuwait (S&EK) areas and break the emulsions and ensure sufficient separation of water at the new upstream facility, to reduce the load on the existing separation equipment in the Gathering Centers (GC). As the existing separation equipment in the Gathering Centers are not efficient to separate the emulsions, the Compact Electrostatic Coalescer (CEC) and Vessel Internal Electrostatic Coalescer (VIEC) technologies have been selected for enhancing the liquid-liquid separation by using the alternating voltage/frequency on electrical fields, to handle the increasing water-cut in S&EK. In the Compact Electrostatic Coalescer (CEC) technology method, the CEC equipment is installed downstream of the inlet separator externally, whereas in the Vessel Internal Electrostatic Coalescer (VIEC) technology method, the VIEC is built inside the treater vessel, downstream of the inlet separator with advanced internals for implementing electrocoalescence of water particles and hence enhancing liquids separation. The CEC and VIEC technologies used in the Water Knockout Facility project has the ability to resolve the increasing water cut in the S&EK area and able to enhance the liquid-liquid separation in the WKO facility separation equipment. In addition, the WKO facility is minimizing the load on the existing Gathering Center’s separation equipment, by tackling the high water-cut wells, upstream of each GC. The required performances at the outlet of the WKO facility are Oil in Water 100ppmv, Water in Oil 15% volume, liquid carryover in gas 0.1 US gal/MMSCFD, for the water cut ranging from 37.5 to 75% volume. The WKO facility project is used to sustain, support and maintain Greater Burgan production at 1.7 Million Barrels of Oil Per Day (MMBOPD), by handling the increasing water production rate.

Keywords: emulsion, increasing water-cut, production, separation equipment

Procedia PDF Downloads 203
1688 Implementing Internet of Things through Building Information Modelling in Order to Assist with the Maintenance Stage of Commercial Buildings

Authors: Ushir Daya, Zenadene Lazarus, Dimelle Moodley, Ehsan Saghatforoush

Abstract:

It was found through literature that there is a lack of implementation of the Internet of Things (IoT) incorporated into Building Information Modelling (BIM) in South Africa. The research aims to find if the implementation of IoT into BIM will make BIM more useful during the maintenance stage of buildings and assist facility managers when doing their job. The research will look at the existing problematic areas with building information modelling, specifically BIM 7D. This paper will look at the capabilities of IoT and what issues IoT will be able to resolve in BIM software, as well as how IoT into BIM will assist facility managers and if such an implementation will make a facility manager's job more efficient.

Keywords: internet of things, building information modeling, facilities management, structural health monitoring

Procedia PDF Downloads 167
1687 X-Bracing Configuration and Seismic Response

Authors: Saeed Rahjoo, Babak H. Mamaqani

Abstract:

Concentric bracing systems have been in practice for many years because of their effectiveness in reducing seismic response. Depending on concept, seismic design codes provide various response modification factors (R), which itself consists of different terms, for different types of lateral load bearing systems but configuration of these systems are often ignored in the proposed values. This study aims at considering the effect of different x-bracing diagonal configuration on values of ductility dependent term in R computation. 51 models were created and nonlinear push over analysis has been performed. The main variables of this study were the suitable location of X–bracing diagonal configurations, which establishes better nonlinear behavior in concentric braced steel frames. Results show that some x-bracing diagonal configurations improve the seismic performance of CBF significantly and explicit consideration of lateral load bearing systems seems necessary.

Keywords: bracing configuration, concentrically braced frame (CBF), push over analyses, response reduction factor

Procedia PDF Downloads 318
1686 A New Resonance Solution to Suppress the Voltage Stresses in the Forward Topology Used in a Switch Mode Power Supply

Authors: Maamar Latroch, Mohamed Bourahla

Abstract:

Forward topology used in switch mode power supply (SMPS) is one of the most famous configuration feeding DC systems such as telecommunication systems and other specific applications where the galvanic isolation is required. This configuration benefits of the high frequency feature of the transformer to provide a small size and light weight of the over all system. However, the stresses existing on the power switch during an ON/OFF commutation limit the transmitted power to the DC load. This paper investigates the main causes of the stresses in voltage existing during a commutation cycle and suggest a low cost solution that eliminates the overvoltage. As a result, this configuration will yield the possibility of the use of this configuration in higher power applications. Simulation results will show the efficiency of the presented method.

Keywords: switch mode power supply, forward topology, resonance topology, high frequency commutation

Procedia PDF Downloads 410
1685 A Solution for Production Facility Assignment: An Automotive Subcontract Case

Authors: Cihan Çetinkaya, Eren Özceylan, Kerem Elibal

Abstract:

This paper presents a solution method for selection of production facility. The motivation has been taken from a real life case, an automotive subcontractor which has two production facilities at different cities and parts. The problem is to decide which part(s) should be produced at which facility. To the best of our knowledge, until this study, there was no scientific approach about this problem at the firm and decisions were being given intuitively. In this study, some logistic cost parameters have been defined and with these parameters a mathematical model has been constructed. Defined and collected cost parameters are handling cost of parts, shipment cost of parts and shipment cost of welding fixtures. Constructed multi-objective mathematical model aims to minimize these costs while aims to balance the workload between two locations. Results showed that defined model can give optimum solutions in reasonable computing times. Also, this result gave encouragement to develop the model with addition of new logistic cost parameters.

Keywords: automotive subcontract, facility assignment, logistic costs, multi-objective models

Procedia PDF Downloads 338
1684 A Qualitative Analysis of Factors Influencing the Intention of Selecting the Charged Nursing Care

Authors: Hyunsik Park

Abstract:

Objective: To provide information of charged nursing care facility for helping to establish geriatric health care policy, and to figure out which factors would be the main determinants for the choice of it. Method: 46 males and 53 females, and the same number of their caregivers admitted into the charged nursing care facility were recruited for intensive interview including personal information, disease information, and economic, familial, marital and emotional statuses. This is a cross-sectional study and we analyzed the data qualitatively. Results: Patients had 3.2 diseases and a hospitalization for 2.3 years on average. They were consists of 46 singles (46.9%), 8 unmarried (8.2%), 5 divorced (5.1%) and 32 married (32.7%). More than two third (70.1%) were supported by their eldest son or daughter. Mostly, the family caregivers decided to admit into the facilities by the doctor’s recommendation (68.4%). When they made a choice for a facility, most of them (42.9%) considered environmental and sanitary conditions. According to their expectation for management in nursing care facility, most caregivers (59.2%) wanted simple-staying for the duration, but most patients (61.3%) expected to be home after taking comprehensive rehabilitation. Three-quarter of the caregivers would agree to use nursing care facilities in the future, if they would be the same situation. Conclusion: Life style and environment are rapidly changing. In the near future, we need lots of the charged nursing care facilities for the old, thus this study can be the good reference for the preparing upcoming aged and super-aged society.

Keywords: nursing care facility, aged society, qualitative analysis, health

Procedia PDF Downloads 453