Search results for: evacuation completion time
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 18004

Search results for: evacuation completion time

17854 Project Knowledge Harvesting: The Case of Improving Project Performance through Project Knowledge Sharing Framework

Authors: Eng Rima Al-Awadhi, Abdul Jaleel Tharayil

Abstract:

In a project-centric organization like KOC, managing the knowledge of the project is of critical importance to the success of the project and the organization. However, due to the very nature and complexity involved, each project engagement generates a lot of 'learnings' that need to be factored into while new projects are initiated and thus avoid repeating the same mistake. But, many a time these learnings are localized and remains as ‘tacit knowledge’ leading to scope re-work, schedule overrun, adjustment orders, concession requests and claims. While KOC follows an asset based organization structure, with a multi-cultural and multi-ethnic workforce and larger chunk of the work is carried out through complex, long term project engagement, diffusion of ‘learnings’ across assets while dealing with the natural entropy of the organization is of great significance. Considering the relatively higher number of mega projects, it's important that the issues raised during the project life cycle are centrally harvested, analyzed and the ‘learnings’ from these issues are shared, absorbed and are in-turn utilized to enhance and refine the existing process and practices, leading to improve the project performance. One of the many factors contributing to the successful completion of a project on time is the reduction in the number of variations or concessions triggered during the project life cycle. The project process integrated knowledge sharing framework discusses the knowledge harvesting methodology adopted, the challenges faced, learnings acquired and its impact on project performance. The framework facilitates the proactive identification of issues that may have an impact on the overall quality of the project and improve performance.

Keywords: knowledge harvesting, project integrated knowledge sharing, performance improvement, knowledge management, lessons learn

Procedia PDF Downloads 359
17853 Groupthink: The Dark Side of Team Cohesion

Authors: Farhad Eizakshiri

Abstract:

The potential for groupthink to explain the issues contributing to deterioration of decision-making ability within the unitary team and so to cause poor outcomes attracted a great deal of attention from a variety of disciplines, including psychology, social and organizational studies, political science, and others. Yet what remains unclear is how and why the team members’ strivings for unanimity and cohesion override their motivation to realistically appraise alternative courses of action. In this paper, the findings of a sequential explanatory mixed-methods research containing an experiment with thirty groups of three persons each and interviews with all experimental groups to investigate this issue is reported. The experiment sought to examine how individuals aggregate their views in order to reach a consensual group decision concerning the completion time of a task. The results indicated that groups made better estimates when they had no interaction between members in comparison with the situation that groups collectively agreed on time estimates. To understand the reasons, the qualitative data and informal observations collected during the task were analyzed through conversation analysis, thus leading to four reasons that caused teams to neglect divergent viewpoints and reduce the number of ideas being considered. Reasons found were the concurrence-seeking tendency, pressure on dissenters, self-censorship, and the illusion of invulnerability. It is suggested that understanding the dynamics behind the aforementioned reasons of groupthink will help project teams to avoid making premature group decisions by enhancing careful evaluation of available information and analysis of available decision alternatives and choices.

Keywords: groupthink, group decision, cohesiveness, project teams, mixed-methods research

Procedia PDF Downloads 370
17852 Simulation Data Summarization Based on Spatial Histograms

Authors: Jing Zhao, Yoshiharu Ishikawa, Chuan Xiao, Kento Sugiura

Abstract:

In order to analyze large-scale scientific data, research on data exploration and visualization has gained popularity. In this paper, we focus on the exploration and visualization of scientific simulation data, and define a spatial V-Optimal histogram for data summarization. We propose histogram construction algorithms based on a general binary hierarchical partitioning as well as a more specific one, the l-grid partitioning. For effective data summarization and efficient data visualization in scientific data analysis, we propose an optimal algorithm as well as a heuristic algorithm for histogram construction. To verify the effectiveness and efficiency of the proposed methods, we conduct experiments on the massive evacuation simulation data.

Keywords: simulation data, data summarization, spatial histograms, exploration, visualization

Procedia PDF Downloads 155
17851 Contractors Perspective on Causes of Delays in Power Transmission Projects

Authors: Goutom K. Pall

Abstract:

At the very heart of the power system, power transmission (PT) acts as an essential link between power generation and distribution. Timely completion of PT infrastructures is therefore crucial to support the development of power system as a whole. Yet despite the importance, studies on PT infrastructure development projects are embryonic and, hence, PT projects undergoing widespread delays worldwide. These delay factors are idiosyncratic and identifying the critical delay factors is essential if the PT industry professionals are to complete their projects efficiently and within the expected timeframes. This study identifies and categorizes 46 causes of PT project delay under ten major groups using six sector expert’s recommendations studied by a preliminary questionnaire survey. Based on the experts’ strong recommendations, two new groups are introduced in the final questionnaire survey: sector specific factors (SSF) and general factors (GF). SSF pertain to delay factors applicable only to the PT projects, while GF represents less biased samples with shared responsibilities of all project parties involved in a project. The study then uses 112 data samples from the contractors to rank the delay factors using relative importance index (RII). The results reveal that SSF, GF and external factors are the most critical groups, while the highest ranked delay factors include the right of way (RoW) problems of transmission lines (TL), delay in payments, frequent changes in TL routes, poor communication and coordination among the project parties and accessibility to TL tower locations. Finally, recommendations are made to minimize the identified delay. The findings are expected to be of substantial benefit to professionals in minimizing time overrun in PT projects implementation, as well as power generation, power distribution, and non-power linear construction projects worldwide.

Keywords: delay, project delay, power transmission projects, time-overruns

Procedia PDF Downloads 147
17850 Temporal Axis in Japanese: The Paradox of a Metaphorical Orientation in Time

Authors: Tomoko Usui

Abstract:

In the field of linguistics, it has been said that concepts associated with space and motion systematically contribute structure to the temporal concept. This is the conceptual metaphor theory. conceptual metaphors typically employ a more abstract concept (time) as their target and a more concrete or physical concept as their source (space). This paper will examine two major temporal conceptual metaphors: Ego-centered Moving Time Metaphor and Time-RP Metaphor. Moving time generally receives a front-back orientation, however, Japanese shows a different orientation given to time. By means of Ego perspective, this paper will illustrate the paradox of a metaphorical orientation in time.

Keywords: Ego-centered Moving Time Metaphor, Japanese saki, temporal metaphors, Time RP Metaphor

Procedia PDF Downloads 462
17849 Final Account Closing in Construction Project: The Use of Supply Chain Management to Reduce the Delays

Authors: Zarabizan Zakaria, Syuhaida Ismail, Aminah Md. Yusof

Abstract:

Project management process starts from the planning stage up to the stage of completion (handover of buildings, preparation of the final accounts and the closing balance). This process is not easy to implement efficiently and effectively. The issue of delays in construction is a major problem for construction projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This is due to several factors, such as environments of construction technology, sophisticated design and customer demands that are constantly changing and influencing, either directly or indirectly, the practice of management. Among the identified influences are physical environment, social environment, information environment, political and moral atmosphere. Therefore, this paper is emerged to determine the problem and issues in the final account closing in construction projects, and it establishes the need to embrace Supply Chain Management (SCM) and then elucidates the need and strategies for the development of a delay reduction framework. At the same time, this paper provides effective measures to avoid or at least reduce the delay to the optimum level. Allowing problems in the closure declaration to occur without proper monitoring and control can leave negative impact on the cost and time of delivery to the end user. Besides, it can also affect the reputation or image of the agency/department that manages the implementation of a contract and consequently may reduce customer's trust towards the agencies/departments. It is anticipated that the findings reported in this paper could address root delay contributors and apply SCM tools for their mitigation for the better development of construction project.

Keywords: final account closing, construction project, construction delay, supply chain management

Procedia PDF Downloads 331
17848 The Effort of Good Governance in Enhancing Foods Security for Sustainable National Development

Authors: Egboja Simon Oga

Abstract:

One of the most important keys to the success of a nation is to ensure steady development and national economic self-sufficiency and independence. It is therefore in this regard that this paper is designed to identify food security to be crucial to all nations’ effort toward sustainable national development. Nigeria as a case study employed various effort by the successive government towards food security. Emphasis were placed on the extent to which government has boosted food security situation on the basis of the identified limitations, conclusion was drawn, recommendation/suggestions proffered, that subsidization of the process of farm inputs like fertilizer, improved seeds and agrochemical, education of farmers on modern methods of farming through extension services, improvisation of village-based food storage mechanism and provision of infrastructural facilities in rural areas to facilitate the preservation and easy evacuation of farm produces are necessary.

Keywords: food, governance, development, security

Procedia PDF Downloads 297
17847 Implementation Research on the Singapore Physical Activity and Nutrition Program: A Mixed-Method Evaluation

Authors: Elaine Wong

Abstract:

Introduction: The Singapore Physical Activity and Nutrition Study (SPANS) aimed to assess the effects of a community-based intervention on physical activity (PA) and nutrition behaviours as well as chronic disease risk factors for Singaporean women aged above 50 years. This article examines the participation, dose, fidelity, reach, satisfaction and reasons for completion and non-completion of the SPANS. Methods: The SPANS program integrated constructs of Social Cognitive Theory (SCT) and is composed of PA activities; nutrition workshops; dietary counselling coupled with motivational interviewing (MI) through phone calls; and text messages promoting healthy behaviours. Printed educational resources and health incentives were provided to participants. Data were collected via a mixed-method design strategy from a sample of 295 intervention participants. Quantitative data were collected using self-completed survey (n = 209); qualitative data were collected via research assistants’ notes, post feedback sessions and exit interviews with program completers (n = 13) and non-completers (n = 12). Results: Majority of participants reported high ‘satisfactory to excellent’ ratings for the program pace, suitability of interest and overall program (96.2-99.5%). Likewise, similar ratings for clarity of presentation; presentation skills, approachability, knowledge; and overall rating of trainers and program ambassadors were achieved (98.6-100%). Phone dietary counselling had the highest level of participation (72%) at less than or equal to 75% attendance rate followed by nutrition workshops (65%) and PA classes (60%). Attrition rate of the program was 19%; major reasons for withdrawal were personal commitments, relocation and health issues. All participants found the program resources to be colourful, informative and practical for their own reference. Reasons for program completion and maintenance were: desired health benefits; social bonding opportunities and to learn more about PA and nutrition. Conclusions: Process evaluation serves as an appropriate tool to identify recruitment challenges, effective intervention strategies and to ensure program fidelity. Program participants were satisfied with the educational resources, program components and delivery strategies implemented by the trainers and program ambassadors. The combination of printed materials and intervention components, when guided by the SCT and MI, were supportive in encouraging and reinforcing lifestyle behavioural changes. Mixed method evaluation approaches are integral processes to pinpoint barriers, motivators, improvements and effective program components in optimising the health status of Singaporean women.

Keywords: process evaluation, Singapore, older adults, lifestyle changes, program challenges

Procedia PDF Downloads 96
17846 Facility Layout Improvement: Based on Safety and Health at Work and Standards of Food Production Facility

Authors: Asifa Fitriani, Galih Prakoso

Abstract:

This study aims to improve the design layout of a Micro, Small and Medium Enterprises (SMEs) to minimize material handling and redesigning the layout of production facilities based on the safety and health and standards of food production facilities. Problems layout in the one of chip making industry mushrooms in Indonesia is cross movement between work stations, work accidents, and the standard of facilities that do not conform with the standards of the food industry. Improvement layout design using CORELAP and 5S method to give recommendation and implementation of occupational health and safety standards of food production facilities. From the analysis, improved layout using CORELAP provide a smaller displacement distance is 155.84 meters from the initial displacement distance of 335.9 meters, and providing a shorter processing time than the original 112.726 seconds to 102.831 seconds. 5S method also has recommended the completion of occupational health and safety issues as well as the standard means of food production by changing the working environment better.

Keywords: Layout Design, Corelap, 5S

Procedia PDF Downloads 503
17845 Resolution Method for Unforeseen Ground Condition Problem Case in Coal Fired Steam Power Plant Project Location Adipala, Indonesia

Authors: Andi Fallahi, Bona Ryan Situmeang

Abstract:

The Construction Industry is notoriously risky. Much of the preparatory paperwork that precedes construction project can be viewed as the formulation of risk allocation between the owner and the Contractor. The Owner is taking the risk that his project will not get built on the schedule that it will not get built for what he has budgeted and that it will not be of the quality he expected. The Contractor Face a multitude of risk. One of them is an unforeseen condition at the construction site. The Owner usually has the upper hand here if the unforeseen condition occurred. Site data contained in Ground Investigation report is often of significant contractual importance in disputes related to the unforeseen ground condition. A ground investigation can never fully disclose all the details of the underground condition (Risk of an unknown ground condition can never be 100% eliminated). Adipala Coal Fired Steam Power Plant (CSFPP) 1 x 660 project is one of the large CSFPP project in Indonesia based on Engineering, Procurement, and Construction (EPC) Contract. Unforeseen Ground Condition it’s responsible by the Contractor has stipulated in the clausal of Contract. In the implementation, there’s indicated unforeseen ground condition at Circulating Water Pump House (CWPH) area which caused the Contractor should be changed the Method of Work that give big impact against Time of Completion and Cost Project. This paper tries to analyze the best way for allocating the risk between The Owner and The Contractor. All parties that allocating of sharing risk fairly can ultimately save time and money for all parties, and get the job done on schedule for the least overall cost.

Keywords: unforeseen ground condition, coal fired steam power plant, circulating water pump house, Indonesia

Procedia PDF Downloads 305
17844 HCIO4-SiO2 Nanoparticles as an Efficient Catalyst for Three-Component Synthesis of Triazolo[1,2-A]Indazole-Triones

Authors: Hossein Anaraki-Ardakani, Tayebe Heidari-Rakati

Abstract:

An environmentally benign protocol for the one-pot, three-component synthesis of Triazolo[1,2-a]indazole-1,3,8-trione derivatives by condensation of dimedone, urazole and aromatic aldehydes catalyzed by HClO4/SiO2 NPS as an ecofriendly catalyst with high catalytic activity and reusability at 100 ºC under solvent-free conditions is reported. The reaction proceeds to completion within 20-30 min in 77-86 % yield.

Keywords: one-pot reaction, dimedone, triazoloindazole, urazole

Procedia PDF Downloads 345
17843 Reinforcement Learning for Self Driving Racing Car Games

Authors: Adam Beaunoyer, Cory Beaunoyer, Mohammed Elmorsy, Hanan Saleh

Abstract:

This research aims to create a reinforcement learning agent capable of racing in challenging simulated environments with a low collision count. We present a reinforcement learning agent that can navigate challenging tracks using both a Deep Q-Network (DQN) and a Soft Actor-Critic (SAC) method. A challenging track includes curves, jumps, and varying road widths throughout. Using open-source code on Github, the environment used in this research is based on the 1995 racing game WipeOut. The proposed reinforcement learning agent can navigate challenging tracks rapidly while maintaining low racing completion time and collision count. The results show that the SAC model outperforms the DQN model by a large margin. We also propose an alternative multiple-car model that can navigate the track without colliding with other vehicles on the track. The SAC model is the basis for the multiple-car model, where it can complete the laps quicker than the single-car model but has a higher collision rate with the track wall.

Keywords: reinforcement learning, soft actor-critic, deep q-network, self-driving cars, artificial intelligence, gaming

Procedia PDF Downloads 7
17842 Conflict Causes within Construction Projects; Conflict Interaction across Project Phases

Authors: Abdullah Mohammed Alshehri

Abstract:

The projects in the construction industry have significantly increased, given its contribution to the overall Gross Domestic Product (GDP) of the countries. Reflecting upon the complex nature and involvement of various agents, the study aims to analyze the conflicts cause within construction projects. Therefore, the study strived to come out with understanding the levels of conflict interaction across project phases. However, this conducted by investigating the association between antecedents and apparent conflicts inherent in. The study used a qualitative approach for collecting the data through a quantitative, semi-structured method. Formation of a questionnaire survey has been conducted for over 30 respondents. However, the survey came out with the identification of 25 conflict cause categories, which can take place in different construction project phases, including pre-design phase, pre-construction phase, construction phase, commissioning, and completion phase. For example, conflicts associated with inconsistencies or discrepancies within or between project documents, which took place at tendering time in the pre-construction phase were relatable with the selection of material specifications that should be supplied or used in the construction projects at the construction phase. Its analysis can provide comprehensive understanding, trace the root of the problem, which offers a roadmap to deepen the understanding of the conflict conditions and ‘course of action’ necessary for project management strategy actions toward avoiding or minimizing conflict causes at project life.

Keywords: construction, conflict causes, levels, interaction, phases

Procedia PDF Downloads 147
17841 Unification of Indonesia Time Zones Encourages People to Be on Time for Facing ASEAN Economic Community

Authors: Hasrullah Hasrullah

Abstract:

Since December 2015, the ASEAN Economic Community (AEC) is officially declared in the 27th Summit Conference of ASEAN and Indonesia is one of country are listed in the ASEAN members. Per January 1st, 2016 the ASEAN Economic Community (AEC) came into effect. However, its implementation in Indonesia is still weighing the pros and cons because Indonesia is considered too late to prepare for the ASEAN Economic Community (AEC). In other words, rubber time of Indonesian people has been occurring in the AEC. This paper reviews how Indonesia language influences people’s attitude to be rubber time culture and how time zones of Indonesia influence people’s attitude through media on television to be rubber time culture. The author addresses this research question empirically by collecting data from various sources of data those are relevant and compare among the unification of Indonesia time zones. The result demonstrates that unification of Indonesia time zones to be Standard Indonesia Time is a solution to encourage people to be ready on time for facing ASEAN Economic Community (AEC).

Keywords: unification time zones, Indonesia Language, Rubber Time, AEC

Procedia PDF Downloads 332
17840 A Cosmic Time Dilation Model for the Week of Creation

Authors: Kwok W. Cheung

Abstract:

A scientific interpretation of creation reconciling the beliefs of six literal days of creation and a 13.7-billion-year-old universe currently perceived by most modern cosmologists is proposed. We hypothesize that the reference timeframe of God’s creation is associated with some cosmic time different from the earth's time. We show that the scale factor of earth time to cosmic time can be determined by the solution of the Friedmann equations. Based on this scale factor and some basic assumptions, we derive a Cosmic Time Dilation model that harmonizes the literal meaning of creation days and scientific discoveries with remarkable accuracy.

Keywords: cosmological expansion, time dilation, creation, genesis, relativity, Big Bang, biblical hermeneutics

Procedia PDF Downloads 40
17839 Minimize Wear and Tear in Y12 Aircraft Tyres

Authors: N. D. Hiripitiya, H. V. H. De Soysa, H. S. U. Thrimavithana, B. R. Epitawala, K. A. D. D. Kuruppu, D. J. K. Lokupathirage

Abstract:

This research was related to identify the reasons which lead for early wear and tear of aircraft tyres. Further this research focused to rectify those issues in tyres with some modifications. The aircraft tyres of Y12 aircraft was selected for the study as due to Y12 aircraft fly frequently. Self-structured questionnaire was prepared and it was distributed among Y12 aircraft technicians. Based on their feedback several issues were identified related to tyre wear and tear. One of the reasons was uneven tyre wearing. But it could rectify after interchanging the tyre sides after completion of 50 landings. Several modifications were done in order to rectify all the identified issues. Several devices were constructed in order to enhance the life time of the Y12 aircraft tyre. Mechanical properties were measured for the worn-out tyres. The properties were compared with the control tyre sample. It was found that there was an average increment of tensile strength by 38.14 % of control tyre, when compared with the worn-out tyres which were completed 50 number of landings. The suggested modifications are in the process of implementation. It is confident that above mentioned solutions will lead to increase the life span of tyres in Y12 aircraft.

Keywords: aircraft, devices, enhance life span, modifications for tyre wear

Procedia PDF Downloads 259
17838 Simulation of Pedestrian Service Time at Different Delay Times

Authors: Imran Badshah

Abstract:

Pedestrian service time reflects the performance of the facility, and it’s a key parameter to analyze the capability of facilities provided to serve pedestrians. The level of service of pedestrians (LOS) mainly depends on pedestrian time and safety. The pedestrian time utilized by taking a service is mainly influenced by the number of available services and the time utilized by each pedestrian in receiving a service; that is called a delay time. In this paper, we analyzed the simulated pedestrian service time with different delay times. A simulation is performed in AnyLogic by developing a model that reflects the real scenario of pedestrian services such as ticket machine gates at rail stations, airports, shopping malls, and cinema halls. The simulated pedestrian time is determined for various delay values. The simulated result shows how pedestrian time changes with the delay pattern. The histogram and time plot graph of a model gives the mean, maximum and minimum values of the pedestrian time. This study helps us to check the behavior of pedestrian time at various services such as subway stations, airports, shopping malls, and cinema halls.

Keywords: agent-based simulation, anylogic model, pedestrian behavior, time delay

Procedia PDF Downloads 178
17837 Evaluating the Success of an Intervention Course in a South African Engineering Programme

Authors: Alessandra Chiara Maraschin, Estelle Trengove

Abstract:

In South Africa, only 23% of engineering students attain their degrees in the minimum time of 4 years. This begs the question: Why is the 4-year throughput rate so low? Improving the throughput rate is crucial in assisting students to the shortest possible path to completion. The Electrical Engineering programme has a fixed curriculum and students must pass all courses in order to graduate. In South Africa, as is the case in several other countries, many students rely on external funding such as bursaries from companies in industry. If students fail a course, they often lose their bursaries, and most might not be able to fund their 'repeating year' fees. It is thus important to improve the throughput rate, since for many students, graduating from university is a way out of poverty for an entire family. In Electrical Engineering, it has been found that the Software Development I course (an introduction to C++ programming) is a significant hurdle course for students and has been found to have a low pass rate. It has been well-documented that students struggle with this type of course as it introduces a number of new threshold concepts that can be challenging to grasp in a short time frame. In an attempt to mitigate this situation, a part-time night-school for Software Development I was introduced in 2015 as an intervention measure. The course includes all the course material from the Software Development I module and allows students who failed the course in first semester a second chance by repeating the course through taking the night-school course. The purpose of this study is to determine whether the introduction of this intervention course could be considered a success. The success of the intervention is assessed in two ways. The study will first look at whether the night-school course contributed to improving the pass rate of the Software Development I course. Secondly, the study will examine whether the intervention contributed to improving the overall throughput from the 2nd year to the 3rd year of study at a South African University. Second year academic results for a sample of 1216 students have been collected from 2010-2017. Preliminary results show that the lowest pass rate for Software Development I was found to be in 2017 with a pass rate of 34.9%. Since the intervention course's inception, the pass rate for Software Development I has increased each year from 2015-2017 by 13.75%, 25.53% and 25.81% respectively. To conclude, the preliminary results show that the intervention course is a success in improving the pass rate of Software Development I.

Keywords: academic performance, electrical engineering, engineering education, intervention course, low pass rate, software development course, throughput

Procedia PDF Downloads 137
17836 Swift Rising Pattern of Emerging Construction Technology Trends in the Construction Management

Authors: Gayatri Mahajan

Abstract:

Modern Construction Technology (CT) includes a broad range of advanced techniques and practices that bound the recent developments in material technology, design methods, quantity surveying, facility management, services, structural analysis and design, and other management education. Adoption of recent digital transformation technology is the need of today to speed up the business and is also the basis of construction improvement. Incorporating and practicing the technologies such as cloud-based communication and collaboration solution, Mobile Apps and 5G,3D printing, BIM and Digital Twins, CAD / CAM, AR/ VR, Big Data, IoT, Wearables, Blockchain, Modular Construction, Offsite Manifesting, Prefabrication, Robotic, Drones and GPS controlled equipment expedite the progress in the Construction industry (CI). Resources used are journaled research articles, web/net surfing, books, thesis, reports/surveys, magazines, etc. The outline of the research organization for this study is framed at four distinct levels in context to conceptualization, resources, innovative and emerging trends in CI, and better methods for completion of the construction projects. The present study conducted during 2020-2022 reveals that implementing these technologies improves the level of standards, planning, security, well-being, sustainability, and economics too. Application uses, benefits, impact, advantages/disadvantages, limitations and challenges, and policies are dealt with to provide information to architects and builders for smooth completion of the project. Results explain that construction technology trends vary from 4 to 15 for CI, and eventually, it reaches 27 for Civil Engineering (CE). The perspective of the most recent innovations, trends, tools, challenges, and solutions is highly embraced in the field of construction. The incorporation of the above said technologies in the pandemic Covid -19 and post-pandemic might lead to a focus on finding out effective ways to adopt new-age technologies for CI.

Keywords: BIM, drones, GPS, mobile apps, 5G, modular construction, robotics, 3D printing

Procedia PDF Downloads 77
17835 Optimal Site Selection for Temporary Housing regarding Disaster Management Case Study: Tehran Municipality (No.6)

Authors: Ghazaleh Monazami Tehrani, Zhamak Monazami Tehrani, Raziyeh Hadavand

Abstract:

Optimal site selection for temporary housing is one of the most important issues in crisis management. In this research, district six of Tehran city with high frequency and geographical distribution of earthquakes has been selected as a case study for positioning temporary housing after a probable earthquake. For achieving this goal this study tries to identify and evaluate distribution of location according to some standards such as compatible and incompatible urban land uses with utility of GIS and AHP. The results of this study show the most susceptible parts of this region in the center. According to the maps, north eastern part of Kordestan, Shaheed Gomnam intersection possesses the highest pixels value in terms of areal extent, therefore these places are recommended as an optimum site location for construction of emergency evacuation base.

Keywords: optimal site selection, temporary housing , crisis management, AHP, GIS

Procedia PDF Downloads 229
17834 Preliminary WRF SFIRE Simulations over Croatia during the Split Wildfire in July 2017

Authors: Ivana Čavlina Tomašević, Višnjica Vučetić, Maja Telišman Prtenjak, Barbara Malečić

Abstract:

The Split wildfire on the mid-Adriatic Coast in July 2017 is one of the most severe wildfires in Croatian history, given the size and unexpected fire behavior, and it is used in this research as a case study to run the Weather Research and Forecasting Spread Fire (WRF SFIRE) model. This coupled fire-atmosphere model was successfully run for the first time ever for one Croatian wildfire case. Verification of coupled simulations was possible by using the detailed reconstruction of the Split wildfire. Specifically, precise information on ignition time and location, together with mapped fire progressions and spotting within the first 30 hours of the wildfire, was used for both – to initialize simulations and to evaluate the model’s ability to simulate fire’s propagation and final fire scar. The preliminary simulations were obtained using high-resolution vegetation and topography data for the fire area, additionally interpolated to fire grid spacing at 33.3 m. The results demonstrated that the WRF SFIRE model has the ability to work with real data from Croatia and produce adequate results for forecasting fire spread. As the model in its setup has the ability to include and exclude the energy fluxes between the fire and the atmosphere, this was used to investigate possible fire-atmosphere interactions during the Split wildfire. Finally, successfully coupled simulations provided the first numerical evidence that a wildfire from the Adriatic coast region can modify the dynamical structure of the surrounding atmosphere, which agrees with observations from fire grounds. This study has demonstrated that the WRF SFIRE model has the potential for operational application in Croatia with more accurate fire predictions in the future, which could be accomplished by inserting the higher-resolution input data into the model without interpolation. Possible uses for fire management in Croatia include prediction of fire spread and intensity that may vary under changing weather conditions, available fuels and topography, planning effective and safe deployment of ground and aerial firefighting forces, preventing wildland-urban interface fires, effective planning of evacuation routes etc. In addition, the WRF SFIRE model results from this research demonstrated that the model is important for fire weather research and education purposes in order to better understand this hazardous phenomenon that occurs in Croatia.

Keywords: meteorology, agrometeorology, fire weather, wildfires, couple fire-atmosphere model

Procedia PDF Downloads 53
17833 The Effectiveness of Dialectical Behavior Therapy in Developing Emotion Regulation Skill for Adolescent with Intellectual Disability

Authors: Shahnaz Safitri, Rose Mini Agoes Salim, Pratiwi Widyasari

Abstract:

Intellectual disability is characterized by significant limitations in intellectual functioning and adaptive behavior that appears before the age of 18 years old. The prominent impacts of intellectual disability in adolescents are failure to establish interpersonal relationships as socially expected and lower academic achievement. Meanwhile, it is known that emotion regulation skills have a role in supporting the functioning of individual, either by nourishing the development of social skills as well as by facilitating the process of learning and adaptation in school. This study aims to look for the effectiveness of Dialectical Behavior Therapy (DBT) in developing emotion regulation skills for adolescents with intellectual disability. DBT's special consideration toward clients’ social environment and their biological condition is foreseen to be the key for developing emotion regulation capacity for subjects with intellectual disability. Through observations on client's behavior, conducted before and after the completion of DBT intervention program, it was found that there is an improvement in client's knowledge and attitudes related to the mastery of emotion regulation skills. In addition, client's consistency to actually practice emotion regulation techniques over time is largely influenced by the support received from the client's social circles.

Keywords: adolescent, dialectical behavior therapy, emotion regulation, intellectual disability

Procedia PDF Downloads 272
17832 Discrete-Time Bulk Queue with Service Capacity Depending on Previous Service Time

Authors: Yutae Lee

Abstract:

This paper considers a discrete-time bulk-arrival bulkservice queueing system, where service capacity varies depending on the previous service time. By using the generating function technique and the supplementary variable method, we compute the distributions of the queue length at an arbitrary slot boundary and a departure time.

Keywords: discrete-time queue, bulk queue, variable service capacity, queue length distribution

Procedia PDF Downloads 449
17831 Risk Based Building Information Modeling (BIM) for Urban Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Building Information Modeling (BIM) is a holistic documentation process for operational visualization, design coordination, estimation and project scheduling. BIM software defines objects parametrically and it is a tool for virtual reality. Primary advantage of implementing BIM is the visual coordination of the building structure and systems such as Mechanical, Electrical and Plumbing (MEP) and it also identifies the possible conflicts between the building systems. This paper is an attempt to develop a risk based BIM model which would highlight the primary advantages of application of BIM pertaining to urban infrastructure transportation project. It has been observed that about 40% of the Architecture, Engineering and Construction (AEC) companies use BIM but primarily for their outsourced projects. Also, 65% of the respondents agree that BIM would be used quiet strongly for future construction projects in India. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors and building service providers (MEP). Integration of risk management along with BIM would provide enhanced co-ordination, collaboration and high probability of successful completion of the complex infrastructure transportation project within stipulated time and cost frame.

Keywords: building information modeling (BIM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 278
17830 The Effect of Environmental Assessment Learning in Evacuation Centers on the COVID-19 Situation

Authors: Hiromi Kawasaki, Satoko Yamasaki, Mika Iwasa, Tomoko Iki, Akiko Takaki

Abstract:

In basic nursing, the conditions necessary for maintaining human health -temperature, humidity, illumination, distance from others, noise, moisture, meals, and excretion- were explained. Nursing students often think of these conditions in the context of a hospital room. In order to make students think of these conditions in terms of an environment necessary for maintaining health and preventing illness for residents, in the third year of community health nursing, students learned how to assess and improve the environment -particularly via the case of shelters in the event of a disaster. The importance of environmental management has increased in 2020 as a preventive measure against COVID-19 infection. We verified the effect of the lessons, which was decided to be conducted through distance learning. Sixty third-year nursing college students consented to participate in this study. Environmental standard knowledge for conducting environmental assessment was examined before and after class, and the percentage of correct answers was compared. The χ² test was used for the test, with a 5% significance level employed. Measures were evaluated via a report submitted by the students after class. Student descriptions were analyzed both qualitatively and descriptively with respect to expected health problems and suggestions for improvement. Students have already learned about the environment in terms of basic nursing in their second year. The correct answers for external environmental values concerning interpersonal distance, illumination, noise, and room temperature (p < 0.001) increased significantly after taking the class. Humidity was registered 83.3% before class and 93.3% after class (p = 0.077). Regarding the body, the percentage of students who answered correctly was 70% or more, both before and after the class. The students’ reports included overcrowding, high humidity/high temperature, and the number of toilets as health hazards. Health disorders to be prevented were heat stroke, infectious diseases, and economy class syndrome; improvement methods were recommended for hyperventilation, stretching, hydration, and waiting at home. After the public health nursing class, the students were able to not only propose environmental management of a hospital room but also had an understanding of the environment in terms of the lives of individuals, environmental assessment, and solutions to health problems. The response rate for basic items learned in the second year was already high before and after class, and interpersonal distance and ventilation were described by students. Students were able to use what they learned in basic nursing about the standards of the human mind and body. In the external environment, the memory of specific numerical values was ambiguous. The environment of the hospital room is controlled, and interest in numerical values may decrease. Nursing staff needs to maintain and improve human health as well as hospital rooms. With COVID-19, it was thought that students would continue to not only consider this point in reference to hospital rooms but also in regard to places where people gather. Even in distance learning, students were able to learn the important issues and lessons.

Keywords: environmental assessment, evacuation center, nursing education, nursing students

Procedia PDF Downloads 68
17829 Brand Building in Higher Education: A Grounded Theory Investigation of the Impact of the ‘Positive-Visualization-Course in Brand Identity’ upon Freshmen Student's Perception

Authors: Maria Kountouridou, Dino Domic

Abstract:

Within an increasingly competitive and dynamic environment, the higher education sector is becoming more commodified, with the concept of branding to become exceedingly imperative and an inextricable ingredient for the university’s success. Branding in higher education has proven to be an effective strategy that managed to receive considerable attention in the recent few years, and a growing number of articles have begun to appear in the literature. However, a clear void in the literature confirms that the concept of students’ perceptions towards the university’s brand image has not been researched extensively. An investigation on this central concept is of paramount importance since it will facilitate the development of an inductively generated theoretical model concerning branding in higher education. This research focuses on examining the impact of the ‘positive-visualization-course in brand identity’ upon the perception of freshmen students towards a university’s brand image. A grounded theory methodology has been selected, consisting of semi-structured interviews. Forty-two students have participated in the research, among which twenty-five women and seventeen men. The identification of the sample emerged through the use of the snowball sampling technique. The participants were divided into two groups (experimental and control group) after the researcher had taken into consideration the factor ‘program of study’, to eliminate any possible interaction between the participants of each group. An experiment was carried out where a ‘positive-visualization-course in brand identity’ was conducted among the participants of the experimental group, while the participants of the control group have not been exposed to the course. For the purpose of this research, the term ‘positive-visualization-course in brand identity’ refers to a course where brand history, past achievements/recognitions/awards, its values, and its mission are presented. Prior to the course implementation, face-to-face semi-structured interviews were carried out among the participants of both groups, with the aim of examining the freshmen students’ perceptions towards the university’s brand image. One week after the course implementation, the researcher carried out semi-structured interviews with the participants of the experimental group only in order to identify whether students’ perceptions had been affected after the course completion. Four months after the course completion, semi-structured interviews were carried out among the participants of both groups. Eight months after the course completion, semi-structured interviews were conducted with the aim of identifying the freshmen students’ updated perceptions. Data has been analyzed using substantive coding (open and selective coding), theoretical coding, field memos, and constant comparative analysis. The findings strongly suggest that the ‘positive-visualization-course in brand identity’ can positively affect freshmen students’ perceptions towards a university’s brand image. Additionally, other factors conduce to the formation of perception throughout the months. This study contributes and expands upon the existing literature by presenting an inductively generated theoretical model to guide future research in the links between ‘positive-visualization-course in brand identity’ and the perception of freshmen students towards a university’s brand image.

Keywords: brand image, brand name, branding, higher education marketing, perception

Procedia PDF Downloads 152
17828 Using Log Files to Improve Work Efficiency

Authors: Salman Hussam

Abstract:

As a monitoring system to manage employees' time and employers' business, this system (logger) will monitor the employees at work and will announce them if they spend too much time on social media (even if they are using proxy it will catch them). In this way, people will spend less time at work and more time with family.

Keywords: clients, employees, employers, family, monitoring, systems, social media, time

Procedia PDF Downloads 465
17827 Time Management in the Public Sector in Nigeria

Authors: Sunny Ewankhiwimen Aigbomian

Abstract:

Time, is a scarce resource and in everything we do, time is required to accomplish any given task. The need for this presentation is predicated on the way majority of Nigerian especially in the public sector operators see “Time Management”. Time as resources cannot be regained if lost or managed badly. As a significant aspect of human life it should be handled with diligence and utmost seriousness if the public sector is to function as a coordinated entity. In our homes, private life and offices, we schedule different things to ensure that some things do not go the unexpected. When it comes to service delivery on the part of government, it ought to be more serious because government is all about effect and efficient service delivery and “Time” is a significant variable necessary to successful accomplishment. The need for Nigerian government to re-examine time management in her public sector with a view of repositioning the sector to be able to compete well with other public sectors in the world. The peculiarity of Time management in Public Sector in Nigerian context as examined and some useful recommendations of immerse assistance proffered.

Keywords: Nigeria, public sector, time management, task

Procedia PDF Downloads 65
17826 Algorithms Minimizing Total Tardiness

Authors: Harun Aydilek, Asiye Aydilek, Ali Allahverdi

Abstract:

The total tardiness is a widely used performance measure in the scheduling literature. This performance measure is particularly important in situations where there is a cost to complete a job beyond its due date. The cost of scheduling increases as the gap between a job's due date and its completion time increases. Such costs may also be penalty costs in contracts, loss of goodwill. This performance measure is important as the fulfillment of due dates of customers has to be taken into account while making scheduling decisions. The problem is addressed in the literature, however, it has been assumed zero setup times. Even though this assumption may be valid for some environments, it is not valid for some other scheduling environments. When setup times are treated as separate from processing times, it is possible to increase machine utilization and to reduce total tardiness. Therefore, non-zero setup times need to be considered as separate. A dominance relation is developed and several algorithms are proposed. The developed dominance relation is utilized in the proposed algorithms. Extensive computational experiments are conducted for the evaluation of the algorithms. The experiments indicated that the developed algorithms perform much better than the existing algorithms in the literature. More specifically, one of the newly proposed algorithms reduces the error of the best existing algorithm in the literature by 40 percent.

Keywords: algorithm, assembly flowshop, dominance relation, total tardiness

Procedia PDF Downloads 326
17825 Time "And" Dimension(s) - Visualizing the 4th and 4+ Dimensions

Authors: Siddharth Rana

Abstract:

As we know so far, there are 3 dimensions that we are capable of interpreting and perceiving, and there is a 4th dimension, called time, about which we don’t know much yet. We, as humans, live in the 4th dimension, not the 3rd. We travel 3 dimensionally but cannot yet travel 4 dimensionally; perhaps if we could, then visiting the past and the future would be like climbing a mountain or going down a road. So far, we humans are not even capable of imagining any higher dimensions than the three dimensions in which we can travel. We are the beings of the 4th dimension; we are the beings of time; that is why we can travel 3 dimensionally; however, if, say, there were beings of the 5th dimension, then they would easily be able to travel 4 dimensionally, i.e., they could travel in the 4th dimension as well. Beings of the 5th dimension can easily time travel. However, beings of the 4th dimension, like us, cannot time travel because we live in a 4-D world, traveling 3 dimensionally. That means to ever do time travel, we just need to go to a higher dimension and not only perceive it but also be able to travel in it. However, traveling to the past is not very possible, unlike traveling to the future. Even if traveling to the past were possible, it would be very unlikely that an event in the past would be changed. In this paper, some approaches are provided to define time, our movement in time to the future, some aspects of time travel using dimensions, and how we can perceive a higher dimension.

Keywords: time, dimensions, String theory, relativity

Procedia PDF Downloads 68