7356 Basic Research on Applying Temporary Work Engineering at the Design Phase

Authors: Jin Woong Lee, Kyuman Cho, Taehoon Kim

Abstract:

The application of constructability is increasingly required not only in the construction phase but also in the whole project stage. In particular, the proper application of construction experience and knowledge during the design phase enables the minimization of inefficiencies such as design changes and improvements in constructability during the construction phase. In order to apply knowledge effectively, engineering technology efforts should be implemented with design progress. Among many engineering technologies, engineering for temporary works, including facilities, equipment, and other related construction methods, is important to improve constructability. Therefore, as basic research, this study investigates the applicability of temporary work engineering during the design phase in the building construction industry. As a result, application of temporary work engineering has a greater impact on construction cost reduction and constructability improvement. In contrast to the existing design-bid-build method, the turn-key and CM (construct management) procurement methods currently being implemented in Korea are expected to have a significant impact on the direction of temporary work engineering. To introduce temporary work engineering, expert/professional organization training is first required, and a lack of client awareness should be preferentially improved. The results of this study are expected to be useful as reference material for the development of more effective temporary work engineering tasks and work processes in the future.

Keywords: Temporary Work Engineering, Design Phase, Constructability, Building Construction

Procedia PDF Downloads 360
7355 Integration of LCA and BIM for Sustainable Construction

Authors: Laura Álvarez Antón, Joaquín Díaz

Abstract:

The construction industry is turning towards sustainability. It is a well-known fact that sustainability is based on a balance between environmental, social and economic aspects. In order to achieve sustainability efficiently, these three criteria should be taken into account in the initial project phases, since that is when a project can be influenced most effectively. Thus the aim must be to integrate important tools like BIM and LCA at an early stage in order to make full use of their potential. With the synergies resulting from the integration of BIM and LCA, a wider approach to sustainability becomes possible, covering the three pillars of sustainability.

Keywords: building information modeling (BIM), construction industry, design phase, life cycle assessment (LCA), sustainability

Procedia PDF Downloads 422
7354 Regional Identity Construction of Acehnese English Teachers in Professional Practice

Authors: Ugahara Bin Mahyuddin Yunus

Abstract:

In English Language Teaching, it cannot be denied that the backgrounds of English teachers do affect the way they teach English to their students, which in turn will affect their students’ English learning itself. Thus, it is very important to understand who the English teachers are so that how they teach English to their students can be understood. One of their backgrounds that is essential to be highlighted is their culture. Certainly, they wittingly or not will bring the perspectives and values of their culture into their daily teaching practices. In other words, their cultural identities do shape how they teach their students. Cultural identities themselves actually consist of some elements, one of which is regional identity. Indeed, the culture of the region in which English teachers identify with has impact on their beliefs and actions during teaching. For this reason, this study aims to understand how the regional identity of English teachers influence the way they teach English to their students. This study is a qualitative study conducted in a multilingual and multicultural setting, namely Aceh, Indonesia. Here, four Acehnese English teachers were involved as the research participants. In addition, this study adopted poststructuralist perspective to identity as the theoretical framework. Three research instruments were used in this study, namely semi-structured interviews, classroom observation, and teacher journal. The data gained from these instruments were then analyzed by using thematic analysis. Obviously, the research about the regional identity of English teachers in English Language Teaching has been studied worldwide. However, little is still known about it in Indonesian context, let alone Indonesia itself is a super diverse country with 34 regions. As a result, this study presents a good opportunity to advance the knowledge of how the regional identity construction of English teachers in this setting is. The findings of the study revealed that their regional identity construction in teaching was highly influenced by their indigenous language and religious faith. Even, how they teach English in classroom, in fact, is related to these two things. The conclusion that can be drawn from this study is for these English teachers, in fact, their regional identity itself constitutes their use of local language and religious identity, which are considered by them as their core identity.

Keywords: English language teaching, English teachers, identity construction, regional identity

Procedia PDF Downloads 222
7353 Risk Factors Affecting Construction Project Cost in Oman

Authors: Omar Amoudi, Latifa Al Brashdi

Abstract:

Construction projects are always subject to risks and uncertainties due to its unique and dynamic nature, outdoor work environment, the wide range of skills employed, various parties involved in addition to situation of construction business environment at large. Altogether, these risks and uncertainties affect projects objectives and lead to cost overruns, delay, and poor quality. Construction projects in Oman often experience cost overruns and delay. Managing these risks and reducing their impacts on construction cost requires firstly identifying these risks, and then analyzing their severity on project cost to obtain deep understanding about these risks. This in turn will assist construction managers in managing and tacking these risks. This paper aims to investigate the main risk factors that affect construction projects cost in the Sultanate of Oman. In order to achieve the main aim, literature review was carried out to identify the main risk factors affecting construction cost. Thirty-three risk factors were identified from the literature. Then, a questionnaire survey was designed and distributed among construction professionals (i.e., client, contractor and consultant) to obtain their opinion toward the probability of occurrence for each risk factor and its possible impact on construction project cost. The collected data was analyzed based on qualitative aspects and in several ways. The severity of each risk factor was obtained by multiplying the probability occurrence of a risk factor with its impact. The findings of this study reveal that the most significant risk factors that have high severity impact on construction project cost are: Change of Oil Price, Delay of Materials and Equipment Delivery, Changes in Laws and Regulations, Improper Budgeting, and Contingencies, Lack of Skilled Workforce and Personnel, Delays Caused by Contractor, Delays of Owner Payments, Delays Caused by Client, and Funding Risk. The results can be used as a basis for construction managers to make informed decisions and produce risk response procedures and strategies to tackle these risks and reduce their negative impacts on construction project cost.

Keywords: construction cost, construction projects, Oman, risk factors, risk management

Procedia PDF Downloads 310
7352 Sustainability Adoption Barriers in Small and Mid-size Enterprises (SEMs)

Authors: L.Vaz, L. Ferreira, R. Aparício, J. Pedro, M. Franco

Abstract:

This article concerns a qualitative analysis, through an interview, regarding “Sustainability Adoption Barriers in SMEs.” To begin with, the article provides a state-of-the-art overview through fifty-seven articles initially extracted from the Scopus database. The articles were analyzed, and four main clusters emerged in the literature: 1) sustainability and small and medium-sized companies; 2) sustainable business models; 3) sustainability practices adoption procedures, and 4) adoption difficulties on sustainability practices. Utilizing interviews as a methodology, the article seeks to strengthen knowledge regarding sustainability practices, their barriers and the sustainable procedures adopted by SMEs in a Portuguese context. The results demonstrate that the literature agrees with this case study, where there are numerous sustainable practices, yet, due to financial, political, cultural, and technological factors, barriers emerge in the adoption process. By comparing the literature findings with the conducted interviews of interior Portuguese SMEs, this article develops a contribution to the scientific community through a captivating, intuitive and motivating way.

Keywords: barriers, practices, business model, green

Procedia PDF Downloads 149
7351 Strength Analysis of RCC Dams Subject to the Layer-by-Layer Construction Method

Authors: Archil Motsonelidze, Vitaly Dvalishvili

Abstract:

Existing roller compacted concrete (RCC) dams indicate that the layer-by-layer construction method gives considerable economies as compared with the conventional methods. RCC dams have also gained acceptance in the regions of high seismic activity. Earthquake resistance analysis of RCC gravity dams based on nonlinear finite element technique is presented. An elastic-plastic approach is used to describe the material of a dam while it is under static conditions (period of construction). Seismic force, as an acceleration equivalent to that produced by a real earthquake, is supposed to act when the dam is completed. The materials of the dam and foundation may be nonhomogeneous and anisotropic. The “dam-foundation” system is idealized as a plain strain problem.

Keywords: finite element method, layer-by-layer construction, RCC dams, strength analysis

Procedia PDF Downloads 530
7350 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 252
7349 Navigating Neural Pathways to Success with Students on the Autism Spectrum

Authors: Panda Krouse

Abstract:

This work is a marriage of the science of Applied Behavioral Analysis and an educator’s look at Neuroscience. The focus is integrating what we know about the anatomy of the brain in autism and evidence-based practices in education. It is a bold attempt to present links between neurological research and the application of evidence-based practices in education. In researching for this work, no discovery of articles making these connections was made. Consideration of the areas of structural differences in the brain are aligned with evidence-based strategies. A brief literary review identifies how identified areas affect overt behavior, which is what, as educators, is what we can see and measure. Giving further justification and validation of our practices in education from a second scientific field is significant for continued improvement in intervention for students on the autism spectrum.

Keywords: autism, evidence based practices, neurological differences, education intervention

Procedia PDF Downloads 38
7348 An Evaluation of Barriers to Implement Reverse Logistics: A Case Study of Indian Fastener Industry

Authors: D. Garg, S. Luthra, A. Haleem

Abstract:

Reverse logistics (RL) is supposed to be a systematic procedure that helps in improving the environmental hazards and maintain business sustainability for industries. Industries in Indian are now opting for adoption of RL techniques in business. But, RL practices are not popular in Indian industries because of many barriers for its successful implementation. Therefore, need arises to identify and evaluate the barriers to implement RL practices by taking an Indian industries perspective. Literature review approach and case study approach have been adapted to identify relevant barriers to implement RL practices. Further, Fuzzy Decision Making Trial and Evaluation Laboratory methodology has been brought into use for evaluating causal relationships among the barriers to implement RL practices. Seven barriers out of ten barriers have been categorized into the cause group and remaining into effect group. This research will help Indian industries to manage these barriers towards effective implementing RL practices.

Keywords: barriers, decision making trial and evaluation laboratory (DEMATEL), fuzzy set theory, Indian industries, reverse logistics (RL)

Procedia PDF Downloads 303
7347 The Way of the English Use of Businessmen for the ASEAN Economic Community in Chonburi Province

Authors: Kittivate Boonyopakorn

Abstract:

The purposes of this study were to investigate the method of the English use of the businessmen and to study their behavior of the utilization for the ASEAN economic community. The participants were divided into the three types of the merchants including the construction contractors, the construction material traders, and SME entrepreneurs. Survey questionnaires and interviews were used in this study. The findings showed that in the type of traders, 23 of the participants are construction contractors, 121 are construction material traders, and 206 are SME entrepreneurs. The study of English in language institute is highly 51.4%. The use of Google in translating English into Thai is 41.7%. Learning English themselves is 41.1% respectively. The businessmen study English for readiness for their trade.

Keywords: way of rnglish use, businessmen, ASEAN economic community, Chonburi province

Procedia PDF Downloads 219
7346 The Relationship between HR Disclosure and Employee’s Turnover: Study on the Telecommunication Sector in Jordan

Authors: Dina Ahmed Alkhodary

Abstract:

Human Resources are the individual skills, knowledge, attitude, capabilities and experience collected to produce wealth to the company. Human Resource disclosure is the process of involving, reporting, and sharing the Investments made in the Human Resources of an Organization that such as organizations short goals and objectives, employees creation value, training and development plan are presently not accounted for in the conventional accounting practices which is importance nowadays to reduce the employee`s turnover. For the purpose of the study 3 telecommunications companies in Jordan have been selected. Telecommunication industry has been chosen for this study since it is a successful sector in Jordan and Human resource disclosure practices were adopted in all the selected companies and companies was aware to the HR practices. The objective of the study is to find out the HR disclosures practices of the telecommunication Companies in Jordan and to find the relationship between the HR Disclosures practices and employees’ turnover which has been measured by leaver proficiencies, remaining member proficiencies and the new comers proficiencies. The researcher has used the questioner to collect data for the research purpose. Results reveal that There are human resource disclosure practices in telecommunication companies in Jordan but in some areas only and has found There that there is a significant relationship between the human resource disclosure practices of the telecommunication companies in Jordan and Employees turnover. It is important to the companies to disclose more information and it’s important to the researchers to study the HR disclosure in the other industries in Jordan to increase the awareness about it.

Keywords: HR, disclosure, employee, turnover

Procedia PDF Downloads 282
7345 Sustainable Human Resource Management in the Hotel Industry: Assessing the Mediating Effect of Physiological Climate on Employee Performance

Authors: Mohammad Salameh Almasarweh

Abstract:

The primary aim of this research is to explore the mediating role of physiological climate in the relationship between green HRM practices (specifically, GHRM practices, GHRM recruitment, GHRM training, GHRM performance appraisal, and GHRM empowerment) and employee performance within the hotel industry. The study revealed that green HRM practices, encompassing green recruiting, green training, green performance evaluation, and green empowerment, exerted a statistically significant influence on employee performance. A quantitative method was employed for this research, focusing on hotel managers in Jordan as the study's population. Data were collected through a questionnaire distributed to a convenience sample of 300 managers from various hotels in Jordan. The results of the study align with prior research, supporting the notion that green HRM practices positively impact both employee performance and physiological climate. Furthermore, the findings of this study indicate that physiological climate acts as a mediating factor in the relationship between green HRM practices and employee performance in Jordanian hotels.

Keywords: GHRM practices, GHRM recruitment, GHRM training, GHRM performance appraisal, GHRM empowerment, employee’s performance, physiological climate

Procedia PDF Downloads 37
7344 Risk Management Practices In The Construction Industry In Malawi

Authors: Taonga Temwani Chibaka

Abstract:

This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.

Keywords: risk management, risk factors, risks, malawi

Procedia PDF Downloads 261
7343 GIS Based Project Management Information System for Infrastructure Projects

Authors: Riki Panchal, Debasis Sarkar

Abstract:

This paper describes the work done for the GIS-based project management for different infrastructure projects. It is a review paper which gives the idea of the trends in the construction project management and various models adopted for the betterment of the project planning and execution. Traditional scheduling and progress control techniques such as bar charts and the critical path method fail to provide information pertaining to the spatial aspects of a construction project. An integrated system was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. Hence, it is suggested to work on the common platform from where all the data can be shared and analyzed.

Keywords: GIS, project management, integrated model, infrastructure project

Procedia PDF Downloads 485
7342 A Study on the Construction Process and Sustainable Renewal Development of High-Rise Residential Areas in Chongqing (1978-2023)

Authors: Xiaoting Jing, Ling Huang

Abstract:

After the reform and opening up, Chongqing has formed far more high-rise residential areas than other cities in its more than 40 years of urban construction. High-rise residential areas have become one of the main modern living models in Chongqing and an important carrier reflecting the city's high quality of life. Reviewing the construction process and renewal work helps understand the characteristics of high-rise residential areas in Chongqing at different stages, clarify current development demands, and look forward to the focus of future renewal work. Based on socio-economic development and policy background, the article sorts the construction process of high-rise residential areas in Chongqing into four stages: the early experimental construction period of high-rise residential areas (1978-1996), the rapid start-up period of high-rise commodity housing construction (1997-2006), the large-scale construction period of high-rise commodity housing and public rental housing (2007-2014), and the period of renewal and renovation of high-rise residential areas and step-by-step construction of quality commodity housing (2015-present). Based on the construction demands and main construction types of each stage, the article summarizes that the construction of high-rise residential areas in Chongqing features large scale, high speed, and high density. It points out that a large number of high-rise residential areas built after 2000 will become important objects of renewal and renovation in the future. Based on existing renewal work experience, it is urgent to explore a path for sustainable renewal and development in terms of policy mechanisms, digital supervision, and renewal and renovation models, leading the high-rise living in Chongqing toward high-quality development.

Keywords: high-rise residential areas, construction process, renewal and renovation, Chongqing

Procedia PDF Downloads 32
7341 An Analysis of Prefabricated Construction Waste: A Case Study Approach

Authors: H. Hakim, C. Kibert, C. Fabre, S. Monadizadeh

Abstract:

Construction industry is an industry saddled with chronic problems of high waste generation. Waste management that is to ensure materials are utilized in an efficient manner would make a major contribution to mitigating the negative environmental impacts of construction waste including finite resources depletion and growing occupied landfill areas to name a few. Furthermore, ‘material resource efficiency’ has been found an economically smart approach specially when considered during the design phase. One effective strategy is to utilizing off-site construction process which includes a series of prefabricated systems such as mobile, modular, and HUD construction (Department of Housing and Urban Development manufactured buildings). These types of buildings are by nature material and resource-efficient. Despite conventional construction that is exposed to adverse weather conditions, manufactured construction production line is capable of creating repetitive units in a factory controlled environment. A factory can have several parallel projects underway with a high speed and in a timely manner which simplifies the storage of excess materials and re-allocating to the next projects. The literature reports that prefabricated construction significantly helps reduce errors, site theft, rework, and delayed problems and can ultimately lead to a considerable waste reduction. However, there is not sufficient data to quantify this reduction when it comes to a regular modular house in the U.S. Therefore, this manuscript aims to provide an analysis of waste originated from a manufactured factory trend. The analysis was made possible with several visits and data collection of Homes of Merits, a Florida Manufactured and Modular Homebuilder. The results quantify and verify a noticeable construction waste reduction.

Keywords: construction waste, modular construction, prefabricated buildings, waste management

Procedia PDF Downloads 243
7340 Causes of Cost Overrun in Building Construction Projects: Case Study from Al Madinah, Saudi Arabia

Authors: Z. Hamed, K. Sa'deya, E. Abdelrasheed, I. Mahamid

Abstract:

The construction industry is one of the main sectors that play basic role in the urban and rural development of a society. It provides important ingredients for the development of an economy. However, many construction projects experience extensive cost overrun. This study was conducted to identify the causes of cost overrun in building construction contracts in Al Madinah, Saudi Arabia and test the importance of these causes from contractors' perspective. To achieve the study objectives, a questionnaire survey was conducted to identify and rank cost overrun causes from the perspective of contractors. The findings found that the top five cost overrun causes are: lack of experience in the line of work, lack of labor productivity, delay in payments, rework and material waste. It is hoped that the findings will guide efforts to improve the performance of construction industry in Saudi Arabia and other developing countries.

Keywords: building, contractor, cost increase, cost overrun

Procedia PDF Downloads 127
7339 Circular Economy: Development of Quantitative Material Wastage Management Plan for Effective Waste Reduction in Building Construction Industry

Authors: Kwok Tak Kit

Abstract:

Combating climate change is becoming a hot topic in various sectors. Building construction and infrastructure sectors contributed a significant proportion of waste and GHGs emissions in the economy of different countries and cities. Many types of research had conducted and discussed the topic of waste management and waste management being a macro-level control is well developed in the building and construction industry. However, there is little research and studies on the micro-level of waste management, “building construction material wastage management,” and fewer reviews about regulatory control in the building construction sector. In this paper, we will focus on the potentialities and importance of material wastage management and review the deficiencies of the current standard to take into account the reduction of material wastage in a systematic and quantitative approach.

Keywords: quantitative measurement, material wastage management plan, waste management, uncalculated waste, circular economy

Procedia PDF Downloads 121
7338 Households’ Willingness to Pay for Watershed Management Practices in Lake Hawassa Watershed, Southern Ethiopia

Authors: Mulugeta Fola, Mengistu Ketema, Kumilachew Alamerie

Abstract:

Watershed provides vast economic benefits within and beyond the management area of interest. But most watersheds in Ethiopia are increasingly facing the threats of degradation due to both natural and man-made causes. To reverse these problems, communities’ participation in sustainable management programs is among the necessary measures. Hence, this study assessed the households’ willingness to pay for watershed management practices through a contingent valuation study approach. Double bounded dichotomous choice with open-ended follow-up format was used to elicit the households’ willingness to pay. Based on data collected from 275 randomly selected households, descriptive statistics results indicated that most households (79.64%) were willing to pay for watershed management practices. A bivariate Probit model was employed to identify determinants of households’ willingness to pay and estimate mean willingness to pay. Its result shows that age, gender, income, livestock size, perception of watershed degradation, social position, and offered bids were important variables affecting willingness to pay for watershed management practices. The study also revealed that the mean willingness to pay for watershed management practices was calculated to be 58.41 Birr and 47.27 Birr per year from the double bounded and open-ended format, respectively. The study revealed that the aggregate welfare gains from watershed management practices were calculated to be 931581.09 Birr and 753909.23 Birr per year from double bounded dichotomous choice and open-ended format, respectively. Therefore, the policymakers should make households to pay for the services of watershed management practices in the study area.

Keywords: bivariate probit model, contingent valuation, watershed management practices, willingness to pay

Procedia PDF Downloads 196
7337 A Comparative Study on the Impact of Global Warming of Applying Low Carbon Factor Concrete Products

Authors: Su-Hyun Cho, Chang-U Chae

Abstract:

Environmental impact assessment techniques have been developed as a result of the worldwide efforts to reduce the environmental impact of global warming. By using the quantification method in the construction industry, it is now possible to manage the greenhouse gas is to systematically evaluate the impact on the environment over the entire construction process. In particular, the proportion of greenhouse gas emissions at the production stage of construction material occupied is high, and efforts are needed in particular in the construction field. In this study, intended for concrete products for the construction materials, by using the LCA evaluation method, we compared the results of environmental impact assessment and carbon emissions of developing products that have been applied low-carbon technologies compared to existing products. As a results, by introducing a raw material of industrial waste, showed carbon reduction. Through a comparison of the carbon emission reduction effect of low-carbon technologies, it is intended to provide academic data for the evaluation of greenhouse gases in the construction sector and the development of low-carbon technologies of the future.

Keywords: CO₂ emissions, CO₂ reduction, ready-mixed concrete, environmental impact assessment

Procedia PDF Downloads 444
7336 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 225
7335 Identifying Barriers of Implementing Building Information Modelling in Construction

Authors: Kasra HosseinMostofi, Mohamadamin Oyar Hossein, Reza Mehdizadeh Anvigh

Abstract:

BIM is an innovative concept for the majority of firms operating in industry. BIM offers a new paradigm to design, construct, operate, and maintain a facility. However, even with the most conscientious use, stakeholders can run into trouble during its implementation on a project or within an organization. At times, project stakeholders are unaware of the challenges that they can face with the implementation at the project level or an organizational level. Therefore, the study aimed to identify and compile barriers associated with the BIM implementation at the project and organizational level, as per the literature. Despite the fact that innumerable advantageous involved in exploiting BIM, there are some barriers to implement it properly. These barriers have been proved as impediments for academicians and members of construction team project to take the maximum advantage of its utilization. Although some research has been conducted to identify these barriers regarding BIM implementation in construction industry, more research is needed to be carried out among academicians to identify these barriers in institutions, and most importantly, to make suggestions for eliminating these obstacles.

Keywords: building information modelling, construction, design and construction, designers

Procedia PDF Downloads 152
7334 Towards an Intelligent Ontology Construction Cost Estimation System: Using BIM and New Rules of Measurement Techniques

Authors: F. H. Abanda, B. Kamsu-Foguem, J. H. M. Tah

Abstract:

Construction cost estimation is one of the most important aspects of construction project design. For generations, the process of cost estimating has been manual, time-consuming and error-prone. This has partly led to most cost estimates to be unclear and riddled with inaccuracies that at times lead to over- or under-estimation of construction cost. The development of standard set of measurement rules that are understandable by all those involved in a construction project, have not totally solved the challenges. Emerging Building Information Modelling (BIM) technologies can exploit standard measurement methods to automate cost estimation process and improves accuracies. This requires standard measurement methods to be structured in ontologically and machine readable format; so that BIM software packages can easily read them. Most standard measurement methods are still text-based in textbooks and require manual editing into tables or Spreadsheet during cost estimation. The aim of this study is to explore the development of an ontology based on New Rules of Measurement (NRM) commonly used in the UK for cost estimation. The methodology adopted is Methontology, one of the most widely used ontology engineering methodologies. The challenges in this exploratory study are also reported and recommendations for future studies proposed.

Keywords: BIM, construction projects, cost estimation, NRM, ontology

Procedia PDF Downloads 521
7333 Recycling Strategies of Construction Waste in Egypt

Authors: Hanan Anwar

Abstract:

All systems recycle. The construction industry has not only become a major consumer of natural materials along with a source of pollution. Environmental integrated production, reusing and recycling is of great importance in Egypt nowadays. Governments should ensure that the technical, environmental and economic feasibility of alternative systems is considered and is taken into account before construction starts. Hereby this paper focuses on the recycle of building materials as a way for environment protection and sustainable development. Environmental management integrates the requirements of sustainable development. There are many methods used to reduce waste and increase profits through salvage, reuse, and the recycling of construction waste. Sustainable development as a tool to continual improvement cycle processes innovations to save money.

Keywords: environment, management, reuse, recycling, sustainable development

Procedia PDF Downloads 282
7332 An Introduction to Critical Chain Project Management Methodology

Authors: Ranjini Ramanath, Nanjunda P. Swamy

Abstract:

Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.

Keywords: critical chain project management methodology, critical chain, project management, construction management

Procedia PDF Downloads 397
7331 Establishment of Thuja Label: Development Prospects for the Marketing Practices of the Handicraft of Essaouira's Marquetry

Authors: Fatima El Kandoussi, Lamiae El Hdiddioui, Mustapha Bouragba

Abstract:

The woodwork of thuja in Essaouira is one of the main crafts in Morocco. Certainly, marquetry reflects both cultural and artistic identity of the city, considering the talent and ancestral knowledge of craftsman working in marquetry. Yet, the production units encounter a considerable number of difficulties among which insufficiencies within marketing practices. Consequently, it is obvious that major improvements are needed, and supportive solutions must be provided in order to improve the Essaouira’s marquetry, as a symbol of the entire province. Thus, the establishment of Thuja Label is a necessary measure that would be the key to ensuring sustainability of this vital craft. The main purpose of this paper is to study marketing practices’ current state of the production units in the marquetry of Essaouira, therefore to recommend remedial actions likely to raise them up to the required functional level.

Keywords: craft, marketing practices, marquetry, thuja label

Procedia PDF Downloads 162
7330 A Teaching Method for Improving Sentence Fluency in Writing

Authors: Manssour Habbash, Srinivasa Rao Idapalapati

Abstract:

Although writing is a multifaceted task, teaching writing is a demanding task basically for two reasons: Grammar and Syntax. This article provides a method of teaching writing that was found to be effective in improving students’ academic writing composition skill. The article explains the concepts of ‘guided-discovery’ and ‘guided-construction’ upon which a method of teaching writing is grounded and developed. Providing a brief commentary on what the core could mean primarily, the article presents an exposition of understanding and identifying the core and building upon the core that can demonstrate the way a teacher can make use of the concepts in teaching for improving the writing skills of their students. The method is an adaptation of grammar translation method that has been improvised to suit to a student-centered classroom environment. An intervention of teaching writing through this method was tried out with positive outcomes in formal classroom research setup, and in view of the content’s quality that relates more to the classroom practices and also in consideration of its usefulness to the practicing teachers the process and the findings are presented in a narrative form along with the results in tabular form.

Keywords: core of a text, guided construction, guided discovery, theme of a text

Procedia PDF Downloads 351
7329 Cost Reduction Techniques for Provision of Shelter to Homeless

Authors: Mukul Anand

Abstract:

Quality oriented affordable shelter for all has always been the key issue in the housing sector of our country. Homelessness is the acute form of housing need. It is a paradox that in spite of innumerable government initiated programmes for affordable housing, certain section of society is still devoid of shelter. About nineteen million (18.78 million) households grapple with housing shortage in Urban India in 2012. In Indian scenario there is major mismatch between the people for whom the houses are being built and those who need them. The prime force faced by public authorities in facilitation of quality housing for all is high cost of construction. The present paper will comprehend executable techniques for dilution of cost factor in housing the homeless. The key actors responsible for delivery of cheap housing stock such as capacity building, resource optimization, innovative low cost building material and indigenous skeleton housing system will also be incorporated in developing these techniques. Time performance, which is an important angle of above actors, will also be explored so as to increase the effectiveness of low cost housing. Along with this best practices will be taken up as case studies where both conventional techniques of housing and innovative low cost housing techniques would be cited. Transportation consists of approximately 30% of total construction budget. Thus use of alternative local solutions depending upon the region would be covered so as to highlight major components of low cost housing. Government is laid back regarding base line information on use of innovative low cost method and technique of resource optimization. Therefore, the paper would be an attempt to bring to light simpler solutions for achieving low cost housing.

Keywords: construction, cost, housing, optimization, shelter

Procedia PDF Downloads 416
7328 Linearization and Process Standardization of Construction Design Engineering Workflows

Authors: T. R. Sreeram, S. Natarajan, C. Jena

Abstract:

Civil engineering construction is a network of tasks involving varying degree of complexity and streamlining, and standardization is the only way to establish a systemic approach to design. While there are off the shelf tools such as AutoCAD that play a role in the realization of design, the repeatable process in which these tools are deployed often is ignored. The present paper addresses this challenge through a sustainable design process and effective standardizations at all stages in the design workflow. The same is demonstrated through a case study in the context of construction, and further improvement points are highlighted.

Keywords: syste, lean, value stream, process improvement

Procedia PDF Downloads 99
7327 Human Resource Management: A Study of Human Resource Practices in 'Maharatna' Central Public Sector Enterprises in India

Authors: Shashi Pingolia

Abstract:

The paper discusses best practices developed and followed by 07 'Maharatna' Central Public sector Enterprises in India. The paper begins with brief analyses of the contribution of ‘Maharatna’ companies in the growth story of India Inc. Progressively; it enlists Human Resource practices and approach of these 'Maharatna' companies in the areas such as Recruitment, Pay structure, Employee Benefits and Development, Rewards and Recognition practices, Performance Management Systems, etc. In the later part of the paper, HR factors that led some of these 'Maharatna' companies from average employers to 'Best Place at Work' are discussed in brief.

Keywords: central public sector enterprises in India, Maharatna companies in India, human resource management, best place to work

Procedia PDF Downloads 329