Search results for: chemotherapy scheduling
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 683

Search results for: chemotherapy scheduling

623 ACO-TS: an ACO-based Algorithm for Optimizing Cloud Task Scheduling

Authors: Fahad Y. Al-dawish

Abstract:

The current trend by a large number of organizations and individuals to use cloud computing. Many consider it a significant shift in the field of computing. Cloud computing are distributed and parallel systems consisting of a collection of interconnected physical and virtual machines. With increasing request and profit of cloud computing infrastructure, diverse computing processes can be executed on cloud environment. Many organizations and individuals around the world depend on the cloud computing environments infrastructure to carry their applications, platform, and infrastructure. One of the major and essential issues in this environment related to allocating incoming tasks to suitable virtual machine (cloud task scheduling). Cloud task scheduling is classified as optimization problem, and there are several meta-heuristic algorithms have been anticipated to solve and optimize this problem. Good task scheduler should execute its scheduling technique on altering environment and the types of incoming task set. In this research project a cloud task scheduling methodology based on ant colony optimization ACO algorithm, we call it ACO-TS Ant Colony Optimization for Task Scheduling has been proposed and compared with different scheduling algorithms (Random, First Come First Serve FCFS, and Fastest Processor to the Largest Task First FPLTF). Ant Colony Optimization (ACO) is random optimization search method that will be used for assigning incoming tasks to available virtual machines VMs. The main role of proposed algorithm is to minimizing the makespan of certain tasks set and maximizing resource utilization by balance the load among virtual machines. The proposed scheduling algorithm was evaluated by using Cloudsim toolkit framework. Finally after analyzing and evaluating the performance of experimental results we find that the proposed algorithm ACO-TS perform better than Random, FCFS, and FPLTF algorithms in each of the makespaan and resource utilization.

Keywords: cloud Task scheduling, ant colony optimization (ACO), cloudsim, cloud computing

Procedia PDF Downloads 392
622 Scheduling of Cross-Docking Center: An Auction-Based Algorithm

Authors: Eldho Paul, Brijesh Paul

Abstract:

This work proposes an auction mechanism based solution methodology for the optimum scheduling of trucks in a cross-docking centre. The cross-docking centre is an important element of lean supply chain. It reduces the amount of storage and transportation costs in the distribution system compared to an ordinary warehouse. Better scheduling of trucks in a cross-docking center is the best way to reduce storage and transportation costs. Auction mechanism is commonly used for allocation of limited resources in different real-life applications. Here, we try to schedule inbound trucks by integrating auction mechanism with the functioning of a cross-docking centre. A mathematical model is developed for the optimal scheduling of inbound trucks based on the auction methodology. The determination of exact solution for problems involving large number of trucks was found to be computationally difficult, and hence a genetic algorithm based heuristic methodology is proposed in this work. A comparative study of exact and heuristic solutions is done using five classes of data sets. It is observed from the study that the auction-based mechanism is capable of providing good solutions to scheduling problem in cross-docking centres.

Keywords: auction mechanism, cross-docking centre, genetic algorithm, scheduling of trucks

Procedia PDF Downloads 381
621 Comparison of 18F-FDG and 11C-Methionine PET-CT for Assessment of Response to Neoadjuvant Chemotherapy in Locally Advanced Breast Carcinoma

Authors: Sonia Mahajan Dinesh, Anant Dinesh, Madhavi Tripathi, Vinod Kumar Ramteke, Rajnish Sharma, Anupam Mondal

Abstract:

Background: Neo-adjuvant chemotherapy plays an important role in treatment of breast cancer by decreasing the tumour load and it offers an opportunity to evaluate response of primary tumour to chemotherapy. Standard anatomical imaging modalities are unable to accurately reflect the response to chemotherapy until several cycles of drug treatment have been completed. Metabolic imaging using tracers like 18F-fluorodeoxyglucose (FDG) as a marker of glucose metabolism or amino acid tracers like L-methyl-11C methionine (MET) have potential role for the measurement of treatment response. In this study, our objective was to compare these two PET tracers for assessment of response to neoadjuvant chemotherapy, in locally advanced breast carcinoma. Methods: In our prospective study, 20 female patients with histology proven locally advanced breast carcinoma underwent PET-CT imaging using FDG and MET before and after three cycles of neoadjuvant chemotherapy (CAF regimen). Thereafter, all patients were taken for MRM and the resected specimen was sent for histo-pathological analysis. Tumour response to the neoadjuvant chemotherapy was evaluated by PET-CT imaging using PERCIST criteria and correlated with histological results. Responses calculated were compared for statistical significance using paired t- test. Results: Mean SUVmax for primary lesion in FDG PET and MET PET was 15.88±11.12 and 5.01±2.14 respectively (p<0.001) and for axillary lymph nodes was 7.61±7.31 and 2.75±2.27 respectively (p=0.001). Statistically significant response in primary tumour and axilla was noted on both FDG and MET PET after three cycles of NAC. Complete response in primary tumour was seen in only 1 patient in FDG and 7 patients in MET PET (p=0.001) whereas there was no histological complete resolution of tumor in any patient. Response to therapy in axillary nodes noted on both PET scans were similar (p=0.45) and correlated well with histological findings. Conclusions: For the primary breast tumour, FDG PET has a higher sensitivity and accuracy than MET PET and for axilla both have comparable sensitivity and specificity. FDG PET shows higher target to background ratios so response is better predicted for primary breast tumour and axilla. Also, FDG-PET is widely available and has the advantage of a whole body evaluation in one study.

Keywords: 11C-methionine, 18F-FDG, breast carcinoma, neoadjuvant chemotherapy

Procedia PDF Downloads 478
620 Tabu Search Algorithm for Ship Routing and Scheduling Problem with Time Window

Authors: Khaled Moh. Alhamad

Abstract:

This paper describes a tabu search heuristic for a ship routing and scheduling problem (SRSP). The method was developed to address the problem of loading cargos for many customers using heterogeneous vessels. Constraints relate to delivery time windows imposed by customers, the time horizon by which all deliveries must be made and vessel capacities. The results of a computational investigation are presented. Solution quality and execution time are explored with respect to problem size and parameters controlling the tabu search such as tenure and neighbourhood size.

Keywords: heuristic, scheduling, tabu search, transportation

Procedia PDF Downloads 478
619 Solving Weighted Number of Operation Plus Processing Time Due-Date Assignment, Weighted Scheduling and Process Planning Integration Problem Using Genetic and Simulated Annealing Search Methods

Authors: Halil Ibrahim Demir, Caner Erden, Mumtaz Ipek, Ozer Uygun

Abstract:

Traditionally, the three important manufacturing functions, which are process planning, scheduling and due-date assignment, are performed separately and sequentially. For couple of decades, hundreds of studies are done on integrated process planning and scheduling problems and numerous researches are performed on scheduling with due date assignment problem, but unfortunately the integration of these three important functions are not adequately addressed. Here, the integration of these three important functions is studied by using genetic, random-genetic hybrid, simulated annealing, random-simulated annealing hybrid and random search techniques. As well, the importance of the integration of these three functions and the power of meta-heuristics and of hybrid heuristics are studied.

Keywords: process planning, weighted scheduling, weighted due-date assignment, genetic search, simulated annealing, hybrid meta-heuristics

Procedia PDF Downloads 449
618 The Effectiveness of Warm-Water Footbath on Fatigue in Cancer Patient Undergoing Chemotherapy

Authors: Yu-Wen Lin, Li-Ni Liu

Abstract:

Introduction: Fatigue is the most common symptoms experienced by cancer patients undergoing chemotherapy. Patients receiving anticancer therapies develop a higher proportion of fatigue compared with patients who do not receive anticancer therapies. Fatigue has significant impacts on quality of life, daily activities, mood status, and social behaviors. A warm-water footbath (WWF) at 41℃ promotes circulation and removes metabolites resulting in improving sleep and relieving fatigue. The aim of this study is to determine the effectiveness of WWF for relieving fatigue with cancer patients undergoing chemotherapy. Materials and Methods: This is a single-center, prospective, quasi-experimental design study in the oncology ward in Taiwan. Participants in this study were assigned to WWF group as experimental group and standard care group as a control group by purposive sampling. In the WWF group, the participants were asked to soak their feet in 42-43℃ water 15 minutes for consecutive 6 days at one day before chemotherapy. Each participant was evaluated for fatigue level by the Taiwanese version of the Brief Fatigue Inventory (BFI-T). BFI-T was completed for consecutive 8 days of the study. The primary outcome was compared the BFI-T score of WWF group to the standard care group. Results: There were 60 participants enrolled in this study. Thirty participants were assigned to WWF group and 30 participants were assigned to standard care group. Both groups have comparable characteristic. The BFI-T scores of both groups were increased associated with the days of chemotherapy. The highest BFI-T scores of both groups were on the day 4 of chemotherapy. The BFI-T scores of both groups were decreased since day 5 and significantly decreased in WWF group on day 5 compared to standard care group (4.17 vs. 5.7, P < .05). At the end of the study the fatigue at its worse were significantly decreased in WWF group (2.33 vs. 4.37, P < .001). There was no adverse event reported in this study. Conclusion: WWF is an easy, safe, non-invasive, and relatively inexpensive nursing intervention for improving fatigue of cancer patients undergoing chemotherapy. In summary, this study shows the WWF is a simple complementary care method, and it is effective for improving and relieving fatigue in a short time. Through improving fatigue is a way to enhance the quality of life which is important for cancer patients undergoing chemotherapy. Larger prospective randomized controlled trial and long-term effectiveness and outcomes of WWF should be performed to confirm this study.

Keywords: chemotherapy, warm-water footbath, fatigue, Taiwanese version of the brief fatigue inventory

Procedia PDF Downloads 118
617 The Constraint of Machine Breakdown after a Match up Scheduling of Paper Manufacturing Industry

Authors: John M. Ikome

Abstract:

In the process of manufacturing, a machine breakdown usually forces a modified flow shop out of the prescribed state, this strategy reschedules part of the initial schedule to match up with the pre-schedule at some point with the objective to create a schedule that is reliable with the other production planning decisions like material flow, production and suppliers by utilizing a critical decision-making concept. We propose a rescheduling strategy and a match-up point that will have a determination procedure through an advanced feedback control mechanism to increase both the schedule quality and stability. These approaches are compared with alternative re-scheduling methods under different experimental settings.

Keywords: scheduling, heuristics, branch, integrated

Procedia PDF Downloads 389
616 Automatic Queuing Model Applications

Authors: Fahad Suleiman

Abstract:

Queuing, in medical system is the process of moving patients in a specific sequence to a specific service according to the patients’ nature of illness. The term scheduling stands for the process of computing a schedule. This may be done by a queuing based scheduler. This paper focuses on the medical consultancy system, the different queuing algorithms that are used in healthcare system to serve the patients, and the average waiting time. The aim of this paper is to build automatic queuing system for organizing the medical queuing system that can analyses the queue status and take decision which patient to serve. The new queuing architecture model can switch between different scheduling algorithms according to the testing results and the factor of the average waiting time. The main innovation of this work concerns the modeling of the average waiting time is taken into processing, in addition with the process of switching to the scheduling algorithm that gives the best average waiting time.

Keywords: queuing systems, queuing system models, scheduling algorithms, patients

Procedia PDF Downloads 323
615 A Hybrid Distributed Algorithm for Solving Job Shop Scheduling Problem

Authors: Aydin Teymourifar, Gurkan Ozturk

Abstract:

In this paper, a distributed hybrid algorithm is proposed for solving the job shop scheduling problem. The suggested method executes different artificial neural networks, heuristics and meta-heuristics simultaneously on more than one machine. The neural networks are used to control the constraints of the problem while the meta-heuristics search the global space and the heuristics are used to prevent the premature convergence. To attain an efficient distributed intelligent method for solving big and distributed job shop scheduling problems, Apache Spark and Hadoop frameworks are used. In the algorithm implementation and design steps, new approaches are applied. Comparison between the proposed algorithm and other efficient algorithms from the literature shows its efficiency, which is able to solve large size problems in short time.

Keywords: distributed algorithms, Apache Spark, Hadoop, job shop scheduling, neural network

Procedia PDF Downloads 353
614 Overview of Time, Resource and Cost Planning Techniques in Construction Management Research

Authors: R. Gupta, P. Jain, S. Das

Abstract:

One way to approach construction scheduling optimization problem is to focus on the individual aspects of planning, which can be broadly classified as time scheduling, crew and resource management, and cost control. During the last four decades, construction planning has seen a lot of research, but to date, no paper had attempted to summarize the literature available under important heads. This paper addresses each of aspects separately, and presents the findings of an in-depth literature of the various planning techniques. For techniques dealing with time scheduling, the authors have adopted a rough chronological documentation. For crew and resource management, classification has been done on the basis of the different steps involved in the resource planning process. For cost control, techniques dealing with both estimation of costs and the subsequent optimization of costs have been dealt with separately.

Keywords: construction planning techniques, time scheduling, resource planning, cost control

Procedia PDF Downloads 453
613 A Heuristic for the Integrated Production and Distribution Scheduling Problem

Authors: Christian Meinecke, Bernd Scholz-Reiter

Abstract:

The integrated problem of production and distribution scheduling is relevant in many industrial applications. Thus, many heuristics to solve this integrated problem have been developed in the last decade. Most of these heuristics use a sequential working principal or a single decomposition and integration approach to separate and solve sub-problems. A heuristic using a multi-step decomposition and integration approach is presented in this paper and evaluated in a case study. The result show significant improved results compared with sequential scheduling heuristics.

Keywords: production and outbound distribution, integrated planning, heuristic, decomposition, integration

Procedia PDF Downloads 395
612 Reliability of Social Support Measurement Modification of the BC-SSAS among Women with Breast Cancer Who Undergone Chemotherapy in Selected Hospital, Central Java, Indonesia

Authors: R. R. Dewi Rahmawaty Aktyani Putri, Earmporn Thongkrajai, Dedy Purwito

Abstract:

There were many instruments have been developed to assess social support which has the different dimension in breast cancer patients. The Issue of measurement is a challenge to determining the component of dimensional concept, defining the unit of measurement, and establishing the validity and reliability of the measurement. However, the instruments where need to know how much support which obtained and perceived among women with breast cancer who undergone chemotherapy which it can help nurses to prevent of non-adherence in chemotherapy. This study aimed to measure the reliability of BC-SSAS instrument among 30 Indonesian women with breast cancer aged 18 years and above who undergone chemotherapy for six cycles in the oncological unit of Outpatient Department (OPD), Margono Soekardjo Hospital, Central Java, Indonesia. Data were collected during October to December 2015 by using modified the Breast Cancer Social Support Assessment (BC-SSAS). The Cronbach’s alpha analysis was carried out to measure internal consistency for reliability test of BC-SSAS instrument. This study used five experts for content validity index. The results showed that for content validity, I-CVI was 0.98 and S-CVI was 0.98; Cronbach’s alpha value was 0.971 and the Cronbach’s alpha coefficients for the subscales were high, with 0.903 for emotional support, 0.865 for informational support, 0.901 for tangible support, 0.897 for appraisal support and 0.884 for positive interaction support. The results confirmed that the BC-SSAS instrument has high reliability. BC-SSAS instruments were reliable and can be used in health care services to measure the social support received and perceived among women with breast cancer who undergone chemotherapy so that preventive interventions can be developed and the quality of health services can be improved.

Keywords: BC-SSAS, women with breast cancer, chemotherapy, Indonesia

Procedia PDF Downloads 342
611 Integer Programming: Domain Transformation in Nurse Scheduling Problem.

Authors: Geetha Baskaran, Andrzej Barjiela, Rong Qu

Abstract:

Motivation: Nurse scheduling is a complex combinatorial optimization problem. It is also known as NP-hard. It needs an efficient re-scheduling to minimize some trade-off of the measures of violation by reducing selected constraints to soft constraints with measurements of their violations. Problem Statement: In this paper, we extend our novel approach to solve the nurse scheduling problem by transforming it through Information Granulation. Approach: This approach satisfies the rules of a typical hospital environment based on a standard benchmark problem. Generating good work schedules has a great influence on nurses' working conditions which are strongly related to the level of a quality health care. Domain transformation that combines the strengths of operation research and artificial intelligence was proposed for the solution of the problem. Compared to conventional methods, our approach involves judicious grouping (information granulation) of shifts types’ that transforms the original problem into a smaller solution domain. Later these schedules from the smaller problem domain are converted back into the original problem domain by taking into account the constraints that could not be represented in the smaller domain. An Integer Programming (IP) package is used to solve the transformed scheduling problem by expending the branch and bound algorithm. We have used the GNU Octave for Windows to solve this problem. Results: The scheduling problem has been solved in the proposed formalism resulting in a high quality schedule. Conclusion: Domain transformation represents departure from a conventional one-shift-at-a-time scheduling approach. It offers an advantage of efficient and easily understandable solutions as well as offering deterministic reproducibility of the results. We note, however, that it does not guarantee the global optimum.

Keywords: domain transformation, nurse scheduling, information granulation, artificial intelligence, simulation

Procedia PDF Downloads 369
610 Analysis of Relative Gene Expression Data of GATA3-AS1 Associated with Resistance to Neoadjuvant Chemotherapy in Locally Advanced Breast Cancer Patients of Luminal B Subtype

Authors: X. Cervantes-López, C. Arriaga-Canon, L. Contreras Espinosa

Abstract:

The goal of this study is to validate the overexpression of the lncRNA GATA3-AS1 associated with resistance to neoadjuvant chemotherapy of female patients with locally advanced mammary adenocarcinoma of luminal B subtype This study involved a cohort of one hundred thirty-seven samples for which total RNA was isolated from formalin fixed paraffin embedded (FFPE) tissue. Samples were cut using a Microtome Hyrax M25 Zeiss and RNA was isolated using the RNeasy FFPE kit and a deparaffinization solution, the next step consisted in the analysis of RNA concentration and quality, then 18 µg of RNA was treated with DNase I, and cDNA was synthesized from 50 ng total RNA, finally real-time PCR was performed with SYBR Green/ROX qPCR Master Mix in order to determined relative gene expression using RPS28 as a housekeeping gene to normalize in a fold calculation ΔCt. As a result, we validated by real-time PCR that the overexpression of the lncRNA GATA3-AS1 is associated with resistance to neoadjuvant chemotherapy in locally advanced breast cancer patients of luminal B subtype.

Keywords: breast cancer, biomarkers, genomics, neoadjuvant chemotherapy, lncRNAS

Procedia PDF Downloads 29
609 Solving Process Planning, Weighted Earliest Due Date Scheduling and Weighted Due Date Assignment Using Simulated Annealing and Evolutionary Strategies

Authors: Halil Ibrahim Demir, Abdullah Hulusi Kokcam, Fuat Simsir, Özer Uygun

Abstract:

Traditionally, three important manufacturing functions which are process planning, scheduling and due-date assignment are performed sequentially and separately. Although there are numerous works on the integration of process planning and scheduling and plenty of works focusing on scheduling with due date assignment, there are only a few works on integrated process planning, scheduling and due-date assignment. Although due-dates are determined without taking into account of weights of the customers in the literature, here weighted due-date assignment is employed to get better performance. Jobs are scheduled according to weighted earliest due date dispatching rule and due dates are determined according to some popular due date assignment methods by taking into account of the weights of each job. Simulated Annealing, Evolutionary Strategies, Random Search, hybrid of Random Search and Simulated Annealing, and hybrid of Random Search and Evolutionary Strategies, are applied as solution techniques. Three important manufacturing functions are integrated step-by-step and higher integration levels are found better. Search meta-heuristics are found to be very useful while improving performance measure.

Keywords: process planning, weighted scheduling, weighted due-date assignment, simulated annealing, evolutionary strategies, hybrid searches

Procedia PDF Downloads 431
608 Right Ventricular Dynamics During Breast Cancer Chemotherapy in Low Cardiovascular Risk Patients

Authors: Nana Gorgiladze, Tamar Gaprindashvili, Mikheil Shavdia, Zurab Pagava

Abstract:

Introduction/Purpose Chemotherapy is a common treatment for breast cancer, but it can also cause damage to the heart and blood vessels. This damage, known as cancer therapy-related cardiovascular toxicity (CTR-CVT), can increase the risk of heart failure and death in breast cancer patients. The left ventricle is often affected by CTR-CVT, but the right ventricle (RV) may also be vulnerable to CTR-CVT and may show signs of dysfunction before the left ventricle. The study aims to investigate how the RV function changes during chemotherapy for breast cancer by using conventional echocardiographic and global longitudinal strain (GLS) techniques. By measuring the GLS strain of the RV, researchers tend to detect early signs of CTR-CVT and improve the management of breast cancer patients. Methods The study was conducted on 28 women with low cardiovascular risk who received anthracycline chemotherapy for breast cancer. Conventional 2D echocardiography (LVEF, RVS’, TAPSE) and speckle-tracking echocardiography (STE) measurements of the left and right ventricles (LVGLS, RVGLS) were used to assess cardiac function before and after chemotherapy. All patients had normal LVEF at the beginning of the study. Cardiotoxicity was defined as a new LVEF reduction of 10 percentage points to an LVEF of 40-49% and/or a new decline in GLS of 15% from baseline, as proposed by the most recent cardio-oncology guideline. ResultsThe research found that the LVGLS decreased from -21.2%2.1% to -18.6%2.6% (t-test = -4.116; df = 54, p=0.001). The change in value LV-GLS was 2.6%3.0%. The mean percentage change of the LVGLS was 11,6%13,3%; p=0.001. Similarly, the right ventricular global longitudinal strain (RVGLS) decreased from -25.2%2.9% to -21.4%4.4% (t-test = -3.82; df = 54, p=0.001). The RV-GLS value of change was 3.8%3.6%. Likewise, the percentage decrease of the RVGLS was 15,0%14,3%, p=0.001.However, the measurements of the right ventricular systolic function (RVS) and tricuspid annular plane systolic excursion (TAPSE) were insignificant, and the left ventricular ejection fraction ( LVEF) remained unchanged.

Keywords: cardiotoxicity, chemotherapy, GLS, right ventricle

Procedia PDF Downloads 37
607 GATA3-AS1 lncRNA as a Predictive Biomarker for Neoadjuvant Chemotherapy Response in Locally Advanced Luminal B Breast Cancer: An RNA ISH Study

Authors: Tania Vasquez Mata, Luis A. Herrera, Cristian Arriaga Canon

Abstract:

Background: Locally advanced breast cancer of the luminal B phenotype, poses challenges due to its variable response to neoadjuvant chemotherapy. A predictive biomarker is needed to identify patients who will not respond to treatment, allowing for alternative therapies. This study aims to validate the use of the lncRNA GATA3-AS1, as a predictive biomarker using RNA in situ hybridization. Research aim: The aim of this study is to determine if GATA3-AS1 can serve as a biomarker for resistance to neoadjuvant chemotherapy in patients with locally advanced luminal B breast cancer. Methodology: The study utilizes RNA in situ hybridization with predesigned probes for GATA3-AS1 on Formalin-Fixed Paraffin-Embedded tissue sections. The samples underwent pretreatment and protease treatment to enable probe penetration. Chromogenic detection and signal evaluation were performed using specific criteria. Findings: Patients who did not respond to neoadjuvant chemotherapy showed a 3+ score for GATA3-AS1, while those who had a complete response had a 1+ score. Theoretical importance: This study demonstrates the potential clinical utility of GATA3-AS1 as a biomarker for resistance to neoadjuvant chemotherapy. Identifying non-responders early on can help avoid unnecessary treatment and explore alternative therapy options. Data collection and analysis procedures: Tissue samples from patients with locally advanced luminal B breast cancer were collected and processed using RNA in situ hybridization. Signal evaluation was conducted under a microscope, and scoring was based on specific criteria. Questions addressed: Can GATA3-AS1 serve as a predictive biomarker for neoadjuvant chemotherapy response in locally advanced luminal B breast cancer? Conclusion: The lncRNA GATA3-AS1 can be used as a biomarker for resistance to neoadjuvant chemotherapy in patients with locally advanced luminal B breast cancer. Its identification through RNA in situ hybridization of tissue obtained from the initial biopsy can aid in treatment decision-making.

Keywords: biomarkers, breast neoplasms, genetics, neoadjuvant therapy, tumor

Procedia PDF Downloads 33
606 Outcome of Unilateral Retinoblastoma: A Ten Years Experience of Children's Cancer, Hospital Egypt

Authors: Ahmed Elhussein, Hossam El-Zomor, Adel Alieldin, Mahmoud A. Afifi, Abdullah Elhusseiny, Hala Taha, Amal Refaat, Soha Ahmed, Mohamed S. Zagloul

Abstract:

Background: A majority of children with retinoblastoma (60%) have a disease in one eye only (unilateral disease). This is a retrospective study to evaluate two different treatment modalities in those patients for saving their lives and vision. Methods: Four hundred and four patients were diagnosed with unilateral intraocular retinoblastoma at Children’s Cancer, Hospital Egypt (CCHE) through the period of July/2007 until December/2017. Management strategies included primary enucleation versus ocular salvage treatment. Results: Patients presented with mean age 24.5 months with range (1.2-154.3 months). According to the international retinoblastoma classification, Group D (n=172, 42%) was the most common, followed by group E (n=142, 35%), group C (n=63, 16%), and group B (n=27, 7%). All patients were alive at the end of the study except four patients who died, with 5-years overall survival 98.3% [CI, (96.5-100%)]. Patients presented with advanced disease and poor visual prognosis (n=241, 59.6%) underwent primary enucleation with 6 cycles adjuvant chemotherapy if they had high-risk features in the enucleated eye; only four patients out of 241 ended-up either with extraocular metastasis (n=3) or death (n=1). While systemic chemotherapy and focal therapy were the primary treatment for those who presented with favorable disease status and good visual prognosis (n=163, 40.4%); seventy-seven patients of them (47%) ended up with a pre-defined event (enucleation, EBRT, off protocol chemotherapy or 2ry malignancy). Ocular survival for patients received primary chemotherapy + focal therapy was [50.9% (CI, 43.5-59.6%)] at 3 years and [46.9% (CI,39.3-56%)] at 5 years. Comparison between upfront enucleation and primary chemotherapy for occurrence of extraocular metastasis revealed that there was no statistical difference between them except in group D (p value). While for occurrence of death, no statistical difference in all classification groups. Conclusion: In retinoblastoma, primary chemotherapy is a reasonable option and has a good probability for ocular salvage without increasing the risk of metastasis in comparison to upfront enucleation except in group D.

Keywords: CCHE, chemotherapy, enucleation, retinoblastoma

Procedia PDF Downloads 127
605 Scheduling Flexibility and Employee Health Outcomes: A Meta-Analytic Review

Authors: Nicole V. Shifrin

Abstract:

Scheduling flexibility is becoming an increasingly available option for employees struggling to balance their work and life responsibilities, allowing employees to coordinate work schedules with their additional roles. The goal of such opportunities is to help employees manage the demands they face across domains of life by allowing employees to work from home, design their own work hours, take time off when necessary, along with various other scheduling accommodations. Organizations are also turning to utilizing scheduling flexibility to facilitate employee health and wellbeing through the reduction of stress and maximization of efficiency. The purpose of the present study is to investigate the effects of scheduling flexibility on employee health-related behaviors and outcomes through a synthesis of research. The current meta-analytic review of 19 samples within 16 studies with a total sample size of 20,707 employees examines the relationship between the degree of scheduling flexibility available to employees and the resulting health outcomes and exercise habits. The results demonstrate that reduced scheduling flexibility is associated with poorer health status, suggesting that schedule inflexibility can hinder employees’ ability to maintain and support their health. These findings hold practical implications for developing work schedules to promote employee health and health-related behaviors, such as eating well and exercising. Additionally, there was a positive association between increased scheduling flexibility and engagement in exercise, suggesting that employees with more flexible schedules exercise more frequently than those with less flexible schedules. A potential explanation for the resulting relationship is that flexible schedules leave employees more time due to shorter work days, shorter or eliminated commutes, etc. with which they can use to engage in healthy behaviors. These findings stress the importance of promoting job designs that facilitate employee engagement in healthy behaviors, which directly impact their overall health status. Implications for practice are discussed as well as future directions in examining the link between job design and employee health and well-being.

Keywords: exercise, health, meta-analysis, job design, scheduling flexibility

Procedia PDF Downloads 108
604 M-Machine Assembly Scheduling Problem to Minimize Total Tardiness with Non-Zero Setup Times

Authors: Harun Aydilek, Asiye Aydilek, Ali Allahverdi

Abstract:

Our objective is to minimize the total tardiness in an m-machine two-stage assembly flowshop scheduling problem. The objective is an important performance measure because of the fact that the fulfillment of due dates of customers has to be taken into account while making scheduling decisions. In the literature, the problem is considered with zero setup times which may not be realistic and appropriate for some scheduling environments. Considering separate setup times from processing times increases machine utilization by decreasing the idle time and reduces total tardiness. We propose two new algorithms and adapt four existing algorithms in the literature which are different versions of simulated annealing and genetic algorithms. Moreover, a dominance relation is developed based on the mathematical formulation of the problem. The developed dominance relation is incorporated in our proposed algorithms. Computational experiments are conducted to investigate the performance of the newly proposed algorithms. We find that one of the proposed algorithms performs significantly better than the others, i.e., the error of the best algorithm is less than those of the other algorithms by minimum 50%. The newly proposed algorithm is also efficient for the case of zero setup times and performs better than the best existing algorithm in the literature.

Keywords: algorithm, assembly flowshop, scheduling, simulation, total tardiness

Procedia PDF Downloads 297
603 Comparison of Due Date Assignment Rules in a Dynamic Job Shop

Authors: Mumtaz Ipek, Burak Erkayman

Abstract:

Due date is assigned as an input for scheduling problems. At the same time, due date is selected as a decision variable for real time scheduling applications. Correct determination of due dates increases shop floor performance and number of jobs completed on time. This subject has been mentioned widely in the literature. Moreover rules for due date determination have been developed from analytical analysis. When a job arrives to the shop floor, a due date is assigned for delivery. Various due date determination methods are used in the literature. In this study six different due date methods are implemented for a hypothetical dynamic job shop and the performances of the due date methods are compared.

Keywords: scheduling, dynamic job shop, due date assignment, management engineering

Procedia PDF Downloads 528
602 Solution Approaches for Some Scheduling Problems with Learning Effect and Job Dependent Delivery Times

Authors: M. Duran Toksari, Berrin Ucarkus

Abstract:

In this paper, we propose two algorithms to optimally solve makespan and total completion time scheduling problems with learning effect and job dependent delivery times in a single machine environment. The delivery time is the extra time to eliminate adverse effect between the main processing and delivery to the customer. In this paper, we introduce the job dependent delivery times for some single machine scheduling problems with position dependent learning effect, which are makespan are total completion. The results with respect to two algorithms proposed for solving of the each problem are compared with LINGO solutions for 50-jobs, 100-jobs and 150-jobs problems. The proposed algorithms can find the same results in shorter time.

Keywords: delivery Times, learning effect, makespan, scheduling, total completion time

Procedia PDF Downloads 446
601 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 233
600 A Memetic Algorithm for an Energy-Costs-Aware Flexible Job-Shop Scheduling Problem

Authors: Christian Böning, Henrik Prinzhorn, Eric C. Hund, Malte Stonis

Abstract:

In this article, the flexible job-shop scheduling problem is extended by consideration of energy costs which arise owing to the power peak, and further decision variables such as work in process and throughput time are incorporated into the objective function. This enables a production plan to be simultaneously optimized in respect of the real arising energy and logistics costs. The energy-costs-aware flexible job-shop scheduling problem (EFJSP) which arises is described mathematically, and a memetic algorithm (MA) is presented as a solution. In the MA, the evolutionary process is supplemented with a local search. Furthermore, repair procedures are used in order to rectify any infeasible solutions that have arisen in the evolutionary process. The potential for lowering the real arising costs of a production plan through consideration of energy consumption levels is highlighted.

Keywords: energy costs, flexible job-shop scheduling, memetic algorithm, power peak

Procedia PDF Downloads 309
599 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 394
598 An Improved GA to Address Integrated Formulation of Project Scheduling and Material Ordering with Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of the resource constraint project scheduling and material ordering problems have received significant attention within the last decades. Hence, the issue has been investigated here with the aim to minimize total project costs. Furthermore, the presented model considers different discount options in order to approach the real world conditions. The incorporated alternatives consist of all-unit and incremental discount strategies. On the other hand, a modified version of the genetic algorithm is applied in order to solve the model for larger sizes, in particular. Finally, the applicability and efficiency of the given model is tested by different numerical instances.

Keywords: genetic algorithm, material ordering, project management, project scheduling

Procedia PDF Downloads 272
597 Effect of Polarized Light Therapy on Oral Mucositis in Cancer Patients Receiving Chemotherapy

Authors: Zakaria Mowafy Emam Mowafy, Hamed Abd Allah Hamed, Marwa Mahmoud Abd-Elmotalb, Andrew Anis Fakhray Mosaad

Abstract:

The purpose of this paper is to determine the efficacy of polarized light therapy for chemotherapy-treated cancer patients who have oral mucositis. Methods of evaluation are the measurement of the WHO oral mucositis scale and the common toxicity criteria scale. Methods: Thirty cancer patients receiving chemotherapy (males and females) who had oral mucositis and ulceration pain, and their ages ranged from 30 to 55 years, were divided into two groups. Group (A), composed of 15 patients, received the Bioptron light therapy (BLT) in addition to the routine medical care of oral mucositis. Group (B) received only the routine medical care of oral mucositis; the duration of the BLT application was 10 minutes applied daily for 30 days. Results and conclusion: Results showed that the application of the BLT had valuable healing effects on oral mucositis in cancer patients receiving chemotherapy, as evidenced by the high decreases of the WHO oral mucositis scale and the common toxicity criteria scale.

Keywords: Bioptron light therapy, oral mucositis, WHO oral mucositis scale, common toxicity criteria scale

Procedia PDF Downloads 66
596 Scheduling of Repetitive Activities for Height-Rise Buildings: Optimisation by Genetic Algorithms

Authors: Mohammed Aljoma

Abstract:

In this paper, a developed prototype for the scheduling of repetitive activities in height-rise buildings was presented. The activities that describe the behavior of the most of activities in multi-storey buildings are scheduled using the developed approach. The prototype combines three methods to attain the optimized planning. The methods include Critical Path Method (CPM), Gantt and Line of Balance (LOB). The developed prototype; POTER is used to schedule repetitive and non-repetitive activities with respect to all constraints that can be automatically generated using a generic database. The prototype uses the method of genetic algorithms for optimizing the planning process. As a result, this approach enables contracting organizations to evaluate various planning solutions that are calculated, tested and classified by POTER to attain an optimal time-cost equilibrium according to their own criteria of time or coast.

Keywords: planning scheduling, genetic algorithms, repetitive activity, construction management, planning, scheduling, risk management, project duration

Procedia PDF Downloads 282
595 Serum 25-Hydroxyvitamin D Levels in Korean Breast Cancer Patients

Authors: Sung Yong Kim, Byung Joo Song

Abstract:

Background: Circulating 25-hydroxyvitamin D (25(OH)D) levels has been considered to be inversely related to breast cancer development, recurrence risk, and mortality. Mean vitamin D levels in Korean population is lower than western countries due to higher incidence of lactose intolerance and lower exposure to sunlight. The purpose of this study was to assess incidence of 25(OH)D deficiency at diagnosis and after adjuvant chemotherapy and to investigate the correlation serum 25(OH)D levels with clinicopathologic features. Methods: From December 2011 to October 2012, 280 breast cancer patients seen at a single tertiary cancer center were enrolled. Serum 25(OH)D was measured at the time of surgery and after completion of adjuvant chemotherapy. Statistical analyses used chi-square test, Fisher's exact test, t-test, and ANOVA. Results: Mean serum 25(OH)D was 18.5 ng/ml. The 25(OH)D levels were deficient (<20 ng/ml) in 190 patients (67.9%), insufficient (20-29 ng/ml) in 51 patients(18.2%), and sufficient (30-150 ng/ml) in 39 patients(13.9%). A notable decrease in 25(OH)D concentration was observed(p<0.001) after chemotherapy but was not related to chemotherapy regimens. It was found significant lower 25(OH)D levels at winter season(from October to March, p=0.030). Subjects with invasive carcinoma (IDC or ILC) had significantly lower circulating levels of 25(OH)D than those with ductal carcinoma in situ(DCIS) (p=0.010). Patients with larger tumor size tends to have lower serum 25(OH)D but there were no statistical significance. Conclusions: Most of the breast cancer patients showed deficient or insufficient serum 25(OH)D concentration. Incidence of vitamin D deficiency was higher in invasive carcinoma than DCIS. Serum 25(OH)D levels were decreased after chemotherapy. Consideration should be given to the supplement of vitamin D to those patients.

Keywords: breast neoplasms, vitamin D, Korean population, breast cancer

Procedia PDF Downloads 389
594 Two-Stage Flowshop Scheduling with Unsystematic Breakdowns

Authors: Fawaz Abdulmalek

Abstract:

The two-stage flowshop assembly scheduling problem is considered in this paper. There are more than one parallel machines at stage one and an assembly machine at stage two. The jobs will be processed into the flowshop based on Johnson rule and two extensions of Johnson rule. A simulation model of the two-stage flowshop is constructed where both machines at stage one are subject to random failures. Three simulation experiments will be conducted to test the effect of the three job ranking rules on the makespan. Johnson Largest heuristic outperformed both Johnson rule and Johnson Smallest heuristic for two performed experiments for all scenarios where each experiments having five scenarios.

Keywords: flowshop scheduling, random failures, johnson rule, simulation

Procedia PDF Downloads 306