Search results for: assembly flow shop
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5272

Search results for: assembly flow shop

5242 A General Variable Neighborhood Search Algorithm to Minimize Makespan of the Distributed Permutation Flowshop Scheduling Problem

Authors: G. M. Komaki, S. Mobin, E. Teymourian, S. Sheikh

Abstract:

This paper addresses minimizing the makespan of the distributed permutation flow shop scheduling problem. In this problem, there are several parallel identical factories or flowshops each with series of similar machines. Each job should be allocated to one of the factories and all of the operations of the jobs should be performed in the allocated factory. This problem has recently gained attention and due to NP-Hard nature of the problem, metaheuristic algorithms have been proposed to tackle it. Majority of the proposed algorithms require large computational time which is the main drawback. In this study, a general variable neighborhood search algorithm (GVNS) is proposed where several time-saving schemes have been incorporated into it. Also, the GVNS uses the sophisticated method to change the shaking procedure or perturbation depending on the progress of the incumbent solution to prevent stagnation of the search. The performance of the proposed algorithm is compared to the state-of-the-art algorithms based on standard benchmark instances.

Keywords: distributed permutation flow shop, scheduling, makespan, general variable neighborhood search algorithm

Procedia PDF Downloads 330
5241 Product Feature Modelling for Integrating Product Design and Assembly Process Planning

Authors: Baha Hasan, Jan Wikander

Abstract:

This paper describes a part of the integrating work between assembly design and assembly process planning domains (APP). The work is based, in its first stage, on modelling assembly features to support APP. A multi-layer architecture, based on feature-based modelling, is proposed to establish a dynamic and adaptable link between product design using CAD tools and APP. The proposed approach is based on deriving “specific function” features from the “generic” assembly and form features extracted from the CAD tools. A hierarchal structure from “generic” to “specific” and from “high level geometrical entities” to “low level geometrical entities” is proposed in order to integrate geometrical and assembly data extracted from geometrical and assembly modelers to the required processes and resources in APP. The feature concept, feature-based modelling, and feature recognition techniques are reviewed.

Keywords: assembly feature, assembly process planning, feature, feature-based modelling, form feature, ontology

Procedia PDF Downloads 274
5240 Design for Error-Proofing Assembly: A Systematic Approach to Prevent Assembly Issues since Early Design Stages, an Industrial Case Study

Authors: Gabriela Estrada, Joaquim Lloveras

Abstract:

Design for error-proofing assembly is a new DFX approach to prevent assembly issues since early design stages. Assembly issues that can happen during the life phases of a system such as: production, installation, operation, and replacement phases. This prevention is possible by designing the product with poka-yoke or error-proofing characteristics. This approach guide designers to make decisions based on poka-yoke assembly design requirements. As a result of applying these requirements designers are able to create solutions to prevent assembly issues for the product in development stage. This paper integrates the needs to design products in an error proofing way into the systematic approach of design process by Pahl and Beitz. A case study is presented applying this approach.

Keywords: poka-yoke, error-proofing, assembly issues, design process, life phases of a system

Procedia PDF Downloads 344
5239 Design for Error-Proofing Assembly: A Systematic Approach to Prevent Assembly Issues since Early Design Stages. An Industry Case Study

Authors: Gabriela Estrada, Joaquim Lloveras

Abstract:

Design for error-proofing assembly is a new DFX approach to prevent assembly issues since early design stages. Assembly issues that can happen during the life phases of a system such as: production, installation, operation and replacement phases. This prevention is possible by designing the product with poka-yoke or error-proofing characteristics. This approach guide designers to make decisions based on poka-yoke assembly design requirements. As a result of applying these requirements designers are able to create solutions to prevent assembly issues for the product in development stage. This paper integrates the needs to design products in an error proofing way into the systematic approach of design process by Pahl and Beitz. A case study is presented applying this approach.

Keywords: poka-yoke, error-proofing, assembly issues, design process, life phases of a system

Procedia PDF Downloads 292
5238 An Overview of Evaluations Using Augmented Reality for Assembly Training Tasks

Authors: S. Werrlich, E. Eichstetter, K. Nitsche, G. Notni

Abstract:

Augmented Reality (AR) is a strong growing research topic in different training domains such as medicine, sports, military, education and industrial use cases like assembly and maintenance tasks. AR claims to improve the efficiency and skill-transfer of training tasks. This paper gives a comprehensive overview of evaluations using AR for assembly and maintenance training tasks published between 1992 and 2017. We search in a structured way in four different online databases and get 862 results. We select 17 relevant articles focusing on evaluating AR-based training applications for assembly and maintenance tasks. This paper also indicates design guidelines which are necessary for creating a successful application for an AR-based training. We also present five scientific limitations in the field of AR-based training for assembly tasks. Finally, we show our approach to solve current research problems using Design Science Research (DSR).

Keywords: assembly, augmented reality, survey, training

Procedia PDF Downloads 248
5237 A Hybrid Distributed Algorithm for Solving Job Shop Scheduling Problem

Authors: Aydin Teymourifar, Gurkan Ozturk

Abstract:

In this paper, a distributed hybrid algorithm is proposed for solving the job shop scheduling problem. The suggested method executes different artificial neural networks, heuristics and meta-heuristics simultaneously on more than one machine. The neural networks are used to control the constraints of the problem while the meta-heuristics search the global space and the heuristics are used to prevent the premature convergence. To attain an efficient distributed intelligent method for solving big and distributed job shop scheduling problems, Apache Spark and Hadoop frameworks are used. In the algorithm implementation and design steps, new approaches are applied. Comparison between the proposed algorithm and other efficient algorithms from the literature shows its efficiency, which is able to solve large size problems in short time.

Keywords: distributed algorithms, Apache Spark, Hadoop, job shop scheduling, neural network

Procedia PDF Downloads 356
5236 Electrochemical Layer by Layer Assembly

Authors: Mao Li, Yuguang Ma, Katsuhiko Ariga

Abstract:

The performance of functional materials is governed by their ability to interact with surrounding environments in a well-defined and controlled manner. Layer-by-Layer (LbL) assembly is one of the most widely used technologies for coating both planar and particulate substrates in a diverse range of fields, including optics, energy, catalysis, separations, and biomedicine. Herein, we introduce electrochemical-coupling layer-by-layer assembly as a novel fabrication methodology for preparing layered thin films. This assembly method not only determines the process properties (such as the time, scalability, and manual intervention) but also directly control the physicochemical properties of the films (such as the thickness, homogeneity, and inter- and intra-layer film organization), with both sets of properties linked to application-specific performance.

Keywords: layer by layer assembly, electropolymerization, carbazole, optical thin film, electronics

Procedia PDF Downloads 349
5235 Agile Implementation of 'PULL' Principles in a Manufacturing Process Chain for Aerospace Composite Parts

Authors: Torsten Mielitz, Dietmar Schulz, York C. Roth

Abstract:

Market forecasts show a significant increase in the demand for aircraft within the next two decades and production rates will be adapted accordingly. Improvements and optimizations in the industrial system are becoming more important to cope with future challenges in manufacturing and assembly. Highest quality standards have to be met for aerospace parts, whereas cost effective production in industrial systems and methodologies are also a key driver. A look at other industries like e.g., automotive shows well established processes to streamline existing manufacturing systems. In this paper, the implementation of 'PULL' principles in an existing manufacturing process chain for a large scale composite part is presented. A nonlinear extrapolation based on 'Little's Law' showed a risk of a significant increase of parts needed in the process chain to meet future demand. A project has been set up to mitigate the risk whereas the methodology has been changed from a traditional milestone approach in the beginning towards an agile way of working in the end in order to facilitate immediate benefits in the shop-floor. Finally, delivery rates could be increased avoiding more semi-finished parts in the process chain (work in progress & inventory) by the successful implementation of the 'PULL' philosophy in the shop-floor between the work stations. Lessons learned during the running project as well as implementation and operations phases are discussed in order to share best practices.

Keywords: aerospace composite part manufacturing, PULL principles, shop-floor implementation, lessons learned

Procedia PDF Downloads 147
5234 A Metaheuristic for the Layout and Scheduling Problem in a Job Shop Environment

Authors: Hernández Eva Selene, Reyna Mary Carmen, Rivera Héctor, Barragán Irving

Abstract:

We propose an approach that jointly addresses the layout of a facility and the scheduling of a sequence of jobs. In real production, these two problems are interrelated. However, they are treated separately in the literature. Our approach is an extension of the job shop problem with transportation delay, where the location of the machines is selected among possible sites. The model minimizes the makespan, using the short processing times rule with two algorithms; the first one considers all the permutations for the location of machines, and the second only a heuristic to select some specific permutations that reduces computational time. Some instances are proved and compared with literature.

Keywords: layout problem, job shop scheduling problem, concurrent scheduling and layout problem, metaheuristic

Procedia PDF Downloads 580
5233 A Memetic Algorithm for an Energy-Costs-Aware Flexible Job-Shop Scheduling Problem

Authors: Christian Böning, Henrik Prinzhorn, Eric C. Hund, Malte Stonis

Abstract:

In this article, the flexible job-shop scheduling problem is extended by consideration of energy costs which arise owing to the power peak, and further decision variables such as work in process and throughput time are incorporated into the objective function. This enables a production plan to be simultaneously optimized in respect of the real arising energy and logistics costs. The energy-costs-aware flexible job-shop scheduling problem (EFJSP) which arises is described mathematically, and a memetic algorithm (MA) is presented as a solution. In the MA, the evolutionary process is supplemented with a local search. Furthermore, repair procedures are used in order to rectify any infeasible solutions that have arisen in the evolutionary process. The potential for lowering the real arising costs of a production plan through consideration of energy consumption levels is highlighted.

Keywords: energy costs, flexible job-shop scheduling, memetic algorithm, power peak

Procedia PDF Downloads 309
5232 Structural Integrity Analysis of Baffle Former Assembly in Pressurized Water Reactors Considering Irradiation Aging

Authors: Jong-Sung Kim, Myung-Jo Jhung

Abstract:

BFA is one of the reactor internals components in PWR. The BFA has the intended functions to support fuel assembly, to keep structural integrity of upper/lower core support structures, and to secure reactor coolant flow path. Failure of the BFA may give rise to significant effect on reactor safety operation and stop. The BFA is subject to relatively high neutron irradiation dose due to location close to the core. Therefore, IASCC can occur on the BFA due to damage accumulation as operating year increases. In this study, IASCC susceptibility on the BFA was assessed via the FEA considering variations of mechanical material behaviors with neutron irradiation. As a result of the assessment, some points have susceptibility more than 0.2 to IASCC during design lifetime.

Keywords: baffle former assembly, finite element analysis, irradiation aging, nuclear power plant, pressurized water reactor

Procedia PDF Downloads 333
5231 3D Linear and Cyclic Homo-Peptide Crystals Forged by Supramolecular Swelling Self-Assembly

Authors: Wenliang Song, Yu Zhang, Hua Jin, Il Kim

Abstract:

The self-assembly of the polypeptide (PP) into well-defined structures at different length scales is both biomimetic relevant and fundamentally interesting. Although there are various reports of nanostructures fabricated by the self-assembly of various PPs, directed self-assembly of PP into three-dimensional (3D) hierarchical structure has proven to be difficult, despite their importance for biological applications. Herein, an efficient method has been developed through living polymerization of phenylalanine N-Carboxy anhydride (NCA) towards the linear and cyclic polyphenylalanine, and the new invented swelling methodology can form diverse hierarchical polypeptide crystals. The solvent-dependent self-assembly behaviors of these homopolymers were characterized by high-resolution imaging tools such as atomic force microscopy, transmission electron microscopy, scanning electron microscope. The linear and cyclic polypeptide formed 3D nano hierarchical shapes, such as a sphere, cubic, stratiform and hexagonal star in different solvents. Notably, a crystalline packing model was proposed to explain the formation of 3D nanostructures based on the various diffraction patterns, looking forward to give an insight for their dissimilar shape inflection during the self-assembly process.

Keywords: self-assembly, polypeptide, bio-polymer, crystalline polymer

Procedia PDF Downloads 206
5230 An Efficient Hybrid Approach Based on Multi-Agent System and Emergence Method for the Integration of Systematic Preventive Maintenance Policies

Authors: Abdelhadi Adel, Kadri Ouahab

Abstract:

This paper proposes a hybrid algorithm for the integration of systematic preventive maintenance policies in hybrid flow shop scheduling to minimize makespan. We have implemented a problem-solving approach for optimizing the processing time, methods based on metaheuristics. The proposed approach is inspired by the behavior of the human body. This hybridization is between a multi-agent system and inspirations of the human body, especially genetics. The effectiveness of our approach has been demonstrated repeatedly in this paper. To solve such a complex problem, we proposed an approach which we have used advanced operators such as uniform crossover set and single point mutation. The proposed approach is applied to three preventive maintenance policies. These policies are intended to maximize the availability or to maintain a minimum level of reliability during the production chain. The results show that our algorithm outperforms existing algorithms. We assumed that the machines might be unavailable periodically during the production scheduling.

Keywords: multi-agent systems, emergence, genetic algorithm, makespan, systematic maintenance, scheduling, hybrid flow shop scheduling

Procedia PDF Downloads 310
5229 Job Shop Scheduling: Classification, Constraints and Objective Functions

Authors: Majid Abdolrazzagh-Nezhad, Salwani Abdullah

Abstract:

The job-shop scheduling problem (JSSP) is an important decision facing those involved in the fields of industry, economics and management. This problem is a class of combinational optimization problem known as the NP-hard problem. JSSPs deal with a set of machines and a set of jobs with various predetermined routes through the machines, where the objective is to assemble a schedule of jobs that minimizes certain criteria such as makespan, maximum lateness, and total weighted tardiness. Over the past several decades, interest in meta-heuristic approaches to address JSSPs has increased due to the ability of these approaches to generate solutions which are better than those generated from heuristics alone. This article provides the classification, constraints and objective functions imposed on JSSPs that are available in the literature.

Keywords: job-shop scheduling, classification, constraints, objective functions

Procedia PDF Downloads 411
5228 Accounting Management Information System for Convenient Shop in Bangkok Thailand

Authors: Anocha Rojanapanich

Abstract:

The purpose of this research is to develop and design an accounting management information system for convenient shop in Bangkok Thailand. The study applied the System Development Life Cycle (SDLC) for development which began with study and analysis of current data, including the existing system. Then, the system was designed and developed to meet users’ requirements via the internet network by use of application software such as My SQL for database management, Product diversity, Apache HTTP Server for Web Server and PHP Hypertext Preprocessor for an interface between web server, database and users. The system was designed into two subsystems as the main system, or system for head office, and the branch system for branch shops. These consisted of three parts which are classified by user management as shop management, inventory management and Point of Sale (POS) management and importance of cost information for decision making also as well as.

Keywords: accounting management information system, convenient shop, cost information for decision making system, development life cycle

Procedia PDF Downloads 394
5227 Genetic Algorithm for Solving the Flexible Job-Shop Scheduling Problem

Authors: Guilherme Baldo Carlos

Abstract:

The flexible job-shop scheduling problem (FJSP) is an NP-hard combinatorial optimization problem, which can be applied to model several applications in a wide array of industries. This problem will have its importance increase due to the shift in the production mode that modern society is going through. The demands are increasing and for products personalized and customized. This work aims to apply a meta-heuristic called a genetic algorithm (GA) to solve this problem. A GA is a meta-heuristic inspired by the natural selection of Charles Darwin; it produces a population of individuals (solutions) and selects, mutates, and mates the individuals through generations in order to find a good solution for the problem. The results found indicate that the GA is suitable for FJSP solving.

Keywords: genetic algorithm, evolutionary algorithm, scheduling, flexible job-shop scheduling

Procedia PDF Downloads 117
5226 Effects of the Flow Direction on the Fluid Flow and Heat Transfer in the Rod Bundle

Authors: Huirui Han, Chao Zhang

Abstract:

The rod bundle is used in the fuel assembly of the supercritical water-cooled nuclear reactor. In the rod bundle, the coolant absorbs the heat contributed by the fission process. Because of the dramatic variations in the thermophysical properties of water at supercritical conditions, it is essential to investigate the heat transfer characteristics of supercritical water in the rod bundle to ensure the safety of the nuclear power plant. In this study, the effects of the flow direction, including horizontal, upward, and downward, on the fluid flow and heat transfer of the supercritical water in the rod bundle were studied numerically. The results show the possibility of gap vortices in the flow subchannels of the rod bundle. In addition, the distributions of the circumferential wall temperature show differences in different flow direction conditions. It was also found that the circumferential cladding surface temperature distribution in the upward flow condition is extremely non-uniform, and there is a large difference between the maximum wall temperatures for different fuel rods.

Keywords: heat transfer, rod bundle, supercritical water, wall temperature

Procedia PDF Downloads 71
5225 Ammonia Release during Photocopying Operations

Authors: Kiurski S. Jelena, Kecić S. Vesna, Oros B. Ivana, Ranogajec G. Jonjaua

Abstract:

The paper represents the dependence of ammonia concentration on microclimate parameters and photocopying shop circulation. The concentration of ammonia was determined during 8-hours working time over five days including three sampling points of a photocopying shop in Novi Sad, Serbia. The obtained results pointed out that the room temperature possesses the highest impact on ammonia release. The obtained ammonia concentration was in the range of 1.53 to 0.42ppm and decreased with the temperature decreasing from 24.6 to 20.7 °C. As the detected concentrations were within the permissible levels of The Occupational Safety and Health Administration, The National Institute for Occupational Safety and The Health and Official Gazette of Republic of Serbia, in the range of 35 to 200ppm, there was no danger to the employee’s health in the photocopying shop.

Keywords: ammonia, emission, indoor environment, photocopying procedure

Procedia PDF Downloads 377
5224 Effect of Interference and Form Defect on the Cohesion of the Shrink-Fit Assembly

Authors: Allal Bedlaoui, Hamid Boutoutaou

Abstract:

Due to its superior economics, shrink-fit assembly is one of the best mechanical assembly methods. There are simply two components, the axis and hub. It is used in many different industries, including the production of trains, cars, and airplanes. The outer radius of the inner cylinder must be greater than the inner radius of the outer cylinder for this operation; this difference is referred to as the "interference" between the two cylinders. There are three ways to accomplish this: heating the outer cylinder to cause it to expand; cooling the cylinder's inside to cause it to contract; and third, finishing the fitting under a press. At the intersection of the two matched parts, a contact pressure and friction force are generated. We consider interference and form defects in this article because they prevent the connection between the axis and the hub from having a perfect form surface and because we will be looking at how they affect the assembly. Numerical simulation is used to ascertain if interference and form defects have a beneficial or negative influence in the distribution of stresses, assembly resistance, and plasticity.

Keywords: shrink-fit, interference, form defect, plasticity, extraction force

Procedia PDF Downloads 54
5223 Modern Technologies and Equipment for Modular-Aggregate Installation of Shipborne Equipment

Authors: A. O. Mikhailov, N. I. Gerasimov, K. N. Morozov, I. V. Grachev

Abstract:

The most advanced method of onboard equipment installation on the world shipbuilding practice is modular method, or modularization. The main idea of this is assembly of equipment, pipelines and hull structures in so called assembly units yet at the shopfloor. Those assembly units are thereafter loaded and installed inside the ship's hull. This allows to reduce labour intensiveness and significantly improve assembly quality, due to the fact that a good part of installation work is performed in the shops, instead of restricted onboard premises. Also, this method allows performing equipment installation at very early stages of hull erection. This practice is widely spread in naval submarines building. However, in merchant shipbuilding, equipment is installed mostly individually. To implement modular principles of equipment installation in designing and construction of civil ships and marine rigs, some new technologies are being developed in the following areas. The paper contains main principles and already achieved results in the above mentioned areas.

Keywords: assembly and installation technology, onboard equipment installation, large-scale assembly units, modular method

Procedia PDF Downloads 632
5222 Optimization of Flexible Job Shop Scheduling Problem with Sequence-Dependent Setup Times Using Genetic Algorithm Approach

Authors: Sanjay Kumar Parjapati, Ajai Jain

Abstract:

This paper presents optimization of makespan for ‘n’ jobs and ‘m’ machines flexible job shop scheduling problem with sequence dependent setup time using genetic algorithm (GA) approach. A restart scheme has also been applied to prevent the premature convergence. Two case studies are taken into consideration. Results are obtained by considering crossover probability (pc = 0.85) and mutation probability (pm = 0.15). Five simulation runs for each case study are taken and minimum value among them is taken as optimal makespan. Results indicate that optimal makespan can be achieved with more than one sequence of jobs in a production order.

Keywords: flexible job shop, genetic algorithm, makespan, sequence dependent setup times

Procedia PDF Downloads 301
5221 A Reactive Flexible Job Shop Scheduling Model in a Stochastic Environment

Authors: Majid Khalili, Hamed Tayebi

Abstract:

This paper considers a stochastic flexible job-shop scheduling (SFJSS) problem in the presence of production disruptions, and reactive scheduling is implemented in order to find the optimal solution under uncertainty. In this problem, there are two main disruptions including machine failure which influences operation time, and modification or cancellation of the order delivery date during production. In order to decrease the negative effects of these difficulties, two derived strategies from reactive scheduling are used; the first one is relevant to being able to allocate multiple machine to each job, and the other one is related to being able to select the best alternative process from other job while some disruptions would be created in the processes of a job. For this purpose, a Mixed Integer Linear Programming model is proposed.

Keywords: flexible job-shop scheduling, reactive scheduling, stochastic environment, mixed integer linear programming

Procedia PDF Downloads 334
5220 Optimization Model for Identification of Assembly Alternatives of Large-Scale, Make-to-Order Products

Authors: Henrik Prinzhorn, Peter Nyhuis, Johannes Wagner, Peter Burggräf, Torben Schmitz, Christina Reuter

Abstract:

Assembling large-scale products, such as airplanes, locomotives, or wind turbines, involves frequent process interruptions induced by e.g. delayed material deliveries or missing availability of resources. This leads to a negative impact on the logistical performance of a producer of xxl-products. In industrial practice, in case of interruptions, the identification, evaluation and eventually the selection of an alternative order of assembly activities (‘assembly alternative’) leads to an enormous challenge, especially if an optimized logistical decision should be reached. Therefore, in this paper, an innovative, optimization model for the identification of assembly alternatives that addresses the given problem is presented. It describes make-to-order, large-scale product assembly processes as a resource constrained project scheduling (RCPS) problem which follows given restrictions in practice. For the evaluation of the assembly alternative, a cost-based definition of the logistical objectives (delivery reliability, inventory, make-span and workload) is presented.

Keywords: assembly scheduling, large-scale products, make-to-order, optimization, rescheduling

Procedia PDF Downloads 422
5219 A Hybrid Hopfield Neural Network for Dynamic Flexible Job Shop Scheduling Problems

Authors: Aydin Teymourifar, Gurkan Ozturk

Abstract:

In this paper, a new hybrid Hopfield neural network is proposed for the dynamic, flexible job shop scheduling problem. A new heuristic based and easy to implement energy function is designed for the Hopfield neural network, which penalizes the constraints violation and decreases makespan. Moreover, for enhancing the performance, several heuristics are integrated to it that achieve active, and non-delay schedules also, prevent early convergence of the neural network. The suggested algorithm that is designed as a generalization of the previous studies for the flexible and dynamic scheduling problems can be used for solving real scheduling problems. Comparison of the presented hybrid method results with the previous studies results proves its efficiency.

Keywords: dynamic flexible job shop scheduling, neural network, heuristics, constrained optimization

Procedia PDF Downloads 391
5218 Comparison of Regime Transition between Ellipsoidal and Spherical Particle Assemblies in a Model Shear Cell

Authors: M. Hossain, H. P. Zhu, A. B. Yu

Abstract:

This paper presents a numerical investigation of regime transition of flow of ellipsoidal particles and a comparison with that of spherical particle assembly. Particle assemblies constituting spherical and ellipsoidal particle of 2.5:1 aspect ratio are examined at separate instances in similar flow conditions in a shear cell model that is numerically developed based on the discrete element method. Correlations among elastically scaled stress, kinetically scaled stress, coordination number and volume fraction are investigated, and show important similarities and differences for the spherical and ellipsoidal particle assemblies. In particular, volume fractions at points of regime transition are identified for both types of particles. It is found that compared with spherical particle assembly, ellipsoidal particle assembly has higher volume fraction for the quasistatic to intermediate regime transition and lower volume fraction for the intermediate to inertial regime transition. Finally, the relationship between coordination number and volume fraction shows strikingly distinct features for the two cases, suggesting that different from spherical particles, the effect of the shear rate on the coordination number is not significant for ellipsoidal particles. This work provides a glimpse of currently running work on one of the most attractive scopes of research in this field and has a wide prospect in understanding rheology of more complex shaped particles in light of the strong basis of simpler spherical particle rheology.

Keywords: DEM, granular rheology, non-spherical particles, regime transition

Procedia PDF Downloads 244
5217 Flexible Mixed Model Assembly Line Design: A Strategy to Respond for Demand Uncertainty at Automotive Part Manufacturer in Indonesia

Authors: T. Yuri, M. Zagloel, Inaki M. Hakim, Tegu Bintang Nugraha

Abstract:

In an era of customer centricity, automotive parts manufacturer in Indonesia must be able to keep up with the uncertainty and fluctuation of consumer demand. Flexible Manufacturing System (FMS) is a strategy to react to predicted and unpredicted changes of demand in automotive industry. This research is about flexible mixed model assembly line design through Value Stream Mapping (VSM) and Line Balancing in mixed model assembly line prior to simulation. It uses value stream mapping to identify and reduce waste while finding the best position to add or reduce manpower. Line balancing is conducted to minimize or maximize production rate while increasing assembly line productivity and efficiency. Results of this research is a recommendation of standard work combination for specifics demand scenario which can enhance assembly line efficiency and productivity.

Keywords: automotive industry, demand uncertainty, flexible assembly system, line balancing, value stream mapping

Procedia PDF Downloads 304
5216 Determination of the Economic Planning Depth for Assembly Process Planning

Authors: A. Kampker, P. Burggräf, Y. Bäumers

Abstract:

In order to be competitive, companies have to reduce their production costs while meeting increasing quality requirements. Therefore, companies try to plan their assembly processes as detailed as possible. However, increasing product individualization leading to a higher number of variants, smaller batch sizes and shorter product life cycles raise the question to what extent the effort of detailed planning is still justified. An important approach in this field of research is the concept of determining the economic planning depth for assembly process planning based on production specific influencing factors. In this paper, first solution hypotheses as well as a first draft of the resulting method will be presented.

Keywords: assembly process planning, economic planning depth, planning benefit, planning effort

Procedia PDF Downloads 478
5215 Measurements of Flow Mixing Behaviors Using a Wire-Mesh Sensor in a Wire-Wrapped 37-Pin Rod Assembly

Authors: Hyungmo Kim, Hwang Bae, Seok-Kyu Chang, Dong Won Lee, Yung Joo Ko, Sun Rock Choi, Hae Seob Choi, Hyeon Seok Woo, Dong-Jin Euh, Hyeong-Yeon Lee

Abstract:

Flow mixing characteristics in the wire-wrapped 37-pin rod bundle were measured by using a wire-mesh sensing system for a sodium-cooled fast reactor (SFR). The subchannel flow mixing in SFR core subchannels was an essential characteristic for verification of a core thermal design and safety analysis. A dedicated test facility including the wire-mesh sensor system and tracing liquid injection system was developed, and the conductivity fields at the end of 37-pin rod bundle were visualized in several different flow conditions. These experimental results represented the reasonable agreements with the results of CFD, and the uncertainty of the mixing experiments has been conducted to evaluate the experimental results.

Keywords: core thermal design, flow mixing, a wire-mesh sensor, a wire-wrap effect

Procedia PDF Downloads 604
5214 Analysis of Eating Habits of Working People in Shopping Centers on a 12-Hour Basis

Authors: A. Sadowska, R. Polaniak, P. Boczarski, E. Grochowska-Niedworok

Abstract:

Working in a shopping center 12 hours a day as a shop assistant is a very demanding and stressful job, which is still underestimated. Proper eating habits, including recommended fruits, vegetables, products rich in fiber, omega-3 fatty acids, and proper hydration, can contribute to improvement in health and make shop assistants more resistant to stress. The aim of this study was to analyze the eating habits of shop assistants working in shopping centers 12 hours a day. Participant 101 sellers from Poland filled out authorial surveys. Nearly 50% of participants consumed the recommended number of 4 to 5 meals per day. There was a slight dependence between the number of meals consumed per day and the time that employers allowed for employee mealtimes. Respondents declared that they engaged in snacking, and they generally chose fruit, chocolates, and other sweets. Survey results indicated a low liquid intake, which was about 1,05 liters daily. Mineral water was chosen most often (63%) by participants. Participant fish consumption was very low in comparison with the norms, which can pose a risk of developing omega-3 fatty acids deficiency. Shop assistants stated that a change in their eating habits was necessary. Study findings suggest a moderate dependence between being on a diet and counting calories and macronutrients contained in meals. The number of meals eaten per day is correlated with the number of meals eaten at the worksite. The percentage of snacking by shop assistants was so high that it suggested a need for more nutrition education. The topic of eating habits among shop assistants should be examined using a larger group of participants. It is necessary to note a connection between nutrition and health problems.

Keywords: eating habits, work during 12 hours a day, shopping center, nutrition

Procedia PDF Downloads 100
5213 Framework Study on Single Assembly Line to Improve Productivity with Six Sigma and Line Balancing Approach

Authors: Inaki Maulida Hakim, T. Yuri M. Zagloel, Astari Wulandari

Abstract:

Six sigma is a framework that is used to identify inefficiency so that the cause of inefficiency will be known and right improvement to overcome cause of inefficiency can be conducted. This paper presents result of implementing six sigma to improve piston assembly line in Manufacturing Laboratory, Universitas Indonesia. Six sigma framework will be used to analyze the significant factor of inefficiency that needs to be improved which causes bottleneck in assembly line. After analysis based on six sigma framework conducted, line balancing method was chosen for improvement to overcome causative factor of inefficiency which is differences time between workstation that causes bottleneck in assembly line. Then after line balancing conducted in piston assembly line, the result is increase in efficiency. Efficiency is shown in the decreasing of Defects per Million Opportunities (DPMO) from 900,000 to 700,000, the increasing of level of labor productivity from 0.0041 to 0.00742, the decreasing of idle time from 121.3 seconds to 12.1 seconds, and the increasing of output, which is from 1 piston in 5 minutes become 3 pistons in 5 minutes.

Keywords: assembly line, line balancing, productivity, six sigma

Procedia PDF Downloads 266