Search results for: Endogenous risks
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1843

Search results for: Endogenous risks

1813 Risk Management in Islamic Banks: A Case Study of the Faisal Islamic Bank of Egypt

Authors: Mohamed Saad Ahmed Hussien

Abstract:

This paper discusses the risk management in Islamic banks and aims to determine the difference in the practices and methods of risk management in those banks compared to the conventional banks, and to make a case study of the biggest Islamic bank in Egypt (Faisal Islamic Bank of Egypt) to identify the most important financial risks faced and how to manage those risks. It was found that Islamic banks face two types of risks. The first type is similar to the risks in conventional banks; the second type is the additional risks which facing the Islamic banks only as a result of some Islamic modes of financing. With regard to the risk management, Islamic banks such as conventional banks applied the regulatory rules issued by the Central Banks and the Basel Committee; Islamic banks also applied the instructions and procedures issued by the Islamic Financial Services Board (IFSB). Also, Islamic banks are similar to the conventional banks in the practices and methods which they use to manage the risks. And there are some factors that may affect the risk management in Islamic banks, such as the size of the bank and the efficiency of the administration and the staff of the bank.

Keywords: conventional banks, Faisal Islamic Bank of Egypt, Islamic banks, risk management

Procedia PDF Downloads 429
1812 Analgesic Efficacy of Opiorphin and Its Analogue

Authors: Preet Singh, Kavitha Kongara, Dave Harding, Neil Ward, Paul Chambers

Abstract:

The objective of this study was to compare the analgesic efficacy of opiorphin and its analogue with a mu-receptor agonist; morphine. Opiorphins (Gln-Arg-Phe-Ser-Arg) belong to the family of endogenous enkephalinase inhibitors, found in saliva of humans. They are inhibitors of two Zinc metal ectopeptidases (Neutral endopeptidase NEP, and amino-peptidase APN) which are responsible for the inactivation of the endogenous opioids; endorphins and enkephalins. Morphine and butorphanol exerts their analgesic effects by mimicking the actions of endorphins and enkephalins. The opiorphin analogue was synthesized based on the structure activity relationship of the amino acid sequence of opiorphin. The pharmacological profile of the analogue was tested by replacing Serine at position 4 with Proline. The hot plate and tail flick test were used to demonstrate the analgesic efficacy. There was a significant increase in the time for the tail flick response after an injection of opiorphin, which was similar to the morphine effect. There was no increase in time in the hot plate test after an injection of opiorphin. The results suggest that opiorphin works at spinal level only rather than both spinal and supraspinal. Further work is required to confirm our results. We did not find analgesic activity of the opiorphin analogue. Thus, Serine at position 4 is also important for its pharmacological action. Further work is required to illustrate the role of serine at position 4 in opiorphin.

Keywords: analgesic peptides, endogenous opioids, morphine, opiorphin

Procedia PDF Downloads 299
1811 Endogeneity between Shari'ah Governance and Board Governance and Its Impact on Financial Stability

Authors: Sabur Mollah, Asma Mobarek

Abstract:

This study aims to explore the endogenous relationship between Shari’ah governance and board governance for Islamic banks to identify complementary or substituting relationship between these governance parameters. By using a sample of 161 Islamic Banks from 24 countries for the period of 2005-2013, we show an endogenous relationship between Shari’ah Supervisory Board (SSB) and Board of Directors (BoD). In this relationship, SSB and BoD complement each other. We also show that this complementary relationship between SSB and BoD helps enhance both management and asset quality, but mitigates capital adequacy, earnings, and liquidity in Islamic banks. The study has important implications for financial stability in the Islamic banking system.

Keywords: Shari’ah Supervisory Board, Boards of Directors, Islamic banking, financial stability

Procedia PDF Downloads 151
1810 The Investigation of Endogenous Intoxication and Lipid Peroxidation in Patients with Giardiasis Before and After Treatment

Authors: R. H. Begaydarova, B. Zh. Kultanov, B. T. Esilbaeva, G. E. Nasakaeva, Y. Yukhnevich, G. K. Alshynbekova, A. E. Dyusembaeva

Abstract:

Background: The level of middle molecules of peptides (MMP) allows to evaluate the severity and prognosis of the disease and is a criterion for the effectiveness of the treatment. The detection the products of lipidperoxidation cascade, such as conjugated dienes, malondialdehyde in biological material, has an important role in the development of pathogenesis, the diagnosis and prognosis in different parasitic diseases. Purpose of the study was to evaluate the state of endogenous intoxication and indicators of lipid peroxidation in patients with giardiasis before and after treatment. Materials and methods: Endogenous intoxication was evaluated in patients with giardiasis in the level of middle molecules of peptides (MMP) in the blood. The amount of MMP and products of lipid peroxidation were determined in the blood of 198 patients with giardiasis, 129 of them were women (65%), 69 were men (35%). The MMP level was detected for comparison in the blood of 84 healthy volunteers. The lipid peroxidation were determined in 40 healthy men and women without giardiasis and history of chronic diseases. Data were processed by conventional methods of variation statistics, we calculated the arithmetic mean (M) and standard dispersion (m). t-test (t) was used to assess differences. Results: The level of MMP in the blood was significantly higher in patients with giardiasis in comparison with group of healthy men and women. MMP concentration in the blood of women with Giardia was 2.5 times greater than that of the comparison groups of women. The level of MMP exceeds more than 6 times in men with giardiasis. The decrease in the intensity of endogenous intoxication was two weeks after antigiardia therapy, both men and women. According to the study, a statistically significant increase in the level of all the studied parameters lipid peroxidation cascade was observed in the blood of men with giardiasis, with the exception of the total primary production (NGN). The treatment of giardiasis helped to stabilize the level of almost all metabolites of lipid peroxidation cascade. The exception was level of malondialdehyde, it was significantly elevated to compare with the control group and after treatment. Conclusion: Thus, the MMP level was significantly higher in blood of patients with giardiasis than in comparison group. This is evidence of severe endogenous intoxication caused by giardia infection. The accumulation of primary and secondary products of lipid peroxidation was observed in the blood of men and women. These processes tend to be more active in men than in women. Antigiardiasis therapy contributed to the normalization of almost all the studied indicators of lipid peroxidation in the blood of participants, except the level malondialdehyde in the blood of men.

Keywords: enzymes of antioxidant protection, giardiasis, blood, treatment

Procedia PDF Downloads 211
1809 Social Media and Counseling: Opportunities, Risks and Ethical Considerations

Authors: Kyriaki G. Giota, George Kleftaras

Abstract:

The purpose of this article is to briefly review the opportunities that social media presents to counselors and psychologists. Particular attention was given to understanding some of the more important common risks inherent in social media and the potential ethical dilemmas which may arise for counselors and psychologists who embrace them in their practice. Key considerations of issues pertinent to an online presence such as multiple relationships, visibility and privacy, maintaining ethical principles and professional boundaries are being discussed.

Keywords: social media, counseling, risks, ethics

Procedia PDF Downloads 391
1808 Security Risks Assessment: A Conceptualization and Extension of NFC Touch-And-Go Application

Authors: Ku Aina Afiqah Ku Adzman, Manmeet Mahinderjit Singh, Zarul Fitri Zaaba

Abstract:

NFC operates on low-range 13.56 MHz frequency within a distance from 4cm to 10cm, and the applications can be categorized as touch and go, touch and confirm, touch and connect, and touch and explore. NFC applications are vulnerable to various security and privacy attacks such due to its physical nature; unprotected data stored in NFC tag and insecure communication between its applications. This paper aims to determine the likelihood of security risks happening in an NFC technology and application. We present an NFC technology taxonomy covering NFC standards, types of application and various security and privacy attack. Based on observations and the survey presented to evaluate the risk assessment within the touch and go application demonstrates two security attacks that are high risks namely data corruption and DOS attacks. After the risks are determined, risk countermeasures by using AHP is adopted. The guideline and solutions to these two high risks, attacks are later applied to a secure NFC-enabled Smartphone Attendance System.

Keywords: Near Field Communication (NFC), risk assessment, multi-criteria decision making, Analytical Hierarchy Process (AHP)

Procedia PDF Downloads 272
1807 Exploring the Association between Risks Emerging from Climate Change Scenarios and the Built Environment

Authors: Abdullah M. Alzahrani, Abdel Halim Boussabaine

Abstract:

There is an international consensus on the climate change in the entire world and this is as a result of the combination of the natural factors, such as volcanoes and hurricanes with increased of human activity on the earth, such as industrial renaissance. Where this solidarity increases emissions of greenhouse gases GHGs that considered as the main driver of climate change scenarios and related emerging risks and impacts on buildings. These climatic risks including damages, disruption and disquiet are set to increase and it is considered as the main challenges and difficulties facing built environment due to major implications on assets sector. Consequently, the threat from climate change patterns has a significant impact on a variety of complex human decisions, which affect all aspects of living. Understanding the relationship between buildings and such risks arising from climate change scenarios on buildings are the key in insuring the optimal timing and design of policies and systems, which affect all aspects of the built environment. This paper will uncovering this correlation between emerging climate change risks and the building assets. In addition, how these emerging risks can be classified in practical way in terms of their impact type on buildings. Hence, this mapping will assist professionals and interested parties in the building sector to cope with such risks in several systematic ways including development and designing of mitigation and adaptation strategies and processes of design, specification, construction, and operation; all these leads to successful management of assets.

Keywords: climate change, climate change risks, built environment, building sector, impacts

Procedia PDF Downloads 326
1806 Development of the Logistic Service Providers under the Pandemic Affects during COVID-19 in Turkey

Authors: Süleyman Günes

Abstract:

The crucial effects of the COVID-19 pandemic have on social and economic systems in Turkey as well as all over the world. It has impacted logistic providers and worldwide supply chains. Unexpected risks played a central role in creating vulnerabilities for logistics service operations during the pandemic terms. This study aims to research and design qualitative and quantitive contributions to logistic services. The COVID-19 pandemic brought unavoidable risks to the logistics industry in Turkey. The Logistic Service Providers (LSPs) have learned how to ensure uncertainties and risks triggered by main and adverse effects. The risks that LSPs encounter during the COVID-19 pandemic have been investigated and unveiled, and identified uncertainties and risks. The cause-effect structures were displayed by the qualitative and quantitive studies. The results suggest that supply chains and demand changes triggered by the COVID-19 pandemic while it influenced financial failure and forecast horizon with operational performances.

Keywords: logistic service providers, COVID-19, development, financial failure

Procedia PDF Downloads 51
1805 Bring Your Own Devices (BOYD): Risks and Mitigation Strategies

Authors: Mohammed Ketel

Abstract:

This paper discusses the security issues related to Bring Your Own Devices (BYOD) programs, an increasingly popular choice for small and big businesses alike, and explores the benefits, risks, the available controls and solutions to mitigate the inherent security concerns with mobile devices, in general, and BYOD programs specifically. The paper also discusses the approaches that organizations can apply to mitigate the risks, which may include policies, diverse technologies, education, and training.

Keywords: BYOD, security, policies, standards, controls, education

Procedia PDF Downloads 260
1804 Evaluation of European Surveys in the Area of Health and Safety at Work and Identification of New Risks in the Labor Environment

Authors: Alena Dadova, Katarina Holla, Anna Cidlinova, Linda Makovicka Osvaldova, Jiri Vala, Samuel Kockar

Abstract:

Occupational health and safety (ASH) is an area in which procedures and applications are constantly evolving and changing through legislation and new directives and guidelines. In this way, the relevant organizations strive to ensure continuous progress and the advantage of up-to-date information to ensure safety and prevent occupational accidents. Three ESENER surveys have been carried out in the European Union, led by the Agency for Safety and Health at Work (EU-OSHA). On the basis of surveys, it was determined how European workplaces manage risks and how they manage the field of safety and health protection at work. Thousands of companies and organizations in the European Union were involved in the surveys. Organizations and businesses were presented with a questionnaire that focused on the following topics: the impact of general risks on the field of OSH and the possibility of their management, psychosocial risks and other factors such as stress, harassment and bullying, and employee participation in OSH procedures. The article is dedicated to the fundamental conclusions from these surveys and their subsequent connection with the strategic intent of the Strategic Framework of European Union for the years 2021 - 2027. In the conclusion, emerging risks are identified and EU will soon have to deal with them.

Keywords: ESENER, emerging risks, strategic framework in OSH, EU

Procedia PDF Downloads 75
1803 Developing Measurement Instruments for Enterprise Resources Planning (ERP) Post-Implementation Failure Model

Authors: Malihe Motiei, Nor Hidayati Zakaria, Davide Aloini

Abstract:

This study aims to present a method to develop the failure measurement model for ERP post-implementation. To achieve this outcome, the study firstly evaluates the suitability of Technology-Organization-Environment framework for the proposed conceptual model. This study explains how to discover the constructs and subsequently to design and evaluate the constructs as formative or reflective. Constructs are used including reflective and purely formative. Then, the risk dimensions are investigated to determine the instruments to examine the impact of risk on ERP failure after implementation. Two construct as formative constructs consist inadequate implementation and poor organizational decision making. Subsequently six construct as reflective construct include technical risks, operational risks, managerial risks, top management risks, lack of external risks, and user’s inefficiency risks. A survey was conducted among Iranian industries to collect data. 69 data were collected from manufacturing sectors and the data were analyzed by Smart PLS software. The results indicated that all measurements included 39 critical risk factors were acceptable for the ERP post-implementation failure model.

Keywords: critical risk factors (CRFs), ERP projects, ERP post-implementation, measurement instruments, ERP system failure measurement model

Procedia PDF Downloads 337
1802 Two Stage Fuzzy Methodology to Evaluate the Credit Risks of Investment Projects

Authors: O. Badagadze, G. Sirbiladze, I. Khutsishvili

Abstract:

The work proposes a decision support methodology for the credit risk minimization in selection of investment projects. The methodology provides two stages of projects’ evaluation. Preliminary selection of projects with minor credit risks is made using the Expertons Method. The second stage makes ranking of chosen projects using the Possibilistic Discrimination Analysis Method. The latter is a new modification of a well-known Method of Fuzzy Discrimination Analysis.

Keywords: expert valuations, expertons, investment project risks, positive and negative discriminations, possibility distribution

Procedia PDF Downloads 637
1801 Prioritization Assessment of Housing Development Risk Factors: A Fuzzy Hierarchical Process-Based Approach

Authors: Yusuf Garba Baba

Abstract:

The construction industry and housing subsector are fraught with risks that have the potential of negatively impacting on the achievement of project objectives. The success or otherwise of most construction projects depends to large extent on how well these risks have been managed. The recent paradigm shift by the subsector to use of formal risk management approach in contrast to hitherto developed rules of thumb means that risks must not only be identified but also properly assessed and responded to in a systematic manner. The study focused on identifying risks associated with housing development projects and prioritisation assessment of the identified risks in order to provide basis for informed decision. The study used a three-step identification framework: review of literature for similar projects, expert consultation and questionnaire based survey to identify potential risk factors. Delphi survey method was employed in carrying out the relative prioritization assessment of the risks factors using computer-based Analytical Hierarchical Process (AHP) software. The results show that 19 out of the 50 risks significantly impact on housing development projects. The study concludes that although significant numbers of risk factors have been identified as having relevance and impacting to housing construction projects, economic risk group and, in particular, ‘changes in demand for houses’ is prioritised by most developers as posing a threat to the achievement of their housing development objectives. Unless these risks are carefully managed, their effects will continue to impede success in these projects. The study recommends the adoption and use of the combination of multi-technique identification framework and AHP prioritization assessment methodology as a suitable model for the assessment of risks in housing development projects.

Keywords: risk management, risk identification, risk analysis, analytic hierarchical process

Procedia PDF Downloads 87
1800 Planning and Strategies for Risks Prevention, Mitigating, and Recovery of Ancient Theatres Heritage: Investigation and Recommendations

Authors: Naif A. Haddad

Abstract:

Greek, Hellenistic and Roman theatre heritage are exposed to multiple risks at varied times or simultaneously. There is no single reason why a theatre building becomes ‘at risk’, as each case has different circumstances which have led to the theatre building decay. There are complicated processes of destruction and distress that show divergence in theatre building materials' decay. Theatre modern use for cultural performances causes much of the risks concerning the physical structure and authenticity of theatre sites. In addition, there are some deterioration and deformations due to previous poor quality restorations and interventions through related excavation and conservation programmes as also risks to authenticity due to new additions. For preventive conservation, theatre natural and anthropogenic risks management can provide a framework for decision making. These risks to ancient theatre heritage may stem from exposure to one or more risk or synergy of many factors. We, therefore, need to link the theatre natural risks to the risks that come from anthropogenic factors associated with social and economic development. However, this requires a holistic approach, and systematic methodology for understanding these risks from various sources while incorporating specific actions, planning and strategies for each specific risk. Elaborating on recent relevant studies, and ERATO and ATHENA EU projects for ancient theaters and odea and general surveys, this paper attempts to discuss the main aspects of the ancient Greek, Hellenistic and Roman theatres risk related issues. Relevant case studies shall also be discussed and investigated to examine frameworks for risk mitigation, and related guidelines and recommendations that provide a systematic approach for sustainable management and planning in relation mainly to ‘compatible use’ of theatre sites.

Keywords: cultural heritage management, European ancient theatres projects, Anthropogenic risks mitigation, sustainable management and planning, preventive conservation, modern use, compatible use

Procedia PDF Downloads 272
1799 Study of the Landslide and Stability of Open Pit Quarry: Case of Open Pite Quarry of Chouf Amar M'sila, Algeria

Authors: Saadoun Abd Errazak, Hafssaoui Abdallah, Fredj Mohamed

Abstract:

Mining operations open induce risks of instability that can cause landslides and collapse at the bleachers slope. These risks may occur both during and after the operation phase. The magnitude of these risks depends on the mechanical and physical characteristics of the rock mass, the geometrical dimensions of ore bodies, their spatial arrangement, and the state of the operated area. If security and technology measures are not taken into account for this purpose, the environment will be affected. The main objective of this work is to assess these risks by analytical and numerical methods. The study is based on the geological, hydrogeological and geotechnical rock mass of the open pit quarry of Chouf Amar M'sila. The results obtained have allowed us to obtain an acceptable factor of safety and stability study of the open pit.

Keywords: stability, land sliding, numerical modeling, safety factor, open-pit quarry

Procedia PDF Downloads 345
1798 Provisions for Risk in Islamic Banking and Finance in Comparison to the Conventional Banks in Malaysia

Authors: Rashid Masoud Ali Al-Mazrui, Ramadhani Mashaka Shabani

Abstract:

Islamic banks and financial institutions are exposed to the same risks as conventional banking. These risks include the rate return risk, credit or market risk, liquidity risk, and operational risk among others. However, being a financial institution that operates Islamic banking and finance operations, there is additional risk associated with its operations different from conventional finance, such as displacing commercial risk. They face Shari'ah compliance risks because of their failure to follow Shari'ah principles. To have proper mitigation and risk management, banks should have proper risk management policies to mitigate risks. This paper aims to study the risk management taken by Islamic banks in comparison with conventional banks. Also, the study evaluates the provisions for risk management taken by selected Islamic banks and conventional banks. The study employs qualitative analysis using secondary data by applying a content analysis approach with a sample size of 4 Islamic banks and four conventional banks ranging from 2010 to 2020. We find that these banks all use the same technique, except for the associated risk. The extra ways are used, but only for additional risks that are available to Islamic banking and finance.

Keywords: emerging risk, risk management, Islamic banking, conventional bank

Procedia PDF Downloads 42
1797 Understanding the Endogenous Impact of Tropical Cyclones Floods and Sustainable Landscape Management Innovations on Farm Productivity in Malawi

Authors: Innocent Pangapanga, Eric Mungatana

Abstract:

Tropical cyclones–related floods (TCRFs) in Malawi have devastating effects on smallholder agriculture, thereby threatening the food security agenda, which is already constrained by poor agricultural innovations, low use of improved varieties, and unaffordable inorganic fertilizers, and fragmenting landholding sizes. Accordingly, households have engineered and indigenously implemented sustainable landscape management (SLM) innovations to contain the adverse effects of TCRFs on farm productivity. This study, therefore, interrogated the efficacy of SLM adoption on farm productivity under varying TCRFs, while controlling for the potential selection bias and unobservable heterogeneity through the application of the Endogenous Switching Regression Model. In this study, we further investigated factors driving SLM adoption. Substantively, we found TCRFs reducing farm productivity by 31 percent, on the one hand, and influencing the adoption of SLM innovations by 27 percent, on the other hand. The study also observed that households that interacted SLM with TCRFs were more likely to enhance farm productivity by 24 percent than their counterparts. Interestingly, the study results further demonstrated that multiple adoptions of SLM-related innovations, including intercropping, agroforestry, and organic manure, enhanced farm productivity by 126 percent, suggesting promoting SLM adoption as a package to appropriately inform existing sustainable development goals’ agricultural productivity initiatives under intensifying TCRFs in the country.

Keywords: tropical cyclones–related floods, sustainable landscape management innovations, farm productivity, endogeneity, endogenous switching regression model, panel data, smallholder agriculture

Procedia PDF Downloads 87
1796 Applying the Underwriting Technique to Analyze and Mitigate the Credit Risks in Construction Project Management

Authors: Hai Chien Pham, Thi Phuong Anh Vo, Chansik Park

Abstract:

Risks management in construction projects is important to ensure the positive feasibility of the projects in which financial risks are most concerned while construction projects always run on a credit basis. Credit risks, therefore, require unique and technical tools to be well managed. Underwriting technique in credit risks, in its most basic sense, refers to the process of evaluating the risks and the potential exposure of losses. Risks analysis and underwriting are applied as a must in banks and financial institutions who are supporters for constructions projects when required. Recently, construction organizations, especially contractors, have recognized the significant increasing of credit risks which caused negative impacts to project performance and profit of construction firms. Despite the successful application of underwriting in banks and financial institutions for many years, there are few contractors who are applying this technique to analyze and mitigate the credit risks of their potential owners before signing contracts with them for delivering their performed services. Thus, contractors have taken credit risks during project implementation which might be not materialized due to the bankruptcy and/or protracted default made by their owners. With this regard, this study proposes a model using the underwriting technique for contractors to analyze and assess credit risks of their owners before making final decisions for the potential construction contracts. Contractor’s underwriters are able to analyze and evaluate the subjects such as owner, country, sector, payment terms, financial figures and their related concerns of the credit limit requests in details based on reliable information sources, and then input into the proposed model to have the Overall Assessment Score (OAS). The OAS is as a benchmark for the decision makers to grant the proper limits for the project. The proposed underwriting model is validated by 30 subjects in Asia Pacific region within 5 years to achieve their OAS, and then compare output OAS with their own practical performance in order to evaluate the potential of underwriting model for analyzing and assessing credit risks. The results revealed that the underwriting would be a powerful method to assist contractors in making precise decisions. The contribution of this research is to allow the contractors firstly to develop their own credit risk management model for proactively preventing the credit risks of construction projects and continuously improve and enhance the performance of this function during project implementation.

Keywords: underwriting technique, credit risk, risk management, construction project

Procedia PDF Downloads 185
1795 Theoretical Discussion on the Classification of Risks in Supply Chain Management

Authors: Liane Marcia Freitas Silva, Fernando Augusto Silva Marins, Maria Silene Alexandre Leite

Abstract:

The adoption of a network structure, like in the supply chains, favors the increase of dependence between companies and, by consequence, their vulnerability. Environment disasters, sociopolitical and economical events, and the dynamics of supply chains elevate the uncertainty of their operation, favoring the occurrence of events that can generate break up in the operations and other undesired consequences. Thus, supply chains are exposed to various risks that can influence the profitability of companies involved, and there are several previous studies that have proposed risk classification models in order to categorize the risks and to manage them. The objective of this paper is to analyze and discuss thirty of these risk classification models by means a theoretical survey. The research method adopted for analyzing and discussion includes three phases: The identification of the types of risks proposed in each one of the thirty models, the grouping of them considering equivalent concepts associated to their definitions, and, the analysis of these risks groups, evaluating their similarities and differences. After these analyses, it was possible to conclude that, in fact, there is more than thirty risks types identified in the literature of Supply Chains, but some of them are identical despite of be used distinct terms to characterize them, because different criteria for risk classification are adopted by researchers. In short, it is observed that some types of risks are identified as risk source for supply chains, such as, demand risk, environmental risk and safety risk. On the other hand, other types of risks are identified by the consequences that they can generate for the supply chains, such as, the reputation risk, the asset depreciation risk and the competitive risk. These results are consequence of the disagreements between researchers on risk classification, mainly about what is risk event and about what is the consequence of risk occurrence. An additional study is in developing in order to clarify how the risks can be generated, and which are the characteristics of the components in a Supply Chain that leads to occurrence of risk.

Keywords: sisks classification, survey, supply chain management, theoretical discussion

Procedia PDF Downloads 602
1794 Risk Assessment in Construction of K-Span Buildings in United Arab Emirates (UAE)

Authors: Imtiaz Ali, Imam Mansoor

Abstract:

Investigations as a part of the academic study were undertaken to identify and evaluate the significant risks associated with the construction of K-span buildings in the region of UAE. Primary field data was collected through questionnaires obtaining specific open and close-ended questions from carefully selected construction firms, civil engineers and, construction manager regarding risks associated to K-span building construction. Historical data available for other regions of the same construction technique was available which was compared for identifying various non-critical and critical risk parameters by comparative evaluation techniques to come up with important risks and potential sources for their control and minimization in K-Span buildings that is increasing in the region. The associated risks have been determined with their Relative Importance Index (RII) values of which Risk involved in Change of Design required by Owners carries the highest value (RII=0.79) whereas, Delayed Payment by Owner to Contractor is one of the least (RII=0.42) value. The overall findings suggest that most relative risks as quantified originate or associated with the contractors. It may be concluded that project proponents undertaking K-span projects in planning and budgeting the cost and delays should take into account of risks on high account if changes in design are also required any delays in the material by the supplier would then be a major risk in K-span project delay. Since projects are, less costly, so owners have limited budgets, then they hire small contractors, which are not highly competent contractors. So study suggests that owner should be aware of these types of risks associated with the construction of K-span buildings in order to make it cost effective.

Keywords: k-span buildings, k-span construction, risk management, relative improvement index (RII)

Procedia PDF Downloads 351
1793 Perceived Risks in Business-to-Consumer Online Contracts: An Empirical Study in Saudi Arabia

Authors: Shaya Alshahrani

Abstract:

Perceived risks play a major role in consumer intentions, behaviors, attitudes, and decisions about online shopping in the KSA. This paper investigates the influence of six perceived risk dimensions on Saudi consumers: product risk, information risk, financial risk, privacy and security risk, delivery risk, and terms and conditions risk empirically. To ensure the success of this study, a random survey was distributed to reflect the consumers’ perceived risk and to enable the generalization of the results. Data were collected from 323 respondents in the Kingdom of Saudi Arabia (KSA): 50 who had never shopped online and 273 who had done so. The results indicated that all six risks influenced the respondents’ perceptions of online shopping. The non-online shoppers perceived financial and delivery risks as the most significant barriers to online shopping. This was followed closely by performance, information, and privacy and security risks. Terms and conditions were perceived as less significant. The online consumers considered delivery and performance risks to be the most significant influences on internet shopping. This was followed closely by information and terms and conditions. Financial and privacy and security risks were perceived as less significant. This paper argues that introducing adequate legal solutions to addressing related problems arising from this study is an urgent need. This may enhance consumer trust in the KSA online market, increase consumers’ intentions regarding online shopping, and improve consumer protection.

Keywords: perceived risk, online contracts, Saudi Arabia, consumer protection

Procedia PDF Downloads 120
1792 Improving the Quantification Model of Internal Control Impact on Banking Risks

Authors: M. Ndaw, G. Mendy, S. Ouya

Abstract:

Risk management in banking sector is a key issue linked to financial system stability and its importance has been elevated by technological developments and emergence of new financial instruments. In this paper, we improve the model previously defined for quantifying internal control impact on banking risks by automatizing the residual criticality estimation step of FMECA. For this, we defined three equations and a maturity coefficient to obtain a mathematical model which is tested on all banking processes and type of risks. The new model allows an optimal assessment of residual criticality and improves the correlation rate that has become 98%.

Keywords: risk, control, banking, FMECA, criticality

Procedia PDF Downloads 291
1791 Application of Forward Contract and Crop Insurance as Risk Management Tools of Agriculture: A Case Study in Bangladesh

Authors: M. Bokhtiar Hasan, M. Delowar Hossain, Abu N. M. Wahid

Abstract:

The principal aim of the study is to find out a way to effectively manage the agricultural risks like price volatility, weather risks, and fund shortage. To hedge price volatility, farmers sometimes make contracts with agro-traders but fail to protect themselves effectively due to not having legal framework for such contracts. The study extensively reviews existing literature and find evidence that the majority studies either deal with price volatility or weather risks. If we could address these risks through a single model, it would be more useful to both the farmers and traders. Intrinsically, the authors endeavor in this regard, and the key contribution of this study basically lies in it. Initially, we conduct a small survey aspiring to identify the shortcomings of existing contracts. Later, we propose a model encompassing forward and insurance contracts together where forward contract will be used to hedge price volatility and insurance contract will be used to protect weather risks. Contribution/Originality: The study adds to the existing literature through proposing an integrated model comprising of forward contract and crop insurance which will support both farmers and traders to cope with the agricultural risks like price volatility, weather hazards, and fund shortage. JEL Classifications: O13, Q13

Keywords: agriculture, forward contract, insurance contract, risk management, model

Procedia PDF Downloads 124
1790 Impact of Exogenous Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

Many of Public Private Partnership (PPP) are developed based on a public project is to be awarded to a private party within a one contractual framework. PPP project risks typically include the development and construction of a new asset as well as its operation. Certainly the most severe consequences of risks through the construction period are price and time overruns. These events are among the most generally used situation in value for money analysis risks. The sources of risk change during the time in PPP project. In traditional procurement, the public sector usually has to cover all prices suffering from these risks. At least there is plenty to suggest that price suffering is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of exogenous risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: public private partnership (PPP), risk, risk pricing, system dynamics (SD)

Procedia PDF Downloads 518
1789 Identifying and Ranking Environmental Risks of Oil and Gas Projects Using the VIKOR Method for Multi-Criteria Decision Making

Authors: Sasan Aryaee, Mahdi Ravanshadnia

Abstract:

Naturally, any activity is associated with risk, and humans have understood this concept from very long times ago and seek to identify its factors and sources. On the one hand, proper risk management can cause problems such as delays and unforeseen costs in the development projects, temporary or permanent loss of services, getting lost or information theft, complexity and limitations in processes, unreliable information caused by rework, holes in the systems and many such problems. In the present study, a model has been presented to rank the environmental risks of oil and gas projects. The statistical population of the study consists of all executives active in the oil and gas fields, that the statistical sample is selected randomly. In the framework of the proposed method, environmental risks of oil and gas projects were first extracted, then a questionnaire based on these indicators was designed based on Likert scale and distributed among the statistical sample. After assessing the validity and reliability of the questionnaire, environmental risks of oil and gas projects were ranked using the VIKOR method of multiple-criteria decision-making. The results showed that the best options for HSE planning of oil and gas projects that caused the reduction of risks and personal injury and casualties and less than other options is costly for the project and it will add less time to the duration of implementing the project is the entering of dye to the environment when painting the generator pond and the presence of the rigger near the crane.

Keywords: ranking, multi-criteria decision making, oil and gas projects, HSEmanagement, environmental risks

Procedia PDF Downloads 127
1788 IL-33 Production in Murine Macrophages via PGE2-E Prostanoid Receptor 2/4 Signaling

Authors: Sachin K. Samuchiwal, Barbara Balestrieri, Amanda Paskavitz, Hannah Raff, Joshua A. Boyce

Abstract:

IL-33, a recently discovered member of the IL-1 cytokine family, binds to the TLR/IL1R super family receptor ST2 and induces type 2 immune responses. IL-33 is constitutively expressed in structural cells at barrier sites such as skin, lung, and intestine, and also inducibly expressed by hematopoietic cells including macrophages. Stimulation of macrophages by Lipopolysaccharide (LPS) can induce de novo IL-33 expression, and also causes the production of prostaglandin-E2 (PGE2) via cyclooxygenase (COX)-2 and microsomal PGE2 synthase-1 (mPGES-1). Because PGE2 can regulate macrophage functions through both autocrine and paracrine mechanisms, the potential interplay of endogenous PGE2 on IL-33 production was explored. Bone-marrow derived murine macrophages (bmMF) that lack either mPGES-1 or EP2 receptor expression were stimulated with LPS in the absence or presence of exogenous PGE2 along with pharmacological agonists and antagonists. The study results demonstrate that endogenous PGE2 markedly enhances LPS-induced IL-33 production by bmMFs via EP2 receptors. Moreover, exogenous PGE2 can amplify LPS-induced IL-33 expression dominantly by EP2 and partly by EP4 receptors by a pathway involving cAMP and exchange protein activated by cAMP (EPAC), but not protein kinase A (PKA). Though both IL-33 production and PGE2 generation in response to LPS require activation of both p38 MAPK and NF-κB, PGE2 did not influence this activation. In conclusion, it is demonstrated that endogenous PGE2 signaling through EP2 and EP4 receptors is a prerequisite for LPS-induced IL-33 production in bmMFs and the underlying cAMP mediated pathway involves EPAC. Since IL-33 is a critical pro-inflammatory cytokine in various pathological disorders, this PGE2-EP2/EP4-cAMP mediated pathway can be exploited to intervene in IL-33 driven pathologies.

Keywords: bone marrow macrophages, EPAC, IL-33, PGE2

Procedia PDF Downloads 155
1787 Impact of Improved Beehive on Income of Rural Households: Evidence from Bugina District of Northern Ethiopia

Authors: Wondmnew Derebe

Abstract:

Increased adoption of modern beehives improves the livelihood of smallholder farmers whose income largely depends on mixed crop-livestock farming. Improved beehives have been disseminated to farmers in many parts of Ethiopia. However, its impact on income is less investigated. Thus, this study estimates how adopting improved beehives impacts rural households' income. Survey data were collected from 350 randomly selected households' and analyzed using an endogenous switching regression model. The result revealed that the adoption of improved beehives is associated with a higher annual income. On average, improved beehive adopters earned about 6,077 (ETB) more money than their counterparts. However, the impact of adoption would have been larger for actual non-adopters, as reflected in the negative transitional heterogeneity effect of 1792 (ETB). The result also indicated that the decision to adopt or not to adopt improved beehives was subjected to individual self-selection. Improved beehive adoption can increase farmers' income and can be used as an alternative poverty reduction strategy.

Keywords: impact, adoption, endogenous switching regression, income, improved

Procedia PDF Downloads 41
1786 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price

Procedia PDF Downloads 535
1785 Valuation of Caps and Floors in a LIBOR Market Model with Markov Jump Risks

Authors: Shih-Kuei Lin

Abstract:

The characterization of the arbitrage-free dynamics of interest rates is developed in this study under the presence of Markov jump risks, when the term structure of the interest rates is modeled through simple forward rates. We consider Markov jump risks by allowing randomness in jump sizes, independence between jump sizes and jump times. The Markov jump diffusion model is used to capture empirical phenomena and to accurately describe interest jump risks in a financial market. We derive the arbitrage-free model of simple forward rates under the spot measure. Moreover, the analytical pricing formulas for a cap and a floor are derived under the forward measure when the jump size follows a lognormal distribution. In our empirical analysis, we find that the LIBOR market model with Markov jump risk better accounts for changes from/to different states and different rates.

Keywords: arbitrage-free, cap and floor, Markov jump diffusion model, simple forward rate model, volatility smile, EM algorithm

Procedia PDF Downloads 393
1784 Stochastic Prioritization of Dependent Actuarial Risks: Preferences among Prospects

Authors: Ezgi Nevruz, Kasirga Yildirak, Ashis SenGupta

Abstract:

Comparing or ranking risks is the main motivating factor behind the human trait of making choices. Cumulative prospect theory (CPT) is a preference theory approach that evaluates perception and bias in decision making under risk and uncertainty. We aim to investigate the aggregate claims of different risk classes in terms of their comparability and amenability to ordering when the impact of risk perception is considered. For this aim, we prioritize the aggregate claims taken as actuarial risks by using various stochastic ordering relations. In order to prioritize actuarial risks, we use stochastic relations such as stochastic dominance and stop-loss dominance that are proposed in the frame of partial order theory. We take into account the dependency of the individual claims exposed to similar environmental risks. At first, we modify the zero-utility premium principle in order to obtain a solution for the stop-loss premium under CPT. Then, we propose a stochastic stop-loss dominance of the aggregate claims and find a relation between the stop-loss dominance and the first-order stochastic dominance under the dependence assumption by using properties of the familiar as well as some emerging multivariate claim distributions.

Keywords: cumulative prospect theory, partial order theory, risk perception, stochastic dominance, stop-loss dominance

Procedia PDF Downloads 299