Search results for: construction safety
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6744

Search results for: construction safety

6504 Vibration-Based Monitoring of Tensioning Stay Cables of an Extradosed Bridge

Authors: Chun-Chung Chen, Bo-Han Lee, Yu-Chi Sung

Abstract:

Monitoring the status of tensioning force of stay cables is a significant issue for the assessment of structural safety of extradosed bridges. Moreover, it is known that there is a high correlation between the existing tension force and the vibration frequencies of cables. This paper presents the characteristic of frequencies of stay cables of a field extradosed bridge by using vibration-based monitoring methods. The vibration frequencies of each stay cables were measured in stages from the beginning to the completion of bridge construction. The result shows that the vibration frequency variation trend of different lengths of cables at each measured stage is different. The observed feature can help the application of the bridge long-term monitoring system and contribute to the assessment of bridge safety.

Keywords: vibration-based method, extradosed bridges, bridge health monitoring, bridge stay cables

Procedia PDF Downloads 132
6503 Design and Control Algorithms for Power Electronic Converters for EV Applications

Authors: Ilya Kavalchuk, Mehdi Seyedmahmoudian, Ben Horan, Aman Than Oo, Alex Stojcevski

Abstract:

The power electronic components within Electric Vehicles (EV) need to operate in several important modes. Some modes directly influence safety, while others influence vehicle performance. Given the variety of functions and operational modes required of the power electronics, it needs to meet efficiency requirements to minimize power losses. Another challenge in the control and construction of such systems is the ability to support bidirectional power flow. This paper considers the construction, operation, and feasibility of available converters for electric vehicles with feasible configurations of electrical buses and loads. This paper describes logic and control signals for the converters for different operations conditions based on the efficiency and energy usage bases.

Keywords: electric vehicles, electrical machines control, power electronics, powerflow regulations

Procedia PDF Downloads 539
6502 Prototype of Low-Cost Safety-Suit for Manual Scavengers in India

Authors: Noopur Anand, Amit Gupta

Abstract:

Sewage divers are the workers involved in cleaning and maintaining of the sewerage lines by entering through manholes. The working conditions of sewage divers in India are more challenging than in other countries. Though India has legal acts framed to ensure protection of the divers called 'The Prohibition of Employment of Manual Scavengers and their Rehabilitation Act, 2013' by Ministry of Law and Justice but these are usually not implemented. Further, the divers are not even provided with safety gear like mask, eyewear, helmet, safety suit, safety belt, gloves, and shoes because of lack of initiative among the agencies/individuals employing them and low awareness of importance of the protective gear amongst workers themselves. Several reports and studies show that because of the non-availability of safety gear, many sewage workers get infected and many of them retire even before attaining superannuation and about 70% of the manual scavengers die while on job. Though there are neoprene safety suits, costing only a few thousand, available in the market which can suffice but is beyond the buying capacity of the sewage diver and agencies/individuals employing them are reluctant to procure it as they find it expensive. In absence of safety suits, the divers get exposed to the parasites, viruses, and disease-causing germs present in the sewage. The research was undertaken with the objective of developing an affordable safety-suit which would save diver from coming into direct contact with the sewage thus preventing infections and diseases. The low cost of the suit may also motivate their employers to procure them for sewage divers.

Keywords: manhole cleaner, manual scavenger, prototype, low-cost safety-suit

Procedia PDF Downloads 150
6501 Treatment of the Modern Management Mechanism of the Debris Flow Processes Expected in the Mletiskhevi

Authors: G. Chakhaia, S. Gogilava, L. Tsulukidze, Z. Laoshvili, I. Khubulava, S. Bosikashvili, T. Gugushvili

Abstract:

The work reviewed and evaluated various genesis debris flow phenomena recently formatted in the Mletiskhevi, accordingly it revealed necessity of treatment modern debris flow against measures. Based on this, it is proposed the debris flow against truncated semi cone shape construction, which elements are contained in the car’s secondary tires. its constituent elements (sections), due to the possibilities of amortization and geometric shapes is effective and sustainable towards debris flow hitting force. The construction is economical, because after crossing the debris flows in the river bed, the riverbed is not cleanable, also the elements of the building are resource saving. For assessment of influence of cohesive debris flow at the construction and evaluation of the construction effectiveness have been implemented calculation in the specific assumptions with approved methodology. According to the calculation, it was established that after passing debris flow in the debris flow construction (in 3 row case) its hitting force reduces 3 times, that causes reduce of debris flow speed and kinetic energy, as well as sedimentation on a certain section of water drain in the lower part of the construction. Based on the analysis and report on the debris flow against construction, it can be said that construction is effective, inexpensive, technically relatively easy-to-reach measure, that’s why its implementation is prospective.

Keywords: construction, debris flow, sections, theoretical calculation

Procedia PDF Downloads 161
6500 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal

Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai

Abstract:

Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.

Keywords: material management, construction site, inventory, construction project

Procedia PDF Downloads 41
6499 Railway Accidents: Using the Global Railway Accident Database and Evaluation for Risk Analysis

Authors: Mathias Linden, André Schneider, Harald F. O. von Korflesch

Abstract:

The risk of train accidents is an ongoing concern for railway organizations, governments, insurance companies and other depended sectors. Safety technologies are installed to reduce and to prevent potential damages of train accidents. Since the budgetary for the safety of railway organizations is limited, it is necessary not only to achieve a high availability and high safety standard but also to be cost effective. Therefore, an economic assessment of safety technologies is fundamental to create an accurate risk analysis. In order to conduct an economical assessment of a railway safety technology and a quantification of the costs of the accident causes, the Global Railway Accident Database & Evaluation (GRADE) has been developed. The aim of this paper is to describe the structure of this accident database and to show how it can be used for risk analyses. A number of risk analysis methods, such as the probabilistic safety assessment method (PSA), was used to demonstrate this accident database’s different possibilities of risk analysis. In conclusion, it can be noted that these analyses would not be as accurate without GRADE. The information gathered in the accident database was not available in this way before. Our findings are relevant for railway operators, safety technology suppliers, assurances, governments and other concerned railway organizations.

Keywords: accident causes, accident costs, accident database, global railway accident database & evaluation, GRADE, probabilistic safety assessment, PSA, railway accidents, risk analysis

Procedia PDF Downloads 338
6498 A Study of Safety of Data Storage Devices of Graduate Students at Suan Sunandha Rajabhat University

Authors: Komol Phaisarn, Natcha Wattanaprapa

Abstract:

This research is a survey research with an objective to study the safety of data storage devices of graduate students of academic year 2013, Suan Sunandha Rajabhat University. Data were collected by questionnaire on the safety of data storage devices according to CIA principle. A sample size of 81 was drawn from population by purposive sampling method. The results show that most of the graduate students of academic year 2013 at Suan Sunandha Rajabhat University use handy drive to store their data and the safety level of the devices is at good level.

Keywords: security, safety, storage devices, graduate students

Procedia PDF Downloads 334
6497 A Review on Future Safety Conditions and Requirements for E-Bikes

Authors: Jonas Palmer, Leon Brüning, Lukas Himmelsbach

Abstract:

The worldwide ambitions to transform the transportation sector are increasingly affecting the safety conditions for all traffic participants and the required infrastructure. To contribute to the transformation and for health aspects, individuals search for carbon-free alternatives that include physical excitation. Especially e-bikes experience a growing demand within the last few years and consequently change the safety requirements. E-cyclists are exposed to amplified risks due to higher velocity in comparison to classic cyclists. Furthermore, cyclists suffer from a lack of infrastructure, rider assistance systems as well as awareness of other road users. For minimizing the risk of accidents, it is crucial to identify, develop and implement safety measures for cyclists. The paper aims to contribute to future research with delivering an overview of the latest publications and to subsequently identify essential research gaps. Therefore, it is essential to analyze the areas of technical adjustments as well as legal aspects and the correlation of both. The review`s insights can intensify the awareness of safety issues related to e-bikes and promote the development and implementation of appropriate measures.

Keywords: e-bike safety measures, future mobility, risk management, road safety

Procedia PDF Downloads 98
6496 Performance Evaluation and Planning for Road Safety Measures Using Data Envelopment Analysis and Fuzzy Decision Making

Authors: Hamid Reza Behnood, Esmaeel Ayati, Tom Brijs, Mohammadali Pirayesh Neghab

Abstract:

Investment projects in road safety planning can benefit from an effectiveness evaluation regarding their expected safety outcomes. The objective of this study is to develop a decision support system (DSS) to support policymakers in taking the right choice in road safety planning based on the efficiency of previously implemented safety measures in a set of regions in Iran. The measures considered for each region in the study include performance indicators about (1) police operations, (2) treated black spots, (3) freeway and highway facility supplies, (4) speed control cameras, (5) emergency medical services, and (6) road lighting projects. To this end, inefficiency measure is calculated, defined by the proportion of fatality rates in relation to the combined measure of road safety performance indicators (i.e., road safety measures) which should be minimized. The relative inefficiency for each region is modeled by the Data Envelopment Analysis (DEA) technique. In a next step, a fuzzy decision-making system is constructed to convert the information obtained from the DEA analysis into a rule-based system that can be used by policy makers to evaluate the expected outcomes of certain alternative investment strategies in road safety.

Keywords: performance indicators, road safety, decision support system, data envelopment analysis, fuzzy reasoning

Procedia PDF Downloads 326
6495 Price Promotions and Inventory Decisions

Authors: George Hadjinicola, Andreas Soteriou

Abstract:

This paper examines the relationship between the number of price promotions that a firm should conduct per year and the level of safety stocks that the firm should maintain. Price promotions result in temporary sales increases, which affect the operations function through (1) an increase in the quantities demanded and (2) an increase in safety stocks required to maintain the desired service level. We propose a modeling framework where both price promotions and improved service levels, operationalized through higher safety stocks, can affect sales. We treat the annual number of promotions as a decision variable. We identify market conditions where the operations function, through improved safety stocks, can complement price promotions or even play the leading role in sales increases.

Keywords: price promotions, safety stocks, marketing/operations interface, mathematical model

Procedia PDF Downloads 68
6494 Implementation of ISO 26262: Issues and Challenges

Authors: Won Jung, Azianti Ismail

Abstract:

Functional safety is about electrical, electronics, and programmable electronic safety-related system focuses on the potential risk of malfunction which may have a significant impact on the safety of humans and/or the environment based on IEC 61508. In November 2011, the automotive industry has been introduced to automotive functional safety ISO 26262 which addresses the complete safety installation from sensor to actuator with its technical as well as management issues. Nowadays, most of the modern automobiles are equipped with embedded electronic systems which include many Electronic Controller Units (ECUs), electronic sensors, signals, bus systems and coding. Due to upcoming more sophisticated systems installed in automobiles, the need to carry out detailed safety is very crucial. Assimilation of existing practices with this new standard is a major challenge for the automotive industry in reducing redundancy, time and resources. Therefore, this paper will analyze the research trends on pre and post introduction of ISO 26262 through publications as well as to take a glimpse in the activities for implementing this standard by the automotive manufacturers around the world. It is going to highlight issues and challenges which have been discussed among the experts in this field. Even though it will take some time for this standard to be fully implemented, the benefits from this implementation will raise the competitiveness in the global automotive market.

Keywords: ISO 26262, automotive, functional safety, implementation, standard, challenges

Procedia PDF Downloads 378
6493 Smart Construction Sites in KSA: Challenges and Prospects

Authors: Ahmad Mohammad Sharqi, Mohamed Hechmi El Ouni, Saleh Alsulamy

Abstract:

Due to the emerging technologies revolution worldwide, the need to exploit and employ innovative technologies for other functions and purposes in different aspects has become a remarkable matter. Saudi Arabia is considered one of the most powerful economic countries in the world, where the construction sector participates effectively in its economy. Thus, the construction sector in KSA should convoy the rapid digital revolution and transformation and implement smart devices on sites. A Smart Construction Site (SCS) includes smart devices, artificial intelligence, the internet of things, augmented reality, building information modeling, geographical information systems, and cloud information. This paper aims to study the level of implementation of SCS in KSA, analyze the obstacles and challenges of adopting SCS and find out critical success factors for its implementation. A survey of close-ended questions (scale and multi-choices) has been conducted on professionals in the construction sector of Saudi Arabia. A total number of twenty-nine questions has been prepared for respondents. Twenty-four scale questions were established, and those questions were categorized into several themes: quality, scheduling, cost, occupational safety and health, technologies and applications, and general perception. Consequently, the 5-point Likert scale tool (very low to very high) was adopted for this survey. In addition, five close-ended questions with multi-choice types have also been prepared; these questions have been derived from a previous study implemented in the United Kingdom (UK) and the Dominic Republic (DR), these questions have been rearranged and organized to fit the structured survey in order to place the Kingdom of Saudi Arabia in comparison with the United Kingdom (UK) as well as the Dominican Republic (DR). A total number of one hundred respondents have participated in this survey from all regions of the Kingdom of Saudi Arabia: southern, central, western, eastern, and northern regions. The drivers, obstacles, and success factors for implementing smart devices and technologies in KSA’s construction sector have been investigated and analyzed. Besides, it has been concluded that KSA is on the right path toward adopting smart construction sites with attractive results comparable to and even better than the UK in some factors.

Keywords: artificial intelligence, construction projects management, internet of things, smart construction sites, smart devices

Procedia PDF Downloads 119
6492 Significant Factors to Motivate Small and Medium Enterprise (SME) Construction Firms in the Philippines to Implement ISO 9001:2008

Authors: Joseph Berlin P. Juanzon, Manuel M. Muhi

Abstract:

Motivating SME-based construction firms to adopt different management systems is not a simple task, especially if they are not aware of the benefits that they will gain from the new process-based management system. The implementation of ISO 9001:2008, Quality Management System in the construction industry is an ongoing trend, more so in the Small and Medium Enterprise. However, the level of awareness and readiness of the construction industry in the Philippines is still low as compared to the neighboring countries in Asia and in the western countries where ISO 9001:2008 originated. The purpose of this research is to determine the significant factors that will motivate SME-based construction firms in the Philippines to implement ISO 9001:2008. A field study was conducted on SME based construction firms in the Philippines, wherein a total of 139 respondents out of the 613 SME-based construction firms in CALABARZON areas were surveyed. Results reveal that the three main factors that will motivate SME-based construction firms to implement ISO 9001:2008 are: - if required by their clients, - to qualify for bidding, and - to increase customer satisfaction. Therefore, based on the results and findings, a certification of ISO 9001:2008 from an accredited auditor shall be required by clients as a constituent in accrediting SME-based construction firms and to qualify for bidding.

Keywords: construction, ISO 9001:2008, quality management systems (QMS), small medium enterprise (SME)

Procedia PDF Downloads 363
6491 Daily Stand-up Meetings - Relationships With Psychological Safety And Well-being In Teams

Authors: Sarah Rietze, Hannes Zacher

Abstract:

Daily stand-up meetings are the most commonly used method in agile teams. In daily stand-ups, team members gather to coordinate and align their efforts, typically for a predefined period of no more than 15 minutes. The primary purpose is to ask and answer the following three questions: What was accomplished yesterday? What will be done today? What obstacles are impeding my progress? Daily stand-ups aim to enhance communication, mutual understanding, and support within the team, as well as promote collective learning from mistakes through daily synchronization and transparency. The use of daily stand-ups is intended to positively influence psychological safety within teams, which is the belief that it is safe to show oneself and take personal risks. Two studies will be presented, which explore the relationships between daily stand-ups, psychological safety, and psychological well-being. In a first study, based on survey results (n = 318), we demonstrated that daily stand-ups have a positive indirect effect on job satisfaction and a negative indirect effect on turnover intention through their impact on psychological safety. In a second study, we investigate, using an experimental design, how the use of daily stand-ups in teams enhances psychological safety and well-being compared to a control group that does not use daily stand-ups. Psychological safety is considered one of the most crucial cultural factors for a sustainable, agile organization. Agile approaches, such as daily stand-ups, are a critical part of the evolving work environment and offer a proactive means to shape and foster psychological safety within teams.

Keywords: occupational wellbeing, agile work practices, psychological safety, daily stand-ups

Procedia PDF Downloads 42
6490 Causality between the Construction Industry and the GDP in the United Arab Emirates

Authors: Hasan S. Mahmoud, Salwa M. Beheiry, Vian Ahmed

Abstract:

In light of the repercussions of the 2008 global economic crisis, the response of the United Arab Emirates economy and growth, and the vast construction activities that are undergoing, there is a need to investigate the relationship between construction activities and the Gross Domestic Product (GDP). This study aims to investigate the causality relationship between the construction industry in the United Arab Emirates and the GDP of the country in the last decade. For that, this study will investigate the relationship between the growth of the GDP and the growth of construction activities and their value addition to the economy. To ascertain this relationship, Granger Causality method is used to identify the causality between the time-dependent series.

Keywords: construction value addition, Granger causality, growth of gross domestic product, United Arab Emirates

Procedia PDF Downloads 123
6489 Assessment of Impact of Manpower Training and Development in the Construction Industry

Authors: Olalekan Bamidele Aruleba

Abstract:

This research assessed the impact of manpower training and development in the construction industry. The aim is to determine the effect of training and development on employees for effective organizational growth in the construction industry to identify the training method for each category of employee in the construction industry, challenges to training and development of workers in the construction industry and impact of manpower training and development on employees and employers. Data for the study were obtained through a well-structured questionnaire administered to building professionals in Nigeria construction firm. Eighty (80) questionnaires were distributed among building professionals in three selected local governments within Ondo State and sixty-four (64) were returned. Data collected were analysed using descriptive statistics and ranking. Findings of the study revealed that in house training and in-service training methods were preferred by most construction industry. It concluded that the attitude of top management and lack of fund was seen as the significant challenges militating against training of employees. The study recommended that manpower training and development must be sustained by all stakeholders in the industry in order to improve workers' productivity; the organization should adopt the right method in training each category of employees and carry out the need assessment for training to avoid training wrong employees.

Keywords: construction, development, manpower, training

Procedia PDF Downloads 196
6488 Determining the Awareness Level of Chefs and Students on Food Safety and Allergens in Kano State, Nigeria and Ankara City in Turkey

Authors: Balarabe Bilyaminu Ismail, Osman Cavus, Fügen Durlu Özkaya

Abstract:

This study is aimed at determining the level of awareness of chefs and students of food science and technology on food safety in general and allergens in particular. To get appropriate data, a questionnaire comprising of 19 questions covering many food safety issues and allergens in foods were used to collect information for the study through face to face interviews. Interviews were conducted for 284 people in Nigeria and Turkey. Sixty-eight percent of respondents from Turkey; 31.3% were students and 68.7% were chefs. Thirty-one percent of respondents from Nigeria include 33.7% students and 66.3% chefs. The result of the study indicated that most of the findings of scientific studies on food safety issues have not been directly applied by the people working in the food sector. Additionally, the knowledge level of the gastronomy and culinary arts students on food safety and allergens are significantly higher than the restaurant chefs that prepare the food and serve it to the public. The study, therefore, concluded that proper training of food business operators is critical to ensuring the safety of foods and control of allergens.

Keywords: allergens, food safety, questionnaire survey, training

Procedia PDF Downloads 334
6487 Apps Reduce the Cost of Construction

Authors: Ali Mohammadi

Abstract:

Every construction that is done, the most important part of attention for employers and contractors is its cost, and they always try to reduce costs so that they can compete in the market, so they estimate the cost of construction before starting their activities. The costs can be generally divided into four parts: the materials used, the equipment used, the manpower required, and the time required. In this article, we are trying to talk about the three items of equipment, manpower, and time, and examine how the use of apps can reduce the cost of construction, while due to various reasons, it has received less attention in the field of app design. Also, because we intend to use these apps in construction and they are used by engineers and experts, we define these apps as engineering apps because the idea of ​​their design must be by an engineer who works in that field. Also, considering that most engineers are familiar with programming during their studies, they can design the apps they need using simple programming software.

Keywords: layout, as-bilt, monitoring, maps

Procedia PDF Downloads 42
6486 Heading for Modern Construction Management: Recommendation for Employers

Authors: Robin Becker, Maike Eilers, Nane Roetmann, Manfred Helmus

Abstract:

The shortage of junior staff in the construction industry is a problem that will be further exacerbated in the coming years by the retirement of the baby-boom generations (1955-1969) from employment. In addition, the current working conditions in the field of construction management are not attractive for young professionals. A survey of students revealed a desire for an increase in flexibility and an improved work-life balance in everyday working life. Students of civil engineering and architecture are basically interested in a career in construction management but have reservations due to the image of the profession and the current working conditions. A survey among experts from the construction industry shows that the profession can become more attractive. This report provides recommendations for action in the form of working modules to improve the working conditions of employees. If these are taken into account, graduates can be attracted to the profession of construction management, and existing staff can be retained more effectively. The aim of this report is to show incentives for employers to respond to the wishes and needs of their current and future employees to the extent that can be implemented.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 68
6485 Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: construction management, control process, cost control, planning and scheduling

Procedia PDF Downloads 225
6484 Study on the Model Predicting Post-Construction Settlement of Soft Ground

Authors: Pingshan Chen, Zhiliang Dong

Abstract:

In order to estimate the post-construction settlement more objectively, the power-polynomial model is proposed, which can reflect the trend of settlement development based on the observed settlement data. It was demonstrated by an actual case history of an embankment, and during the prediction. Compared with the other three prediction models, the power-polynomial model can estimate the post-construction settlement more accurately with more simple calculation.

Keywords: prediction, model, post-construction settlement, soft ground

Procedia PDF Downloads 410
6483 Health and Safety Practices of Midsayapenos in Relation to The Governance of the Local Government Unit of Midsayap in Responding to the COVID-19 Pandemic

Authors: Jolai R. Garca, Sergio Mahinay Jr., Fathma Dubpaleg, Rhea Jaberina, Jovanne Mabit II

Abstract:

The COVID-19 pandemic has still been going on for almost two years now, but because of the health and safety practices of the citizens, together with the action of the Local Government Unit, it has slowly dissipated. This study investigated the relationship between the health and safety protocols as well as the status of governance of the Local Government Unit of Midsayap using the evidence-based key indicators of Good Governance aggregated from the Organisation for Economic Co-operation and Development (OECD). A quantitative research design was employed to determine the relationship of the variables under study. Findings showed that the residents of Midsayap often practice the necessary health and safety measures against COVID-19 and that the Local Government Unit of Midsayap is effective in responding to the pandemic.

Keywords: governance, health and safety practices, covid-19, local government unit

Procedia PDF Downloads 154
6482 Building Information Models Utilization for Design Improvement of Infrastructure

Authors: Keisuke Fujioka, Yuta Itoh, Masaru Minagawa, Shunji Kusayanagi

Abstract:

In this study, building information models of the underground temporary structures and adjacent embedded pipes were constructed to show the importance of the information on underground pipes adjacent to the structures to enhance the productivity of execution of construction. Next, the bar chart used in actual construction process were employed to make the Gantt chart, and the critical pass analysis was carried out to show that accurate information on the arrangement of underground existing pipes can be used for the enhancement of the productivity of the construction of underground structures. In the analyzed project, significant construction delay was not caused by unforeseeable existence of underground pipes by the management ability of the construction manager. However, in many cases of construction executions in the developing countries, the existence of unforeseeable embedded pipes often causes substantial delay of construction. Design change based on uncertainty on the position information of embedded pipe can be also important risk for contractors in domestic construction. So CPM analyses were performed by a project-management-software to the situation that influence of the tasks causing construction delay was assumed more significant. Through the analyses, the efficiency of information management on underground pipes and BIM analysis in the design stage for workability improvement was indirectly confirmed.

Keywords: building-information modelling, construction information modelling, design improvement, infrastructure

Procedia PDF Downloads 287
6481 Application of Support Vector Machines in Forecasting Non-Residential

Authors: Wiwat Kittinaraporn, Napat Harnpornchai, Sutja Boonyachut

Abstract:

This paper deals with the application of a novel neural network technique, so-called Support Vector Machine (SVM). The objective of this study is to explore the variable and parameter of forecasting factors in the construction industry to build up forecasting model for construction quantity in Thailand. The scope of the research is to study the non-residential construction quantity in Thailand. There are 44 sets of yearly data available, ranging from 1965 to 2009. The correlation between economic indicators and construction demand with the lag of one year was developed by Apichat Buakla. The selected variables are used to develop SVM models to forecast the non-residential construction quantity in Thailand. The parameters are selected by using ten-fold cross-validation method. The results are indicated in term of Mean Absolute Percentage Error (MAPE). The MAPE value for the non-residential construction quantity predicted by Epsilon-SVR in corporation with Radial Basis Function (RBF) of kernel function type is 5.90. Analysis of the experimental results show that the support vector machine modelling technique can be applied to forecast construction quantity time series which is useful for decision planning and management purpose.

Keywords: forecasting, non-residential, construction, support vector machines

Procedia PDF Downloads 415
6480 Influence of the Reliability Index on the Safety Factor of the Concrete Contribution to Shear Strength of HSC Beams

Authors: Ali Sagiroglu, Sema Noyan Alacali, Guray Arslan

Abstract:

This paper presents a study on the influence of the safety factor in the concrete contribution to shear strength of high-strength concrete (HSC) beams according to TS500. In TS500, the contribution of concrete to shear strength is obtained by reducing diagonal cracking strength with a safety factor of 0.8. It was investigated that the coefficient of 0.8 considered in determining the contribution of concrete to the shear strength corresponds to which value of failure probability. Also, the changes in the reduction factor depending on different coefficients of variation of concrete were examined.

Keywords: reinforced concrete, beam, shear strength, failure probability, safety factor

Procedia PDF Downloads 812
6479 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness

Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami

Abstract:

A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.

Keywords: construction, critical success factors, performance, stakeholders, team effectiveness

Procedia PDF Downloads 108
6478 To Study the Existing System of Surgical Safety for Cataract Surgery at Tertiary Care Ophthalmic Centre to Implement Who Surgical Safety Checklist

Authors: Ruchi Garg

Abstract:

Background: Dr. Rajendra Prasad Centre for Ophthalmic Sciences, named after the first President of India, was established on the 10th of March, 1967 as a National Center for ophthalmic science to provide state-of-the-art patient care, expand human resources for medical education and undertake research to find solutions to eye health problems of national importance. The average number of cataract surgeries performed per month is 700 to 1000. Methods: Anticipating implementation in 50% cases hundred cases of cataract surgery were observed to study the existing system of surgical safety followed at Dr. R.P. Center and gap analysis done against the WHO surgical safety checklist for cataract surgery. A modified WHO surgical safety checklist for cataract surgery was developed and implemented in the center. Barriers in the implementation of the surgical safety checklist were also identified, and remedial measures were suggested. Results: Significant improvement was noticed in all the parameters after the introduction of the modified checklist. The additional points which were added in the modified surgical safety checklist were implemented in almost all the cases by the nursing staff. The overall mean compliance percentage before the implementation of the modified surgical safety checklist at Dr. R.P.C was 37%±10.1 (P=0.001). While after the introduction of the modified surgical safety checklist, the mean compliance has improved to 62.7%±10.3; the Wilcoxon rank sum test/Independent test is applied for each domain. Conclusions: The cataract procedure is the most common surgical procedure performed in the population in India. High volume and high turnover increase the potential for errors. Compliance with the surgical safety checklist before intervention was 32%. After intervention in the form of a focus group discussion and introduction of a modified surgical safety checklist has resulted in an increase in the compliance rate to 67%, this study revealed that changes or additional work are not happily accepted by the staff. After six months of intervention with the modified surgical safety checklist compliance rate was still high, this suggests that constant supervision and monitoring by senior staff can sustain the compliance rate.

Keywords: patient safety, hospital safety, quality, WHO surgical safety checklist

Procedia PDF Downloads 65
6477 Genetic Algorithms Based ACPS Safety

Authors: Emine Laarouchi, Daniela Cancila, Laurent Soulier, Hakima Chaouchi

Abstract:

Cyber-Physical Systems as drones proved their efficiency for supporting emergency applications. For these particular applications, travel time and autonomous navigation algorithms are of paramount importance, especially when missions are performed in urban environments with high obstacle density. In this context, however, safety properties are not properly addressed. Our ambition is to optimize the system safety level under autonomous navigation systems, by preserving performance of the CPS. At this aim, we introduce genetic algorithms in the autonomous navigation process of the drone to better infer its trajectory considering the possible obstacles. We first model the wished safety requirements through a cost function and then seek to optimize it though genetics algorithms (GA). The main advantage in the use of GA is to consider different parameters together, for example, the level of battery for navigation system selection. Our tests show that the GA introduction in the autonomous navigation systems minimize the risk of safety lossless. Finally, although our simulation has been tested for autonomous drones, our approach and results could be extended for other autonomous navigation systems such as autonomous cars, robots, etc.

Keywords: safety, unmanned aerial vehicles , CPS, ACPS, drones, path planning, genetic algorithms

Procedia PDF Downloads 165
6476 Determination of Safety Distance Around Gas Pipelines Using Numerical Methods

Authors: Omid Adibi, Nategheh Najafpour, Bijan Farhanieh, Hossein Afshin

Abstract:

Energy transmission pipelines are one of the most vital parts of each country which several strict laws have been conducted to enhance the safety of these lines and their vicinity. One of these laws is the safety distance around high pressure gas pipelines. Safety distance refers to the minimum distance from the pipeline where people and equipment do not confront with serious damages. In the present study, safety distance around high pressure gas transmission pipelines were determined by using numerical methods. For this purpose, gas leakages from cracked pipeline and created jet fires were simulated as continuous ignition, three dimensional, unsteady and turbulent cases. Numerical simulations were based on finite volume method and turbulence of flow was considered using k-ω SST model. Also, the combustion of natural gas and air mixture was applied using the eddy dissipation method. The results show that, due to the high pressure difference between pipeline and environment, flow chocks in the cracked area and velocity of the exhausted gas reaches to sound speed. Also, analysis of the incident radiation results shows that safety distances around 42 inches high pressure natural gas pipeline based on 5 and 15 kW/m2 criteria are 205 and 272 meters, respectively.

Keywords: gas pipelines, incident radiation, numerical simulation, safety distance

Procedia PDF Downloads 315
6475 Historiography of Wood Construction in Portugal

Authors: João Gago dos Santos, Paulo Pereira Almeida

Abstract:

The present study intends to deepen and understand the reasons that led to the decline and disappearance of wooden construction systems in Portugal, for that reason, its use in history must be analyzed. It is observed that this material was an integral part of the construction systems in Europe and Portugal for centuries, and it is possible to conclude that its decline happens with the appearance of hybrid construction and later with the emergence and development of reinforced concrete technology. It is also verified that wood as a constructive element, and for that reason, an element of development had great importance in national construction, with its peak being the Pombaline period, after the 1755 earthquake. In this period, the great scarcity of materials in the metropolis led to the import wood from Brazil for the reconstruction of Lisbon. This period is linked to an accentuated exploitation of forests, resulting in laws and royal decrees aimed at protecting them, guaranteeing the continued existence of profitable forests, crucial to the reconstruction effort. The following period, with the gradual loss of memory of the catastrophe, resulted in a construction that was weakened structurally as a response to a time of real estate speculation and great urban expansion. This was the moment that precluded the inexistence of the use of wood in construction. At the beginning of the 20th century and in the 30s and 40s, with the appearance and development of reinforced concrete, it became part of the great structures of the state, and it is considered a versatile material capable of resolving issues throughout the national territory. It is at this point that the wood falls into disuse and practically disappears from the new works produced.

Keywords: construction history, construction in portugal, construction systems, wood construction

Procedia PDF Downloads 107