Search results for: railway technology
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7939

Search results for: railway technology

7819 Experimental Characterisation of Composite Panels for Railway Flooring

Authors: F. Pedro, S. Dias, A. Tadeu, J. António, Ó. López, A. Coelho

Abstract:

Railway transportation is considered the most economical and sustainable way to travel. However, future mobility brings important challenges to railway operators. The main target is to develop solutions that stimulate sustainable mobility. The research and innovation goals for this domain are efficient solutions, ensuring an increased level of safety and reliability, improved resource efficiency, high availability of the means (train), and satisfied passengers with the travel comfort level. These requirements are in line with the European Strategic Agenda for the 2020 rail sector, promoted by the European Rail Research Advisory Council (ERRAC). All these aspects involve redesigning current equipment and, in particular, the interior of the carriages. Recent studies have shown that two of the most important requirements for passengers are reasonable ticket prices and comfortable interiors. Passengers tend to use their travel time to rest or to work, so train interiors and their systems need to incorporate features that meet these requirements. Among the various systems that integrate train interiors, the flooring system is one of the systems with the greatest impact on passenger safety and comfort. It is also one of the systems that takes more time to install on the train, and which contributes seriously to the weight (mass) of all interior systems. Additionally, it presents a strong impact on manufacturing costs. The design of railway floor, in the development phase, is usually made relying on a design software that allows to draw and calculate several solutions in a short period of time. After obtaining the best solution, considering the goals previously defined, experimental data is always necessary and required. This experimental phase has such great significance, that its outcome can provoke the revision of the designed solution. This paper presents the methodology and some of the results of an experimental characterisation of composite panels for railway application. The mechanical tests were made for unaged specimens and for specimens that suffered some type of aging, i.e. heat, cold and humidity cycles or freezing/thawing cycles. These conditionings aim to simulate not only the time effect, but also the impact of severe environmental conditions. Both full solutions and separated components/materials were tested. For the full solution, (panel) these were: four-point bending tests, tensile shear strength, tensile strength perpendicular to the plane, determination of the spreading of water, and impact tests. For individual characterisation of the components, more specifically for the covering, the following tests were made: determination of the tensile stress-strain properties, determination of flexibility, determination of tear strength, peel test, tensile shear strength test, adhesion resistance test and dimensional stability. The main conclusions were that experimental characterisation brings a huge contribution to understand the behaviour of the materials both individually and assembled. This knowledge contributes to the increase the quality and improvements of premium solutions. This research work was framed within the POCI-01-0247-FEDER-003474 (coMMUTe) Project funded by Portugal 2020 through the COMPETE 2020.

Keywords: durability, experimental characterization, mechanical tests, railway flooring system

Procedia PDF Downloads 154
7818 When does technology alignment influence supply chain performance

Authors: Joseph Akyeh, Abdul Samed Muntaka, Emmanuel Anin, Dorcas Nuertey

Abstract:

Purpose: This study develops and tests arguments that the relationship between technology alignment and supply chain performance is conditional upon levels of technology championing. Methodology: The proposed relationships are tested on a sample of 217 hospitals in a major sub-Saharan African economy. Findings: Findings from the study indicate that technology alignment has a positive and significant effect on supply chain performance. The study further finds that while technology championing strengthens the direct effects of technology alignment on supply chain performance. Theoretical Contributions: A theoretical contribution from this study is the finding that when technology alignment drives supply chain performance is more complex than previously thought it depends on whether or not technology alignment is first championed by top management. Originality: Though some studies have been conducted on technology alignment and health supply chain performance, to the best of the researcher’s knowledge, no previous study has examined the moderating role of technology championing the link between technology alignment and supply chain performance.

Keywords: technology alignment, supply chain performance, technology championing, structural equation modelling

Procedia PDF Downloads 46
7817 Disabilities in Railways: Proposed Changes to the Design of Railway Compartments for the Inclusion of Differently Abled Persons

Authors: Bathmajaa Muralisankar

Abstract:

As much as railway station infrastructure designs and ticket-booking norms have been changed to facilitate use by differently abled persons, the railway train compartments themselves have not been made user-friendly for differently abled persons. Owing to safety concerns, dependency on others for their travel, and fear of isolation, differently abled people do not prefer travelling by train. Rather than including a dedicated compartment open only to the differently abled, including the latter with others in the normal compartment (with the proposed modifications discussed here) will make them feel secure and make for an enhanced travel experience for them. This approach also represents the most practical way to include a particular category of people in the mainstream society. Lowering the height of the compartment doors and providing a wider entrance with a ramp will provide easy entry for those using wheelchairs. As well, removing the first two alternate rows and the first two side seats will not only widen the passage and increase seating space but also improve wheelchair turning radius. This will help them travel without having to depend on others. Seating arrangements may be done to accommodate their family members near them instead of isolating the differently abled in a separate compartment. According to present ticket-booking regulations of the Indian Railways, three to four disabled persons may travel without their family or one to two along with their family, and the numbers may be added or reduced. To help visually challenged and hearing-impaired persons, in addition to the provision of special instruments, railings, and textured footpaths and flooring, the seat numbers above the seats may be set in metal or plastic as an outward projection so the visually impaired can touch and feel the numbers. Braille boards may be included at the entrance to the compartment along with seat numbers in the aforementioned projected manner. These seat numbers may be designed as buttons, which when pressed results in an announcement of the seat number in the applicable local language as well as English. Emergency buttons, rather than emergency chains, within the easy reach of disabled passengers will also help them.

Keywords: dependency, differently abled, inclusion, mainstream society

Procedia PDF Downloads 253
7816 Feasibility Studies through Quantitative Methods: The Revamping of a Tourist Railway Line in Italy

Authors: Armando Cartenì, Ilaria Henke

Abstract:

Recently, the Italian government has approved a new law for public contracts and has been laying the groundwork for restarting a planning phase. The government has adopted the indications given by the European Commission regarding the estimation of the external costs within the Cost-Benefit Analysis, and has been approved the ‘Guidelines for assessment of Investment Projects’. In compliance with the new Italian law, the aim of this research was to perform a feasibility study applying quantitative methods regarding the revamping of an Italian tourist railway line. A Cost-Benefit Analysis was performed starting from the quantification of the passengers’ demand potentially interested in using the revamped rail services. The benefits due to the external costs reduction were also estimated (quantified) in terms of variations (with respect to the not project scenario): climate change, air pollution, noises, congestion, and accidents. Estimations results have been proposed in terms of the Measure of Effectiveness underlying a positive Net Present Value equal to about 27 million of Euros, an Internal Rate of Return much greater the discount rate, a benefit/cost ratio equal to 2 and a PayBack Period of 15 years.

Keywords: cost-benefit analysis, evaluation analysis, demand management, external cost, transport planning, quality

Procedia PDF Downloads 218
7815 Ground Improvement with Basal Reinforcement with High Strength Geogrids and PVDs for Embankment over Soft Soils

Authors: Ratnakar Mahajan, Matteo Lelli, Kinjal Parmar

Abstract:

Ground improvement is a very important aspect of infrastructure development, especially when it comes to deep-ground improvement. The use of various geosynthetic applications is very common these days for ground improvement. This paper presents a case study where the combination of two geosynthetic applications was used in order to optimize the design as well as to control the settlements through uniform load distribution. The Agartala-Akaura rail project was made to help increase railway connectivity between India and Bangladesh. Both countries have started the construction of the same. The project requires high railway embankments to be built for the rail link. However, the challenge was to design a proper ground improvement solution as the entire area comprises very soft soil for an average depth of 15m. After due diligence, a combination of two methods was worked out by Maccaferri. PVDs were provided for the consolidation, and on top of that, a layer of high-strength geogrids (Paralink) was proposed as a basal reinforcement. The design approach was followed as described in Indian standards as well as British standards. By introducing a basal reinforcement, the spacing of PVDs could be increased, which allowed quick installation and less material consumption while keeping the consolidation time within the project duration.

Keywords: ground improvement, basal reinforcement, PVDs, high strength geogrids, Paralink

Procedia PDF Downloads 72
7814 The Importance of Science and Technology Education in Skill Acquisition for Self Dependence

Authors: Olaje Monday Olaje

Abstract:

Science and technology has been prove to be the back bone for economic development of any country, and for Nigeria, it has more critical role to play. This paper examines the importance of science and technology education for national development and self dependence for Nigerian citizens. A historical overview of the interconnectivity of science and technology and self dependence is heighted. The current situation and challenges facing science and technology education are also highlighted to bring out the theoretical importance of science and technology education for self dependence which actually has not been practically achieved. Recommendations are also made at the of the study so as to skill acquisition through science and technology for self dependence.

Keywords: acquisition, education, self-dependence, science, technology

Procedia PDF Downloads 503
7813 Single Pole-To-Earth Fault Detection and Location on the Tehran Railway System Using ICA and PSO Trained Neural Network

Authors: Masoud Safarishaal

Abstract:

Detecting the location of pole-to-earth faults is essential for the safe operation of the electrical system of the railroad. This paper aims to use a combination of evolutionary algorithms and neural networks to increase the accuracy of single pole-to-earth fault detection and location on the Tehran railroad power supply system. As a result, the Imperialist Competitive Algorithm (ICA) and Particle Swarm Optimization (PSO) are used to train the neural network to improve the accuracy and convergence of the learning process. Due to the system's nonlinearity, fault detection is an ideal application for the proposed method, where the 600 Hz harmonic ripple method is used in this paper for fault detection. The substations were simulated by considering various situations in feeding the circuit, the transformer, and typical Tehran metro parameters that have developed the silicon rectifier. Required data for the network learning process has been gathered from simulation results. The 600Hz component value will change with the change of the location of a single pole to the earth's fault. Therefore, 600Hz components are used as inputs of the neural network when fault location is the output of the network system. The simulation results show that the proposed methods can accurately predict the fault location.

Keywords: single pole-to-pole fault, Tehran railway, ICA, PSO, artificial neural network

Procedia PDF Downloads 122
7812 Dynamic Interaction between Two Neighboring Tunnels in a Layered Half-Space

Authors: Chao He, Shunhua Zhou, Peijun Guo

Abstract:

The vast majority of existing underground railway lines consist of twin tunnels. In this paper, the dynamic interaction between two neighboring tunnels in a layered half-space is investigated by an analytical model. The two tunnels are modelled as cylindrical thin shells, while the soil in the form of a layered half-space with two cylindrical cavities is simulated by the elastic continuum theory. The transfer matrix method is first used to derive the relationship between the plane wave vectors in arbitrary layers and the source layer. Thereafter, the wave translation and transformation are introduced to determine the plane and cylindrical wave vectors in the source layer. The solution for the dynamic interaction between twin tunnels in a layered half-space is obtained by means of the compatibility of displacements and equilibrium of stresses on the two tunnel–soil interfaces. By coupling the proposed model with a fully track model, the train-induced vibrations from twin tunnels in a multi-layered half-space are investigated. The numerical results demonstrate that the existence of a neighboring tunnel has a significant effect on ground vibrations.

Keywords: underground railway, twin tunnels, wave translation and transformation, transfer matrix method

Procedia PDF Downloads 119
7811 Exploitation of Technology by the Tshwane Residence for Tourism Development Purposes

Authors: P. P. S. Sifolo, P. Tladi, J. Maimela

Abstract:

This article investigates technology used by Tshwane residents intended for tourism purposes. The aim is to contribute information to the Tshwane interested parties for planning and management concerning technology within the tourism sector. This study identified the types of tourist related technologies used by the Tshwane residents, be it for business purposes or personal use. The study connected the exploitation of technology for tourism purposes through unpacking the tourism sector as it utilizes technology. Quantitative research methodology was used whereby self-completed questionnaires were chosen as research instruments. The research study carried out a search for knowledge on technology for tourism and the Tshwane residents; however the study revealed that technology has certainly imprinted tourism massively because of its effectiveness and efficiency. Technology has assisted tourism businesses stay abreast of competition with ICT and because of that, SA is on the map as one the economically performing countries in Africa. Moreover, technology and tourism make a meaningful impact on job creation and Gross Domestic Product (GDP).

Keywords: tourism, information and communication technology, Tshwane residents, technology for tourism

Procedia PDF Downloads 388
7810 Ridership Study for the Proposed Installation of Automatic Guide-way Transit (AGT) System along Sapphire Street in Balanga City, Bataan

Authors: Nelson Andres, Meeko C. Masangcap, John Denver D. Catapang

Abstract:

Balanga City as, the heart of Bataan, is a growing City and is now at its fast pace of development. The growth of commerce in the city results to an increase in commuters who travel back and forth through the city, leading to congestions. Consequently, queuing of vehicles along national roads and even in the highways of the city have become a regular occurrence. This common scenario of commuters flocking the city, private and public vehicles going bumper to bumper, especially during the rush hours, greatly affect the flow of traffic vehicles and is now a burden not only to the commuters but also to the government who is trying to address this dilemma. Seeing these terrible events, the implementation of an elevated Automated Guide-way transit is seen as a possible solution to help in the decongestion of the affected parts of Balanga City.In response to the problem, the researchers identify if it is feasible to have an elevated guide-way transit in the vicinity of Sapphire Street in Balanga City, Bataan. Specifically, the study aims to determine who will be the riders based on the demographic profile, where the trip can be generated and distributed, the time when volume of people usually peaks and the estimated volume of passengers. Statistical analysis is applied to the data gathered to find out if there is an important relationship between the demographic profile of the respondents and their preference of having an elevated railway transit in the City of Balanga.

Keywords: ridership, AGT, railway, elevated track

Procedia PDF Downloads 78
7809 Vertical Vibration Mitigation along Railway Lines

Authors: Jürgen Keil, Frank Walther

Abstract:

This article presents two innovative solutions for vertical vibration mitigation barriers including experimental and numerical investigations on the completed barriers. There is a continuing growth of exposure to noise and vibration in people´s daily lives due to the quest for more mobility and flexibility. In previous times neglected, immissions caused by vibrations can lead, for example, to secondary noise or damage in the adjacent buildings. Also people can feel very affected by vibrations. But unlike in new construction, in existing infrastructure and buildings action can be taken almost only on the transmission path of those vibrations. In the following two solutions were shown how vibrations on the transmission path can be mitigated. These are the jet grouting method and a new installation method (patent pending) by means of a prefabricated hollow box which is filled with vibration reducing mats and driven down to depth, are presented. The essential results of the numerical and experimental investigations on the completed wave barriers are included as well. This article is based on the results of a field test with the participation of Keller Holding, which was executed in the context of the European research project RIVAS (Railway Induced Vibration Abatement Solutions), and on a thesis done at the Technical University of Dresden with the involvement of BAUGRUND DRESDEN Ingenieurgesellschaft mbH and the Keller Holding GmbH.

Keywords: jet grouting, rail way lines, vertical vibration mitigation, vibration reducing mats

Procedia PDF Downloads 402
7808 The Impact of Information and Communication Technology on the Performance of Office Technology Managers

Authors: Sunusi Tijjani

Abstract:

Information and communication technology is an indispensable tool in the performance of office technology managers. Today's offices are automated and equipped with modern office machines that enhances and improve the work of office managers. However, today's office technology managers can process, evaluate, manage and communicate all forms of information using technological devices. Information and Communication Technology is viewed as the process of processing, storing ad dissemination information while office technology managers are trained professional who can effectively operate modern office machines, perform administrative duties and attend meetings to take dawn minute of meetings. This paper examines the importance of information and communication technology toward enhancing the work of office managers. It also stresses the importance of information and communication technology toward proper and accurate record management.

Keywords: communication, information, technology, managers

Procedia PDF Downloads 483
7807 Investigating the Shear Behaviour of Fouled Ballast Using Discrete Element Modelling

Authors: Ngoc Trung Ngo, Buddhima Indraratna, Cholachat Rujikiathmakjornr

Abstract:

For several hundred years, the design of railway tracks has practically remained unchanged. Traditionally, rail tracks are placed on a ballast layer due to several reasons, including economy, rapid drainage, and high load bearing capacity. The primary function of ballast is to distributing dynamic track loads to sub-ballast and subgrade layers, while also providing lateral resistance and allowing for rapid drainage. Upon repeated trainloads, the ballast becomes fouled due to ballast degradation and the intrusion of fines which adversely affects the strength and deformation behaviour of ballast. This paper presents the use of three-dimensional discrete element method (DEM) in studying the shear behaviour of the fouled ballast subjected to direct shear loading. Irregularly shaped particles of ballast were modelled by grouping many spherical balls together in appropriate sizes to simulate representative ballast aggregates. Fouled ballast was modelled by injecting a specified number of miniature spherical particles into the void spaces. The DEM simulation highlights that the peak shear stress of the ballast assembly decreases and the dilation of fouled ballast increases with an increase level of fouling. Additionally, the distributions of contact force chain and particle displacement vectors were captured during shearing progress, explaining the formation of shear band and the evolutions of volumetric change of fouled ballast.

Keywords: railway ballast, coal fouling, discrete element modelling, discrete element method

Procedia PDF Downloads 448
7806 Analysis of Cascade Control Structure in Train Dynamic Braking System

Authors: B. Moaveni, S. Morovati

Abstract:

In recent years, increasing the usage of railway transportations especially in developing countries caused more attention to control systems railway vehicles. Consequently, designing and implementing the modern control systems to improve the operating performance of trains and locomotives become one of the main concerns of researches. Dynamic braking systems is an important safety system which controls the amount of braking torque generated by traction motors, to keep the adhesion coefficient between the wheel-sets and rail road in optimum bound. Adhesion force has an important role to control the braking distance and prevent the wheels from slipping during the braking process. Cascade control structure is one of the best control methods for the wide range of industrial plants in the presence of disturbances and errors. This paper presents cascade control structure based on two forward simple controllers with two feedback loops to control the slip ratio and braking torque. In this structure, the inner loop controls the angular velocity and the outer loop control the longitudinal velocity of the locomotive that its dynamic is slower than the dynamic of angular velocity. This control structure by controlling the torque of DC traction motors, tries to track the desired velocity profile to access the predefined braking distance and to control the slip ratio. Simulation results are employed to show the effectiveness of the introduced methodology in dynamic braking system.

Keywords: cascade control, dynamic braking system, DC traction motors, slip control

Procedia PDF Downloads 363
7805 University-Industry Technology Transfer and Technology Transfer Offices in Emerging Economies

Authors: José Carlos Rodríguez, Mario Gómez

Abstract:

The aim of this paper is to get insight on the nature of university-industry technology transfer (UITT) and technology transfer offices (TTOs) activity at universities in the case of emerging economies. In relation to the process of transferring knowledge/technology in the case of emerging economies, knowledge/technology transfer in these economies are more reactive than in developed economies due to differences in maturity of technologies. It is assumed in this paper that knowledge/technology transfer is a complex phenomenon, and thus the paper contributes to get insight on the nature of UITT and TTOs creation in the case of emerging economies by using a system dynamics model of knowledge/technology transfer in these countries. The paper recognizes the differences between industrialized countries and emerging economies on these phenomena.

Keywords: university-industry technology transfer, technology transfer offices, technology transfer models, emerging economies

Procedia PDF Downloads 248
7804 TRAC: A Software Based New Track Circuit for Traffic Regulation

Authors: Jérôme de Reffye, Marc Antoni

Abstract:

Following the development of the ERTMS system, we think it is interesting to develop another software-based track circuit system which would fit secondary railway lines with an easy-to-work implementation and a low sensitivity to rail-wheel impedance variations. We called this track circuit 'Track Railway by Automatic Circuits.' To be internationally implemented, this system must not have any mechanical component and must be compatible with existing track circuit systems. For example, the system is independent from the French 'Joints Isolants Collés' that isolate track sections from one another, and it is equally independent from component used in Germany called 'Counting Axles,' in French 'compteur d’essieux.' This track circuit is fully interoperable. Such universality is obtained by replacing the train detection mechanical system with a space-time filtering of train position. The various track sections are defined by the frequency of a continuous signal. The set of frequencies related to the track sections is a set of orthogonal functions in a Hilbert Space. Thus the failure probability of track sections separation is precisely calculated on the basis of signal-to-noise ratio. SNR is a function of the level of traction current conducted by rails. This is the reason why we developed a very powerful algorithm to reject noise and jamming to obtain an SNR compatible with the precision required for the track circuit and SIL 4 level. The SIL 4 level is thus reachable by an adjustment of the set of orthogonal functions. Our major contributions to railway engineering signalling science are i) Train space localization is precisely defined by a calibration system. The operation bypasses the GSM-R radio system of the ERTMS system. Moreover, the track circuit is naturally protected against radio-type jammers. After the calibration operation, the track circuit is autonomous. ii) A mathematical topology adapted to train space localization by following the train through a linear time filtering of the received signal. Track sections are numerically defined and can be modified with a software update. The system was numerically simulated, and results were beyond our expectations. We achieved a precision of one meter. Rail-ground and rail-wheel impedance sensitivity analysis gave excellent results. Results are now complete and ready to be published. This work was initialised as a research project of the French Railways developed by the Pi-Ramses Company under SNCF contract and required five years to obtain the results. This track circuit is already at Level 3 of the ERTMS system, and it will be much cheaper to implement and to work. The traffic regulation is based on variable length track sections. As the traffic growths, the maximum speed is reduced, and the track section lengths are decreasing. It is possible if the elementary track section is correctly defined for the minimum speed and if every track section is able to emit with variable frequencies.

Keywords: track section, track circuits, space-time crossing, adaptive track section, automatic railway signalling

Procedia PDF Downloads 331
7803 Investigation of Flame and Soot Propagation in Non-Air Conditioned Railway Locomotives

Authors: Abhishek Agarwal, Manoj Sarda, Juhi Kaushik, Vatsal Sanjay, Arup Kumar Das

Abstract:

Propagation of fire through a non-air conditioned railway compartment is studied by virtue of numerical simulations. Simultaneous computational fire dynamics equations, such as Navier-Stokes, lumped species continuity, overall mass and energy conservation, and heat transfer are solved using finite volume based (for radiation) and finite difference based (for all other equations) solver, Fire Dynamics Simulator (FDS). A single coupe with an eight berth occupancy is used to establish the numerical model, followed by the selection of a three coupe system as the fundamental unit of the locomotive compartment. Heat Release Rate Per Unit Area (HRRPUA) of the initial fire is varied to consider a wide range of compartmental fires. Parameters, such as air inlet velocity relative to the locomotive at the windows, the level of interaction with the ambiance and closure of middle berth are studied through a wide range of numerical simulations. Almost all the loss of lives and properties due to fire breakout can be attributed to the direct or indirect exposure to flames or to the inhalation of toxic gases and resultant suffocation due to smoke and soot. Therefore, the temporal stature of fire and smoke are reported for each of the considered cases which can be used in the present or extended form to develop guidelines to be followed in case of a fire breakout.

Keywords: fire dynamics, flame propagation, locomotive fire, soot flow pattern, non-air-conditioned coaches

Procedia PDF Downloads 291
7802 Empirical Superpave Mix-Design of Rubber-Modified Hot-Mix Asphalt in Railway Sub-Ballast

Authors: Fernando M. Soto, Gaetano Di Mino

Abstract:

The design of an unmodified bituminous mixture and three rubber-aggregate mixtures containing rubber-aggregate by a dry process (RUMAC) was evaluated, using an empirical-analytical approach based on experimental findings obtained in the laboratory with the volumetric mix design by gyratory compaction. A reference dense-graded bituminous sub-ballast mixture (3% of air voids and a bitumen 4% over the total weight of the mix), and three rubberized mixtures by dry process (1,5 to 3% of rubber by total weight and 5-7% of binder) were used applying the Superpave mix-design for a level 3 (high-traffic) design rail lines. The railway trackbed section analyzed was a granular layer of 19 cm compacted, while for the sub-ballast a thickness of 12 cm has been used. In order to evaluate the effect of increasing the specimen density (as a percent of its theoretical maximum specific gravity), in this article, are illustrated the results obtained after different comparative analysis into the influence of varying the binder-rubber percentages under the sub-ballast layer mix-design. This work demonstrates that rubberized blends containing crumb and ground rubber in bituminous asphalt mixtures behave at least similar or better than conventional asphalt materials. By using the same methodology of volumetric compaction, the densification curves resulting from each mixture have been studied. The purpose is to obtain an optimum empirical parameter multiplier of the number of gyrations necessary to reach the same compaction energy as in conventional mixtures. It has provided some experimental parameters adopting an empirical-analytical method, evaluating the results obtained from the gyratory-compaction of bituminous mixtures with an HMA and rubber-aggregate blends. An extensive integrated research has been carried out to assess the suitability of rubber-modified hot mix asphalt mixtures as a sub-ballast layer in railway underlayment trackbed. Design optimization of the mixture was conducted for each mixture and the volumetric properties analyzed. Also, an improved and complete manufacturing process, compaction and curing of these blends are provided. By adopting this increase-parameters of compaction, called 'beta' factor, mixtures modified with rubber with uniform densification and workability are obtained that in the conventional mixtures. It is found that considering the usual bearing capacity requirements in rail track, the optimal rubber content is 2% (by weight) or 3.95% (by volumetric substitution) and a binder content of 6%.

Keywords: empirical approach, rubber-asphalt, sub-ballast, superpave mix-design

Procedia PDF Downloads 367
7801 Classifying the Role of Technology in Technology Development

Authors: Hyun Joung No, Chul Lee

Abstract:

Even though technology evolves and develops through interaction with each other, not all technologies contribute to the development of technology equally. While some technologies play a central role in developing technology, others play a secondary role. The role of the technological components can be classified as core or non-core (peripheral) technology. The core technologies have a considerable knowledge interaction with other technological components while the non-core technologies barely interact with others within the system. This study introduces the concept that classifies the technological components into core or peripheral technology according to their role and importance in the technology field. The study adapted the social network analysis to examine the relationship between technological components. Using a continuous core-periphery analysis, it identifies the technological network structure and classifies the core and peripheral nodes. Based on their knowledge inflow/outflow direction and their dependence/influence on core technologies, the technological clusters are classified into four categories: (1) high dependence and high influence on core technology, (2) high dependence and low influence on core technology, (3) low dependence and high influence on core technology, and (4) low dependence and low influence on core technology.

Keywords: core technology, periphery technology, technological components, technological role

Procedia PDF Downloads 535
7800 Structural and Microstructural Analysis of White Etching Layer Formation by Electrical Arcing Induced on the Surface of Rail Track

Authors: Ali Ahmed Ali Al-Juboori, H. Zhu, D. Wexler, H. Li, C. Lu, J. McLeod, S. Pannila, J. Barnes

Abstract:

A number of studies have focused on the formation mechanics of white etching layer and its origin in the railway operation. Until recently, the following hypotheses consider the precise mechanics of WELs formation: (i) WELs are the result of thermal process caused by wheel slip; (ii) WELs are mechanically induced by severe plastic deformation; (iii) WELs are caused by a combination of thermo-mechanical process. The mechanisms discussed above lead to occurrence of white etching layers on the area of wheel and rail contact. This is because the contact patch which is the active point of the wheel on the rail is exposed to highest shear stresses which result in localised severe plastic deformation; and highest rate of heat caused by wheel slipe during excessive traction or braking effort. However, if the WELs are not on the running band area, it would suggest that there is another cause of WELs formation. In railway system, particularly electrified railway, arcing phenomenon has been occurring more often and regularly on the rails. In electrified railway, the current is delivered to the train traction motor via contact wires and then returned to the station via the contact between the wheel and the rail. If the contact between the wheel and the rail is temporarily losing, due to dynamic vibration, entrapped dirt or water, lubricant effect or oxidation occurrences, high current can jump through the gap and results in arcing. The other resources of arcing also include the wheel passage the insulated joint and lightning on a train during bad weather. During the arcing, an extensive heat is generated and speared over a large area of top surface of rail. Thus, arcing is considered another heat source in the rail head (rather than wheel slipe) that results in microstructural changes and white etching layer formation. A head hardened (HH) rail steel, cut from a curved rail truck was used for the investigation. Samples were sectioned from a depth of 10 mm below the rail surface, where the material is considered to be still within the hardened layer but away from any microstructural changes on the top surface layer caused by train passage. These samples were subjected to electrical discharges by using Gas Tungsten Arc Welding (GTAW) machine. The arc current was controlled and moved along the samples surface in the direction of travel, as indicated by an arrow. Five different conditions were applied on the surface of the samples. Samples containing pre-existed WELs, taken from ex-service rail surface, were also considered in this study for comparison. Both simulated and ex-serviced WELs were characterised by advanced methods including SEM, TEM, TKD, EDS, XRD. Samples for TEM and TKFD were prepared by Focused Ion Beam (FIB) milling. The results showed that both simulated WELs by electrical arcing and ex-service WEL comprise similar microstructure. Brown etching layer was found with WELs and likely induced by a concurrent tempering process. This study provided a clear understanding of new formation mechanics of WELs which contributes to track maintenance procedure.

Keywords: white etching layer, arcing, brown etching layer, material characterisation

Procedia PDF Downloads 120
7799 Survival Strategies of Street Children Using the Urban Space: A Case Study at Sealdah Railway Station Area, Kolkata, West Bengal, India

Authors: Sibnath Sarkar

Abstract:

Developing countries are facing many Social problems. In India, too there are several such problems. The problem of street children is one of them. No country or city anywhere in the world today is without the presence of street children, but the problem is most acute in developing countries. Thousands of street children can be seen in our populous cities like Mumbai, Kolkata, Delhi, and Chennai. Most of them are in the age group of 5-15 years. The number of street children is increasing gradually. Poverty, unemployment, rapid urbanization, rural-urban migrations are the root causes of street children. Being deprive from many of their, they have escaped to the street as a safe place for living. Street children always related with the urban spaces in the developing world and it represents a sad outcome of the rapid urbanization process. After coming to the streets, these children have to cope with the new situation every day. They also adopt or develop many complex survival strategies and a variety of different informal or even illegal activities in public space and form supportive social networks in order to survive in street life. Street children use the different suitable urban spaces as their earning, living, entertaining spot. Therefore, the livelihoods of young people on the street should analyze in relation to the spaces they use, as well as their age and length of stay on the streets. This paper tries to explore the livelihood strategies and copping situation of street children in Sealdah station area. One hundred seventy-five street living children are included in the study living in and around the railway station.

Keywords: strategies, street children, survive, urban-space

Procedia PDF Downloads 360
7798 Focusing of Technology Monitoring Activities Using Indicators

Authors: Günther Schuh, Christina König, Toni Drescher

Abstract:

One of the key factors for the competitiveness and market success of technology-driven companies is the timely provision of information about emerging technologies, changes in existing technologies, as well as relevant related changes in the market's structures and participants. Therefore, many companies conduct technology intelligence (TI) activities to ensure an early identification of appropriate technologies and other (weak) signals. One base activity of TI is technology monitoring, which is defined as the systematic tracking of developments within a specified topic of interest as well as related trends over a long period of time. Due to the very large number of dynamically changing parameters within the technological and the market environment of a company as well as their possible interdependencies, it is necessary to focus technology monitoring on specific indicators or other criteria, which are able to point out technological developments and market changes. In addition to the execution of a literature review on existing approaches, which mainly propose patent-based indicators, it is examined in this paper whether indicator systems from other branches such as risk management or economic research could be transferred to technology monitoring in order to enable an efficient and focused technology monitoring for companies.

Keywords: technology forecasting, technology indicator, technology intelligence, technology management, technology monitoring

Procedia PDF Downloads 469
7797 Using a Design Structure Method to Support Technology Roadmapping for Product-Service Integrated Systems

Authors: Heungwook Son, Sungjoo Lee

Abstract:

Recently, due to intensifying competition in several industries, the importance of meeting customer requirements has increased. The role that service plays in satisfying customer‘s requirements is key area of focus. Thus, the concept of using product development-research in the service system has been actively practiced. As strategic decision making tool, various types of the technology roadmap were suggested in the product-service system (PSS). However, the technology roadmap was configured a top-down form around the technologies of the elements. The limitation is that it hard for it to indicate a variety of interrelations. In response, this paper suggests using the planning support tool of PSS for a DSM for the technology roadmap; it consists of the relationship of product-service-technology as a bottom-up form. Therefore, nine types of the technology roadmap of PSS exist. The first defines the relationship of product-service-technology. The second phase identifies output when of the technology roadmaps are adapted to the DSM process. Finally, the DSM-based forms of each type of technology roadmap are presented through case studies.

Keywords: DSM, technology roadmap, PSS, product-service system, bottom-up

Procedia PDF Downloads 377
7796 Interface Problems in Construction Projects

Authors: Puti F. Marzuki, Adrianto Oktavianus, Almerinda Regina

Abstract:

Interface problems among interacting parties in Indonesian construction projects have most often led to low productivity and completion delay. In the midst of this country’s needs to accelerate construction of public infrastructure providing connectivity among regions and supporting economic growth as well as better living quality, project delays have to be seriously addressed. This paper identifies potential causes factors of interface problems experienced by construction projects in Indonesia. Data are collected through a survey involving the main actors of six important public infrastructure construction projects including railway, LRT, sports stadiums, apartment, and education building construction projects. Five of these projects adopt the design-build project delivery method and one applies the design-bid-build scheme. Interface problems’ potential causes are categorized into contract, management, technical experience, coordination, financial, and environmental factors. Research results reveal that, especially in railway and LRT projects, potential causes of interface problems are mainly technical and managerial in nature. These relate to complex construction execution in highly congested areas. Meanwhile, coordination cause factors are mainly found in the education building construction project with loan from a foreign donor. All of the six projects have to resolve interface problems caused by incomplete or low-quality contract documents. This research also shows that the design-bid-build delivery method involving more parties in construction projects tends to induce more interface problem cause factors than the design-build scheme.

Keywords: cause factors, construction delays, project delivery method, contract documents

Procedia PDF Downloads 255
7795 Connecting Lives Inside and Outside the Classroom: Why and How to Implement Technology in the Language Learning Classroom

Authors: Geoffrey Sinha

Abstract:

This paper is primarily addressed to teachers who stand on the threshold of bringing technology and new media into their classrooms. Technology and new media, such as smart phones and tablets have changed the face of communication in general and of language teaching more specifically. New media has widespread appeal among young people in particular, so it is in the teacher’s best interests to bring new media into their lessons. It is the author’s firm belief that technology will never replace the teacher, but it is without question that the twenty-first century teacher must employ technology and new media in some form, or run the risk of failure. The level that one chooses to incorporate new media within their class is entirely in their hands.

Keywords: new media, social media, technology, education, language learning

Procedia PDF Downloads 332
7794 System Devices to Reduce Particulate Matter Concentrations in Railway Metro Systems

Authors: Armando Cartenì

Abstract:

Within the design of sustainable transportation engineering, the problem of reducing particulate matter (PM) concentrations in railways metro system was not much discussed. It is well known that PM levels in railways metro system are mainly produced by mechanical friction at the rail-wheel-brake interactions and by the PM re-suspension caused by the turbulence generated by the train passage, which causes dangerous problems for passenger health. Starting from these considerations, the aim of this research was twofold: i) to investigate the particulate matter concentrations in a ‘traditional’ railways metro system; ii) to investigate the particulate matter concentrations of a ‘high quality’ metro system equipped with design devices useful for reducing PM concentrations: platform screen doors, rubber-tyred and an advanced ventilation system. Two measurement surveys were performed: one in the ‘traditional’ metro system of Naples (Italy) and onother in the ‘high quality’ rubber-tyred metro system of Turin (Italy). Experimental results regarding the ‘traditional’ metro system of Naples, show that the average PM10 concentrations measured in the underground station platforms are very high and range between 172 and 262 µg/m3 whilst the average PM2,5 concentrations range between 45 and 60 µg/m3, with dangerous problems for passenger health. By contrast the measurements results regarding the ‘high quality’ metro system of Turin show that: i) the average PM10 (PM2.5) concentrations measured in the underground station platform is 22.7 µg/m3 (16.0 µg/m3) with a standard deviation of 9.6 µg/m3 (7.6 µg/m3); ii) the indoor concentrations (both for PM10 and for PM2.5) are statistically lower from those measured in outdoors (with a ratio equal to 0.9-0.8), meaning that the indoor air quality is greater than those in urban ambient; iii) that PM concentrations in underground stations are correlated to the trains passage; iv) the inside trains concentrations (both for PM10 and for PM2.5) are statistically lower from those measured at station platform (with a ratio equal to 0.7-0.8), meaning that inside trains the use of air conditioning system could promote a greater circulation that clean the air. The comparison among the two case studies allow to conclude that the metro system designed with PM reduction devices allow to reduce PM concentration up to 11 times against a ‘traditional’ one. From these results, it is possible to conclude that PM concentrations measured in a ‘high quality’ metro system are significantly lower than the ones measured in a ‘traditional’ railway metro systems. This result allows possessing the bases for the design of useful devices for retrofitting metro systems all around the world.

Keywords: air quality, pollutant emission, quality in public transport, underground railway, external cost reduction, transportation planning

Procedia PDF Downloads 210
7793 Focusing on the Utilization of Information and Communication Technology for Improving Childrens’ Potentials in Science: Challenges for Sustainable Development in Nigeria

Authors: Osagiede Mercy Afe

Abstract:

After the internet explosion in the 90’s, Technology was immediately integrated into the school system. Technology which symbolizes advancement in human knowledge was seen as a setback by many educators many efforts have been made to help stem this erroneous believes and help educators realize the benefits of technology and ways of implementing it in the classrooms especially in the sciences. This advancement created a constantly expanding gap between the pupil’s perception on the use of technology within the learning atmosphere and the teacher’s perception and limitations hence the focus of this paper is on the need to refocus on the potentials of Science and Technology in enhancing children learning at school especially in science for sustainable development in Nigeria. The paper recommended measures for facilitating the sustenance of science and technology in Nigerian schools so as to enhance the potentials of our children in Science and Technology for a better tomorrow.

Keywords: children, information communication technology (ICT), potentials, sustainable development, science education

Procedia PDF Downloads 485
7792 The Reach of Shopping Center Layout Form on Subway Based on Kernel Density Estimate

Authors: Wen Liu

Abstract:

With the rapid progress of modern cities, the railway construction must be developing quickly in China. As a typical high-density country, shopping center on the subway should be one important factor during the process of urban development. The paper discusses the influence of the layout of shopping center on the subway, and put it in the time and space’s axis of Shanghai urban development. We use the digital technology to establish the database of relevant information. And then get the change role about shopping center on subway in Shanghaiby the Kernel density estimate. The result shows the development of shopping center on subway has a relationship with local economic strength, population size, policy support, and city construction. And the suburbanization trend of shopping center would be increasingly significant. By this case research, we could see the Kernel density estimate is an efficient analysis method on the spatial layout. It could reveal the characters of layout form of shopping center on subway in essence. And it can also be applied to the other research of space form.

Keywords: Shanghai, shopping center on the subway, layout form, Kernel density estimate

Procedia PDF Downloads 313
7791 Patent License of Transfer Technology: Challenges and Opportunities in Indonesia

Authors: Agung Sujatmiko

Abstract:

One of the purposes of patent licensing was to transfer technology from developed countries to developing countries. For this reason, the role of the patent license agreement was very important and had a function as a tool to achieve technological development. This goal was very good, but in fact, many problems and obstacles arose in its implementation, so the technology transfer that had been implemented had not given good results. For this reason, it was necessary to find a solution so that technology could switch properly. The problem approach used the statutory and conceptual approaches. The analysis used was deductive by analyzing general laws and regulations and then concluding. Several regulations related to technology transfer were the main source to find answers to why technology transfer was difficult to achieve and what caused it. Once the cause was known, a solution would be sought.

Keywords: license, patent, technology, tie in clause

Procedia PDF Downloads 92
7790 Technology Use by African Smallholder Farmers and the Significant Mediating Factors

Authors: Enobong Akpan-Etuk

Abstract:

The willingness of smallholder farmers in Africa to adopt new agricultural technologies has been low, despite the technological advancement in agriculture. Although technology is seen as the main route out of the traditional methods of food production and poverty, the rate of adoption of agricultural technology remains low among farmers in Africa. Factors affecting the adoption of agricultural technologies include the acquisition of information, characteristics of the technology, education of farmers, social capital, farm size, and household size. This paper explored the literature on the influence of the factors that determine the adoption of technology by smallholder farmers.

Keywords: smallholder, technology, adoption

Procedia PDF Downloads 142