Search results for: self- maintenance
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1523

Search results for: self- maintenance

1433 Budget Optimization for Maintenance of Bridges in Egypt

Authors: Hesham Abd Elkhalek, Sherif M. Hafez, Yasser M. El Fahham

Abstract:

Allocating limited budget to maintain bridge networks and selecting effective maintenance strategies for each bridge represent challenging tasks for maintenance managers and decision makers. In Egypt, bridges are continuously deteriorating. In many cases, maintenance works are performed due to user complaints. The objective of this paper is to develop a practical and reliable framework to manage the maintenance, repair, and rehabilitation (MR&R) activities of Bridges network considering performance and budget limits. The model solves an optimization problem that maximizes the average condition of the entire network given the limited available budget using Genetic Algorithm (GA). The framework contains bridge inventory, condition assessment, repair cost calculation, deterioration prediction, and maintenance optimization. The developed model takes into account multiple parameters including serviceability requirements, budget allocation, element importance on structural safety and serviceability, bridge impact on network, and traffic. A questionnaire is conducted to complete the research scope. The proposed model is implemented in software, which provides a friendly user interface. The framework provides a multi-year maintenance plan for the entire network for up to five years. A case study of ten bridges is presented to validate and test the proposed model with data collected from Transportation Authorities in Egypt. Different scenarios are presented. The results are reasonable, feasible and within acceptable domain.

Keywords: bridge management systems (BMS), cost optimization condition assessment, fund allocation, Markov chain

Procedia PDF Downloads 291
1432 Advancing Power Network Maintenance: The Development and Implementation of a Robotic Cable Splicing Machine

Authors: Ali Asmari, Alex Symington, Htaik Than, Austin Caradonna, John Senft

Abstract:

This paper presents the collaborative effort between ULC Technologies and Con Edison in developing a groundbreaking robotic cable splicing machine. The focus is on the machine's design, which integrates advanced robotics and automation to enhance safety and efficiency in power network maintenance. The paper details the operational steps of the machine, including cable grounding, cutting, and removal of different insulation layers, and discusses its novel technological approach. The significant benefits over traditional methods, such as improved worker safety and reduced outage times, are highlighted based on the field data collected during the validation phase of the project. The paper also explores the future potential and scalability of this technology, emphasizing its role in transforming the landscape of power network maintenance.

Keywords: cable splicing machine, power network maintenance, electric distribution, electric transmission, medium voltage cable

Procedia PDF Downloads 66
1431 Machine Learning Application in Shovel Maintenance

Authors: Amir Taghizadeh Vahed, Adithya Thaduri

Abstract:

Shovels are the main components in the mining transportation system. The productivity of the mines depends on the availability of shovels due to its high capital and operating costs. The unplanned failure/shutdowns of a shovel results in higher repair costs, increase in downtime, as well as increasing indirect cost (i.e. loss of production and company’s reputation). In order to mitigate these failures, predictive maintenance can be useful approach using failure prediction. The modern mining machinery or shovels collect huge datasets automatically; it consists of reliability and maintenance data. However, the gathered datasets are useless until the information and knowledge of data are extracted. Machine learning as well as data mining, which has a major role in recent studies, has been used for the knowledge discovery process. In this study, data mining and machine learning approaches are implemented to detect not only anomalies but also patterns from a dataset and further detection of failures.

Keywords: maintenance, machine learning, shovel, conditional based monitoring

Procedia PDF Downloads 218
1430 Investigating the Road Maintenance Performance in Developing Countries

Authors: Jamaa Salih, Francis Edum-Fotwe, Andrew Price

Abstract:

One of the most critical aspects of the management of road infrastructure is the type and scale of maintenance systems adopted and the consequences of their inadequacy. The performance of road maintenance systems can be assessed by a number of important indicators such as: cost, safety, environmental impact, and level of complaints by users. A review of practice reveals that insufficient level of expenditure or poor management of the road network often has serious consequences for the economic and social life of a country in terms of vehicle operating costs (VOC), travel time costs, accident costs and environmental impact. Despite an increase in the attention paid by global road agencies to the environmental and the road users’ satisfaction, the overwhelming evidence from the available literature agree on the lack of similar levels of attention for the two factors in many developing countries. While many sources agree that the road maintenance backlog is caused by either the shortage of expenditures or lack of proper management or both, it appears that managing the available assets particularly in the developing countries is the main issue. To address this subject, this paper will concentrate on exposing the various issues related to this field.

Keywords: environmental impact, performance indicators, road maintenance, users’ satisfaction

Procedia PDF Downloads 357
1429 The Integrated Strategy of Maintenance with a Scientific Analysis

Authors: Mahmoud Meckawey

Abstract:

This research is dealing with one of the most important aspects of maintenance fields, that is Maintenance Strategy. It's the branch which concerns the concepts and the schematic thoughts in how to manage maintenance and how to deal with the defects in the engineering products (buildings, machines, etc.) in general. Through the papers we will act with the followings: i) The Engineering Product & the Technical Systems: When we act with the maintenance process, in a strategic view, we act with an (engineering product) which consists of multi integrated systems. In fact, there is no engineering product with only one system. We will discuss and explain this topic, through which we will derivate a developed definition for the maintenance process. ii) The factors or basis of the functionality efficiency: That is the main factors affect the functional efficiency of the systems and the engineering products, then by this way we can give a technical definition of defects and how they occur. iii) The legality of occurrence of defects (Legal defects and Illegal defects): with which we assume that all the factors of the functionality efficiency been applied, and then we will discuss the results. iv) The Guarantee, the Functional Span Age and the Technical surplus concepts: In the complementation with the above topic, and associated with the Reliability theorems, where we act with the Probability of Failure state, with which we almost interest with the design stages, that is to check and adapt the design of the elements. But in Maintainability we act in a different way as we act with the actual state of the systems. So, we act with the rest of the story that means we have to act with the complementary part of the probability of failure term which refers to the actual surplus of the functionality for the systems.

Keywords: engineering product and technical systems, functional span age, legal and illegal defects, technical and functional surplus

Procedia PDF Downloads 475
1428 Preventative Maintenance, Impact on the Optimal Replacement Strategy of Secondhand Products

Authors: Pin-Wei Chiang, Wen-Liang Chang, Ruey-Huei Yeh

Abstract:

This paper investigates optimal replacement and preventative maintenance policies of secondhand products under a Finite Planning Horizon (FPH). Any consumer wishing to replace their product under FPH would have it undergo minimal repairs. The replacement provided would be required to undergo periodical preventive maintenance done to avoid product failure. Then, a mathematical formula for disbursement cost for products under FPH can be derived. Optimal policies are then obtained to minimize cost. In the first of two segments of the paper, a model for initial product purchase of either new or secondhand products is used. This model is built by analyzing product purchasing price, surplus value of product, as well as the minimal repair cost. The second segment uses a model for replacement products, which are also secondhand products with no limit on usage. This model analyzes the same components as the first as well as expected preventative maintenance cost. Using these two models, a formula for the expected final total cost can be developed. The formula requires four variables (optimal preventive maintenance level, preventive maintenance frequency, replacement timing, age of replacement product) to find minimal cost requirement. Based on analysis of the variables using the expected total final cost model, it was found that the purchasing price and length of ownership were directly related. Also, consumers should choose the secondhand product with the higher usage for replacement. Products with higher initial usage upon acquisition require an earlier replacement schedule. In this case, replacements should be made with a secondhand product with less usage. In addition, preventative maintenance also significantly reduces cost. Consumers that plan to use products for longer periods of time replace their products later. Hence these consumers should choose the secondhand product with lesser initial usage for replacement. Preventative maintenance also creates significant total cost savings in this case. This study provides consumers with a method of calculating both the ideal amount of usage of the products they should purchase as well as the frequency and level of preventative maintenance that should be conducted in order to minimize cost and maintain product function.

Keywords: finite planning horizon, second hand product, replacement, preventive maintenance, minimal repair

Procedia PDF Downloads 473
1427 Action Research: Impact of the Health Facilities Infrastructure's Quality on Maternal and Newborn Health

Authors: Ladislas Havugimana, Véronique Zinnen, Mary Hadley, Jean Claude Mwumvaneza, Francois Régis Habarugira, Silas Rudasingwa, Victor Ndaruhutse, Evelyne Bocquet

Abstract:

Rwanda's health systems face various challenges, including low health infrastructure coverage (the objective is to have at least one health center per administrative sector) and insufficient qualified human resources for infrastructure maintenance and financing. Moreover, there is no policy for the preventive maintenance of infrastructures for the health sector. This paper presents action research conducted in seven districts, focusing on the impact of health infrastructure's quality on maternal and neonatal care, with the support of the Belgian cooperation agency through Enable Barame project.

Keywords: health infrastructure, maintenance, maternity, neonatology

Procedia PDF Downloads 145
1426 Assessing Native Plant Presence and Maintenance Resource Allocations in New Zealand Backyards: A Nationwide Online Questionnaire

Authors: Megan Burfoot, Shanta Budha-Magar, Ali Ghaffarianhoseini, Amirhoseini Ghaffarianhoseini

Abstract:

Domestic backyards offer a valuable opportunity to contribute to biodiversity conservation efforts and promote ecological sustainability by cultivating native plant species. This study focuses on assessing the presence and maintenance of native plants in New Zealand's residential gardens through an online questionnaire. The survey was designed to collect data on the presence of native, exotic, and lawn plants in New Zealand backyards, alongside the allocation of maintenance resources for each category. Targeting a diverse range of residents and property sizes from different regions of New Zealand, this study sought to gain essential insights into practices related to native plant cultivation. Results reveal there is a collective inclination to reduce lawn coverage and introduce a higher abundance of native and exotic species. A thorough analysis of maintenance practices reveals a significant portion of respondents embracing environmentally friendly gardening, characterized by low-intensity fertilizer usage. Homeowners, especially those residing in their properties, demonstrate proactive engagement in backyard maintenance. Native plants were found to require more time, money and fertilizer for maintenance than those of exotic and lawn species. The insights gained from this study can guide targeted efforts to enhance urban biodiversity, making a significant contribution to the preservation and enrichment of New Zealand's unique biodiversity and ecological heritage in urban settings.

Keywords: biodiversity, backyards, planting behaviour, backyard maintenance, native planting

Procedia PDF Downloads 69
1425 Instruction Program for Human Factors in Maintenance, Addressed to the People Working in Colombian Air Force Aeronautical Maintenance Area to Strengthen Operational Safety

Authors: Rafael Andres Rincon Barrera

Abstract:

Safety in global aviation plays a preponderant role in organizations that seek to avoid accidents in an attempt to preserve their most precious assets (the people and the machines). Human factors-based programs have shown to be effective in managing human-generated risks. The importance of training on human factors in maintenance has not been indifferent to the Colombian Air Force (COLAF). This research, which has a mixed quantitative, qualitative and descriptive approach, deals with its absence of structuring an instruction program in Human Factors in Aeronautical Maintenance, which serves as a tool to improve Operational Safety in the military air units of the COLAF. Research shows the trends and evolution of human factors programs in aeronautical maintenance through the analysis of a data matrix with 33 sources taken from different databases that are about the incorporation of these types of programs in the aeronautical industry in the last 20 years; as well as the improvements in the operational safety process that are presented after the implementation of these ones. Likewise, it compiles different normative guides in force from world aeronautical authorities for training in these programs, establishing a matrix of methodologies that may be applicable to develop a training program in human factors in maintenance. Subsequently, it illustrates the design, validation, and development of a human factors knowledge measurement instrument for maintenance at the COLAF that includes topics on Human Factors (HF), Safety Management System (SMS), and aeronautical maintenance regulations at the COLAF. With the information obtained, it performs the statistical analysis showing the aspects of knowledge and strengthening the staff for the preparation of the instruction program. Performing data triangulation based on the applicable methods and the weakest aspects found in the maintenance people shows a variable crossing from color coding, thus indicating the contents according to a training program for human factors in aeronautical maintenance, which are adjusted according to the competencies that are expected to be developed with the staff in a curricular format established by the COLAF. Among the most important findings are the determination that different authors are dealing with human factors in maintenance agrees that there is no standard model for its instruction and implementation, but that it must be adapted to the needs of the organization, that the Safety Culture in the Companies which incorporated programs on human factors in maintenance increased, that from the data obtained with the instrument for knowledge measurement of human factors in maintenance, the level of knowledge is MEDIUM-LOW with a score of 61.79%. And finally that there is an opportunity to improve Operational Safety for the COLAF through the implementation of the training program of human factors in maintenance for the technicians working in this area.

Keywords: Colombian air force, human factors, safety culture, safety management system, triangulation

Procedia PDF Downloads 134
1424 Comparisons of Individual and Group Replacement Policies for a Series Connection System with Two Machines

Authors: Wen Liang Chang, Mei Wei Wang, Ruey Huei Yeh

Abstract:

This paper studies the comparisons of individual and group replacement policies for a series connection system with two machines. Suppose that manufacturer’s production system is a series connection system which is combined by two machines. For two machines, when machines fail within the operating time, minimal repair is performed for machines by the manufacturer. The manufacturer plans to a preventive replacement for machines at a pre-specified time to maintain system normal operation. Under these maintenance policies, the maintenance cost rate models of individual and group replacement for a series connection system with two machines is derived and further, optimal preventive replacement time is obtained such that the expected total maintenance cost rate is minimized. Finally, some numerical examples are given to illustrate the influences of individual and group replacement policies to the maintenance cost rate.

Keywords: individual replacement, group replacement, replacement time, two machines, series connection system

Procedia PDF Downloads 488
1423 Decision Support System for the Management and Maintenance of Sewer Networks

Authors: A. Bouamrane, M. T. Bouziane, K. Boutebba, Y. Djebbar

Abstract:

This paper aims to develop a decision support tool to provide solutions to the problems of sewer networks management/maintenance in order to assist the manager to sort sections upon priority of intervention by taking account of the technical, economic, social and environmental standards as well as the managers’ strategy. This solution uses the Analytic Network Process (ANP) developed by Thomas Saaty, coupled with a set of tools for modelling and collecting integrated data from a geographic information system (GIS). It provides to the decision maker a tool adapted to the reality on the ground and effective in usage compared to the means and objectives of the manager.

Keywords: multi-criteria decision support, maintenance, Geographic Information System, modelling

Procedia PDF Downloads 637
1422 A Case Study on Barriers in Total Productive Maintenance Implementation in the Abu Dhabi Power Industry

Authors: A. Alseiari, P. Farrell

Abstract:

Maintenance has evolved into an imperative function, and contributes significantly to efficient and effective equipment performance. Total Productive Maintenance (TPM) is an ideal approach to support the development and implementation of operation performance improvement. It systematically aims to understand the function of equipment, the service quality relationship with equipment and the probable critical equipment failure conditions. Implementation of TPM programmes need strategic planning and there has been little research applied in this area within Middle-East power plants. In the power sector of Abu Dhabi, technologically and strategically, the power industry is extremely important, and it thus needs effective and efficient equipment management support. The aim of this paper is to investigate barriers to successful TPM implementation in the Abu Dhabi power industry. The study has been conducted in the context of a leading power company in the UAE. Semi-structured interviews were conducted with 16 employees, including maintenance and operation staff, and senior managers. The findings of this research identified seven key barriers, thus: managerial; organisational; cultural; financial; educational; communications; and auditing. With respect to the understanding of these barriers and obstacles in TPM implementation, the findings can contribute towards improved equipment operations and maintenance in power organisations.

Keywords: Abu Dhabi Power Industry, TPM implementation, key barriers, organisational culture, critical success factors

Procedia PDF Downloads 245
1421 Optimal Maintenance Policy for a Three-Unit System

Authors: A. Abbou, V. Makis, N. Salari

Abstract:

We study the condition-based maintenance (CBM) problem of a system subject to stochastic deterioration. The system is composed of three units (or modules): (i) Module 1 deterioration follows a Markov process with two operational states and one failure state. The operational states are partially observable through periodic condition monitoring. (ii) Module 2 deterioration follows a Gamma process with a known failure threshold. The deterioration level of this module is fully observable through periodic inspections. (iii) Only the operating age information is available of Module 3. The lifetime of this module has a general distribution. A CBM policy prescribes when to initiate a maintenance intervention and which modules to repair during intervention. Our objective is to determine the optimal CBM policy minimizing the long-run expected average cost of operating the system. This is achieved by formulating a Markov decision process (MDP) and developing the value iteration algorithm for solving the MDP. We provide numerical examples illustrating the cost-effectiveness of the optimal CBM policy through a comparison with heuristic policies commonly found in the literature.

Keywords: reliability, maintenance optimization, Markov decision process, heuristics

Procedia PDF Downloads 219
1420 Conceptualizing a Strategic Facilities Management Decision Framework for Heritage Building Maintenance Management

Authors: Adegoriola Mayowa I., Lai Joseph H. K., Yung Esther H. K., Chan Edwin H. K.

Abstract:

Heritage buildings (HBs) as structures with historical and architectural relevance that form an integral part of contemporary society. These buildings deserve to be protected for as long as possible to retain their significance. Therefore, the need to prioritize HB maintenance management is pertinent. However, the decision-making process of HBMM can be relatively daunting. The decision-making challenge may be attributed to the multiple 'stakeholders' expectation and requirement which needs to be met. To this end, professionals in the built environment have identified the need to apply the strategic concept of facilities management (FM) in decision making. Furthermore, the different maintenance dimensions have been applied to maintenance management of residential, commercial, and health facilities. Unfortunately, these different maintenance approaches, such as FM, sustainable FM, urban FM, green FM, and strategic FM, are yet to be fully explored in the decision-making process of HBMM. To bridge this gap, this study focuses on developing a framework for strategic decision-making HBMM, which helps achieve HBMM sustainability. At the study's inception, relevant works of literature in the domains of HBMM and FM were conducted. This review helped in the identification of contemporary maintenance practices and their applicability to HBMM. Afterward, a conceptual framework to aid decision-making in HBMM was developed. This framework integrated the concept of FM scope (people, place, process, and technology) while ensuring that decisions plans were made at strategic, tactical, and operational levels. Also, the different characteristics of HBs and stakeholders' requirements were considered in the framework. The conceptual framework presents a holistic guide for professionals in HBMM to ensure that decision processes and outcomes are practical and efficient. It also contributes to the existing body of knowledge on the integration of FM in HBMM. Furthermore, it will serve as a basis for future studies by applying the conceptualized framework in actual cases.

Keywords: decision-making, facility management, strategy, sustainability, heritage building, maintenance

Procedia PDF Downloads 138
1419 Availability Analysis of a Power Plant by Computer Simulation

Authors: Mehmet Savsar

Abstract:

Reliability and availability of power stations are extremely important in order to achieve a required level of power generation. In particular, in the hot desert climate of Kuwait, reliable power generation is extremely important because of cooling requirements at temperatures exceeding 50-centigrade degrees. In this paper, a particular power plant, named Sabiya Power Plant, which has 8 steam turbines and 13 gas turbine stations, has been studied in detail; extensive data are collected; and availability of station units are determined. Furthermore, a simulation model is developed and used to analyze the effects of different maintenance policies on availability of these stations. The results show that significant improvements can be achieved in power plant availabilities if appropriate maintenance policies are implemented.

Keywords: power plants, steam turbines, gas turbines, maintenance, availability, simulation

Procedia PDF Downloads 618
1418 Causes of Deteriorations of Flexible Pavement, Its Condition Rating and Maintenance

Authors: Pooja Kherudkar, Namdeo Hedaoo

Abstract:

There are various causes for asphalt pavement distresses which can develop prematurely or with aging in services. These causes are not limited to aging of bitumen binder but include poor quality materials and construction, inadequate mix design, inadequate pavement structure design considering the traffic and lack of preventive maintenance. There is physical evidence available for each type of pavement distress. Distress in asphalt pavements can be categorized in different distress modes like fracture (cracking and spalling), distortion (permanent deformation and slippage), and disintegration (raveling and potholes). This study shows the importance of severity determination of distresses for the selection of appropriate preventive maintenance treatment. Distress analysis of the deteriorated roads was carried out. Four roads of urban flexible pavements from Pune city was selected as a case study. The roads were surveyed to detect the types, to measure the severity and extent of the distresses. Causes of distresses were investigated. The pavement condition rating values of the roads were calculated. These ranges of ratings were as follows; 1 for poor condition road, 1.1 to 2 for fair condition road and 2.1 to 3 for good condition road. Out of the four roads, two roads were found to be in fair condition and the other two were found in good condition. From the various preventive maintenance treatments like crack seal, fog seal, slurry seal, microsurfacing, surface dressing and thin hot mix/cold mix bituminous overlays, the effective maintenance treatments with respect to the surface condition and severity levels of the existing pavement were recommended.

Keywords: distress analysis, pavement condition rating, preventive maintenance treatments, surface distress measurement

Procedia PDF Downloads 198
1417 An Improved Approach Based on MAS Architecture and Heuristic Algorithm for Systematic Maintenance

Authors: Abdelhadi Adel, Kadri Ouahab

Abstract:

This paper proposes an improved approach based on MAS Architecture and Heuristic Algorithm for systematic maintenance to minimize makespan. We have implemented a problem-solving approach for optimizing the processing time, methods based on metaheuristics. The proposed approach is inspired by the behavior of the human body. This hybridization is between a multi-agent system and inspirations of the human body, especially genetics. The effectiveness of our approach has been demonstrated repeatedly in this paper. To solve such a complex problem, we proposed an approach which we have used advanced operators such as uniform crossover set and single point mutation. The proposed approach is applied to three preventive maintenance policies. These policies are intended to maximize the availability or to maintain a minimum level of reliability during the production chain. The results show that our algorithm outperforms existing algorithms. We assumed that the machines might be unavailable periodically during the production scheduling.

Keywords: multi-agent systems, emergence, genetic algorithm, makespan, systematic maintenance, scheduling, hybrid flow shop scheduling

Procedia PDF Downloads 301
1416 Use of Life Cycle Data for State-Oriented Maintenance

Authors: Maximilian Winkens, Matthias Goerke

Abstract:

The state-oriented maintenance enables the preventive intervention before the failure of a component and guarantees avoidance of expensive breakdowns. Because the timing of the maintenance is defined by the component’s state, the remaining service life can be exhausted to the limit. The basic requirement for the state-oriented maintenance is the ability to define the component’s state. New potential for this is offered by gentelligent components. They are developed at the Corporative Research Centre 653 of the German Research Foundation (DFG). Because of their sensory ability they enable the registration of stresses during the component’s use. The data is gathered and evaluated. The methodology developed determines the current state of the gentelligent component based on the gathered data. This article presents this methodology as well as current research. The main focus of the current scientific work is to improve the quality of the state determination based on the life-cycle data analysis. The methodology developed until now evaluates the data of the usage phase and based on it predicts the timing of the gentelligent component’s failure. The real failure timing though, deviate from the predicted one because the effects from the production phase aren’t considered. The goal of the current research is to develop a methodology for state determination which considers both production and usage data.

Keywords: state-oriented maintenance, life-cycle data, gentelligent component, preventive intervention

Procedia PDF Downloads 495
1415 Availability Analysis of Process Management in the Equipment Maintenance and Repair Implementation

Authors: Onur Ozveri, Korkut Karabag, Cagri Keles

Abstract:

It is an important issue that the occurring of production downtime and repair costs when machines fail in the machine intensive production industries. In the case of failure of more than one machine at the same time, which machines will have the priority to repair, how to determine the optimal repair time should be allotted for this machines and how to plan the resources needed to repair are the key issues. In recent years, Business Process Management (BPM) technique, bring effective solutions to different problems in business. The main feature of this technique is that it can improve the way the job done by examining in detail the works of interest. In the industries, maintenance and repair works are operating as a process and when a breakdown occurs, it is known that the repair work is carried out in a series of process. Maintenance main-process and repair sub-process are evaluated with process management technique, so it is thought that structure could bring a solution. For this reason, in an international manufacturing company, this issue discussed and has tried to develop a proposal for a solution. The purpose of this study is the implementation of maintenance and repair works which is integrated with process management technique and at the end of implementation, analyzing the maintenance related parameters like quality, cost, time, safety and spare part. The international firm that carried out the application operates in a free region in Turkey and its core business area is producing original equipment technologies, vehicle electrical construction, electronics, safety and thermal systems for the world's leading light and heavy vehicle manufacturers. In the firm primarily, a project team has been established. The team dealt with the current maintenance process again, and it has been revised again by the process management techniques. Repair process which is sub-process of maintenance process has been discussed again. In the improved processes, the ABC equipment classification technique was used to decide which machine or machines will be given priority in case of failure. This technique is a prioritization method of malfunctioned machine based on the effect of the production, product quality, maintenance costs and job security. Improved maintenance and repair processes have been implemented in the company for three months, and the obtained data were compared with the previous year data. In conclusion, breakdown maintenance was found to occur in a shorter time, with lower cost and lower spare parts inventory.

Keywords: ABC equipment classification, business process management (BPM), maintenance, repair performance

Procedia PDF Downloads 194
1414 Maintenance Work Order Management Tool (Desktop & Mobile Solution)

Authors: Haitham Al Rawahi

Abstract:

Oman Electricity Transmission Company (OETC) has implemented Computerized Maintenance Management System (CMMS), which is based on Oracle enterprise asset management model e-AM. This was implemented with cooperation of Nama Shared Services (NSS). CMMS is mainly used to create maintenance work orders with a preconfigured workflow of defined maintenance schedules/plans, required resources, and materials, obtaining shutdown approvals, completing maintenance activities, and closing the work orders. Furthermore, CMMS is also configured with asset failure classifications, asset hierarchy, asset maintenance activities, integration with spare inventories, etc. Since the year 2017, site engineer is working on CMMS by filling-in manually all related maintenance and inspection records on paper forms and then scanning and attaching it in CMMS for further analysis. Site engineer will finalize all paper works at site and then goes back to office to scan and attach it to work order in CMMS. This creates sub tasks for site engineer and makes it very difficult and lengthy process. Also, there is a significant risk for missing or deleted important fields on the paper due to usage of pen to fill the paper. In addition to that, site engineer may take time and days working outside of the office. therefore, OETC has decided to digitize these inspection and maintenance forms in one platform in CMMS, and it can be opened with both functionalities online and offline. The ArcGIS product formats or web-enabled solutions which has ability to access from mobile and desktop devices via arc map modules will be used too. The purpose of interlinking is to setup for maintenance and inspection forms to work orders in e-AM, which the site engineer has daily interactions with. This ArcGIS environment or tool is designed to link with e-AM, so when site engineer opens this application from the site and a window will take him through same ArcGIS. This window opens the maintenance forms and shows the required fields to fill-in and save the work through his mobile application. After saving his work with the availability of network (Off/In) line, notification will trigger to his line manager to review and take further actions (approve/reject/request more information). In this function, the user can see the assigned work orders to his departments as well as chart of all work orders with status. The approver has ability to see the statistics of all work.

Keywords: e-AM, GIS, CMMS, integration

Procedia PDF Downloads 97
1413 Issues in Implementation of Vertical Greenery System on Existing Government Building in Malaysia

Authors: Jamilah Halina Abdul Halim, Norsiah Hassan, Azlina Aziz, Norhayati Mat Wajid, Mohd Saipul Asrafi

Abstract:

There are various types of vertical greenery system (VGS) in Malaysia, but none is installed at government buildings, although the government is looking into energy efficient building design. This is due to lack of technical information that focus on the maintenance and care, issues, and challenges face by vertical greenery system under tropical climate conditions. This research aim to identify issues in implementation of vertical greenery system on existing government building in Malaysia. The methodology used are literature reviews (desktop study), observation on sites, and case studies. Initial findings indicates that design and maintenance issues of vertical greenery system are the main challenges faced mainly by designer, especially those who involved in decision-making process. It can be concluded that orientation, openings, maintenance, performance, longevity, structural load, access, wind resistance, design failure, system failure, and lack of maintenance foresight are the main factors that need to be considered. These factors should be holistically aligned towards the economic cost, effective time, and quality design in implementation of vertical greenery system on existing government building. A comprehensive implementation of vertical greenery system will lead to greater sustainable investment for government buildings and responsive action to climate change.

Keywords: issues, government building, maintenance, vertical greenery system

Procedia PDF Downloads 84
1412 Optimal Maintenance Policy for a Partially Observable Two-Unit System

Authors: Leila Jafari, Viliam Makis, G. B. Akram Khaleghei

Abstract:

In this paper, we present a maintenance model of a two-unit series system with economic dependence. Unit#1, which is considered to be more expensive and more important, is subject to condition monitoring (CM) at equidistant, discrete time epochs and unit#2, which is not subject to CM, has a general lifetime distribution. The multivariate observation vectors obtained through condition monitoring carry partial information about the hidden state of unit#1, which can be in a healthy or a warning state while operating. Only the failure state is assumed to be observable for both units. The objective is to find an optimal opportunistic maintenance policy minimizing the long-run expected average cost per unit time. The problem is formulated and solved in the partially observable semi-Markov decision process framework. An effective computational algorithm for finding the optimal policy and the minimum average cost is developed and illustrated by a numerical example.

Keywords: condition-based maintenance, semi-Markov decision process, multivariate Bayesian control chart, partially observable system, two-unit system

Procedia PDF Downloads 459
1411 Machine Installation and Maintenance Management

Authors: Mohammed Benmostefa

Abstract:

In the industrial production of large series or even medium series, there are vibration problems. In continuous operations, technical devices result in vibrations in solid bodies and machine components, which generate solid noise and/or airborne noise. This is because vibrations are the mechanical oscillations of an object near its equilibrium point. In response to the problems resulting from these vibrations, a number of remedial acts and solutions have been put forward. These include insulation of machines, insulation of concrete masses, insulation under screeds, insulation of sensitive equipment, point insulation of machines, linear insulation of machines, full surface insulation of machines, and the like. Following this, the researcher sought not only to raise awareness on the possibility of lowering the vibration frequency in industrial machines but also to stress the significance of procedures involving the pre-installation process of machinery, namely, setting appropriate installation and start-up methods of the machine, allocating and updating imprint folders to each machine, and scheduling maintenance of each machine all year round to have reliable equipment, gain cost reduction and maintenance efficiency to eventually ensure the overall economic performance of the company.

Keywords: maintenance, vibration, efficiency, production, machinery

Procedia PDF Downloads 87
1410 Jointly Optimal Statistical Process Control and Maintenance Policy for Deteriorating Processes

Authors: Lucas Paganin, Viliam Makis

Abstract:

With the advent of globalization, the market competition has become a major issue for most companies. One of the main strategies to overcome this situation is the quality improvement of the product at a lower cost to meet customers’ expectations. In order to achieve the desired quality of products, it is important to control the process to meet the specifications, and to implement the optimal maintenance policy for the machines and the production lines. Thus, the overall objective is to reduce process variation and the production and maintenance costs. In this paper, an integrated model involving Statistical Process Control (SPC) and maintenance is developed to achieve this goal. Therefore, the main focus of this paper is to develop the jointly optimal maintenance and statistical process control policy minimizing the total long run expected average cost per unit time. In our model, the production process can go out of control due to either the deterioration of equipment or other assignable causes. The equipment is also subject to failures in any of the operating states due to deterioration and aging. Hence, the process mean is controlled by an Xbar control chart using equidistant sampling epochs. We assume that the machine inspection epochs are the times when the control chart signals an out-of-control condition, considering both true and false alarms. At these times, the production process will be stopped, and an investigation will be conducted not only to determine whether it is a true or false alarm, but also to identify the causes of the true alarm, whether it was caused by the change in the machine setting, by other assignable causes, or by both. If the system is out of control, the proper actions will be taken to bring it back to the in-control state. At these epochs, a maintenance action can be taken, which can be no action, or preventive replacement of the unit. When the equipment is in the failure state, a corrective maintenance action is performed, which can be minimal repair or replacement of the machine and the process is brought to the in-control state. SMDP framework is used to formulate and solve the joint control problem. Numerical example is developed to demonstrate the effectiveness of the control policy.

Keywords: maintenance, semi-Markov decision process, statistical process control, Xbar control chart

Procedia PDF Downloads 91
1409 Maintenance Wrench Time Improvement Project

Authors: Awadh O. Al-Anazi

Abstract:

As part of the organizational needs toward successful maintaining activities, a proper management system need to be put in place, ensuring the effectiveness of maintenance activities. The management system shall clearly describes the process of identifying, prioritizing, planning, scheduling, execution, and providing valuable feedback for all maintenance activities. Completion and accuracy of the system with proper implementation shall provide the organization with a strong platform for effective maintenance activities that are resulted in efficient outcomes toward business success. The purpose of this research was to introduce a practical tool for measuring the maintenance efficiency level within Saudi organizations. A comprehensive study was launched across many maintenance professionals throughout Saudi leading organizations. The study covered five main categories: work process, identification, planning and scheduling, execution, and performance monitoring. Each category was evaluated across many dimensions to determine its current effectiveness through a five-level scale from 'process is not there' to 'mature implementation'. Wide participation was received, responses were analyzed, and the study was concluded by highlighting major gaps and improvement opportunities within Saudi organizations. One effective implementation of the efficiency enhancement efforts was deployed in Saudi Kayan (one of Sabic affiliates). Below details describes the project outcomes: SK overall maintenance wrench time was measured at 20% (on average) from the total daily working time. The assessment indicates the appearance of several organizational gaps, such as a high amount of reactive work, poor coordination and teamwork, Unclear roles and responsibilities, as well as underutilization of resources. Multidiscipline team was assigned to design and implement an appropriate work process that is capable to govern the execution process, improve the maintenance workforce efficiency, and maximize wrench time (targeting > 50%). The enhanced work process was introduced through brainstorming and wide benchmarking, incorporated with a proper change management plan and leadership sponsorship. The project was completed in 2018. Achieved Results: SK WT was improved to 50%, which resulted in 1) reducing the Average Notification completion time. 2) reducing maintenance expenses on OT and manpower support (3.6 MSAR Actual Saving from Budget within 6 months).

Keywords: efficiency, enhancement, maintenance, work force, wrench time

Procedia PDF Downloads 146
1408 A Study on Impact of Scheduled Preventive Maintenance on Overall Self-Life as Well as Reduction of Operational down Time of Critical Oil Field Mobile Equipment

Authors: Dipankar Deka

Abstract:

Exploration and production of Oil & Gas is a very challenging business on which a nation’s energy security depends on. The exploration and Production of hydrocarbon is a very precise and time-bound process. The striking rate of hydrocarbon in a drilled well is so uncertain that the success rate is only 31% in 2021 as per Rigzone. Huge cost is involved in drilling as well as the production of hydrocarbon from a well. Due to this very reason, no one can effort to lose a well because of faulty machines, which increases the non-productive time (NPT). Numerous activities that include manpower and machines synchronized together works in a precise way to complete the full cycle of exploration, rig movement, drilling and production of crude oil. There are several machines, both fixed and mobile, are used in the complete cycle. Most of these machines have a tight schedule of work operating in various drilling sites that are simultaneously being drilled, providing a very narrow window for maintenance. The shutdown of any of these machines for even a small period of time delays the whole project and increases the cost of production of hydrocarbon by manifolds. Moreover, these machines are custom designed exclusively for oil field operations to be only used in Mining Exploration Licensed area (MEL) earmarked by the government and are imported and very costly in nature. The cost of some of these mobile units like Well Logging Units, Coil Tubing units, Nitrogen pumping units etc. that are used for Well stimulation and activation process exceeds more than 1 million USD per unit. So the increase of self-life of these units also generates huge revenues during the extended duration of their services. In this paper we are considering the very critical mobile oil field equipment like Well Logging Unit, Coil Tubing unit, well-killing unit, Nitrogen pumping unit, MOL Oil Field Truck, Hot Oil Circulation Unit etc., and their extensive preventive maintenance in our auto workshop. This paper is the outcome of 10 years of structured automobile maintenance and minute documentation of each associated event that allowed us to perform the comparative study between the new practices of preventive maintenance over the age-old practice of system-based corrective maintenance and its impact on the self-life of the equipment.

Keywords: automobile maintenance, preventive maintenance, symptom based maintenance, workshop technologies

Procedia PDF Downloads 74
1407 Revolutionizing Healthcare Facility Maintenance: A Groundbreaking AI, BIM, and IoT Integration Framework

Authors: Mina Sadat Orooje, Mohammad Mehdi Latifi, Behnam Fereydooni Eftekhari

Abstract:

The integration of cutting-edge Internet of Things (IoT) technologies with advanced Artificial Intelligence (AI) systems is revolutionizing healthcare facility management. However, the current landscape of hospital building maintenance suffers from slow, repetitive, and disjointed processes, leading to significant financial, resource, and time losses. Additionally, the potential of Building Information Modeling (BIM) in facility maintenance is hindered by a lack of data within digital models of built environments, necessitating a more streamlined data collection process. This paper presents a robust framework that harmonizes AI with BIM-IoT technology to elevate healthcare Facility Maintenance Management (FMM) and address these pressing challenges. The methodology begins with a thorough literature review and requirements analysis, providing insights into existing technological landscapes and associated obstacles. Extensive data collection and analysis efforts follow to deepen understanding of hospital infrastructure and maintenance records. Critical AI algorithms are identified to address predictive maintenance, anomaly detection, and optimization needs alongside integration strategies for BIM and IoT technologies, enabling real-time data collection and analysis. The framework outlines protocols for data processing, analysis, and decision-making. A prototype implementation is executed to showcase the framework's functionality, followed by a rigorous validation process to evaluate its efficacy and gather user feedback. Refinement and optimization steps are then undertaken based on evaluation outcomes. Emphasis is placed on the scalability of the framework in real-world scenarios and its potential applications across diverse healthcare facility contexts. Finally, the findings are meticulously documented and shared within the healthcare and facility management communities. This framework aims to significantly boost maintenance efficiency, cut costs, provide decision support, enable real-time monitoring, offer data-driven insights, and ultimately enhance patient safety and satisfaction. By tackling current challenges in healthcare facility maintenance management it paves the way for the adoption of smarter and more efficient maintenance practices in healthcare facilities.

Keywords: artificial intelligence, building information modeling, healthcare facility maintenance, internet of things integration, maintenance efficiency

Procedia PDF Downloads 59
1406 Augmented Reality for Maintenance Operator for Problem Inspections

Authors: Chong-Yang Qiao, Teeravarunyou Sakol

Abstract:

Current production-oriented factories need maintenance operators to work in shifts monitoring and inspecting complex systems and different equipment in the situation of mechanical breakdown. Augmented reality (AR) is an emerging technology that embeds data into the environment for situation awareness to help maintenance operators make decisions and solve problems. An application was designed to identify the problem of steam generators and inspection centrifugal pumps. The objective of this research was to find the best medium of AR and type of problem solving strategies among analogy, focal object method and mean-ends analysis. Two scenarios of inspecting leakage were temperature and vibration. Two experiments were used in usability evaluation and future innovation, which included decision-making process and problem-solving strategy. This study found that maintenance operators prefer build-in magnifier to zoom the components (55.6%), 3D exploded view to track the problem parts (50%), and line chart to find the alter data or information (61.1%). There is a significant difference in the use of analogy (44.4%), focal objects (38.9%) and mean-ends strategy (16.7%). The marked differences between maintainers and operators are of the application of a problem solving strategy. However, future work should explore multimedia information retrieval which supports maintenance operators for decision-making.

Keywords: augmented reality, situation awareness, decision-making, problem-solving

Procedia PDF Downloads 230
1405 Relationship between Quality Improvement Strategies on the Basis of Different Management Activities

Authors: Manjinder Singh, Anish Sachdeva

Abstract:

Research on total quality management (TQM), total productive maintenance (TPM), international organization for standardization (ISO) and six sigma generally investigate the implementation and impact of these programs in isolation. However, none of these quality improvement programs is self-sufficient and they may not be powerful enough to deliver the improvements and innovations that are required nowadays to ensure the survival and growth of a firm. They are not mutually exclusive and inconsistent. On the contrary, they need complementary support and may reinforce mutually to make use of their complementarity, inducement of side-effects in favor of other quality improvement program, mutual simulation and exploitation of shared values. In this paper, first of all, the various management activities were identified which are normally under focus when any quality improvement program is implemented in any organization. Then TOPSIS methodology was applied to establish the ranking of various quality improvement programs (total quality management, total productive maintenance, ISO and six sigma which were brought to the corporate boardroom to improve the quality) with respect to different management activities (operations related activities, quality related activities, maintenance related activities, organizational related activities, human related activities and finance related activities).

Keywords: total productive maintenance (TPM), total quality management (TQM), TOPSIS, international organization for standardization (ISO)

Procedia PDF Downloads 439
1404 Technological Developments to Reduce Wind Blade Turbine Levelized Cost of Energy

Authors: Pedro Miguel Cardoso Carneiro, Ricardo André Nunes Borges, João Pedro Soares Loureiro, Hermínio Maio Graça Fernandes

Abstract:

Wind energy has been exponentially growing over the last years and will allow countries to progress regarding the decarbonization objective. In parallel, the maintenance activities have also been increasing in consequence of ageing and deterioration of the wind farms. The time available for wind blade maintenance is given by the weather window that is based upon weather conditions. Most of the wind blade repair and maintenance activities require a narrow window of temperature and humidity. Due to this limitation, the current weather windows result only on approximately 35% days/year are used for maintenance, that takes place mostly during summertime. This limitation creates large economic losses in the energy production of the wind towers, since they can be inoperative or with the energy production output reduced for days or weeks due to existing damages. Another important aspect is that the maintenance costs are higher due to the high standby time and seasonality imposed on the technicians. To reduce the relevant maintenance costs of blades and energy loses some technological developments were carried out to significantly improve this reality. The focus of this activity was to develop a series of key developments to have in the near future a suspended access equipment that can operate in harsh conditions, wind rain, cold/hot environment. To this end we have identified key areas that need to be revised and require new solutions to be found; a habitat system, multi-configurable roof and floor, roof and floor interface to blade, secondary attachment solutions to the blade and to the tower. On this paper we will describe the advances produced during a national R&D project made in partnership with an end-user (Onrope) and a test center (ISQ).

Keywords: wind turbine maintenance, cost reduction, technological innovations, wind turbine blade

Procedia PDF Downloads 92