Search results for: initial delay estimator
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 4128

Search results for: initial delay estimator

4038 Estimation of Population Mean under Random Non-Response in Two-Phase Successive Sampling

Authors: M. Khalid, G. N. Singh

Abstract:

In this paper, we have considered the problem of estimation for population mean, on current (second) occasion in the presence of random non response in two-occasion successive sampling under two phase set-up. Modified exponential type estimators have been proposed, and their properties are studied under the assumptions that numbers of sampling units follow a distribution due to random non response situations. The performances of the proposed estimators are compared with linear combinations of two estimators, (a) sample mean estimator for fresh sample and (b) ratio estimator for matched sample under the complete response situations. Results are demonstrated through empirical studies which present the effectiveness of the proposed estimators. Suitable recommendations have been made to the survey practitioners.

Keywords: successive sampling, random non-response, auxiliary variable, bias, mean square error

Procedia PDF Downloads 521
4037 Travel Delay and Modal Split Analysis: A Case Study

Authors: H. S. Sathish, H. S. Jagadeesh, Skanda Kumar

Abstract:

Journey time and delay study is used to evaluate the quality of service, the travel time and study can also be used to evaluate the quality of traffic movement along the route and to determine the location types and extent of traffic delays. Components of delay are boarding and alighting, issue of tickets, other causes and distance between each stops. This study investigates the total journey time required to travel along the stretch and the influence the delays. The route starts from Kempegowda Bus Station to Yelahanka Satellite Station of Bangalore City. The length of the stretch is 16.5 km. Modal split analysis has been done for this stretch. This stretch has elevated highway connecting to Bangalore International Airport and the extension of metro transit stretch. From the regression analysis of total journey time it is affected by delay due to boarding and alighting moderately, Delay due to issue of tickets affects the journey time to a higher extent. Some of the delay factors affecting significantly the journey time are evident from F-test at 10 percent level of confidence. Along this stretch work trips are more prevalent as indicated by O-D study. Modal shift analysis indicates about 70 percent of commuters are ready to shift from current system to Metro Rail System. Metro Rail System carries maximum number of trips compared to private mode. Hence Metro is a highly viable choice of mode for Bangalore Metropolitan City.

Keywords: delay, journey time, modal choice, regression analysis

Procedia PDF Downloads 496
4036 Investigation of Extreme Gradient Boosting Model Prediction of Soil Strain-Shear Modulus

Authors: Ehsan Mehryaar, Reza Bushehri

Abstract:

One of the principal parameters defining the clay soil dynamic response is the strain-shear modulus relation. Predicting the strain and, subsequently, shear modulus reduction of the soil is essential for performance analysis of structures exposed to earthquake and dynamic loadings. Many soil properties affect soil’s dynamic behavior. In order to capture those effects, in this study, a database containing 1193 data points consists of maximum shear modulus, strain, moisture content, initial void ratio, plastic limit, liquid limit, initial confining pressure resulting from dynamic laboratory testing of 21 clays is collected for predicting the shear modulus vs. strain curve of soil. A model based on an extreme gradient boosting technique is proposed. A tree-structured parzan estimator hyper-parameter tuning algorithm is utilized simultaneously to find the best hyper-parameters for the model. The performance of the model is compared to the existing empirical equations using the coefficient of correlation and root mean square error.

Keywords: XGBoost, hyper-parameter tuning, soil shear modulus, dynamic response

Procedia PDF Downloads 201
4035 Network Functions Virtualization-Based Virtual Routing Function Deployment under Network Delay Constraints

Authors: Kenichiro Hida, Shin-Ichi Kuribayashi

Abstract:

NFV-based network implements a variety of network functions with software on general-purpose servers, and this allows the network operator to select any capabilities and locations of network functions without any physical constraints. In this paper, we evaluate the influence of the maximum tolerable network delay on the virtual routing function deployment guidelines which the authors proposed previously. Our evaluation results have revealed the following: (1) the more the maximum tolerable network delay condition becomes severe, the more the number of areas where the route selection function is installed increases and the total network cost increases, (2) the higher the routing function cost relative to the circuit bandwidth cost, the increase ratio of total network cost becomes larger according to the maximum tolerable network delay condition.

Keywords: NFV (Network Functions Virtualization), resource allocation, virtual routing function, minimum total network cost

Procedia PDF Downloads 247
4034 Early Childhood Developmental Delay in 63 Low- and Middle-Income Countries: Prevalence and Inequalities Estimated from National Health Surveys

Authors: Jesus D. Cortes Gil, Fernanda Ewerling, Leonardo Ferreira, Aluisio J. D. Barros

Abstract:

Background: The sustainable development goals call for inclusive, equitable, and quality learning opportunities for all. This is especially important for children, to ensure they all develop to their full potential. We studied the prevalence and inequalities of suspected delay in child development in 63 low- and middle-income countries. Methods and Findings: We used the early child development module from national health surveys, which covers four developmental domains (physical, social-emotional, learning, literacy-numeracy) and provides a combined indicator (early child development index, ECDI) of whether children are on track. We calculated the age-adjusted prevalence of suspected delay at the country level and stratifying by wealth, urban/rural residence, sex of the child, and maternal education. We also calculated measures of absolute and relative inequality. We studied 330.613 children from 63 countries. The prevalence of suspected delay for the ECDI ranged from 3% in Barbados to 67% in Chad. For all countries together, 25% of the children were suspected of developmental delay. At regional level, the prevalence of delay ranged from 10% in Europe and Central Asia to 42% in West and Central Africa. The literacy-numeracy domain was by far the most challenging, with the highest proportions of delay. We observed very large inequalities, and most markedly for the literacy-numeracy domain. Conclusions: To date, our study presents the most comprehensive analysis of child development using an instrument especially developed for national health surveys. With a quarter of the children globally suspected of developmental delay, we face an immense challenge. The multifactorial aspect of early child development and the large gaps we found only add to the challenge of not leaving these children behind.

Keywords: child development, inequalities, global health, equity

Procedia PDF Downloads 119
4033 Normalizing Logarithms of Realized Volatility in an ARFIMA Model

Authors: G. L. C. Yap

Abstract:

Modelling realized volatility with high-frequency returns is popular as it is an unbiased and efficient estimator of return volatility. A computationally simple model is fitting the logarithms of the realized volatilities with a fractionally integrated long-memory Gaussian process. The Gaussianity assumption simplifies the parameter estimation using the Whittle approximation. Nonetheless, this assumption may not be met in the finite samples and there may be a need to normalize the financial series. Based on the empirical indices S&P500 and DAX, this paper examines the performance of the linear volatility model pre-treated with normalization compared to its existing counterpart. The empirical results show that by including normalization as a pre-treatment procedure, the forecast performance outperforms the existing model in terms of statistical and economic evaluations.

Keywords: Gaussian process, long-memory, normalization, value-at-risk, volatility, Whittle estimator

Procedia PDF Downloads 354
4032 A Unique Exact Approach to Handle a Time-Delayed State-Space System: The Extraction of Juice Process

Authors: Mohamed T. Faheem Saidahmed, Ahmed M. Attiya Ibrahim, Basma GH. Elkilany

Abstract:

This paper discusses the application of Time Delay Control (TDC) compensation technique in the juice extraction process in a sugar mill. The objective is to improve the control performance of the process and increase extraction efficiency. The paper presents the mathematical model of the juice extraction process and the design of the TDC compensation controller. Simulation results show that the TDC compensation technique can effectively suppress the time delay effect in the process and improve control performance. The extraction efficiency is also significantly increased with the application of the TDC compensation technique. The proposed approach provides a practical solution for improving the juice extraction process in sugar mills using MATLAB Processes.

Keywords: time delay control (TDC), exact and unique state space model, delay compensation, Smith predictor.

Procedia PDF Downloads 92
4031 Investigating the Efficiency of Stratified Double Median Ranked Set Sample for Estimating the Population Mean

Authors: Mahmoud I. Syam

Abstract:

Stratified double median ranked set sampling (SDMRSS) method is suggested for estimating the population mean. The SDMRSS is compared with the simple random sampling (SRS), stratified simple random sampling (SSRS), and stratified ranked set sampling (SRSS). It is shown that SDMRSS estimator is an unbiased of the population mean and more efficient than SRS, SSRS, and SRSS. Also, by SDMRSS, we can increase the efficiency of mean estimator for specific value of the sample size. SDMRSS is applied on real life examples, and the results of the example agreed the theoretical results.

Keywords: efficiency, double ranked set sampling, median ranked set sampling, ranked set sampling, stratified

Procedia PDF Downloads 247
4030 Measuring Delay Using Software Defined Networks: Limitations, Challenges, and Suggestions for Openflow

Authors: Ahmed Alutaibi, Ganti Sudhakar

Abstract:

Providing better Quality-of-Service (QoS) to end users has been a challenging problem for researchers and service providers. Building applications relying on best effort network protocols hindered the adoption of guaranteed service parameters and, ultimately, Quality of Service. The introduction of Software Defined Networking (SDN) opened the door for a new paradigm shift towards a more controlled programmable configurable behavior. Openflow has been and still is the main implementation of the SDN vision. To facilitate better QoS for applications, the network must calculate and measure certain parameters. One of those parameters is the delay between the two ends of the connection. Using the power of SDN and the knowledge of application and network behavior, SDN networks can adjust to different conditions and specifications. In this paper, we use the capabilities of SDN to implement multiple algorithms to measure delay end-to-end not only inside the SDN network. The results of applying the algorithms on an emulated environment show that we can get measurements close to the emulated delay. The results also show that depending on the algorithm, load on the network and controller can differ. In addition, the transport layer handshake algorithm performs best among the tested algorithms. Out of the results and implementation, we show the limitations of Openflow and develop suggestions to solve them.

Keywords: software defined networking, quality of service, delay measurement, openflow, mininet

Procedia PDF Downloads 165
4029 Step Method for Solving Nonlinear Two Delays Differential Equation in Parkinson’s Disease

Authors: H. N. Agiza, M. A. Sohaly, M. A. Elfouly

Abstract:

Parkinson's disease (PD) is a heterogeneous disorder with common age of onset, symptoms, and progression levels. In this paper we will solve analytically the PD model as a non-linear delay differential equation using the steps method. The step method transforms a system of delay differential equations (DDEs) into systems of ordinary differential equations (ODEs). On some numerical examples, the analytical solution will be difficult. So we will approximate the analytical solution using Picard method and Taylor method to ODEs.

Keywords: Parkinson's disease, step method, delay differential equation, two delays

Procedia PDF Downloads 205
4028 Estimation of a Finite Population Mean under Random Non Response Using Improved Nadaraya and Watson Kernel Weights

Authors: Nelson Bii, Christopher Ouma, John Odhiambo

Abstract:

Non-response is a potential source of errors in sample surveys. It introduces bias and large variance in the estimation of finite population parameters. Regression models have been recognized as one of the techniques of reducing bias and variance due to random non-response using auxiliary data. In this study, it is assumed that random non-response occurs in the survey variable in the second stage of cluster sampling, assuming full auxiliary information is available throughout. Auxiliary information is used at the estimation stage via a regression model to address the problem of random non-response. In particular, the auxiliary information is used via an improved Nadaraya-Watson kernel regression technique to compensate for random non-response. The asymptotic bias and mean squared error of the estimator proposed are derived. Besides, a simulation study conducted indicates that the proposed estimator has smaller values of the bias and smaller mean squared error values compared to existing estimators of finite population mean. The proposed estimator is also shown to have tighter confidence interval lengths at a 95% coverage rate. The results obtained in this study are useful, for instance, in choosing efficient estimators of the finite population mean in demographic sample surveys.

Keywords: mean squared error, random non-response, two-stage cluster sampling, confidence interval lengths

Procedia PDF Downloads 137
4027 Building Information Modelling for Construction Delay Management

Authors: Essa Alenazi, Zulfikar Adamu

Abstract:

The Kingdom of Saudi Arabia (KSA) is not an exception in relying on the growth of its construction industry to support rapid population growth. However, its need for infrastructure development is constrained by low productivity levels and cost overruns caused by factors such as delays to project completion. Delays in delivering a construction project are a global issue and while theories such as Optimism Bias have been used to explain such delays, in KSA, client-related causes of delays are also significant. The objective of this paper is to develop a framework-based approach to explore how the country’s construction industry can manage and reduce delays in construction projects through building information modelling (BIM) in order to mitigate the cost consequences of such delays.  It comprehensively and systematically reviewed the global literature on the subject and identified gaps, critical delay factors and the specific benefits that BIM can deliver for the delay management.  A case study comprising of nine hospital projects that have experienced delay and cost overruns was also carried out. Five critical delay factors related to the clients were identified as candidates that can be mitigated through BIM’s benefits. These factors are: Ineffective planning and scheduling of the project; changes during construction by the client; delay in progress payment; slowness in decision making by the client; and poor communication between clients and other stakeholders. In addition, data from the case study projects strongly suggest that optimism bias is present in many of the hospital projects. Further validation via key stakeholder interviews and documentations are planned.

Keywords: building information modelling (BIM), clients perspective, delay management, optimism bias, public sector projects

Procedia PDF Downloads 324
4026 An Indoor Positioning System in Wireless Sensor Networks with Measurement Delay

Authors: Pyung Soo Kim, Eung Hyuk Lee, Mun Suck Jang

Abstract:

In the current paper, an indoor positioning system is proposed with consideration of measurement delay. Firstly, an estimation filter with a measurement delay is designed for the indoor positioning mechanism under a weighted least square criterion, which utilizes only finite measurements on the most recent window. The proposed estimation filtering based scheme gives the filtered estimates for position, velocity and acceleration of moving target in real-time, while removing undesired noisy effects and preserving desired moving positions. Secondly, the proposed scheme is shown to have good inherent properties such as unbiasedness, efficiency, time-invariance, deadbeat, and robustness due to the finite memory structure. Finally, computer simulations shows that the performance of the proposed estimation filtering based scheme can outperform to the existing infinite memory filtering based mechanism.

Keywords: indoor positioning system, wireless sensor networks, measurement delay

Procedia PDF Downloads 482
4025 An Intercontinental Comparison of Delay Discounting for Real and Hypothetical Money and Cigarettes among Cigarette Smokers

Authors: Steven R. Lawyer, Tereza Prihodova, Katerina Prihodova

Abstract:

Delay discounting (DD) is one of the most frequently used behavioral-economic measures of impulsive choice, but there are few cross-cultural comparisons of discounting, and to the best of our knowledge, none compare patterns of DD across different commodities or compare real and hypothetical rewards across cultures. The purpose of this study was to compare patterns of DD for both real and hypothetical money and cigarettes among participants in the USA and the Czech Republic. Adult smokers from the United States and the Czech Republic completed standard measures of DD for hypothetical and real money (~$10USD) and cigarettes (1 pack, or 20 cigarettes). Contrary to data from the USA sample, Czech Republic participants discounted the value of real money steeper than hypothetical money, though this could be related to the relatively poor fit of the hyperbolic decay function to DD for hypothetical money in the Czech sample. These findings suggest that there might be cultural differences in delay discounting that warrant further attention.

Keywords: delay discounting, temporal discounting, cigarette smoking, real rewards, hypothetical rewards

Procedia PDF Downloads 188
4024 Existence of positive periodic solutions for certain delay differential equations

Authors: Farid Nouioua, Abdelouaheb Ardjouni

Abstract:

In this article, we study the existence of positive periodic solutions of certain delay differential equations. In the process we convert the differential equation into an equivalent integral equation after which appropriate mappings are constructed. We then employ Krasnoselskii's fixed point theorem to obtain sufficient conditions for the existence of a positive periodic solution of the differential equation. The obtained results improve and extend the results in the literature. Finally, an example is given to illustrate our results.

Keywords: delay differential equations, positive periodic solutions, integral equations, Krasnoselskii fixed point theorem

Procedia PDF Downloads 438
4023 A Method to Identify the Critical Delay Factors for Building Maintenance Projects of Institutional Buildings: Case Study of Eastern India

Authors: Shankha Pratim Bhattacharya

Abstract:

In general building repair and renovation projects are minor in nature. It requires less attention as the primary cost involvement is relatively small. Although the building repair and maintenance projects look simple, it involves much complexity during execution. Many of the present research indicate that few uncertain situations are usually linked with maintenance projects. Those may not be read properly in the planning stage of the projects, and finally, lead to time overrun. Building repair and maintenance become essential and periodical after commissioning of the building. In Institutional buildings, the regular maintenance projects also include addition –alteration, modification activities. Increase in the student admission, new departments, and sections, new laboratories and workshops, up gradation of existing laboratories are very common in the institutional buildings in the developing nations like India. The project becomes very critical because it undergoes space problem, architectural design issues, structural modification, etc. One of the prime factors in the institutional building maintenance and modification project is the time constraint. Mostly it required being executed a specific non-work time period. The present research considered only the institutional buildings of the Eastern part of India to analyse the repair and maintenance project delay. A general survey was conducted among the technical institutes to find the causes and corresponding nature of construction delay factors. Five technical institutes are considered in the present study with repair, renovation, modification and extension type of projects. Construction delay factors are categorically subdivided into four groups namely, material, manpower (works), Contract and Site. The survey data are collected for the nature of delay responsible for a specific project and the absolute amount of delay through proposed and actual duration of work. In the first stage of the paper, a relative importance index (RII) is proposed for the delay factors. The occurrence of the delay factors is also judged by its frequency-severity nature. Finally, the delay factors are then rated and linked with the type of work. In the second stage, a regression analysis is executed to establish an empirical relationship between the actual time of a project and the percentage of delay. It also indicates the impact of the factors for delay responsibility. Ultimately, the present paper makes an effort to identify the critical delay factors for the repair and renovation type project in the Eastern Indian Institutional building.

Keywords: delay factor, institutional building, maintenance, relative importance index, regression analysis, repair

Procedia PDF Downloads 250
4022 Delay in the Diagnosis of Tuberculosis and Initiation of TB Treatment in the Private and Public Health Sectors, Udaipur District, Rajasthan, India, Nov 2013

Authors: Yogita Tulsian, R. S. Gupta, K. F. Laserson

Abstract:

Background: Delays in the diagnosis and treatment of TB facilitates disease transmission in the community, so we conducted a study to evaluate the burden of and risk factors for delay in TB diagnosis and initiation of TB treatment among patients in the private and public sectors in Udaipur district, Rajasthan, India. Methods: A retrospective cohort study was conducted among 100 new sputum-positive TB. Patients were interviewed in the intensive phase of treatment September 2013-November 2013 Long total diagnosis delay (TDD) was defined as a time interval between first symptom to confirmed diagnosis > 30 days. Long health treatment delay (HTD) was defined as a time interval between confirmed diagnosis to treatment initiation > 7 days. Results: We observed a median TDD of 55 days (range: 7-136 days) in the public sector and of 92 days (11-380 days) in the private sector. Long TDD in the private sector was significantly associated with middle-higher socio-economic status (Risk Ratio (RR): 2;95% CI: 1.3-3). The reasons reported from the private sector for long TDD were suspect TB patients not advised for sputum examination (RR: 42; 95% CI:2.6-660), practise of self-medication (RR: 17.4; 95% CI: 1.1-267), or lack of awareness (RR: 9.7;95% CI: 0.6-145). The median HTD in the public sector was 3 days (range: 0-14 days), and in the private sector, 2 days (range: 0-11 days) (non-significant difference). Conclusions: Long TDD in private sector may be improved through sputum referral for all suspect TB cases and better education to all regarding TB.

Keywords: diagnosis delay, treatment delay, privatesector, public sector

Procedia PDF Downloads 427
4021 Disadvantaged Adolescents and Educational Delay in South Africa: Impacts of Personal, Family, and School Characteristics

Authors: Rocio Herrero Romero, Lucie Cluver, James Hall, Janina Steinert

Abstract:

Educational delay and non-completion are major policy concerns in South Africa. However, little research has focused on predictors for educational delay amongst adolescents in disadvantaged areas. This study has two aims: first, to use data integration approaches to compare the educational delay of 599 adolescents aged 16 to 18 from disadvantaged communities to national and provincial representative estimates in South Africa. Second, the paper also explores predictors for educational delay by comparing adolescents out of school (n=64) and at least one year behind (n=380), with adolescents in the age-appropriate grade or higher (n=155). Multinomial logistic regression models using self-report and administrative data were applied to look for significant associations of risk and protective factors. Significant risk factors for being behind (rather than in age-appropriate grade) were: male gender, past grade repetition, rural location and larger school size. Risk factors for being out of school (rather than in the age-appropriate grade) were: past grade repetition, having experienced problems concentrating at school, household poverty, and food insecurity. Significant protective factors for being in the age-appropriate grade (rather than out of school) were: living with biological parents or grandparents and access to school counselling. Attending school in wealthier communities was a significant protective factor for being in the age-appropriate grade (rather than behind). Our results suggest that both personal and contextual factors –family and school- predicted educational delay. This study provides new evidence to the significant effects of personal, family, and school characteristics on the educational outcomes of adolescents from disadvantaged communities in South Africa. This is the first longitudinal and quantitative study to systematically investigate risk and protective factors for post-compulsory educational outcomes amongst South African adolescents living in disadvantaged communities.

Keywords: disadvantaged communities, quantitative analysis, school delay, South Africa

Procedia PDF Downloads 348
4020 Stability Analysis for an Extended Model of the Hypothalamus-Pituitary-Thyroid Axis

Authors: Beata Jackowska-Zduniak

Abstract:

We formulate and analyze a mathematical model describing dynamics of the hypothalamus-pituitary-thyroid homoeostatic mechanism in endocrine system. We introduce to this system two types of couplings and delay. In our model, feedback controls the secretion of thyroid hormones and delay reflects time lags required for transportation of the hormones. The influence of delayed feedback on the stability behaviour of the system is discussed. Analytical results are illustrated by numerical examples of the model dynamics. This system of equations describes normal activity of the thyroid and also a couple of types of malfunctions (e.g. hyperthyroidism).

Keywords: mathematical modeling, ordinary differential equations, endocrine system, delay differential equation

Procedia PDF Downloads 336
4019 Tracking Patient Pathway for Assessing Public Health and Financial Burden to Community for Pulmonary Tuberculosis: Pointer from Central India

Authors: Ashish Sinha, Pushpend Agrawal

Abstract:

Background: Patients with undiagnosed pulmonary TB predominantly act as reservoirs for its transmission through 10-15 secondary infections in the next 1-5 Yrs. Delays in the diagnosis and treatment may worsen the disease with increase the risk of death. Factors responsible for such delays by tracking patient pathways to treatment may help in planning better interventions. The provision of ‘free diagnosis and treatment’ forms the cornerstone of the National Tuberculosis Elimination Programme (NTEP). OOPE is defined as the money spent by the patient during TB care other than public health facilities. Free TB care at all health facilities could reduce out-of-pocket expenses to the minimum possible levels. Material and Methods: This cross-sectional study was conducted among randomly selected 252 TB patients from Nov – Oct 2022 by taking in-depth interviews following informed verbal consent. We documented their journey from initial symptoms until they reached the public health facility, along with their ‘out-of-pocket expenditure’ (OOPE) pertaining to TB care. Results: Total treatment delay was 91±72 days on average (median: 77days, IQR: 45-104 days), while the isolated patient delay was 31±45 days (median: 15 days, IQR: 0 days to 43 days); diagnostic delay; 57±60 days (median: 42days, IQR 14-78 days), treatment delay 19 ± 18 days (median: 15days, IQR: 11-19 days). A patient delay (> 30 days) was significantly associated with ignorance about classic symptoms of pulmonary TB, adoption of self-medication, illiteracy, and middle and lower social class. Diagnostic delay was significantly higher among those who contacted private health facilities, were unaware of signs and symptoms, had >2 consultations, and not getting an appropriate referral for TB care. Most (97%) of the study participants interviewed claimed to have incurred some expenditure.Median total expenses were 6155(IQR: 2625-15175) rupees. More than half 141 (56%) of the study participants had expenses >5000 rupees. Median transport expenses were 525(IQR: 200-1012) rupees; Median consultation expenses were 700(IQR: 200-1600) rupees; Median investigation expenses were 1000(IQR: 0-3025) rupees and the Median medicine expenses were 3350(IQR: 1300-7525).OOPE for consultation, investigation, and medicine was observed to be significantly higher among patients who ignored classical signs& symptoms of TB, repeated visits to private health facilities, and due to self-medication practices. Transport expenses and delays in seeking care at facilities were observed to have an upward trend with OOP Expenses (r =1). Conclusion: Delay in TB care due to low awareness about signs and symptoms of TB and poor seeking care, lack of proper consultation, and appropriate referrals reported by the study subjects indicate the areas which need proper attention by the program managers. Despite a centrally sponsored programme, the financial burden on TB patients is still in the unacceptable range. OOPE could be reduced as low as possible by addressing the responsible factors linked to it.

Keywords: patient pathway, delay, pulmonary tuberculosis, out of pocket expenses

Procedia PDF Downloads 65
4018 Aliasing Free and Additive Error in Spectra for Alpha Stable Signals

Authors: R. Sabre

Abstract:

This work focuses on the symmetric alpha stable process with continuous time frequently used in modeling the signal with indefinitely growing variance, often observed with an unknown additive error. The objective of this paper is to estimate this error from discrete observations of the signal. For that, we propose a method based on the smoothing of the observations via Jackson polynomial kernel and taking into account the width of the interval where the spectral density is non-zero. This technique allows avoiding the “Aliasing phenomenon” encountered when the estimation is made from the discrete observations of a process with continuous time. We have studied the convergence rate of the estimator and have shown that the convergence rate improves in the case where the spectral density is zero at the origin. Thus, we set up an estimator of the additive error that can be subtracted for approaching the original signal without error.

Keywords: spectral density, stable processes, aliasing, non parametric

Procedia PDF Downloads 129
4017 Population Size Estimation Based on the GPD

Authors: O. Anan, D. Böhning, A. Maruotti

Abstract:

The purpose of the study is to estimate the elusive target population size under a truncated count model that accounts for heterogeneity. The purposed estimator is based on the generalized Poisson distribution (GPD), which extends the Poisson distribution by adding a dispersion parameter. Thus, it becomes an useful model for capture-recapture data where concurrent events are not homogeneous. In addition, it can account for over-dispersion and under-dispersion. The ratios of neighboring frequency counts are used as a tool for investigating the validity of whether generalized Poisson or Poisson distribution. Since capture-recapture approaches do not provide the zero counts, the estimated parameters can be achieved by modifying the EM-algorithm technique for the zero-truncated generalized Poisson distribution. The properties and the comparative performance of proposed estimator were investigated through simulation studies. Furthermore, some empirical examples are represented insights on the behavior of the estimators.

Keywords: capture, recapture methods, ratio plot, heterogeneous population, zero-truncated count

Procedia PDF Downloads 435
4016 A Kolmogorov-Smirnov Type Goodness-Of-Fit Test of Multinomial Logistic Regression Model in Case-Control Studies

Authors: Chen Li-Ching

Abstract:

The multinomial logistic regression model is used popularly for inferring the relationship of risk factors and disease with multiple categories. This study based on the discrepancy between the nonparametric maximum likelihood estimator and semiparametric maximum likelihood estimator of the cumulative distribution function to propose a Kolmogorov-Smirnov type test statistic to assess adequacy of the multinomial logistic regression model for case-control data. A bootstrap procedure is presented to calculate the critical value of the proposed test statistic. Empirical type I error rates and powers of the test are performed by simulation studies. Some examples will be illustrated the implementation of the test.

Keywords: case-control studies, goodness-of-fit test, Kolmogorov-Smirnov test, multinomial logistic regression

Procedia PDF Downloads 456
4015 Low Power Glitch Free Dual Output Coarse Digitally Controlled Delay Lines

Authors: K. Shaji Mon, P. R. John Sreenidhi

Abstract:

In deep-submicrometer CMOS processes, time-domain resolution of a digital signal is becoming higher than voltage resolution of analog signals. This claim is nowadays pushing toward a new circuit design paradigm in which the traditional analog signal processing is expected to be progressively substituted by the processing of times in the digital domain. Within this novel paradigm, digitally controlled delay lines (DCDL) should play the role of digital-to-analog converters in traditional, analog-intensive, circuits. Digital delay locked loops are highly prevalent in integrated systems.The proposed paper addresses the glitches present in delay circuits along with area,power dissipation and signal integrity.The digitally controlled delay lines(DCDL) under study have been designed in a 90 nm CMOS technology 6 layer metal Copper Strained SiGe Low K Dielectric. Simulation and synthesis results show that the novel circuits exhibit no glitches for dual output coarse DCDL with less power dissipation and consumes less area compared to the glitch free NAND based DCDL.

Keywords: glitch free, NAND-based DCDL, CMOS, deep-submicrometer

Procedia PDF Downloads 245
4014 Using Arellano-Bover/Blundell-Bond Estimator in Dynamic Panel Data Analysis – Case of Finnish Housing Price Dynamics

Authors: Janne Engblom, Elias Oikarinen

Abstract:

A panel dataset is one that follows a given sample of individuals over time, and thus provides multiple observations on each individual in the sample. Panel data models include a variety of fixed and random effects models which form a wide range of linear models. A special case of panel data models are dynamic in nature. A complication regarding a dynamic panel data model that includes the lagged dependent variable is endogeneity bias of estimates. Several approaches have been developed to account for this problem. In this paper, the panel models were estimated using the Arellano-Bover/Blundell-Bond Generalized method of moments (GMM) estimator which is an extension of the Arellano-Bond model where past values and different transformations of past values of the potentially problematic independent variable are used as instruments together with other instrumental variables. The Arellano–Bover/Blundell–Bond estimator augments Arellano–Bond by making an additional assumption that first differences of instrument variables are uncorrelated with the fixed effects. This allows the introduction of more instruments and can dramatically improve efficiency. It builds a system of two equations—the original equation and the transformed one—and is also known as system GMM. In this study, Finnish housing price dynamics were examined empirically by using the Arellano–Bover/Blundell–Bond estimation technique together with ordinary OLS. The aim of the analysis was to provide a comparison between conventional fixed-effects panel data models and dynamic panel data models. The Arellano–Bover/Blundell–Bond estimator is suitable for this analysis for a number of reasons: It is a general estimator designed for situations with 1) a linear functional relationship; 2) one left-hand-side variable that is dynamic, depending on its own past realizations; 3) independent variables that are not strictly exogenous, meaning they are correlated with past and possibly current realizations of the error; 4) fixed individual effects; and 5) heteroskedasticity and autocorrelation within individuals but not across them. Based on data of 14 Finnish cities over 1988-2012 differences of short-run housing price dynamics estimates were considerable when different models and instrumenting were used. Especially, the use of different instrumental variables caused variation of model estimates together with their statistical significance. This was particularly clear when comparing estimates of OLS with different dynamic panel data models. Estimates provided by dynamic panel data models were more in line with theory of housing price dynamics.

Keywords: dynamic model, fixed effects, panel data, price dynamics

Procedia PDF Downloads 1507
4013 The Usage of Bridge Estimator for Hegy Seasonal Unit Root Tests

Authors: Huseyin Guler, Cigdem Kosar

Abstract:

The aim of this study is to propose Bridge estimator for seasonal unit root tests. Seasonality is an important factor for many economic time series. Some variables may contain seasonal patterns and forecasts that ignore important seasonal patterns have a high variance. Therefore, it is very important to eliminate seasonality for seasonal macroeconomic data. There are some methods to eliminate the impacts of seasonality in time series. One of them is filtering the data. However, this method leads to undesired consequences in unit root tests, especially if the data is generated by a stochastic seasonal process. Another method to eliminate seasonality is using seasonal dummy variables. Some seasonal patterns may result from stationary seasonal processes, which are modelled using seasonal dummies but if there is a varying and changing seasonal pattern over time, so the seasonal process is non-stationary, deterministic seasonal dummies are inadequate to capture the seasonal process. It is not suitable to use seasonal dummies for modeling such seasonally nonstationary series. Instead of that, it is necessary to take seasonal difference if there are seasonal unit roots in the series. Different alternative methods are proposed in the literature to test seasonal unit roots, such as Dickey, Hazsa, Fuller (DHF) and Hylleberg, Engle, Granger, Yoo (HEGY) tests. HEGY test can be also used to test the seasonal unit root in different frequencies (monthly, quarterly, and semiannual). Another issue in unit root tests is the lag selection. Lagged dependent variables are added to the model in seasonal unit root tests as in the unit root tests to overcome the autocorrelation problem. In this case, it is necessary to choose the lag length and determine any deterministic components (i.e., a constant and trend) first, and then use the proper model to test for seasonal unit roots. However, this two-step procedure might lead size distortions and lack of power in seasonal unit root tests. Recent studies show that Bridge estimators are good in selecting optimal lag length while differentiating nonstationary versus stationary models for nonseasonal data. The advantage of this estimator is the elimination of the two-step nature of conventional unit root tests and this leads a gain in size and power. In this paper, the Bridge estimator is proposed to test seasonal unit roots in a HEGY model. A Monte-Carlo experiment is done to determine the efficiency of this approach and compare the size and power of this method with HEGY test. Since Bridge estimator performs well in model selection, our approach may lead to some gain in terms of size and power over HEGY test.

Keywords: bridge estimators, HEGY test, model selection, seasonal unit root

Procedia PDF Downloads 340
4012 Evaluation of Sensor Pattern Noise Estimators for Source Camera Identification

Authors: Benjamin Anderson-Sackaney, Amr Abdel-Dayem

Abstract:

This paper presents a comprehensive survey of recent source camera identification (SCI) systems. Then, the performance of various sensor pattern noise (SPN) estimators was experimentally assessed, under common photo response non-uniformity (PRNU) frameworks. The experiments used 1350 natural and 900 flat-field images, captured by 18 individual cameras. 12 different experiments, grouped into three sets, were conducted. The results were analyzed using the receiver operator characteristic (ROC) curves. The experimental results demonstrated that combining the basic SPN estimator with a wavelet-based filtering scheme provides promising results. However, the phase SPN estimator fits better with both patch-based (BM3D) and anisotropic diffusion (AD) filtering schemes.

Keywords: sensor pattern noise, source camera identification, photo response non-uniformity, anisotropic diffusion, peak to correlation energy ratio

Procedia PDF Downloads 441
4011 Stability Analysis of Two-delay Differential Equation for Parkinson's Disease Models with Positive Feedback

Authors: M. A. Sohaly, M. A. Elfouly

Abstract:

Parkinson's disease (PD) is a heterogeneous movement disorder that often appears in the elderly. PD is induced by a loss of dopamine secretion. Some drugs increase the secretion of dopamine. In this paper, we will simply study the stability of PD models as a nonlinear delay differential equation. After a period of taking drugs, these act as positive feedback and increase the tremors of patients, and then, the differential equation has positive coefficients and the system is unstable under these conditions. We will present a set of suggested modifications to make the system more compatible with the biodynamic system. When giving a set of numerical examples, this research paper is concerned with the mathematical analysis, and no clinical data have been used.

Keywords: Parkinson's disease, stability, simulation, two delay differential equation

Procedia PDF Downloads 130
4010 Analysis and Performance of Handover in Universal Mobile Telecommunications System (UMTS) Network Using OPNET Modeller

Authors: Latif Adnane, Benaatou Wafa, Pla Vicent

Abstract:

Handover is of great significance to achieve seamless connectivity in wireless networks. This paper gives an impression of the main factors which are being affected by the soft and the hard handovers techniques. To know and understand the handover process in The Universal Mobile Telecommunications System (UMTS) network, different statistics are calculated. This paper focuses on the quality of service (QoS) of soft and hard handover in UMTS network, which includes the analysis of received power, signal to noise radio, throughput, delay traffic, traffic received, delay, total transmit load, end to end delay and upload response time using OPNET simulator.

Keywords: handover, UMTS, mobility, simulation, OPNET modeler

Procedia PDF Downloads 321
4009 Using Optimal Control Method to Investigate the Stability and Transparency of a Nonlinear Teleoperation System with Time Varying Delay

Authors: Abasali Amini, Alireza Mirbagheri, Amir Homayoun Jafari

Abstract:

In this paper, a new structure for teleoperation systems with time varying delay has been modeled and proposed. A random time varying the delay of up to 150 msec is simulated in teleoperation channel of both masters to slave and vice versa. The system stability and transparency have been investigated, comparing the result of a PID controller and an optimal controller on each master and slave sub-systems separately. The controllers have been designed in slave subsystem for reducing position errors between master and slave, and another controller has been designed in the master subsystem to establish stability, transparency and force tracking. Results have been compared together. The results showed PID controller is appropriate in position tracking, but force response oscillates in contact with the environment. We showed the optimal control established position tracking properly. Also, force tracking is achieved in this controller appropriately.

Keywords: optimal control, time varying delay, teleoperation systems, stability and transparency

Procedia PDF Downloads 256