Search results for: construction plan
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5446

Search results for: construction plan

4306 Predicting Costs in Construction Projects with Machine Learning: A Detailed Study Based on Activity-Level Data

Authors: Soheila Sadeghi

Abstract:

Construction projects are complex and often subject to significant cost overruns due to the multifaceted nature of the activities involved. Accurate cost estimation is crucial for effective budget planning and resource allocation. Traditional methods for predicting overruns often rely on expert judgment or analysis of historical data, which can be time-consuming, subjective, and may fail to consider important factors. However, with the increasing availability of data from construction projects, machine learning techniques can be leveraged to improve the accuracy of overrun predictions. This study applied machine learning algorithms to enhance the prediction of cost overruns in a case study of a construction project. The methodology involved the development and evaluation of two machine learning models: Random Forest and Neural Networks. Random Forest can handle high-dimensional data, capture complex relationships, and provide feature importance estimates. Neural Networks, particularly Deep Neural Networks (DNNs), are capable of automatically learning and modeling complex, non-linear relationships between input features and the target variable. These models can adapt to new data, reduce human bias, and uncover hidden patterns in the dataset. The findings of this study demonstrate that both Random Forest and Neural Networks can significantly improve the accuracy of cost overrun predictions compared to traditional methods. The Random Forest model also identified key cost drivers and risk factors, such as changes in the scope of work and delays in material delivery, which can inform better project risk management. However, the study acknowledges several limitations. First, the findings are based on a single construction project, which may limit the generalizability of the results to other projects or contexts. Second, the dataset, although comprehensive, may not capture all relevant factors influencing cost overruns, such as external economic conditions or political factors. Third, the study focuses primarily on cost overruns, while schedule overruns are not explicitly addressed. Future research should explore the application of machine learning techniques to a broader range of projects, incorporate additional data sources, and investigate the prediction of both cost and schedule overruns simultaneously.

Keywords: cost prediction, machine learning, project management, random forest, neural networks

Procedia PDF Downloads 19
4305 Unlocking the Puzzle of Borrowing Adult Data for Designing Hybrid Pediatric Clinical Trials

Authors: Rajesh Kumar G

Abstract:

A challenging aspect of any clinical trial is to carefully plan the study design to meet the study objective in optimum way and to validate the assumptions made during protocol designing. And when it is a pediatric study, there is the added challenge of stringent guidelines and difficulty in recruiting the necessary subjects. Unlike adult trials, there is not much historical data available for pediatrics, which is required to validate assumptions for planning pediatric trials. Typically, pediatric studies are initiated as soon as approval is obtained for a drug to be marketed for adults, so with the adult study historical information and with the available pediatric pilot study data or simulated pediatric data, the pediatric study can be well planned. Generalizing the historical adult study for new pediatric study is a tedious task; however, it is possible by integrating various statistical techniques and utilizing the advantage of hybrid study design, which will help to achieve the study objective in a smoother way even with the presence of many constraints. This research paper will explain how well the hybrid study design can be planned along with integrated technique (SEV) to plan the pediatric study; In brief the SEV technique (Simulation, Estimation (using borrowed adult data and applying Bayesian methods)) incorporates the use of simulating the planned study data and getting the desired estimates to Validate the assumptions.This method of validation can be used to improve the accuracy of data analysis, ensuring that results are as valid and reliable as possible, which allow us to make informed decisions well ahead of study initiation. With professional precision, this technique based on the collected data allows to gain insight into best practices when using data from historical study and simulated data alike.

Keywords: adaptive design, simulation, borrowing data, bayesian model

Procedia PDF Downloads 57
4304 Unintended Health Inequity: Using the Relationship Between the Social Determinants of Health and Employer-Sponsored Health Insurance as a Catalyst for Organizational Development and Change

Authors: Dinamarie Fonzone

Abstract:

Employer-sponsored health insurance (ESI) strategic decision-making processes rely on financial analysis to guide leadership in choosing plans that will produce optimal organizational spending outcomes. These financial decision-making methods have not abated ESI costs. Previously unrecognized external social determinants, the impact on ESI plan spending, and other organizational strategies are emerging and are important considerations for organizational decision-makers and change management practitioners. The purpose of thisstudy is to examine the relationship between the social determinants of health (SDoH), employer-sponsored health insurance (ESI) plans, andthe unintended consequence of health inequity. A quantitative research design using selectemployee records from an existing employer human capital management database will be analyzed. Statistical regressionmethods will be used to study the relationships between certainSDoH (employee income, neighborhood geographic living area, and health care access) and health plan utilization, cost, and chronic disease prevalence. The discussion will include an application of the social gradient of health theory to the study findings, organizational transformation through changes in ESI decision-making mental models, and the connection of ESI health inequity to organizational development and changediversity, equity, and inclusion strategies.

Keywords: employer-sponsored health insurance, social determinants of health, health inequity, mental models, organizational development, organizational change, social gradient of health theory

Procedia PDF Downloads 90
4303 Public Participation and Decision-Making towards Planning Legislation: A Case for GCC Countries

Authors: Saad Saeed Althiabi

Abstract:

There is great progress in formulating and executing legislative policies in GCC, however, the public participation in formulating and in major decision making still remains weak. Drawing attention on the international law of public participation in construction and natural resource management, this paper aims in creating a feasible legislative framework for extensive public participation in the industries such as construction and oil and gas decision-making that GCC can implement. This paper would address the conflicts associated with the management and creation of legislation and ensuring public participation for the creation of a practical framework. A feasible legislative framework must take into account the various factors that shape the effectiveness of participation and the elements that promote the objectives of participation. It is premised on the ground that viewing to international prescriptions might help to reveal gaps in domestic laws, as well as alternatives to overcome them.

Keywords: legislative policies, public participation, planning legislation, GCC countries, international law

Procedia PDF Downloads 517
4302 Assessing the Perceptions toward the Impacts of Tourism in Poverty Alleviation: A Basis for Pro-Poor Tourism Policy in Sta. Lucia, Guimba, Nueva Ecija

Authors: Lady Salvador Purganan, Jojo M. Villamin, Noel L. Lansang

Abstract:

Tourism is a multifaceted but interdependent industry. This industry is composed of four major players, the public sector, the private sector, the local community, and the tourists. Each player has a vital role in the success of delivering high-quality tourism products and activities. There are various manifestations of positive economic outcomes that benefit the local community. Pro-poor tourism development approach has a great potential to serve as an avenue for capacity building leading to economic independence since natural attractions and cultural resources are assets that can be capitalized on, especially by the poor, because it is more accessible to them compared to financial resources. In the National Tourism Development Plan 2016-2022, specific mechanisms are not reflected to combat and lower poverty incidence through tourism. The researcher used the multidimensional poverty theory and sustainable tourism theory to formulate indicators in the research instrument and social exchange theory. The expected output of the study is to unlock opportunities, specifically in Brgy. Sta. Lucia, Guimba, Nueva Ecija, by crafting policies taking into utmost consideration local community involvement and participation in the process of tourism development which is essential in attaining inclusive growth and sustainability. This study will apply the sequential explanatory design mixed-method approach.

Keywords: pro-poor tourism, poverty alleviation, livelihood opportunities, tourism development plan

Procedia PDF Downloads 86
4301 Introduction of Dams Impacts on Downstream Wetlands: Case Study in Ahwar Delta in Yemen

Authors: Afrah Saad Mohsen Al-Mahfadi

Abstract:

The construction of dams can provide various ecosystem services, but it can also lead to ecological changes such as habitat loss and coastal degradation. Yemen faces multiple risks, including water crises and inadequate environmental policies, which are particularly detrimental to coastal zones like the Ahwar Delta in Abyan. This study aims to examine the impacts of dam construction on downstream wetlands and propose sustainable management approaches. Research Aim: The main objective of this study is to assess the different impacts of dam construction on downstream wetlands, specifically focusing on the Ahwar Delta in Yemen. Methodology: The study utilizes a literature review approach to gather relevant information on dam impacts and adaptation measures. Interviews with decision-making stakeholders and local community members are conducted to gain insights into the specific challenges faced in the Ahwar Delta. Additionally, sensing data, such as Arc-GIS and precipitation data from 1981 to 2020, are analyzed to examine changes in hydrological dynamics. Questions Addressed: This study addresses the following questions: What are the impacts of dam construction on downstream wetlands in the Ahwar delta? How can environmental management planning activities be implemented to minimize these impacts? Findings: The results indicate several future issues arising from dam construction in the coastal areas, including land loss due to rising sea levels and increased salinity in drinking water wells. Climate change has led to a decrease in rainfall rates, impacting vegetation and increasing sedimentation and erosion. Downstream areas with dams exhibit lower sediment levels and slower flowing habitats compared to those without dams. Theoretical Importance: The findings of this study provide valuable insights into the ecological impacts of dam construction on downstream wetlands. Understanding these dynamics can inform decision-makers about the need for adaptation measures and their potential benefits in improving coastal biodiversity under dam impacts. Data Collection and Analysis Procedures: The study collects data through a literature review, interviews, and sensing technology. The literature review helps identify relevant studies on dam impacts and adaptation measures. Interviews with stakeholders and local community members provide firsthand information on the specific challenges faced in the Ahwar Delta. Sensing data, such as Arc-GIS and precipitation data, are analyzed to understand changes in hydrological dynamics over time. Conclusion: The study concludes that while the situation can worsen due to dam construction, practical adaptation measures can help mitigate the impacts. Recommendations include improving water management, developing integrated coastal zone planning, raising awareness among stakeholders, improving health and education, and implementing emergency projects to combat climate change.

Keywords: dam impact, delta wetland, hydrology, Yemen

Procedia PDF Downloads 48
4300 Algorithmic Approach to Management of Complications of Permanent Facial Filler: A Saudi Experience

Authors: Luay Alsalmi

Abstract:

Background: Facial filler is the most common type of cosmetic surgery next to botox. Permanent filler is preferred nowadays due to the low cost brought about by non-recurring injection appointments. However, such fillers pose a higher risk for complications, with even greater adverse effects when the procedure is done using unknown dermal filler injections. AIM: This study aimed to establish an algorithm to categorize and manage patients that receive permanent fillers. Materials and Methods: Twelve participants were presented to the service through emergency or as outpatient from November 2015 to May 2021. Demographics such as age, sex, date of injection, time of onset, and types of complications were collected. After examination, all cases were managed based on an algorithm established. FACE-Q was used to measure overall satisfaction and psychological well-being. Results: The algorithm to diagnose and manage these patients effectively with a high satisfaction rate was established in this study. All participants were non-smoker females with no known medical comorbidities. The algorithm presented determined the treatment plan when faced with complications. Results revealed high appearance-related psychosocial distress was observed prior to surgery, while it significantly dropped after surgery. FACE-Q was able to establish evidence of satisfactory ratings among patients prior to and after surgery. Conclusion: This treatment algorithm can guide the surgeon in formulating a suitable plan with fewer complications and a high satisfaction rate.

Keywords: facial filler, FACE-Q, psycho-social stress, botox, treatment algorithm

Procedia PDF Downloads 66
4299 A Machine Learning Approach for Efficient Resource Management in Construction Projects

Authors: Soheila Sadeghi

Abstract:

Construction projects are complex and often subject to significant cost overruns due to the multifaceted nature of the activities involved. Accurate cost estimation is crucial for effective budget planning and resource allocation. Traditional methods for predicting overruns often rely on expert judgment or analysis of historical data, which can be time-consuming, subjective, and may fail to consider important factors. However, with the increasing availability of data from construction projects, machine learning techniques can be leveraged to improve the accuracy of overrun predictions. This study applied machine learning algorithms to enhance the prediction of cost overruns in a case study of a construction project. The methodology involved the development and evaluation of two machine learning models: Random Forest and Neural Networks. Random Forest can handle high-dimensional data, capture complex relationships, and provide feature importance estimates. Neural Networks, particularly Deep Neural Networks (DNNs), are capable of automatically learning and modeling complex, non-linear relationships between input features and the target variable. These models can adapt to new data, reduce human bias, and uncover hidden patterns in the dataset. The findings of this study demonstrate that both Random Forest and Neural Networks can significantly improve the accuracy of cost overrun predictions compared to traditional methods. The Random Forest model also identified key cost drivers and risk factors, such as changes in the scope of work and delays in material delivery, which can inform better project risk management. However, the study acknowledges several limitations. First, the findings are based on a single construction project, which may limit the generalizability of the results to other projects or contexts. Second, the dataset, although comprehensive, may not capture all relevant factors influencing cost overruns, such as external economic conditions or political factors. Third, the study focuses primarily on cost overruns, while schedule overruns are not explicitly addressed. Future research should explore the application of machine learning techniques to a broader range of projects, incorporate additional data sources, and investigate the prediction of both cost and schedule overruns simultaneously.

Keywords: resource allocation, machine learning, optimization, data-driven decision-making, project management

Procedia PDF Downloads 16
4298 Empirical Study on Causes of Project Delays

Authors: Khan Farhan Rafat, Riaz Ahmed

Abstract:

Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.

Keywords: causes of construction project delays, construction industry, construction management, power distance

Procedia PDF Downloads 201
4297 Wind Energy Status in Turkey

Authors: Mustafa Engin Başoğlu, Bekir Çakir

Abstract:

Since large part of electricity generation is provided by using fossil based resources, energy is an important agenda for countries. Depletion of fossil resources, increasing awareness of climate change and global warming concerns are the major reasons for turning to alternative energy resources. Solar, wind and hydropower energy are the main renewable energy sources. Among of them, wind energy is promising for Turkey whose installed power capacity increases approximately eight times between 2008 - seventh month of 2014. Signing of Kyoto Protocol can be accepted as a milestone for Turkey's energy policy. Turkish government has announced 2023 Vision (2023 targets) in 2010-2014 Strategic Plan prepared by Ministry of Energy and Natural Resources (MENR). 2023 Energy targets can be summarized as follows: Share of renewable energy sources in electricity generation is 30% of total electricity generation by 2023. Installed capacity of wind energy will be 20 GW by 2023. Other renewable energy sources such as solar, hydropower and geothermal are encouraged with new incentive mechanisms. Share of nuclear power plants in electricity generation will be 10% of total electricity generation by 2023. Dependence on foreign energy is reduced for sustainability and energy security. As of seventh month of 2014, total installed capacity of wind power plants is 3.42 GW and a lot of wind power plants are under construction with capacity 1.16 GW. Turkish government also encourages the locally manufactured equipments. MILRES is an important project aimed to promote the use of renewable sources in electricity generation. A 500 kW wind turbine will be produced in the first phase of project. Then 2.5 MW wind turbine will be manufactured domestically within this project

Keywords: wind energy, wind speed, 2023 vision, MILRES, wind energy potential in TURKEY

Procedia PDF Downloads 526
4296 Engineering of E-Learning Content Creation: Case Study for African Countries

Authors: María-Dolores Afonso-Suárez, Nayra Pumar-Carreras, Juan Ruiz-Alzola

Abstract:

This research addresses the use of an e-Learning creation methodology for learning objects. Throughout the process, indicators are being gathered, to determine if it responds to the main objectives of an engineering discipline. These parameters will also indicate if it is necessary to review the creation cycle and readjust any phase. Within the project developed for this study, apart from the use of structured methods, there has been a central objective: the establishment of a learning atmosphere. A place where all the professionals involved are able to collaborate, plan, solve problems and determine guides to follow in order to develop creative and innovative solutions. It has been outlined as a blended learning program with an assessment plan that proposes face to face lessons, coaching, collaboration, multimedia and web based learning objects as well as support resources. The project has been drawn as a long term task, the pilot teaching actions designed provide the preliminary results object of study. This methodology is been used in the creation of learning content for the African countries of Senegal, Mauritania and Cape Verde. It has been developed within the framework of the MACbioIDi, an Interreg European project for the International cooperation and development. The educational area of this project is focused in the training and advice of professionals of the medicine as well as engineers in the use of applications of medical imaging technology, specifically the 3DSlicer application and the Open Anatomy Browser.

Keywords: teaching contents engineering, e-learning, blended learning, international cooperation, 3dslicer, open anatomy browser

Procedia PDF Downloads 153
4295 Decision Support for Modularisation: Engineering Construction Case Studies

Authors: Rolla Monib, Chris Ian Goodier, Alistair Gibb

Abstract:

This paper aims to investigate decision support strategies in the EC sector to determine the most appropriate degree of modularization. This is achieved through three oil and gas (O&G) and two power plant case studies via semi-structured interviews (n=59 and n=27, respectively), analysis of project documents, and case study-specific semi-structured validation interviews (n=12 and n=8). New terminology to distinguish degrees of modularization is proposed, along with a decision-making support checklist and a diagrammatic decision-making support figure. Results indicate that the EC sub-sectors were substantially more satisfied with the application of component, structural, or traditional modularization compared with system modularization for some types of modules. Key drivers for decisions on the degree of modularization vary across module types. This paper can help the EC sector determine the most suitable degree of modularization via a decision-making support strategy.

Keywords: modularization, engineering construction, case study, decision support

Procedia PDF Downloads 72
4294 The Effects of Land Grabbing on Livelihood Assets and Its Implication on Food Production in Ghana: A Case Study of Bui Dam Construction Project

Authors: Charles Kwaku Oppong

Abstract:

This study examined the effects of the agricultural land grabbed for the Bui Dam project on the livelihoods assets of the affected people and its implication on food production. Both quantitative and qualitative data were collected through the use of focus group discussions, questionnaire administration, interview guide, and observations. It was found that the land grabbing incident in the study communities as a result of the Bui Dam construction has resulted in the improvements in the physical assets of the affected people. The findings also indicated that local food crop production and the quantity of fish catch have dwindled after the land grabs. Contrary to this, the local people’s access to the natural capital, particularly the local land for agricultural activities has been worsened. The study recommends alternative sustainable livelihood for the affected people by the local government.

Keywords: land grabbing, livelihood, asset, food production

Procedia PDF Downloads 146
4293 Prioritization Ranking for Managing Moisture Problems in a Building

Authors: Sai Amulya Gollapalli, Dilip A. Patel, Parth Patel K., Lukman E. Mansuri

Abstract:

Accumulation of moisture is one of the most worrisome aspects of a building. Architects and engineers tend to ignore its vitality during the designing and construction stage. Major fatalities in buildings can be caused by it. People avoid spending a lot of money on waterproofing. If the same mistake is repeated, no deep thinking is done. The quality of workmanship and construction is depleting due to negligence. It is important to do an analysis of the water maintenance issues happening in the current buildings and give a database for all the factors that are causing the defect. In this research, surveys are done with two waterproofing consultants, two client engineers, and two project managers. The survey was based on a matrix that was based on the causes of water maintenance issues. There were around 100 causes that were identified. The causes were categorized into six, namely, manpower, finance, method, management, environment, and material. In the matrices, the causes on the x-direction matched with the causes on the y-direction. 3 Likert scale was used to make a pairwise comparison between causes on each cell. Matrices were evaluated for the main categories and for each category separately. A final ranking was done by the weights achieved, and ‘cracks arriving from various construction joints’ was the highest with 0.57 relative significance, and ‘usage of the material’ was the lowest with 0.03 relative significance. Twelve defects due to water leakage were identified, and interviewees were asked to make a pairwise comparison of them, too, to understand the priorities. When the list of causes is achieved, the prioritization as per the stratification analysis is done. This will be beneficial to the consultants and contractors as they will get a primary idea of which causes to focus on.

Keywords: water leakage, survey, causes, matrices, prioritization

Procedia PDF Downloads 79
4292 Analysis to the Characterization of Self-Esteem of Students in Eulogio 'Amang' Rodriguez Institute of Science and Technology: A Foundation of Conceptualizing Substantial Plan of Action

Authors: Eriberto R. Astorga Jr., Herbert D. Vertucio, Evelyn M. Polison

Abstract:

This study was conducted in order to determine the analysis with regards to the Characterization of Self-Esteem of EARIST Students according to their origin of self-esteem and low self-esteem as well as its causes. The respondents of this study are three thousand three hundred twenty three (3,323) randomly selected students from eight colleges of EARIST such as Arts and Sciences, Education, Public Administration and Criminology, Business Administration, Hospitality Management, Architecture and Fine Arts, Engineering, and Industrial Technology. A survey was conducted by using a validated questionnaire for information gathering about respondents profile and different factors relating to self-esteem of students such as self-origin, familial and social relationship, financial situation and education. Frequency, percentage, ranking and standards deviation, standard t-test and ANOVA were applied to investigate the differences of the answers of the respondents to the origin of their self-esteem and the reasons for low self-esteem. The results revealed that there are no significant differences in the origin of their self-esteem and the reasons of low esteem as to the eight group of respondent’s. Moreover, most causes of low esteem are caused by hearing a comment or experiencing an incident that has a negative impact student mentally and emotionally, poor health, being bullied, lack of support from family, friends, and job loss, experiencing verbal and sexual abuse and are in a violent relationship, feelings of isolation, divorce, dysfunctional family, death and lack of achievement at work and at school, trying to conform to stereotypes and prove our independence from our parents.

Keywords: characterization, plan of action, profile, self-esteem

Procedia PDF Downloads 155
4291 Analytical Study on the Shape of T-Type Girder Modular Bridge Connection by Using Parametric

Authors: Jongho Park, Jinwoong Choi, Sungnam Hong, Seung-Kyung Kye, Sun-Kyu Park

Abstract:

Recently, to cope with the rapidly changing construction trend because of aging infrastructures, modular bridge technology has been studied actively. Modular bridge is easily constructed by assembling standardized precast structure members in the field. It will be possible to construct rapidly and reduce construction cost efficiently. However, the shape examination of the transverse connection of T-type girder newly developed between the segmented modules is not performed. Therefore, the investigation of the connection shape is needed. In this study, shape of the modular T-girder bridge transverse connection was analyzed by finite element model that was verified in study which was verification of model for transverse connection using Abaqus. Connection angle was chosen as the parameter. The result of analyses showed that optimal value of angle is 130 degree.

Keywords: modular bridge, optimal transverse shape, parameter, FEM

Procedia PDF Downloads 636
4290 Development of an Systematic Design in Evaluating Force-On-Force Security Exercise at Nuclear Power Plants

Authors: Seungsik Yu, Minho Kang

Abstract:

As the threat of terrorism to nuclear facilities is increasing globally after the attacks of September 11, we are striving to recognize the physical protection system and strengthen the emergency response system. Since 2015, Korea has implemented physical protection security exercise for nuclear facilities. The exercise should be carried out with full cooperation between the operator and response forces. Performance testing of the physical protection system should include appropriate exercises, for example, force-on-force exercises, to determine if the response forces can provide an effective and timely response to prevent sabotage. Significant deficiencies and actions taken should be reported as stipulated by the competent authority. The IAEA(International Atomic Energy Agency) is also preparing force-on-force exercise program documents to support exercise of member states. Currently, ROK(Republic of Korea) is implementing exercise on the force-on-force exercise evaluation system which is developed by itself for the nuclear power plant, and it is necessary to establish the exercise procedure considering the use of the force-on-force exercise evaluation system. The purpose of this study is to establish the work procedures of the three major organizations related to the force-on-force exercise of nuclear power plants in ROK, which conduct exercise using force-on-force exercise evaluation system. The three major organizations are composed of licensee, KINAC (Korea Institute of Nuclear Nonproliferation and Control), and the NSSC(Nuclear Safety and Security Commission). Major activities are as follows. First, the licensee establishes and conducts an exercise plan, and when recommendations are derived from the result of the exercise, it prepares and carries out a force-on-force result report including a plan for implementation of the recommendations. Other detailed tasks include consultation with surrounding units for adversary, interviews with exercise participants, support for document evaluation, and self-training to improve the familiarity of the MILES (Multiple Integrated Laser Engagement System). Second, KINAC establishes a force-on-force exercise plan review report and reviews the force-on-force exercise plan report established by licensee. KINAC evaluate force-on-force exercise using exercise evaluation system and prepare training evaluation report. Other detailed tasks include MILES training, adversary consultation, management of exercise evaluation systems, and analysis of exercise evaluation results. Finally, the NSSC decides whether or not to approve the force-on-force exercise and makes a correction request to the nuclear facility based on the exercise results. The most important part of ROK's force-on-force exercise system is the analysis through the exercise evaluation system implemented by KINAC after the exercise. The analytical method proceeds in the order of collecting data from the exercise evaluation system and analyzing the collected data. The exercise application process of the exercise evaluation system introduced in ROK in 2016 will be concretely set up, and a system will be established to provide objective and consistent conclusions between exercise sessions. Based on the conclusions drawn up, the ultimate goal is to complement the physical protection system of licensee so that the system makes licensee respond effectively and timely against sabotage or unauthorized removal of nuclear materials.

Keywords: Force-on-Force exercise, nuclear power plant, physical protection, sabotage, unauthorized removal

Procedia PDF Downloads 128
4289 Structural Behaviour of Small-Scale Fibre-Filled Steel Tubular Planar Frames

Authors: Sadaf Karkoodi, Hassan Karampour

Abstract:

There is a growing interest in the construction industry towards hybrid systems. The hybrid systems use construction materials such as timber, steel, and concrete smartly, can be prefabricated, and are cost-effective and sustainable solutions to an industry targeting reduced carbon footprint. Moreover, in case of periodical shortage in timber resources, reusable and waste wood such as fibres can be used in the hybrid modules, which facilitates the circular economy. In this research, a hybrid frame is proposed and experimentally validated by introducing dried wood fibre products inside cold-formed steel square hollow sections without using any adhesives. As such, fibre-filled steel tubular (FFST) columns, beams, and 2D frames are manufactured and tested. The results show that the FFST columns have stiffness and strength 44% and 55% higher than cold-formed steel columns, respectively. The bearing strength of the FFST beams shows an increase of 39.5% compared to steel only. The flexural stiffness and strength of the FFST beams are 8.5% and 28% higher than the bare steel beams, respectively. The FFST frame depicted an 18.4% higher ultimate load capacity than the steel-only frame under a mid-point concentrated load. Moreover, the FFST beam-to-column bolted connection showed high ductile performance. The initial results and the proposed simple manufacturing process suggest that the proposed FFST concept can be upscaled and used in real structures.

Keywords: wood fibre, reusing wood, fibre-filled steel, hybrid construction

Procedia PDF Downloads 59
4288 Developing a Framework to Aid Sustainable Assessment in Indian Buildings

Authors: P. Amarnath, Albert Thomas

Abstract:

Buildings qualify to be the major consumer of energy and resources thereby urging the designers, architects and policy makers to place a great deal of effort in achieving and implementing sustainable building strategies in construction. Green building rating systems help a great deal in this by measuring the effectiveness of these strategies along with the escalation of building performance in social, environmental and economic perspective, and construct new sustainable buildings. However, for a country like India, enormous population and its rapid rate of growth impose an increasing burden on the country's limited and continuously degrading natural resource base, which also includes the land available for construction. In general, the number of sustainable rated buildings in India is very minimal primarily due to the complexity and obstinate nature of the assessment systems/regulations that restrict the stakeholders and designers in proper implementation and utilization of these rating systems. This paper aims to introduce a data driven and user-friendly framework which cross compares the present prominent green building rating systems such as LEED, BREEAM, and GRIHA and subsequently help the users to rate their proposed building design as per the regulations of these assessment frameworks. This framework is validated using the input data collected from green buildings constructed globally. The proposed system has prospects to encourage the users to test the efficiency of various sustainable construction practices and thereby promote more sustainable buildings in the country.

Keywords: BREEAM, GRIHA, green building rating systems, LEED, sustainable buildings

Procedia PDF Downloads 113
4287 A Review on Building Information Modelling in Nigeria and Its Potentials

Authors: Mansur Hamma-Adama, Tahar Kouider

Abstract:

Construction Industry has been evolving since the development of Building Information Modelling (BIM). This technological process is unstoppable; it is out to the market with remarkable case studies of solving the long industry’s history of fragmentation. This industry has been changing over time; United States has recorded the most significant development in construction digitalization, Australia, United Kingdom and some other developed nations are also amongst promoters of BIM process and its development. Recently, a developing country like China and Malaysia are keying into the industry’s digital shift, while very little move is seen in South Africa whose development is considered higher and perhaps leader in the digital transition amongst the African countries. To authors’ best knowledge, Nigerian construction industry has never engaged in BIM discussions hence has no attention at national level. Consequently, Nigeria has no “Noteworthy BIM publications.” Decision makers and key stakeholders need to be informed on the current trend of the industry’s development (BIM in specific) and the opportunities of adopting this digitalization trend in relation to the identified challenges. BIM concept can be traced mostly in Architectural practices than engineering practices in Nigeria. A superficial BIM practice is found to be at organisational level only and operating a model based - “BIM stage 1.” Research to adopting this innovation has received very little attention. This piece of work is literature review based, aimed at exploring BIM in Nigeria and its prospects. The exploration reveals limitations in the literature availability as to extensive research in the development of BIM in the country. Numerous challenges were noticed including building collapse, inefficiencies, cost overrun and late project delivery. BIM has potentials to overcome the above challenges and even beyond. Low level of BIM adoption with reasonable level of awareness is noticed. However, lack of policy and guideline as well as serious lack of experts in the field are amongst the major barriers to BIM adoption. The industry needs to embrace BIM to possibly compete with its global counterpart.

Keywords: adoption, BIM, CAD, construction industry, Nigeria, opportunities

Procedia PDF Downloads 140
4286 Enhancing Problem Communication and Management Using Civil Information Modeling for Infrastructure Projects

Authors: Yu-Cheng Lin, Yu-Chih Su

Abstract:

Generally, there are many numerous existing problems during the construction phase special in civil engineering. The problems communication and management (PCM) of civil engineering are important and necessary to enhance the performance of construction management. The civil information modelling (CIM) approach is used to retain information with digital format and assist easy updating and transferring of information in the 3D environment for all related civil and infrastructure projects. When the application of CIM technology is adopted in infrastructure projects, all the related project participants can discuss problems and obtain feedback and responds among project participants integrated with the assistance of CIM models 3D illustration. Usually, electronic mail (e-mail) is one of the most popular communication tools among all related participants for rapid transit system (MRT), also known as a subway or metro, construction project in Taiwan. Furthermore, all interfaces should be traced and managed effectively during the process. However, there are many problems with the use of e-mail for communication of all interfaces. To solve the above problems, this study proposes a CIM-based Problem Communication and Management (CPCM) system to improve performance of problem communication and management. The CPCM system is applied to a case study of an MRT project in Taiwan to identify its CPCM effectiveness. Case study results show that the proposed CPCM system and Markup-enabled CIM Viewer are effective CIM-based communication tools in CIM-supported PCM work of civil engineering. Finally, this study identifies conclusion, suggestion, benefits, and limitations for further applications.

Keywords: building information modeling, civil information modeling, infrastructure, general contractor

Procedia PDF Downloads 137
4285 Modeling of Geotechnical Data Using GIS and Matlab for Eastern Ahmedabad City, Gujarat

Authors: Rahul Patel, S. P. Dave, M. V Shah

Abstract:

Ahmedabad is a rapidly growing city in western India that is experiencing significant urbanization and industrialization. With projections indicating that it will become a metropolitan city in the near future, various construction activities are taking place, making soil testing a crucial requirement before construction can commence. To achieve this, construction companies and contractors need to periodically conduct soil testing. This study focuses on the process of creating a spatial database that is digitally formatted and integrated with geotechnical data and a Geographic Information System (GIS). Building a comprehensive geotechnical Geo-database involves three essential steps. Firstly, borehole data is collected from reputable sources. Secondly, the accuracy and redundancy of the data are verified. Finally, the geotechnical information is standardized and organized for integration into the database. Once the Geo-database is complete, it is integrated with GIS. This integration allows users to visualize, analyze, and interpret geotechnical information spatially. Using a Topographic to Raster interpolation process in GIS, estimated values are assigned to all locations based on sampled geotechnical data values. The study area was contoured for SPT N-Values, Soil Classification, Φ-Values, and Bearing Capacity (T/m2). Various interpolation techniques were cross-validated to ensure information accuracy. The GIS map generated by this study enables the calculation of SPT N-Values, Φ-Values, and bearing capacities for different footing widths and various depths. This approach highlights the potential of GIS in providing an efficient solution to complex phenomena that would otherwise be tedious to achieve through other means. Not only does GIS offer greater accuracy, but it also generates valuable information that can be used as input for correlation analysis. Furthermore, this system serves as a decision support tool for geotechnical engineers. The information generated by this study can be utilized by engineers to make informed decisions during construction activities. For instance, they can use the data to optimize foundation designs and improve site selection. In conclusion, the rapid growth experienced by Ahmedabad requires extensive construction activities, necessitating soil testing. This study focused on the process of creating a comprehensive geotechnical database integrated with GIS. The database was developed by collecting borehole data from reputable sources, verifying its accuracy and redundancy, and organizing the information for integration. The GIS map generated by this study is an efficient solution that offers greater accuracy and generates valuable information that can be used as input for correlation analysis. It also serves as a decision support tool for geotechnical engineers, allowing them to make informed decisions during construction activities.

Keywords: arcGIS, borehole data, geographic information system (GIS), geo-database, interpolation, SPT N-value, soil classification, φ-value, bearing capacity

Procedia PDF Downloads 50
4284 Effects of Rising Cost of Building Materials in Nigeria: A Case Study of Adamawa State

Authors: Ibrahim Yerima Gwalem, Jamila Ahmed Buhari

Abstract:

In recent years, there has been an alarming rate of increase in the costs of building materials in Nigeria, and this ugly phenomenon threatens the contributions of the construction industry in national development. The purpose of this study was to assess the effects of the rising cost of building materials in Adamawa State Nigeria. Four research questions in line with the purpose of the study were raised to guide the study. Two null hypotheses were formulated and tested at 0.05 level of significance. The study adopted a survey research design. The population of the study comprises registered contractors, registered builders, selected merchants, and consultants in Adamawa state. Data were collected using researcher designed instrument tagged effects of the rising cost of building materials questionnaire (ERCBMQ). The instrument was subjected to face and content validation by two experts, one from Modibbo Adama University of Technology Yola and the other from Federal Polytechnic Mubi. The reliability of the instrument was determined by the Cronbach Alpha method and yielded a reliability index of 0.85 high enough to ascertain the reliability. Data collected from a field survey of 2019 was analyzed using mean and percentage. The means of the prices were used in the calculations of price indices and rates of inflation on building materials. Findings revealed that factors responsible for the rising cost of building materials are the exchange rate of the Nigeria Naira with a mean rating (MR) = 4.4; cost of fuel and power supply, MR = 4.3; and changes in government policies and legislation, MR = 4.2, while fluctuations in the construction cost with MR = 2.8; reduced volume of construction output, MR = 2.52; and risk of project abandonment, MRA = 2.51, were the three effects. The study concluded that adverse effects could result in a downward effect on the contributions of the construction industries on the gross domestic product (GDP) in the nation’s economy. Among the recommendations proffered include that the government should formulate a policy that will play down the agitations on the use of imported building materials by encouraging research in the production of local building materials.

Keywords: effects, rising, cost, building, materials

Procedia PDF Downloads 121
4283 Self-Compacting White Concrete Mix Design Using the Particle Matrix Model

Authors: Samindi Samarakoon, Ørjan Sletbakk Vie, Remi Kleiven Fjelldal

Abstract:

White concrete facade elements are widely used in construction industry. It is challenging to achieve the desired workability in casting of white concrete elements. Particle Matrix model was used for proportioning the self-compacting white concrete (SCWC) to control segregation and bleeding and to improve workability. The paper presents how to reach the target slump flow while controlling bleeding and segregation in SCWC. The amount of aggregates, binders and mixing water, as well as type and dosage of superplasticizer (SP) to be used are the major factors influencing the properties of SCWC. Slump flow and compressive strength tests were carried out to examine the performance of SCWC, and the results indicate that the particle matrix model could produce successfully SCWC controlling segregation and bleeding.

Keywords: white concrete, particle matrix model, mix design, construction industry

Procedia PDF Downloads 257
4282 Framing a Turkish Campus Sustainability Indicator Set

Authors: Cansu Tari, Ute Poerschke

Abstract:

Sustainable campus design and planning in Higher Education requires an entire action plan and coordination of physical, educational, and social systems. Many institutions in the world are defining their sustainable development path and some are following existing green building and sustainable campus rating/ranking systems, guidelines. In the context of higher education, Turkish universities have limited academic, social and financial support related to sustainable living, building, and campus studies. While some research has been conducted in the last 60 years by farsighted academics, most of these works are based on individuals’ or small organizations’ own interests and efforts, and they are not known enough by the population of universities and possible prospective investors. Regarding the recent fast and uncontrolled growth in the Turkish Higher Education environment, setting a campus sustainability indicator set is a necessity for sustainable development of universities. The main objective of this paper is to specify the applicable sustainability indicators in the national context of Turkey, and propose a model guideline for sustainable Turkish university campuses. The analysis of Turkish legislation on environmental issues, special conditions of Turkish Higher Education system, and Turkey’s environmental risks and challenges set the backbone of the study and distinguish the set of indicators from generalized guidelines. Finally, the paper outlines some concrete suggestions for Turkish Universities to integrate sustainability efforts in their regional context. It will be useful for campus sustainability managers and planners, interested in developing action plans in their national and regional scope.

Keywords: campus sustainability, sustainability indicators, Turkish universities, national campus sustainability action plan

Procedia PDF Downloads 242
4281 The Exploitation of the MOSES Project Outcomes on Supply Chain Optimisation

Authors: Reza Karimpour

Abstract:

Ports play a decisive role in the EU's external and internal trade, as about 74% of imports and exports and 37% of exchanges go through ports. Although ports, especially Deep Sea Shipping (DSS) ports, are integral nodes within multimodal logistic flows, Short Sea Shipping (SSS) and inland waterways are not so well integrated. The automated vessels and supply chain optimisations for sustainable shortsea shipping (MOSES) project aims to enhance the short sea shipping component of the European supply chain by addressing the vulnerabilities and strains related to the operation of large containerships. The MOSES concept can be shortly described as a large containership (mother-vessel) approaching a DSS port (or a large container terminal). Upon her arrival, a combined intelligent mega-system consisting of the MOSES Autonomous tugboat swarm for manoeuvring and the MOSES adapted AutoMoor system. Then, container handling processes are ready to start moving containers to their destination via hinterland connections (trucks and/or rail) or to be shipped to destinations near small ports (on the mainland or island). For the first case, containers are stored in a dedicated port area (Storage area), waiting to be moved via trucks and/or rail. For the second case, containers are stacked by existing port equipment near-dedicated berths of the DSS port. They then are loaded on the MOSES Innovative Feeder Vessel, equipped with the MOSES Robotic Container-Handling System that provides (semi-) autonomous (un) feeding of the feeder. The Robotic Container-Handling System is remotely monitored through a Shore Control Centre. When the MOSES innovative Feeder vessel approaches the small port, where her docking is achieved without tugboats, she automatically unloads the containers using the Robotic Container-Handling System on the quay or directly on trucks. As a result, ports with minimal or no available infrastructure may be effectively integrated with the container supply chain. Then, the MOSES innovative feeder vessel continues her voyage to the next small port, or she returns to the DSS port. MOSES exploitation activity mainly aims to exploit research outcomes beyond the project, facilitate utilisation of the pilot results by others, and continue the pilot service after the project ends. By the mid-lifetime of the project, the exploitation plan introduces the reader to the MOSES project and its key exploitable results. It provides a plan for delivering the MOSES innovations to the market as part of the overall exploitation plan.

Keywords: automated vessels, exploitation, shortsea shipping, supply chain

Procedia PDF Downloads 93
4280 Acausal and Causal Model Construction with FEM Approach Using Modelica

Authors: Oke Oktavianty, Tadayuki Kyoutani, Shigeyuki Haruyama, Junji Kaneko, Ken Kaminishi

Abstract:

Modelica has many advantages and it is very useful in modeling and simulation especially for the multi-domain with a complex technical system. However, the big obstacle for a beginner is to understand the basic concept and to build a new system model for a real system. In order to understand how to solve the simple circuit model by hand translation and to get a better understanding of how modelica works, we provide a detailed explanation about solver ordering system in horizontal and vertical sorting and make some proposals for improvement. In this study, some difficulties in using modelica software with the original concept and the comparison with Finite Element Method (FEM) approach is discussed. We also present our textual modeling approach using FEM concept for acausal and causal model construction. Furthermore, simulation results are provided that demonstrate the comparison between using textual modeling with original coding in modelica and FEM concept.

Keywords: FEM, a causal model, modelica, horizontal and vertical sorting

Procedia PDF Downloads 292
4279 Feasibility Analysis of Active and Passive Technical Integration of Rural Buildings

Authors: Chanchan Liu

Abstract:

In the process of urbanization in China, the rapid development of urban construction has been achieved, but a large number of rural buildings still continue the construction mode many years ago. This paper mainly analyzes the rural residential buildings in the hot summer and cold winter regions analyze the active and passive technologies of the buildings. It explored the feasibility of realizing the sustainable development of rural buildings in an economically reasonable range, using mainly passive technologies, innovative building design methods, reducing the buildings’ demand for conventional energy, and supplementing them with renewable energy sources. On this basis, appropriate technology and regional characteristics are proposed to keep the rural architecture retain its characteristics in the development process. It is hoped that this exploration can provide reference and help for the development of rural buildings in the hot summer and cold winter regions.

Keywords: the rural building, active technology, passive technology, sustainable development

Procedia PDF Downloads 194
4278 Development of a Roadmap for Assessment the Sustainability of Buildings in Saudi Arabia Using Building Information Modeling

Authors: Ibrahim A. Al-Sulaihi, Khalid S. Al-Gahtani, Abdullah M. Al-Sugair, Aref A. Abadel

Abstract:

Achieving environmental sustainability is one of the important issues considered in many countries’ vision. Green/Sustainable building is widely used terminology for describing a friendly environmental construction. Applying sustainable practices has a significant importance in various fields, including construction field that consumes an enormous amount of resource and causes a considerable amount of waste. The need for sustainability is increased in the regions that suffering from the limitation of natural resource and extreme weather conditions such as Saudi Arabia. Since buildings designs are getting sophisticated, the need for tools, which support decision-making for sustainability issues, is increasing, especially in the design and preconstruction stages. In this context, Building Information Modeling (BIM) can aid in performing complex building performance analyses to ensure an optimized sustainable building design. Accordingly, this paper introduces a roadmap towards developing a systematic approach for presenting the sustainability of buildings using BIM. The approach includes set of main processes including; identifying the sustainability parameters that can be used for sustainability assessment in Saudi Arabia, developing sustainability assessment method that fits the special circumstances in the Kingdom, identifying the sustainability requirements and BIM functions that can be used for satisfying these requirements, and integrating these requirements with identified functions. As a result, the sustainability-BIM approach can be developed which helps designers in assessing the sustainability and exploring different design alternatives at the early stage of the construction project.

Keywords: green buildings, sustainability, BIM, rating systems, environment, Saudi Arabia

Procedia PDF Downloads 364
4277 The Early Stages of the Standardisation of Finnish Building Sector

Authors: Anu Soikkeli

Abstract:

Early 20th century functionalism aimed at generalising living and rationalising construction, thus laying the foundation for the standardisation of construction components and products. From the 1930s onwards, all measurement and quality instructions for building products, different types of building components, descriptions of working methods complying with advisable building practises, planning, measurement and calculation guidelines, terminology, etc. were called standards. Standardisation was regarded as a necessary prerequisite for the mass production of housing. This article examines the early stages of standardisation in Finland in the 1940s and 1950s, as reflected on the working history of an individual architect, Erkki Koiso-Kanttila (1914-2006). In 1950 Koiso-Kanttila was appointed the Head of Design of the Finnish Association of Architects’ Building Standards Committee, a position which he held until 1958. His main responsibilities were the development of the RT Building Information File and compiling of the files.

Keywords: architecture, post WWII period, reconstruction, standardisation

Procedia PDF Downloads 403