Search results for: causes of construction project delays
7450 Performance Analysis of Vision-Based Transparent Obstacle Avoidance for Construction Robots
Authors: Siwei Chang, Heng Li, Haitao Wu, Xin Fang
Abstract:
Construction robots are receiving more and more attention as a promising solution to the manpower shortage issue in the construction industry. The development of intelligent control techniques that assist in controlling the robots to avoid transparency and reflected building obstacles is crucial for guaranteeing the adaptability and flexibility of mobile construction robots in complex construction environments. With the boom of computer vision techniques, a number of studies have proposed vision-based methods for transparent obstacle avoidance to improve operation accuracy. However, vision-based methods are also associated with disadvantages such as high computational costs. To provide better perception and value evaluation, this study aims to analyze the performance of vision-based techniques for avoiding transparent building obstacles. To achieve this, commonly used sensors, including a lidar, an ultrasonic sensor, and a USB camera, are equipped on the robotic platform to detect obstacles. A Raspberry Pi 3 computer board is employed to compute data collecting and control algorithms. The turtlebot3 burger is employed to test the programs. On-site experiments are carried out to observe the performance in terms of success rate and detection distance. Control variables include obstacle shapes and environmental conditions. The findings contribute to demonstrating how effectively vision-based obstacle avoidance strategies for transparent building obstacle avoidance and provide insights and informed knowledge when introducing computer vision techniques in the aforementioned domain.Keywords: construction robot, obstacle avoidance, computer vision, transparent obstacle
Procedia PDF Downloads 807449 An Engineer-Oriented Life Cycle Assessment Tool for Building Carbon Footprint: The Building Carbon Footprint Evaluation System in Taiwan
Authors: Hsien-Te Lin
Abstract:
The purpose of this paper is to introduce the BCFES (building carbon footprint evaluation system), which is a LCA (life cycle assessment) tool developed by the Low Carbon Building Alliance (LCBA) in Taiwan. A qualified BCFES for the building industry should fulfill the function of evaluating carbon footprint throughout all stages in the life cycle of building projects, including the production, transportation and manufacturing of materials, construction, daily energy usage, renovation and demolition. However, many existing BCFESs are too complicated and not very designer-friendly, creating obstacles in the implementation of carbon reduction policies. One of the greatest obstacle is the misapplication of the carbon footprint inventory standards of PAS2050 or ISO14067, which are designed for mass-produced goods rather than building projects. When these product-oriented rules are applied to building projects, one must compute a tremendous amount of data for raw materials and the transportation of construction equipment throughout the construction period based on purchasing lists and construction logs. This verification method is very cumbersome by nature and unhelpful to the promotion of low carbon design. With a view to provide an engineer-oriented BCFE with pre-diagnosis functions, a component input/output (I/O) database system and a scenario simulation method for building energy are proposed herein. Most existing BCFESs base their calculations on a product-oriented carbon database for raw materials like cement, steel, glass, and wood. However, data on raw materials is meaningless for the purpose of encouraging carbon reduction design without a feedback mechanism, because an engineering project is not designed based on raw materials but rather on building components, such as flooring, walls, roofs, ceilings, roads or cabinets. The LCBA Database has been composited from existing carbon footprint databases for raw materials and architectural graphic standards. Project designers can now use the LCBA Database to conduct low carbon design in a much more simple and efficient way. Daily energy usage throughout a building's life cycle, including air conditioning, lighting, and electric equipment, is very difficult for the building designer to predict. A good BCFES should provide a simplified and designer-friendly method to overcome this obstacle in predicting energy consumption. In this paper, the author has developed a simplified tool, the dynamic Energy Use Intensity (EUI) method, to accurately predict energy usage with simple multiplications and additions using EUI data and the designed efficiency levels for the building envelope, AC, lighting and electrical equipment. Remarkably simple to use, it can help designers pre-diagnose hotspots in building carbon footprint and further enhance low carbon designs. The BCFES-LCBA offers the advantages of an engineer-friendly component I/O database, simplified energy prediction methods, pre-diagnosis of carbon hotspots and sensitivity to good low carbon designs, making it an increasingly popular carbon management tool in Taiwan. To date, about thirty projects have been awarded BCFES-LCBA certification and the assessment has become mandatory in some cities.Keywords: building carbon footprint, life cycle assessment, energy use intensity, building energy
Procedia PDF Downloads 1397448 Construction Noise Control: Hong Kong Reviews International Best Practices
Authors: Morgan Cheng, Wilson Ho, Max Yiu, Dragon Tsui, Wylog Wong, Richard Kwan, K. C. Lam, Hannah Lo, C. L. Wong
Abstract:
Hong Kong has been known worldwide for its ability to thrive under trying circumstances. The 7.5 million residents of this mature and busy metropolis are living in a primarily high-rise city whereby development and renewal of the cityscape are taking place unceasingly. Hong Kong residents are therefore affected by the virtually continuous and numerous construction activities. In 2020, the Hong Kong environmental protection department (EPD) completed a feasibility study on managing construction noise, including those associated with the renovation of domestic premises. Part of the study was the review of management and control of construction noise in other metropolitan cities globally. As far as the authors are aware of, such worldwide and extensive review of best practices on construction noise control has not been conducted for over 20 years. In order to benefit from international best practices, the extensive review is to identify possible areas for improvement in Hong Kong. The consultant of the study first referred to the United Nations Report ‘The World’s Cities in 2016’ and examined the top 100 cities therein. The 20 most suitable cities were then chosen for further review. Upon screening of each of these 20 cities, 12 cities with the more relevant management practices were selected for further scrutiny. These 12 cities were: Asia – Tokyo, Seoul, Taipei, Guangzhou, Singapore; Europe – City of Westminster (London), Berlin; North America – Toronto, New York City, San Francisco; Oceania – Sydney, Melbourne. Afterwards, three cities, namely Sydney, City of Westminster, and New York City, were selected for in-depth review. These cities were chosen primarily because of the maturity, success, and effectiveness of their construction noise management and control measures, as well as their similarity to Hong Kong in key and selected aspects. One of the more important findings of the review is the usefulness of early focus, with the aim of designing the noise issues away wherever practicable. The consultant examined the similar yet different construction noise early focus mechanisms of the three cities. This paper describes this landmark worldwide and extensive review of international best practices on construction noise management and control. The methodology, approach, and key findings are presented to give readers a succinct yet comprehensive view. The authors shared the findings with the acoustics professionals worldwide with the hope of global advancement of more mature construction noise management while welcoming sustainable development and construction.Keywords: construction noise, international best practices, noise control, noise management
Procedia PDF Downloads 1377447 An Alternative to Resolve Land use Conflicts: the Rétköz Lake Project
Authors: Balázs Kulcsár
Abstract:
Today, there is no part of the world that does not bear the mark of man in some way. This process seems unstoppable. So perhaps the best thing we can do is to touch that handprint gently and with the utmost care. There are multiple uses for the same piece of land, the coordination of which requires careful and sustainable spatial planning. The case study of the Rétközlake in north-eastern Hungary illustrates a habitat rehabilitation project in which a number of human uses were coordinated with the conservation and restoration of the natural environment. Today, the good condition of the habitat can only be maintained artificially, but the project has paid particular attention to finding a sustainable solution. The rehabilitation of Lake Rétköz is considered good practice in resolving land-use conflicts.Keywords: sustainability, ecosystem service, land use conflict, landscape utilization
Procedia PDF Downloads 1697446 Possibilities of Output Technology the Project ADAPTIV for Use in Infrared Camouflage
Authors: Jiří Barta, Teodor Baláž, Tomáš Ludík, Jiří. F. Urbánek
Abstract:
This article deals with the outputs of project acronym ADAPTIV of Czech Defence Research Project. This Project solved tends to adaptive camouflage. The camouflage is concealment by means of disguise. Perceptive interface between recipient and camouflaged object is visualized by means of textile modular screens. Screens special light semi-permeability enables front/ back projection with nearly identical light parameters. Information permeability, towards illusion creation, must be controlled by the camouflage provider by means sophisticated and mastered illusion with perfect scenarios. The project ADAPTIV was primarily funded with the maximum possible use of COTS (Commercial-Off-The-Shelf) principle asks special definition of feasibility conditions, especially recipient space position. This paper deals with uses the ADAPTIV output with name DATAsam with modification for infrared camouflage. It is focused on active camouflage in infrared spectrum of emissivity at <8;14> μm for laboratory conditions. The main chapter provides basic experiments and testing physical properties needed for camouflage in infrared environment. The evaluation experiments revealed the possibility of use case in various types of camouflage.Keywords: camouflage, ADAPTIV, infrared camouflage, computer-aided, COTS
Procedia PDF Downloads 4187445 Qualitative Evaluation of the Morris Collection Conservation Project at the Sainsbury Centre of Visual Arts in the Context of Agile, Lean and Hybrid Project Management Approaches
Authors: Maria Ledinskaya
Abstract:
This paper examines the Morris Collection Conservation Project at the Sainsbury Centre for Visual Arts in the context of Agile, Lean, and Hybrid project management. It is part case study and part literature review. To date, relatively little has been written about non-traditional project management approaches in heritage conservation. This paper seeks to introduce Agile, Lean, and Hybrid project management concepts from business, software development, and manufacturing fields to museum conservation, by referencing their practical application on a recent museum-based conservation project. The Morris Collection Conservation Project was carried out in 2019-2021 in Norwich, UK, and concerned the remedial conservation of around 150 Abstract Constructivist artworks bequeathed to the Sainsbury Centre for Visual Arts by private collectors Michael and Joyce Morris. The first part introduces the chronological timeline and key elements of the project. It describes a medium-size conservation project of moderate complexity, which was planned and delivered in an environment with multiple known unknowns – unresearched collection, unknown condition and materials, unconfirmed budget. The project was also impacted by the unknown unknowns of the COVID-19 pandemic, such as indeterminate lockdowns, and the need to accommodate social distancing and remote communications. The author, a staff conservator at the Sainsbury Centre who acted as project manager on the Morris Collection Conservation Project, presents an incremental, iterative, and value-based approach to managing a conservation project in an uncertain environment. Subsequent sections examine the project from the point of view of Traditional, Agile, Lean, and Hybrid project management. The author argues that most academic writing on project management in conservation has focussed on a Traditional plan-driven approach – also known as Waterfall project management – which has significant drawbacks in today’s museum environment, due to its over-reliance on prediction-based planning and its low tolerance to change. In the last 20 years, alternative Agile, Lean and Hybrid approaches to project management have been widely adopted in software development, manufacturing, and other industries, although their recognition in the museum sector has been slow. Using examples from the Morris Collection Conservation Project, the author introduces key principles and tools of Agile, Lean, and Hybrid project management and presents a series of arguments on the effectiveness of these alternative methodologies in museum conservation, as well as the ethical and practical challenges to their implementation. These project management approaches are discussed in the context of consequentialist, relativist, and utilitarian developments in contemporary conservation ethics, particularly with respect to change management, bespoke ethics, shared decision-making, and value-based cost-benefit conservation strategy. The author concludes that the Morris Collection Conservation Project had multiple Agile and Lean features which were instrumental to the successful delivery of the project. These key features are identified as distributed decision making, a co-located cross-disciplinary team, servant leadership, focus on value-added work, flexible planning done in shorter sprint cycles, light documentation, and emphasis on reducing procedural, financial, and logistical waste. Overall, the author’s findings point largely in favour of a Hybrid model which combines traditional and alternative project processes and tools to suit the specific needs of the project.Keywords: project management, conservation, waterfall, agile, lean, hybrid
Procedia PDF Downloads 1007444 Envisioning Process in Medium Enterprises: An Exploratory Study of Cambodian Living Arts
Authors: Alexandre Bédard, Caroline Coulombe, Jonathan Harvey
Abstract:
Envisioning process (EP) in medium enterprises is treated equally in very small enterprises. Building on the concept of social construction, this study aims to explore how envisioning is constructed in a medium enterprise in which stakeholders are involved and how it is influenced. We use a unique case method based on qualitative data collected through 11 interviews representing various members of the organization. Through the discussion of the findings, we were able to confirm the social construction of the EP and to identify three main stakeholders responsible for the construction of the vision, mainly political and social powers, actors of the organization, and financial providers. Moreover, EP is influenced by external factors; in this case, the history of the organization and the value and importance of the art and the culture for Cambodians.Keywords: envisioning process, social constructivism, medium enterprise, legitimacy
Procedia PDF Downloads 1217443 Stress and Coping Strategies: A Correlational Analysis to Profiling Maladaptive Behaviors at Work
Authors: Silvia Riva, Ezekiel Chinyio
Abstract:
Introduction: Workers in different sectors are prone to stress at varying levels. They also respond to stress in different ways. An inspiration was to study stress development amongst workers in a work dangerous setting (Construction Industry) as well as how they cope with specific stress incidences. Objective: The overarching objective of the study was to study and correlate between stress and coping strategies. The research was conducted in an organizational industrial setting, and its findings on the coping actions of construction workers are reported in this article. Methods: An online cross-sectional survey was conducted with 80 participants aged 18-62. These were working for three different construction organizations in the West Midland region of the UK. Their coping actions were assessed using the COPE Inventory (Carver, 2013) instrument while the level of stress was assessed by the Perceived Stress Scale (Cohen, 1994). Results: Out of 80 workers (20 female, 25%, mean age 40.66), positive reinterpretation (M=4.15, SD=2.60) and active coping (M=4.18, SD=2.55) were the two most adaptive strategies reported by the workers while the most frequent maladaptive behavior was mental disengagement (M=3.62, SD=2.25). Among the maladaptive tactics, alcohol and drug abuse was a significant moderator in stress reactions (t=6.12, p=.000). Conclusion: Some maladaptive strategies are adopted by construction workers to cope with stress. So, it could be argued that programs of stress prevention and control in the construction industry have a basis to develop solutions that can improve and strengthen effective interventions when workers are stressed or getting stressed.Keywords: coping, organization, strategies, stress
Procedia PDF Downloads 2187442 An Assessment of Suitable Alternative Public Transport System in Mid-Sized City of India
Authors: Sanjeev Sinha, Samir Saurav
Abstract:
The rapid growth of urban areas in India has led to transportation challenges like traffic congestion and an increase in accidents. Despite efforts by state governments and local administrations to improve urban transport, the surge in private vehicles has worsened the situation. Patna, located in Bihar State, is an example of the trend of increasing reliance on private motor vehicles, resulting in vehicular congestion and emissions. The existing transportation infrastructure is inadequate to meet future travel demands, and there has been a notable increase in the share of private vehicles in the city. Additionally, there has been a surge in economic activities in the region, which has increased the demand for improved travel convenience and connectivity. To address these challenges, a study was conducted to assess the most suitable transit mode for the proposed transit corridor outlined in the Comprehensive Mobility Plan (CMP) for Patna. The study covered four stages: developing screening criteria, evaluating parameters for various alternatives, qualitative and quantitative evaluations of alternatives, and implementation options for the most viable alternative. The study suggests that a mass transit system such as a metro rail is necessary to enhance Patna's urban public transport system. The New Metro Policy 2017 outlines specific prerequisites for submitting a Metro Rail Project Proposal to the Ministry of Housing and Urban Affairs (MoHUA), including the preparation of a CMP, the formation of an Urban Metropolitan Transport Authority (UMTA), the creation of an Alternative Analysis Report, the development of a Detailed Project Report, a Multi-Modal Integration Plan, and a Transit-Oriented Development (TOD) Plan. In 2018, the Comprehensive Mobility Plan for Patna was prepared, setting the stage for the subsequent steps in the metro rail project proposal. The results indicated that from the screening and analysis of qualitative parameters for different alternative modes in Patna, it is inferred that the Metro Rail and Monorail score 82.25 and 70.50, respectively, on a scale of 100. Based on the initial analysis and alternative evaluation in the form of quantitative analysis, the Metro Rail System significantly outperformed the Monorail system. The Metro Rail System has a positive Economic Net Present Value (ENPV) at a 14% internal rate of return, while the Monorail has a negative value. In conclusion, the study recommends choosing metro rail over monorail for the proposed transit corridor in Patna. However, the lack of broad-based technical expertise may result in implementation delays and increased costs for monorail.Keywords: comprehensive mobility plan, alternative analysis, mobility corridors, mass transit system
Procedia PDF Downloads 1247441 Recovery of the Demolition and Construction Waste, Casablanca (Morocco)
Authors: Morsli Mourad, Tahiri Mohamed, Samdi Azzeddine
Abstract:
Casablanca is the biggest city in Morocco. It concentrates more than 60% of the economic and industrial activity of the kingdom. Its building and public works (BTP) sector is the leading source of inert waste scattered in open areas. This inert waste is a major challenge for the city of Casablanca, as it is not properly managed, thus causing a significant nuisance for the environment and the health of the population. Hence the vision of our project is to recycle and valorize concrete waste. In this work, we present concrete results in the exploitation of this abundant and permanent deposit. Typical wastes are concrete, clay and concrete bricks, ceramic tiles, marble panels, gypsum, scrap metal, wood . The work performed included: geolocation with a combination of artificial intelligence and Google Earth, estimation of the amount of waste per site, sorting, crushing, grinding, and physicochemical characterization of the samples. Then, we proceeded to the exploitation of the types of substrates to be developed: light cement, coating, and glue for ceramics... The said products were tested and characterized by X-ray fluorescence, specific surface, resistance to bending and crushing, etc. We will present in detail the main results of our research work and also describe the specific properties of each material developed.Keywords: déchets de démolition et des chantiers de construction, logiciels de combinaison SIG, valorisation de déchets inertes, enduits, ciment leger, casablanca
Procedia PDF Downloads 1157440 A Techno-Economic Simulation Model to Reveal the Relevance of Construction Process Impact Factors for External Thermal Insulation Composite System (ETICS)
Authors: Virgo Sulakatko
Abstract:
The reduction of energy consumption of the built environment has been one of the topics tackled by European Commission during the last decade. Increased energy efficiency requirements have increased the renovation rate of apartment buildings covered with External Thermal Insulation Composite System (ETICS). Due to fast and optimized application process, a large extent of quality assurance is depending on the specific activities of artisans and are often not controlled. The on-site degradation factors (DF) have the technical influence to the façade and cause future costs to the owner. Besides the thermal conductivity, the building envelope needs to ensure the mechanical resistance and stability, fire-, noise-, corrosion and weather protection, and long-term durability. As the shortcomings of the construction phase become problematic after some years, the common value of the renovation is reduced. Previous work on the subject has identified and rated the relevance of DF to the technical requirements and developed a method to reveal the economic value of repair works. The future costs can be traded off to increased the quality assurance during the construction process. The proposed framework is describing the joint simulation of the technical importance and economic value of the on-site DFs of ETICS. The model is providing new knowledge to improve the resource allocation during the construction process by enabling to identify and diminish the most relevant degradation factors and increase economic value to the owner.Keywords: ETICS, construction technology, construction management, life cycle costing
Procedia PDF Downloads 4197439 The Analysis of New Town Hillside Development Pattern Guided by Low-Intensity Damage
Authors: Shan Zhou, Wenju Li, Kehui Chai
Abstract:
Along with economic globalization, marketization and regional development, strengthen planning and construction of the New Town, which is always the main way to optimize the structure and function of metropolitan spatial configuration. But, the new town is often of high-intensity development, bringing a series of natural, ecological and environmental issues, so it is difficult to achieve sustainable development. In this paper, taking the administrative center of Jiangping in Dongxing as an example. It is analyzed from the following three aspects:Vertical design of road traffic,Space layout of mountain buildings,and the design of landscape. The purpose is to elaborate the hillside design methods guided by low-intensity damage, and explore the guiding significance of sustainable development of the hillside construction in the future.Keywords: low-intensity damage, new town construction,hillside,sustainable development, natural, ecology
Procedia PDF Downloads 4737438 An Exploratory Study to Appraise the Current Challenges and Limitations Faced in Applying and Integrating the Historic Building Information Modelling Concept for the Management of Historic Buildings
Authors: Oluwatosin Adewale
Abstract:
The sustainability of built heritage has become a relevant issue in recent years due to the social and economic values associated with these buildings. Heritage buildings provide a means for human perception of culture and represent a legacy of long-existing history; they define the local character of the social world and provide a vital connection to the past with their associated aesthetical and communal benefits. The identified values of heritage buildings have increased the importance of conservation and the lifecycle management of these buildings. The recent developments of digital design technology in engineering and the built environment have led to the adoption of Building Information Modelling (BIM) by the Architecture, Engineering, Construction, and Operations (AECO) industry. BIM provides a platform for the lifecycle management of a construction project through effective collaboration among stakeholders and the analysis of a digital information model. This growth in digital design technology has also made its way into the field of architectural heritage management in the form of Historic Building Information Modelling (HBIM). A reverse engineering process for digital documentation of heritage assets that draws upon similar information management processes as the BIM process. However, despite the several scientific and technical contributions made to the development of the HBIM process, it doesn't remain easy to integrate at the most practical level of heritage asset management. The main objective identified under the scope of the study is to review the limitations and challenges faced by heritage management professionals in adopting an HBIM-based asset management procedure for historic building projects. This paper uses an exploratory study in the form of semi-structured interviews to investigate the research problem. A purposive sample of heritage industry experts and professionals were selected to take part in a semi-structured interview to appraise some of the limitations and challenges they have faced with the integration of HBIM into their project workflows. The findings from this study will present the challenges and limitations faced in applying and integrating the HBIM concept for the management of historic buildings.Keywords: building information modelling, built heritage, heritage asset management, historic building information modelling, lifecycle management
Procedia PDF Downloads 1027437 Numerical Simulation for a Shallow Braced Excavation of Campus Building
Authors: Sao-Jeng Chao, Wen-Cheng Chen, Wei-Humg Lu
Abstract:
In order to prevent encountering unpredictable factors, geotechnical engineers always conduct numerical analysis for braced excavation design. Simulation work in advance can predict the response of subsequent excavation and thus will be designed to increase the security coefficient of construction. The parameters that are considered include geological conditions, soil properties, soil distributions, loading types, and the analysis and design methods. National Ilan University is located on the LanYang plain, mainly deposited by clayey soil and loose sand, and thus is vulnerable to external influence displacement. National Ilan University experienced a construction of braced excavation with a complete program of monitoring excavation. This study takes advantage of a one-dimensional finite element method RIDO to simulate the excavation process. The predicted results from numerical simulation analysis are compared with the monitored results of construction to explore the differences between them. Numerical simulation analysis of the excavation process can be used to analyze retaining structures for the purpose of understanding the relationship between the displacement and supporting system. The resulting deformation and stress distribution from the braced excavation cab then be understand in advance. The problems can be prevented prior to the construction process, and thus acquire all the affected important factors during design and construction.Keywords: excavation, numerical simulation, RIDO, retaining structure
Procedia PDF Downloads 2637436 Impact of the Currency Devaluation on Contractors in Egypt
Authors: Mariam Zahwy, Waleed El Nemr, A. Samer Ezeldin
Abstract:
In 2016, the depreciation of the Egyptian pound (EGP) had a substantial impact on Egypt's construction industry. Studies assessing this influence are scarce, though. The impact of devaluation on contractors is measured in this study using empirical data. The difficulties contractors have as a result of rising import material costs, limited financing alternatives, and inflationary pressures are also determined by analyzing survey responses from contractors and industry experts. The approaches contractors utilize to lessen the impact of devaluation are also examined in the research. The survey results show how currency depreciation directly affects contractors in the Egyptian construction industry in terms of financial consequences. Inflationary pressures, fewer financing alternatives, and rising expenses have all affected contractors. To minimize losses, contractors have, nonetheless, put a number of tactics into practice. These findings highlight the importance of understanding and managing the impact of devaluation on the construction industry to ensure its resilience and development.Keywords: construction, devaluation, contractors, material costs, inflationary pressures, empirical data, quantitative research
Procedia PDF Downloads 257435 Trans-Boundary Water Disputes between India and Bangladesh and the Policy Responses
Authors: Aditaya Narayan Mishra
Abstract:
Unequal distribution of environmental resources as a possible cause of conflict has been the topic of substantial research, and these connections have ruled the post-Cold War attention in the discourse of environmental security. In this category, considerable concentration has been given to water resources, on account of their important standing for human existence. Thus, water is considered to be one of the most important non-conventional security issues. As per this consideration, the case of India-Bangladesh is one of the most critical examples of disputes over transboundary water sharing. The concern regarding sharing of trans-boundary rivers has been the main focus of Bangladesh and India‘s relationship for the last forty-five years. Both countries share fifty-four rivers, most of which have originated in the Himalayan range. The main causes for problems in the sharing of the waters of trans-boundary rivers between India and Bangladesh include the: Farakka Barrage, Teesta river sharing issue, River linking project and Tipaimukh Dam. The construction of Farakka barrage across the Ganga River was the beginning of water dispute. Attempts at unilateral exploitation of the trans-boundary water resources led to inter-state conflicts that spilled over into other areas of bilateral disputes between India and Bangladesh. Apart from Farakka, Barrage, the disputes over Teesta River sharing, River linking project and Tipaimukh Dam are also vital contents for the both countries bilateral diplomacy. Till date, India and Bangladesh have signed five treaties regarding water sharing. However, all these treaties have been rendered worthless due to mistrust and political upheaval in both countries. The current paper would address all these water sharing disputes between India and Bangladesh with focus on the various policy responses (both bilateral and multilateral initiatives) to deal with these water sharing disputes. It will try to analyze the previous agreements and their drawbacks and loopholes. In addition, it will mention the reasons for water sharing cooperation between India and Bangladesh.Keywords: India and Bangladesh relations, water disputes, Teesta, river linking project, Tipaimukh Dam, Farakka, policy responses
Procedia PDF Downloads 2347434 Strategy in Practice: Strategy Development, Strategic Error and Project Delivery
Authors: Nipun Agarwal, David Paul, Fareed Un Din
Abstract:
Strategy development and implementation is the key to an organization’s success in today’s competitive marketplace. Many organizations develop excellent strategy but are unable to implement this strategy in order to succeed. The difference between strategic goals and its implementation is called strategic error. Strategic error occurs when an organization does not have structures in place to implement their strategy. Strategy implementation happens through projects and having a project management method that provides certainty and agility will help an organization become more competitive in implementing strategy. Numerous project management methods exist in theory and practice. However, projects mainly used the Waterfall method in the past that provides certainty in terms of budget, delivery date and resourcing. It is common practice now to utilise Agile based methods. However, Agile based methods do not provide specific deadlines and budgets. But provide agility in product design and project delivery, which is useful to companies. Both Waterfall and Agile methods in some forms are the opposites of each other. Executive management prefer agility in delivery projects as the competitive landscape changes frequently. However, they also appreciate certainty in the projects being able to quantify budgets, deadlines and resources that is harder for an Agile based method to provide. This paper attempts to develop a hybrid project management method that attempts to merge these Waterfall and Agile methods to provide the positives from both these approaches.Keywords: strategy, project management, strategy implementation, agile
Procedia PDF Downloads 1187433 Digital Architectural Practice as a Challenge for Digital Architectural Technology Elements in the Era of Digital Design
Authors: Ling Liyun
Abstract:
In the field of contemporary architecture, complex forms of architectural works continue to emerge in the world, along with some new terminology emerged: digital architecture, parametric design, algorithm generation, building information modeling, CNC construction and so on. Architects gradually mastered the new skills of mathematical logic in the form of exploration, virtual simulation, and the entire design and coordination in the construction process. Digital construction technology has a greater degree in controlling construction, and ensure its accuracy, creating a series of new construction techniques. As a result, the use of digital technology is an improvement and expansion of the practice of digital architecture design revolution. We worked by reading and analyzing information about the digital architecture development process, a large number of cases, as well as architectural design and construction as a whole process. Thus current developments were introduced and discussed in our paper, such as architectural discourse, design theory, digital design models and techniques, material selecting, as well as artificial intelligence space design. Our paper also pays attention to the representative three cases of digital design and construction experiment at great length in detail to expound high-informatization, high-reliability intelligence, and high-technique in constructing a humane space to cope with the rapid development of urbanization. We concluded that the opportunities and challenges of the shift existed in architectural paradigms, such as the cooperation methods, theories, models, technologies and techniques which were currently employed in digital design research and digital praxis. We also find out that the innovative use of space can gradually change the way people learn, talk, and control information. The past two decades, digital technology radically breaks the technology constraints of industrial technical products, digests the publicity on a particular architectural style (era doctrine). People should not adapt to the machine, but in turn, it’s better to make the machine work for users.Keywords: artificial intelligence, collaboration, digital architecture, digital design theory, material selection, space construction
Procedia PDF Downloads 1367432 Teaching Timber: The Role of the Architectural Student and Studio Course within an Interdisciplinary Research Project
Authors: Catherine Sunter, Marius Nygaard, Lars Hamran, Børre Skodvin, Ute Groba
Abstract:
Globally, the construction and operation of buildings contribute up to 30% of annual green house gas emissions. In addition, the building sector is responsible for approximately a third of global waste. In this context, the utilization of renewable resources in buildings, especially materials that store carbon, will play a significant role in the growing city. These are two reasons for introducing wood as a building material with a growing relevance. A third is the potential economic value in countries with a forest industry that is not currently used to capacity. In 2013, a four-year interdisciplinary research project titled “Wood Be Better” was created, with the principle goal to produce and publicise knowledge that would facilitate increased use of wood in buildings in urban areas. The research team consisted of architects, engineers, wood technologists and mycologists, both from research institutions and industrial organisations. Five structured work packages were included in the initial research proposal. Work package 2 was titled “Design-based research” and proposed using architecture master courses as laboratories for systematic architectural exploration. The aim was twofold: to provide students with an interdisciplinary team of experts from consultancies and producers, as well as teachers and researchers, that could offer the latest information on wood technologies; whilst at the same time having the studio course test the effects of the use of wood on the functional, technical and tectonic quality within different architectural projects on an urban scale, providing results that could be fed back into the research material. The aim of this article is to examine the successes and failures of this pedagogical approach in an architecture school, as well as the opportunities for greater integration between academic research projects, industry experts and studio courses in the future. This will be done through a set of qualitative interviews with researchers, teaching staff and students of the studio courses held each semester since spring 2013. These will investigate the value of the various experts of the course; the different themes of each course; the response to the urban scale, architectural form and construction detail; the effect of working with the goals of a research project; and the value of the studio projects to the research. In addition, six sample projects will be presented as case studies. These will show how the projects related to the research and could be collected and further analysed, innovative solutions that were developed during the course, different architectural expressions that were enabled by timber, and how projects were used as an interdisciplinary testing ground for integrated architectural and engineering solutions between the participating institutions. The conclusion will reflect on the original intentions of the studio courses, the opportunities and challenges faced by students, researchers and teachers, the educational implications, and on the transparent and inclusive discourse between the architectural researcher, the architecture student and the interdisciplinary experts.Keywords: architecture, interdisciplinary, research, studio, students, wood
Procedia PDF Downloads 3127431 Possible Number of Dwelling Units Using Waste Plastic Bottle for Construction
Authors: Dibya Jivan Pati, Kazuhisa Iki, Riken Homma
Abstract:
Unlike other metro cities of India, Bhubaneswar–the capital city of Odisha, is expected to reach 1-million-mark population by now. The demands of dwelling unit requirement mostly among urban poor belonging to Economically Weaker section (EWS) and Low Income groups (LIG) is becoming a challenge due to high housing cost and rents. As a matter of fact, it’s also noted that, with increase in population, the solid waste generation also increases subsequently affecting the environment due to inefficiency in collection of waste by local government bodies. Methods of utilizing Solid Waste - especially in form of Plastic bottles, Glass bottles and Metal cans (PGM) are now widely used as an alternative material for construction of low-cost building by Non-Government Organizations (NGOs) in developing countries like India to help the urban poor afford a shelter. The application of disposed plastic bottle used in construction of single dwelling significantly reduces the overall cost of construction to as much as 14% compared to traditional construction material. Therefore, considering its cost-benefit result, it’s possible to provide housing to EWS and LIGs at an affordable price. In this paper, we estimated the quantity of plastic bottles generated in Bhubaneswar which further helped to estimate the possible number of single dwelling unit that can be constructed on yearly basis so as to refrain from further housing shortage. The estimation results will be practically used for planning and managing low-cost housing business by local government and NGOs.Keywords: construction, dwelling unit, plastic bottle, solid waste generation, groups
Procedia PDF Downloads 4757430 Hybrid Stainless Steel Girder for Bridge Construction
Authors: Tetsuya Yabuki, Yasunori Arizumi, Tetsuhiro Shimozato, Samy Guezouli, Hiroaki Matsusita, Masayuki Tai
Abstract:
The main object of this paper is to present the research results of the development of a hybrid stainless steel girder system for bridge construction undertaken at University of Ryukyu. In order to prevent the corrosion damage and reduce the fabrication costs, a hybrid stainless steel girder in bridge construction is developed, the stainless steel girder of which is stiffened and braced by structural carbon steel materials. It is verified analytically and experimentally that the ultimate strength of the hybrid stainless steel girder is equal to or greater than that of conventional carbon steel girder. The benefit of the life-cycle cost of the hybrid stainless steel girder is also shown.Keywords: smart structure, hybrid stainless steel members, ultimate strength, steel bridge, corrosion prevention
Procedia PDF Downloads 3797429 The Development Practice and SystemConstruction of Low- Carbon City in China
Authors: Xu Xiao China, Xu Lei China
Abstract:
After the 1990s, the concept of urban sustainable development has been increasing attention in urban planning and urban design. High carbon city, not a sustainable city construction model, has become an important problem which restricts the sustainable development of the city. Therefore, low-carbon city construction is the urgent need to solve the problem, and China is one of the core areas of low-carbon city construction in the world. The research work of low-carbon cities were participated by the Chinese government and academic institutes on theory and practice since 2007, and nowadays it comes to a practice stage with six low-carbon pilot provinces and 36 low-carbon pilot cities identified. To achieve the low-carbon target, developing low-carbon energy, adopting non-pollution technique, constructing green buildings and adopting ecolife-style are suggest by the government. Meanwhile, besides a new standard system and a new eco-environmental status evaluation method, the government also established the Chinese urban development institute including the Low-Carbon City Group. Finally, we want to transform the modern industrial civilization into an ecological civilization and realize sustainable urban development.Keywords: low-carbon city, China, development practice, system construction, urban sustainability
Procedia PDF Downloads 5297428 A Fuzzy Structural Equation Model for Development of a Safety Performance Index Assessment Tool in Construction Sites
Authors: Murat Gunduz, Mustafa Ozdemir
Abstract:
In this research, a framework is to be proposed to model the safety performance in construction sites. Determinants of safety performance are to be defined through extensive literature review and a multidimensional safety performance model is to be developed. In this context, a questionnaire is to be administered to construction companies with sites. The collected data through questionnaires including linguistic terms are then to be defuzzified to get concrete numbers by using fuzzy set theory which provides strong and significant instruments for the measurement of ambiguities and provides the opportunity to meaningfully represent concepts expressed in the natural language. The validity of the proposed safety performance model, relationships between determinants of safety performance are to be analyzed using the structural equation modeling (SEM) which is a highly strong multi variable analysis technique that makes possible the evaluation of latent structures. After validation of the model, a safety performance index assessment tool is to be proposed by the help of software. The proposed safety performance assessment tool will be based on the empirically validated theoretical model.Keywords: Fuzzy set theory, safety performance assessment, safety index, structural equation modeling (SEM), construction sites
Procedia PDF Downloads 5267427 Construction of Green Aggregates from Waste Processing
Authors: Fahad K. Alqahtani
Abstract:
Nowadays construction industry is developing means to incorporate waste products in concrete to ensure sustainability. To meet the need of construction industry, a synthetic aggregate was developed using optimized technique called compression moulding press technique. The manufactured aggregate comprises mixture of plastic, waste which acts as binder, together with by-product waste which acts as fillers. The physical properties and microstructures of the inert materials and the manufactured aggregate were examined and compared with the conventional available aggregates. The outcomes suggest that the developed aggregate has potential to be used as substitution of conventional aggregate due to its less weight and water absorption. The microstructure analysis confirmed the efficiency of the manufacturing process where the final product has the same mixture of binder and filler.Keywords: fly ash, plastic waste, quarry fine, red sand, synthetic aggregate
Procedia PDF Downloads 2327426 Analyzing Software Testing Phase in Agile Project Management: The Case of Jordan
Authors: Ghaleb Y. Abbasi, Satanay Alhiary
Abstract:
This paper focused on software testing phase of activities, types, techniques, teams and methods under agile project management (APM) in the Jordanian software industry. The effect of using agile principles and practices on testing process in software development life cycle (SDLC) was analyzed in order to create full view of the agile testing aspects such as phases, levels, types, methods, team and customers. Qualitative and quantitative research methods were utilized to cover earlier literature and collect data via web survey and short interviews in Jordanian software companies. Results indicated that agile testing had positive influence on quality of product, team performance, and customer satisfaction with a rate above 80%. APM is a powerful practice of moving software project forward in current markets with a rate above 51% by early involvement of testing activities in development.Keywords: agile project management, software development life cycle, agile methods, agile testing, software testing
Procedia PDF Downloads 4567425 Integration of Entrepreneurial Mindset Learning in Green Chemistry and Processes Course
Authors: Tsvetanka Filipova
Abstract:
Entrepreneurial mindset learning (EML) is the combined process of instilling curiosity and invention, developing insight and value creation while building on other active pedagogy, such as project-based learning (PBL). It is essential to introduce students to chemistry and chemical engineering entrepreneurship in a manner that gives a holistic approach by first educating students on diverse entrepreneurial skills and then providing an opportunity to build their innovation. Chemistry and chemical engineering students have an opportunity to be engaged in an entrepreneurial class project in the Green Chemistry and Processes course at South Dakota Mines. The course provides future chemists and chemical engineers with the knowledge and skills required to enable them to design materials and processes in an environmentally benign way. This paper presents findings from implementing an open-ended design project in the Green Chemistry and Processes course. The goal of this team project is to have student teams design sustainable polymer materials to fulfill a need and/or opportunity related to a fictitious aerospace company that satisfies technical, safety, environmental, regulatory, economic, and social needs. Each student team is considered a start-up company charged with the task of designing sustainable polymer materials for aerospace applications. Through their work on the project, students utilize systems and entrepreneurial thinking in selecting their design project, being aware of the existent technologies (literature and patent search) and users and clients (connections), determining the goals and motivations (creating value), and what need or problem they are trying to address (curiosity). The project draws systems boundaries by focusing on student exploration of feedstocks to end-of-life of polymeric materials and products. Additional subtopics to explore are green processes for syntheses, green engineering for process design, and the economics of sustainable polymers designed for circularity. Project deliverables are team project reports and project presentations to a panel of industry, chemistry, and engineering professionals. Project deliverables are team project reports and project presentations to a panel of industry, chemistry, and engineering professionals. The impact of the entrepreneurial mindset project is evaluated through a student survey at the end of the semester. It has been found that the Innovative Solution project was excellent in promoting student curiosity, creativity, critical and systems thinking and teamwork. The results of this study suggest that incorporating EML positively impacted students’ professional skill development, their ability to understand and appreciate the socio-technical context of chemistry and engineering, and the cultivation of an entrepreneurial mindset to discover, evaluate and exploit opportunities.Keywords: curriculum, entrepreneurial mindset learning, green chemistry and engineering, systems thinking
Procedia PDF Downloads 177424 Factors Affecting Contractual Disputes in Construction ProJects in Sri Lanka
Authors: R. M. Rajapaksa
Abstract:
Construction industry is one of the key players in driving the economy of a country to achieve its prosperity. However, a dispute is one of the crucial factors which prevent the completion of construction contracts within the budgeted cost, scheduled time, and accepted quality. Disputes are inevitable in the construction contract. Accordingly, a study has been undertaken to identify the factors affecting contractual disputes in construction projects in Sri Lanka. The study was a mixed approach with major qualitative and minor quantitative. Qualitative study was set in the form of in-depth interviews with eighteen participants, and quantitative study was conducted using a questionnaire with twenty-four respondents from previously implemented projects by the National Water Supply & Drainage Board representing the employer, engineer and the Contractor to identify the factors affecting contractual disputes and to verify most critical factors respectively. Data analysis for qualitative and quantitative studies was carried out by means of transcribing, code & categorizeand average score methods, respectively. The study reveals that there are forty factors affecting the contractual disputes in construction contracts in Sri Lanka. The finding further illustrates that conflicting decisions by inexperience personnel in the higher position of the Employer, ambiguities resulting inadequate descriptions of the preliminary/general items in price schedule, unfair valuation and late confirmation of variations, unfair determination due to lack of experience of the Engineer/Consultant, under certification of progress payments, unfair grant of EOT & application of delay damages, unreasonable claims for variation of works, errors/discrepancies/ambiguities in the contract conditions and discrepancies & errors in designs & specifications are the most critical factors affecting contractual disputes. Finally, the study proposed remedial measures to most critical factors affecting contractual disputes.Keywords: dispute, contractual, factors, employer, engineer, contractor, construction projects
Procedia PDF Downloads 2187423 Post-occupancy Evaluation of Greenway Based on Multi-source data : A Case Study of Jincheng Greenway in Chengdu
Authors: Qin Zhu
Abstract:
Under the development concept of Park City, Tianfu Greenway system, as the basic and pre-configuration element of Chengdu Global Park construction, connects urban open space with linear and circular structures and undertakes and exerts the ecological, cultural and recreational functions of the park system. Chengdu greenway construction is in full swing. In the process of greenway planning and construction, the landscape effect of greenway on urban quality improvement is more valued, and the long-term impact of crowd experience on the sustainable development of greenway is often ignored. Therefore, it is very important to test the effectiveness of greenway construction from the perspective of users. Taking Jincheng Greenway in Chengdu as an example, this paper attempts to introduce multi-source data to construct a post-occupancy evaluation model of greenway and adopts behavior mapping method, questionnaire survey method, web text analysis and IPA analysis method to comprehensively evaluate the user 's behavior characteristics and satisfaction. According to the evaluation results, we can grasp the actual behavior rules and comprehensive needs of users so that the experience of building greenways can be fed back in time and provide guidance for the optimization and improvement of built greenways and the planning and construction of future greenways.Keywords: multi-source data, greenway, IPA analysis, post -occupancy evaluation (POE)
Procedia PDF Downloads 617422 Exploring the Implementation of Building Information Modelling Level 2 in the UK Construction Industry: The Case of Small and Medium-Sized Enterprises
Authors: Khaled Abu Awwad, Abdussalam Shibani, Michel Ghostin
Abstract:
In the last few years, building information modelling (BIM) has been acknowledged as a new technology capable of transforming the construction sector to a collaborated industry. The implementation of BIM in the United Kingdom (UK) construction sector has increased significantly in the last decade, particularly after the UK government mandated the use of BIM in all public projects by 2016. Despite this, there are many indicators that BIM implementation is the main concern for large companies, while small and medium-sized enterprises (SMEs) are lagging behind in adopting and implementing this new technology. This slow adoption of BIM leads to an uncompetitive disadvantage in public projects and possible private projects. On the other hand, there is limited research focusing on the implementation of BIM Level 2 within SMEs. Therefore, the aim of this study is to bridge this gap and provide a conceptual framework to aid SMEs in implementing BIM Level 2. This framework is a result of interpreting qualitative data obtained by conducting semi-structured interviews with BIM experts in the UK construction industry.Keywords: building information modelling, critical success factors, small and medium-sized enterprises, United Kingdom
Procedia PDF Downloads 2067421 Project Risk Assessment of the Mining Industry of Ghana
Authors: Charles Amoatey
Abstract:
The issue of risk in the mining industry is a global phenomenon and the Ghanaian mining industry is not exempted. The main purpose of this study is to identify the critical risk factors affecting the mining industry. The study takes an integrated view of the mining industry by examining the contribution of various risk factors to mining project failure in Ghana. A questionnaire survey was conducted to solicit the critical risk factors from key mining practitioners. About 80 respondents from 11 mining firms participated in the survey. The study identified 22 risk factors contributing to mining project failure in Ghana. The five most critical risk factors based on both probability of occurrence and impact were: (1) unstable commodity prices, (2) inflation/exchange rate, (3) land degradation, (4) high cost of living and (5) government bureaucracy for obtaining licenses. Furthermore, the study found that risk assessment in the mining sector has a direct link with mining project sustainability. Mitigation measures for addressing the identified risk factors were discussed. The key findings emphasize the need for a comprehensive risk management culture in the entire mining industry.Keywords: risk, assessment, mining, Ghana
Procedia PDF Downloads 454