Search results for: factors influencing project selection
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 17237

Search results for: factors influencing project selection

17177 Classification of Factors Influencing Buyer-Supplier Relationship: A Case Study from the Cement Industry

Authors: Alberto Piatto, Zaza Nadja Lee Hansen, Peter Jacobsen

Abstract:

This paper examines the quantitative and qualitative factors influencing the buyer-supplier relationship. Understanding and acting on the right factors influencing supplier relationship management is crucial when a company outsource an important part of its business as it can be for engineering to order (ETO) company executing only the designing part in-house. Acting on these factors increase the quality of the relationship obtaining for both parties what they want and expect from an improved relationship. Best practices in supplier relationship management are considered and a case study of a large global company, called Cement A/S, operating in the cement business is carried out. One study is conducted including a large international company and hundreds of its suppliers. Data from the company is collected using semi-structured interviews and data from the suppliers is collected using a survey. Based on these inputs and an extensive literature review a classification of factors influencing the relationship buyer-supplier is presented and discussed. The results show that different managers among the company are assessing supplier from various perspectives, a standard approach to measure the performance of suppliers does not exist. The factors used nowadays in the company to measure performances of the suppliers are mostly related to time and cost. Quality is a key factor, but it has not been addressed properly since no data are available in the system. From a practical perspective, managers can learn from this paper which factors to consider when applying best practices of Supplier Relationship Management. Furthermore, from a theoretical perspective, this paper contributes with new knowledge in the area as limited research in collaboration with the company has been conducted. For this reason, a company, its suppliers and few studies for this type of industry have been conducted. For further research, it is suggested to define the correlation of factors to the profitability of the company and calculate its impact. When conducting this analysis it is important to focus on the efficient and effective use of factors that can be measurable and accepted from the supplier.

Keywords: buyer-supplier relationship, cement industry, classification of factors, ETO

Procedia PDF Downloads 282
17176 The Successful in Construction Project via Effectiveness of Project Team

Authors: Zarabizan Zakaria, Hayati Zainal

Abstract:

The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.

Keywords: project team, leadership, construction project, project successful

Procedia PDF Downloads 177
17175 Influencing Factors to Mandatory versus Non-Mandatory E-Government Services Adoption in India: An Empirical Study

Authors: Rajiv Kumar, Amit Sachan, Arindam Mukherjee

Abstract:

Government agencies around the world, including India, are incorporating digital technologies and processes into their day-to-day operations to become more efficient. Despite low internet penetration (around 34.8% of total population) in India, Government of India has made some public services mandatory to access online (e.g. passport, tax filing).This is insisting citizens to access mandatory public services online. However, due to digital divide, all citizens do not have equal access to internet. In light of this, it is an interesting topic to explore how citizens are able to access mandatory online public services. It is important to understand how citizens are adopting these mandatory e-government services and how the adoption behavior of these mandatory e-government services is different or similar to adoption behavior of non-mandatory e-government services. The purpose of this research is to investigate the factors that influence adoption of mandatory and non-mandatory e-government services in India. A quantitative technique is employed in this study. A conceptual model has been proposed by integrating the influencing factors to adopt e-government services from previous studies. The proposed conceptual model highlights a comprehensive set of potential factors influencing the adoption of e-government services. The proposed model has been validated by keeping in view the local context of Indian society. Online and paper based survey was administered, collected data was analyzed and results have been discussed. A total of 463 valid responses were received and further the responses were analyzed. The research reveals that the influencing factors to adopt e-government services are not same for both mandatory and non-mandatory e-government services. There are some factors that influence adoption of both mandatory and non-mandatory e-government services but there are some which are relevant for either of mandatory and non-mandatory e-government services. The research findings may help government or concerned agencies in successfully implementing e-government services.

Keywords: adoption, e-government, India, mandatory, non-mandatory

Procedia PDF Downloads 318
17174 A Study to Understand the Factors Influencing the Behavioral Intentions of Individuals Towards Using Metaverse

Authors: Suktisuddha Goswami, Surekha Chukkali

Abstract:

Metaverse is a real time rendered 3D world which is an extension of the virtual reality, augmented reality, mixed reality, and holographic reality. While using the metaverse can enhance various aspects of our lives, it might also create certain challenges. However, since the concept of the metaverse is very new, there is a lack of research on factors influencing the individual’s behavioural intentions to use it. To address this gap, this quantitative research study was conducted to understand the factors influencing the behavioural intention of individuals towards metaverse usage. This research was conducted through a large-scale questionnaire survey of 325 Indian students at three major engineering colleges. The questionnaire was adequately customized for the present study. It was found that behavioral intention towards metaverse usage differs among individuals. There were few individuals who had no intention of using metaverse in near future, while some of them were already using it and a few were significantly inclined towards using it. The findings of this study have suggested that behavioural intention was significantly and positively related to performance expectancy and effort expectancy of individuals.

Keywords: behavioral intention, effort expectancy, performance expectancy, technology, metaverse

Procedia PDF Downloads 113
17173 Project Risk Assessment of the Mining Industry of Ghana

Authors: Charles Amoatey

Abstract:

The issue of risk in the mining industry is a global phenomenon and the Ghanaian mining industry is not exempted. The main purpose of this study is to identify the critical risk factors affecting the mining industry. The study takes an integrated view of the mining industry by examining the contribution of various risk factors to mining project failure in Ghana. A questionnaire survey was conducted to solicit the critical risk factors from key mining practitioners. About 80 respondents from 11 mining firms participated in the survey. The study identified 22 risk factors contributing to mining project failure in Ghana. The five most critical risk factors based on both probability of occurrence and impact were: (1) unstable commodity prices, (2) inflation/exchange rate, (3) land degradation, (4) high cost of living and (5) government bureaucracy for obtaining licenses. Furthermore, the study found that risk assessment in the mining sector has a direct link with mining project sustainability. Mitigation measures for addressing the identified risk factors were discussed. The key findings emphasize the need for a comprehensive risk management culture in the entire mining industry.

Keywords: risk, assessment, mining, Ghana

Procedia PDF Downloads 452
17172 Optimization of Personnel Selection Problems via Unconstrained Geometric Programming

Authors: Vildan Kistik, Tuncay Can

Abstract:

From a business perspective, cost and profit are two key factors for businesses. The intent of most businesses is to minimize the cost to maximize or equalize the profit, so as to provide the greatest benefit to itself. However, the physical system is very complicated because of technological constructions, rapid increase of competitive environments and similar factors. In such a system it is not easy to maximize profits or to minimize costs. Businesses must decide on the competence and competence of the personnel to be recruited, taking into consideration many criteria in selecting personnel. There are many criteria to determine the competence and competence of a staff member. Factors such as the level of education, experience, psychological and sociological position, and human relationships that exist in the field are just some of the important factors in selecting a staff for a firm. Personnel selection is a very important and costly process in terms of businesses in today's competitive market. Although there are many mathematical methods developed for the selection of personnel, unfortunately the use of these mathematical methods is rarely encountered in real life. In this study, unlike other methods, an exponential programming model was established based on the possibilities of failing in case the selected personnel was started to work. With the necessary transformations, the problem has been transformed into unconstrained Geometrical Programming problem and personnel selection problem is approached with geometric programming technique. Personnel selection scenarios for a classroom were established with the help of normal distribution and optimum solutions were obtained. In the most appropriate solutions, the personnel selection process for the classroom has been achieved with minimum cost.

Keywords: geometric programming, personnel selection, non-linear programming, operations research

Procedia PDF Downloads 269
17171 Analysis of the Interference from Risk-Determining Factors of Cooperative and Conventional Construction Contracts

Authors: E. Harrer, M. Mauerhofer, T. Werginz

Abstract:

As a result of intensive competition, the building sector is suffering from a high degree of rivalry. Furthermore, there can be observed an unbalanced distribution of project risks. Clients are aimed to shift their own risks into the sphere of the constructors or planners. The consequence of this is that the number of conflicts between the involved parties is inordinately high or even increasing; an alternative approach to counter on that developments are cooperative project forms in the construction sector. This research compares conventional contract models and models with partnering agreements to examine the influence on project risks by an early integration of the involved parties. The goal is to show up deviations in different project stages from the design phase to the project transfer phase. These deviations are evaluated by a survey of experts from the three spheres: clients, contractors and planners. By rating the influence of the participants on specific risk factors it is possible to identify factors which are relevant for a smooth project execution.

Keywords: building projects, contract models, partnering, project risks

Procedia PDF Downloads 274
17170 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 138
17169 Statistical Analysis of the Main Causes of Delay Factors of Infrastructure Projects

Authors: Seyed Ali Mohammadiborna, Mehdi Ravanshadnia

Abstract:

Project delays usually detrimentally affect perceptions of project success and can in some instances, result in increased costs and other time-related damages to project stakeholders. One of the realities in the national infrastructure projects is that since the primary stakeholders are state-affiliated, the delay factors of the projects have not been seriously taken into account despite the importance of on-time completion of projects. Project postponement has different economic and social consequences and leads to the technical and economic infeasibility of the infrastructure projects in the form of reduced productivity and exploitation capacity. The present study aimed at investigating delay factors of Iranian national infrastructure projects according to regulatory reports of the Plan and Budget Organization (BPO) of Iran. The present study scrutinized the influence of each of the factors that caused delays in national Iranian infrastructure projects according to the supervision reports of the planning and budget organization in 8 years. For this purpose, the study analyzed the information regarding the impact of 12 key delay factors causing delays in average 4867 projects per year in all provinces. The said factors were classified into the three groups of executive, credit, and financial and environmental-procurement factors.

Keywords: delays, infrastructure, projects, regulatory

Procedia PDF Downloads 137
17168 Factors Influencing the Usage of ERP in Enterprise Systems

Authors: Mohammad Reza Babaei, Sanaz Kamrani

Abstract:

The main problems That arise In adopting most Enterprise resources planning (ERP) strategies come from organizational, complex information systems like the ERP integrate the data of all business areas within the organization. The implementation of ERP is a difficult process as it involves different types of end users. Based on literature, we proposed a conceptual framework and examined it to find the effect of some of the individual, organizational, and technological factors on the usage of ERP and its impact on the end user. The results of the analysis suggest that computer self-efficacy, organizational support, training, and compatibility have a positive influence on ERP usage which in turn has significant influence on panoptic empowerment and individual performance.

Keywords: factor, influencing, enterprise, system

Procedia PDF Downloads 367
17167 Test Procedures for Assessing the Peel Strength and Cleavage Resistance of Adhesively Bonded Joints with Elastic Adhesives under Detrimental Service Conditions

Authors: Johannes Barlang

Abstract:

Adhesive bonding plays a pivotal role in various industrial applications, ranging from automotive manufacturing to aerospace engineering. The peel strength of adhesives, a critical parameter reflecting the ability of an adhesive to withstand external forces, is crucial for ensuring the integrity and durability of bonded joints. This study provides a synopsis of the methodologies, influencing factors, and significance of peel testing in the evaluation of adhesive performance. Peel testing involves the measurement of the force required to separate two bonded substrates under controlled conditions. This study systematically reviews the different testing techniques commonly applied in peel testing, including the widely used 180-degree peel test and the T-peel test. Emphasis is placed on the importance of selecting an appropriate testing method based on the specific characteristics of the adhesive and the application requirements. The influencing factors on peel strength are multifaceted, encompassing adhesive properties, substrate characteristics, environmental conditions, and test parameters. Through an in-depth analysis, this study explores how factors such as adhesive formulation, surface preparation, temperature, and peel rate can significantly impact the peel strength of adhesively bonded joints. Understanding these factors is essential for optimizing adhesive selection and application processes in real-world scenarios. Furthermore, the study highlights the role of peel testing in quality control and assurance, aiding manufacturers in maintaining consistent adhesive performance and ensuring the reliability of bonded structures. The correlation between peel strength and long-term durability is discussed, shedding light on the predictive capabilities of peel testing in assessing the service life of adhesive bonds. In conclusion, this study underscores the significance of peel testing as a fundamental tool for characterizing adhesive performance. By delving into testing methodologies, influencing factors, and practical implications, this study contributes to the broader understanding of adhesive behavior and fosters advancements in adhesive technology across diverse industrial sectors.

Keywords: adhesively bonded joints, cleavage resistance, elastic adhesives, peel strength

Procedia PDF Downloads 95
17166 Key Factors Influencing the Purchasing Decisions of Low Emission Cars: A Comparative Study between Egypt and Slovenia

Authors: O. Alaa, D. Ahmed, R. Baher, K. Matjaz

Abstract:

This paper provides a study of the factors influencing the purchasing of low emission vehicles. In order to achieve the objectives of the paper, and in the light of the pool of literature and availability of data, the authors relied on qualitative methods to offers a comparison between Egypt as a developing country and Slovenia as a developed country, through analysing a survey that involves an Egyptian sample and Slovenian samples, it also studies the effect of different push and pull methods on different buyers in order to help the governments as well as the manufacturers to understand the most significant factors that affect the purchasing behaviour of LEV in the future. The results of this paper show the important vehicle performance factors, financial considerations, and environmental considerations along with the gender and age of the consumer show that consumers are more interested in the total price of the car than in different taxes.

Keywords: low emission vehicles, purchasing behavior, developed countries, developing countries

Procedia PDF Downloads 135
17165 Analyzing How Working From Home Can Lead to Higher Job Satisfaction for Employees Who Have Care Responsibilities Using Structural Equation Modeling

Authors: Christian Louis Kühner, Florian Pfeffel, Valentin Nickolai

Abstract:

Taking care of children, dependents, or pets can be a difficult and time-consuming task. Especially for part- and full-time employees, it can feel exhausting and overwhelming to meet these obligations besides working a job. Thus, working mostly at home and not having to drive to the company can save valuable time and stress. This study aims to show the influence that the working model has on the job satisfaction of employees with care responsibilities in comparison to employees who do not have such obligations. Using structural equation modeling (SEM), the three work models, “work from home”, “working remotely”, and a hybrid model, have been analyzed based on 13 influencing constructs on job satisfaction. These 13 factors have been further summarized into three groups “classic influencing factors”, “influencing factors changed by remote working”, and “new remote working influencing factors”. Based on the influencing factors on job satisfaction, an online survey was conducted with n = 684 employees from the service sector. Here, Cronbach’s alpha of the individual constructs was shown to be suitable. Furthermore, the construct validity of the constructs was confirmed by face validity, content validity, convergent validity (AVE > 0.5: CR > 0.7), and discriminant validity. In addition, confirmatory factor analysis (CFA) confirmed the model fit for the investigated sample (CMIN/DF: 2.567; CFI: 0.927; RMSEA: 0.048). The SEM-analysis has shown that the most significant influencing factor on job satisfaction is “identification with the work” with β = 0.540, followed by “Appreciation” (β = 0.151), “Compensation” (β = 0.124), “Work-Life-Balance” (β = 0.116), and “Communication and Exchange of Information” (β = 0.105). While the significance of each factor can vary depending on the work model, the SEM-analysis shows that the identification with the work is the most significant factor in all three work models and, in the case of the traditional office work model, it is the only significant influencing factor. The study shows that among the employees with care responsibilities, the higher the proportion of working from home in comparison to working from the office, the more satisfied the employees are with their job. Since the work models that meet the requirements of comprehensive care led to higher job satisfaction amongst employees with such obligations, adapting as a company to such private obligations by employees can be crucial to sustained success. Conversely, the satisfaction level of the working model where employees work at the office is higher for workers without caregiving responsibilities.

Keywords: care responsibilities, home office, job satisfaction, structural equation modeling

Procedia PDF Downloads 83
17164 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 364
17163 Decision-Making Tool for Planning the Construction of Infrastructure Projects

Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs

Abstract:

The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.

Keywords: infrastructure, modularization, decision support, decision-making

Procedia PDF Downloads 60
17162 Quality Management in Construction Project

Authors: Harsh Panchal, Saurabh Amrutkar

Abstract:

Quality management is an essential part of any project that has directly related to the performance of a project. Quality management is depended on multiple factors at different stages in a project, right from time management to construction logistics. A project is a mixture of various components that include iternary management, health and safety, crew productivity, and many more. From the survey conducted, we came to the conclusion that advancement in technology and indigenous approach to any project will result in maximum quality standards and better project performance. In this paper, we discuss various components of the factors above that lead to compromise the quality of a project and how it can be controlled in order to achieve maximum quality assurance using quality planning and total quality management. The paper also focuses on limitations and problems faced in each factor responsible for quality management and to tackle them using techniques and processes based on activities and identifying the sequence, approaching critical path, and duration. The project management concept that deals with the sequence of scope cost time give us an overview regarding the ongoing quality management, in a nutshell, giving us hints to regulate the current procedure for maximum achievable quality. It also deals with the problems faced by engineers that make the mundane work process slow, reducing the quality outcome drastically.

Keywords: management, performance, project, quality

Procedia PDF Downloads 165
17161 Using Structural Equation Modeling to Analyze the Impact of Remote Work on Job Satisfaction

Authors: Florian Pfeffel, Valentin Nickolai, Christian Louis Kühner

Abstract:

Digitalization has disrupted the traditional workplace environment by allowing many employees to work from anywhere at any time. This trend of working from home was further accelerated due to the COVID-19 crisis, which forced companies to rethink their workplace models. While in many companies, this shift happened out of pure necessity; many employees were left more satisfied with their job due to the opportunity to work from home. This study focuses on employees’ job satisfaction in the service sector in dependence on the different work models, which are defined as a “work from home” model, the traditional “work in office” model, and a hybrid model. Using structural equation modeling (SEM), these three work models have been analyzed based on 13 influencing factors on job satisfaction that have been further summarized in the three groups “classic influencing factors”, “influencing factors changed by remote working”, and “new remote working influencing factors”. Based on the influencing factors on job satisfaction, a survey has been conducted with n = 684 employees in the service sector. Cronbach’s alpha of the individual constructs was shown to be suitable. Furthermore, the construct validity of the constructs was confirmed by face validity, content validity, convergent validity (AVE > 0.5: CR > 0.7), and discriminant validity. Additionally, confirmatory factor analysis (CFA) confirmed the model fit for the investigated sample (CMIN/DF: 2.567; CFI: 0.927; RMSEA: 0.048). The SEM-analysis has shown that the most significant influencing factor on job satisfaction is “identification with the work” with β = 0.540, followed by “Appreciation” (β = 0.151), “Compensation” (β = 0.124), “Work-Life-Balance” (β = 0.116), and “Communication and Exchange of Information” (β = 0.105). While the significance of each factor can vary depending on the work model, the SEM-analysis shows that the identification with the work is the most significant factor in all three work models and, in the case of the traditional office work model, it is the only significant influencing factor. The study shows that employees who work entirely remotely or have a hybrid work model are significantly more satisfied with their job, with a job satisfaction score of 5.0 respectively on a scale from 1 (very dissatisfied) to 7 (very satisfied), than employees do not have the option to work from home with a score of 4.6. This comes as a result of the lower identification with the work in the model without any remote working. Furthermore, the responses indicate that it is important to consider the individual preferences of each employee when it comes to the work model to achieve overall higher job satisfaction. Thus, it can be argued that companies can profit off of more motivation and higher productivity by considering the individual work model preferences, therefore, increasing the identification with the respective work.

Keywords: home-office, identification with work, job satisfaction, new work, remote work, structural equation modeling

Procedia PDF Downloads 82
17160 Simulating the Interaction of Strategy Development and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Every organization develops a strategy that needs to be implemented and is undertaken through project delivery. In essence, project requirements should exactly replicate an organization’s strategy. In reality this does not happen, and behavioral factors deviate the project delivery from the strategic objectives. This occurs as project stakeholders can have competing objectives. Resultantly, requirements that are implemented through projects are less aligned to the strategy. This paper develops a game theoretic model to simulate why such deviations occur. That explains the difference between strategy development and implementation.

Keywords: strategy, simulation, project management, game theory

Procedia PDF Downloads 138
17159 Factors Affecting Attitude of Community Pharmacists Towards Locally Manufactured Pharmaceutical Products in Addisababa: A Cross-sectional Study

Authors: Gelila Tamyalew, Asres Abitie

Abstract:

Community Pharmacists (CPs) have a significant part in consumer choice in the rational use of LMPPs. The opinion of pharmacists regarding branded and generic medications can offer a perception of the potential obstacles that might have to be overcome to advance generic medicine utilization. Many factors affect CPs' attitudes negatively toward LMPPs. Therefore, the current study assessed factors that can affect CPs' attitudes toward LMPPs. In the regression analysis of variables, three variables were associated with CPs' attitudes toward LMPPs. These are; maximum educational status, professional status, and year of experience in community pharmacy practice. Moreover, lack of belief in LMPPs, substitution agreement with the prescriber, cost-effectiveness of LMPPs, and consumer preference/demand were the most influencing reasons for the selection of LMPPs. In conclusion, the attitude of CPs seems suboptimal that requires an intervention to optimize LMPP utilization.

Keywords: locally manufactured pharmaceutical products, attitude, community pharmacist, Ethiopia

Procedia PDF Downloads 84
17158 Analysis of Initial Entry-Level Technology Course Impacts on STEM Major Selection

Authors: Ethan Shafer, Timothy Graziano

Abstract:

This research seeks to answer whether first-year courses at institutions of higher learning can impact STEM major selection. Unlike many universities, an entry-level technology course (often referred to as CS0) is required for all United States Military Academy (USMA) students–regardless of major–in their first year of attendance. Students at the academy choose their major at the end of their first year of studies. Through student responses to a multi-semester survey, this paper identifies a number of factors that potentially influence STEM major selection. Student demographic data, pre-existing exposure and access to technology, perceptions of STEM subjects, and initial desire for a STEM major are captured before and after taking a CS0 course. An analysis of factors that contribute to student perception of STEM and major selection are presented. This work provides recommendations and suggestions for institutions currently providing or looking to provide CS0-like courses to their students.

Keywords: education, STEM, pedagogy, digital literacy

Procedia PDF Downloads 121
17157 Efficient Relay Selection Scheme Utilizing OVSF Code in Cooperative Communication System

Authors: Yeong-Seop Ahn, Myoung-Jin Kim, Young-Min Ko, Hyoung-Kyu Song

Abstract:

This paper proposes a relay selection scheme utilizing an orthogonal variable spreading factor (OVSF) code in a cooperative communication. The relay selection scheme influences on the communication performance in the cooperative communication. Conventional relay selection schemes such as the best harmonic mean relay selection scheme or the threshold-based relay selection scheme should know information such as channel state information (CSI) in advance. The proposed relay selection scheme does not require information in advance by using a reference signal utilizing the OVSF code. The simulation result shows that bit error rate (BER) performance of proposed relay selection scheme is similar to the best harmonic mean relay selection scheme that is known as one of the optimal relay selection schemes.

Keywords: cooperative communication, relay selection, OFDM, OVSF code

Procedia PDF Downloads 637
17156 Ranking of the Main Criteria for Contractor Selection Procedures on Major Construction Projects in Libya Using the Delphi Method

Authors: Othoman Elsayah, Naren Gupta, Binsheng Zhang

Abstract:

The construction sector constitutes one of the most important sectors in the economy of any country. Contractor selection is a critical decision that is undertaken by client organizations and is central to the success of any construction project. Contractor selection (CS) is a process which involves investigating, screening and determining whether candidate contractors have the technical and financial capability to be accepted to formally tender for construction work. The process should be conducted prior to the award of contract, characterized by many factors such as: contactor’s skills, experience on similar projects, track- record in the industry, and financial stability. However, this paper evaluates the current state of knowledge in relation to contractor selection process and demonstrates the findings from the analysis of the data collected from the Delphi questionnaire survey. The survey was conducted with a group of 12 experts working in the Libyan construction industry (LCI). The paper starts by briefly explaining the general outline of the questionnaire including the survey participation rate, the different fields the experts came from, and the business titles of the participants. Then, the paper describes the tests used to determine when the experts had reached consensus. The paper is based on research which aims to develop rank contractor selection criteria with specific application to make construction projects in the Libyan context. The findings of this study will be utilized to establish the scope of work that will be used as part of a PhD research.

Keywords: contractor selection, Libyan construction industry, decision experts, Delphi technique

Procedia PDF Downloads 332
17155 Using ANN in Emergency Reconstruction Projects Post Disaster

Authors: Rasha Waheeb, Bjorn Andersen, Rafa Shakir

Abstract:

Purpose The purpose of this study is to avoid delays that occur in emergency reconstruction projects especially in post disaster circumstances whether if they were natural or manmade due to their particular national and humanitarian importance. We presented a theoretical and practical concepts for projects management in the field of construction industry that deal with a range of global and local trails. This study aimed to identify the factors of effective delay in construction projects in Iraq that affect the time and the specific quality cost, and find the best solutions to address delays and solve the problem by setting parameters to restore balance in this study. 30 projects were selected in different areas of construction were selected as a sample for this study. Design/methodology/approach This study discusses the reconstruction strategies and delay in time and cost caused by different delay factors in some selected projects in Iraq (Baghdad as a case study).A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. Project participants from the case projects provided data about the projects through a data collection instrument distributed through a survey. Mixed approach and methods were applied in this study. Mathematical data analysis was used to construct models to predict delay in time and cost of projects before they started. The artificial neural networks analysis was selected as a mathematical approach. These models were mainly to help decision makers in construction project to find solutions to these delays before they cause any inefficiency in the project being implemented and to strike the obstacles thoroughly to develop this industry in Iraq. This approach was practiced using the data collected through survey and questionnaire data collection as information form. Findings The most important delay factors identified leading to schedule overruns were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are quite in line with findings from similar studies in other countries/regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. Originality/value we selected ANN’s analysis first because ANN’s was rarely used in project management , and never been used in Iraq to finding solutions for problems in construction industry. Also, this methodology can be used in complicated problems when there is no interpretation or solution for a problem. In some cases statistical analysis was conducted and in some cases the problem is not following a linear equation or there was a weak correlation, thus we suggested using the ANN’s because it is used for nonlinear problems to find the relationship between input and output data and that was really supportive.

Keywords: construction projects, delay factors, emergency reconstruction, innovation ANN, post disasters, project management

Procedia PDF Downloads 165
17154 Critical Success Factors of Information Technology Projects

Authors: Athar Imtiaz, Abduljalil S. Al-Mudhary, Taha Mirhashemi, Roslina Ibrahim

Abstract:

Information Technology (IT) is being used by almost all organizations throughout the world. However, its success at supporting and improving business is debatable. There is always the risk of IT project failure and studies have proven that a large number of IT projects indeed do fail. There are many components that further the success of IT projects; these have been studied in previous studies. Studies have found the most necessary components for success in software development projects, executive information systems etc. In this study, previous literature that has looked into these success promoting factors have been critically reviewed and analyzed. Fifteen critical Success Factors (CSF) of IT projects were enlisted and examined. These factors can be applied to all IT projects and is not specific to a particular type of IT/IS project. A hypothesis was also generated after the evaluation of the factors.

Keywords: critical success factors, CSF, IT projects, IS projects, software development projects

Procedia PDF Downloads 400
17153 Critical Success Factors for Sustainable Smart City Project in India

Authors: Debasis Sarkar

Abstract:

Development of a Smart City would depend upon the development of its infrastructure in a smart way. Primarily based on the ideology of the fourth industrial revolution a Smart City project should have Smart governance, smart health care, smart building, smart transportation, smart mobility, smart energy, smart technology and smart citizen. Considering the Indian scenario of current state of cities in India, it has become very essential to decide the specific parameters which would govern the development of a Smart City project. It has been observed that there are significant parameters beyond Information and Communication Technology (ICT), which govern the development of a Smart City project. This paper is an attempt to identify the Critical Success Factors (CSF) which are significantly responsible for the development of a Smart City project in Western India. Responses to questionnaire survey were analyzed on basis of Likert scale. They were further critically evaluated with help of Factor Comparison Method (FCM) and Analytical Hierarchy Process (AHP). The project authorities need to incorporate Building Information Modeling (BIM) to make the smart city project more collaborative. To make the project more sustainable, use of flyash in the concrete used, reduced usage of cement and steel, use of alternate fuels like biodiesel is recommended.

Keywords: analytical hierarchical process, building information modeling, critical success factors, factor comparison method

Procedia PDF Downloads 252
17152 Analyzing the Critical Factors Influencing Employees' Tacit and Explicit Knowledge Sharing Intentions for Sustainable Competitive Advantage: A Systematic Review and a Conceptual Framework

Authors: Made Ayu Aristyana Dewi

Abstract:

Due to the importance of knowledge in today’s competitive world, an understanding of how to enhance employee knowledge sharing has become critical. This study discerning employees’ knowledge sharing intentions according to the type of knowledge to be shared, whether tacit or explicit. This study provides a critical and systematic review of the current literature on knowledge sharing, with a particular focus on the most critical factors influencing employees’ tacit and explicit knowledge sharing intentions. The extant literature was identified through four electronic databases, from 2006 to 2016. The findings of this review reveal that most of the previous studies only focus on individual and social factors as the antecedents of knowledge sharing intention. Therefore, those previous studies did not consider some other potential factors, like organizational and technological factors that may hinder the progress of knowledge sharing processes. Based on the findings of the critical review, a conceptual framework is proposed, which presents the antecedents of employees’ tacit and explicit knowledge sharing intentions and its impact on innovation and sustainable competitive advantage.

Keywords: antecedents, explicit knowledge, individual factors, innovation, intentions, knowledge sharing, organizational factors, social factors, sustainable competitive advantage, tacit knowledge, technological factors

Procedia PDF Downloads 319
17151 Determinants of Sustainable Supplier Selection: An Exploratory Study of Manufacturing Tunisian’s SMEs

Authors: Ahlem Dhahri, Audrey Becuwe

Abstract:

This study examines the adoption of sustainable purchasing practices among Tunisian SMEs, with a focus on assessing how environmental and social sustainability maturity affects the implementation of sustainable supplier selection (SSS) criteria. Using institutional theory to classify coercive, normative, and mimetic pressures, as well as emerging drivers and barriers, this study explores the institutional factors influencing sustainable purchasing practices and the specific barriers faced by Tunisian SMEs in this area. An exploratory, abductive qualitative research design was adopted for this multiple case study, which involved 19 semi-structured interviews with owners and managers of 17 Tunisian manufacturing SMEs. The Gioia method was used to analyze the data, thus enabling the identification of key themes and relationships directly from the raw data. This approach facilitated a structured interpretation of the institutional factors influencing sustainable purchasing practices, with insights drawn from the participants' perspectives. The study reveals that Tunisian SMEs are at different levels of sustainability maturity, with a significant impact on their procurement practices. SMEs with advanced sustainability maturity integrate both environmental and social criteria into their supplier selection processes, while those with lower maturity levels rely on mostly traditional criteria such as cost, quality, and delivery. Key institutional drivers identified include regulatory pressure, market expectations, and stakeholder influence. Additional emerging drivers—such as certifications and standards, economic incentives, environmental commitment as a core value, and group-wide strategic alignment—also play a critical role in driving sustainable procurement. Conversely, the study reveals significant barriers, including economic constraints, limited awareness, and resource limitations. It also identifies three main categories of emerging barriers: (1) logistical and supply chain constraints, including retailer/intermediary dependency, tariff regulations, and a perceived lack of direct responsibility in B2B supply chains; (2) economic and financial constraints; and (3) operational barriers, such as unilateral environmental responsibility, a product-centric focus and the influence of personal relationships. Providing valuable insights into the role of sustainability maturity in supplier selection, this study is the first to explore sustainable procurement practices in the Tunisian SME context. Integrating an analysis of institutional drivers, including emerging incentives and barriers, provides practical implications for SMEs seeking to improve sustainability in procurement. The results highlight the need for stronger regulatory frameworks and support mechanisms to facilitate the adoption of sustainable practices among SMEs in Tunisia.

Keywords: Tunisian SME, sustainable supplier selection, institutional theory, determinant, qualitative study

Procedia PDF Downloads 10
17150 Exploring Factors Affecting Electricity Production in Malaysia

Authors: Endang Jati Mat Sahid, Hussain Ali Bekhet

Abstract:

Ability to supply reliable and secure electricity has been one of the crucial components of economic development for any country. Forecasting of electricity production is therefore very important for accurate investment planning of generation power plants. In this study, we aim to examine and analyze the factors that affect electricity generation. Multiple regression models were used to find the relationship between various variables and electricity production. The models will simultaneously determine the effects of the variables on electricity generation. Many variables influencing electricity generation, i.e. natural gas (NG), coal (CO), fuel oil (FO), renewable energy (RE), gross domestic product (GDP) and fuel prices (FP), were examined for Malaysia. The results demonstrate that NG, CO, and FO were the main factors influencing electricity generation growth. This study then identified a number of policy implications resulting from the empirical results.

Keywords: energy policy, energy security, electricity production, Malaysia, the regression model

Procedia PDF Downloads 163
17149 Exploring the Critical Success Factors of Construction Stakeholders Team Effectiveness

Authors: Olusegun Akinsiku, Olukayode Oyediran, Koleola Odusami

Abstract:

A construction project is usually made up of a variety of stakeholders whose interests may positively or negatively impact on the outcome of the project execution. The variability of project stakeholders is apparent in their cultural differences, professional background and ethics, and differences in ideas. The need for the effectiveness of construction teams has been investigated as this is an important aspect to meeting client’s expectations in the construction industry. This study adopts a cross-sectional descriptive survey with the purpose of identifying the critical success factors (CSFs) associated with the team effectiveness of construction projects stakeholders, their relationship and the effects on construction project performance. The instrument for data collection was a designed questionnaire which was administered to construction professionals in the construction industry in Lagos State, Nigeria using proportionate stratified sampling. The highest ranked identified CSFs include “team trust”, “esprit de corps among members” and “team cohesiveness”. Using factor analysis and considering the effects of team cohesiveness on project performance, the identified CSFs were categorized into three groups namely cognitive attributes, behavior and processes attributes and affective attributes. All the three groups were observed to have a strong correlation with project performance. The findings of this study are useful in helping construction stakeholders benchmark the team effectiveness factors that will guarantee project success.

Keywords: construction, critical success factors, performance, stakeholders, team effectiveness

Procedia PDF Downloads 129
17148 Influencing Factors of School Enterprise Cooperation: An Exploratory Study in Chinese Vocational Nursing Education

Authors: Xiao Chen, Alice Ho, Mabel Tie, Xiaoheng Xu

Abstract:

Background and Significance of the Study: School-enterprise cooperation has been the cornerstone of vocational education in China and many other countries. Researchers and policymakers have paid much attention to ensuring the implementation and improving the quality of school-enterprise cooperation. However, many problems still exist on the implementation level of the cooperation. On the one hand, the enterprises lack the motivation to participate in the cooperation. On the other hand, there is a lack of effective guidance and management during the cooperation. Furthermore, the current literature focuses greatly on policy recommendations on the national level while failing to provide a detailed practical understanding of how school-enterprise cooperation is carried out on the ground level. With emerging social problems, such as the aging population in China, there is an increasing need for diverse nursing services and better nursing quality. Methodology: To gain a deeper understanding of the influencing factors of the implementation of school-enterprise cooperation, this work conducted 37 exploratory interviews in four Chinese cities spanning first-tier to fourth-tier cities with hospital department directors, vocational school deans, nurses, and vocational students. Multiple critical policy documents that founded the current vocational education system in China were analyzed, along with the data collected from the interviews. Major Findings: Based on the policy and interview analyses, this work reveals a set of influencing factors for school-enterprise cooperation implementation. Findings from each region contribute to an overall model of influencing factors for implementing school-enterprise cooperation in vocational nursing education in China, which leads to practical insights for policy recommendation. The key influencing factors are found based on the policy, hospital, school, and social levels. Following practical policy recommendations were presented. Moving forward, further research on the implementation of school-enterprise cooperation in specific industries will become increasingly critical to improving the effectiveness of educational policies and the quality of vocational education.

Keywords: nursing, policy recommendation, school-enterprise cooperation, vocational education

Procedia PDF Downloads 115