Search results for: construction workers’ safety
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7822

Search results for: construction workers’ safety

7162 Gig-Work in the Midst of the COVID-19 Pandemic

Authors: Audie Daniel Wood

Abstract:

In the spring of 2020, the country and the economy came to a halt due to an outbreak of the novel coronavirus, SARS-2, virus known as COVID-19. One of the hardest hit sectors of the economy was the gig-sector, which includes Lyft, Uber, Door-Dash, and other services. In this study, we examined the effects of the independent contractor status of laborers in this field to see how a near-complete economic shut-down affected the lives of laborers who are denied access to health-care and unemployment benefits due to their status as independent contractors. What the study found was there was no 'life-altering' change to the lives of the workers who used gig-work as supplementary income during the economic shut-down, but those who relied on Lyft and Uber, etc. as their sole source of income were more heavily impacted by the economic shut-down than part-time workers. The second significant finding of the study was that across all genders and races, the idea of having to seek unemployment or help was something that none of the workers wanted. They all felt as if unemployment and social-insurance were for those who could not work. While the findings are not generalizable due to this being a small qualitative study consisting of 27 participants, the findings suggest that the economic and social impact of COVID-19 on those that work in the gig-industry warrants further discussion and research.

Keywords: gig-work, Covid-19, independent contractor, Uber

Procedia PDF Downloads 105
7161 Climbing up to Safety and Security: The Facilitation of an NGO Awareness Culture

Authors: Mirad Böhm, Diede De Kok

Abstract:

It goes without saying that for many NGOs a high level of safety and security are crucial issues, which often necessitates the support of military personnel to varying degrees. The relationship between military and NGO personnel is usually a difficult one and while there has been progress, clashes naturally still occur owing to different interpretations of mission objectives amongst many other challenges. NGOs tend to view safety and security as necessary steps towards their goal instead of fundamental pillars of their core ‘business’. The military perspective, however, considers them primary objectives; thus, frequently creating a different vision of how joint operations should be conducted. This paper will argue that internalizing safety and security into the NGO organizational culture is compelling in order to ensure a more effective cooperation with military partners and, ultimately, to achieve their goals. This can be accomplished through a change in perception of safety and security concepts as a fixed and major point on the everyday agenda. Nowadays, there are several training programmes on offer addressing such issues but they primarily focus on the individual level. True internalization of these concepts should reach further by encompassing a wide range of NGO activities, beginning with daily proceedings in office facilities far from conflict zones including logistical and administrative tasks such as budgeting, and leading all the way to actual and potentially hazardous missions in the field. In order to effectuate this change, a tool is required to help NGOs realize, firstly, how they perceive and define safety and security, and secondly, how they can adjust this perception to their benefit. The ‘safety culture ladder’ is a concept that suggests what organizations can and should do to advance their safety. While usually applied to private industrial scenarios, this work will present the concept as a useful instrument to visualize and facilitate the internalization process NGOs ought to go through. The ‘ladder’ allows them to become more aware of the level of their safety and security measures, and moreover, cautions them to take these measures proactively rather than reactively. This in turn will contribute to a rapprochement between military and NGO priority setting in regard to what constitutes a safe working environment.

Keywords: NGO-military cooperation, organisational culture, safety and security awareness, safety culture ladder

Procedia PDF Downloads 307
7160 Reflection on the Resilience Construction of Megacities Under the Background of Territorial Space Governance

Authors: Xin Jie Li

Abstract:

Due to population agglomeration, huge scale, and complex activities, megacities have become risk centers. To resist the risks brought by development uncertainty, the construction of resilient cities has become a common strategic choice for megacities. As a key link in promoting the modernization of the national governance system and governance capacity, optimizing the layout of national land space that focuses on ecology, production, and life and improving the rationality of spatial resource allocation are conducive to fundamentally promoting the resilience construction of megacities. Therefore, based on the perspective of territorial space governance, this article explores the potential risks faced by the territorial space of megacities and proposes possible paths for the resilience construction of megacities from four aspects: promoting the construction of a resilience system throughout the entire life cycle, constructing a disaster prevention and control system with ecological resilience, creating an industrial spatial pattern with production resilience, and enhancing community resilience to anchor the front line of risk response in megacities.

Keywords: mega cities, potential risks, resilient city construction, territorial and spatial governance

Procedia PDF Downloads 29
7159 Permissible Horizontal Displacements during the Construction of Vertical Shafts in Soft Soils at the Valley of Mexico: Case History

Authors: Joel M. De La Rosa R.

Abstract:

In this paper, the results obtained when monitoring the horizontal deformations of the soil mass are detailed, during each of the construction stages of several vertical shafts located in the soft soils of the Valley of Mexico, by means of the flotation method. From the analysis of these results, the magnitude and percentage relationship with respect to the diameter and depth of excavation of the horizontal deformations that occurred during the monitoring period is established. Based on the horizontal deformation monitoring system and the information provided by the supervisor's site log, the construction stages that have the greatest impact on deformations are established. Additionally, an analysis of the deformations is carried out, which takes into account the resistance and deformability characteristics of the excavated soils, as well as the prevailing hydraulic conditions. This work will allow construction engineers and institutions in charge of infrastructure works in the Valley of Mexico to establish permissible ranges for horizontal deformations that can occur in very soft and saturated soils, during the different construction stages; improving response protocols to potentially dangerous behaviors.

Keywords: vertical shaft, flotation method, very soft clays, construction supervision

Procedia PDF Downloads 172
7158 Effect of Site Amplification on Seismic Safety Evaluation of Flyover Pier

Authors: Mohammad Raihan Mukhlis, M. Abdur Rahman Bhuiyan

Abstract:

Bangladesh is a developing country in which a lot of multi-span simply/continuous supported flyovers are being constructed in its major cities. Being situated in a seismically active region, seismic safety evaluation of flyovers is essential for seismic risk reduction. Effects of site amplification on seismic safety evaluation of flyover piers are the main concern of this study. In this regard, failure mode, lateral strength and displacement ductility of piers of a typical multi-span simply supported flyover have been evaluated by Japan Road Association (JRA) recommended guidelines, with and without considering site amplification. Ultimate flexural strengths of piers have been computed using the pushover analysis results. Shear capacity of piers has been calculated using the guidelines of JRA. Lateral strengths have been determined depending on the failure modes of the piers. Displacement ductility of piers has been computed using yield and ultimate displacements of the piers obtained from the pushover analysis results. Selected earthquake time history is used in seismic safety evaluation of the flyover piers. Finally, the ductility design method is used to conduct the seismic safety evaluation of the piers with and without considering site amplification. From the numerical results, it has been revealed that the effects of site amplification on seismic safety evaluation of bridge structures should be carefully taken into account.

Keywords: displacement ductility, flyover pier, lateral strength, safety evaluation, site amplification

Procedia PDF Downloads 150
7157 Optimizing Recycling and Reuse Strategies for Circular Construction Materials with Life Cycle Assessment

Authors: Zhongnan Ye, Xiaoyi Liu, Shu-Chien Hsu

Abstract:

Rapid urbanization has led to a significant increase in construction and demolition waste (C&D waste), underscoring the need for sustainable waste management strategies in the construction industry. Aiming to enhance the sustainability of urban construction practices, this study develops an optimization model to effectively suggest the optimal recycling and reuse strategies for C&D waste, including concrete and steel. By employing Life Cycle Assessment (LCA), the model evaluates the environmental impacts of adopted construction materials throughout their lifecycle. The model optimizes the quantity of materials to recycle or reuse, the selection of specific recycling and reuse processes, and logistics decisions related to the transportation and storage of recycled materials with the objective of minimizing the overall environmental impact, quantified in terms of carbon emissions, energy consumption, and associated costs, while adhering to a range of constraints. These constraints include capacity limitations, quality standards for recycled materials, compliance with environmental regulations, budgetary limits, and temporal considerations such as project deadlines and material availability. The strategies are expected to be both cost-effective and environmentally beneficial, promoting a circular economy within the construction sector, aligning with global sustainability goals, and providing a scalable framework for managing construction waste in densely populated urban environments. The model is helpful in reducing the carbon footprint of construction projects, conserving valuable resources, and supporting the industry’s transition towards a more sustainable future.

Keywords: circular construction, construction and demolition waste, material recycling, optimization modeling

Procedia PDF Downloads 42
7156 Basic Research on Applying Temporary Work Engineering at the Design Phase

Authors: Jin Woong Lee, Kyuman Cho, Taehoon Kim

Abstract:

The application of constructability is increasingly required not only in the construction phase but also in the whole project stage. In particular, the proper application of construction experience and knowledge during the design phase enables the minimization of inefficiencies such as design changes and improvements in constructability during the construction phase. In order to apply knowledge effectively, engineering technology efforts should be implemented with design progress. Among many engineering technologies, engineering for temporary works, including facilities, equipment, and other related construction methods, is important to improve constructability. Therefore, as basic research, this study investigates the applicability of temporary work engineering during the design phase in the building construction industry. As a result, application of temporary work engineering has a greater impact on construction cost reduction and constructability improvement. In contrast to the existing design-bid-build method, the turn-key and CM (construct management) procurement methods currently being implemented in Korea are expected to have a significant impact on the direction of temporary work engineering. To introduce temporary work engineering, expert/professional organization training is first required, and a lack of client awareness should be preferentially improved. The results of this study are expected to be useful as reference material for the development of more effective temporary work engineering tasks and work processes in the future.

Keywords: Temporary Work Engineering, Design Phase, Constructability, Building Construction

Procedia PDF Downloads 373
7155 Optimizing Recycling and Reuse Strategies for Circular Construction Materials with Life Cycle Assessment

Authors: Zhongnan Ye, Xiaoyi Liu, Shu-Chien Hsu

Abstract:

Rapid urbanization has led to a significant increase in construction and demolition waste (C&D waste), underscoring the need for sustainable waste management strategies in the construction industry. Aiming to enhance the sustainability of urban construction practices, this study develops an optimization model to effectively suggest the optimal recycling and reuse strategies for C&D waste, including concrete and steel. By employing Life Cycle Assessment (LCA), the model evaluates the environmental impacts of adopted construction materials throughout their lifecycle. The model optimizes the quantity of materials to recycle or reuse, the selection of specific recycling and reuse processes, and logistics decisions related to the transportation and storage of recycled materials with the objective of minimizing the overall environmental impact, quantified in terms of carbon emissions, energy consumption, and associated costs, while adhering to a range of constraints. These constraints include capacity limitations, quality standards for recycled materials, compliance with environmental regulations, budgetary limits, and temporal considerations such as project deadlines and material availability. The strategies are expected to be both cost-effective and environmentally beneficial, promoting a circular economy within the construction sector, aligning with global sustainability goals, and providing a scalable framework for managing construction waste in densely populated urban environments. The model is helpful in reducing the carbon footprint of construction projects, conserving valuable resources, and supporting the industry’s transition towards a more sustainable future.

Keywords: circular construction, construction and demolition waste, life cycle assessment, material recycling

Procedia PDF Downloads 57
7154 Factors Influencing the Use of Green Building Practices in the South African Residential Apartment Construction

Authors: Mongezi Nene, Emma Ayesu-Koranteng, Christopher Amoah, Ayo Adeniran

Abstract:

Although its use has been criticized over the years as being unencouraging, the green building concept is quickly overtaking other concepts, particularly in the construction of commercial properties. The goal of the study is to identify the variables influencing the use of green building practices when developing residential structures. A qualitative methodology, using interviews with semi-structured open-ended questions to 35 property practitioners operating residential apartments in Bloemfontein, South Africa, was used to collect primary data which was analysed using thematic content analysis. The findings show that while respondents have a good understanding of green building principles, they are not being used in the construction of residential buildings in South Africa due to issues with green building approval procedures, the potential for tenant rent increases, the cost of materials, technical issues, contractual issues, and a lack of awareness, among others. This paper recommends among others an urgent need to implement measures by stakeholders towards enhancing the adoption of green building concepts in the construction of residential buildings as well as incentivising its construction through lowered property rates.

Keywords: green building, residential apartments, construction, South Africa

Procedia PDF Downloads 76
7153 Resiliency in Fostering: A Qualitative Study of Highly Experienced Foster Parents

Authors: Ande Nesmith

Abstract:

There is an ongoing shortage of foster parents worldwide to take on a growing population of children in need of out-of-home care. Currently, resources are primarily aimed at recruitment rather than retention. Retention rates are extraordinarily low, especially in the first two years of fostering. Qualitative interviews with 19 foster parents averaging 20 years of service provided insight into the challenges they faced and how they overcame them. Thematic analysis of interview transcripts identified sources of stress and resiliency. Key stressors included lack of support and responsiveness from the children’s social workers, false maltreatment allegations, and secondary trauma from children’s destructive behaviors and emotional dysregulation. Resilient parents connected with other foster parents for support, engaged in creative problem-solving, recognized that positive feedback from children usually arrives years later, and through training, understood the neurobiological impact of trauma on child behavior. Recommendations include coordinating communication between the foster parent licensing agency social workers and the children’s social workers, creating foster parent support networks and mentoring, and continuous training on trauma including effective parenting strategies. Research is needed to determine whether these resilience indicators in fact lead to long-term retention. Policies should include a mechanism to develop a cohesive line of communication and connection between foster parents and the children’s social workers as well as their respective agencies.

Keywords: foster care stability, foster parent burnout, foster parent resiliency, foster parent retention, trauma-informed fostering

Procedia PDF Downloads 332
7152 Integration of LCA and BIM for Sustainable Construction

Authors: Laura Álvarez Antón, Joaquín Díaz

Abstract:

The construction industry is turning towards sustainability. It is a well-known fact that sustainability is based on a balance between environmental, social and economic aspects. In order to achieve sustainability efficiently, these three criteria should be taken into account in the initial project phases, since that is when a project can be influenced most effectively. Thus the aim must be to integrate important tools like BIM and LCA at an early stage in order to make full use of their potential. With the synergies resulting from the integration of BIM and LCA, a wider approach to sustainability becomes possible, covering the three pillars of sustainability.

Keywords: building information modeling (BIM), construction industry, design phase, life cycle assessment (LCA), sustainability

Procedia PDF Downloads 433
7151 Application of Mathematical Models for Conducting Long-Term Metal Fume Exposure Assessments for Workers in a Shipbuilding Factory

Authors: Shu-Yu Chung, Ying-Fang Wang, Shih-Min Wang

Abstract:

To conduct long-term exposure assessments are important for workers exposed to chemicals with chronic effects. However, it usually encounters with several constrains, including cost, workers' willingness, and interference to work practice, etc., leading to inadequate long-term exposure data in the real world. In this study, an integrated approach was developed for conducting long-term exposure assessment for welding workers in a shipbuilding factory. A laboratory study was conducted to yield the fume generation rates under various operating conditions. The results and the measured environmental conditions were applied to the near field/far field (NF/FF) model for predicting long term fume exposures via the Monte Carlo simulation. Then, the predicted long-term concentrations were used to determine the prior distribution in Bayesian decision analysis (BDA). Finally, the resultant posterior distributions were used to assess the long-term exposure and serve as basis for initiating control strategies for shipbuilding workers. Results show that the NF/FF model was a suitable for predicting the exposures of metal contents containing in welding fume. The resultant posterior distributions could effectively assess the long-term exposures of shipbuilding welders. Welders' long-term Fe, Mn and Pb exposures were found with high possibilities to exceed the action level indicating preventive measures should be taken for reducing welders' exposures immediately. Though the resultant posterior distribution can only be regarded as the best solution based on the currently available predicting and monitoring data, the proposed integrated approach can be regarded as a possible solution for conducting long term exposure assessment in the field.

Keywords: Bayesian decision analysis, exposure assessment, near field and far field model, shipbuilding industry, welding fume

Procedia PDF Downloads 122
7150 Risk Factors Affecting Construction Project Cost in Oman

Authors: Omar Amoudi, Latifa Al Brashdi

Abstract:

Construction projects are always subject to risks and uncertainties due to its unique and dynamic nature, outdoor work environment, the wide range of skills employed, various parties involved in addition to situation of construction business environment at large. Altogether, these risks and uncertainties affect projects objectives and lead to cost overruns, delay, and poor quality. Construction projects in Oman often experience cost overruns and delay. Managing these risks and reducing their impacts on construction cost requires firstly identifying these risks, and then analyzing their severity on project cost to obtain deep understanding about these risks. This in turn will assist construction managers in managing and tacking these risks. This paper aims to investigate the main risk factors that affect construction projects cost in the Sultanate of Oman. In order to achieve the main aim, literature review was carried out to identify the main risk factors affecting construction cost. Thirty-three risk factors were identified from the literature. Then, a questionnaire survey was designed and distributed among construction professionals (i.e., client, contractor and consultant) to obtain their opinion toward the probability of occurrence for each risk factor and its possible impact on construction project cost. The collected data was analyzed based on qualitative aspects and in several ways. The severity of each risk factor was obtained by multiplying the probability occurrence of a risk factor with its impact. The findings of this study reveal that the most significant risk factors that have high severity impact on construction project cost are: Change of Oil Price, Delay of Materials and Equipment Delivery, Changes in Laws and Regulations, Improper Budgeting, and Contingencies, Lack of Skilled Workforce and Personnel, Delays Caused by Contractor, Delays of Owner Payments, Delays Caused by Client, and Funding Risk. The results can be used as a basis for construction managers to make informed decisions and produce risk response procedures and strategies to tackle these risks and reduce their negative impacts on construction project cost.

Keywords: construction cost, construction projects, Oman, risk factors, risk management

Procedia PDF Downloads 318
7149 Strength Analysis of RCC Dams Subject to the Layer-by-Layer Construction Method

Authors: Archil Motsonelidze, Vitaly Dvalishvili

Abstract:

Existing roller compacted concrete (RCC) dams indicate that the layer-by-layer construction method gives considerable economies as compared with the conventional methods. RCC dams have also gained acceptance in the regions of high seismic activity. Earthquake resistance analysis of RCC gravity dams based on nonlinear finite element technique is presented. An elastic-plastic approach is used to describe the material of a dam while it is under static conditions (period of construction). Seismic force, as an acceleration equivalent to that produced by a real earthquake, is supposed to act when the dam is completed. The materials of the dam and foundation may be nonhomogeneous and anisotropic. The “dam-foundation” system is idealized as a plain strain problem.

Keywords: finite element method, layer-by-layer construction, RCC dams, strength analysis

Procedia PDF Downloads 534
7148 The Use of Hearing Protection Devices and Hearing Loss in Steel Industry Workers in Samut Prakan Province, Thailand

Authors: Petcharat Kerdonfag, Surasak Taneepanichskul, Winai Wadwongtham

Abstract:

Background: Although there have not been effective treatments for Noise Induced Hearing Loss (NIHL), it can be definitely preventable with promoting the use of Hearing Protection devices (HPDs) among workers who have been exposed to excessive noise for a long period. Objectives: The objectives of this study were to explore the use of HPDs among steel industrial workers in the high noise level zone in Samut Prakan province, Thailand and to examine the relationships of the HPDs use and hearing loss. Materials and Methods: In this cross-sectional study, eligible ninety-three participants were recruited in the designated zone of higher noise (> 85dBA) of two factories, using simple random sampling. The use of HPDs was gathered by the self-record form, examined and confirmed by the researcher team. Hearing loss was assessed by the audiometric screening at the regional Samut Prakan hospital. If an average threshold level exceeds 25 dBA at high frequency (4 and 6 Hz) in each ear, participants would be lost of hearing. Data were collected from October to December, 2016. All participants were examined by the same examiners for the validity. An Audiometric testing was performed with the participants who have been exposed to high noise levels at least 14 hours from workplace. Results: Sixty participants (64.5%) had secondary level of education. The average mean score of percent time of using HPDs was 60.5% (SD = 25.34). Sixty-seven participants (72.0%) had abnormal hearing which they have still needed to increase lower percent time of using HPDs (Mean = 37.01, SD = 23.81) than those having normal hearing (Mean = 45.77, SD = 28.44). However, there was no difference in the mean average of percent time of using HPDs between these two groups.Conclusion: The findings of this study have confirmed that the steel industrial workers still need to be motivated to use HPDs regularly. Future research should pay more attentions for creating a meaningful innovation to steel industrial workers.

Keywords: hearing protection devices, noise induced hearing loss, audiometric testing, steel industry

Procedia PDF Downloads 236
7147 Students' Perception of Virtual Learning Environment (VLE) Skills in Setting up the Simulator Welding Technology

Authors: Mohd Afif Md Nasir, Faizal Amin Nur Yunus, Jamaluddin Hashim, Abd Samad Hassan Basari, A. Halim Sahelan

Abstract:

The aim of this study is to identify the suitability of Virtual Learning Environment (VLE) in welding simulator application towards Computer-Based Training (CBT) in developing skills upon new students at the Advanced Technology Training Center (ADTEC), Batu Pahat, Johor, Malaysia and GIATMARA, Batu Pahat, Johor, Malaysia. The purpose of the study is to create a computer-based skills development approach in welding technology among new students in ADTEC and GIATMARA, as well as cultivating the elements of general skills among them. This study is also important in elevating the number of individual knowledge workers (K-workers) working in manufacturing industry in order to achieve a national vision which is to be an industrial nation in the year of 2020. The design of the study is a survey type of research which uses questionnaires as the instruments and 136 students from ADTEC and GIATMARA were interviewed. Descriptive analysis is used to identify the frequency and mean values. The findings of the study shows that the welding technology skills have developed in the students as a result of the application of VLE simulator at a high level and the respondents agreed that the skills could be embedded through the application of the VLE simulator. In summary, the VLE simulator is suitable in welding skills development training in terms of exposing new students with the relevant characteristics of welding skills and at the same time spurring the students’ interest towards learning more about the skills.

Keywords: computer-based training (CBT), knowledge workers (K-workers), virtual learning environment, welding simulator, welding technology

Procedia PDF Downloads 336
7146 The Impact of Using Building Information Modeling Technology in Construction Projects Management

Authors: Mohammad Ashraf

Abstract:

This research links the use of Building Information Modeling technology in constructions and infrastructure projects, starting from the moment when considering the establishment of a project to demolishing or renovating it, going through the design work, planning, procurement and implementation. BIM Software's which used are Revit, Navisworks and Asta Project in the case study for the Atletico Madrid Stadium project (Wanda Stadium). Also, the project improves through various phases of construction (planning - implementation - management). Besides, the level of the details managed within this project advances gradually. In addition, the construction process problems become about 30 % less than before, resulting from high coordination between designing, implementation and follow through that is done by the project management office (PMO). The current disposition in the industry is to tightly manage the detail contained within the planning and coordination phases of construction, but we miss the opportunity to manage that data as it matures and grows into the execution and commissioning phases.

Keywords: construction management, BIM technology, planning, design, procurements, critical path method

Procedia PDF Downloads 265
7145 Utilization of an Object Oriented Tool to Perform Model-Based Safety Analysis According to Extended Failure System Models

Authors: Royia Soliman, Salma ElAnsary, Akram Amin Abdellatif, Florian Holzapfel

Abstract:

Model-Based Safety Analysis (MBSA) is an approach in which the system and safety engineers share a common system model created using a model-based development process. The model can also be extended by the failure modes of the system components. There are two famous approaches for the addition of fault behaviors to system models. The first one is to enclose the failure into the system design directly. The second approach is to develop a fault model separately from the system model, thus combining both independent models for safety analysis. This paper introduces a hybrid approach of MBSA. The approach tries to use informal abstracted models to investigate failure behaviors. The approach will combine various concepts such as directed graph traversal, event lists and Constraint Satisfaction Problems (CSP). The approach is implemented using an Object Oriented programming language. The components are abstracted to its failure logic and relationships of connected components. The implemented approach is tested on various flight control systems, including electrical and multi-domain examples. The various tests are analyzed, and a comparison to different approaches is represented.

Keywords: flight control systems, model based safety analysis, safety assessment analysis, system modelling

Procedia PDF Downloads 146
7144 The Way of the English Use of Businessmen for the ASEAN Economic Community in Chonburi Province

Authors: Kittivate Boonyopakorn

Abstract:

The purposes of this study were to investigate the method of the English use of the businessmen and to study their behavior of the utilization for the ASEAN economic community. The participants were divided into the three types of the merchants including the construction contractors, the construction material traders, and SME entrepreneurs. Survey questionnaires and interviews were used in this study. The findings showed that in the type of traders, 23 of the participants are construction contractors, 121 are construction material traders, and 206 are SME entrepreneurs. The study of English in language institute is highly 51.4%. The use of Google in translating English into Thai is 41.7%. Learning English themselves is 41.1% respectively. The businessmen study English for readiness for their trade.

Keywords: way of rnglish use, businessmen, ASEAN economic community, Chonburi province

Procedia PDF Downloads 228
7143 Comparative Study on Fire Safety Evaluation Methods for External Cladding Systems: ISO 13785-2 and BS 8414

Authors: Kyungsuk Cho, H. Y. Kim, S. U. Chae, J. H. Choi

Abstract:

Technological development has led to the construction of super-tall buildings and insulators are increasingly used as exterior finishing materials to save energy. However, insulators are usually combustible and vulnerable to fire. Fires like that at Wooshin Golden Suite Building in Busan, Korea in 2010 and that at CCTV Building in Beijing, China are the major examples of fire spread accelerated by combustible insulators. The exterior finishing materials of a high-rise building are not made of insulators only, but they are integrated with the building’s external cladding system. There is a limit in evaluating the fire safety of a cladding system with a single small-unit material such as a cone calorimeter. Therefore, countries provide codes to evaluate the fire safety of exterior finishing materials using full-scale tests. This study compares and to examine the applicability of the methods to Korea. Standard analysis showed differences in the type and size of fire sources and duration and exterior finishing materials also differed in size. In order to confirm the differences, fire tests were conducted on identical external cladding systems to compare fire safety. Although the exterior finishing materials were identical, varying degrees of fire spread were observed, which could be considered as differences in the type and size of the fire sources and duration. Therefore, it is deduced that extended studies should be conducted before the evaluation methods and standards are employed in Korea. The two standards for evaluating fire safety provided different results. Peak heat release rate was 5.5MW in ISO method and 3.0±0.5MW in BS method. Peak heat release rate in ISO method continued for 15 minutes. Fire ignition, growth, full development and decay evolved for 30 minutes in BS method where wood cribs were used as fire sources. Therefore, follow-up studies should be conducted to determine which of the two standards provides fire sources that approximate the size of flames coming out from the openings or those spreading to the outside when a fire occurs at a high-rise building.

Keywords: external cladding systems, fire safety evaluation, ISO 13785-2, BS 8414

Procedia PDF Downloads 226
7142 GIS Based Project Management Information System for Infrastructure Projects

Authors: Riki Panchal, Debasis Sarkar

Abstract:

This paper describes the work done for the GIS-based project management for different infrastructure projects. It is a review paper which gives the idea of the trends in the construction project management and various models adopted for the betterment of the project planning and execution. Traditional scheduling and progress control techniques such as bar charts and the critical path method fail to provide information pertaining to the spatial aspects of a construction project. An integrated system was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. Hence, it is suggested to work on the common platform from where all the data can be shared and analyzed.

Keywords: GIS, project management, integrated model, infrastructure project

Procedia PDF Downloads 501
7141 Subcontractor Development Practices and Processes: A Conceptual Model for LEED Projects

Authors: Andrea N. Ofori-Boadu

Abstract:

The purpose is to develop a conceptual model of subcontractor development practices and processes that strengthen the integration of subcontractors into construction supply chain systems for improved subcontractor performance on Leadership in Energy and Environmental Design (LEED) certified building projects. The construction management of a LEED project has an important objective of meeting sustainability certification requirements. This is in addition to the typical project management objectives of cost, time, quality, and safety for traditional projects; and, therefore increases the complexity of LEED projects. Considering that construction management organizations rely heavily on subcontractors, poor performance on complex projects such as LEED projects has been largely attributed to the unsatisfactory preparation of subcontractors. Furthermore, the extensive use of unique and non-repetitive short term contracts limits the full integration of subcontractors into construction supply chains and hinders long-term cooperation and benefits that could enhance performance on construction projects. Improved subcontractor development practices are needed to better prepare and manage subcontractors, so that complex objectives can be met or exceeded. While supplier development and supply chain theories and practices for the manufacturing sector have been extensively investigated to address similar challenges, investigations in the construction sector are not that obvious. Consequently, the objective of this research is to investigate effective subcontractor development practices and processes to guide construction management organizations in their development of a strong network of high performing subcontractors. Drawing from foundational supply chain and supplier development theories in the manufacturing sector, a mixed interpretivist and empirical methodology is utilized to assess the body of knowledge within literature for conceptual model development. A self-reporting survey with five-point Likert scale items and open-ended questions is administered to 30 construction professionals to estimate their perceptions of the effectiveness of 37 practices, classified into five subcontractor development categories. Data analysis includes descriptive statistics, weighted means, and t-tests that guide the effectiveness ranking of practices and categories. The results inform the proposed three-phased LEED subcontractor development program model which focuses on preparation, development and implementation, and monitoring. Highly ranked LEED subcontractor pre-qualification, commitment, incentives, evaluation, and feedback practices are perceived as more effective, when compared to practices requiring more direct involvement and linkages between subcontractors and construction management organizations. This is attributed to unfamiliarity, conflicting interests, lack of trust, and resource sharing challenges. With strategic modifications, the recommended practices can be extended to other non-LEED complex projects. Additional research is needed to guide the development of subcontractor development programs that strengthen direct involvement between construction management organizations and their network of high performing subcontractors. Insights from this present research strengthen theoretical foundations to support future research towards more integrated construction supply chains. In the long-term, this would lead to increased performance, profits and client satisfaction.

Keywords: construction management, general contractor, supply chain, sustainable construction

Procedia PDF Downloads 98
7140 A Study on the Construction Process and Sustainable Renewal Development of High-Rise Residential Areas in Chongqing (1978-2023)

Authors: Xiaoting Jing, Ling Huang

Abstract:

After the reform and opening up, Chongqing has formed far more high-rise residential areas than other cities in its more than 40 years of urban construction. High-rise residential areas have become one of the main modern living models in Chongqing and an important carrier reflecting the city's high quality of life. Reviewing the construction process and renewal work helps understand the characteristics of high-rise residential areas in Chongqing at different stages, clarify current development demands, and look forward to the focus of future renewal work. Based on socio-economic development and policy background, the article sorts the construction process of high-rise residential areas in Chongqing into four stages: the early experimental construction period of high-rise residential areas (1978-1996), the rapid start-up period of high-rise commodity housing construction (1997-2006), the large-scale construction period of high-rise commodity housing and public rental housing (2007-2014), and the period of renewal and renovation of high-rise residential areas and step-by-step construction of quality commodity housing (2015-present). Based on the construction demands and main construction types of each stage, the article summarizes that the construction of high-rise residential areas in Chongqing features large scale, high speed, and high density. It points out that a large number of high-rise residential areas built after 2000 will become important objects of renewal and renovation in the future. Based on existing renewal work experience, it is urgent to explore a path for sustainable renewal and development in terms of policy mechanisms, digital supervision, and renewal and renovation models, leading the high-rise living in Chongqing toward high-quality development.

Keywords: high-rise residential areas, construction process, renewal and renovation, Chongqing

Procedia PDF Downloads 44
7139 An Analysis of Prefabricated Construction Waste: A Case Study Approach

Authors: H. Hakim, C. Kibert, C. Fabre, S. Monadizadeh

Abstract:

Construction industry is an industry saddled with chronic problems of high waste generation. Waste management that is to ensure materials are utilized in an efficient manner would make a major contribution to mitigating the negative environmental impacts of construction waste including finite resources depletion and growing occupied landfill areas to name a few. Furthermore, ‘material resource efficiency’ has been found an economically smart approach specially when considered during the design phase. One effective strategy is to utilizing off-site construction process which includes a series of prefabricated systems such as mobile, modular, and HUD construction (Department of Housing and Urban Development manufactured buildings). These types of buildings are by nature material and resource-efficient. Despite conventional construction that is exposed to adverse weather conditions, manufactured construction production line is capable of creating repetitive units in a factory controlled environment. A factory can have several parallel projects underway with a high speed and in a timely manner which simplifies the storage of excess materials and re-allocating to the next projects. The literature reports that prefabricated construction significantly helps reduce errors, site theft, rework, and delayed problems and can ultimately lead to a considerable waste reduction. However, there is not sufficient data to quantify this reduction when it comes to a regular modular house in the U.S. Therefore, this manuscript aims to provide an analysis of waste originated from a manufactured factory trend. The analysis was made possible with several visits and data collection of Homes of Merits, a Florida Manufactured and Modular Homebuilder. The results quantify and verify a noticeable construction waste reduction.

Keywords: construction waste, modular construction, prefabricated buildings, waste management

Procedia PDF Downloads 250
7138 HIV and STIs among Female Sex Workers in Ba Ria – Vung Tau, Vietnam

Authors: Tri Nguyen

Abstract:

Background: Female sex workers (FSWs) are at heightened risk of sexually transmitted infections (STIs) and HIV. The purpose of the research is to study FSWs socio-demographic and behavioral characteristics and their HIV/STIs prevalence in Ba Ria – Vung Tau, Vietnam. Methods: A cross-sectional survey of 420 direct and indirect FSWs between January and May, 2014 from 2 cities and 6 districts in Ba Ria – Vung Tau were collected using sampling methods. FSWs were interviewed using the structured questionnaire and biological samples were tested for syphilis, gonorrhoea, chlamydia and HIV in the study. A database was constructed and entered using Epidata 3.1 software and analyzed using the SPSS 20.0 statistical package. Results: A total of 420 FSWs participated in the survey, with a median age of 27 years within a range of 18 – 43 years. Education levels were low with 33.1% only completing all seven major indicators. The median age of first sexual intercourse of the FSWs was 18 years. Most (88.8%) of the FSWs had oral sex. A high proportion (82.4 %) of the FSWs had consumed alcohol. Among them, 51.2% of the FSWs have had sex after drunk. Of the 177 FSWs have reported that they have had sex after drunk, almost half of direct FSWs have had unprotected sex. Among the 420 FSWs who participated in the survey, 2.6 % (11/420) were found to be HIV positive. There was a difference in HIV prevalence among direct and indirect FSWs (4.8 % and 1.2%, p= 0,022). Nearly 7 percent of the FSWs were infected with Syphilis. Similarly, the percentage (7.9 %) of the FSWs was found with Gonorrhoea and a doubly higher percentage (16.4%) of them was suffering from Chlamydia. On the aggregate, the percentage of FSWs with any one of the STIs (Gonorrhoea or Chlamydia) was highest 21.4 %. Conclusions: FSWs in Ba Ria – Vung Tau, Vietnam are highly vulnerable to STIs and need to enhance the existing STIs treatment and intervention programs in order to reduce the risk of HIV infections. HIV/STIs health education and a 100% condom use program should be implemented, and sex industry should be regulated by law.

Keywords: sex workers, female sex workers, HIV, STIs

Procedia PDF Downloads 240
7137 Causes of Cost Overrun in Building Construction Projects: Case Study from Al Madinah, Saudi Arabia

Authors: Z. Hamed, K. Sa'deya, E. Abdelrasheed, I. Mahamid

Abstract:

The construction industry is one of the main sectors that play basic role in the urban and rural development of a society. It provides important ingredients for the development of an economy. However, many construction projects experience extensive cost overrun. This study was conducted to identify the causes of cost overrun in building construction contracts in Al Madinah, Saudi Arabia and test the importance of these causes from contractors' perspective. To achieve the study objectives, a questionnaire survey was conducted to identify and rank cost overrun causes from the perspective of contractors. The findings found that the top five cost overrun causes are: lack of experience in the line of work, lack of labor productivity, delay in payments, rework and material waste. It is hoped that the findings will guide efforts to improve the performance of construction industry in Saudi Arabia and other developing countries.

Keywords: building, contractor, cost increase, cost overrun

Procedia PDF Downloads 138
7136 Circular Economy: Development of Quantitative Material Wastage Management Plan for Effective Waste Reduction in Building Construction Industry

Authors: Kwok Tak Kit

Abstract:

Combating climate change is becoming a hot topic in various sectors. Building construction and infrastructure sectors contributed a significant proportion of waste and GHGs emissions in the economy of different countries and cities. Many types of research had conducted and discussed the topic of waste management and waste management being a macro-level control is well developed in the building and construction industry. However, there is little research and studies on the micro-level of waste management, “building construction material wastage management,” and fewer reviews about regulatory control in the building construction sector. In this paper, we will focus on the potentialities and importance of material wastage management and review the deficiencies of the current standard to take into account the reduction of material wastage in a systematic and quantitative approach.

Keywords: quantitative measurement, material wastage management plan, waste management, uncalculated waste, circular economy

Procedia PDF Downloads 134
7135 A Comparative Study on the Impact of Global Warming of Applying Low Carbon Factor Concrete Products

Authors: Su-Hyun Cho, Chang-U Chae

Abstract:

Environmental impact assessment techniques have been developed as a result of the worldwide efforts to reduce the environmental impact of global warming. By using the quantification method in the construction industry, it is now possible to manage the greenhouse gas is to systematically evaluate the impact on the environment over the entire construction process. In particular, the proportion of greenhouse gas emissions at the production stage of construction material occupied is high, and efforts are needed in particular in the construction field. In this study, intended for concrete products for the construction materials, by using the LCA evaluation method, we compared the results of environmental impact assessment and carbon emissions of developing products that have been applied low-carbon technologies compared to existing products. As a results, by introducing a raw material of industrial waste, showed carbon reduction. Through a comparison of the carbon emission reduction effect of low-carbon technologies, it is intended to provide academic data for the evaluation of greenhouse gases in the construction sector and the development of low-carbon technologies of the future.

Keywords: CO₂ emissions, CO₂ reduction, ready-mixed concrete, environmental impact assessment

Procedia PDF Downloads 463
7134 Project Time and Quality Management during Construction

Authors: Nahed Al-Hajeri

Abstract:

Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.

Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time

Procedia PDF Downloads 231
7133 Evaluating the Relationship between Neighbourhood Satisfaction and Urban Safety: The Case Study of Riverwood, Sydney

Authors: Samaneh Arasteh

Abstract:

Neighbourhood satisfaction and safety are the two main components of urban life and have a substantial impact on residents’ quality of life. The relationship between these two components, especially in areas surrounding our individual private dwellings, is highly influential on many social, economic, and wellbeing activities that may benefit neighbourhood residents. Neighbourhood and urban design – which are liable to be affected by the perceived quality of local public spaces – are likely to be significant factors influencing broader residents’ feelings of safety. With this in mind, this study reviews recent normative literature on how these design processes have influenced neighbourhood satisfaction including perceived safety with a focus on different aspects of public spaces including planning, management, and design in a mix-tenure neighbourhood. Following the study aim, Riverwood in Sydney’s southwest was chosen as a case study to gain a detailed understanding of the context by engaging with community members, residents, non-government organisations, and experts. Moreover, archival studies on neighbourhood satisfaction and safety, expert interviews, and resident questionnaires are presented to shed light on the relationship between neighbourhood satisfaction and perception of safety. The study argues that for the safer neighbourhood in urban areas, social-cultural factors need to be aligned toward strengthening physical factors and since making the environments safer, it is important to understand practical and achievable mechanisms which are required to improve existing estates. Findings show that increasing the clarity of community social and physical environmental involvements can promote residents’ feelings of safety and following neighbourhood satisfaction.

Keywords: neighbourhood satisfaction, public space, Riverwood, urban safety

Procedia PDF Downloads 169