6497 Feasibility Study of a Solar Farm Project with an Executive Approach
Authors: Amir Reza Talaghat
Abstract:
Since 2015, a new approach and policy regarding energy resources protection and using renewable energies has been started in Iran which was developing new projects. Investigating about the feasibility study of these new projects helped to figure out five steps to prepare an executive feasibility study of the concerned projects, which are proper site selections, authorizations, design and simulation, economic study and programming, respectively. The results were interesting and essential for decision makers and investors to start implementing of these projects in reliable condition. The research is obtained through collection and study of the project's documents as well as recalculation to review conformity of the results with GIS data and the technical information of the bidders. In this paper, it is attempted to describe the result of the performed research by describing the five steps as an executive methodology, for preparing a feasible study of installing a 10 MW – solar farm project. The corresponding results of the research also help decision makers to start similar projects is explained in this paper as follows: selecting the best location for the concerned PV plant, reliable and safe conditions for investment and the required authorizations to start implementing the solar farm project in the concerned region, selecting suitable component to achieve the best possible performance for the plant, economic profit of the investment, proper programming to implement the project on time.Keywords: solar farm, solar energy, execution of PV power plant PV power plant
Procedia PDF Downloads 1796496 A Model of Applied Psychology Research Defining Community Participation and Collective Identity as a Major Asset for Strategic Planning and Political Decision: The Project SIA (Social Inclusion through Accessibility)
Authors: Rui Serôdio, Alexandra Serra, José Albino Lima, Luísa Catita, Paula Lopes
Abstract:
We will present the outline of the Project SIA (Social Inclusion through Accessibility) focusing in one of its core components: how our applied research model contributes to define community participation as a pillar for strategic and political agenda amongst local authorities. Project ISA, supported by EU regional funding, was design as part of a broader model developed by SIMLab–Social Inclusion Monitoring Laboratory, in which the relation University-Community is a core element. The project illustrates how University of Porto developed a large scale project of applied psychology research in a close partnership with 18 municipalities that cover almost all regions of Portugal, and with a private architecture enterprise, specialized in inclusive accessibility and “design for all”. Three fundamental goals were defined: (1) creation of a model that would promote the effective civic participation of local citizens; (2) the “voice” of such participation should be both individual and collective; (3) the scientific and technical framework should serve as one of the bases for political decision on inclusive accessibility local planning. The two main studies were run in a standardized model across all municipalities and the samples of the three modalities of community participation were the following: individual participation based on 543 semi-structured interviews and 6373 inquiries; collective participation based on group session with 302 local citizens. We present some of the broader findings of Project SIA and discuss how they relate to our applied research model.Keywords: applied psychology, collective identity, community participation, inclusive accessibility
Procedia PDF Downloads 4456495 The Role of Branding for Success in the Georgian Tea Market
Authors: Maia Seturi, Tamari Todua
Abstract:
Economic growth is seen as the increase in the production capacity of a country. It enables a country to produce more and more material wealth and social benefits. Today, the success of any product on the market is closely related to the issue of branding. The brand is a source of information for a user/consumer, which helps to simplify the choice of goods and reduce consumer risk. The paper studies the role of branding in order to promote Georgian tea brands. The main focus of the research is directed to consumer attitudes regarding Georgian tea brands. The methodology of the paper is based on marketing research. The findings study revealed that the majority of consumers prefer foreign tea brands. The final part of the article presents the main recommendations.Keywords: marketing research, customer behavior, brand, successful brand
Procedia PDF Downloads 1366494 Effects of Main Contractors’ Service Quality on Subcontractors’ Behaviours and Project Outcomes
Authors: Zhuoyuan Wang, Benson T. H. Lim, Imriyas Kamardeen
Abstract:
Effective service quality management has long been touted as a means of improving project and organisational performance. Particularly, in construction projects, main contractors are often seen as a broker between clients and subcontractors, and their service quality is thus associated with the overall project affinity and outcomes. While a considerable amount of research has focused on the aspect of clients-main contractors, very little research has been done to explore the effect of contractors’ service quality on subcontractors’ behaviours and so project outcomes. In addressing this gap, this study surveyed 97 subcontractors in the Chinese Construction industry and data was analysed using the Partial Least Square (PLS) Structural Equation Modelling (SEM) technique. The overall findings reveal that subcontractors categorised main contractors’ service quality into three dimensions: assurance; responsiveness; reliability and empathy. Of these, it is found that main contractors’ ‘assurance’ and ‘responsiveness’ positively influence subcontractors’ intention to engage in contractual behaviours. The results further show that the subcontractors’ intention to engage in organizational citizenship behaviours is associated with how flexible and committed the main contractors are in reliability and empathy. Collectively, both subcontractors’ contractual and organizational citizenship behaviours positively influence the overall project outcomes. In conclusion, the findings inform contractors different strategies towards managing and gaining subcontractors’ behaviour commitment in a socially connected, yet complex and uncertain, business environment.Keywords: construction firms, organisational citizenship behaviour, service quality, social exchange theory
Procedia PDF Downloads 2136493 The Impact of Client Leadership, Building Information Modelling (BIM) and Integrated Project Delivery (IPD) on Construction Project: A Case Study in UAE
Authors: C. W. F. Che Wan Putra, M. Alshawi, M. S. Al Ahbabi, M. Jabakhanji
Abstract:
The construction industry is a multi-disciplinary and multi-national industry, which has an important role to play within the overall economy of any country. There are major challenges to an improved performance within the industry. Particularly lacking is, the ability to capture the large amounts of information generated during the life-cycle of projects and to make these available, in the right format, so that professionals can then evaluate alternative solutions based on life-cycle analysis. The fragmented nature of the industry is the main reason behind the unavailability and ill utilisation of project information. The lack of adequately engaging clients and managing their requirements contributes adversely to construction budget and schedule overruns. This is a difficult task to achieve, particularly if clients are not continuously and formally involved in the design and construction process, which means that the design intent is left to designers that may not always satisfy clients’ requirements. Client lead is strongly recognised in bringing change through better collaboration between project stakeholders. However, one of the major challenges is that collaboration is operated under conventional procurement methods, which hugely limit the stakeholders’ roles and responsibilities to bring about the required level of collaboration. A research has been conducted with a typical project in the UAE. A qualitative research work was conducted including semi-structured interviews with project partners to discover the real reasons behind this delay. The case study also investigated the real causes of the problems and if they can be adequately addressed by BIM and IPD. Special focus was also placed on the Client leadership and the role the Client can play to eliminate/minimize these problems. It was found that part of the ‘key elements’ from which the problems exist can be attributed to the client leadership and the collaborative environment and BIM.Keywords: client leadership, building information modelling (BIM), integrated project delivery (IPD), case study
Procedia PDF Downloads 3236492 Resolution Method for Unforeseen Ground Condition Problem Case in Coal Fired Steam Power Plant Project Location Adipala, Indonesia
Authors: Andi Fallahi, Bona Ryan Situmeang
Abstract:
The Construction Industry is notoriously risky. Much of the preparatory paperwork that precedes construction project can be viewed as the formulation of risk allocation between the owner and the Contractor. The Owner is taking the risk that his project will not get built on the schedule that it will not get built for what he has budgeted and that it will not be of the quality he expected. The Contractor Face a multitude of risk. One of them is an unforeseen condition at the construction site. The Owner usually has the upper hand here if the unforeseen condition occurred. Site data contained in Ground Investigation report is often of significant contractual importance in disputes related to the unforeseen ground condition. A ground investigation can never fully disclose all the details of the underground condition (Risk of an unknown ground condition can never be 100% eliminated). Adipala Coal Fired Steam Power Plant (CSFPP) 1 x 660 project is one of the large CSFPP project in Indonesia based on Engineering, Procurement, and Construction (EPC) Contract. Unforeseen Ground Condition it’s responsible by the Contractor has stipulated in the clausal of Contract. In the implementation, there’s indicated unforeseen ground condition at Circulating Water Pump House (CWPH) area which caused the Contractor should be changed the Method of Work that give big impact against Time of Completion and Cost Project. This paper tries to analyze the best way for allocating the risk between The Owner and The Contractor. All parties that allocating of sharing risk fairly can ultimately save time and money for all parties, and get the job done on schedule for the least overall cost.Keywords: unforeseen ground condition, coal fired steam power plant, circulating water pump house, Indonesia
Procedia PDF Downloads 3286491 Predictors of School Drop out among High School Students
Authors: Osman Zorbaz, Selen Demirtas-Zorbaz, Ozlem Ulas
Abstract:
The factors that cause adolescents to drop out school were several. One of the frameworks about school dropout focuses on the contextual factors around the adolescents whereas the other one focuses on individual factors. It can be said that both factors are important equally. In this study, both adolescent’s individual factors (anti-social behaviors, academic success) and contextual factors (parent academic involvement, parent academic support, number of siblings, living with parent) were examined in the term of school dropout. The study sample consisted of 346 high school students in the public schools in Ankara who continued their education in 2015-2016 academic year. One hundred eighty-five the students (53.5%) were girls and 161 (46.5%) were boys. In addition to this 118 of them were in ninth grade, 122 of them in tenth grade and 106 of them were in eleventh grade. Multiple regression and one-way ANOVA statistical methods were used. First, it was examined if the data meet the assumptions and conditions that are required for regression analysis. After controlling the assumptions, regression analysis was conducted. Parent academic involvement, parent academic support, number of siblings, anti-social behaviors, academic success variables were taken into the regression model and it was seen that parent academic involvement (t=-3.023, p < .01), anti-social behaviors (t=7.038, p < .001), and academic success (t=-3.718, p < .001) predicted school dropout whereas parent academic support (t=-1.403, p > .05) and number of siblings (t=-1.908, p > .05) didn’t. The model explained 30% of the variance (R=.557, R2=.300, F5,345=30.626, p < .001). In addition to this the variance, results showed there was no significant difference on high school students school dropout levels according to living with parents or not (F2;345=1.183, p > .05). Results discussed in the light of the literature and suggestion were made. As a result, academic involvement, academic success and anti-social behaviors will be considered as an important factors for preventing school drop-out.Keywords: adolescents, anti-social behavior, parent academic involvement, parent academic support, school dropout
Procedia PDF Downloads 2846490 Student Project on Using a Spreadsheet for Solving Differential Equations by Euler's Method
Authors: Andriy Didenko, Zanin Kavazovic
Abstract:
Engineering students often have certain difficulties in mastering major theoretical concepts in mathematical courses such as differential equations. Student projects were proposed to motivate students’ learning and can be used as a tool to promote students’ interest in the material. Authors propose a student project that includes the use of Microsoft Excel. This instructional tool is often overlooked by both educators and students. An integral component of the experimental part of such a project is the exploration of an interactive spreadsheet. The aim is to assist engineering students in better understanding of Euler’s method. This method is employed to numerically solve first order differential equations. At first, students are invited to select classic equations from a list presented in a form of a drop-down menu. For each of these equations, students can select and modify certain key parameters and observe the influence of initial condition on the solution. This will give students an insight into the behavior of the method in different configurations as solutions to equations are given in numerical and graphical forms. Further, students could also create their own equations by providing functions of their own choice and a variety of initial conditions. Moreover, they can visualize and explore the impact of the length of the time step on the convergence of a sequence of numerical solutions to the exact solution of the equation. As a final stage of the project, students are encouraged to develop their own spreadsheets for other numerical methods and other types of equations. Such projects promote students’ interest in mathematical applications and further improve their mathematical and programming skills.Keywords: student project, Euler's method, spreadsheet, engineering education
Procedia PDF Downloads 1346489 National Project 'Environment' of Russian Federation as a Management Tool in Achieving SDGs
Authors: Ekaterina Posokhova, Boris Gavrilov
Abstract:
Priority national projects have become an essential phenomenon in the Russian Federation. Both regional and local government institutions and a significant part of the society have been involved in their implementation. The scale and multispectricity of the national projects give a reason to believe that their concept is beyond the scope of the individual state programs. The national project “environment” contains federal projects on waste management, water, and air quality, ecotourism development, and biodiversity conservation highlights the importance of the preservation and restoration of Volga River and Lake Baikal ecosystems. This study assesses the national projects according to their relativeness with the current SDGs (i.e., SGD 14 and 15), evaluates the methodology of the projects. The paper considers the peculiarities of the national projects as strategic management tools as well as the possibility of amending the project objective indicators. Conclusion on the effectiveness of NP in terms of achieving SDGs is provided.Keywords: management, SDP, russia, conservation, law
Procedia PDF Downloads 1446488 Creation of Greenhouses by Students, Using the Own Installations of the University and Increasing the Growth of Plants
Authors: Espinosa-Garza G., Loera-Hernandez I., Antonyan N.
Abstract:
To innovate, it is necessary to perform projects directed towards the search of improvement. The agricultural technique and the design of greenhouses have been studied by undergraduate engineering students from the Tecnológico de Monterrey using the campus areas. The purpose of this project was to incite students to create innovations and help rural populations of the state to solve one of the problems that they are dealing with nowadays. The main objective of the project was to search for an alternative technique that will allow the planting of the “chile piquín” plant, also known as Capsicum annuum, to grow quicker as it germinates. The “chile piquín” is one of the original crops of Mexico and forms the basis of the Mesoamerican cultures’ diet since the pre-hispanic era. To fulfill with today’s demand, it is required to implement new alternative methods to increase the “chile piquín’s” growth. The project lasted one semester with the participation of engineering students from multiple majors. The most important results from this academic experience were that, from the proposed goal, the students could analyze the needs of their town and were capable of introducing new and innovative ideas with the aim of resolving them. In the present article the pedagogic methodologies that allowed to carry out this project will be discussed.Keywords: academic experience, chile piquín, engineering education, greenhouse design, innovation
Procedia PDF Downloads 1506487 Selecting The Contractor using Multi Criteria Decision Making in National Gas Company of Lorestan Province of Iran
Authors: Fatemeh Jaferi, Moslem Parsa, Heshmatolah Shams Khorramabadi
Abstract:
In this modern fluctuating world, organizations need to outsource some parts of their activities (project) to providers in order to show a quick response to their changing requirements. In fact, a number of companies and institutes have contractors do their projects and have some specific criteria in contractor selection. Therefore, a set of scientific tools is needed to select the best contractors to execute the project according to appropriate criteria. Multi-criteria decision making (MCDM) has been employed in the present study as a powerful tool in ranking and selecting the appropriate contractor. In this study, devolving second-source (civil) project to contractors in the National Gas Company of Lorestan Province (Iran) has been found and therefore, 5 civil companies have been evaluated. Evaluation criteria include executive experience, qualification of technical staff, good experience and company's rate, technical interview, affordability, equipment and machinery. Criteria's weights are found through experts' opinions along with AHP and contractors ranked through TOPSIS and AHP. The order of ranking contractors based on MCDM methods differs by changing the formula in the study. In the next phase, the number of criteria and their weights has been sensitivity analysed through using AHP. Adding each criterion changed contractors' ranking. Similarly, changing weights resulted in a change in ranking. Adopting the stated strategy resulted in the facts that not only is an appropriate scientific method available to select the most qualified contractors to execute gas project, but also a great attention is paid to picking needed criteria for selecting contractors. Consequently, executing such project is undertaken by most qualified contractors resulted in optimum use of limited resource, accelerating the implementation of project, increasing quality and finally boosting organizational efficiency.Keywords: multi-criteria decision making, project, management, contractor selection, gas company
Procedia PDF Downloads 4036486 Strategies for Success: Strategic Thinking’s Critical Role in Entrepreneurial
Authors: Silvia Rahmita
Abstract:
Entrepreneurial success is crucial for economic growth, competitiveness, and job creation, yet many entrepreneurs face failure due to various challenges. This paper explores the critical role of strategic thinking in mitigating entrepreneurial failure. Entrepreneurial competencies—encompassing knowledge, skills, and traits—are essential for creating and growing ventures. Despite these competencies, numerous entrepreneurs fail due to poor management, inadequate support, and ineffective policies. The paper categorizes entrepreneurial failures into financial, operational, market, product or service, strategic, leadership, legal, human capital, technological, and environmental failures. Each failure type can be addressed through strategic thinking, which involves foresight, balancing short-term and long-term goals, and hypothesis-driven processes. By integrating strategic thinking into their approach, entrepreneurs can enhance risk management, adapt to market changes, and sustain growth. This process involves setting clear goals, innovating products, and maintaining a competitive edge. Ultimately, strategic thinking provides a framework for proactive planning, adaptation, and continuous improvement, reducing the likelihood of failure and ensuring long-term success. Entrepreneurs who prioritize strategic thinking are better equipped to navigate the complexities of the business environment and achieve sustainable growth.Keywords: entrepreneurial failure, strategic thinking, risk management, business failure
Procedia PDF Downloads 406485 Ground Response Analysis at the Rukni Irrigation Project Site Located in Assam, India
Authors: Tauhidur Rahman, Kasturi Bhuyan
Abstract:
In the present paper, Ground Response Analysis at the Rukni irrigation project has been thoroughly investigated. Surface level seismic hazard is mainly used by the practical Engineers for designing the important structures. Surface level seismic hazard can be obtained accounting the soil factor. Structures on soft soil will show more ground shaking than the structure located on a hard soil. The Surface level ground motion depends on the type of soil. Density and shear wave velocity is different for different types of soil. The intensity of the soil amplification depends on the density and shear wave velocity of the soil. Rukni irrigation project is located in the North Eastern region of India, near the Dauki fault (550 Km length) which has already produced earthquakes of magnitude (Mw= 8.5) in the past. There is a probability of a similar type of earthquake occuring in the future. There are several faults also located around the project site. There are 765 recorded strong ground motion time histories available for the region. These data are used to determine the soil amplification factor by incorporation of the engineering properties of soil. With this in view, three of soil bore holes have been studied at the project site up to a depth of 30 m. It has been observed that in Soil bore hole 1, the shear wave velocity vary from 99.44 m/s to 239.28 m/s. For Soil Bore Hole No 2 and 3, shear wave velocity vary from 93.24 m/s to 241.39 m/s and 93.24m/s to 243.01 m/s. In the present work, surface level seismic hazard at the project site has been calculated based on the Probabilistic seismic hazard approach accounting the soil factor.Keywords: Ground Response Analysis, shear wave velocity, soil amplification, surface level seismic hazard
Procedia PDF Downloads 5496484 A Project-Based Learning Approach in the Course of 'Engineering Skills' for Undergraduate Engineering Students
Authors: Armin Eilaghi, Ahmad Sedaghat, Hayder Abdurazzak, Fadi Alkhatib, Shiva Sadeghi, Martin Jaeger
Abstract:
A summary of experiences, recommendations, and lessons learnt in the application of PBL in the course of “Engineering Skills” in the School of Engineering at Australian College of Kuwait in Kuwait is presented. Four projects were introduced as part of the PBL course “Engineering Skills” to 24 students in School of Engineering. These students were grouped in 6 teams to develop their skills in 10 learning outcomes. The learning outcomes targeted skills such as drawing, design, modeling, manufacturing and analysis at a preliminary level; and also some life line learning and teamwork skills as these students were exposed for the first time to the PBL (project based learning). The students were assessed for 10 learning outcomes of the course and students’ feedback was collected using an anonymous survey at the end of the course. Analyzing the students’ feedbacks, it is observed that 67% of students preferred multiple smaller projects than a single big project because it provided them with more time and attention focus to improve their “soft skills” including project management, risk assessment, and failure analysis. Moreover, it is found that 63% of students preferred to work with different team members during the course to improve their professional communication skills. Among all, 62% of students believed that working with team members from other departments helped them to increase the innovative aspect of projects and improved their overall performance. However, 70% of students counted extra time needed to regenerate momentum with the new teams as the major challenge. Project based learning provided a suitable platform for introducing students to professional engineering practice and meeting the needs of students, employers and educators. It was found that students achieved their 10 learning outcomes and gained new skills developed in this PBL unit. This was reflected in their portfolios and assessment survey.Keywords: project-based learning, engineering skills, undergraduate engineering, problem-based learning
Procedia PDF Downloads 1656483 Quantitative Analysis of Contract Variations Impact on Infrastructure Project Performance
Authors: Soheila Sadeghi
Abstract:
Infrastructure projects often encounter contract variations that can significantly deviate from the original tender estimates, leading to cost overruns, schedule delays, and financial implications. This research aims to quantitatively assess the impact of changes in contract variations on project performance by conducting an in-depth analysis of a comprehensive dataset from the Regional Airport Car Park project. The dataset includes tender budget, contract quantities, rates, claims, and revenue data, providing a unique opportunity to investigate the effects of variations on project outcomes. The study focuses on 21 specific variations identified in the dataset, which represent changes or additions to the project scope. The research methodology involves establishing a baseline for the project's planned cost and scope by examining the tender budget and contract quantities. Each variation is then analyzed in detail, comparing the actual quantities and rates against the tender estimates to determine their impact on project cost and schedule. The claims data is utilized to track the progress of work and identify deviations from the planned schedule. The study employs statistical analysis using R to examine the dataset, including tender budget, contract quantities, rates, claims, and revenue data. Time series analysis is applied to the claims data to track progress and detect variations from the planned schedule. Regression analysis is utilized to investigate the relationship between variations and project performance indicators, such as cost overruns and schedule delays. The research findings highlight the significance of effective variation management in construction projects. The analysis reveals that variations can have a substantial impact on project cost, schedule, and financial outcomes. The study identifies specific variations that had the most significant influence on the Regional Airport Car Park project's performance, such as PV03 (additional fill, road base gravel, spray seal, and asphalt), PV06 (extension to the commercial car park), and PV07 (additional box out and general fill). These variations contributed to increased costs, schedule delays, and changes in the project's revenue profile. The study also examines the effectiveness of project management practices in managing variations and mitigating their impact. The research suggests that proactive risk management, thorough scope definition, and effective communication among project stakeholders can help minimize the negative consequences of variations. The findings emphasize the importance of establishing clear procedures for identifying, assessing, and managing variations throughout the project lifecycle. The outcomes of this research contribute to the body of knowledge in construction project management by demonstrating the value of analyzing tender, contract, claims, and revenue data in variation impact assessment. However, the research acknowledges the limitations imposed by the dataset, particularly the absence of detailed contract and tender documents. This constraint restricts the depth of analysis possible in investigating the root causes and full extent of variations' impact on the project. Future research could build upon this study by incorporating more comprehensive data sources to further explore the dynamics of variations in construction projects.Keywords: contract variation impact, quantitative analysis, project performance, claims analysis
Procedia PDF Downloads 406482 Effects of the Quality Construction of Public Construction in Taiwan to Implementation Three Levels Quality Management Institution
Authors: Hsin-Hung Lai, Wei Lo
Abstract:
Whether it is in virtue or vice for a construction quality of public construction project, it is one of the important indicators for national economic development and overall construction, the impact on the quality of national life is very deep. In recent years, a number of scandal of public construction project occurred, the requirements of the government agencies and the public require the quality of construction of public construction project are getting stricter than ever, the three-level public construction project construction quality of quality control system implemented by the government has a profound impact. This study mainly aggregated the evolution of ISO 9000 quality control system, the difference between the practice of implementing management of construction quality by many countries and three-level quality control of our country, so we explored and found that almost all projects of enhancing construction quality are dominated by civil organizations in foreign countries, whereas, it is induced by the national power in our country and develop our three-level quality control system and audit mechanism based on IOS system and implement the works by legislation, we also explored its enhancement and relevance with construction quality of public construction project that are intervened by such system and national power, and it really presents the effectiveness of construction quality been enhanced by the audited result. The three-level quality control system of our country to promote the policy of public construction project is almost same with the quality control system of many developed countries; however our country mainly implements such system on public construction project only, we promote the three-level quality control system is for enhancing the quality of public construction project, for establishing effective quality management system, so as to urge, correct and prevent the defects of quality management by manufacturers, whereas, those developed countries is comprehensively promoting (both public construction project and civil construction) such system. Therefore, this study is to explore the scope for public construction project only; the most important is the quality recognition by the executor, either good quality or deterioration is not a single event, there is a certain procedure extends from the demand and feasibility analysis, design, tendering, contracting, construction performance, inspection, continuous improvement, completion and acceptance, transferring and meeting the needs of the users, all of mentioned above have a causal relationship and it is a systemic problems. So the best construction quality would be manufactured and managed by reasonable cost if it is by extensive thinking and be preventive. We aggregated the implemented results in the past 10 years (2005 to 2015), the audited results of both in central units and local ones were slightly increased in A-grade while those listed in B-grade were decreased, although the levels were not evidently upgraded, yet, such result presents that the construction quality of concept of manufacturers are improving, and the construction quality has been established in the design stage, thus it is relatively beneficial to the enhancement of construction quality of overall public construction project.Keywords: ISO 9000, three-level quality control system, audit and review mechanism for construction implementation, quality of construction implementation
Procedia PDF Downloads 3466481 Educational Theatre Making Project: Prior Conditions
Authors: Larisa Akhmylovskaia, Andriana Barysh
Abstract:
The present paper is introducing the translation score developing methodology and methods in the cross-cultural communication. The ideas and examples presented by the authors illustrate the universal character of translation score developing methods under analysis. Personal experience in the international theatre-making projects, opera laboratories, cross-cultural master-classes give more opportunities to single out the conditions, forms, means and principles of translation score developing as well as the translator/interpreter’s functions as cultural liaison for multiethnic collaboration.Keywords: methodology of translation score developing, pre-production, analysis, production, post-production, ethnic scene theory, theatre anthropology, laboratory, master-class, educational project, academic project, participant observation, super-objective
Procedia PDF Downloads 5146480 Impact of Exogenous Risk Factors into Actual Construction Price in PPP Projects
Authors: Saleh Alzahrani, Halim Boussabaine
Abstract:
Many of Public Private Partnership (PPP) are developed based on a public project is to be awarded to a private party within a one contractual framework. PPP project risks typically include the development and construction of a new asset as well as its operation. Certainly the most severe consequences of risks through the construction period are price and time overruns. These events are among the most generally used situation in value for money analysis risks. The sources of risk change during the time in PPP project. In traditional procurement, the public sector usually has to cover all prices suffering from these risks. At least there is plenty to suggest that price suffering is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of exogenous risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.Keywords: public private partnership (PPP), risk, risk pricing, system dynamics (SD)
Procedia PDF Downloads 5576479 Factors Influencing Agricultural Systems Adoption Success: Evidence from Thailand
Authors: Manirath Wongsim, Ekkachai Naenudorn, Nipotepat Muangkote
Abstract:
Information Technology (IT), play an important role in business management strategies and can provide assistance in all phases of decision making. Thus, many organizations need to be seen as adopting IT, which is critical for a company to organize, manage and operate its processes. In order to implement IT successfully, it is important to understand the underlying factors that influence agricultural system's adoption success. Therefore, this research intends to study this perspective of factors that influence and impact successful IT adoption and related agricultural performance. Case study and survey methodology were adopted for this research. Case studies in two Thai- organizations were carried out. The results of the two main case studies suggested 21 factors that may have an impact on IT adoption in agriculture in Thailand, which led to the development of the preliminary framework. Next, a survey instrument was developed based on the findings from case studies. Survey questionnaires were gathered from 217 respondents from two large-scale surveys were sent to selected members of Thailand farmer, and Thailand computer to test the research framework. The results indicate that the top five critical factors for ensuring IT adoption in agricultural were: 1) network and communication facilities; 2) software; 3) hardware; 4) farmer’s IT knowledge, and; 5) training and education. Therefore, it is now clear which factors are influencing IT adoption and which of those factors are critical success factors for ensuring IT adoption in agricultural organization.Keywords: agricultural systems adoption, factors influencing IT adoption, factors affecting in agricultural adoption
Procedia PDF Downloads 1616478 Strategies Employed to Enhance Floriculture Production for Masvingo City Residents’ Livelihood Improvement
Authors: Jotham Mazhura
Abstract:
Floriculture production is an ideal project for sustainable horticultural production in Masvingo city.Gender links in collaboration with the embasy of Sweedenare supporting the floriculture project with the aim of improving residents livelihoods in the city.World trade in floriculture such as cut flowers,live ornamental plants and foliage continue to increase and there are recognised markets opportunities across the globe.Some specific opportunitiesin an interview discussion by the consultant appointed by gender links and embasy of Sweeden highlightedsome constraints and opportunities in the project of floriculture in Masvingo city.Based on the outcome of the scoping studies this research project developed and evaluated strategies for enhancing floriculture production in Masvingo city. A survey was therefore carried out by the researcher among the existing florists farmers in the city to determine strategies to be employed to improve floriculture production.The survey was conducted to twenty florists in the city.The sample was taken by using purposive sampling which is a sampling technique based on the certain considerations, hence there were some basic creteria in selecting samples. A questionnaire in this aspect was administered to the 20 florists to determine the essential strategies to be employed to enhance floriculture production.Each respondent was given data for the business strategies and asked to rank those strategies from the most to the least important.From the research findings the following were revealed out by the respondents that is capturing marketshare,establishment of of ownership of the project,the project manager to be innovative,the business should gain competitive strategic through generic strategies market development strategy and product development strategy. Based on the observation and structured interview with respondents the average of floriculture owners had similar strategies implemented on their business.The research proved that floriculture farmers use various strategies to keep their businesses running and succeding in achieving set goals.Therefore the ressearche who happens to be the project focal person became certain that it is edeal to emply a variety of of strategies to improve floriculture oproductionKeywords: florist, floriculture, strategy, livelihoods
Procedia PDF Downloads 866477 The Sustainability of Human Resource Planning for Construction Projects
Authors: Adegbenga Ashiru, Adebimpe L. Ashiru
Abstract:
The construction industry is considered to work by diversifying personnel. Hence managing human resource is an issue considered to be a highly challenging task. Nonetheless, HR planning for the construction project is a very critical aspect of managing human resource within an expanding nature of construction industry, and there are rising concerns over the failure of construction planning to achieve its goals in spite of the substantial resources allocated to it and as a result of different planning strategies. To justify the above statement, this research was carried out to examine the sustainability of HR planning for construction project. Based on the researcher’s experience, a quantitative approach was adopted that provided a broader understanding of the research and was analysed using descriptive statistics and inferential statistics. The Statistical Package for the Social Sciences (SPSS) was used to obtain the descriptive and inferential statistical analysis. However, research findings showed that literature sources agreed with varying challenges of HR planning on construction projects which were justified by empirical findings. Also, the paper identified four major factors and the key consideration for Project HR Planning (Organisation’s structure with right individuals at right positions and evaluation current resources) will lead to the efficient utilisation implementation of new HR Planning technique and tools for a construction project. Essentially the main reoccurring theme identified was that management of the construction organisations needs to look into the essential factors needed to be considered at the strategic level. Furthermore, leaders leading a construction project team should consider those essential factors needed at the operational level to clarify the numerous functions of HRM in the construction organisations and avoid inconsistencies among several practices on construction projects. The Sustainability of HR planning for construction project policy was indicated and recommendations were made for further future research.Keywords: construction industry, HRM planning in construction, SHRM in construction, HR planning in construction
Procedia PDF Downloads 3506476 Multi-Sensor Target Tracking Using Ensemble Learning
Authors: Bhekisipho Twala, Mantepu Masetshaba, Ramapulana Nkoana
Abstract:
Multiple classifier systems combine several individual classifiers to deliver a final classification decision. However, an increasingly controversial question is whether such systems can outperform the single best classifier, and if so, what form of multiple classifiers system yields the most significant benefit. Also, multi-target tracking detection using multiple sensors is an important research field in mobile techniques and military applications. In this paper, several multiple classifiers systems are evaluated in terms of their ability to predict a system’s failure or success for multi-sensor target tracking tasks. The Bristol Eden project dataset is utilised for this task. Experimental and simulation results show that the human activity identification system can fulfill requirements of target tracking due to improved sensors classification performances with multiple classifier systems constructed using boosting achieving higher accuracy rates.Keywords: single classifier, ensemble learning, multi-target tracking, multiple classifiers
Procedia PDF Downloads 2686475 Upon One Smoothing Problem in Project Management
Authors: Dimitri Golenko-Ginzburg
Abstract:
A CPM network project with deterministic activity durations, in which activities require homogenous resources with fixed capacities, is considered. The problem is to determine the optimal schedule of starting times for all network activities within their maximal allowable limits (in order not to exceed the network's critical time) to minimize the maximum required resources for the project at any point in time. In case when a non-critical activity may start only at discrete moments with the pregiven time span, the problem becomes NP-complete and an optimal solution may be obtained via a look-over algorithm. For the case when a look-over requires much computational time an approximate algorithm is suggested. The algorithm's performance ratio, i.e., the relative accuracy error, is determined. Experimentation has been undertaken to verify the suggested algorithm.Keywords: resource smoothing problem, CPM network, lookover algorithm, lexicographical order, approximate algorithm, accuracy estimate
Procedia PDF Downloads 3026474 Arboretum: Community Mixed Reality Nature Environment
Authors: Radek Richtr, Petr Paus
Abstract:
The connection to the primal environment, living and growing nature is disappearing for most of the residents in urban core areas nowadays. Most of the residents perceive scattered green mass like more technical objects than sentient living organisms. The Arboretum is a type of application from the 'serious games' genre -it is a research experiment masked as a gaming environment. In used virtual and augmented reality environments, every city district is represented by central objects; Pillars created as a result of resident’s consensus. Every player can furthermore plant and grow virtual organic seeds everywhere he wants. Seeds sprout, and their form is determined by both players’ choice and nearest pillar. Every house, private rooms, and even workspace get their new living virtual avatar-connected 'residents' growing from player-planted seeds. Every room or workspace is transformed into (calming) nature scene, reflecting in some way both players and community spirit and together create a vicinity environment. The conceptual design phase of the project is crucial and allows for the identification of the fundamental problems through abstraction. The project that centers on wide community usage needs a clear and accessible interface. Simultaneously the conceptual design allows early sharing of project ideas and creating public concern. The paper discusses the current conceptual model of an Arboretum project (which is part of a whole widespread project) and its validation.Keywords: augmented reality, conceptual design, mixed reality, social engineering
Procedia PDF Downloads 2306473 Project Marayum: Creating a Community Built Mobile Phone Based, Online Web Dictionary for Endangered Philippine Languages
Authors: Samantha Jade Sadural, Kathleen Gay Figueroa, Noel Nicanor Sison II, Francis Miguel Quilab, Samuel Edric Solis, Kiel Gonzales, Alain Andrew Boquiren, Janelle Tan, Mario Carreon
Abstract:
Of the 185 languages in the Philippines, 28 are endangered, 11 are dying off, and 4 are extinct. Language documentation, as a prerequisite to language education, can be one of the ways languages can be preserved. Project Marayum is envisioned to be a collaboratively built, mobile phone-based, online dictionary platform for Philippine languages. Although there are many online language dictionaries available on the Internet, Project Marayum aims to give a sense of ownership to the language community's dictionary as it is built and maintained by the community for the community. From a seed dictionary, members of a language community can suggest changes, add new entries, and provide language examples. Going beyond word definitions, the platform can be used to gather sample sentences and even audio samples of word usage. These changes are reviewed by language experts of the community, sourced from the local state universities or local government units. Approved changes are then added to the dictionary and can be viewed instantly through the Marayum website. A companion mobile phone application allows users to browse the dictionary in remote areas where Internet connectivity is nonexistent. The dictionary will automatically be updated once the user regains Internet access. Project Marayum is still a work in progress. At the time of this abstract's writing, the Project has just entered its second year. Prototypes are currently being tested with the Asi language of Romblon island as its initial language testbed. In October 2020, Project Marayum will have both a webpage and mobile application with Asi, Ilocano, and Cebuano language dictionaries available for use online or for download. In addition, the Marayum platform would be then easily expandable for use of the more endangered language communities. Project Marayum is funded by the Philippines Department of Science and Technology.Keywords: collaborative language dictionary, community-centered lexicography, content management system, software engineering
Procedia PDF Downloads 1636472 The Environmental Damages Related to Urban Sites
Authors: Kherbache Radhwane
Abstract:
We currently live in the world pressed by technological developments necessary for the construction, where the concept of sustainable development is truly rooted in recent years. Construction or demolitions of buildings necessarily generate environmental pollution, both inside and outside the site. Depending on the size and nature of work and the context surrounding these problems can be more or less important as is the case here in Algeria. They may affect the smooth running of the site. Moreover, there are regulations exist or are under development and should be taken into account by the various players in the act of building. This is, for example, the case of new obligations in terms of sorting and recycling of construction waste. Given this situation, it appears increasingly necessary to integrate the building sites in an effort to better respect the environment and its regulation. Several operations were performed according to this principle. The success of a project is that respects its environment through the involvement of each actor of the operation of the site with a low nuisance. As such, the client assisted by his driver and its operating contractor and the company plays a central role as an initiator of the process. It must ensure the establishment of appropriate means of organizational plans and contract.Keywords: evolution, sustainable development, construction, demolition, building, nuisance, environmental, tailings, construction, regulations
Procedia PDF Downloads 2646471 Optimization of the Rain Harvest Using Multi-Purpose Valley Tanks
Authors: Ahmad Hashad
Abstract:
Valley tanks are a kind of rain harvest which is used as ground water storage to overcome drought seasons in some countries. This research displays the rain harvest evolution and introduces some ideas to develop the valley tanks to be more than water storage. These ideas developed the current valley tanks design to become an integrated renaissance project. The suggested design has some changes making it different than the traditional design of valley tanks. These changes allow for the new design to be more flexible for adding additional capacity, water purification units and water pumping units. The suggested valley tanks project will be designed based on studying the rainfall and evaporation rates, as well as land topography and designed agricultural map linked to seasons of rain and drought.Keywords: valley tanks, rain harvest, volatile nature, integrated renaissance project
Procedia PDF Downloads 2496470 Studies on Performance of an Airfoil and Its Simulation
Authors: Rajendra Roul
Abstract:
The main objective of the project is to bring attention towards the performance of an aerofoil when exposed to the fluid medium inside the wind tunnel. This project aims at involvement of civil as well as mechanical engineering thereby making itself as a multidisciplinary project. The airfoil of desired size is taken into consideration for the project to carry out effectively. An aerofoil is the shape of the wing or blade of propeller, rotor or turbine. Lot of experiment have been carried out through wind-tunnel keeping aerofoil as a reference object to make a future forecast regarding the design of turbine blade, car and aircraft. Lift and drag now become the major identification factor for any design industry which shows that wind tunnel testing along with software analysis (ANSYS) becomes the mandatory task for any researchers to forecast an aerodynamics design. This project is an initiative towards the mitigation of drag, better lift and analysis of wake surface profile by investigating the surface pressure distribution. The readings has been taken on airfoil model in Wind Tunnel Testing Machine (WTTM) at different air velocity 20m/sec, 25m/sec, 30m/sec and different angle of attack 00,50,100,150,200. Air velocity and pressures are measured in several ways in wind tunnel testing machine by use to measuring instruments like Anemometer and Multi tube manometer. Moreover to make the analysis more accurate Ansys fluent contribution become substantial and subsequently the CFD simulation results. Analysis on an Aerofoil have a wide spectrum of application other than aerodynamics including wind loads in the design of buildings and bridges for structural engineers.Keywords: wind-tunnel, aerofoil, Ansys, multitube manometer
Procedia PDF Downloads 4146469 Comparing the Contribution of General Vocabulary Knowledge and Academic Vocabulary Knowledge to Learners' Academic Achievement
Authors: Reem Alsager, James Milton
Abstract:
Coxhead’s (2000) Academic Word List (AWL) believed to be essential for students pursuing higher education and helps differentiate English for Academic Purposes (EAP) from General English as a course of study, and it is thought to be important for comprehending English academic texts. It has been described that AWL is an infrequent, discrete set of vocabulary items unreachable from general language. On the other hand, it has been known for a period of time that general vocabulary knowledge is a good predictor of academic achievement. This study, however, is an attempt to measure and compare the contribution of academic knowledge and general vocabulary knowledge to learners’ GPA and examine what knowledge is a better predictor of academic achievement and investigate whether AWL as a specialised list of infrequent words relates to the frequency effect. The participants were comprised of 44 international postgraduate students in Swansea University, all from the School of Management, following the taught MSc (Master of Science). The study employed the Academic Vocabulary Size Test (AVST) and the XK_Lex vocabulary size test. The findings indicate that AWL is a list based on word frequency rather than a discrete and unique word list and that the AWL performs the same function as general vocabulary, with tests of each found to measure largely the same quality of knowledge. The findings also suggest that the contribution that AWL knowledge provides for academic success is not sufficient and that general vocabulary knowledge is better in predicting academic achievement. Furthermore, the contribution that academic knowledge added above the contribution of general vocabulary knowledge when combined is really small and noteworthy. This study’s results are in line with the argument and suggest that it is the development of general vocabulary size is an essential quality for academic success and acquiring the words of the AWL will form part of this process. The AWL by itself does not provide sufficient coverage, and is probably not specialised enough, for knowledge of this list to influence this general process. It can be concluded that AWL as an academic word list epitomizes only a fraction of words that are actually needed for academic success in English and that knowledge of academic vocabulary combined with general vocabulary knowledge above the most frequent 3000 words is what matters most to ultimate academic success.Keywords: academic achievement, academic vocabulary, general vocabulary, vocabulary size
Procedia PDF Downloads 2196468 Development of an Intelligent Decision Support System for Smart Viticulture
Authors: C. M. Balaceanu, G. Suciu, C. S. Bosoc, O. Orza, C. Fernandez, Z. Viniczay
Abstract:
The Internet of Things (IoT) represents the best option for smart vineyard applications, even if it is necessary to integrate the technologies required for the development. This article is based on the research and the results obtained in the DISAVIT project. For Smart Agriculture, the project aims to provide a trustworthy, intelligent, integrated vineyard management solution that is based on the IoT. To have interoperability through the use of a multiprotocol technology (being the future connected wireless IoT) it is necessary to adopt an agnostic approach, providing a reliable environment to address cyber security, IoT-based threats and traceability through blockchain-based design, but also creating a concept for long-term implementations (modular, scalable). The ones described above represent the main innovative technical aspects of this project. The DISAVIT project studies and promotes the incorporation of better management tools based on objective data-based decisions, which are necessary for agriculture adapted and more resistant to climate change. It also exploits the opportunities generated by the digital services market for smart agriculture management stakeholders. The project's final result aims to improve decision-making, performance, and viticulturally infrastructure and increase real-time data accuracy and interoperability. Innovative aspects such as end-to-end solutions, adaptability, scalability, security and traceability, place our product in a favorable situation over competitors. None of the solutions in the market meet every one of these requirements by a unique product being innovative.Keywords: blockchain, IoT, smart agriculture, vineyard