5727 Navigating Construction Project Outcomes: Synergy Through the Evolution of Digital Innovation and Strategic Management

Authors: Derrick Mirindi, Frederic Mirindi, Oluwakemi Oshineye

Abstract:

The ongoing high rate of construction project failures worldwide is often blamed on the difficulties of managing stakeholders. This highlights the crucial role of strategic management (SM) in achieving project success. This study investigates how integrating digital tools into the SM framework can effectively address stakeholder-related challenges. This work specifically focuses on the impact of evolving digital tools, such as Project Management Software (PMS) (e.g., Basecamp and Wrike), Building Information Modeling (BIM) (e.g., Tekla BIMsight and Autodesk Navisworks), Virtual and Augmented Reality (VR/AR) (e.g., Microsoft HoloLens), drones and remote monitoring, and social media and Web-Based platforms, in improving stakeholder engagement and project outcomes. Through existing literature with examples of failed projects, the study highlights how the evolution of digital tools will serve as facilitators within the strategic management process. These tools offer benefits such as real-time data access, enhanced visualization, and more efficient workflows to mitigate stakeholder challenges in construction projects. The findings indicate that integrating digital tools with SM principles effectively addresses stakeholder challenges, resulting in improved project outcomes and stakeholder satisfaction. The research advocates for a combined approach that embraces both strategic management and digital innovation to navigate the complex stakeholder landscape in construction projects.

Keywords: strategic management, digital tools, virtual and augmented reality, stakeholder management, building information modeling, project management software

Procedia PDF Downloads 84
5726 Encouraging the Development of Scientific Literacy in Early Childhood Institutions: Croatian Experience

Authors: L. Vujičić, Ž. Ivković, Ž. Boneta

Abstract:

There is a widespread belief in everyday discourse that science subjects (physics, chemistry and biology) are, along with math, the most difficult school subjects in the education of an individual. This assumption is usually justified by the following facts: low GPA in these subjects, the number of pupils who fail these subjects is high in comparison to other subjects, and the number of pupils interested in continuing their studies in the fields with a focus on science subjects is lower compared to non-science-oriented fields. From that perspective, the project: “Could it be different? How do children explore it?” becomes extremely interesting because it is focused on young children and on the introduction of new methods, with aim of arousing interest in scientific literacy development in 10 kindergartens by applying the methodology of an action research, with an ethnographic approach. We define scientific literacy as a process of encouraging and nurturing the research and explorative spirit in children, as well as their natural potential and abilities that represent an object of scientific research: to learn about exploration by conducting exploration. Upon project completion, an evaluation questionnaire was created for the parents of the children who had participated in the project, as well as for those whose children had not been involved in the project. The purpose of the first questionnaire was to examine the level of satisfaction with the project implementation and its outcomes among those parents whose children had been involved in the project (N=142), while the aim of the second questionnaire was to find out how much the parents of the children not involved (N=154) in this activity were interested in this topic.

Keywords: documenting, early childhood education, evaluation questionnaire for parents, scientific literacy development

Procedia PDF Downloads 253
5725 Educational Experience and the Investigation Results: Creation of New Healthy Products

Authors: G. Espinosa Garza, I. Loera, N. Antonyan

Abstract:

In the last decades, teaching in particular engineering subjects is going through a significative problem. A quick evaluation of the entrepreneurial surroundings makes it more difficult for students to identify the course contents with real situations related with their future professions. Proposing teaching through challenges or problem-based projects, and real-life situations is turning into an important challenge for any university-level educator. The objective of this work is to present the educational experience and the investigation results taken through the Project Viability course, done by a group of professors and students from the Technologic of Monterrey. Currently, in Mexico, the orange peels are considered a dispose and they are not being utilized as an alternative to create subproducts. However, there is a great opportunity in its use as a raw material with the goal to originate the waste from the local citric firms or business. The project challenge consisted in the development of edible products from the orange peel with the intention to generate new healthy products. With this project, apart from the obtainment of the original results, the accomplishment consisted in creating a learning atmosphere, where students together with the professors were able to plan, evaluate, and implement the project related with the creative, innovative, and sustainable processes with the goal to apply it in the development of local solutions. In the present article, the pedagogic methodologies that allowed to carry out this project will be discussed.

Keywords: engineering subjects, learning project, orange peel, sustainable process

Procedia PDF Downloads 289
5724 Evaluating Construction Project Outcomes: Synergy Through the Evolution of Digital Innovation and Strategic Management

Authors: Mirindi Derrick, Mirindi Frederic, Oluwakemi Oshineye

Abstract:

Abstract: The ongoing high rate of construction project failures worldwide is often blamed on the difficulties of managing stakeholders. This highlights the crucial role of strategic management (SM) in achieving project success. This study investigates how integrating digital tools into the SM framework can effectively address stakeholder-related challenges. This work specifically focuses on the impact of evolving digital tools, such as Project Management Software (PMS) (e.g., Basecamp and Wrike), Building Information Modeling (BIM) (e.g., Tekla BIMsight and Autodesk Navisworks), Virtual and Augmented Reality (VR/AR) (e.g., Microsoft HoloLens), drones and remote monitoring, and social media and Web-Based platforms, in improving stakeholder engagement and project outcomes. Through existing literature with examples of failed projects, the study highlights how the evolution of digital tools will serve as facilitators within the strategic management process. These tools offer benefits such as real-time data access, enhanced visualization, and more efficient workflows to mitigate stakeholder challenges in construction projects. The findings indicate that integrating digital tools with SM principles effectively addresses stakeholder challenges, resulting in improved project outcomes and stakeholder satisfaction. The research advocates for a combined approach that embraces both strategic management and digital innovation to navigate the complex stakeholder landscape in construction projects.

Keywords: strategic management, digital tools, virtual and augmented reality, stakeholder management, building information modeling, project management software

Procedia PDF Downloads 51
5723 A Method for Allocation of Smart Intersections Using Traffic Information

Authors: Sang-Tae Ji, Jeong-Woo Park, Jun-Ho Park, Kwang-Woo Nam

Abstract:

This study aims is to suggest the basic factors by considering the priority of intersection in the diffusion project of Smart intersection. Busan Metropolitan City is conducting a smart intersection project for efficient traffic management. The smart intersection project aims to make breakthrough improvement of the intersection congestion by optimizing the signal system using CCTV (closed-circuit television camera) image analysis technology. This study investigated trends of existing researches and analyzed by setting three things of traffic volume, characteristics of intersection road, and whether or not to conduct the main arterial road as factors for selecting new intersection when spreading smart intersection. Using this, we presented the priority of the newly installed intersection through the present situation and analysis for the Busan Metropolitan City which is the main destination of the spreading project of the smart intersection. The results of this study can be used as a consideration in the implementation of smart intersection business.

Keywords: CCTV, GIS, ICT, Smart City, smart intersection

Procedia PDF Downloads 387
5722 Risk Based Building Information Modeling (BIM) for Urban Infrastructure Transportation Project

Authors: Debasis Sarkar

Abstract:

Building Information Modeling (BIM) is a holistic documentation process for operational visualization, design coordination, estimation and project scheduling. BIM software defines objects parametrically and it is a tool for virtual reality. Primary advantage of implementing BIM is the visual coordination of the building structure and systems such as Mechanical, Electrical and Plumbing (MEP) and it also identifies the possible conflicts between the building systems. This paper is an attempt to develop a risk based BIM model which would highlight the primary advantages of application of BIM pertaining to urban infrastructure transportation project. It has been observed that about 40% of the Architecture, Engineering and Construction (AEC) companies use BIM but primarily for their outsourced projects. Also, 65% of the respondents agree that BIM would be used quiet strongly for future construction projects in India. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors and building service providers (MEP). Integration of risk management along with BIM would provide enhanced co-ordination, collaboration and high probability of successful completion of the complex infrastructure transportation project within stipulated time and cost frame.

Keywords: building information modeling (BIM), infrastructure transportation, project risk management, underground metro rail

Procedia PDF Downloads 310
5721 Corporate Female Entrepreneurship, Moving Boundaries

Authors: Morena Paulisic, Marli Gonan Bozac

Abstract:

Business organization and management in theory are typically presented as gender- neutral. Although in practice female contribution to corporation is not questionable, gender diversity in top management of corporation is and that especially in emerging countries like Croatia. This paper brings insights into obstacles and problems which should be overcome. Furthermore, gives an introspective view on the most important promotion and motivation factors of powerful female CEOs in Croatia. The goal was to clarify perception and performance of female CEOs that contributed to their success and to determine mutual characteristics of women in corporate entrepreneurship regarding the motivation. For our study we used survey instrument that was developed for this research. The research methods used were: table research, field research, generalization method, comparative method, and statistical method (descriptive statistics and Pearson’s Chi-square test). Some result showed us that today even more women in corporations are not likely to accept more engagement at work if it harms their families (2003 – 31.9% in 2013 – 33.8%) although their main motivating factor is still interested job (2003 – 95.8%; in 2013-100%). It is also significant that 78.8 % of Croatian top managers (2013) think that women managers in Croatia are insufficiently spoken and written about, and that the reasons for this are that: (1) the society underestimates their ability (37.9%); (2) women underestimate themselves (22.4%); (3) the society still mainly focuses on male managers (20.7%) and (4) women managers avoid interviews and appearing on front pages (19%). The environment still “blocks” the natural course of advancement of women managers in organisations (entrepreneurship in general) and the main obstacle is that women must always or almost always be more capable than men in order to succeed (96.6%). Based on survey results on longitudinal research conducted in 2003 (return rate 30,8%) and 2013 (return rate 29,2%) in Croatia we expand understanding of determination indicators of corporate female entrepreneurship. Theoretically in practice gender structure at the management level (executive management, management board and supervisory board) throw years (2011- 2014) have positive score but still women remain significantly underrepresented at those positions. Findings from different sources have shown that diversity at the top of corporations’ correlates with better performance. In this paper, we have contributed to research on gender in corporate entrepreneurship by offering experiences from successful female CEOs and explanation why in social responsible society women with their characteristics can support needed changes and construct different way forward for corporations. Based on research result we can conclude that in future underrepresentation of female in corporate entrepreneurship should be overcome.

Keywords: Croatia, female entrepreneurship, glass ceiling, motivation

Procedia PDF Downloads 331
5720 An Empirical Investigation of Factors Influencing Construction Project Selection Processes within the Nigeria Public Sector

Authors: Emmanuel U. Unuafe, Oyegoke T. Bukoye, Sandhya Sastry, Yanqing Duan

Abstract:

Globally, there is increasing interest in project management due to a shortage in infrastructure services supply capability. Hence, it is of utmost importance that organisations understand that choosing a particular project over another is an opportunity cost – tying up the organisations resources. In order to devise constructive ways to bring direction, structure, and oversight to the process of project selection has led to the development of tools and techniques by researchers and practitioners. However, despite the development of various frameworks to assist in the appraisal and selection of government projects, failures are still being recorded with government projects. In developing countries, where frameworks are rarely used, the problems are compounded. To improve the situation, this study will investigate the current practice of construction project selection processes within the Nigeria public sector in order to inform theories of decision making from the perspective of developing nations and project management practice. Unlike other research around construction projects in Nigeria this research concentrate on factors influencing the selection process within the Nigeria public sector, which has received limited study. The authors report the findings of semi-structured interviews of top management in the Nigerian public sector and draw conclusions in terms of decision making extant theory and current practice. Preliminary results from the data analysis show that groups make project selection decisions and this forces sub-optimal decisions due to pressure on time, clashes of interest, lack of standardised framework for selecting projects, lack of accountability and poor leadership. Consequently, because decision maker is usually drawn from different fields, religious beliefs, ethnic group and with different languages. The choice of a project by an individual will be greatly influence by experience, political precedence than by realistic investigation as well as his understanding of the desired outcome of the project, in other words, the individual’s ideology and their level of fairness.

Keywords: factors influencing project selection, public sector construction project selection, projects portfolio selection, strategic decision-making

Procedia PDF Downloads 331
5719 Practices in Planning, Design and Construction of Head Race Tunnel of a Hydroelectric Project

Authors: M. S. Thakur, Mohit Shukla

Abstract:

A channel/tunnel, which carries the water to the penstock/pressure shaft is called headrace tunnel (HRT). It is necessary to know the general topography, geology of the area, state of stress and other mechanical properties of the strata. For this certain topographical and geological investigations, in-situ and laboratory tests, and observations are required to be done. These investigations play an important role in a tunnel design as these help in deciding the optimum layout, shape and size and support requirements of the tunnel. The paper includes inputs from Nathpa Jhakri Hydeoelectric project which is India’s highest capacity (1500 MW) operating hydroelectric project. The paper would help the design engineers with various new concepts and preparedness against geological surprises.

Keywords: tunnelling, geology, HRT, rockmass

Procedia PDF Downloads 256
5718 An Alternative to Resolve Land use Conflicts: the Rétköz Lake Project

Authors: Balázs Kulcsár

Abstract:

Today, there is no part of the world that does not bear the mark of man in some way. This process seems unstoppable. So perhaps the best thing we can do is to touch that handprint gently and with the utmost care. There are multiple uses for the same piece of land, the coordination of which requires careful and sustainable spatial planning. The case study of the Rétközlake in north-eastern Hungary illustrates a habitat rehabilitation project in which a number of human uses were coordinated with the conservation and restoration of the natural environment. Today, the good condition of the habitat can only be maintained artificially, but the project has paid particular attention to finding a sustainable solution. The rehabilitation of Lake Rétköz is considered good practice in resolving land-use conflicts.

Keywords: sustainability, ecosystem service, land use conflict, landscape utilization

Procedia PDF Downloads 169
5717 Assessing Knowledge Management Impacts: Challenges, Limits and Base for a New Framework

Authors: Patrick Mbassegue, Mickael Gardoni

Abstract:

In a market environment centered more and more on services and the digital economy, knowledge management becomes a framework that can help organizations to create value and to improve their overall performance. Based on an optimal allocation of scarce resources, managers are interested in demonstrating the added value generated by knowledge management projects. One of the challenges faced by organizations is the difficulty in measuring impacts and concrete results of knowledge management initiatives. The present article concerns the measure of concrete results coming from knowledge management projects based on balance scorecard model. One of the goals is to underline what can be done based on this model but also to highlight the limits associated. The present article is structured in five parts; 1-knowledge management projects and organizational impacts; 2- a framework and a methodology to measure organizational impacts; 3- application illustrated in two case studies; 4- limits concerning the proposed framework; 5- the proposal of a new framework to measure organizational impacts.

Keywords: knowledge management, project, balance scorecard, impacts

Procedia PDF Downloads 262
5716 Possibilities of Output Technology the Project ADAPTIV for Use in Infrared Camouflage

Authors: Jiří Barta, Teodor Baláž, Tomáš Ludík, Jiří. F. Urbánek

Abstract:

This article deals with the outputs of project acronym ADAPTIV of Czech Defence Research Project. This Project solved tends to adaptive camouflage. The camouflage is concealment by means of disguise. Perceptive interface between recipient and camouflaged object is visualized by means of textile modular screens. Screens special light semi-permeability enables front/ back projection with nearly identical light parameters. Information permeability, towards illusion creation, must be controlled by the camouflage provider by means sophisticated and mastered illusion with perfect scenarios. The project ADAPTIV was primarily funded with the maximum possible use of COTS (Commercial-Off-The-Shelf) principle asks special definition of feasibility conditions, especially recipient space position. This paper deals with uses the ADAPTIV output with name DATAsam with modification for infrared camouflage. It is focused on active camouflage in infrared spectrum of emissivity at <8;14> μm for laboratory conditions. The main chapter provides basic experiments and testing physical properties needed for camouflage in infrared environment. The evaluation experiments revealed the possibility of use case in various types of camouflage.

Keywords: camouflage, ADAPTIV, infrared camouflage, computer-aided, COTS

Procedia PDF Downloads 418
5715 Qualitative Evaluation of the Morris Collection Conservation Project at the Sainsbury Centre of Visual Arts in the Context of Agile, Lean and Hybrid Project Management Approaches

Authors: Maria Ledinskaya

Abstract:

This paper examines the Morris Collection Conservation Project at the Sainsbury Centre for Visual Arts in the context of Agile, Lean, and Hybrid project management. It is part case study and part literature review. To date, relatively little has been written about non-traditional project management approaches in heritage conservation. This paper seeks to introduce Agile, Lean, and Hybrid project management concepts from business, software development, and manufacturing fields to museum conservation, by referencing their practical application on a recent museum-based conservation project. The Morris Collection Conservation Project was carried out in 2019-2021 in Norwich, UK, and concerned the remedial conservation of around 150 Abstract Constructivist artworks bequeathed to the Sainsbury Centre for Visual Arts by private collectors Michael and Joyce Morris. The first part introduces the chronological timeline and key elements of the project. It describes a medium-size conservation project of moderate complexity, which was planned and delivered in an environment with multiple known unknowns – unresearched collection, unknown condition and materials, unconfirmed budget. The project was also impacted by the unknown unknowns of the COVID-19 pandemic, such as indeterminate lockdowns, and the need to accommodate social distancing and remote communications. The author, a staff conservator at the Sainsbury Centre who acted as project manager on the Morris Collection Conservation Project, presents an incremental, iterative, and value-based approach to managing a conservation project in an uncertain environment. Subsequent sections examine the project from the point of view of Traditional, Agile, Lean, and Hybrid project management. The author argues that most academic writing on project management in conservation has focussed on a Traditional plan-driven approach – also known as Waterfall project management – which has significant drawbacks in today’s museum environment, due to its over-reliance on prediction-based planning and its low tolerance to change. In the last 20 years, alternative Agile, Lean and Hybrid approaches to project management have been widely adopted in software development, manufacturing, and other industries, although their recognition in the museum sector has been slow. Using examples from the Morris Collection Conservation Project, the author introduces key principles and tools of Agile, Lean, and Hybrid project management and presents a series of arguments on the effectiveness of these alternative methodologies in museum conservation, as well as the ethical and practical challenges to their implementation. These project management approaches are discussed in the context of consequentialist, relativist, and utilitarian developments in contemporary conservation ethics, particularly with respect to change management, bespoke ethics, shared decision-making, and value-based cost-benefit conservation strategy. The author concludes that the Morris Collection Conservation Project had multiple Agile and Lean features which were instrumental to the successful delivery of the project. These key features are identified as distributed decision making, a co-located cross-disciplinary team, servant leadership, focus on value-added work, flexible planning done in shorter sprint cycles, light documentation, and emphasis on reducing procedural, financial, and logistical waste. Overall, the author’s findings point largely in favour of a Hybrid model which combines traditional and alternative project processes and tools to suit the specific needs of the project.

Keywords: project management, conservation, waterfall, agile, lean, hybrid

Procedia PDF Downloads 99
5714 Application of Analytic Hierarchy Process Model to Weight and Prioritize Challenges and Barriers to Strategic Approach

Authors: Mohammad Mehdi Mohebi, Nima Kazempour, Mohammad Naeim Kazempour

Abstract:

Strategic thinking enables managers to find out what factors are effective in achieving the desired goals and how these factors create value for the customer. Strategic thinking can be interpreted as a form of mental and inner strength in the manager, who by utilizing it, while considering the conditions of the environment and unstable global environment changes, takes decisions, and plans actions, and designs the strategy of his organization in today's changing and unsustainable business environment. Strategic thinking is very important in today’s business world, because without this thinking, the organization's efforts to achieve developed strategies will not be effective. In this study, through a detailed study of the challenges and barriers to strategic thinking that is carried out by various scholars and experts theoretically and experimentally, 7 major factors were identified. Then, based on these main factors of challenges and related elements, a tool in the form of a questionnaire was developed in order to determine their importance and priority from the perspective of strategic management experts. Using statistical tests the reliability and validity of this instrument, including its structural validity, has been examined and approved using factor analysis. These factors are weighted and prioritized using AHP techniques and the opinions of scholars and experts. Prioritization of barriers to strategic thinking include: lack of participatory management, lack of a systematic approach, difficulty in aligning the organization members, lack of incentive organizational culture, behavioural and internal barriers of managers, lack of key managers and lack of access to timely and accurate information.

Keywords: strategic thinking, challenges and barriers to strategic thinking, EN bank, AHP method

Procedia PDF Downloads 546
5713 Assessing Project Performance through Work Sampling and Earned Value Analysis

Authors: Shobha Ramalingam

Abstract:

The majority of the infrastructure projects are affected by time overrun, resulting in project delays and subsequently cost overruns. Time overrun may vary from a few months to as high as five or more years, placing the project viability at risk. One of the probable reasons noted in the literature for this outcome in projects is due to poor productivity. Researchers contend that productivity in construction has only marginally increased over the years. While studies in the literature have extensively focused on time and cost parameters in projects, there are limited studies that integrate time and cost with productivity to assess project performance. To this end, a study was conducted to understand the project delay factors concerning cost, time and productivity. A case-study approach was adopted to collect rich data from a nuclear power plant project site for two months through observation, interviews and document review. The data were analyzed using three different approaches for a comprehensive understanding. Foremost, a root-cause analysis was performed on the data using Ishikawa’s fish-bone diagram technique to identify the various factors impacting the delay concerning time. Based on it, a questionnaire was designed and circulated to concerned executives, including project engineers and contractors to determine the frequency of occurrence of the delay, which was then compiled and presented to the management for a possible solution to mitigate. Second, a productivity analysis was performed on select activities, including rebar bending and concreting through a time-motion study to analyze product performance. Third, data on cost of construction for three years allowed analyzing the cost performance using earned value management technique. All three techniques allowed to systematically and comprehensively identify the key factors that deter project performance and productivity loss in the construction of the nuclear power plant project. The findings showed that improper planning and coordination between multiple trades, concurrent operations, improper workforce and material management, fatigue due to overtime were some of the key factors that led to delays and poor productivity. The findings are expected to act as a stepping stone for further research and have implications for practitioners.

Keywords: earned value analysis, time performance, project costs, project delays, construction productivity

Procedia PDF Downloads 97
5712 Faults in the Projects, Deviation in the Cost

Authors: S. Ahmed, P. Dlask, B. Hasan

Abstract:

There are several ways to estimate the cost of the construction project: simple and detailed. The process of estimating cost is usually done during the design stage, which should take long-time and the designer must give attention to all details. This paper explain the causes of the deviations occurring in the cost of the construction project, and determines the reasons of these differences between contractual cost and final cost of the construction project, through the study of literature review related to this field, and benefiting from the experience of workers in the field of building (owners, contractors) through designing a questionnaire, and finding the most ten important reasons and explain the relation between the contractual cost and the final cost according to these reasons. The difference between those values will be showed through diagrams drawn using the statistical program. In addition to studying the effects of overrun costs on the advancing of the project, and identify the most five important effects. According to the results, we can propose the right direction for the final cost evaluation and propose some measures that would help to control and adjust the deviation in the costs.

Keywords: construction projects, building, cost, estimating costs, delay, overrun

Procedia PDF Downloads 294
5711 Millennials' Career Expectations: Exploring Attitudes and Individual Differences in Croatia

Authors: Lovorka Galetić, Maja Klindžić, Ivana Načinović Braje

Abstract:

Generation Y individuals or Millennials are known for their unique views, work values and motivational needs which implies that, in order to attract and retain those individuals, activities in the area of career management should be given special attention by HRM managers. After a theoretical background on Millennials’ life and work attitudes, an empirical research on career preferences of Millennials in Croatia was described. Empirical research was conducted among 249 members of generation Y. The data analysis revealed that respondents generally perceive promotion opportunities as the most important career aspect; however, job security and work-life balance are almost as important. Furthermore, it was shown that Generation Y is not necessarily a homogenous group. More precisely, women assign greater importance than men to work-life balance and job security. Therefore, HRM managers should adapt career planning activities not only with respect to generational preferences, but individual characteristics as well.

Keywords: career, individual differences, millennials, work values

Procedia PDF Downloads 399
5710 The Link between Strategic Sense-Making and Performance in Dubai Public Sector

Authors: Mohammad Rahman, Guy Burton, Megan Mathias

Abstract:

Strategic management as an organizational practice was adopted by the public sector in the New Public Management (NPM) era that began in most parts of the world in the 1980s. Strategy as a new public management concept was subscribed by governments in both developed and developing world, as they were persuaded that clearly defined vision, mission and goals, as well as programs and projects - aligned with the goals - could potentially help achieve government vision at the national level and organizational goals at the service-delivery level. The advocates for strategic management in the public sector saw an inherent link between strategy and performance, claiming that the implementation of organizational strategy has an effect on the overall performance of an organization. Arguably, many government entities that have failed in enhancing team and individual performance had poorly-designed strategy or weak strategy implementation. Another key argument about low-level performance is linked with lack of strategic sense-making and orientation by middle managers in particular. Scholars maintain that employees at all levels need to understand strategic management plan in order to facilitate its implementation. Therefore, involving employees (particularly the middle managers) from the beginning potentially helps an organization avoid the drop in performance, and on the contrary would increase their commitment. The United Arab Emirates (UAE) is well known for adopting public sector reform strategies and tools since the 1990s. This observation is contextually pertinent in the case of the Government of Dubai, which has provided a Strategy Execution Guide to all of its entities to achieve high level strategic success in service delivery. The Dubai public sector also adopts road maps for e-Government, Smart Dubai, Expo 2020, investment, environment, education, health and other sectors. Evidently, some of these strategies are bringing tangible (e.g. Smart Dubai transformation) results in a transformational manner. However, the amount of academic research and literature on the strategy process vis-à-vis staff performance in the Government of Dubai is limited. In this backdrop, this study examines how individual performance of public sector employees in Dubai is linked with their sense-making, engagement and orientation with strategy development and implementation processes. Based on a theoretical framework, this study will undertake a sample-based questionnaire survey amongst middle managers in Dubai public sector to (a) measure the level of engagement of middle managers in strategy development and implementation processes as perceived by them; (b) observe the organizational landscape in which role expectations are placed on middle managers; and (c) examine the impact of employee engagement in strategy development process and the conditions for role expectations on individual performance. The paper is expected to provide new insights on the interface between strategic sense-making and performance in order to contribute a better understanding of the current culture/practices of staff engagement in strategic management in the public sector of Dubai.

Keywords: employee performance, government of Dubai, middle managers, strategic sense-making

Procedia PDF Downloads 198
5709 Series Network-Structured Inverse Models of Data Envelopment Analysis: Pitfalls and Solutions

Authors: Zohreh Moghaddas, Morteza Yazdani, Farhad Hosseinzadeh

Abstract:

Nowadays, data envelopment analysis (DEA) models featuring network structures have gained widespread usage for evaluating the performance of production systems and activities (Decision-Making Units (DMUs)) across diverse fields. By examining the relationships between the internal stages of the network, these models offer valuable insights to managers and decision-makers regarding the performance of each stage and its impact on the overall network. To further empower system decision-makers, the inverse data envelopment analysis (IDEA) model has been introduced. This model allows the estimation of crucial information for estimating parameters while keeping the efficiency score unchanged or improved, enabling analysis of the sensitivity of system inputs or outputs according to managers' preferences. This empowers managers to apply their preferences and policies on resources, such as inputs and outputs, and analyze various aspects like production, resource allocation processes, and resource efficiency enhancement within the system. The results obtained can be instrumental in making informed decisions in the future. The top result of this study is an analysis of infeasibility and incorrect estimation that may arise in the theory and application of the inverse model of data envelopment analysis with network structures. By addressing these pitfalls, novel protocols are proposed to circumvent these shortcomings effectively. Subsequently, several theoretical and applied problems are examined and resolved through insightful case studies.

Keywords: inverse models of data envelopment analysis, series network, estimation of inputs and outputs, efficiency, resource allocation, sensitivity analysis, infeasibility

Procedia PDF Downloads 53
5708 Decision-Making Tool for Planning the Construction of Infrastructure Projects

Authors: Rolla Monib, Chris I. Goodier, Alistair Gibbs

Abstract:

The aim of this paper is to investigate the key drivers in planning the construction phase for infrastructure projects to reduce project delays. To achieve this aim, the research conducted three case studies using semi-structured and unstructured interviews (n=36). The results conclude that a lack of modularisation awareness is among the key factors attributed to project delays. The current emotive and ill-informed approach to decision-making, coupled with the lack of knowledge regarding appropriate construction method selection, prevents the potential benefits of modularisation being fully realised. To assist with decision-making for the best construction method, the research presents project management tools to help decision makers to choose the most appropriate construction approach through optimising the use of modularisation in EC. A decision-making checklist and diagram are presented in this paper. These checklist tools and diagrams assist the project team in determining the best construction method, taking into consideration the module type.

Keywords: infrastructure, modularization, decision support, decision-making

Procedia PDF Downloads 63
5707 Strategy in Practice: Strategy Development, Strategic Error and Project Delivery

Authors: Nipun Agarwal, David Paul, Fareed Un Din

Abstract:

Strategy development and implementation is the key to an organization’s success in today’s competitive marketplace. Many organizations develop excellent strategy but are unable to implement this strategy in order to succeed. The difference between strategic goals and its implementation is called strategic error. Strategic error occurs when an organization does not have structures in place to implement their strategy. Strategy implementation happens through projects and having a project management method that provides certainty and agility will help an organization become more competitive in implementing strategy. Numerous project management methods exist in theory and practice. However, projects mainly used the Waterfall method in the past that provides certainty in terms of budget, delivery date and resourcing. It is common practice now to utilise Agile based methods. However, Agile based methods do not provide specific deadlines and budgets. But provide agility in product design and project delivery, which is useful to companies. Both Waterfall and Agile methods in some forms are the opposites of each other. Executive management prefer agility in delivery projects as the competitive landscape changes frequently. However, they also appreciate certainty in the projects being able to quantify budgets, deadlines and resources that is harder for an Agile based method to provide. This paper attempts to develop a hybrid project management method that attempts to merge these Waterfall and Agile methods to provide the positives from both these approaches.

Keywords: strategy, project management, strategy implementation, agile

Procedia PDF Downloads 117
5706 Commercial Management vs. Quantity Surveying: Hoax or Harmonization

Authors: Zelda Jansen Van Rensburg

Abstract:

Purpose: This study investigates the perceived disparities between Quantity Surveying and Commercial Management in the construction industry, questioning if these differences are substantive or merely semantic. It aims to challenge the conventional notion of Commercial Managers’ superiority by critically evaluating QS and CM roles, exploring CM integration possibilities, examining qualifications for aspiring Commercial Managers, assessing regulatory frameworks, and considering terminology redefinition for global QS professional enhancement. Design: Utilizing mixed methods like literature reviews, surveys, interviews, and document analyses, this research examines the QS-CM relationship. Insights from industry professionals, academics, and regulatory bodies inform the investigation into changing QS roles. Findings: Empirical data highlight evolving roles, showcasing areas of convergence and divergence between QSs and CM. Potential CM integration into QS practice and qualifications for aspiring Commercial Managers are identified. Limitations/Implications: Limitations include potential bias in self-reported data and findings. Nevertheless, the research informs future practices and educational approaches in QS and CM, reflecting the changing roles and responsibilities of Quantity Surveyors. Practical Implications: Findings inform industry practitioners, educators, and regulators, stressing the need to adapt to changing QS roles and integrate CM principles where applicable. Value to the Conference Theme: Aligned with ‘Evolving roles and responsibilities of Quantity Surveyors,’ this research offers insights crucial for understanding the changing dynamics within the QS profession and informs strategies to navigate these shifts effectively.

Keywords: quantity surveying, commercial management, cost engineering, quantity survey

Procedia PDF Downloads 42
5705 Building Information Modeling and Its Application in the State of Kuwait

Authors: Michael Gerges, Ograbe Ahiakwo, Martin Jaeger, Ahmad Asaad

Abstract:

Recent advances of Building Information Modeling (BIM) especially in the Middle East have increased remarkably. Dubai has been taking a lead on this by making it mandatory for BIM to be adopted for all projects that involve complex architecture designs. This is because BIM is a dynamic process that assists all stakeholders in monitoring the project status throughout different project phases with great transparency. It focuses on utilizing information technology to improve collaboration among project participants during the entire life cycle of the project from the initial design, to the supply chain, resource allocation, construction and all productivity requirements. In view of this trend, the paper examines the extent of applying BIM in the State of Kuwait, by exploring practitioners’ perspectives on BIM, especially their perspectives on main barriers and main advantages. To this end structured interviews were carried out based on questionnaires and with a range of different construction professionals. The results revealed that practitioners perceive improved communication and mitigated project risks by encouraged collaboration between project participants. However, it was also observed that the full implementation of BIM in the State of Kuwait requires concerted efforts to make clients demanding BIM, counteract resistance to change among construction professionals and offer more training for design team members. This paper forms part of an on-going research effort on BIM and its application in the State of Kuwait and it is on this basis that further research on the topic is proposed.

Keywords: building information modeling, BIM, construction industry, Kuwait

Procedia PDF Downloads 378
5704 BIM Application Research Based on the Main Entrance and Garden Area Project of Shanghai Disneyland

Authors: Ying Yuken, Pengfei Wang, Zhang Qilin, Xiao Ben

Abstract:

Based on the main entrance and garden area (ME&G) project of Shanghai Disneyland, this paper introduces the application of BIM technology in this kind of low-rise comprehensive building with complex facade system, electromechanical system and decoration system. BIM technology is applied to the whole process of design, construction and completion of the whole project. With the construction of BIM application framework of the whole project, the key points of BIM modeling methods of different systems and the integration and coordination of BIM models are elaborated in detail. The specific application methods of BIM technology in similar complex low-rise building projects are sorted out. Finally, the paper summarizes the benefits of BIM technology application, and puts forward some suggestions for BIM management mode and practical application of similar projects in the future.

Keywords: BIM, complex low-rise building, BIM modeling, model integration and coordination, 3D scanning

Procedia PDF Downloads 173
5703 Analyzing Software Testing Phase in Agile Project Management: The Case of Jordan

Authors: Ghaleb Y. Abbasi, Satanay Alhiary

Abstract:

This paper focused on software testing phase of activities, types, techniques, teams and methods under agile project management (APM) in the Jordanian software industry. The effect of using agile principles and practices on testing process in software development life cycle (SDLC) was analyzed in order to create full view of the agile testing aspects such as phases, levels, types, methods, team and customers. Qualitative and quantitative research methods were utilized to cover earlier literature and collect data via web survey and short interviews in Jordanian software companies. Results indicated that agile testing had positive influence on quality of product, team performance, and customer satisfaction with a rate above 80%. APM is a powerful practice of moving software project forward in current markets with a rate above 51% by early involvement of testing activities in development.

Keywords: agile project management, software development life cycle, agile methods, agile testing, software testing

Procedia PDF Downloads 456
5702 Integration of Entrepreneurial Mindset Learning in Green Chemistry and Processes Course

Authors: Tsvetanka Filipova

Abstract:

Entrepreneurial mindset learning (EML) is the combined process of instilling curiosity and invention, developing insight and value creation while building on other active pedagogy, such as project-based learning (PBL). It is essential to introduce students to chemistry and chemical engineering entrepreneurship in a manner that gives a holistic approach by first educating students on diverse entrepreneurial skills and then providing an opportunity to build their innovation. Chemistry and chemical engineering students have an opportunity to be engaged in an entrepreneurial class project in the Green Chemistry and Processes course at South Dakota Mines. The course provides future chemists and chemical engineers with the knowledge and skills required to enable them to design materials and processes in an environmentally benign way. This paper presents findings from implementing an open-ended design project in the Green Chemistry and Processes course. The goal of this team project is to have student teams design sustainable polymer materials to fulfill a need and/or opportunity related to a fictitious aerospace company that satisfies technical, safety, environmental, regulatory, economic, and social needs. Each student team is considered a start-up company charged with the task of designing sustainable polymer materials for aerospace applications. Through their work on the project, students utilize systems and entrepreneurial thinking in selecting their design project, being aware of the existent technologies (literature and patent search) and users and clients (connections), determining the goals and motivations (creating value), and what need or problem they are trying to address (curiosity). The project draws systems boundaries by focusing on student exploration of feedstocks to end-of-life of polymeric materials and products. Additional subtopics to explore are green processes for syntheses, green engineering for process design, and the economics of sustainable polymers designed for circularity. Project deliverables are team project reports and project presentations to a panel of industry, chemistry, and engineering professionals. Project deliverables are team project reports and project presentations to a panel of industry, chemistry, and engineering professionals. The impact of the entrepreneurial mindset project is evaluated through a student survey at the end of the semester. It has been found that the Innovative Solution project was excellent in promoting student curiosity, creativity, critical and systems thinking and teamwork. The results of this study suggest that incorporating EML positively impacted students’ professional skill development, their ability to understand and appreciate the socio-technical context of chemistry and engineering, and the cultivation of an entrepreneurial mindset to discover, evaluate and exploit opportunities.

Keywords: curriculum, entrepreneurial mindset learning, green chemistry and engineering, systems thinking

Procedia PDF Downloads 17
5701 Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U. A. E.

Authors: Firas Mohamad Al-Sabek

Abstract:

The Purpose of the paper is to examine the most critical and important factor which will affect the implementation of Total Quality Management (TQM) in the construction industry in the United Arab Emirates. It also examines the most effected Project outcome from implementing TQM. A framework was also proposed depending on the literature studies. The method used in this paper is a quantitative study. A survey with a sample of 60 respondents was created and distributed in a construction company in Abu Dhabi, which includes 15 questions to examine the most critical factor that will affect the implementation of TQM in addition to the most effected project outcome from implementing TQM. The survey showed that management commitment is the most important factor in implementing TQM in a construction company. Also it showed that Project cost is most effected outcome from the implementation of TQM. Management commitment is very important for implementing TQM in any company. If the management loose interest in quality then everyone in the organization will do so. The success of TQM will depend mostly on the top of the pyramid. Also cost is reduced and money is saved when the project team implement TQM. While if no quality measures are present within the team, the project will suffer a commercial failure. Based on literature, more factors can be examined and added to the model. In addition, more construction companies could be surveyed in order to obtain more accurate results. Also this study could be conducted outside the United Arab Emirates for further enchantment.

Keywords: construction project, total quality management, management commitment, cost, theoretical framework

Procedia PDF Downloads 426
5700 Effect of Underwater Antiquities as a Hidden Competitive Advantage of Hotels on Their Financial Performance: An Exploratory Study

Authors: Iman Shawky, Mohamed Elsayed

Abstract:

Every hotel works in the hospitality market tends to have its own merit and character in its products marketing in order to maintain both its brand's identity and image among guests. According to the growth of global competition in the hospitality industry; the concept of competitive advantage is becoming increasingly important in hotels' marketing world as it examines reasons for outweighing hotels in their dimensions of strategic and marketing plans. In fact, Egypt is the land of appeared and submerged secrets as a result of its ancient civilization ongoing explorations. Although underwater antiquities represent ambiguous treasures, they have auspicious future in it, particularly in Alexandria. The study aims at examining to what extent underwater antiquities represent a competitive advantage of four and five-star hotels in Alexandria. For achieving this aim, an exploratory study conducted by currying out the investigation and comparison of the closest and most popular landmarks mentioned on both hotels' official websites and on common used reservations' websites. In addition to that, two different questionnaire forms designed; one for both revenue and sales and marketing hotels' managers while the other for their guests. The results indicate that both official hotels' websites and the most common used reservations' websites totally ignore mentioning underwater antiquities as attractive landmarks surrounding Alexandria hotels. Furthermore, most managers expect that underwater antiquities can furnish distinguished competitive advantage to their hotels. Also, they can help exceeding guests' expectations during their accommodation as long as they included on both official hotels' and reservations' websites as the most surrounding famous landmarks. Moreover, most managers foresee that high awareness of underwater antiquities can enhance the guests' accommodation frequencies and improve the financial performance of their hotels.

Keywords: competitive advantage, financial performance, hotels' websites, underwater antiquities

Procedia PDF Downloads 168
5699 Building Information Modeling Implementation for Managing an Extra Large Governmental Building Renovation Project

Authors: Pornpote Nusen, Manop Kaewmoracharoen

Abstract:

In recent years, there was an observable shift in fully developed countries from constructing new buildings to modifying existing buildings. The issue was that although an effective instrument like BIM (Building Information Modeling) was well developed for constructing new buildings, it was not widely used to renovate old buildings. BIM was accepted as an effective means to overcome common managerial problems such as project delay, cost overrun, and poor quality of the project life cycle. It was recently introduced in Thailand and rarely used in a renovation project. Today, in Thailand, BIM is mostly used for creating aesthetic 3D models and quantity takeoff purposes, though it can be an effective tool to use as a project management tool in planning and scheduling. Now the governmental sector in Thailand begins to recognize the uses of using BIM to manage a construction project, but the knowledge about the BIM implementation to governmental construction projects is underdeveloped. Further studies need to be conducted to maximize its advantages for the governmental sector. An educational extra large governmental building of 17,000 square-meters was used in this research. It is currently under construction for a two-year renovation project. BIM models of the building for the exterior and interior areas were created for the whole five floors. Then 4D BIM with combination of 3D BIM plus time was created for planning and scheduling. Three focus groups had been done with executive committee, contractors, and officers of the building to discuss the possibility of usage and usefulness of BIM approach over the traditional process. Several aspects were discussed in the positive sides, especially several foreseen problems, such as the inadequate accessibility of ways, the altered ceiling levels, the impractical construction plan created through a traditional approach, and the lack of constructability information. However, for some parties, the cost of BIM implementation was a concern, though, this study believes, its uses outweigh the cost.

Keywords: building information modeling, extra large building, governmental building renovation, project management, renovation, 4D BIM

Procedia PDF Downloads 153
5698 Project Risk Assessment of the Mining Industry of Ghana

Authors: Charles Amoatey

Abstract:

The issue of risk in the mining industry is a global phenomenon and the Ghanaian mining industry is not exempted. The main purpose of this study is to identify the critical risk factors affecting the mining industry. The study takes an integrated view of the mining industry by examining the contribution of various risk factors to mining project failure in Ghana. A questionnaire survey was conducted to solicit the critical risk factors from key mining practitioners. About 80 respondents from 11 mining firms participated in the survey. The study identified 22 risk factors contributing to mining project failure in Ghana. The five most critical risk factors based on both probability of occurrence and impact were: (1) unstable commodity prices, (2) inflation/exchange rate, (3) land degradation, (4) high cost of living and (5) government bureaucracy for obtaining licenses. Furthermore, the study found that risk assessment in the mining sector has a direct link with mining project sustainability. Mitigation measures for addressing the identified risk factors were discussed. The key findings emphasize the need for a comprehensive risk management culture in the entire mining industry.

Keywords: risk, assessment, mining, Ghana

Procedia PDF Downloads 454