Search results for: enforcing contracts
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 273

Search results for: enforcing contracts

3 Explanation of the Main Components of the Unsustainability of Cooperative Institutions in Cooperative Management Projects to Combat Desertification in South Khorasan Province

Authors: Yaser Ghasemi Aryan, Firoozeh Moghiminejad, Mohammadreza Shahraki

Abstract:

Background: The cooperative institution is considered the first and most essential pillar of strengthening social capital, whose sustainability is the main guarantee of survival and continued participation of local communities in natural resource management projects. The Village Development Group and the Microcredit Fund are two important social and economic institutions in the implementation of the International Project for the Restoration of Degraded Forest Lands (RFLDL) in Sarayan City, South Khorasan Province, which has learned positive lessons from the participation of the beneficiaries in the implementation. They have brought more effective projects to deal with desertification. However, the low activity or liquidation of some of these institutions has become one of the important challenges and concerns of project executive experts. The current research was carried out with the aim of explaining the main components of the instability of these institutions. Materials and Methods: This research is descriptive-analytical in terms of method, practical in terms of purpose, and the method of collecting information is two documentary and survey methods. The statistical population of the research included all the members of the village development groups and microcredit funds in the target villages of the RFLDL project of Sarayan city, based on the Kochran formula and matching with the Karjesi and Morgan table. Net people were selected as a statistical sample. After confirming the validity of the expert's opinions, the reliability of the questionnaire was 0.83, which shows the appropriate reliability of the researcher-made questionnaire. Data analysis was done using SPSS software. Results: The results related to the extraction of obstacles to the stability of social and economic networks were classified and prioritized in the form of 5 groups of social-cultural, economic, administrative, educational-promotional and policy-management factors. Based on this, in the socio-cultural factors, the items ‘not paying attention to the structural characteristics and composition of groups’, ‘lack of commitment and moral responsibility in some members of the group,’ and ‘lack of a clear pattern for the preservation and survival of groups’, in the disciplinary factors, The items ‘Irregularity in holding group meetings’ and ‘Irregularity of members to participate in meetings’, in the economic factors of the items "small financial capital of the fund’, ‘the low amount of loans of the fund’ and ‘the fund's inability to conclude contracts and attract capital from other sources’, in the educational-promotional factors of the items ‘non-simultaneity of job training with the granting of loans to create jobs’ and ‘insufficient training for the effective use of loans and job creation’ and in the policy-management factors of the item ‘failure to provide government facilities for support From the funds, they had the highest priority. Conclusion: In general, the results of this research show that policy-management factors and social factors, especially the structure and composition of social and economic institutions, are the most important obstacles to their sustainability. Therefore, it is suggested to form cooperative institutions based on network analysis studies in order to achieve the appropriate composition of members.

Keywords: cooperative institution, social capital, network analysis, participation, Sarayan.

Procedia PDF Downloads 25
2 Benchmarking of Petroleum Tanker Discharge Operations at a Nigerian Coastal Terminal and Jetty Facilitates Optimization of the Ship–Shore Interface

Authors: Bassey O. Bassey

Abstract:

Benchmarking has progressively become entrenched as a requisite activity for process improvement and enhancing service delivery at petroleum jetties and terminals, most especially during tanker discharge operations at the ship – shore interface, as avoidable delays result in extra operating costs, non-productive time, high demurrage payments and ultimate product scarcity. The jetty and terminal in focus had been operational for 3 and 8 years respectively, with proper operational and logistic records maintained to evaluate their progress over time in order to plan and implement modifications and review of procedures for greater technical and economic efficiency. Regular and emergency staff meetings were held on a team, departmental and company-wide basis to progressively address major challenges that were encountered during each operation. The process and outcome of the resultant collectively planned changes carried out within the past two years forms the basis of this paper, which mirrors the initiatives effected to enhance operational and maintenance excellence at the affected facilities. Operational modifications included a second cargo receipt line designated for gasoline, product loss control at jetty and shore ends, enhanced product recovery and quality control, and revival of terminal–jetty backloading operations. Logistic improvements were the incorporation of an internal logistics firm and shipping agency, fast tracking of discharge procedures for tankers, optimization of tank vessel selection process, and third party product receipt and throughput. Maintenance excellence was achieved through construction of two new lay barges and refurbishment of the existing one; revamping of existing booster pump and purchasing of a modern one as reserve capacity; extension of Phase 1 of the jetty to accommodate two vessels and construction of Phase 2 for two more vessels; regular inspection, draining, drying and replacement of cargo hoses; corrosion management program for all process facilities; and an improved, properly planned and documented maintenance culture. Safety, environmental and security compliance were enhanced by installing state-of-the-art fire fighting facilities and equipment, seawater intake line construction as backup for borehole at the terminal, remediation of the shoreline and marine structures, modern spill containment equipment, improved housekeeping and accident prevention practices, and installation of hi-technology security enhancements, among others. The end result has been observed over the past two years to include improved tanker turnaround time, higher turnover on product sales, consistent product availability, greater indigenous human capacity utilisation by way of direct hires and contracts, as well as customer loyalty. The lessons learnt from this exercise would, therefore, serve as a model to be adapted by other operators of similar facilities, contractors, academics and consultants in a bid to deliver greater sustainability and profitability of operations at the ship – shore interface to this strategic industry.

Keywords: benchmarking, optimisation, petroleum jetty, petroleum terminal

Procedia PDF Downloads 336
1 An Innovation Decision Process View in an Adoption of Total Laboratory Automation

Authors: Chia-Jung Chen, Yu-Chi Hsu, June-Dong Lin, Kun-Chen Chan, Chieh-Tien Wang, Li-Ching Wu, Chung-Feng Liu

Abstract:

With fast advances in healthcare technology, various total laboratory automation (TLA) processes have been proposed. However, adopting TLA needs quite high funding. This study explores an early adoption experience by Taiwan’s large-scale hospital group, the Chimei Hospital Group (CMG), which owns three branch hospitals (Yongkang, Liouying and Chiali, in order by service scale), based on the five stages of Everett Rogers’ Diffusion Decision Process. 1.Knowledge stage: Over the years, two weaknesses exists in laboratory department of CMG: 1) only a few examination categories (e.g., sugar testing and HbA1c) can now be completed and reported within a day during an outpatient clinical visit; 2) the Yongkang Hospital laboratory space is dispersed across three buildings, resulting in duplicated investment in analysis instruments and inconvenient artificial specimen transportation. Thus, the senior management of the department raised a crucial question, was it time to process the redesign of the laboratory department? 2.Persuasion stage: At the end of 2013, Yongkang Hospital’s new building and restructuring project created a great opportunity for the redesign of the laboratory department. However, not all laboratory colleagues had the consensus for change. Thus, the top managers arranged a series of benchmark visits to stimulate colleagues into being aware of and accepting TLA. Later, the director of the department proposed a formal report to the top management of CMG with the results of the benchmark visits, preliminary feasibility analysis, potential benefits and so on. 3.Decision stage: This TLA suggestion was well-supported by the top management of CMG and, finally, they made a decision to carry out the project with an instrument-leasing strategy. After the announcement of a request for proposal and several vendor briefings, CMG confirmed their laboratory automation architecture and finally completed the contracts. At the same time, a cross-department project team was formed and the laboratory department assigned a section leader to the National Taiwan University Hospital for one month of relevant training. 4.Implementation stage: During the implementation, the project team called for regular meetings to review the results of the operations and to offer an immediate response to the adjustment. The main project tasks included: 1) completion of the preparatory work for beginning the automation procedures; 2) ensuring information security and privacy protection; 3) formulating automated examination process protocols; 4) evaluating the performance of new instruments and the instrument connectivity; 5)ensuring good integration with hospital information systems (HIS)/laboratory information systems (LIS); and 6) ensuring continued compliance with ISO 15189 certification. 5.Confirmation stage: In short, the core process changes include: 1) cancellation of signature seals on the specimen tubes; 2) transfer of daily examination reports to a data warehouse; 3) routine pre-admission blood drawing and formal inpatient morning blood drawing can be incorporated into an automatically-prepared tube mechanism. The study summarizes below the continuous improvement orientations: (1) Flexible reference range set-up for new instruments in LIS. (2) Restructure of the specimen category. (3) Continuous review and improvements to the examination process. (4) Whether installing the tube (specimen) delivery tracks need further evaluation.

Keywords: innovation decision process, total laboratory automation, health care

Procedia PDF Downloads 397