Search results for: web project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1167

Search results for: web project

1047 Effectiveness of Business Software Systems Development and Enhancement Projects versus Work Effort Estimation Methods

Authors: Beata Czarnacka-Chrobot

Abstract:

Execution of Business Software Systems (BSS) Development and Enhancement Projects (D&EP) is characterized by the exceptionally low effectiveness, leading to considerable financial losses. The general reason for low effectiveness of such projects is that they are inappropriately managed. One of the factors of proper BSS D&EP management is suitable (reliable and objective) method of project work effort estimation since this is what determines correct estimation of its major attributes: project cost and duration. BSS D&EP is usually considered to be accomplished effectively if product of a planned functionality is delivered without cost and time overrun. The goal of this paper is to prove that choosing approach to the BSS D&EP work effort estimation has a considerable influence on the effectiveness of such projects execution.

Keywords: Business software systems, development and enhancement projects, effectiveness, work effort estimation methods, software product size, software product functionality, project duration, project cost.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2035
1046 The Effect of Social Capital on Creativity in Information Systems Development Projects: The Mediating Effect of Knowledge Integration

Authors: Hsiu-Hua Cheng

Abstract:

This study analyzed the creativity of student teams participating in an exploratory information system development project (ISDP) and examined antecedents of their creativity. By using partial least squares (PLS) to analyze a sample of thirty-six teams enrolled in an information system department project training course that required three semesters of project-based lessons, the results found social capitals (structural, relational and cognitive social capital) positively influence knowledge integration. However, relational social capital does not significantly influence knowledge integration. Knowledge integration positively affects team creativity. This study also demonstrated that social capitals significantly influence team creativity through knowledge integration. The implications of our findings for future research are discussed.

Keywords: Information system development project (ISDP), Social capital, Knowledge integration, Team creativity.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1780
1045 Development of a Project Selection Method on Information System Using ANP and Fuzzy Logic

Authors: Ingu Kim, Shangmun Shin, Yongsun Choi, Nguyen Manh Thang, Edwin R. Ramos, Won-Joo Hwang

Abstract:

Project selection problems on management information system (MIS) are often considered a multi-criteria decision-making (MCDM) for a solving method. These problems contain two aspects, such as interdependencies among criteria and candidate projects and qualitative and quantitative factors of projects. However, most existing methods reported in literature consider these aspects separately even though these two aspects are simultaneously incorporated. For this reason, we proposed a hybrid method using analytic network process (ANP) and fuzzy logic in order to represent both aspects. We then propose a goal programming model to conduct an optimization for the project selection problems interpreted by a hybrid concept. Finally, a numerical example is conducted as verification purposes.

Keywords: Analytic Network Process (ANP), Multi-Criteria Decision-Making (MCDM), Fuzzy Logic, Information System Project Selection, Goal Programming.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2041
1044 Practices in Planning, Design and Construction of Head Race Tunnel of a Hydroelectric Project

Authors: M. S. Thakur, Mohit Shukla

Abstract:

A channel/tunnel, which carries the water to the penstock/pressure shaft is called headrace tunnel (HRT). It is necessary to know the general topography, geology of the area, state of stress and other mechanical properties of the strata. For this certain topographical and geological investigations, in-situ and laboratory tests, and observations are required to be done. These investigations play an important role in a tunnel design as these help in deciding the optimum layout, shape and size and support requirements of the tunnel. The paper includes inputs from Nathpa Jhakri Hydeoelectric project which is India’s highest capacity (1500 MW) operating hydroelectric project. The paper would help the design engineers with various new concepts and preparedness against geological surprises.

Keywords: Tunnelling, geology, head race tunnel, rockmass.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3684
1043 Rebuilding the Dental Hygiene Habits of the Hospitalized Patients with Schizophrenia

Authors: Chia-Jou Hsieh, Feng-Chuan Pan

Abstract:

Oral health is particular important to the hospitalized patients with chronic schizophrenia for an extreme high potential of the respiratory infections. Due to the degeneration of physical capability, patients of this kind typically fall dependent in the activity of daily living (ADL). A very high percentage of patients had dental problems of which mostly could be easily avoid by easy regular tooth brushing. Purpose of the project is to develop a mechanism in helping the schizophrenia patients in rebuilding a tooth-cleaning habit. The project observed and evaluated the tooth-cleaning behavior of 100 male patients in a psychiatric hospital, and found the majority of them ignored such an activity in a three-month period of time. In the meantime, the primary care-givers were not aware or not convinced the importance of such a need of dental hygiene, and thus few if any tooth cleaning training or knowledge on dental hygiene were given to the patients. The project then developed a program based on the numerous observations and discussions. The improvement program included patients- group education, care-givers- training, and a tool-kit for tooth-brush holding was erected. The project launched with some incentive package. The outcomes were encouraging with 87% of the patients had rebuilt their tooth-brushing habits against previous 22%, and the tooth cleaning kits were 100% kept against 22% in the past. This project had significantly improved the oral health of the patients. The project, included the procedure and the tool-kit holder specific for this purpose, was a good examples for psychiatric hospitals.

Keywords: Schizophrenia, dental hygiene, tool-kit holder, health education

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1909
1042 Feasibility Study for a Castor oil Extraction Plant in South Africa

Authors: Mohamed Belaid, Edison Muzenda, Getrude Mitilene, Mansoor Mollagee

Abstract:

A feasibility study for the design and construction of a pilot plant for the extraction of castor oil in South Africa was conducted. The study emphasized the four critical aspects of project feasibility analysis, namely technical, financial, market and managerial aspects. The technical aspect involved research on existing oil extraction technologies, namely: mechanical pressing and solvent extraction, as well as assessment of the proposed production site for both short and long term viability of the project. The site is on the outskirts of Nkomazi village in the Mpumalanga province, where connections for water and electricity are currently underway, potential raw material supply proves to be reliable since the province is known for its commercial farming. The managerial aspect was evaluated based on the fact that the current producer of castor oil will be fully involved in the project while receiving training and technical assistance from Sasol Technology, the TSC and SEDA. Market and financial aspects were evaluated and the project was considered financially viable with a Net Present Value (NPV) of R2 731 687 and an Internal Rate of Return (IRR) of 18% at an annual interest rate of 10.5%. The payback time is 6years for analysis over the first 10 years with a net income of R1 971 000 in the first year. The project was thus found to be feasible with high chance of success while contributing to socio-economic development. It was recommended for lab tests to be conducted to establish process kinetics that would be used in the initial design of the plant.

Keywords: Mechanical pressing, Net Present Value, Oilextraction, Project feasibility, Solvent extraction

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 6033
1041 Case Study Approach Using Scenario Analysis to Analyze Unabsorbed Head Office Overheads

Authors: K. C. Iyer, T. Gupta, Y. M. Bindal

Abstract:

Head office overhead (HOOH) is an indirect cost and is recovered through individual project billings by the contractor. Delay in a project impacts the absorption of HOOH cost allocated to that particular project and thus diminishes the expected profit of the contractor. This unabsorbed HOOH cost is later claimed by contractors as damages. The subjective nature of the available formulae to compute unabsorbed HOOH is the difficulty that contractors and owners face and thus dispute it. The paper attempts to bring together the rationale of various HOOH formulae by gathering contractor’s HOOH cost data on all of its project, using case study approach and comparing variations in values of HOOH using scenario analysis. The case study approach uses project data collected from four construction projects of a contractor in India to calculate unabsorbed HOOH costs from various available formulae. Scenario analysis provides further variations in HOOH values after considering two independent situations mainly scope changes and new projects during the delay period. Interestingly, one of the findings in this study reveals that, in spite of HOOH getting absorbed by additional works available during the period of delay, a few formulae depict an increase in the value of unabsorbed HOOH, neglecting any absorption by the increase in scope. This indicates that these formulae are inappropriate for use in case of a change to the scope of work. Results of this study can help both parties in deciding on an appropriate formula more objectively, considering the events on a project causing the delay and contractor's position in respect of obtaining new projects.

Keywords: Absorbed and unabsorbed overheads, head office overheads, scenario analysis, scope variation

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 761
1040 The Reason of Principles of Construction Engineering and Management Being Necessary for Contracting Firms and Their Projects Managers

Authors: Mamoon Mousa Atout

Abstract:

The industries of construction are in continuous growth not only in Middle East rejoin but almost all over the world. For the last fifteen years, big expansion and increase of different types of projects has been observed. Many infrastructural projects have been developed, high rise buildings, big shopping malls, power sub-stations, roads, bridges, schools, universities and developing many of new cities with full and complete facilities. The growth and enlargement of the mentioned developed projects has been accomplished through many international and local contracting organizations. Senior management of these organizations depend on their qualified and experienced team whom are aware of the implications of project management, construction management, engineering management and resource management during tendering till final completion of the project. This research aims to find out why reasons of principles of construction engineering and management are necessary for contracting firms and their managers. Principles of construction management help contracting organizations to accomplish and deliver projects without delay. This can be maintained by establishing guidelines’ details for updating the adopted system of construction management that they have through qualified and experienced project managers. The research focuses on benefits of other essential skills of projects planning, monitoring and control. Defining roles and responsibilities of contractor project managers during tendering and execution is a part of the investigated factors that will be analyzed. Other skills like optimizing and utilizing the obtainable project resources to deliver the project within time, cost and quality will be also investigated to find out how these factors are affecting the performance of contracting firms, projects managers and projects. The conclusion of the research will help senior management team and the contractors project managers about the benefits of implications and benefits construction management system and its effect upon the performance and knowledge of contract values that they have, and the optimal profit margin of the firm it.

Keywords: Construction management, contracting firms, project managers, planning processes, roles and responsibilities.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1690
1039 Development of a Support Tool for Cost and Schedule Integration Managment at Program Level

Authors: H. J. Yang, R. Z. Jin, I. J. Park, C. T. Hyun

Abstract:

There has been gradual progress of late in construction projects, particularly in big-scale megaprojects. Due to the long-term construction period, however, with large-scale budget investment, lack of construction management technologies, and increase in the incomplete elements of project schedule management, a plan to conduct efficient operations and to ensure business safety is required. In particular, as the project management information system (PMIS) is meant for managing a single project centering on the construction phase, there is a limitation in the management of program-scale businesses like megaprojects. Thus, a program management information system (PgMIS) that includes program-level management technologies is needed to manage multiple projects. In this study, a support tool was developed for managing the cost and schedule information occurring in the construction phase, at the program level. In addition, a case study on the developed support tool was conducted to verify the usability of the system. With the use of the developed support tool program, construction managers can monitor the progress of the entire project and of the individual subprojects in real time.

Keywords: Cost∙Schedule integration management, Supporting Tool, UI, WBS, CBS, introduce PgMIS (Program Management Information System), PMIS (Project Management Information System)

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1415
1038 Analysis of Delays during Initial Phase of Construction Projects and Mitigation Measures

Authors: Sunaitan Al Mutairi

Abstract:

A perfect start is a key factor for project completion on time. The study examined the effects of delayed mobilization of resources during the initial phases of the project. This paper mainly highlights the identification and categorization of all delays during the initial construction phase and their root cause analysis with corrective/control measures for the Kuwait Oil Company oil and gas projects. A relatively good percentage of the delays identified during the project execution (Contract award to end of defects liability period) attributed to mobilization/preliminary activity delays. Data analysis demonstrated significant increase in average project delay during the last five years compared to the previous period. Contractors had delays/issues during the initial phase, which resulted in slippages and progressively increased, resulting in time and cost overrun. Delays/issues not mitigated on time during the initial phase had very high impact on project completion. Data analysis of the delays for the past five years was carried out using trend chart, scatter plot, process map, box plot, relative importance index and Pareto chart. Construction of any project inside the Gathering Centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. Delay affects completion of projects and compromises quality, schedule and budget of project deliverables. Works executed as per plan during the initial phase and start-up duration of the project construction activities resulted in minor slippages/delays in project completion. In addition, there was a good working environment between client and contractor resulting in better project execution and management. Mainly, the contractor was on the front foot in the execution of projects, which had minimum/no delays during the initial and construction period. Hence, having a perfect start during the initial construction phase shall have a positive influence on the project success. Our research paper studies each type of delay with some real example supported by statistic results and suggests mitigation measures. Detailed analysis carried out with all stakeholders based on impact and occurrence of delays to have a practical and effective outcome to mitigate the delays. The key to improvement is to have proper control measures and periodic evaluation/audit to ensure implementation of the mitigation measures. The focus of this research is to reduce the delays encountered during the initial construction phase of the project life cycle.

Keywords: Construction activities delays, delay analysis for construction projects, mobilization delays, oil and gas projects delays.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1795
1037 Schedule Management of an Enterprise Receiving Orders Considering Dependency between Unit Tasks of a Collaborative Project

Authors: Joseph Oh, Bo-Hyun Kim, Jae-Yong Baek

Abstract:

This study suggests how an order-receiving company can avoid disclosing schedule information on unit tasks to the order-placing company when carrying out a collaborative project on the value chain in an order-oriented industry. Specifically, it suggests methods for keeping schedule information confidential, and categorizes potential situations by inter-task dependency. Lastly, an approach to select the most optimal non-disclosure method is discussed. With the methods for not disclosing work-related information suggested in the study, order-receiving companies can logically deal with political issues relating to the question of whether or not to disclose information upon the execution of a collaborative project in cooperation with an order-placing firm. Moreover, order-placing companies can monitor undistorted information, while respecting the legitimate rights of an order-receiving company. Therefore, it is fair to say that the suggestions made in this study will contribute to the smooth operation of collaborative intercompany projects.

Keywords: collaborative project, dependency, schedule management, unit task.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1442
1036 Physical Exercise Intervention on Hypertension Patients

Authors: Ling-Lih Shen, Feng-Chuan Pan

Abstract:

Chronic diseases prevailed along with economic growth as well as life style changed in recent years in Taiwan. According to the governmental statistics, hypertension related disease is the tenth of death causes with 1,816 died directly from hypertension in 2010. There were more death causes amongst the top ten had been proofed that having strong association with the hypertension, such as heart diseases, cardiovascular diseases, and diabetes. Hypertension or High blood pressure is one of the major indicators for chronic diseases, and was generally perceived as the major causes of mortality. The literature generally suggested that regular physical exercise was helpful to prevent the occurrence or to ease the progress of a hypertension. This paper reported the process and outcomes in detailed of an improvement project of physical exercise intervention specific for hypertension patients. Physical information were measured before and after the project to obtain information such as weight, waistline, cholesterol (HD & LD), blood examination, as well as self-perceived health status. The intervention project involved a six-week exercise program, of which contained three times a week, 30 minutes of tutored physical exercise intervention. The project had achieved several gains in changing the subjects- behavior in terms of many important biophysical indexes. Around 20% of the participants had significantly improved their cholesterols, BMI, and changed unhealthy behaviors. Results from the project were encouraging, and would be good reference for other samples.

Keywords: Intervention, biological information, hypertension patients, behavioral changes, chronic disease

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1998
1035 Applications of Building Information Modeling (BIM) in Knowledge Sharing and Management in Construction

Authors: Shu-Hui Jan, Shih-Ping Ho, Hui-Ping Tserng

Abstract:

Construction knowledge can be referred to and reused among involved project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology to provide sharing of construction knowledge by using the Building Information Modeling (BIM) approach. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format, and facilitation of easy updating and transfer of information in the 3D BIM environment. Using the BIM approach, project managers and engineers can gain knowledge related to 3D BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management in the construction phase of construction projects and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to verify the proposed methodology and demonstrate the effectiveness of sharing knowledge in the BIM environment. The combined results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM approach and web technology.

Keywords: Construction knowledge management, building information modeling, project management, web-based information system.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4286
1034 Evaluation of an Offshore Wind Power Project: Economic, Strategic and Environmental Value

Authors: Paula Ferreira, Filipa Vieira

Abstract:

The use of wind energy for electricity generation is growing rapidly across the world and in Portugal. However, the geographical characteristics of the country along with the average wind regime and with the environmental restrictions imposed to these projects create limitations to the exploit of the onshore wind resource. The best onshore wind spots are already committed and the possibility of offshore wind farms in the Portuguese cost is now being considered. This paper aims to make a contribution to the evaluation of offshore wind power projects in Portugal. The technical restrictions are addressed and the strategic, environmental and financial interest of the project is analysed from the private company and public points of view. The results suggest that additional support schemes are required to ensure private investors interest for these projects. Assuming an approach of direct substitution of energy sources for electricity generation, the avoided CO2 equivalent emissions for an offshore wind power project were quantified. Based on the conclusions, future research is proposed to address the environmental and social impacts of these projects.

Keywords: Feed-in tariff, offshore wind power, project evaluation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1913
1033 An Investigation on the Variation of Software Development Productivity

Authors: Zhizhong Jiang, Peter Naudé, Craig Comstock

Abstract:

The productivity of software development is one of the major concerns for project managers. Given the increasing complexity of the software being developed and the concomitant rise in the typical project size, the productivity has not consistently improved. By analyzing the latest release of ISBSG data repository with 4106 projects ever developed, we report on the factors found to significantly influence productivity, and present an original model for the estimation of productivity during project design. We further illustrate that software development productivity has experienced irregular variations between the years 1995 and 2005. Considering the factors significant to productivity, we found its variations are primarily caused by the variations of average team size for the development and the unbalanced use of the less productive development language 3GL.

Keywords: Development Platform, Function Point, Language, Productivity, Software Engineering, Team Size.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1627
1032 HEXAFLY-INT Project: Design of a High Speed Flight Experiment

Authors: S. Di Benedetto, M. P. Di Donato, A. Rispoli, S. Cardone, J. Riehmer, J. Steelant, L. Vecchione

Abstract:

Thanks to a coordinated funding by the European Space Agency (ESA) and the European Commission (EC) within the 7th framework program, the High-Speed Experimental Fly Vehicles – International (HEXAFLY-INT) project is aimed at the flight validation of hypersonics technologies enabling future trans-atmospheric flights. The project, which is currently involving partners from Europe, Russian Federation and Australia operating under ESA/ESTEC coordination, will achieve the goal of designing, manufacturing, assembling and flight testing an unpowered high speed vehicle in a glider configuration by 2018. The main technical challenges of the project are specifically related to the design of the vehicle gliding configuration and to the complexity of integrating breakthrough technologies with standard aeronautical technologies, e.g. high temperature protection system and airframe cold structures. Also, the sonic boom impact, which is one of the environmental challenges of the high speed flight, will be assessed. This paper provides a comprehensive and detailed update on all the current projects activities carried out to date on both the vehicle and mission design.

Keywords: Design, flight testing, hypersonics, integration.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2262
1031 Critical Success Factors Influencing Construction Project Performance for Different Objectives: Procurement Phase

Authors: Samart Homthong, Wutthipong Moungnoi

Abstract:

Critical success factors (CSFs) and the criteria to measure project success have received much attention over the decades and are among the most widely researched topics in the context of project management. However, although there have been extensive studies on the subject by different researchers, to date, there has been little agreement on the CSFs. The aim of this study is to identify the CSFs that influence the performance of construction projects, and determine their relative importance for different objectives across five stages in the project life cycle. A considerable literature review was conducted that resulted in the identification of 179 individual factors. These factors were then grouped into nine major categories. A questionnaire survey was used to collect data from three groups of respondents: client representatives, consultants, and contractors. Out of 164 questionnaires distributed, 93 were returned, yielding a response rate of 56.7%. Using the mean score, relative importance index, and weighted average method, the top 10 critical factors for each category were identified. The agreement of survey respondents on those categorised factors were analysed using Spearman’s rank correlation. A one-way analysis of variance was then performed to determine whether the mean scores among the various groups of respondents were statistically significant. The findings indicate the most CSFs in each category in procurement phase are: proper procurement programming of materials (time), stability in the price of materials (cost), and determining quality in the construction (quality). They are then followed by safety equipment acquisition and maintenance (health and safety), budgeting allowed in a contractual arrangement for implementing environmental management activities (environment), completeness of drawing documents (productivity), accurate measurement and pricing of bill of quantities (risk management), adequate communication among the project team (human resource), and adequate cost control measures (client satisfaction). An understanding of CSFs would help all interested parties in the construction industry to improve project performance. Furthermore, the results of this study would help construction professionals and practitioners take proactive measures for effective project management.

Keywords: Critical success factors, procurement phase, project life cycle, project performance.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2166
1030 Using Project MIND - Math Is Not Difficult Strategies to Help Children with Autism Improve Mathematics Skills

Authors: Hui Fang Huang Su, Leanne Lai, Pei-Fen Li, Mei-Hwei Ho, Yu-Wen Chiu

Abstract:

This study aimed to provide a practical, systematic, and comprehensive intervention for children with Autism Spectrum Disorder (ASD). A pilot study of quasi-experimental pre-post intervention with control group design was conducted to evaluate if the mathematical intervention (Project MIND - Math Is Not Difficult) increases the math comprehension of children with ASD Children with ASD in the primary grades (K-1, 2) participated in math interventions to enhance their math comprehension and cognitive ability. The Bracken basic concept scale was used to evaluate subjects’ language skills, cognitive development, and school readiness. The study found that our systemic interventions of Project MIND significantly improved the mathematical and cognitive abilities in children with autism. The results of this study may lead to a major change in effective and adequate health care services for children with ASD and their families. All statistical analyses were performed with the IBM SPSS Statistics Version 25 for Windows. The significant level was set at 0.05 P-value.

Keywords: Young Children, Autism, Mathematics, Curriculum, teaching and learning, children with special needs, Project MIND.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 810
1029 Conflict of the Thai-Malaysian Gas Pipeline Project

Authors: Nopadol Burananuth

Abstract:

This research was aimed to investigate (1) the relationship among local social movements, non-governmental Organization activities and state measures deployment; and (2) the effects of local social movements, non-governmental Organization activities, and state measures deployment on conflict of local people towards the Thai-Malaysian gas pipeline project. These people included 1,000 residents of the four districts in Songkhla province. The methods of data analysis consist of multiple regression analysis. The results of the analysis showed that: (1) local social movements depended on information, and mass communication; deployment of state measures depended on compromise, coordination, and mass communication; and (2) the conflict of local people depended on mobilization, negotiation, and campaigning for participation of people in the project. Thus, it is recommended that to successfully implement any government policy, consideration must be paid to the conflict of local people, mobilization, negotiation, and campaigning for people’s participation in the project.

Keywords: Conflict, NGO activities, social movements, state measures.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1189
1028 Preliminary Roadway Alignment Design: A Spatial-Data Optimization Approach

Authors: Y. Abdelrazig, R. Moses

Abstract:

Roadway planning and design is a very complex process involving five key phases before a project is completed; planning, project development, final design, right-of-way, and construction. The planning phase for a new roadway transportation project is a very critical phase as it greatly affects all latter phases of the project. A location study is usually performed during the preliminary planning phase in a new roadway project. The objective of the location study is to develop alignment alternatives that are cost efficient considering land acquisition and construction costs. This paper describes a methodology to develop optimal preliminary roadway alignments utilizing spatial-data. Four optimization criteria are taken into consideration; roadway length, land cost, land slope, and environmental impacts. The basic concept of the methodology is to convert the proposed project area into a grid, which represents the search space for an optimal alignment. The aforementioned optimization criteria are represented in each of the grid’s cells. A spatial-data optimization technique is utilized to find the optimal alignment in the search space based on the four optimization criteria. Two case studies for new roadway projects in Duval County in the State of Florida are presented to illustrate the methodology. The optimization output alignments are compared to the proposed Florida Department of Transportation (FDOT) alignments. The comparison is based on right-of-way costs for the alignments. For both case studies, the right-of-way costs for the developed optimal alignments were found to be significantly lower than the FDOT alignments.

Keywords: Optimization, planning, roadway alignment, FDOT.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1981
1027 Introducing Principles of Land Surveying by Assigning a Practical Project

Authors: Introducing Principles of Land Surveying by Assigning a Practical Project

Abstract:

A practical project is used in an engineering surveying course to expose sophomore and junior civil engineering students to several important issues related to the use of basic principles of land surveying. The project, which is the design of a two-lane rural highway to connect between two arbitrary points, requires students to draw the profile of the proposed highway along with the existing ground level. Areas of all cross-sections are then computed to enable quantity computations between them. Lastly, Mass-Haul Diagram is drawn with all important parts and features shown on it for clarity. At the beginning, students faced challenges getting started on the project. They had to spend time and effort thinking of the best way to proceed and how the work would flow. It was even more challenging when they had to visualize images of cut, fill and mixed cross sections in three dimensions before they can draw them to complete the necessary computations. These difficulties were then somewhat overcome with the help of the instructor and thorough discussions among team members and/or between different teams. The method of assessment used in this study was a well-prepared-end-of-semester questionnaire distributed to students after the completion of the project and the final exam. The survey contained a wide spectrum of questions from students' learning experience when this course development was implemented to students' satisfaction of the class instructions provided to them and the instructor's competency in presenting the material and helping with the project. It also covered the adequacy of the project to show a sample of a real-life civil engineering application and if there is any excitement added by implementing this idea. At the end of the questionnaire, students had the chance to provide their constructive comments and suggestions for future improvements of the land surveying course. Outcomes will be presented graphically and in a tabular format. Graphs provide visual explanation of the results and tables, on the other hand, summarize numerical values for each student along with some descriptive statistics, such as the mean, standard deviation, and coefficient of variation for each student and each question as well. In addition to gaining experience in teamwork, communications, and customer relations, students felt the benefit of assigning such a project. They noticed the beauty of the practical side of civil engineering work and how theories are utilized in real-life engineering applications. It was even recommended by students that such a project be exercised every time this course is offered so future students can have the same learning opportunity they had.

Keywords: Land surveying, highway project, assessment, evaluation, descriptive statistic.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1426
1026 Investigation of Economic and Social Effects of the Dairy Cattle Support Project to Regional Economy via Cooperatives: Example of Isparta Province

Authors: Mevlüt Gül, Hilal Yılmaz, M. Göksel Akpınar, Ayse Karadağ Gürsoy, Özge Bayındır

Abstract:

Milk is a very important nutrient. Low productivity is a problem of Turkish dairy farming. During recent years, Turkish government has supported cooperatives that assist milk producers and encouraged farmers to become cooperative members. Turkish government established several ways to support specially smallholders. For example Ministry of Agriculture and Rural Affairs (MARA) provided two to four cows to villagers on a grant or loan basis with a long repayment period at low interest rates by cooperatives. Social Support Project in Rural Areas (SSPRA) is another support program targeting only disadvantaged people, especially poor villager. Both programs have a very strong social support component and similar objectives. But there are minor differences between them in terms of target people, terms and conditions of the credit supplied Isparta province in Mediterranean region of Turkey is one of the supported regions. MARA distributed dairy cows to 1072 farmers through 16 agricultural cooperatives in Isparta province in the context of SSPRA. In this study, economic-social impacts on dairy cattle project implemented through cooperatives were examined in Isparta. Primary data were collected from 12 cooperatives- president. The data were obtained by personal interview through a questionnaire and to cooperatives and given to farms benefiting from the project in order to reveal the economic and social developments. Finding of the study revealed that project provided new job opportunities and improved quality of livestock. It was found that producers who benefited from the project were more willing to participate in cooperative or other producer organizations.

Keywords: ooperative, Dairy Cattle, Economic Impact, Livestock Support Project, Social Impact.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1820
1025 Entrepreneur Features as a Competence in the Design of the European Higher Education Area Degrees

Authors: Herruzo E., Espejo R.A., Moreno R., González C., Benavides J.I., Plata, O.

Abstract:

This paper aims to explain the project carried out at the University of Cordoba, specifically at the High Polytechnic School in collaboration with two other organizations belonging to the Andalusian Ministry of Innovation, Science and Business: Andalusian Innovation and Development Agency (IDEA agency) [1] and the Territorial Net of Entrepreneurship Support (in Spanish Red Territorial de Apoyo al Emprendedor) [11]. The project is being developed in several stages of which only the first one has already been completed. However, several important preliminary results derive from it, based mainly in the description of the nature of entrepreneurship in the field of university education and its impact on student-s competency as recommended by the European Higher Education Area. Some problems holding back the correct future development will also be shown as derived from the specific context of application of the project.

Keywords: EHEA, Entrepreneurship, Innovation, TransversalCompetence.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1310
1024 Dynamic Performance Indicators for Aged-Care Construction Projects

Authors: Norman Wu, Darren Sun

Abstract:

Key performance indicators (KPIs) are used for post result evaluation in the construction industry, and they normally do not have provisions for changes. This paper proposes a set of dynamic key performance indicators (d-KPIs) which predicts the future performance of the activity being measured and presents the opportunity to change practice accordingly. Critical to the predictability of a construction project is the ability to achieve automated data collection. This paper proposes an effective way to collect the process and engineering management data from an integrated construction management system. The d-KPI matrix, consisting of various indicators under seven categories, developed from this study can be applied to close monitoring of the development projects of aged-care facilities. The d-KPI matrix also enables performance measurement and comparison at both project and organization levels.

Keywords: Aged-care project, construction, dynamic KPI, healthcare system.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2328
1023 Using Multi-Objective Particle Swarm Optimization for Bi-objective Multi-Mode Resource-Constrained Project Scheduling Problem

Authors: Fatemeh Azimi, Razeeh Sadat Aboutalebi, Amir Abbas Najafi

Abstract:

In this paper the multi-mode resource-constrained project scheduling problem with discounted cash flows is considered. Minimizing the makespan and maximization the net present value (NPV) are the two common objectives that have been investigated in the literature. We apply one evolutionary algorithm named multiobjective particle swarm optimization (MOPSO) to find Pareto front solutions. We used standard sets of instances from the project scheduling problem library (PSPLIB). The results are computationally compared respect to different metrics taken from the literature on evolutionary multi-objective optimization.

Keywords: Evolutionary multi-objective optimization makespan, multi-mode, resource constraint, net present value.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2250
1022 Knowledge Representation and Retrieval in Design Project Memory

Authors: Smain M. Bekhti, Nada T. Matta

Abstract:

Knowledge sharing in general and the contextual access to knowledge in particular, still represent a key challenge in the knowledge management framework. Researchers on semantic web and human machine interface study techniques to enhance this access. For instance, in semantic web, the information retrieval is based on domain ontology. In human machine interface, keeping track of user's activity provides some elements of the context that can guide the access to information. We suggest an approach based on these two key guidelines, whilst avoiding some of their weaknesses. The approach permits a representation of both the context and the design rationale of a project for an efficient access to knowledge. In fact, the method consists of an information retrieval environment that, in the one hand, can infer knowledge, modeled as a semantic network, and on the other hand, is based on the context and the objectives of a specific activity (the design). The environment we defined can also be used to gather similar project elements in order to build classifications of tasks, problems, arguments, etc. produced in a company. These classifications can show the evolution of design strategies in the company.

Keywords: Project Memory, Knowledge re-use, Design rationale, Knowledge representation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1579
1021 Study of the Effect of Project Management on Manufacturing and Production Projects

Authors: S.B. Ahmadi, Z. Moradpour, Gh. Liaghat

Abstract:

In this article the accumulated results out of the effects and length of the manufacture and production projects in the university and research standard have been settled with the usefulness definition of the process of project management for the accessibility to the proportional pattern in the “time and action" stages. Studies show that many problems confronted by the researchers in these projects are connected to the non-profiting of: 1) autonomous timing for gathering the educational theme, 2) autonomous timing for planning and pattern, presenting before the construction, and 3) autonomous timing for manufacture and sample presentation from the output. The result of this study indicates the division of every manufacture and production projects into three smaller autonomous projects from its kind, budget and autonomous expenditure, shape and order of the stages for the management of these kinds of projects. In this case study real result are compared with theoretical results.

Keywords: Project management, Manufacturing, production.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1619
1020 Analysis and Design of Security Oriented Communication System

Authors: Jiří Barta

Abstract:

The paper deals with results of a project “Interoperability Workplaces to Support Teaching of Security Management in a Computer Network". This project is focused on the perspectives and possibilities of "new approaches" to education, training and crisis communication of rescue teams in the Czech Republic. It means that common technologies considering new perspectives are used to educate selected members of crisis management. The main part concentrates on possibilities of application of new technology and computer-aided tools to education and training of Integrated Rescue System teams.This project uses the COST principle for the creation of specialized centers and for all communication between these workplaces.

Keywords: Communication of Crisis Management, Information System, Interoperability, specializedcenter, Security Oriented Information System.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1471
1019 Feasibility Study of a Solar Farm Project with an Executive Approach

Authors: Amir Reza Talaghat

Abstract:

Since 2015, a new approach and policy regarding energy resources protection and using renewable energies has been started in Iran which was developing new projects. Investigating about the feasibility study of these new projects helped to figure out five steps to prepare an executive feasibility study of the concerned projects, which are proper site selections, authorizations, design and simulation, economic study and programming, respectively. The results were interesting and essential for decision makers and investors to start implementing of these projects in reliable condition. The research is obtained through collection and study of the project's documents as well as recalculation to review conformity of the results with GIS data and the technical information of the bidders. In this paper, it is attempted to describe the result of the performed research by describing the five steps as an executive methodology, for preparing a feasible study of installing a 10 MW – solar farm project. The corresponding results of the research also help decision makers to start similar projects is explained in this paper as follows: selecting the best location for the concerned PV plant, reliable and safe conditions for investment and the required authorizations to start implementing the solar farm project in the concerned region, selecting suitable component to achieve the best possible performance for the plant, economic profit of the investment, proper programming to implement the project on time.

Keywords: Solar farm, solar energy, execution of PV power plant, PV power plant, feasibility study.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1667
1018 A Comparative Study on the Financial Characteristics for Development Methods of Urban Development Project - Focusing on Multi-level Replotting Method -

Authors: Jin hui Kim, Hyung kwan Cho, Ji won Moon, Hoon Chang

Abstract:

The purpose of this study is comparing and analysing of the financial characteristics for development methods of the urban development project in the established area, focusing on the multi-level replotting. Analysis showed that the type of the lowest expenditure was 'combination type of group-land and multi-level replotting' and the type of the highest profitability was 'multi-level replotting type'. But 'multi-level replotting type' has still risk of amount of cost for the additional architecture. In addition, we subdivided standard amount for liquidation of replotting and analysed income-expenditure flow. Analysis showed that both of 'multi-level replotting type' and 'combination type of group-land and multi-level replotting' improved profitability of project and property change ratio. However, when the standard was under a certain amount, amount of original property for the replotting was increased exponentially, and profitability of project.

Keywords: Urban development, multi-level replotting, financial characteristics, expropriation type, combination type, urban meteorology.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1507