Practices in Planning, Design and Construction of Head Race Tunnel of a Hydroelectric Project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33087
Practices in Planning, Design and Construction of Head Race Tunnel of a Hydroelectric Project

Authors: M. S. Thakur, Mohit Shukla

Abstract:

A channel/tunnel, which carries the water to the penstock/pressure shaft is called headrace tunnel (HRT). It is necessary to know the general topography, geology of the area, state of stress and other mechanical properties of the strata. For this certain topographical and geological investigations, in-situ and laboratory tests, and observations are required to be done. These investigations play an important role in a tunnel design as these help in deciding the optimum layout, shape and size and support requirements of the tunnel. The paper includes inputs from Nathpa Jhakri Hydeoelectric project which is India’s highest capacity (1500 MW) operating hydroelectric project. The paper would help the design engineers with various new concepts and preparedness against geological surprises.

Keywords: Tunnelling, geology, head race tunnel, rockmass.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1339508

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3754

References:


[1] Tunnelling- Design, Stability and Construction by B.N Whittsker and R.C. Frith
[2] The Art of Tunnelling, Second English Edition (1973) – Karoly Szechy.
[3] Manual on The Planning and Design of Hydraulic Tunnels – Central Board of Irrigation and Power (2012).
[4] Hydropower Engineering (Module 5) – NPTEL.
[5] IS:4880 – 1987 Design of Tunnels conveying water.
[6] Underground Infrastructures: Planning, Design and Construction - R.K. Goel, Bhawani Singh, Jian Zhao.
[7] Water and Energy International: Special Issue on 1500 MW NJHPS, CBIP, New Delhi (April-June 2008)
[8] Civil Excavations and tunnelling: A Practical Guide by Ratan Tatiya
[9] Tunnelling problems encountered at Nathpa Jhakri Hydroelectric Project (H.P.) by S.P.S. Chauhan, R.K. Gupta, G.L. Bansal.
[10] Importance of Logistics in Long Tunnel (A case Study of Dulhasti H.E Project, NHPC) – S.C. Gupta and P.K. Gupta.
[11] Special Issue on 1500 MW Nathpa Jhakri Hydroelectric Project – Central Board of Irrigation and Power, New Delhi.