WASET
	%0 Journal Article
	%A Norman Wu and  Darren Sun
	%D 2013
	%J International Journal of Civil and Environmental Engineering
	%B World Academy of Science, Engineering and Technology
	%I Open Science Index 76, 2013
	%T Dynamic Performance Indicators for Aged-Care Construction Projects
	%U https://publications.waset.org/pdf/8386
	%V 76
	%X Key performance indicators (KPIs) are used for post
result evaluation in the construction industry, and they normally do
not have provisions for changes. This paper proposes a set of
dynamic key performance indicators (d-KPIs) which predicts the
future performance of the activity being measured and presents the
opportunity to change practice accordingly. Critical to the
predictability of a construction project is the ability to achieve
automated data collection. This paper proposes an effective way to
collect the process and engineering management data from an
integrated construction management system. The d-KPI matrix,
consisting of various indicators under seven categories, developed
from this study can be applied to close monitoring of the
development projects of aged-care facilities. The d-KPI matrix also
enables performance measurement and comparison at both project
and organization levels.
	%P 298 - 302