Search results for: project objectives
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7531

Search results for: project objectives

7471 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 513
7470 Historical Geotechnical Study and Evaluation of Project Progress for the Tafila City Center Development Project

Authors: Mohmd Sarireh

Abstract:

The geotechnical study can be employed successfully to assess and follow the expected development or delay in the project construction. The development project of city center or downtown was taken as a case study for the investigation of the project conditions that might support progress or cause delay. The project was proposed to build 7447 m2 by reinforced concrete mainly to serve and support the services provided to people in Tafila. The project construction had faced challenges and obstacles such as soil collapse because of excavation of the weak soil that found in the project site. In addition, the topography of the project area showed a high slope from South-West to North. The slope through the project footprint reached to 83.3% which is considered very high slope. One year and a half proposed to finish the project construction since the 1st of March 2013 and it was planned to be finished by the 31th of August 2014, but the project needs more than one year and a half as extension according to the consultant engineer. The collecting of data was conducted through the interviews with the engineers and officials, and by analyzing the soil reports and samples taken during design and excavation. The major findings came out to weak and fractured soil and construction waste that were found at project site. Also, soil was considered very fine according to the plasticity index (PI) values, in addition to the high depths required for foundation that contribute to the collapse of soil and the increase of project cost. The current project aims to present how the unseen conditions can delay the project construction and increase the cost of the project that rises to JD8.305 Million.

Keywords: geotechnical, management, progress, risk, soil unseen conditions management

Procedia PDF Downloads 193
7469 Quality Management in Construction Project

Authors: Harsh Panchal, Saurabh Amrutkar

Abstract:

Quality management is an essential part of any project that has directly related to the performance of a project. Quality management is depended on multiple factors at different stages in a project, right from time management to construction logistics. A project is a mixture of various components that include iternary management, health and safety, crew productivity, and many more. From the survey conducted, we came to the conclusion that advancement in technology and indigenous approach to any project will result in maximum quality standards and better project performance. In this paper, we discuss various components of the factors above that lead to compromise the quality of a project and how it can be controlled in order to achieve maximum quality assurance using quality planning and total quality management. The paper also focuses on limitations and problems faced in each factor responsible for quality management and to tackle them using techniques and processes based on activities and identifying the sequence, approaching critical path, and duration. The project management concept that deals with the sequence of scope cost time give us an overview regarding the ongoing quality management, in a nutshell, giving us hints to regulate the current procedure for maximum achievable quality. It also deals with the problems faced by engineers that make the mundane work process slow, reducing the quality outcome drastically.

Keywords: management, performance, project, quality

Procedia PDF Downloads 126
7468 Incentivize Contracting Partners of Public Projects

Authors: Sai On Cheung, Qiuwen Ma, Fong Chung Lee

Abstract:

Due to increased project complexity and technological advancement in the last decade, the designers and contractors are expected to put more efforts to achieve project goals. To render extra efforts from the agents, incentivization has become one of the primary strategies for the client. Despite increased academia interest in the design of incentive strategies, there is still a need for discussion about the underlying motivations and favourable conditions to make incentives effective. Therefore, this study focuses on the effects of motivations and favourable conditions for the use of incentives in public projects. Questionnaire survey is used as the data collection tool. The questionnaire survey was piloted through interviews with professionals from Hong Kong public sector. A total of 100 responses were collected for this survey. Accountability and organizational effectiveness were found to be the prime objectives of incentives installed by public clients. Furthermore, a list of favourable conditions for incentivization and its consequent effects on cost, schedule, risk and public opinions were identified. To conclude, this study analyses the means and ends of the use of incentives in public projects in Hong Kong.

Keywords: incentives, public accountability, project effectiveness, public opinions

Procedia PDF Downloads 35
7467 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine

Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad

Abstract:

In the framework of the modernization of the city of Constantine, and in order to restore its status as a regional metropolis and introduce it into the network of cities international metropolises, a major urban project was launched: project of modernization and of metropolitanization of the city of Constantine (PMMC). Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. Among the cases revealing taken into account in our research work on the question of participation of actors and their organizations, the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This operation with the objective of improving the living conditions of citizens has faced several challenges and obstacles that have been in major part the factors of its failure. Through this study, we examine the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally propose managerial solutions to conflict situations observed.

Keywords: the urban project, the urban improvement, participation, Constantine

Procedia PDF Downloads 374
7466 Design and Modeling of a Green Building Energy Efficient System

Authors: Berhane Gebreslassie

Abstract:

Conventional commericial buildings are among the highest unwisely consumes enormous amount of energy and as consequence produce significant amount Carbon Dioxide (CO2). Traditional/conventional buildings have been built for years without consideration being given to their impact on the global warming issues as well as their CO2 contributions. Since 1973, simulation of Green Building (GB) for Energy Efficiency started and many countries in particular the US showed a positive response to minimize the usage of energy in respect to reducing the CO2 emission. As a consequence many software companies developed their own unique building energy efficiency simulation software, interfacing interoperability with Building Information Modeling (BIM). The last decade has witnessed very rapid growing number of researches on GB energy efficiency system. However, the study also indicates that the results of current GB simulation are not yet satisfactory to meet the objectives of GB. In addition most of these previous studies are unlikely excluded the studies of ultimate building energy efficiencies simulation. The aim of this project is to meet the objectives of GB by design, modeling and simulation of building ultimate energy efficiencies system. This research project presents multi-level, L-shape office building in which every particular part of the building materials has been tested for energy efficiency. An overall of 78.62% energy is saved, approaching to NetZero energy saving. Furthermore, the building is implements with distributed energy resources like renewable energies and integrating with Smart Building Automation System (SBAS) for controlling and monitoring energy usage.

Keywords: ultimate energy saving, optimum energy saving, green building, sustainable materials and renewable energy

Procedia PDF Downloads 247
7465 Engineering Management and Practice in Nigeria

Authors: Harold Jideofor

Abstract:

The application of Project Management (PM) tools and techniques in the public sector is gradually becoming an important issue in developing economies, especially in a country like Nigeria where projects of different size and structures are undertaken. The paper examined the application of the project management practice in the public sector in Nigeria. The PM lifecycles, tools, and techniques were presented. The study was carried out in Lagos because of its metropolitan nature and rapidly growing economy. Twenty-three copies of questionnaire were administered to 23 public institutions in Lagos to generate primary data. The descriptive analysis techniques using percentages and table presentations coupled with the coefficient of correlation were used for data analysis. The study revealed that application of PM tools and techniques is an essential management approach that tends to achieve specified objectives within specific time and budget limits through the optimum use of resources. Furthermore, the study noted that there is a lack of in-depth knowledge of PM tools and techniques in public sector institutions sampled, also a high cost of the application was also observed by the respondents. The study recommended among others that PM tools and techniques should be applied gradually especially in old government institutions where resistance to change is perceived to be high.

Keywords: project management, public sector, practice, Nigeria

Procedia PDF Downloads 300
7464 Application of Agile Project Management to Construction Projects: Case Study

Authors: Ran Etgar, Sarit Freund

Abstract:

Agile project management (APM) has been developed originally for software development project. Construction projects seemed to be more apt to traditional water-fall approach than to APM. However, Construction project suffers from similar problems that necessitated the invention of APM, mainly the need to break down the project structure to small increments, thus minimizing the needed managerial planning and design. Since the classical structure of APM is not applicable the way it is to construction project, a modified version of APM was devised. This method, nicknamed 'The anchor method', exploits the fundamentals of APM (i.e., iterations, or sprints of short time frames or timeboxes, cross-functional teams, risk reduction and adaptation to changes) and adjust them to the construction world. The projects had to be structured appropriately to proactively and quickly adapt to change. The method aims to encompass human behavior and lean towards adaptivity rather than predictability. To enable smooth application of the method, a special project management software was developed, so as to provide solid administrational help and accurate data. The method is tested on a bunch of construction projects and some key performance indicators (KPIs) are collected. According to preliminary results the method is indeed very advantageous and with proper assimilation can radically change the construction project management paradigm.

Keywords: agile project management, construction, information systems, project management

Procedia PDF Downloads 100
7463 Conceptualising Project Complexity in Ghana’s Construction Industry: A Qualitative Study

Authors: Kwasi Dartey-Baah, Mias De Klerk

Abstract:

Project complexity has been cited as one of the essential areas of project management. It can be observed from environmental, social, technological, and organisational viewpoints, and its handling is critical to project success. Conceptualised in varied industries, this paper seeks to ascertain the meaning and understanding of project complexity within the Ghanaian construction industry based on the three dimensions of complexities (faith, fact, and interaction) using experts' opinions. Taking the form of a focus group discussion, the paper sought to gain an in-depth understanding of project complexity issues in Ghana’s construction industry. The method use obtained data from experts (a purposely selected group) comprising project leaders and project management academics. The findings indicated that the experts broadly agreed with the complexity items but offered varied reasons for their agreement. In the composite assessment of the complexity dimensions of (faith, fact, and interaction), it emerged that there was some agreement with the complexity dimensions of fact and interaction within Ghana’s construction industry. On the other hand, with the dimension for complexity by faith, it was noted that the experts in Ghana’s construction construed complexity by faith, not as the absence of evidence but the evidence that hinges on at least a member of the project team. It is expected that other researches on project complexity will focus on other industries to enhance the knowledge of the same within the field of project management.

Keywords: project complexity, complexity by faith, complexity by fact, complexity by interaction, construction industry, Ghana

Procedia PDF Downloads 129
7462 Evolution of Performance Measurement Methods in Conditions of Uncertainty: The Implementation of Fuzzy Sets in Performance Measurement

Authors: E. A. Tkachenko, E. M. Rogova, V. V. Klimov

Abstract:

One of the basic issues of development management is connected with performance measurement as a prerequisite for identifying the achievement of development objectives. The aim of our research is to develop an improved model of assessing a company’s development results. The model should take into account the cyclical nature of development and the high degree of uncertainty in dealing with numerous management tasks. Our hypotheses may be formulated as follows: Hypothesis 1. The cycle of a company’s development may be studied from the standpoint of a project cycle. To do that, methods and tools of project analysis are to be used. Hypothesis 2. The problem of the uncertainty when justifying managerial decisions within the framework of a company’s development cycle can be solved through the use of the mathematical apparatus of fuzzy logic. The reasoned justification of the validity of the hypotheses made is given in the suggested article. The fuzzy logic toolkit applies to the case of technology shift within an enterprise. It is proven that some restrictions in performance measurement that are incurred to conventional methods could be eliminated by implementation of the fuzzy logic apparatus in performance measurement models.

Keywords: logic, fuzzy sets, performance measurement, project analysis

Procedia PDF Downloads 346
7461 A Predictive Analytics Approach to Project Management: Reducing Project Failures in Web and Software Development Projects

Authors: Tazeen Fatima

Abstract:

Use of project management in web & software development projects is very significant. It has been observed that even with the application of effective project management, projects usually do not complete their lifecycle and fail. To minimize these failures, key performance indicators have been introduced in previous studies to counter project failures. However, there are always gaps and problems in the KPIs identified. Despite of incessant efforts at technical and managerial levels, projects still fail. There is no substantial approach to identify and avoid these failures in the very beginning of the project lifecycle. In this study, we aim to answer these research problems by analyzing the concept of predictive analytics which is a specialized technology and is very easy to use in this era of computation. Project organizations can use data gathering, compute power, and modern tools to render efficient Predictions. The research aims to identify such a predictive analytics approach. The core objective of the study was to reduce failures and introduce effective implementation of project management principles. Existing predictive analytics methodologies, tools and solution providers were also analyzed. Relevant data was gathered from projects and was analyzed via predictive techniques to make predictions well advance in time to render effective project management in web & software development industry.

Keywords: project management, predictive analytics, predictive analytics methodology, project failures

Procedia PDF Downloads 306
7460 Project Knowledge Harvesting: The Case of Improving Project Performance through Project Knowledge Sharing Framework

Authors: Eng Rima Al-Awadhi, Abdul Jaleel Tharayil

Abstract:

In a project-centric organization like KOC, managing the knowledge of the project is of critical importance to the success of the project and the organization. However, due to the very nature and complexity involved, each project engagement generates a lot of 'learnings' that need to be factored into while new projects are initiated and thus avoid repeating the same mistake. But, many a time these learnings are localized and remains as ‘tacit knowledge’ leading to scope re-work, schedule overrun, adjustment orders, concession requests and claims. While KOC follows an asset based organization structure, with a multi-cultural and multi-ethnic workforce and larger chunk of the work is carried out through complex, long term project engagement, diffusion of ‘learnings’ across assets while dealing with the natural entropy of the organization is of great significance. Considering the relatively higher number of mega projects, it's important that the issues raised during the project life cycle are centrally harvested, analyzed and the ‘learnings’ from these issues are shared, absorbed and are in-turn utilized to enhance and refine the existing process and practices, leading to improve the project performance. One of the many factors contributing to the successful completion of a project on time is the reduction in the number of variations or concessions triggered during the project life cycle. The project process integrated knowledge sharing framework discusses the knowledge harvesting methodology adopted, the challenges faced, learnings acquired and its impact on project performance. The framework facilitates the proactive identification of issues that may have an impact on the overall quality of the project and improve performance.

Keywords: knowledge harvesting, project integrated knowledge sharing, performance improvement, knowledge management, lessons learn

Procedia PDF Downloads 359
7459 Building Information Management Advantages, Adaptation, and Challenges of Implementation in Kabul Metropolitan Area

Authors: Mohammad Rahim Rahimi, Yuji Hoshino

Abstract:

Building Information Management (BIM) at recent years has widespread consideration on the Architecture, Engineering and Construction (AEC). BIM has been bringing innovation in AEC industry and has the ability to improve the construction industry with high quality, reduction time and budget of project. Meanwhile, BIM support model and process in AEC industry, the process include the project time cycle, estimating, delivery and generally the way of management of project but not limited to those. This research carried the BIM advantages, adaptation and challenges of implementation in Kabul region. Capital Region Independence Development Authority (CRIDA) have responsibilities to implement the development projects in Kabul region. The method of study were considers on advantages and reasons of BIM performance in Afghanistan based on online survey and data. Besides that, five projects were studied, the reason of consideration were many times design revises and changes. Although, most of the projects had problems regard to designing and implementation stage, hence in canal project was discussed in detail with the main reason of problems. Which were many time changes and revises due to the lack of information, planning, and management. In addition, two projects based on BIM utilization in Japan were also discussed. The Shinsuizenji Station and Oita River dam projects. Those are implemented and implementing consequently according to the BIM requirements. The investigation focused on BIM usage, project implementation process. Eventually, the projects were the comparison with CRIDA and BIM utilization in Japan. The comparison will focus on the using of the model and the way of solving the problems based upon on the BIM. In conclusion, that BIM had the capacity to prevent many times design changes and revises. On behalf of achieving those objectives are required to focus on data management and sharing, BIM training and using new technology.

Keywords: construction information management, implementation and adaptation of BIM, project management, developing countries

Procedia PDF Downloads 94
7458 Connecting the Dots: Bridging Academia and National Community Partnerships When Delivering Healthy Relationships Programming

Authors: Nicole Vlasman, Karamjeet Dhillon

Abstract:

Over the past four years, the Healthy Relationships Program has been delivered in community organizations and schools across Canada. More than 240 groups have been facilitated in collaboration with 33 organizations. As a result, 2157 youth have been engaged in the programming. The purpose and scope of the Healthy Relationships Program are to offer sustainable, evidence-based skills through small group implementation to prevent violence and promote positive, healthy relationships in youth. The program development has included extensive networking at regional and national levels. The Healthy Relationships Program is currently being implemented, adapted, and researched within the Resilience and Inclusion through Strengthening and Enhancing Relationships (RISE-R) project. Alongside the project’s research objectives, the RISE-R team has worked to virtually share the ongoing findings of the project through a slow ontology approach. Slow ontology is a practice integrated into project systems and structures whereby slowing the pace and volume of outputs offers creative opportunities. Creative production reveals different layers of success and complements the project, the building blocks for sustainability. As a result of integrating a slow ontology approach, the RISE-R team has developed a Geographic Information System (GIS) that documents local landscapes through a Story Map feature, and more specifically, video installations. Video installations capture the cartography of space and place within the context of singular diverse community spaces (case studies). By documenting spaces via human connections, the project captures narratives, which further enhance the voices and faces of the community within the larger project scope. This GIS project aims to create a visual and interactive flow of information that complements the project's mixed-method research approach. Conclusively, creative project development in the form of a geographic information system can provide learning and engagement opportunities at many levels (i.e., within community organizations and educational spaces or with the general public). In each of these disconnected spaces, fragmented stories are connected through a visual display of project outputs. A slow ontology practice within the context of the RISE-R project documents activities on the fringes and within internal structures; primarily through documenting project successes as further contributions to the Centre for School Mental Health framework (philosophy, recruitment techniques, allocation of resources and time, and a shared commitment to evidence-based products).

Keywords: community programming, geographic information system, project development, project management, qualitative, slow ontology

Procedia PDF Downloads 132
7457 Empowering Volunteers at Tawanchai Centre for Patients with Cleft Lip and Palate

Authors: Suteera Pradubwong, Darawan Augsornwan, Pornpen Pathumwiwathana, Benjamas Prathanee, Bowornsilp Chowchuen

Abstract:

Background: Cleft lip and palate (CLP) congenital anomalies have a high prevalence in the Northeast of Thailand. A care team’s understand of treatment plan would help to guide the family of patients with CLP to achieve the treatment. Objectives: To examine the impact of the empowering volunteer project, established in the northeast Thailand. Materials and Methods: The Empowering Volunteer project was conducted in 2008 under the Tawanchai Royal Granted project. The patients and family’s general information, treatment, the group brainstorming, and satisfaction with the project were analyzed. Results: Participants were 12 children with CLP, their families and five volunteers with CLP; the participating patients were predominantly females and the mean, age was 12.2 years. The treatment comprised of speech training, dental hygiene care, bone graft and orthodontic treatment. Four issues were addressed including: problems in taking care of breast feeding; instructions’ needs for care at birth; difficulty in access information and society impact; and needs in having a network of volunteers. Conclusions: Empowering volunteer is important for holistic care of patients with CLP which provides easy access and multiple channels for patients and their families. It should be developed as part of the self-help and family support group, the development of community based team and comprehensive CLP care program.

Keywords: self-help and family support group, community based model, volunteer, cleft lip-cleft palate

Procedia PDF Downloads 257
7456 Ranking the Factors That Influence the Construction Project Success: The Jordanian Perspective

Authors: Ghanim A. Bekr

Abstract:

Project success is what must be done for the project to be acceptable to the client, stakeholders and end-users who will be affected by the project. The study of project success and the critical success factors (CSFs) are the means adopted to improve the effectiveness of project. This research is conducted to make an attempt to identify which variables influence the success of project implementation. This study has selected, through an extensive literature review and interviews, (83) factors categorized in (7) groups that the questionnaire respondents were asked to score. The responses from 66 professionals with an average of 15 years of experience in different types of construction projects in Jordan were collected and analyzed using SPSS and most important factors for success for various success criteria are presented depending on the relative importance index to rank the categories. The research revealed the significant groups of factors are: Client related factors, Contractor’s related factors, Project Manager (PM) related factors, and Project management related factors. In addition the top ten sub factors are: Assertion of the client towards short time of the project, availability of skilled labor, Assertion of the client towards high level of the quality, capability of the client in taking risk, previous experience of the PM in similar projects, previous experience of the contractor in similar projects, decision making by the client/ the client’s representative at the right time, assertion of client towards low cost of project, experience in project management in previous projects, and flow of the information among parties. The results would be helpful to construction project professionals in taking proactive measures for successful completion of construction projects in Jordan.

Keywords: construction projects, critical success factors, Jordan, project success

Procedia PDF Downloads 129
7455 Sustainability Index for REDD-Plus Implementation in Central Kalimantan, Indonesia

Authors: Febrina Natalia, Noriyuki Tanaka, Mitsuru Osaki

Abstract:

Sustainability Index for REDD-plus implementation was constructed to evaluate the sustainability of different communities in 5 villages (Taruna Jaya, Tumbang Nusa, Marang, Terantang, and Seragam Jaya) in Central Kalimantan, Indonesia based on the main objectives of REDD-plus project (reducing emission from deforestation and forest degradation, increasing carbon stock, preserving biodiversity and sustaining forest management). This index was separately composed of 3 different components; (1) ecology, (2) economy, and (3) society. The index of sustainability was determined into four categories; 3,3-4,0 (excellent), 2,5-3,2 (good), 1,8-2,4 (fair), and 1,0-1,7 (poor). Overall, this technique aims to assist all stakeholders and local government in particular in providing information of villages’ sustainability index before implementing REDD-plus project that the assistance and benefits given to villages will be beneficial, effective and efficient.

Keywords: central kalimantan, Indonesia, REDD-plus, sustainability index

Procedia PDF Downloads 414
7454 Effect of Project Control Practices on the Performance of Building Construction Companies in Uganda: A Case Study of Kampala City

Authors: Tukundane Hillary

Abstract:

This research paper analytically evaluates the project control practice levels used by the building construction companies within Kampala, Uganda. The research also assesses the outcome of project control practices on the productivity of the companies. The research was performed to ascertain the current control practices among 160 respondents from various construction companies registered with the Uganda Registration Services Bureau. This research used amalgamation from multiple literature to obtain the variables. The research adopts 34 standard control practices from four vital project control duties: planning, monitoring, analyzing, and reporting. These project control tasks were organized using mean response ratings grounded on their relevance to the construction companies. Results showed that evaluating performance with the use of curves (4.32), timely access to information and encouragement (4.55), report representation using quantitative tools 4.75, and cost value comparison application during analysis (4.76) were rated least among the control practices. On the other hand, the top project control practices included formulation of the project schedule (8.88), Project feasibility validation (8.86), Budgeting for each activity (8.84), Key project route definition (8.81), Team awareness of the budget (8.77), Setting realistic targets for projects (8.50) and Consultation from subcontractors (8.74). From the results obtained by the sample respondents specified, it can be concluded that planning is the most vital project control task practiced in the building construction industry in Uganda. In addition, this research ascertained a substantial relationship between project control practices and the performance of building construction companies. Accordingly, this research recommends that project control practices be effectively observed by both contracting and consulting companies to enhance their overall performance and governance.

Keywords: cost value, project control, cost control, time control, project performance, control practices

Procedia PDF Downloads 27
7453 A Principal-Agent Model for Sharing Mechanism in Integrated Project Delivery Context

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasingly attention from construction industry because of its efficiency of solving adversarial problems and reliability to deliver high-performing buildings. However, some evidence showed that some project participants obtained less profit from IPD projects than the typical projects. They attributed it to the unfair IPD sharing mechanism, which resulted in additional time and cost of negotiation on the sharing fractions among project participants. The study is aimed to investigate the reward distribution by constructing a principal-agent model. Based on cooperative game theory, it is examined how to distribute the shared project rewards between client and non-client parties, and identify the sharing fractions among non-client parties. It is found that at least half of the project savings should be allocated to the non-client parties to motivate them to create more project value. Second, the client should raise his sharing fractions when the integration among project participants is efficient. In addition, the client should allocate higher sharing fractions to the non-client party who is more able. This study can help the IPD project participants make fair and motivated sharing mechanisms.

Keywords: cooperative game theory, IPD, principal agent model, sharing mechanism

Procedia PDF Downloads 264
7452 Lexicographic Rules on the Use of Technologies for Realization of the National Signs-Terms Inventory of Cultural Heritage Field in Libras

Authors: Gláucio de Castro Júnior, Daniela Prometi, Patrícia Tuxi

Abstract:

The project 'Inventory Signs-terms of the cultural heritage field in Libras' provides for the establishment of an inventory of signs, terms relating to the field of cultural heritage in Libras, from the results of research in progress as the pilot project' Accessibility Communication, Translation and Interpretation to the Application Portal Libras Heritage 'and the Pilot Project' registration-signal terms for the preparation of bilingual lexicon Libras / Portuguese terms available in the Portal Heritage. The project's goal is to spread the lexicographical rules on the use of technologies in video graphic records of sign language and foster the training of undergraduate students and graduate to the registration of the linguistic diversity of Libras through social and communicative interaction with the community deaf and enable access to Deaf information relating to the field of cultural heritage in Libras. As a result, we expect the spread of the inventory of cultural heritage-signs in terms Libras in application usage 'Portal Heritage'. To achieve the proposed objectives are accomplished technical consulting and continuous training for the production of academic material through theoretical and practical meetings, taught by experts Libras LIP / UNB in partnership with some institutions. The Inventory project signals-Terms under Heritage in Libras field initially took place in Rio de Janeiro in order to allow its development in the Midwest region, due to technical, elected some cities in Brazil, including Manaus in Amazon Macapa in Amapa, Salvador Bahia, Goiás and Goiânia in Florianopolis in Santa Catarina. At the end of all this process, the assessment by preparing a technical report presenting all the advances and points achieved in the project looking for social improvement, economic, environmental and language in the use of technology will be conducted.

Keywords: signs-terms, equity-cultural accessibility, technology, sign language

Procedia PDF Downloads 391
7451 Technology Roadmapping in Defense Industry

Authors: Sevgi Özlem Bulu, Arif Furkan Mendi, Tolga Erol, İzzet Gökhan Özbilgin

Abstract:

The rapid progress of technology in today's competitive conditions has also accelerated companies' technology development activities. As a result, companies are paying more attention to R&D studies and are beginning to allocate a larger share to R&D projects. A more systematic, comprehensive, target-oriented implementation of R&D studies is crucial for the company to achieve successful results. As a consequence, Technology Roadmap (TRM) is gaining importance as a management tool. It has critical prospects for achieving medium and long term success as it contains decisions about past business, future plans, technological infrastructure. When studies on TRM are examined, projects to be placed on the roadmap are selected by many different methods. Generally preferred methods are based on multi-criteria decision making methods. Management of selected projects becomes an important point after the selection phase of the projects. At this stage, TRM are used. TRM can be created in many different ways so that each institution can prepare its own Technology Roadmap according to their strategic plan. Depending on the intended use, there can be TRM with different layers at different sizes. In the evaluation phase of the R&D projects and in the creation of the TRM, HAVELSAN, Turkey's largest defense company in the software field, carries out this process with great care and diligence. At the beginning, suggested R&D projects are evaluated by the Technology Management Board (TMB) of HAVELSAN in accordance with the company's resources, objectives, and targets. These projects are presented to the TMB periodically for evaluation within the framework of certain criteria by board members. After the necessary steps have been passed, the approved projects are added to the time-based TRM, which is composed of four layers as market, product, project and technology. The use of a four-layered roadmap provides a clearer understanding and visualization of company strategy and objectives. This study demonstrates the benefits of using TRM, four-layered Technology Roadmapping and the possibilities for the institutions in the defense industry.

Keywords: technology roadmap, research and development project, project selection, research development in defense industry

Procedia PDF Downloads 149
7450 Managing Multiple Change Projects in Supply Chains: A Case Study of a Moroccan Multi-Technical Services Company

Authors: Abdelouahab Errida, Bouchra Lotfi, Elalami Semma

Abstract:

In this paper, we try to address the topic of multiple change management by adopting an engineered research methodology, conducted within a Moroccan company during its implementation of several change projects that aim at improving its supply chain management performance. Firstly, we present the key concepts related to our research, namely change management, multiproject management and supply chain management. Then, we try to assess how the change management and multi-project management are applied in this company. Finally, we try to propose an approach that will help managers in dealing with multiple change projects. This approach proposes to integrate change management, project management and multi-project management for managing change projects according to three organizational levels: executive level, project portfolio level and change project level.

Keywords: change management, multi-project management, project management, change portfolio, supply chain management,

Procedia PDF Downloads 192
7449 The Impact of Management Competency, Project Team, and Process Design to Corporate Performance through Implementing the Self-Development ERP

Authors: Zeplin Jiwa Husada Tarigan, Sautma Ronni Basana, Widjojo Suprapto

Abstract:

Manufacturing companies in East Java develop their own ERP system or alter the ERP system which is developed by other companies to suit their needs. To make their own system, the companies mostly assign several employees from various departments to create a project team, and the employees are from the departments that are going to utilize the ERP system as the integrated data. The project team decides the making of the ERP system from the preparation stage until the going live implementation process. In designing the business process, the top management is working together with the project team until the project is accomplished. The completion of the ERP projects depends on the project to be undertaken itself, the strategy chosen to complete the project, the work method selection, the measurement system to monitor the project, the evaluation system of the project, and, in the end, the declaration of 'going live' of the ERP project. There is an increase in the business performance for the companies that have implemented the information technology or ERP as they manage to integrate all management functions within their companies. To investigate, some questionnaires are distributed to 100 manufacturing companies, and 90 questionnaires are returned; however, there are only 46 companies that develop their own ERP system, so the response rate is 46%. The result of data analysis using PLS shows that the management competency brings impacts to the project team and the process design. The process design is adjusted to the real process in order to implement the ERP, but it does not bring direct impacts to the business performance. The implementation of ERP brings positive impacts to the company business performance.

Keywords: management competency, project team, process design, ERP implementation, business performance

Procedia PDF Downloads 183
7448 Measurement of Project Success in Construction Using Performance Indices

Authors: Annette Joseph

Abstract:

Background: The construction industry is dynamic in nature owing to the increasing uncertainties in technology, budgets, and development processes making projects more complex. Thus, predicting project performance and chances of its likely success has become difficult. The goal of all parties involved in construction projects is to successfully complete it on schedule, within planned budget and with the highest quality and in the safest manner. However, the concept of project success has remained ambiguously defined in the mind of the construction professionals. Purpose: This paper aims to study the analysis of a project in terms of its performance and measure the success. Methodology: The parameters for evaluating project success and the indices to measure success/performance of a project are identified through literature study. Through questionnaire surveys aimed at the stakeholders in the projects, data is collected from two live case studies (an ongoing and completed project) on the overall performance in terms of its success/failure. Finally, with the help of SPSS tool, the data collected from the surveys are analyzed and applied on the selected performance indices. Findings: The score calculated by using the indices and models helps in assessing the overall performance of the project and interpreting it to find out whether the project will be a success or failure. This study acts as a reference for firms to carry out performance evaluation and success measurement on a regular basis helping projects to identify the areas which are performing well and those that require improvement. Originality & Value: The study signifies that by measuring project performance; a project’s deviation towards success/failure can be assessed thus helping in suggesting early remedial measures to bring it on track ensuring that a project will be completed successfully.

Keywords: project, performance, indices, success

Procedia PDF Downloads 163
7447 Overcoming the Impacts of Covid-19 Outbreak Using Value Integrated Project Delivery Model

Authors: G. Ramya

Abstract:

Value engineering is a systematic approach, widely used to optimize the design or process or product in the designing stage. It used to achieve the client's obligation by increasing the functionality and attain the targeted cost in the cost planning. Value engineering effectiveness and benefits decrease along with the progress of the project since the change in the scope of the work and design will account for more cost all along the lifecycle of the project. Integrating the value engineering with other project management activities will promote cost minimization, client satisfaction, and ensure early completion of the project in time. Previous research studies suggested that value engineering can integrate with other project delivery activities, but research studies unable to frame a model that collaborates the project management activities with the job plan of value engineering approach. I analyzed various project management activities and their synergy between each other. The project management activities and processes like a)risk analysis b)lifecycle cost analysis c)lean construction d)facility management e)Building information modelling f)Contract administration, collaborated, and project delivery model planned along with the RIBA plan of work. The key outcome of the research is a value-driven project delivery model, which will succeed in dealing with the economic impact, constraints and conflicts arise due to the COVID-19 outbreak in the Indian construction sector. Benefits associated with the structured framework is construction project delivery that ensures early contractor involvement, mutual risk sharing, and reviving the project with a cost overrun and delay back on track ,are discussed. Keywords: Value-driven project delivery model, Integration, RIBA plan of work Themes: Design Economics

Keywords: value-driven project delivery model, Integration, RIBA

Procedia PDF Downloads 95
7446 Project and Experiment-Based Fluid Dynamics Education

Authors: Etsuo Morishita

Abstract:

This paper presents the project and experiment-based fluid dynamics education in Meisei University, a private institution in Tokyo, Japan. We pay attention not only to the basic engineering courses but also to the practical aspect of engineering experience. So, we prepare courses called the Projects from I to VI. The Projects I and II are designed for the first year, III and IV are designated for the second year, V and VI are prepared for the third year, respectively. Each supervisor is responsible for two of these projects every year. When students take the Project V and VI at the third year, we automatically assume that these students will join the lab of the project for the graduation thesis. We would like to show our experience in the Project I in the summer term, 2016. In this project, we introduce a traction flight vehicle called Cat Flyer. This is a kind of a kite towed by a car for example. This is very similar to parasailing, but flight is possible even on the roads. Experiments in mechanical engineering education are also very important, and we would like to explain our course on centrifugal pump, venture, and orifice. Although these are described in detail in the text books of fluid dynamics, it is still crucial to have practical experiments as a student.

Keywords: aerodynamics, experiment, fluid dynamics, project

Procedia PDF Downloads 235
7445 An Evaluation of Rational Approach to Management by Objectives in Construction Contracting Organisation

Authors: Zakir H. Shaik, Punam L. Vartak

Abstract:

Management By Objectives (MBO) is a management technique in which objectives of an organisation are conveyed to the employees to establish the individual goals. These objectives and goals are then monitored and assessed jointly by management and the employee time to time. This tool can be used for planning, monitoring as well as for performance appraisal. The success of an organisation is largely dependent on its’s Vision. Thus, it is of paramount importance to achieve the realm of vision through a mission which is well crafted within the organisation to address the objectives. The success of the mission depends upon how realistic and action oriented philosophical approach, an organisation caters to; and how the individual goals are set to track and meet the objectives. Thus, focused and passionate efforts of the team, assigned for the mission, are an absolute obligation for achieving the vision of any organisation. Any construction site is generally a controlled disorder having huge investments, resources and logistics involved. The Construction progression is time-consuming with many isolated as well as interconnected activities. Traditional MBO approach can be unsuccessful if planning and control is non-realistic and inflexible. Moreover, the Construction Industry is far behind understanding these concepts. It is important to address the employee engagement in defining and creating awareness to achieve the targets. Besides, current economic environment and competitive world demands refined management tools to achieve profit, growth and survival of the business. Therefore, the necessity of rational MBO becomes vital part towards the success of an organisation. This paper details about the philosophical assumptions to develop the grounded theory in lieu of achieving objectives through RATIONAL MBO approach in Construction Contracting Organisations. The goals and objectives of the Construction Contracting Organisations can be achieved efficiently by adopting this RATIONAL MBO approach, as those are based on realistic, logical and balanced assumptions.

Keywords: growth, leadership, management by objectives, Management By Objectives (MBO), profit, rational

Procedia PDF Downloads 128
7444 The Current Application of BIM - An Empirical Study Focusing on the BIM-Maturity Level

Authors: Matthias Stange

Abstract:

Building Information Modelling (BIM) is one of the most promising methods in the building design process and plays an important role in the digitalization of the Architectural, Engineering, and Construction (AEC) Industry. The application of BIM is seen as the key enabler for increasing productivity in the construction industry. The model-based collaboration using the BIM method is intended to significantly reduce cost increases, schedule delays, and quality problems in the planning and construction of buildings. Numerous qualitative studies based on expert interviews support this theory and report perceived benefits from the use of BIM in terms of achieving project objectives related to cost, schedule, and quality. However, there is a large research gap in analysing quantitative data collected from real construction projects regarding the actual benefits of applying BIM based on representative sample size and different application regions as well as different project typologies. In particular, the influence of the project-related BIM maturity level is completely unexplored. This research project examines primary data from 105 construction projects worldwide using quantitative research methods. Projects from the areas of residential, commercial, and industrial construction as well as infrastructure and hydraulic engineering were examined in application regions North America, Australia, Europe, Asia, MENA region, and South America. First, a descriptive data analysis of 6 independent project variables (BIM maturity level, application region, project category, project type, project size, and BIM level) were carried out using statistical methods. With the help of statisticaldata analyses, the influence of the project-related BIM maturity level on 6 dependent project variables (deviation in planning time, deviation in construction time, number of planning collisions, frequency of rework, number of RFIand number of changes) was investigated. The study revealed that most of the benefits of using BIM perceived through numerous qualitative studies have not been confirmed. The results of the examined sample show that the application of BIM did not have an improving influence on the dependent project variables, especially regarding the quality of the planning itself and the adherence to the schedule targets. The quantitative research suggests the conclusion that the BIM planning method in its current application has not (yet) become a recognizable increase in productivity within the planning and construction process. The empirical findings indicate that this is due to the overall low level of BIM maturity in the projects of the examined sample. As a quintessence, the author suggests that the further implementation of BIM should primarily focus on an application-oriented and consistent development of the project-related BIM maturity level instead of implementing BIM for its own sake. Apparently, there are still significant difficulties in the interweaving of people, processes, and technology.

Keywords: AEC-process, building information modeling, BIM maturity level, project results, productivity of the construction industry

Procedia PDF Downloads 49
7443 The Need for Implementing Building Information Modelling (BIM) and Integrated Project Delivery (IPD) in the Construction Project: A Case Study in UAE

Authors: C. W. F. Che Wan Putra, M. Alshawi, M. S. Al Ahbabi, M. Jabakhanji

Abstract:

Much of the waste that is generated throughout the life-cycle of a building is mainly related to project stakeholders not having access to information that others have created. This results in waste and high costs. Over the past decade, however, the industry reacted to these challenges by adopting effective procurement approaches, such as partnering and design and build, to improve collaboration and communication among projects’ stakeholders. Most recently, there is a focus on creating and reusing digital project information of stakeholders throughout the life-cycle to facilitate the exchange of information among partners. This shift is based around BIM (Building Information Modelling) and collaborative environment (IPD). The power of collaborative BIM goes beyond improving efficiency. Sustainability, perhaps the most important challenge for the design and construction community, is at the intersection of BIM and collaborative project delivery, drawing strength from both. Due to these benefits, a research study has been carried out to investigate the need of BIM and IPD, on a large scale construction project which is procured on a traditional approach, i.e. design-bid-build. A qualitative research work including a semi-structured interview with project partners was conducted on a typical project in the UAE, whereby the selected project suffered from severe delays and cost overrun. This paper aims to bring about clear evidence to what most likely to happen to a typical construction project in spite of employing very good consultants, project manager and contractors and how these problems could have been avoided if BIM and IPD were deployed.

Keywords: building information modelling (BIM), integrated project delivery (IPD), collaborative environment, case study

Procedia PDF Downloads 375
7442 The Impact of Funders on the Media Industry in the Kurdistan Region Iraqi

Authors: Abdulsamad Qadir Hussien

Abstract:

This paper examines the impact of funders on the media industry in the Kurdistan Region Iraqi (henceforth KRI). The key objectives of the study are also looking at: how the media industry funder influences the media organization and journalists’ practices in the Kurdish community; how the media organizations attempt to utilize the available capabilities to serve the goals of the funded entities, whether they are parties, NGOs, governments, commercial companies or have individual ownership of media institutes. Further, the research project seeks to discover the influence and role of the funder on the media content and determine the prioritizing that will broadcast on the media. Furthermore, the project tries to understand to what extent the media organizations have a commitment to achieve the public interest and public affairs by following the key ethical principles. The study also attempts to explain the situation of the public service media. These variables are measured through a survey questionnaire distributed among a sample of 108 journalists and media practitioners. This research project, therefore, explores a new topic for study in the Kurdish community regarding the media industry, funding, and financial support. This article adopted surveys (n=108) as data collection tools by using a statistical method (SPSS 21). The data of the study have been tabulated, coded, and presented in a descriptive form.

Keywords: funding, journalists’ practices, Kurdish media industry, public services media

Procedia PDF Downloads 115