Search results for: priority to repair
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1343

Search results for: priority to repair

1223 The Evaluation of Signal Timing Optimization and Implement of Transit Signal Priority in Intersections and Their Effect on Delay Reduction

Authors: Mohammad Reza Ramezani, Shahriyar Afandizadeh

Abstract:

Since the intersections play a crucial role in traffic delay, it is significant to evaluate them precisely. In this paper, three critical intersections in Tehran (Capital of Iran) had been simulated. The main purpose of this paper was to optimize the public transit delay. The simulation had three different phase in three intersections of Tehran. The first phase was about the current condition of intersection; the second phase was about optimized signal timing and the last phase was about prioritized public transit access. The Aimsun software was used to simulate all phases, and the Synchro software was used to optimization of signals as well. The result showed that the implement of optimization and prioritizing system would reduce about 50% of delay for public transit.

Keywords: transit signal priority, intersection optimization, public transit, simulation

Procedia PDF Downloads 437
1222 The Analysis of Priority Flood Control Management Using Analysis Hierarchy Process

Authors: Pravira Rizki Suwarno, Fanny Aliza Savitri, Priseyola Ayunda Prima, Pipin Surahman, Mahelga Levina Amran, Khoirunisa Ulya Nur Utari, Nora Permatasari

Abstract:

The Bogowonto River or commonly called the Bhagawanta River, is one of the rivers on Java Island. It is located in Central Java, Indonesia. Its watershed area is 35 km² with 57 km long. This river covers three regencies, namely Wonosobo Regency and Magelang Regency in the upstream and Purworejo Regency in the south and downstream. The Bogowonto River experiences channel narrowing and silting. It is caused by garbage along the river that comes from livestock and household waste. The narrowing channel and siltation cause a capacity reduction of the river to drain flood discharge. Comprehensive and sustainable actions are needed in dealing with current and future floods. Based on these current conditions, a priority scale is required. Therefore, this study aims to determine the priority scale of flood management in Purworejo Regency using the Analytical Hierarchy Process (AHP) method. This method will determine the appropriate actions based on the rating. In addition, there will be field observations through distributing questionnaires to several parties, including the stakeholders and the community. The results of this study will be in 2 (two) forms of actions, both structurally covering water structures and non-structural, including social, environmental, and law enforcement.

Keywords: analytical hierarchy process, bogowonto, flood control, management

Procedia PDF Downloads 165
1221 Arithmetic Operations in Deterministic P Systems Based on the Weak Rule Priority

Authors: Chinedu Peter, Dashrath Singh

Abstract:

Membrane computing is a computability model which abstracts its structures and functions from the biological cell. The main ingredient of membrane computing is the notion of a membrane structure, which consists of several cell-like membranes recurrently placed inside a unique skin membrane. The emergence of several variants of membrane computing gives rise to the notion of a P system. The paper presents a variant of P systems for arithmetic operations on non-negative integers based on the weak priorities for rule application. Consequently, we obtain deterministic P systems. Two membranes suffice. There are at most four objects for multiplication and five objects for division throughout the computation processes. The model is simple and has a potential for possible extension to non-negative integers and real numbers in general.

Keywords: P system, binary operation, determinism, weak rule priority

Procedia PDF Downloads 425
1220 Anal Repair and Diamond Flap in Moderate Anal Stenosis Patient After an Open Hemorrhoidectomy Surgery: A Case Report

Authors: Andriana Purnama, Reno Rudiman, Kezia Christy

Abstract:

Anal stenosis which develops due to anoderm scarring usually caused by secondary to surgical trauma, has become common, causing significant decrease patient’s quality of life. Even though mild anal stenosis was treated with non-surgical treatment, but surgical reconstruction in unavoidable for moderate to severe anal stenosis that cause distressing, severe anal pain and inability to defecate. In our study, we intend to share our result with the use of diamond flap in treatment of anal stenosis. This case report illustrates a 57-year-old male patient who presented with difficulty and discomfort in defecation caused by anal stenosis after 2 years of open hemorrhoidectomy surgery. At physical examination, there was requirement of forceful dilatation when the index finger was inserted or precisely 6mm as measured by hegar dilator (moderate anal stenosis). Blood test result was within normal limits. The patient underwent anal repair and diamond flap where the scar tissue at 6 and 9 o’clock directions was excised and diamond graft was incised carefully while paying attention to the vascular supply. Finally, the graft was fixated without any tension to the anal canal, resulting in diameter of 2 cm after operation. After 2 days post operation, the patient was in stable condition, without any complication, and discharged. There was no abnormality concerning the stool. Ten days after the operation, diamond flap was in normal condition and without any complication. He was scheduled for futher follow up at the Digestive Surgery Department. Anal stenosis due to overzealous hemorrhoidectomy is a complication that is preventable when performed in experienced hands. Diamond flap was one of the options for the anal stenosis treatment with less complication.

Keywords: anal stenosis, diamond flap, post hemorrhoidectomy, anal repair

Procedia PDF Downloads 63
1219 The Addition of Opioids to Bupivacaine in Bilateral Infraorbital Nerve Block for Postoperative Pain Relief in Paediatric Patients for Cleft Lip Repair-Comparative Effects of Pethidine and Fentanyl: A Prospective Randomized Double Blind Study

Authors: Mrudula Kudtarkar, Rajesh Mane

Abstract:

Introduction: Cleft lip repair is one of the common surgeries performed in India and the usual method used for post-operative analgesia is perioperative opioids and NSAIDs. There has been an increase in use of regional techniques and Opioids are the common adjuvants but their efficacy and safety have not been studied extensively in children. Aim: A prospective, randomized, double-blind study was done to compare the efficacy, duration and safety of intraoral infraorbital nerve block on post-operative pain relief using bupivacaine alone or in combination with fentanyl or pethidine in paediatric cleft lip repair. Methodology: 45 children between the age group 5 – 60 months undergoing cleft lip surgery randomly allocated into 3 groups of 15 each received bilateral intraoral infraorbital nerve block with 0.75ml of solution. Group B received 0.25% bupivacaine; group P received 0.25% bupivacaine with 0.25mg/kg pethidine, group F received 0.25% bupivacaine with 0.25microgm/kg fentanyl. Sedation after recovery, post-operative pain intensity and duration of post-operative analgesia were assessed using Modified Hannallah Pain Score. Results: The mean duration of analgesia was 17.8 hrs in Group B, 23.53 hrs in Group F and 35.13 hrs in Group P. There was statistically significant difference between the means of the three groups- ANOVA (p < 0.05). Conclusion: Thus we conclude that addition of fentanyl or pethidine to bupivacaine for Bilateral Intraoral Infraorbital Nerve Block prolong the duration of analgesia with no complications and can be used safely in paediatric patients.

Keywords: cleft lip, infraorbital block, NSAIDS, Opiods

Procedia PDF Downloads 213
1218 The Role of Bone Marrow Stem Cells Transplantation in the Repair of Damaged Inner Ear in Albino Rats

Authors: Ahmed Gaber Abdel Raheem, Nashwa Ahmed Mohamed

Abstract:

Introduction: Sensorineural hearing loss (SNHL) is largely caused by the degeneration of the cochlea. Therapeutic options for SNHL are limited to hearing aids and cochlear implants. The cell transplantation approach to the regeneration of hair cells has gained considerable attention because stem cells are believed to accumulate in the damaged sites and have the potential for the repair of damaged tissues. The aim of the work: was to assess the use of bone marrow transplantation in repair of damaged inner ear hair cells in rats after the damage had been inflicted by Amikacin injection. Material and Methods: Thirty albino rats were used in this study. They were divided into three groups. Each group ten rats. Group I: used as control. Group II: Were given Amikacin- intratympanic injection till complete loss of hearing function. This could be assessed by Distortion product Otoacoustic Emission (DPOAEs) and / or auditory brain stem evoked potential (ABR). GroupIII: were given intra-peritoneal injection of bone marrow stem cell after complete loss of hearing caused by Amikacin. Clinical assessment was done using DPOAEs and / or auditory brain stem evoked potential (ABR), before and after bone marrow injection. Histological assessment of the inner ear was done by light and electron microscope. Also, Detection of stem cells in the inner ear by immunohistochemistry. Results: Histological examination of the specimens showed promising improvement in the structure of cochlea that may be responsible for the improvement of hearing function in rats detected by DPOAEs and / or ABR. Conclusion: Bone marrow stem cells transplantation might be useful for the treatment of SNHL.

Keywords: amikacin, hair cells, sensorineural hearing loss, stem cells

Procedia PDF Downloads 423
1217 Dynamic Determination of Spare Engine Requirements for Air Fighters Integrating Feedback of Operational Information

Authors: Tae Bo Jeon

Abstract:

Korean air force is undertaking a big project to replace prevailing hundreds of old air fighters such as F-4, F-5, KF-16 etc. The task is to develop and produce domestic fighters equipped with 2 complete-type engines each. A large number of engines, however, will be purchased as products from a foreign engine maker. In addition to the fighters themselves, secure the proper number of spare engines serves a significant role in maintaining combat readiness and effectively managing the national defense budget due to high cost. In this paper, we presented a model dynamically updating spare engine requirements. Currently, the military administration purchases all the fighters, engines, and spare engines at acquisition stage and does not have additional procurement processes during the life cycle, 30-40 years. With the assumption that procurement procedure during the operational stage is established, our model starts from the initial estimate of spare engine requirements based on limited information. The model then performs military missions and repair/maintenance works when necessary. During operation, detailed field information - aircraft repair and test, engine repair, planned maintenance, administration time, transportation pipeline between base, field, and depot etc., - should be considered for actual engine requirements. At the end of each year, the performance measure is recorded and proceeds to next year when it shows higher the threshold set. Otherwise, additional engine(s) will be bought and added to the current system. We repeat the process for the life cycle period and compare the results. The proposed model is seen to generate far better results appropriately adding spare engines thus avoiding possible undesirable situations. Our model may well be applied to future air force military operations.

Keywords: DMSMS, operational availability, METRIC, PRS

Procedia PDF Downloads 148
1216 Trends in Incisional and Ventral Hernia Repair: A Population Analysis from 2001 to 2021

Authors: Lakmali Anthony, Madeline Gillies

Abstract:

Background: Incisional and ventral hernias are highly prevalent, with primary ventral hernias occurring in approximately 20% of adults and incisional hernias developing in up to 30% of midline abdominal incisions. Recent data from the United States have shown an increasing incidence of elective incisional and ventral hernia repair (IVHR) and emergency repair of complicated hernias. This study examines Australian population trends in IVHR over a two-decade study period. Methods: This retrospective study was performed using procedure data from the Australian Institute of Health and Welfare, and population data from the Australian Bureau of Statistics captured between 2000 and 2021 to calculate incidence rates per 100,000 population by age and sex for selected subcategories of IVHR operations. Trends over time were evaluated using simple linear regression. Results: There were 809,308 IVHR operations performed in Australia during the study period. The cumulative incidence adjusted for the population was 182 per 100,000; this increased by 9.578 per year during the study period (95% CI = 8.431- 10.726, p<.001). IVHR for primary umbilical hernias experienced the most significant increase in population-adjusted incidence, 1.177 per year. (95% CI = 0.654- 1.701, p<.001). Emergency IVHR for incarcerated, obstructed, and strangulated hernias increased by 0.576 per year (95% CI = 0.510 -0.642, p<.001). Only 20.2% of IVHR procedures were performed as day surgery. Conclusions: Australia has seen a significant increase in IVHR operations performed in the last 20 years, particularly those for primary ventral hernias. IVHR for hernias complicated by incarceration, obstruction, and strangulation also increased significantly. The proportion of IVHR operations performed as day surgery is well below the target set by the Royal Australasian College of Surgeons. With the increasing incidence of IVHR operations and an increasing proportion of these being emergent, elective IVHR should be performed as day surgery when it is safe.

Keywords: ventral, incisional, hernia, trends

Procedia PDF Downloads 44
1215 Characterization of Mechanical Properties of Graphene-Modified Epoxy Resin for Pipeline Repair

Authors: Siti Nur Afifah Azraai, Lim Kar Sing, Nordin Yahaya, Norhazilan Md Noor

Abstract:

This experimental study consists of a characterization of epoxy grout where an amount of 2% of graphene nanoplatelets particles were added to commercial epoxy resin to evaluate their behavior regarding neat epoxy resin. Compressive tests, tensile tests and flexural tests were conducted to study the effect of graphene nanoplatelets on neat epoxy resin. By comparing graphene-based and neat epoxy grout, there is no significant increase of strength due to weak interface in the graphene nanoplatelets/epoxy composites. From this experiment, the tension and flexural strength of graphene-based epoxy grouts is slightly lower than ones of neat epoxy grout. Nevertheless, the addition of graphene has produced more consistent results according to a smaller standard deviation of strength. Furthermore, the graphene has also improved the ductility of the grout, hence reducing its brittle behaviour. This shows that the performance of graphene-based grout is reliably predictable and able to minimize sudden rupture. This is important since repair design of damaged pipeline is of deterministic nature.

Keywords: composite, epoxy resin, graphene nanoplatelets, pipeline

Procedia PDF Downloads 455
1214 Increasing Efficiency of Own Used Fuel Gas by “LOTION” Method in Generating Systems PT. Pertamina EP Cepu Donggi Matindok Field in Central Sulawesi Province, Indonesia

Authors: Ridwan Kiay Demak, Firmansyahrullah, Muchammad Sibro Mulis, Eko Tri Wasisto, Nixon Poltak Frederic, Agung Putu Andika, Lapo Ajis Kamamu, Muhammad Sobirin, Kornelius Eppang

Abstract:

PC Prove LSM successfully improved the efficiency of Own Used Fuel Gas with the "Lotion" method in the PT Pertamina EP Cepu Donggi Matindok Generating System. The innovation of using the "LOTION" (LOAD PRIORITY SELECTION) method in the generating system is modeling that can provide a priority qualification of main and non-main equipment to keep gas processing running even though it leaves 1 GTG operating. GTG operating system has been integrated, controlled, and monitored properly through PC programs and web-based access to answer Industry 4.0 problems. The results of these improvements have succeeded in making Donggi Matindok Field Production reach 98.77 MMSCFD and become a proper EMAS candidate in 2022-2023. Additional revenue from increasing the efficiency of the use of own used gas amounting to USD USD 5.06 Million per year and reducing operational costs from maintenance efficiency (ABO) due to saving running hours GTG amounted to USD 3.26 Million per year. Continuity of fuel gas availability for the GTG generation system can maintain the operational reliability of the plant, which is 3.833333 MMSCFD. And reduced gas emissions wasted to the environment by 33,810 tons of C02 eq per year.

Keywords: LOTION method, load priority selection, fuel gas efficiency, gas turbine generator, reduce emissions

Procedia PDF Downloads 21
1213 Accounting for Downtime Effects in Resilience-Based Highway Network Restoration Scheduling

Authors: Zhenyu Zhang, Hsi-Hsien Wei

Abstract:

Highway networks play a vital role in post-disaster recovery for disaster-damaged areas. Damaged bridges in such networks can disrupt the recovery activities by impeding the transportation of people, cargo, and reconstruction resources. Therefore, rapid restoration of damaged bridges is of paramount importance to long-term disaster recovery. In the post-disaster recovery phase, the key to restoration scheduling for a highway network is prioritization of bridge-repair tasks. Resilience is widely used as a measure of the ability to recover with which a network can return to its pre-disaster level of functionality. In practice, highways will be temporarily blocked during the downtime of bridge restoration, leading to the decrease of highway-network functionality. The failure to take downtime effects into account can lead to overestimation of network resilience. Additionally, post-disaster recovery of highway networks is generally divided into emergency bridge repair (EBR) in the response phase and long-term bridge repair (LBR) in the recovery phase, and both of EBR and LBR are different in terms of restoration objectives, restoration duration, budget, etc. Distinguish these two phases are important to precisely quantify highway network resilience and generate suitable restoration schedules for highway networks in the recovery phase. To address the above issues, this study proposes a novel resilience quantification method for the optimization of long-term bridge repair schedules (LBRS) taking into account the impact of EBR activities and restoration downtime on a highway network’s functionality. A time-dependent integer program with recursive functions is formulated for optimally scheduling LBR activities. Moreover, since uncertainty always exists in the LBRS problem, this paper extends the optimization model from the deterministic case to the stochastic case. A hybrid genetic algorithm that integrates a heuristic approach into a traditional genetic algorithm to accelerate the evolution process is developed. The proposed methods are tested using data from the 2008 Wenchuan earthquake, based on a regional highway network in Sichuan, China, consisting of 168 highway bridges on 36 highways connecting 25 cities/towns. The results show that, in this case, neglecting the bridge restoration downtime can lead to approximately 15% overestimation of highway network resilience. Moreover, accounting for the impact of EBR on network functionality can help to generate a more specific and reasonable LBRS. The theoretical and practical values are as follows. First, the proposed network recovery curve contributes to comprehensive quantification of highway network resilience by accounting for the impact of both restoration downtime and EBR activities on the recovery curves. Moreover, this study can improve the highway network resilience from the organizational dimension by providing bridge managers with optimal LBR strategies.

Keywords: disaster management, highway network, long-term bridge repair schedule, resilience, restoration downtime

Procedia PDF Downloads 121
1212 Anatomy of the Human Mitral Valve Leaflets: Implications for Transcatheter and Surgical Mitral Valve Repair Techniques

Authors: Agata Krawczyk-Ozog, Mateusz K. Holda, Mateusz Koziej, Danuta Sorysz, Zbigniew Siudak, Wieslawa Klimek-Piotrowska, Dariusz Dudek

Abstract:

Introduction: Rapid development of the surgical and less-invasive percutaneous mitral valve repair procedures greatly increase the interest of the mitral valve anatomy. The aim of this study was to characterize morphological variability of the mitral valve leaflets and to provide the size of their particular parts. Materials and Methods: In the study, we included 200 autopsied human hearts from Caucasian individuals (25% females) with mean age 47.5 (±17.9) without any valvular diseases. The morphology of the mitral valve was evaluated. The intercommissural and aorto-mural diameters of the mitral annulus were measured. All leaflets and their scallops were identified. The base and the height of the posteromedial commissure (PM-C), anterolateral commissure (AL-C), anterior leaflet (AL) and posterior leaflet (PL) with their scallops were measured. Results: The intercommissural diameter was 28.0±4.8 mm, the aorto-mural diameter 19.7±4.8 mm, circumference of the mitral annulus 89.9±12.6 mm and the area of the mitral valve 485.4±171.4 mm2. Classical mitral valves (AL+AL-C+PL(P1,P2,P3)+PM-C) were found in 141 (70.5%) specimens. In classical type, the mean AL base and height were 30.8±4.9 mm and 20.6±4.2 mm, while mean PL base and height 45.1±8.2 mm 12.9±2.8 mm respectively. The mean ratio of the AL base to PL base was 0.7±0.2. Variations in PL were found in 55 (27.5%) and in AL in 5 (2.5%) hearts. The most common variations were: valve with one accessory scallop (AcS) between P3 and PM-C (7%); AcS between P1 and AL-C (4%); connections of P2 and P3 scallops (4%); connections of P1 and P2 scallops (3%); AcS in AL (2.5%). All AcS were smaller than the main PL scallops. The mean intertrigonal distance was 21.9±3.8 mm. Conclusions: In all cases, the mitral valve is built by two main leaflets with possible variants in secondary to leaflets scallops (29.5%). The variations are largely associated with PL and are mostly related to the presence of AcS. Anatomically the AL is not divided into scallops, and it occupies 34.5% of the mitral annulus circumference. Understanding the anatomy of the mitral valve leaflets helps to planning and performing mitral valve repair procedures.

Keywords: accessory scallop, commissure, connected scallops, human heart, mitral leaflets, mitral valve

Procedia PDF Downloads 354
1211 Investigation of Failure Mechanisms of Composite Laminates with Delamination and Repaired with Bolts

Authors: Shuxin Li, Peihao Song, Haixiao Hu, Dongfeng Cao

Abstract:

The interactive deformation and failure mechanisms, including local bucking/delamination propagation and global bucking, are investigated in this paper with numerical simulation and validation with experimental results. Three dimensional numerical models using ABAQUS brick elements combined with cohesive elements and contact elements are developed to simulate the deformation and failure characteristics of composite laminates with and without delamination under compressive loading. The zero-thickness cohesive elements are inserted on the possible path of delamination propagation, and the inter-laminate behavior is characterized by the mixed-mode traction-separation law. The numerical simulations identified the complex feature of interaction among local buckling and/or delamination propagation and final global bucking for composite laminates with delamination under compressive loading. Firstly there is an interaction between the local buckling and delamination propagation, i.e., local buckling induces delamination propagation, and then delamination growth further enhances the local buckling. Secondly, the interaction between the out-plan deformation caused by local buckling and the global bucking deformation results in final failure of the composite laminates. The simulation results are validated by the good agreement with the experimental results published in the literature. The numerical simulation validated with experimental results revealed that the degradation of the load capacity, in particular of the compressive strength of composite structures with delamination, is mainly attributed to the combined local buckling/delamination propagation effects. Consequently, a simple field-bolt repair approach that can hinder the local buckling and prevent delamination growth is explored. The analysis and simulation results demonstrated field-bolt repair could effectively restore compressive strength of composite laminates with delamination.

Keywords: cohesive elements, composite laminates, delamination, local and global bucking, field-bolt repair

Procedia PDF Downloads 96
1210 Durability of Reinforced Concrete Structure on Very High Aggressive Environment: A Case Study

Authors: Karla Peitl Miller, Leomar Bravin Porto, Kaitto Correa Fraga, Nataniele Eler Mendes

Abstract:

This paper presents the evaluation and study of a real reinforced concrete structure of a fertilizer storage building, constructed on a Vale’s Port at Brazil, which has been recently under refurbishment. Data that will be shared and commented aim to show how wrong choices in project concepts allied to a very high aggressive environment lead to a fast track degradation, incurring on a hazardous condition associated with huge and expensive treatment for repair and guarantee of minimum performance conditions and service life. It will be also shown and discussed all the covered steps since pathological manifestations first signs were observed until the complete revitalization and reparation planning would be drawn. The conclusions of the work easily explicit the importance of professional technical qualification, the importance of minimum requirements for design and structural reforms, and mainly, the importance of good inspection and diagnostic engineering continuous work.

Keywords: durability, reinforced concrete repair, structural inspection, diagnostic engineering

Procedia PDF Downloads 109
1209 Resource Allocation Scheme For IEEE802.16 Networks

Authors: Elmabruk Laias

Abstract:

IEEE Standard 802.16 provides QoS (Quality of Service) for the applications such as Voice over IP, video streaming and high bandwidth file transfer. With the ability of broadband wireless access of an IEEE 802.16 system, a WiMAX TDD frame contains one downlink subframe and one uplink subframe. The capacity allocated to each subframe is a system parameter that should be determined based on the expected traffic conditions. a proper resource allocation scheme for packet transmissions is imperatively needed. In this paper, we present a new resource allocation scheme, called additional bandwidth yielding (ABY), to improve transmission efficiency of an IEEE 802.16-based network. Our proposed scheme can be adopted along with the existing scheduling algorithms and the multi-priority scheme without any change. The experimental results show that by using our ABY, the packet queuing delay could be significantly improved, especially for the service flows of higher-priority classes.

Keywords: IEEE 802.16, WiMAX, OFDMA, resource allocation, uplink-downlink mapping

Procedia PDF Downloads 435
1208 The Comparative Study of the Characteristics of Chinese and Foreign Excellent Woman’s Single Players’ Serve, Receive Tactic Author

Authors: Zhai Yuan, Wu Xueqing

Abstract:

This article statistics the technology which used by Chinese and foreign excellent players in the game, including types and serves areas,receive technology and effect and utilization ratio receiving and losing points. The sample is che videos which is world's top matches of excellent badminton athletes of che single, including Chinese players’ 43 games and foreign players’ 38 games. Conclusion: For the serving, Chinese and foreign single players are to give priority to forehand short-low serve and the long-high serve. And Chinese and foreign players in using forehand short-low serve and drive server exist significant differences; For the serves areas, Chinese and foreign players serve area is concentrated in area 1,5,6. Area 6 has the highest rate of all the district areas, following by the area 1and area 5. Among the 2ed serve area Sino-foreign player, there exist significant differences; In the receiver, when returning the frontcourt shutter, players is given priority to net lift and push. When returning the backcourt shutter, receiver's the best ball is smash, followed by clear and drop shot. Foreign players have higher utilization rate in smash than Chinese players in the backcourt; In the receiver result, Chinese players give priority to actively and equally situation than foreign players, but in negatively receiving is just opposite.

Keywords: badminton, woman’s singles, technique and tactics, comparative analysis

Procedia PDF Downloads 502
1207 The Efficiency of the Resin for Steel Concrete Adhesion

Authors: Oualid Benyamina Douma

Abstract:

Repair is always the result of the appearance of apparent disorder or aggravation of a mass. Which had hitherto been considered minor if not negligible: The work was not done according to plan. So; the examination of causes can lead to thinking about repair. While the application of the epoxy resin has become a hot topic. In this context, we conducted an experimental campaign (48 specimens are tested beakout) whose objective is based on three points: 1- Highlight the importance and influence of important parameters (compressive strength of concrete anchorage length and diameter of the steel bar) on routes (steel-concrete and steel–concrete epoxy resin) 2- Understanding the influence of the parameters mentioned above on the relationship that may exist between the peel strength and slippage. 3- Faces of cracks and failure modes. This study shows that passage of a compressive strength of 40 MPa to 62 MPa increases the adhesion between the steel bar and concrete and for specimens with or without epoxy resin. The loading force was increased form 40 to 81 kM kN, a rate if increase in loading over 100% In addition, for specimens with and without epoxy resin. increased breakout force through a specimen without a specimen with resin ranging from 20% to 32%.

Keywords: epoxy resin, peel strength, anchors, slip diameter steel rod, anchor plain concrete and concrete with moderate resistance

Procedia PDF Downloads 404
1206 Mechanical Performance of Geopolymeric Mortars Based on Natural Clay, Fly Ash and Metakaolin

Authors: W. Tahri, B. Samet, F. Pacheco-Torgal, J. L. Barroso de Aguiar, S. Baklouti

Abstract:

Infrastructure rehabilitation represents a multitrillion dollar opportunity for the construction industry. Since the majority of the existent infrastructures are Portland cement concrete based this means that concrete infrastructure rehabilitation is a hot issue to be dealt with. Geopolymers are novel inorganic binders with high potential to replace Portland cement based ones. So far very few studies in the geopolymer field have addressed the rehabilitation of deteriorated concrete structures. This paper discloses results of an investigation concerning the development geopolymeric repair mortars. The mortars are based on Tunisian natural clay plus calcium hydroxide, sodium silicate and sodium hydroxide. Results show that the geopolymeric mortar has a high compressive strength and a lower unrestrained shrinkage performance as long as partial replacement by metakaolin is carried out. The results also show that Tunisian calcined clay based mortars have hydration products with typical geopolymeric phases.

Keywords: geopolymeric mortars, infrastructure repair, compressive strength, shrinkage

Procedia PDF Downloads 297
1205 Multishape Task Scheduling Algorithms for Real Time Micro-Controller Based Application

Authors: Ankur Jain, W. Wilfred Godfrey

Abstract:

Embedded systems are usually microcontroller-based systems that represent a class of reliable and dependable dedicated computer systems designed for specific purposes. Micro-controllers are used in most electronic devices in an endless variety of ways. Some micro-controller-based embedded systems are required to respond to external events in the shortest possible time and such systems are known as real-time embedded systems. So in multitasking system there is a need of task Scheduling,there are various scheduling algorithms like Fixed priority Scheduling(FPS),Earliest deadline first(EDF), Rate Monotonic(RM), Deadline Monotonic(DM),etc have been researched. In this Report various conventional algorithms have been reviewed and analyzed, these algorithms consists of single shape task, A new Multishape scheduling algorithms has been proposed and implemented and analyzed.

Keywords: dm, edf, embedded systems, fixed priority, microcontroller, rtos, rm, scheduling algorithms

Procedia PDF Downloads 370
1204 Analysis of the Plastic Zone Under Mixed Mode Fracture in Bonded Composite Repair of Aircraft

Authors: W. Oudad, H. Fikirini, K. Boulenouar

Abstract:

Material fracture by opening (mode I) is not alone responsible for fracture propagation. Many industrial examples show the presence of mode II and mixed mode I + II. In the present work the three-dimensional and non-linear finite element method is used to estimate the performance of the bonded composite repair of metallic aircraft structures by analyzing the plastic zone size ahead of repaired cracks under mixed mode loading. The computations are made according to Von Mises and Tresca criteria. The extension of the plastic zone which takes place at the tip of a crack strictly depends on many variables, such as the yield stress of the material, the loading conditions, the crack size and the thickness of the cracked component, The obtained results show that the presence of the composite patch reduces considerably the size of the plastic zone ahead of the crack. The effects of the composite orientation layup (adhesive properties) and the patch thickness on the plastic zone size ahead of repaired cracks were analyzed.

Keywords: crack, elastic-plastic, J integral, patch, plastic zone

Procedia PDF Downloads 412
1203 The Development of User Behavior in Urban Regeneration Areas by Utilizing the Floating Population Data

Authors: Jung-Hun Cho, Tae-Heon Moon, Sun-Young Heo

Abstract:

A lot of urban problems, caused by urbanization and industrialization, have occurred around the world. In particular, the creation of satellite towns, which was attributed to the explicit expansion of the city, has led to the traffic problems and the hollowization of old towns, raising the necessity of urban regeneration in old towns along with the aging of existing urban infrastructure. To select urban regeneration priority regions for the strategic execution of urban regeneration in Korea, the number of population, the number of businesses, and deterioration degree were chosen as standards. Existing standards had a limit in coping with solving urban problems fundamentally and rapidly changing reality. Therefore, it was necessary to add new indicators that can reflect the decline in relevant cities and conditions. In this regard, this study selected Busan Metropolitan City, Korea as the target area as a leading city, where urban regeneration such as an international port city has been activated like Yokohama, Japan. Prior to setting the urban regeneration priority region, the conditions of reality should be reflected because uniform and uncharacterized projects have been implemented without a quantitative analysis about population behavior within the region. For this reason, this study conducted a characterization analysis and type classification, based on the user behaviors by using representative floating population of the big data, which is a hot issue all over the society in recent days. The target areas were analyzed in this study. While 23 regions were classified as three types in existing Busan Metropolitan City urban regeneration priority region, 23 regions were classified as four types in existing Busan Metropolitan City urban regeneration priority region in terms of the type classification on the basis of user behaviors. Four types were classified as follows; type (Ⅰ) of young people - morning type, Type (Ⅱ) of the old and middle-aged- general type with sharp floating population, type (Ⅲ) of the old and middle aged-24hour-type, and type (Ⅳ) of the old and middle aged with less floating population. Characteristics were shown in each region of four types, and the study results of user behaviors were different from those of existing urban regeneration priority region. According to the results, in type (Ⅰ) young people were the majority around the existing old built-up area, where floating population at dawn is four times more than in other areas. In Type (Ⅱ), there were many old and middle-aged people around the existing built-up area and general neighborhoods, where the average floating population was more than in other areas due to commuting, while in type (Ⅲ), there was no change in the floating population throughout 24 hours, although there were many old and middle aged people in population around the existing general neighborhoods. Type (Ⅳ) includes existing economy-based type, central built-up area type, and general neighborhood type, where old and middle aged people were the majority as a general type of commuting with less floating population. Unlike existing urban regeneration priority region, these types were sub-divided according to types, and in this study, approach methods and basic orientations of urban regeneration were set to reflect the reality to a certain degree including the indicators of effective floating population to identify the dynamic activity of urban areas and existing regeneration priority areas in connection with urban regeneration projects by regions. Therefore, it is possible to make effective urban plans through offering the substantial ground by utilizing scientific and quantitative data. To induce more realistic and effective regeneration projects, the regeneration projects tailored to the present local conditions should be developed by reflecting the present conditions on the formulation of urban regeneration strategic plans.

Keywords: floating population, big data, urban regeneration, urban regeneration priority region, type classification

Procedia PDF Downloads 180
1202 PDDA: Priority-Based, Dynamic Data Aggregation Approach for Sensor-Based Big Data Framework

Authors: Lutful Karim, Mohammed S. Al-kahtani

Abstract:

Sensors are being used in various applications such as agriculture, health monitoring, air and water pollution monitoring, traffic monitoring and control and hence, play the vital role in the growth of big data. However, sensors collect redundant data. Thus, aggregating and filtering sensors data are significantly important to design an efficient big data framework. Current researches do not focus on aggregating and filtering data at multiple layers of sensor-based big data framework. Thus, this paper introduces (i) three layers data aggregation and framework for big data and (ii) a priority-based, dynamic data aggregation scheme (PDDA) for the lowest layer at sensors. Simulation results show that the PDDA outperforms existing tree and cluster-based data aggregation scheme in terms of overall network energy consumptions and end-to-end data transmission delay.

Keywords: big data, clustering, tree topology, data aggregation, sensor networks

Procedia PDF Downloads 302
1201 Analysis of Economic Order Quantity, Safety Stock, Maximum Inventory Control, Lot Size and Reorder Point for Engro Polymers and Chemicals

Authors: Ali Akber Jaffri, Asad Naseem, Javeria Khan, Zubair Hamza, Ishtiaq

Abstract:

The purpose of this study is to determine safety stock, maximum inventory level, reordering point, and reordering quantity by rearranging lot sizes for supplier and customer in MRO (maintenance repair operations) warehouse of Engro Polymers & Chemicals. To achieve the aim, physical analysis method and excel commands were carried out to elicit the customer and supplier data provided by the company. Initially, we rearranged the current lot sizes and MOUs (measure of units) in SAP software. Due to change in lot sizes, we have to determine the new quantities for safety stock, maximum inventory, reordering point and reordering quantity as per company's demand. By proposed system, we saved extra cost in terms of reducing time of receiving from vendor and in issuance to customer, ease of material handling in MRO warehouse and also reduce human efforts.

Keywords: maintenance repair operation, maximum inventory, reorder quantity, safety stock

Procedia PDF Downloads 250
1200 Life Cycle Cost Evaluation of Structures with Hysteretic Dampers

Authors: Jinkoo Kim, Hyungoo Kang, Hyungjun Shin

Abstract:

In this study, a hybrid energy dissipation device is developed by combining a steel slit plate and friction pads to be used for seismic retrofit of structures, and its effectiveness is investigated by comparing the life cycle costs of the structure before and after the retrofit. The seismic energy dissipation capability of the dampers is confirmed by cyclic loading tests. The probabilities of reaching various damage states are obtained by fragility analysis, and the life cycle costs of the model structures are computed using the PACT (Performance Assessment Calculation Tool) program based on FEMA P-58 methodology. The fragility analysis shows that the probabilities of reaching limit states are minimized by the seismic retrofit with hybrid dampers and increasing column size. The seismic retrofit with increasing column size and hybrid dampers results in the lowest repair cost and shortest repair time.

Keywords: slit dampers, friction dampers, seismic retrofit, life cycle cost, FEMA P-58, PACT

Procedia PDF Downloads 301
1199 Methodologies for Stability Assessment of Existing and Newly Designed Reinforced Concrete Bridges

Authors: Marija Vitanovа, Igor Gjorgjiev, Viktor Hristovski, Vlado Micov

Abstract:

Evaluation of stability is very important in the process of definition of optimal structural measures for maintenance of bridge structures and their strengthening. To define optimal measures for their repair and strengthening, it is necessary to evaluate their static and seismic stability. Presented in this paper are methodologies for evaluation of the seismic stability of existing reinforced concrete bridges designed without consideration of seismic effects and checking of structural justification of newly designed bridge structures. All bridges are located in the territory of the Republic of North Macedonia. A total of 26 existing bridges of different structural systems have been analyzed. Visual inspection has been carried out for all bridges, along with the definition of three main damage categories according to which structures have been categorized in respect to the need for their repair and strengthening. Investigations involving testing the quality of the built-in materials have been carried out, and dynamic tests pointing to the dynamic characteristics of the structures have been conducted by use of non-destructive methods of ambient vibration measurements. The conclusions drawn from the performed measurements and tests have been used for the development of accurate mathematical models that have been analyzed for static and dynamic loads. Based on the geometrical characteristics of the cross-sections and the physical characteristics of the built-in materials, interaction diagrams have been constructed. These diagrams along with the obtained section quantities under seismic effects, have been used to obtain the bearing capacity of the cross-sections. The results obtained from the conducted analyses point to the need for the repair of certain structural parts of the bridge structures. They indicate that the stability of the superstructure elements is not critical during a seismic effect, unlike the elements of the sub-structure, whose strengthening is necessary.

Keywords: existing bridges, newly designed bridges, reinforced concrete bridges, stability assessment

Procedia PDF Downloads 75
1198 Epstein, Barr Virus Alters ATM-Dependent DNA Damage Responses in Germinal Centre B-Cells during Early Infection

Authors: Esther N. Maina, Anna Skowronska, Sridhar Chaganti, Malcolm A. Taylor, Paul G. Murray, Tatjana Stankovic

Abstract:

Epstein-Barr virus (EBV) has been implicated in the pathogenesis of human tumours of B-cell origin. The demonstration that a proportion of Hodgkin lymphomas and all Burkitt’s lymphomas harbour EBV suggests that the virus contributes to the development of these malignancies. However, the mechanisms of lymphomagenesis remain largely unknown. To determine whether EBV causes DNA damage and alters DNA damage response in cells of EBV-driven lymphoma origin, Germinal Centre (GC) B cells were infected with EBV and DNA damage responses to gamma ionising radiation (IR) assessed at early time points (12hr – 72hr) after infection and prior to establishment of lymphoblastoid (LCL) cell lines. In the presence of EBV, we observed induction of spontaneous DNA DSBs and downregulation of ATM-dependent phosphorylation in response to IR. This downregulation coincided with reduced ability of infected cells to repair IR-induced DNA double-strand breaks, as measured by the kinetics of gamma H2AX, a marker of double-strand breaks, and by the tail moment of the comet assay. Furthermore, we found that alteration of DNA damage responses coincided with the expression of LMP-1 protein. The presence of the EBV virus did not affect the localization of the ATM-dependent DNA repair proteins to sites of damage but instead lead to an increased expression of PP5, a phosphatase that regulates ATM function. The impact of the virus on DNA repair was most prominent 24h after infection, suggesting that this time point is crucial for the viral establishment in B cells. Our results suggest that during an early infection EBV virus dampens crucial cellular responses to DNA double-strand breaks which facilitate successful viral infection, but at the same time might provide the mechanism for tumor development.

Keywords: EBV, ATM, DNA damage, germinal center cells

Procedia PDF Downloads 321
1197 Induction of Adaptive Response in Yeast Cells under Influence of Extremely High Frequency Electromagnetic Field

Authors: Sergei Voychuk

Abstract:

Introduction: Adaptive response (AR) is a manifestation of radiation hormesis, which deal with the radiation resistance that may be increased with the pretreatment with small doses of radiation. In the current study, we evaluated the potency of radiofrequency EMF to induce the AR mechanisms and to increase a resistance to UV light. Methods: Saccharomyces cerevisiae yeast strains, which were created to study induction of mutagenesis and recombination, were used in the study. The strains have mutations in rad2 and rad54 genes, responsible for DNA repair: nucleotide excision repair (PG-61), postreplication repair (PG-80) and mitotic (crossover) recombination (T2). An induction of mutation and recombination are revealed due to the formation of red colonies on agar plates. The PG-61 and T2 are UV sensitive strains, while PG-80 is sensitive to ionizing radiation. Extremely high frequency electromagnetic field (EHF-EMF) was used. The irradiation was performed in floating mode and frequency changed during exposure from 57 GHz to 62 GHz. The power of irradiation was 100 mkW, and duration of exposure was 10 and 30 min. Treatment was performed at RT and then cells were stored at 28° C during 1 h without any exposure but after that they were treated with UV light (254nm) for 20 sec (strain T2) and 120 sec (strain PG-61 and PG-80). Cell viability and quantity of red colonies were determined after 5 days of cultivation on agar plates. Results: It was determined that EHF-EMF caused 10-20% decrease of viability of T2 and PG-61 strains, while UV showed twice stronger effect (30-70%). EHF-EMF pretreatment increased T2 resistance to UV, and decreased it in PG-61. The PG-80 strain was insensitive to EHF-EMF and no AR effect was determined for this strain. It was not marked any induction of red colonies formation in T2 and PG-80 strain after EHF or UV exposure. The quantity of red colonies was 2 times more in PG-61 strain after EHF-EMF treatment and at least 300 times more after UV exposure. The pretreatment of PG-61 with EHF-EMF caused at least twice increase of viability and consequent decrease of amount of red colonies. Conclusion: EHF-EMF may induce AR in yeast cells and increase their viability under UV treatment.

Keywords: Saccharomyces cerevisiae, EHF-EMF, UV light, adaptive response

Procedia PDF Downloads 293
1196 Feeling Sorry for Some Creditors

Authors: Hans Tjio, Wee Meng Seng

Abstract:

The interaction of contract and property has always been a concern in corporate and commercial law, where there are internal structures created that may not match the externally perceived image generated by the labels attached to those structures. We will focus, in particular, on the priority structures created by affirmative asset partitioning, which have increasingly come under challenge by those attempting to negotiate around them. The most prominent has been the AT1 bonds issued by Credit Suisse which were wiped out before its equity when the troubled bank was acquired by UBS. However, this should not have come as a surprise to those whose “bonds” had similarly been “redeemed” upon the occurrence of certain reference events in countries like Singapore, Hong Kong and Taiwan during their Minibond crisis linked to US sub-prime defaults. These were derivatives classified as debentures and sold as such. At the same time, we are again witnessing “liabilities” seemingly ranking higher up the balance sheet ladder, finding themselves lowered in events of default. We will examine the mechanisms holders of perpetual securities or preference shares have tried to use to protect themselves. This is happening against a backdrop that sees a rise in the strength of private credit and inter-creditor conflicts. The restructuring regime of the hybrid scheme in Singapore now, while adopting the absolute priority rule in Chapter 11 as the quid pro quo for creditor cramdown, does not apply to shareholders and so exempts them from cramdown. Complicating the picture further, shareholders are not exempted from cramdown in the Dutch scheme, but it adopts a relative priority rule. At the same time, the important UK Supreme Court decision in BTI 2014 LLC v Sequana [2022] UKSC 25 has held that directors’ duties to take account of creditor interests are activated only when a company is almost insolvent. All this has been complicated by digital assets created by businesses. Investors are quite happy to have them classified as property (like a thing) when it comes to their transferability, but then when the issuer defaults to have them seen as a claim on the business (as a choice in action), that puts them at the level of a creditor. But these hidden interests will not show themselves on an issuer’s balance sheet until it is too late to be considered and yet if accepted, may also prevent any meaningful restructuring.

Keywords: asset partitioning, creditor priority, restructuring, BTI v Sequana, digital assets

Procedia PDF Downloads 40
1195 Improving Library Service Quality in Local City of Indonesia

Authors: Prima Fithri, Afri Adnan, Verra Syahmer

Abstract:

Library as a public service should be able to provide excellent and quality service. The criteria that should be available in the library is having the collection which relevant, actual and reliable, qualified and professional employee, delivery system that prompt and appropriate as well as supported by proper infrastructure. The aim of this study is to show the performance as an effort to provide quality of services that appropriate with the needs and desires of user. Then, in this research has been carried out the calculation of the gap between the perceptions and expectations of user about the services of the library. The Sevqual and QFD methods are used in this study. Servqual method for measuring the value of the gap that occurs in the dimensions of service quality and QFD method for determine priority repairment that need to be done to improve the quality of services that occur in the dimensions of service quality. From 97 questionaires, shows that value of the gap that occurs in the dimensions of service quality using by Servqual is 27.7% dimensions of responsiveness. It show how much user expectations are not met by the quality of existing services. Construction of the library and standard library becomes priority improvements that need to be done to improve the quality of service that occurs in the dimensions of service quality using the QFD.

Keywords: library, service quality, service quality, QFD

Procedia PDF Downloads 540
1194 Modelling of Multi-Agent Systems for the Scheduling of Multi-EV Charging from Power Limited Sources

Authors: Manan’Iarivo Rasolonjanahary, Chris Bingham, Nigel Schofield, Masoud Bazargan

Abstract:

This paper presents the research and application of model predictive scheduled charging of electric vehicles (EV) subject to limited available power resource. To focus on algorithm and operational characteristics, the EV interface to the source is modelled as a battery state equation during the charging operation. The researched methods allow for the priority scheduling of EV charging in a multi-vehicle regime and when subject to limited source power availability. Priority attribution for each connected EV is described. The validity of the developed methodology is shown through the simulation of different scenarios of charging operation of multiple connected EVs including non-scheduled and scheduled operation with various numbers of vehicles. Performance of the developed algorithms is also reported with the recommendation of the choice of suitable parameters.

Keywords: model predictive control, non-scheduled, power limited sources, scheduled and stop-start battery charging

Procedia PDF Downloads 129