Search results for: pharmaceutical procurement supplier selection criteria
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5405

Search results for: pharmaceutical procurement supplier selection criteria

5345 Multi-Criteria Evaluation for the Selection Process of a Wind Power Plant's Location Using Choquet Integral

Authors: Serhat Tüzün, Tufan Demirel

Abstract:

The objective of the present study is to select the most suitable location for a wind power plant station through Choquet integral method. The problem of selecting the location for a wind power station was considered as a multi-criteria decision-making problem. The essential and sub-criteria were specified and location selection was expressed in a hierarchic structure. Among the main criteria taken into account in this paper are wind potential, technical factors, social factors, transportation, and costs. The problem was solved by using different approaches of Choquet integral and the best location for a wind power station was determined. Then, the priority weights obtained from different Choquet integral approaches are compared and commented on.

Keywords: multi-criteria decision making, choquet integral, fuzzy sets, location of a wind power plant

Procedia PDF Downloads 386
5344 Selection of Social and Sustainability Criteria for Public Investment Project Evaluation in Developing Countries

Authors: Pintip Vajarothai, Saad Al-Jibouri, Johannes I. M. Halman

Abstract:

Public investment projects are primarily aimed at achieving development strategies to increase national economies of scale and overall improvement in a country. However, experience shows that public projects, particularly in developing countries, struggle or fail to fulfill the immediate needs of local communities. In many cases, the reason for that is that projects are selected in a subjective manner and that a major part of the problem is related to the evaluation criteria and techniques used. The evaluation process is often based on a broad strategic economic effects rather than real benefits of projects to society or on the various needs from different levels (e.g. national, regional, local) and conditions (e.g. long-term and short-term requirements). In this paper, an extensive literature review of the types of criteria used in the past by various researchers in project evaluation and selection process is carried out and the effectiveness of such criteria and techniques is discussed. The paper proposes substitute social and project sustainability criteria to improve the conditions of local people and in particular the disadvantaged groups of the communities. Furthermore, it puts forward a way for modelling the interaction between the selected criteria and the achievement of the social goals of the affected community groups. The described work is part of developing a broader decision model for public investment project selection by integrating various aspects and techniques into a practical methodology. The paper uses Thailand as a case to review what and how the various evaluation techniques are currently used and how to improve the project evaluation and selection process related to social and sustainability issues in the country. The paper also uses an example to demonstrates how to test the feasibility of various criteria and how to model the interaction between projects and communities. The proposed model could be applied to other developing and developed countries in the project evaluation and selection process to improve its effectiveness in the long run.

Keywords: evaluation criteria, developing countries, public investment, project selection methodology

Procedia PDF Downloads 249
5343 Evaluating the Implementation of Public Procurement Principles at Tendering Stage: SME Contractors' Perspective

Authors: Charles Poleni Mukumba, Kahilu Kajimo-Shakantu

Abstract:

Purpose: Principles of public procurement are the foundation of good public procurement, representing best practices in delivering public services by the government and its organs. They provide guidance in the public procurement cycle to achieve the best value for public resources. Tendering stage in the procurement cycle is the most critical, as tendering information is made available to bidders. The paper evaluates the implementation of public procurement principles at the tendering stage. Design/Methodology/Approach: The research was conducted by using qualitative methods with 18 SME contractors in Lusaka as the sample. The samples are business owners and managers of purposively selected SME contractors. The collected data was analysed using thematic and content analysis. Findings: The findings indicate inconsistency in accessing information critical for tendering success by bidders. Further, the findings suggest that adjustments to technical specifications are made to suit certain preferred bidders by procuring officials. Research Limitations/Implications: The interviews were limited to SME contractors registered with the national council for construction and involved in public sector construction works in Lusaka, Zambia. Practical Implications: Implementing principles of public procurement at the tendering stage creates equal, open, and fair competition for the bidders in cost terms to deliver standardised and quality works to the public sector. Original/Value: The findings reveal how principles of public procurement play a critical role in enhancing the efficient performance of the procurement cycle at the tendering stage.

Keywords: evaluating, implementation, public procurement principles, tendering stage, SME contractors

Procedia PDF Downloads 48
5342 A Case Study on Evaluating and Selecting Soil /Pipeline Interaction Analysis Software for the Oil and Gas Industry

Authors: Abdinasir Mohamed, Ashraf El-Hamalawi, Steven Yeomans, Matthew Frost, Andy Connell

Abstract:

The evaluation and selection of appropriate software solutions to meet with an organisation’s inherent business requirements can be a problematic software engineering process that if done incorrectly can have a significant, costly and adverse effect on the business and its processes. The aim of this paper is to show the process and evaluation criteria followed to select the right engineering solution for the identified business requirement. The research adopted an action research method within an organisation in the oil and gas industry, which required a solution suitable for conducting stress analysis for soil-pipeline interaction analysis (SPIA). Through the use of the presented software selection and evaluation approach, to capture and measure key requirements, it was possible to determine a suitable software for the organisation. This paper investigates methodologies for selecting software packages, software evaluation techniques, and software evaluation criteria in evaluating software packages before providing an explanation of the developed methodology adopted. The key findings of the study are: (1) that there is a need to create a framework for software selection methodologies, (2) there are no universal selection criteria in the engineering industry, and (3) there is a need to validate the findings by creating an application based on the evaluation technique and evaluation criteria for selecting software packages for the engineering industry. The findings of the study are offered to support organisations in the oil and gas sector improve software selection methodologies for SPIA.

Keywords: software evaluation, end user programs, soil pipeline analysis, software selection

Procedia PDF Downloads 161
5341 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.

Keywords: discount strategies, material purchasing, project planning, project scheduling

Procedia PDF Downloads 231
5340 Solving Fuzzy Multi-Objective Linear Programming Problems with Fuzzy Decision Variables

Authors: Mahnaz Hosseinzadeh, Aliyeh Kazemi

Abstract:

In this paper, a method is proposed for solving Fuzzy Multi-Objective Linear Programming problems (FMOLPP) with fuzzy right hand side and fuzzy decision variables. To illustrate the proposed method, it is applied to the problem of selecting suppliers for an automotive parts producer company in Iran in order to find the number of optimal orders allocated to each supplier considering the conflicting objectives. Finally, the obtained results are discussed.

Keywords: fuzzy multi-objective linear programming problems, triangular fuzzy numbers, fuzzy ranking, supplier selection problem

Procedia PDF Downloads 352
5339 Prevention of Corruption in Public Purchases

Authors: Anatoly Krivinsh

Abstract:

The results of dissertation research "Preventing and combating corruption in public procurement" are presented in this publication. The study was conducted 2011 till 2013 in a Member State of the European Union, in the Republic of Latvia. Goal of the thesis is to explore corruption prevention and combating issues in public procurement sphere, to identify the prevalence rates, determinants and contributing factors and prevention opportunities in Latvia. In the first chapter the author analyses theoretical aspects of understanding corruption in public procurement, with particular emphasis on corruption definition problem, its nature, causes and consequences. A separate section is dedicated to the public procurement concept, mechanism and legal framework. In the first part of this work the author presents cognitive methodology of corruption in public procurement field, based on which the author has carried out an analysis of corruption situation in public procurement in Republic of Latvia. In the second chapter of the thesis, the author analyzes the problem of corruption in public procurement, including its historical aspects, typology and classification of corruption subjects involved, corruption risk elements in public procurement and their identification. During the development of the second chapter author's practical experience in public procurements was widely used. The third and fourth chapter deals with issues related to the prevention and combating corruption in public procurement, namely the operation of the concept, principles, methods and techniques, subjects in Republic of Latvia, as well as an analysis of foreign experience in preventing and combating corruption. The fifth chapter is devoted to the corruption prevention and combating perspectives and their assessment. In this chapter the author has made the evaluation of corruption prevention and combating measures efficiency in Republic of Latvia, assessment of anti-corruption legislation development stage in public procurement field in Latvia.

Keywords: prevention of corruption, public purchases, good governance, human rights

Procedia PDF Downloads 297
5338 Analysis of Particle Reinforced Metal Matrix Composite Crankshaft

Authors: R. S. Vikaash, S. Vinodh, T. S. Sai Prashanth

Abstract:

Six sigma is a defect reduction strategy enabling modern organizations to achieve business prosperity. The practitioners are in need to select best six sigma project among the available alternatives to achieve customer satisfaction. In this circumstance, this article presents a study in which six sigma project selection is formulated as Multi-Criteria Decision-Making(MCDM) problem and the best project has been found using AHP. Five main governing criteria and 14 sub criteria are being formulated. The decision maker’s inputs were gathered and computations were performed. The project with the high values from the set of projects is selected as the best project. Based on calculations, Project “P1”is found to be the best and further deployment actions have been undertaken in the organization.

Keywords: six Sigma, project selection, MCDM, analytic hierarchy process, business prosperity

Procedia PDF Downloads 317
5337 Evaluation and Selection of SaaS Product Based on User Preferences

Authors: Boussoualim Nacira, Aklouf Youcef

Abstract:

Software as a Service (SaaS) is a software delivery paradigm in which the product is not installed on-premise, but it is available on Internet and Web. The customers do not pay to possess the software itself but rather to use it. This concept of pay per use is very attractive. Hence, we see increasing number of organizations adopting SaaS. However, each customer is unique, which leads to a very large variation in the requirements off the software. As several suppliers propose SaaS products, the choice of this latter becomes a major issue. When multiple criteria are involved in decision making, we talk about a problem of «Multi-Criteria Decision-Making» (MCDM). Therefore, this paper presents a method to help customers to choose a better SaaS product satisfying most of their conditions and alternatives. Also, we know that a good method of adaptive selection should be based on the correct definition of the different parameters of choice. This is why we started by extraction and analysis the various parameters involved in the process of the selection of a SaaS application.

Keywords: cloud computing, business operation, Multi-Criteria Decision-Making (MCDM), Software as a Service (SaaS)

Procedia PDF Downloads 451
5336 A Review of the Parameters Used in Gateway Selection Schemes for Internet Connected MANETs

Authors: Zainab S. Mahmood, Aisha H. Hashim, Wan Haslina Hassan, Farhat Anwar

Abstract:

The wide use of the internet-based applications bring many challenges to the researchers to guarantee the continuity of the connections needed by the mobile hosts and provide reliable Internet access for them. One of proposed solutions by Internet Engineering Task Force (IETF) is to connect the local, multi-hop, and infrastructure-less Mobile Ad hoc Network (MANET) with Internet structure. This connection is done through multi-interface devices known as Internet Gateways. Many issues are related to this connection like gateway discovery, hand off, address auto-configuration and selecting the optimum gateway when multiple gateways exist. Many studies were done proposing gateway selection schemes with a single selection criterion or weighted multiple criteria. In this research, a review of some of these schemes is done showing the differences, the features, the challenges and the drawbacks of each of them.

Keywords: Internet Gateway, MANET, mobility, selection criteria

Procedia PDF Downloads 390
5335 Factors Influencing the Logistics Services Providers' Performance: A Literature Overview

Authors: A. Aguezzoul

Abstract:

The Logistics Services Providers (LSPs) selection and performance is a strategic decision that affects the overall performance of any company as well as its supply chain. It is a complex process, which takes into account various conflicting quantitative and qualitative factors, as well as outsourced logistics activities. This article focuses on the evolution of the weights associated to these factors over the last years in order to better understand the change in the importance that logistics professionals place on them criteria when choosing their LSPs. For that, an analysis of 17 main studies published during 2014-2017 period was carried out and the results are compared to those of a previous literature review on this subject. Our analysis allowed us to deduce the following observations: 1) the LSPs selection is a multi-criteria process; 2) the empirical character of the majority of studies, conducted particularly in Asian countries; 3) the criteria importance has undergone significant changes following the emergence of information technologies that have favored the work in close collaboration and in partnership between the LSPs and their customers, even on a worldwide scale; 4) the cost criterion is relatively less important than in the past; and finally 5) with the development of sustainable supply chains, the factors associated with the logistic activities of return and waste processing (reverse logistics) are becoming increasingly important in this multi-criteria process of selection and evaluation of LSPs performance.

Keywords: logistics outsourcing, logistics providers, multi-criteria decision making, performance

Procedia PDF Downloads 125
5334 Barriers to E-Tendering Adoption and Implementation in the Ghanaian Construction Industry

Authors: Aynur Kazaz, Yusif Inusah

Abstract:

In the bid to improve transparency and efficiency as well as to reduce the cost of the public procurement process, Ghana started implementing an electronic Government Procurement System, known as the Ghana Electronic Procurement System (GHANEPS) in November 2019. The implementation of e-tendering technology is new to the stakeholders. Therefore, this research is aimed to identify the critical barriers to e-tendering implementation in the Ghanaian construction industry. Examples of barriers to e-tendering implementation were first identified through a literature review, and questionnaires and interview questions were prepared to gather the data. This study contributes to the in-depth understanding of global e-tendering barriers in the Ghanaian construction industry. The findings could help researchers, practitioners, and governments make strategic investment decisions and overcome e-tendering challenges.

Keywords: barriers, challenges, construction industry, e-procurement, e-tendering

Procedia PDF Downloads 82
5333 Future Outlook and Current Situation for Security of Gas Supply in Eastern Baltic Region

Authors: Ando Leppiman, Kati Kõrbe Kaare, Ott Koppel

Abstract:

The growing demand for gas has rekindled a debate on gas security of supply due to supply interruptions, increasing gas prices, transportation and distribution bottlenecks and a growing reliance on imports over longer distances. Security of supply is defined mostly as an infrastructure package to satisfy N-1 criteria. In case of Estonia, Finland, Latvia, and Lithuania all the gas infrastructure is built to supply natural gas only from one single supplier, Russia. In 2012, almost 100% of natural gas to the Eastern Baltic Region was supplied by Gazprom. under such circumstances infrastructure N-1 criteria does not guarantee security of supply. In the Eastern Baltic Region, the assessment of risk of gas supply disruption has been worked out by applying the method of risk scenarios. There are various risks to be tackled in Eastern Baltic States in terms of improving security of supply, such as single supplier risk, physical infrastructure risk, regulatory gap, fair price, and competition. The objective of this paper is to evaluate the energy security of the Eastern Baltic Region within the framework of the European Union’s policies and to make recommendations on how to better guarantee the energy security of the region.

Keywords: security of supply, supply routes for natural gas, energy balance, diversified supply options, common regulative package

Procedia PDF Downloads 230
5332 Causes of Non-Compliance With Public Procurement Act, 2007 Among Some Selected State Own Public Tertiary Education Institutions in Southwest, Nigeria

Authors: Ibitoye Olabode Clement

Abstract:

The huge amount of grants for infrastructures development in Tertiary Institutions in Nigeria calls for transparency and accountability in the procurement process. However, questions have been raised concerning the judicious and appropriate use of the funds, and it was doubtful if the institutions complied with due process. This paper examined the causes of non-compliance with the Public Procurement Act (2007) in the procurement of Goods, Works, and Services through either direct or indirect processes of procurement, mostly in Tertiary Institutions of State government subvention institutions in Nigeria. Nigeria has over 120 public universities, polytechnics, and colleges of Education. This paper will take samples of some selected Institutions in southwest Nigeria. The institutions comprise 5 Universities, 5 Polytechnics, and 5 Colleges of Education / Health and Technology. The opinions of the institutions’ Procurement Officers on the tremendous investment through grants and interventions for infrastructure development in Tertiary Education Institutions (TEI) in Nigeria call for transparency and accountability in the procurement process. However, there are a lot of questions have been raised as to the judicious use of the funds, and it was doubtful if the institutions complied with due process. This study examined the causes of non-compliance with the Public Procurement Act (2007) in the procurement of Goods, Works, and Services in most State Government Public Institutions in Southwest Nigeria. Over, 120 public institutions comprising 5 Universities, 5 Polytechnics, and 5 Colleges of Education / Health and Technology were used for the study. The opinions of the institutions’ Procurement Officers on the causes of non-compliance with the Act in their procurement process were sought using a structured questionnaire. The results revealed that non-independent of Procurement Officers, non-compliance with the Act by some at the managerial level, claiming inadequate knowledge of the Act, non-employment of qualified and experienced Procurement officers, insufficient publicity of the Act, and non-existence of corporate governance led to poor management of procurement record and non-provision of incentive, Inability to separate the duties of Internal Auditors and Procurement Officers, Inability to translate procurement entity at large which makes nearly all at departmental level believe they procurement officers. Conclusively, on taking the Procurement Officers through interviewing having it that: the right educational and professional qualifications, understanding of the Act, sufficient cognate working experience, recruiting most professionals needed if not all, and occupying management position will enhance compliance. Hence, in addition, adopting an external empowered department from the Bureau should raise for monitoring the compliance mostly in State Government Tertiary Education Institution. Also, an organizational culture with a corporate governance structure that supports the engagement of the right and qualified personnel to handle procurement, encourages them to perform at their best and rewards excellent service by giving incentives, and operates within an administrative environment devoid of corruption.

Keywords: non compliance of procurement act, tertiary education institution, university, polytechnic and college of education/ health science and technology, Nigeria

Procedia PDF Downloads 72
5331 Towards Sustainable Consumption: A Framework for Assessing Supplier's Commitment

Authors: O. O. Oguntoye

Abstract:

Product consumption constitutes an important consideration for sustainable development. Seeing how product consumption could be highly unsustainable, coupled with how existing policies on corporate responsibility do not particularly address the consumption aspect of product lifecycle, conducting this research became necessary. The research makes an attempt to provide a framework by which to gauge corporate responsibility of product suppliers in terms of their commitment towards the sustainable consumption of their products. Through an exploration of relevant literature, independently established ideas with which to assess a given product supplier were galvanised into a four-criterion framework. The criteria are: (1) Embeddedness of consumption as a factor in corporate sustainability policy, (2) Level of understanding of consumption behaviour, (3) Breadth of behaviour-influencing strategies adopted, and (4) Inclusiveness for all main dimensions of sustainability. This resulting framework was then applied in a case study involving a UK-based furniture supplier where interviews and content analysis of corporate documents were used as the mode for primary data collection. From the case study, it was found that the supplier had performed to different levels across the four themes of the assessment. Two major areas for improvement were however identified – one is for the furniture supplier to focus more proactively on understanding consumption behaviour and, two is for it to widen the scope of its current strategies for enhancing sustainable consumption of supplied furniture. As a generalisation, the framework presented here makes it possible for companies to reflect with a sense of guidance, how they have demonstrated commitment towards sustainable consumption through their values, culture, and operations. It also provides a foundation for developing standardized assessment which the current widely used frameworks such as the GRI, the Global Compact, and others do not cover. While these popularly used frameworks mainly focus on sustainability of companies within the production and supply chain management contexts (i.e. mostly ‘upstream’), the framework here provides an extension by bringing the ‘downstream’ or consumer bit into light.

Keywords: corporate sustainability, design for sustainable consumption, extended producer responsibility, sustainable consumer behaviour

Procedia PDF Downloads 389
5330 A Two Tailed Secretary Problem with Multiple Criteria

Authors: Alaka Padhye, S. P. Kane

Abstract:

The following study considers some variations made to the secretary problem (SP). In a multiple criteria secretary problem (MCSP), the selection of a unit is based on two independent characteristics. The units that appear before an observer are known say N, the best rank of a unit being N. A unit is selected, if it is better with respect to either first or second or both the characteristics. When the number of units is large and due to constraints like time and cost, the observer might want to stop earlier instead of inspecting all the available units. Let the process terminate at r2th unit where r1Keywords: joint distribution, marginal distribution, real ranks, secretary problem, selection criterion, two tailed secretary problem

Procedia PDF Downloads 250
5329 A Relational Case-Based Reasoning Framework for Project Delivery System Selection

Authors: Yang Cui, Yong Qiang Chen

Abstract:

An appropriate project delivery system (PDS) is crucial to the success of a construction project. Case-based reasoning (CBR) is a useful support for PDS selection. However, the traditional CBR approach represents cases as attribute-value vectors without taking relations among attributes into consideration, and could not calculate the similarity when the structures of cases are not strictly same. Therefore, this paper solves this problem by adopting the relational case-based reasoning (RCBR) approach for PDS selection, considering both the structural similarity and feature similarity. To develop the feature terms of the construction projects, the criteria and factors governing PDS selection process are first identified. Then, feature terms for the construction projects are developed. Finally, the mechanism of similarity calculation and a case study indicate how RCBR works for PDS selection. The adoption of RCBR in PDS selection expands the scope of application of traditional CBR method and improves the accuracy of the PDS selection system.

Keywords: relational cased-based reasoning, case-based reasoning, project delivery system, PDS selection

Procedia PDF Downloads 395
5328 A Combined AHP-GP Model for Selecting Knowledge Management Tool

Authors: Ahmad Sarfaraz, Raiyad Herwies

Abstract:

In this paper, a multi-criteria decision making analysis is used to help any organization selects the best KM tool that fits and serves its needs. The AHP model is used based on a previous study to highlight and identify the main criteria and sub-criteria that are incorporated in the selection process. Different KM tools alternatives with different criteria are compared and weighted accurately to be incorporated in the GP model. The main goal is to combine the GP model with the AHP model to ensure that selecting the KM tool considers the resource constraints. Two important issues are discussed in this paper: how different factors could be taken into consideration in forming the AHP model, and how to incorporate the AHP results into the GP model for better results.

Keywords: knowledge management, analytical hierarchy process, goal programming, multi-criteria decision making

Procedia PDF Downloads 342
5327 The Key Factors in Shipping Company's Port Selection for Providing Their Supplies

Authors: Sedigheh Zarei

Abstract:

The aim of this research is to identify the key factors in shipping company’s port selection in order to providing their requirement. To identify and rank factors that are play the main role in selecting port for providing the ship supplies. At the first step, Data were collected via Semi-structured interviews, The aim was to generate knowledge on how shipping company select the port and suppliers for providing their needs. 37 port selection factors were chosen from the previous researches and field interviews and have been categorized into two groups of port's factor and the factors of services of suppliers companies. The current study adopts a questionnaire survey to the main shipping companies' operators in Iran. Their responses reveal that level of services of supplying companies and customs rules play the important role in selecting the ports. Our findings could affect decisions made by port authorities to consider that supporting the privet sections for ship chandelling business could have the best result in attracting ships.

Keywords: ship supplier, port selection, ship chandler, provision

Procedia PDF Downloads 427
5326 Application of Fuzzy Multiple Criteria Decision Making for Flooded Risk Region Selection in Thailand

Authors: Waraporn Wimuktalop

Abstract:

This research will select regions which are vulnerable to flooding in different level. Mathematical principles will be systematically and rationally utilized as a tool to solve problems of selection the regions. Therefore the method called Multiple Criteria Decision Making (MCDM) has been chosen by having two analysis standards, TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) and AHP (Analytic Hierarchy Process). There are three criterions that have been considered in this research. The first criterion is climate which is the rainfall. The second criterion is geography which is the height above mean sea level. The last criterion is the land utilization which both forest and agriculture use. The study found that the South has the highest risk of flooding, then the East, the Centre, the North-East, the West and the North, respectively.

Keywords: multiple criteria decision making, TOPSIS, analytic hierarchy process, flooding

Procedia PDF Downloads 204
5325 Monitoring System for Electronic Procurement Systems

Authors: Abdulah Fajar

Abstract:

Electronic Procurement System has been implemented at government institution in Indonesia. This system has been developed centrally at Institution of National Procurement Policy (LKPP) and implemented autonomously at either local or national government institution. The lack of competency at many institution on Information Technology Management arise several major problems. The main concern of LKPP to local administrator is assured that the system is running normally and always be able to serve the needs of its users. Monitoring system has been identified as the one of solution to prevent the problems appeared. Monitoring system is developed using Simple Network Management Protocol (SNMP) and implemented at LKPP. There are two modules; Main Dashboard and Local Agent. Main Dashboard is intended for LKPP and Local Agent is intended to implement at local autonomous e-procurement system (LPSE). There are several resources that must be monitored such as computation, memory and network traffic. Agile paradigm is applied to this project to assure user and system requirement is met. The length of project is the one of reason why agile paradigm has been chosen. The system has been successfully delivered to LKPP.

Keywords: procurement system, SNMP, LKPP, LPSE

Procedia PDF Downloads 381
5324 Classification of Factors Influencing Buyer-Supplier Relationship: A Case Study from the Cement Industry

Authors: Alberto Piatto, Zaza Nadja Lee Hansen, Peter Jacobsen

Abstract:

This paper examines the quantitative and qualitative factors influencing the buyer-supplier relationship. Understanding and acting on the right factors influencing supplier relationship management is crucial when a company outsource an important part of its business as it can be for engineering to order (ETO) company executing only the designing part in-house. Acting on these factors increase the quality of the relationship obtaining for both parties what they want and expect from an improved relationship. Best practices in supplier relationship management are considered and a case study of a large global company, called Cement A/S, operating in the cement business is carried out. One study is conducted including a large international company and hundreds of its suppliers. Data from the company is collected using semi-structured interviews and data from the suppliers is collected using a survey. Based on these inputs and an extensive literature review a classification of factors influencing the relationship buyer-supplier is presented and discussed. The results show that different managers among the company are assessing supplier from various perspectives, a standard approach to measure the performance of suppliers does not exist. The factors used nowadays in the company to measure performances of the suppliers are mostly related to time and cost. Quality is a key factor, but it has not been addressed properly since no data are available in the system. From a practical perspective, managers can learn from this paper which factors to consider when applying best practices of Supplier Relationship Management. Furthermore, from a theoretical perspective, this paper contributes with new knowledge in the area as limited research in collaboration with the company has been conducted. For this reason, a company, its suppliers and few studies for this type of industry have been conducted. For further research, it is suggested to define the correlation of factors to the profitability of the company and calculate its impact. When conducting this analysis it is important to focus on the efficient and effective use of factors that can be measurable and accepted from the supplier.

Keywords: buyer-supplier relationship, cement industry, classification of factors, ETO

Procedia PDF Downloads 238
5323 The Case for Implementing a Supplier Diversity and Inclusion Program beyond the Ethical Value

Authors: Arnaud Deshais

Abstract:

The supply chain industry has integrated the need for supplier Diversity and Inclusion (D&I), mostly from an ethical and moral argument. In addition, in some countries, it is also a legal requirement for companies reaching a certain size. As a matter of fact, a lot of successful companies have developed a Corporate Social Responsibility Program that encourages diversity and inclusion in the supply chain, such as building strong relationships with minority owned businesses (women, LGBT, veterans, etc.). Outside ethical and legal perspectives, it is also worth researching the economic and financial benefits of pursuing such efforts. Through surveys of purchasing and supply chain managers in their current roles as well as review of some case studies on supplier based D&I programs, it becomes apparent that a financial return on investment is to be expected as well for companies who make a concerted effort to grow their D&I programs. The study explores the levers to increase shareholder value and business efficiencies. Finally, the research highlights the competitive advantage related to a broad minority based supplier network. The benefits manifest themselves in the areas of competitiveness, innovation, and collaboration. The economic reward ends up being at the forefront of those programs while being an opportunity for organizations to become 'a good citizen'.

Keywords: diversity, inclusion, purchasing, supplier

Procedia PDF Downloads 90
5322 The Client-Supplier Relationship in Managing Innovation: Delineating Defence Industry First Mover Challenges within the Government Contract Competition

Authors: Edward Pol

Abstract:

All companies are confronted with the need to innovate in order to meet market demands. In so doing they are challenged with the dilemma of whether to aim to be first into the market with a new innovative product or to deliberately wait and learn from a pioneers’ mistakes; potentially avoiding higher risks. It is therefore important to critically understand from a first-mover advantage and disadvantage perspective the decision-making implications of defence industry transformation onset by an innovative paradigm shift. This paper will argue that the type of industry characteristics matter, especially when considering what role the clients play in the innovation process and what is their level of influence. Through investigation of qualitative case study research, this inquiry will focus on first mover advantages and first mover disadvantages with a view to establish practical and value-added academic findings by focusing on specific industries where the clients play an active role in cooperation with the supplier innovation. The resulting findings will help managers to mitigate risk in innovative technology introduction. A selection from several defense industry innovations is specifically chosen because of the client-supplier relationship typically differing from traditional first-mover research. In this instance, case studies will be used referencing vertical-takeoff-and-landing defence equipment innovations.

Keywords: innovation, pioneer, first-mover advantage, first-mover disadvantage, risk

Procedia PDF Downloads 159
5321 The Good, the Bad and the Ugly in E-Procurement: A Case Study of Agricultural Company in Vietnam

Authors: D. T. Tran, H. P. Tran, L. G. Hoang, V. N. H. Bui, Q. T. Nguyen, A. K. Das

Abstract:

This paper provides some insight information about a current situation of e-procurement implementation in Vietnam, including opportunities and challenges. A case study of Phuc Thien Company which is classified as a medium enterprise in the country, specialising on animal feed production. Since the technological development rapidly changes, companies have implemented advanced technologies in supply chain management to increase efficiency and gain collaboration amidst partners in their manufacturing and development activities. The findings of this research reveal strengths and ongoing weaknesses when Phuc Thien company internally implemented eProcurement system. Although cost savings, visibility of payment and speedy procurement process are one of the largest benefits of eProcurement implementation, the company faces greater hurdles, such as employee capability to use technology and their resistance to change, that overshadow everything else. In terms of governmental policy, the adaptation of e-invoicing has commenced since June 2015 in Vietnam, legal regulations and administrative framework related to e-Procurement carries various ambiguous in its content and extremely fragment. Hence, this adds a great burden to enterprises in general and Phuc Thien in particular in view of creating higher competitive advantage for animal feed industry in Vietnam as well as South East Asia region.

Keywords: procurement, e-procurement, animal feed industry, efficiency

Procedia PDF Downloads 296
5320 Contractor Selection by Using Analytical Network Process

Authors: Badr A. Al-Jehani

Abstract:

Nowadays, contractor selection is a critical activity of the project owner. Selecting the right contractor is essential to the project manager for the success of the project, and this cab happens by using the proper selecting method. Traditionally, the contractor is being selected based on his offered bid price. This approach focuses only on the price factor and forgetting other essential factors for the success of the project. In this research paper, the Analytic Network Process (ANP) method is used as a decision tool model to select the most appropriate contractor. This decision-making method can help the clients who work in the construction industry to identify contractors who are capable of delivering satisfactory outcomes. Moreover, this research paper provides a case study of selecting the proper contractor among three contractors by using ANP method. The case study identifies and computes the relative weight of the eight criteria and eleven sub-criteria using a questionnaire.

Keywords: contractor selection, project management, decision-making, bidding

Procedia PDF Downloads 68
5319 A Comparative Analysis Approach Based on Fuzzy AHP, TOPSIS and PROMETHEE for the Selection Problem of GSCM Solutions

Authors: Omar Boutkhoum, Mohamed Hanine, Abdessadek Bendarag

Abstract:

Sustainable economic growth is nowadays driving firms to extend toward the adoption of many green supply chain management (GSCM) solutions. However, the evaluation and selection of these solutions is a matter of concern that needs very serious decisions, involving complexity owing to the presence of various associated factors. To resolve this problem, a comparative analysis approach based on multi-criteria decision-making methods is proposed for adequate evaluation of sustainable supply chain management solutions. In the present paper, we propose an integrated decision-making model based on FAHP (Fuzzy Analytic Hierarchy Process), TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution) and PROMETHEE (Preference Ranking Organisation METHod for Enrichment Evaluations) to contribute to a better understanding and development of new sustainable strategies for industrial organizations. Due to the varied importance of the selected criteria, FAHP is used to identify the evaluation criteria and assign the importance weights for each criterion, while TOPSIS and PROMETHEE methods employ these weighted criteria as inputs to evaluate and rank the alternatives. The main objective is to provide a comparative analysis based on TOPSIS and PROMETHEE processes to help make sound and reasoned decisions related to the selection problem of GSCM solution.

Keywords: GSCM solutions, multi-criteria analysis, decision support system, TOPSIS, FAHP, PROMETHEE

Procedia PDF Downloads 123
5318 E-Procurement Adoption and Effective Service Delivery in the Uganda Coffee Industry

Authors: Taus Muganda

Abstract:

This research explores the intricate relationship between e-procurement adoption and effective service delivery in the Uganda Coffee Industry, focusing on the processes involved, key actors, and the impact of digital transformation. The study is guided by three prominent theories, Actor-Network Theory, Resource-Based View Theory, and Institutional Theory to comprehensively explore the dynamics of e-procurement in the context of the coffee sector. The primary aim of this project is to examine the e-procurement adoption process and its role in enhancing service delivery within the Uganda Coffee Industry. The research questions guiding this inquiry are: firstly, whether e-procurement adoption and implementation contribute to achieving quality service delivery; and secondly, how e-procurement adoption can be effectively realized within the Uganda Coffee Industry. To address these questions, the study has laid out specific objectives. Firstly, it seeks to investigate the impact of e-procurement on effective service delivery, analysing how the integration of digital processes influences the overall quality of services provided in the coffee industry. Secondly, it aims to critically analyse the measures required to achieve effective delivery outcomes through the adoption and implementation of e-procurement, assessing the strategies that can maximize the benefits of digital transformation. Furthermore, the research endeavours to identify and examine the key actor’s instrumental in achieving effective service delivery within the Uganda Coffee Industry. By utilizing Actor-Network Theory, the study will elucidate the network of relationships and collaborations among actors involved in the e-procurement process. The research contributes to addressing a critical gap in the sector. Despite coffee being the leading export crop in Uganda, constituting 16% of total exports, there is a recognized need for digital transformation, specifically in the realm of e-procurement, to enhance the productivity of producers and contribute to the economic growth of the country. The study aims to provide insights into transforming the Uganda Coffee Industry by focusing on improving the e-procurement services delivered to actors in the coffee sector. The three forms of e-procurement investigated in this research—E-Sourcing, E-Payment, and E-Invoicing—serve as focal points in understanding the multifaceted dimensions of digital integration within the Uganda Coffee Industry. This research endeavours to offer practical recommendations for policymakers, industry stakeholders, and the UCDA to strategically leverage e-procurement for the benefit of the entire coffee value chain.

Keywords: e-procurement, effective service delivery, actors, actor-network theory, resource-based view theory, institutional theory, e-invocing, e-payment, e-sourcing

Procedia PDF Downloads 17
5317 Managing the Cloud Procurement Process: Findings from a Case Study

Authors: Andreas Jede, Frank Teuteberg

Abstract:

Cloud computing (CC) has already gained overall appreciation in research and practice. Whereas the willingness to integrate cloud services in various IT environments is still unbroken, the previous CC procurement processes run mostly in an unorganized and non-standardized way. In practice, a sufficiently specific, yet applicable business process for the important acquisition phase is often lacking. And research does not appropriately remedy this deficiency yet. Therefore, this paper introduces a field-tested approach for CC procurement. Based on an extensive literature review and augmented by expert interviews, we designed a model that is validated and further refined through an in-depth real-life case study. For the detailed process description, we apply the event-driven process chain notation (EPC). The gained valuable insights into the case study may help CC research to shift to a more socio-technical area. For practice, next to giving useful organizational instructions we will provide extended checklists and lessons learned.

Keywords: cloud procurement process, IT-organization, event-driven process chain, in-depth case study

Procedia PDF Downloads 357
5316 Optimization of Personnel Selection Problems via Unconstrained Geometric Programming

Authors: Vildan Kistik, Tuncay Can

Abstract:

From a business perspective, cost and profit are two key factors for businesses. The intent of most businesses is to minimize the cost to maximize or equalize the profit, so as to provide the greatest benefit to itself. However, the physical system is very complicated because of technological constructions, rapid increase of competitive environments and similar factors. In such a system it is not easy to maximize profits or to minimize costs. Businesses must decide on the competence and competence of the personnel to be recruited, taking into consideration many criteria in selecting personnel. There are many criteria to determine the competence and competence of a staff member. Factors such as the level of education, experience, psychological and sociological position, and human relationships that exist in the field are just some of the important factors in selecting a staff for a firm. Personnel selection is a very important and costly process in terms of businesses in today's competitive market. Although there are many mathematical methods developed for the selection of personnel, unfortunately the use of these mathematical methods is rarely encountered in real life. In this study, unlike other methods, an exponential programming model was established based on the possibilities of failing in case the selected personnel was started to work. With the necessary transformations, the problem has been transformed into unconstrained Geometrical Programming problem and personnel selection problem is approached with geometric programming technique. Personnel selection scenarios for a classroom were established with the help of normal distribution and optimum solutions were obtained. In the most appropriate solutions, the personnel selection process for the classroom has been achieved with minimum cost.

Keywords: geometric programming, personnel selection, non-linear programming, operations research

Procedia PDF Downloads 245