4594 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 316
4593 Prioritization Assessment of Housing Development Risk Factors: A Fuzzy Hierarchical Process-Based Approach

Authors: Yusuf Garba Baba

Abstract:

The construction industry and housing subsector are fraught with risks that have the potential of negatively impacting on the achievement of project objectives. The success or otherwise of most construction projects depends to large extent on how well these risks have been managed. The recent paradigm shift by the subsector to use of formal risk management approach in contrast to hitherto developed rules of thumb means that risks must not only be identified but also properly assessed and responded to in a systematic manner. The study focused on identifying risks associated with housing development projects and prioritisation assessment of the identified risks in order to provide basis for informed decision. The study used a three-step identification framework: review of literature for similar projects, expert consultation and questionnaire based survey to identify potential risk factors. Delphi survey method was employed in carrying out the relative prioritization assessment of the risks factors using computer-based Analytical Hierarchical Process (AHP) software. The results show that 19 out of the 50 risks significantly impact on housing development projects. The study concludes that although significant numbers of risk factors have been identified as having relevance and impacting to housing construction projects, economic risk group and, in particular, ‘changes in demand for houses’ is prioritised by most developers as posing a threat to the achievement of their housing development objectives. Unless these risks are carefully managed, their effects will continue to impede success in these projects. The study recommends the adoption and use of the combination of multi-technique identification framework and AHP prioritization assessment methodology as a suitable model for the assessment of risks in housing development projects.

Keywords: risk management, risk identification, risk analysis, analytic hierarchical process

Procedia PDF Downloads 116
4592 Risk Management in Industrial Supervision Projects

Authors: Érick Aragão Ribeiro, George André Pereira Thé, José Marques Soares

Abstract:

Several problems in industrial supervision software development projects may lead to the delay or cancellation of projects. These problems can be avoided or contained by using identification methods, analysis and control of risks. These procedures can give an overview of the possible problems that can happen in the projects and what are the immediate solutions. Therefore, we propose a risk management method applied to the teaching and development of industrial supervision software. The method is developed through a literature review and previous projects can be divided into phases of management and have basic features that are validated with experimental research carried out by mechatronics engineering students and professionals. The management is conducted through the stages of identification, analysis, planning, monitoring, control and communication of risks. Programmers use a method of prioritizing risks considering the gravity and the possibility of occurrence of the risk. The outputs of the method indicate which risks occurred or are about to happen. The first results indicate which risks occur at different stages of the project and what risks have a high probability of occurring. The results show the efficiency of the proposed method compared to other methods, showing the improvement of software quality and leading developers in their decisions. This new way of developing supervision software helps students identify design problems, evaluate software developed and propose effective solutions. We conclude that the risk management optimizes the development of the industrial process control software and provides higher quality to the product.

Keywords: supervision software, risk management, industrial supervision, project management

Procedia PDF Downloads 355
4591 Analysis of Risk-Based Disaster Planning in Local Communities

Authors: R. A. Temah, L. A. Nkengla-Asi

Abstract:

Planning for future disasters sets the stage for a variety of activities that may trigger multiple recurring operations and expose the community to opportunities to minimize risks. Local communities are increasingly embracing the necessity for planning based on local risks, but are also significantly challenged to effectively plan and response to disasters. This research examines basic risk-based disaster planning model and compares it with advanced risk-based planning that introduces the identification and alignment of varieties of local capabilities within and out of the local community that can be pivotal to facilitate the management of local risks and cascading effects prior to a disaster. A critical review shows that the identification and alignment of capabilities can potentially enhance risk-based disaster planning. A tailored holistic approach to risk based disaster planning is pivotal to enhance collective action and a reduction in disaster collective cost.

Keywords: capabilities, disaster planning, hazards, local community, risk-based

Procedia PDF Downloads 204
4590 Sources and Potential Ecological Risks of Heavy Metals in the Sediment Samples From Coastal Area in Ondo, Southwest Nigeria

Authors: Ogundele Lasun Tunde, Ayeku Oluwagbemiga Patrick

Abstract:

Heavy metals are released into the sediments in aquatic environment from both natural and anthropogenic sources and they are considered as worldwide issue due to their deleterious ecological risks and food chain disruption. In this study, sediments samples were collected at three major sites (Awoye, Abereke and Ayetoro) along Ondo coastal area using VanVeen grab sampler. The concentrations of As, Cd, Cr, Cu, Fe, Mn, Ni, Pb, V and Zn were determined by employing Atomic Absorption Spectroscopy (AAS). The combined concentrations data were subjected to Positive Matrix Factorization (PMF) receptor approach for source identification and apportionment. The probable risks that might be posed by heavy metals in the sediment were estimated by potential and integrated ecological risks indices. Among the measured heavy metals, Fe had the average concentrations of 20.38 ± 2.86, 23.56 ± 4.16 and 25.32 ± 4.83 lg/g at Abereke, Awoye and Ayetoro sites, respectively. The PMF resulted in identification of four sources of heavy metals in the sediments. The resolved sources and their percentage contributions were oil exploration (39%), industrial waste/sludge (35%), detrital process (18%) and Mn-sources (8%). Oil exploration activities and industrial wastes are the major sources that contribute heavy metals into the coastal sediments. The major pollutants that posed ecological risks to the local aquatic ecosystem are As, Pb, Cr and Cd (40 B Ei ≤ 80) classifying the sites as moderate risk. The integrate risks values of Awoye, Abereke and Ayetoro are 231.2, 234.0 and 236.4, respectively suggesting that the study areas had a moderate ecological risk. The study showed the suitability of PMF receptor model for source identification of heavy metals in the sediments. Also, the intensive anthropogenic activities and natural sources could largely discharge heavy metals into the study area, which may increase the heavy metal contents of the sediments and further contribute to the associated ecological risk, thus affecting the local aquatic ecosystem.

Keywords: positive matrix factorization, sediments, heavy metals, sources, ecological risks

Procedia PDF Downloads 21
4589 Identification of Risks Associated with Process Automation Systems

Authors: J. K. Visser, H. T. Malan

Abstract:

A need exists to identify the sources of risks associated with the process automation systems within petrochemical companies or similar energy related industries. These companies use many different process automation technologies in its value chain. A crucial part of the process automation system is the information technology component featuring in the supervisory control layer. The ever-changing technology within the process automation layers and the rate at which it advances pose a risk to safe and predictable automation system performance. The age of the automation equipment also provides challenges to the operations and maintenance managers of the plant due to obsolescence and unavailability of spare parts. The main objective of this research was to determine the risk sources associated with the equipment that is part of the process automation systems. A secondary objective was to establish whether technology managers and technicians were aware of the risks and share the same viewpoint on the importance of the risks associated with automation systems. A conceptual model for risk sources of automation systems was formulated from models and frameworks in literature. This model comprised six categories of risk which forms the basis for identifying specific risks. This model was used to develop a questionnaire that was sent to 172 instrument technicians and technology managers in the company to obtain primary data. 75 completed and useful responses were received. These responses were analyzed statistically to determine the highest risk sources and to determine whether there was difference in opinion between technology managers and technicians. The most important risks that were revealed in this study are: 1) the lack of skilled technicians, 2) integration capability of third-party system software, 3) reliability of the process automation hardware, 4) excessive costs pertaining to performing maintenance and migrations on process automation systems, and 5) requirements of having third-party communication interfacing compatibility as well as real-time communication networks.

Keywords: distributed control system, identification of risks, information technology, process automation system

Procedia PDF Downloads 138
4588 Risks in the Islamic Banking Model and Methods Adopted to Manage Them

Authors: K. P. Fasalu Rahman

Abstract:

The financial services industry of Islam include large number of institutions, such as investment banks and commercial banks, investment companies and mutual insurance companies. All types of these financial institutions should have to deal with many issues and risks in their field of work. Islamic banks should expect to face two types of risks: risks that are similar to those faced by conventional financial intermediaries and risks that are unique to the Islamic Banks due to their compliance with the Shariah. The use of financial services and products that comply with the Shariah principles cause special issues for supervision and risk management. Risks are uncertain future events that could influence the achievement of the bank’s objectives, including strategic, operational, financial and compliance objectives. In Islamic banks, effective risk management deserves special attention. As an operational problem, risk management is the classification and identification of methods, processes, and risks in banks to supervise, monitor and measure them. In comparison to conventional banks, Islamic banks face big difficulties in identifying and managing risks due to bigger complexities emerging from the profit loss sharing (PLS) concept and nature of particular risks of Islamic financing. As the developing of managing risks tool becomes very essential, especially in Islamic banking as most of the products are depending on PLS principle, identifying and measuring each type of risk is highly important and critical in any Islamic finance based systems. This paper highlights the special and general risks surrounding Islamic banking. And it investigates in detail the need for risk management in Islamic banks. In addition to analyzing the effectiveness of risk management strategies adopted by Islamic financial institutions at present, this research is also suggesting strategies for improving risk management process of Islamic banks in future.

Keywords: Islamic banking, management, risk, risk management

Procedia PDF Downloads 139
4587 Evaluation of European Surveys in the Area of Health and Safety at Work and Identification of New Risks in the Labor Environment

Authors: Alena Dadova, Katarina Holla, Anna Cidlinova, Linda Makovicka Osvaldova, Jiri Vala, Samuel Kockar

Abstract:

Occupational health and safety (ASH) is an area in which procedures and applications are constantly evolving and changing through legislation and new directives and guidelines. In this way, the relevant organizations strive to ensure continuous progress and the advantage of up-to-date information to ensure safety and prevent occupational accidents. Three ESENER surveys have been carried out in the European Union, led by the Agency for Safety and Health at Work (EU-OSHA). On the basis of surveys, it was determined how European workplaces manage risks and how they manage the field of safety and health protection at work. Thousands of companies and organizations in the European Union were involved in the surveys. Organizations and businesses were presented with a questionnaire that focused on the following topics: the impact of general risks on the field of OSH and the possibility of their management, psychosocial risks and other factors such as stress, harassment and bullying, and employee participation in OSH procedures. The article is dedicated to the fundamental conclusions from these surveys and their subsequent connection with the strategic intent of the Strategic Framework of European Union for the years 2021 - 2027. In the conclusion, emerging risks are identified and EU will soon have to deal with them.

Keywords: ESENER, emerging risks, strategic framework in OSH, EU

Procedia PDF Downloads 113
4586 Risk Identification of Investment Feasibility in Indonesia’s Toll Road Infrastructure Investment

Authors: Christo Februanto Putra

Abstract:

This paper presents risk identification that affects investment feasibility on toll road infrastructure in Indonesia using qualitative methods survey based on the expert practitioner in investor, contractor, and state officials. The problems on infrastructure investment in Indonesia, especially on KPBU model contract, is many risk factors in the investment plan is not calculated in detail thoroughly. Risk factor is a value used to provide an overview of the risk level assessment of an event which is a function of the probability of the occurrence and the consequences of the risks that arise. As results of the survey which is to show which risk factors impacts directly to the investment feasibility and rank them by their impacts on the investment.

Keywords: risk identification, indonesia toll road, investment feasibility

Procedia PDF Downloads 279
4585 Theoretical Discussion on the Classification of Risks in Supply Chain Management

Authors: Liane Marcia Freitas Silva, Fernando Augusto Silva Marins, Maria Silene Alexandre Leite

Abstract:

The adoption of a network structure, like in the supply chains, favors the increase of dependence between companies and, by consequence, their vulnerability. Environment disasters, sociopolitical and economical events, and the dynamics of supply chains elevate the uncertainty of their operation, favoring the occurrence of events that can generate break up in the operations and other undesired consequences. Thus, supply chains are exposed to various risks that can influence the profitability of companies involved, and there are several previous studies that have proposed risk classification models in order to categorize the risks and to manage them. The objective of this paper is to analyze and discuss thirty of these risk classification models by means a theoretical survey. The research method adopted for analyzing and discussion includes three phases: The identification of the types of risks proposed in each one of the thirty models, the grouping of them considering equivalent concepts associated to their definitions, and, the analysis of these risks groups, evaluating their similarities and differences. After these analyses, it was possible to conclude that, in fact, there is more than thirty risks types identified in the literature of Supply Chains, but some of them are identical despite of be used distinct terms to characterize them, because different criteria for risk classification are adopted by researchers. In short, it is observed that some types of risks are identified as risk source for supply chains, such as, demand risk, environmental risk and safety risk. On the other hand, other types of risks are identified by the consequences that they can generate for the supply chains, such as, the reputation risk, the asset depreciation risk and the competitive risk. These results are consequence of the disagreements between researchers on risk classification, mainly about what is risk event and about what is the consequence of risk occurrence. An additional study is in developing in order to clarify how the risks can be generated, and which are the characteristics of the components in a Supply Chain that leads to occurrence of risk.

Keywords: sisks classification, survey, supply chain management, theoretical discussion

Procedia PDF Downloads 631
4584 Sustainable Management Practices of International Construction Joint Ventures: A Conceptual Model for Managing Barriers and Risks

Authors: Mershack O. Tetteh, Albert P. C. Chan, Amos Darko, Gabriel Nani

Abstract:

International construction joint ventures (ICJVs) have evolved as an effective approach to sustainable development, given their myriad socio-economic and environmental benefits. Yet, they are not free of barriers and risks. In many studies, it is termed as risks for convenience’s sake. While the barriers and risks continue to affect the success of ICJVs, a systematic and reliable approach for managing them has yet to be developed. This study aims to identify and classify the barriers and risks factors affecting ICJVs through a systematic literature review. Based on a critical review of 54 papers published in peer-reviewed journals from 1990 to 2019, a conceptual framework was proposed for managing the barriers and risks in ICJV operations. The review showed that the barriers can be grouped into six including inter-organizational differences, lack of expertise and confidence, lack of effective planning and strategies, lack of knowledge of ICJV’s fundamentals, conflicts among ICJV entities, and management difficulties. The risks were also categorized into six: policy and political risks, legal risks, financial risks, management risks, project and technical risks, and market risks. The developed model would help practitioners achieve more efficient resource allocation and bring new perspectives for managerial practices in ICJVs. Moreover, it is positioned to alleviate the negligence of previous studies that combined the barriers and risks factors as one checklist.

Keywords: barriers, construction, international construction joint venture, risks, sustainable development

Procedia PDF Downloads 258
4583 Process for Analyzing Information Security Risks Associated with the Incorporation of Online Dispute Resolution Systems in the Context of Conciliation in Colombia

Authors: Jefferson Camacho Mejia, Jenny Paola Forero Pachon, Luis Carlos Gomez Florez

Abstract:

The innumerable possibilities offered by the use of Information Technology (IT) in the development of different socio-economic activities has made a change in the social paradigm and the emergence of the so-called information and knowledge society. The Colombian government, aware of this reality, has been promoting the use of IT as part of the E-government strategy adopted in the country. However, it is well known that the use of IT implies the existence of certain threats that put the security of information in the digital environment at risk. One of the priorities of the Colombian government is to improve access to alternative justice through IT, in particular, access to Alternative Dispute Resolution (ADR): conciliation, arbitration and friendly composition; by means of which it is sought that the citizens directly resolve their differences. To this end, a trend has been identified in the use of Online Dispute Resolution (ODR) systems, which extend the benefits of ADR to the digital environment through the use of IT. This article presents a process for the analysis of information security risks associated with the incorporation of ODR systems in the context of conciliation in Colombia, based on four fundamental stages identified in the literature: (I) Identification of assets, (II) Identification of threats and vulnerabilities (III) Estimation of the impact and 4) Estimation of risk levels. The methodological design adopted for this research was the grounded theory, since it involves interactions that are applied to a specific context and from the perspective of diverse participants. As a result of this investigation, the activities to be followed are defined to carry out an analysis of information security risks, in the context of the conciliation in Colombia supported by ODR systems, thus contributing to the estimation of the risks to make possible its subsequent treatment.

Keywords: alternative dispute resolution, conciliation, information security, online dispute resolution systems, process, risk analysis

Procedia PDF Downloads 238
4582 Optimal Diversification and Bank Value Maximization

Authors: Chien-Chih Lin

Abstract:

This study argues that the optimal diversifications for the maximization of bank value are asymmetrical; they depend on the business cycle. During times of expansion, systematic risks are relatively low, and hence there is only a slight effect from raising them with a diversified portfolio. Consequently, the benefit of reducing individual risks dominates any loss from raising systematic risks, leading to a higher value for a bank by holding a diversified portfolio of assets. On the contrary, in times of recession, systematic risks are relatively high. It is more likely that the loss from raising systematic risks surpasses the benefit of reducing individual risks from portfolio diversification. Consequently, more diversification leads to lower bank values. Finally, some empirical evidence from the banks in Taiwan is provided.

Keywords: diversification, default probability, systemic risk, banking, business cycle

Procedia PDF Downloads 435
4581 Risk Assessment on New Bio-Composite Materials Made from Water Resource Recovery

Authors: Arianna Nativio, Zoran Kapelan, Jan Peter van der Hoek

Abstract:

Bio-composite materials are becoming increasingly popular in various applications, such as the automotive industry. Usually, bio-composite materials are made from natural resources recovered from plants, now, a new type of bio-composite material has begun to be produced in the Netherlands. This material is made from resources recovered from drinking water treatments (calcite), wastewater treatment (cellulose), and material from surface water management (aquatic plants). Surface water, raw drinking water, and wastewater can be contaminated with pathogens and chemical compounds. Therefore, it would be valuable to develop a framework to assess, monitor, and control the potential risks. Indeed, the goal is to define the major risks in terms of human health, quality of materials, and environment associated with the production and application of these new materials. This study describes the general risk assessment framework, starting with a qualitative risk assessment. The qualitative risk analysis was carried out by using the HAZOP methodology for the hazard identification phase. The HAZOP methodology is logical and structured and able to identify the hazards in the first stage of the design when hazards and associated risks are not well known. The identified hazards were analyzed to define the potential associated risks, and then these were evaluated by using the qualitative Event Tree Analysis. ETA is a logical methodology used to define the consequences for a specific hazardous incidents, evaluating the failure modes of safety barriers and dangerous intermediate events that lead to the final scenario (risk). This paper shows the effectiveness of combining of HAZOP and qualitative ETA methodologies for hazard identification and risk mapping. Then, key risks were identified, and a quantitative framework was developed based on the type of risks identified, such as QMRA and QCRA. These two models were applied to assess human health risks due to the presence of pathogens and chemical compounds such as heavy metals into the bio-composite materials. Thus, due to these contaminations, the bio-composite product, during its application, might release toxic substances into the environment leading to a negative environmental impact. Therefore, leaching tests are going to be planned to simulate the application of these materials into the environment and evaluate the potential leaching of inorganic substances, assessing environmental risk.

Keywords: bio-composite, risk assessment, water reuse, resource recovery

Procedia PDF Downloads 107
4580 Analysis of Risks of Adopting Integrated Project Delivery: Application of Bayesian Theory

Authors: Shan Li, Qiuwen Ma

Abstract:

Integrated project delivery (IPD) is a project delivery method distinguished by a shared risk/rewards mechanism and multiparty agreement. IPD has drawn increasing attention from construction industry due to its reliability to deliver high-performing buildings. However, unavailable IPD specific insurance concerns the industry participants who are interested in IPD implementation. Even though the risk management capability can be enhanced using shared risk mechanism, some risks may occur when the partners do not commit themselves into the integrated practices in a desired manner. This is because the intense collaboration and close integration can not only create added value but bring new opportunistic behaviors and disputes. The study is aimed to investigate the risks of implementing IPD using Bayesian theory. IPD risk taxonomy is presented to identify all potential risks of implementing IPD and a risk network map is developed to capture the interdependencies between IPD risks. The conditional relations between risk occurrences and the impacts of IPD risks on project performances are evaluated and simulated based on Bayesian theory. The probability of project outcomes is predicted by simulation. In addition, it is found that some risks caused by integration are most possible occurred risks. This study can help the IPD project participants identify critical risks of adopting IPD to improve project performances. In addition, it is helpful to develop IPD specific insurance when the pertinent risks can be identified.

Keywords: Bayesian theory, integrated project delivery, project risks, project performances

Procedia PDF Downloads 298
4579 Psychosocial Risk Factors among Women: A Case-Study of the Nigerian Female Worker

Authors: Bassey Odiong Akan

Abstract:

In recent decades potentially significant changes have taken place in the world of work and these have led to the emergence of new challenges in occupational safety and health. The working environment is now not only wroth with concerns about physical, biological and chemical risks but also emerging risks which are completely new risks that have never been seen before or previously known risks that are evolving in unexpected ways with unanticipated consequences. Psychosocial risk factors and its attendant hazards happen to be one of them and can impact health directly or indirectly, mediated by work-related stress. These risks are related to the way work is designed, organised and managed, as well as the economic and social contexts of work. It has become necessary to identify, explore and anticipate the dynamics of these risks factors and hazards with regards to how it affects women. This presentation is a review of information gathered from books of distinguished authors, research work and scientific/professional journals on the psychosocial work environment intended as a guide to stimulate discussion, raise awareness and encourage research and action at different levels.

Keywords: emerging risks, psychosocial hazards, psychosocial risk factors, work related stress

Procedia PDF Downloads 277
4578 A Theoretical Framework of Multifactor Systematic Risks in Equity Market: Behavioral Finance Paradigm

Authors: Jasman Tuyon, Zamri Ahmad

Abstract:

Behavioral asset pricing research has been gaining momentum since in 1990s. However, it is still incomplete and has been criticized for some philosophical, theoretical and model specification limitations. Due to these drawbacks, investors’ behaviors as a source of risk in behavioral asset pricing modeling still remains disputable. This paper aims to address these issues with an alternative perspective based on behavioral finance paradigm. Specifically, this paper proposes a theoretical linkages of both fundamental and behavioral risks on stock prices formation and an extension of the multifactor stock pricing model by combining multi-factor fundamentals and behavioral risks factors.

Keywords: behavioral finance, multifactor asset pricing, behavioral risks, fundamental risks

Procedia PDF Downloads 497
4577 A Risk-Based Approach to Construction Management

Authors: Chloe E. Edwards, Yasaman Shahtaheri

Abstract:

Risk management plays a fundamental role in project planning and delivery. The purpose of incorporating risk management into project management practices is to identify and address uncertainties related to key project-related activities. The uncertainties, known as risk events, can relate to project deliverables that are quantifiable and are often measured by impact to project schedule, cost, or environmental impact. Risk management should be incorporated as an iterative practice throughout the planning, execution, and commissioning phases of a project. This paper specifically examines how risk management contributes to effective project planning and delivery through a case study of a transportation project. This case study focused solely on impacts to project schedule regarding three milestones: readiness for delivery, readiness for testing and commissioning, and completion of the facility. The case study followed the ISO 31000: Risk Management – Guidelines. The key factors that are outlined by these guidelines include understanding the scope and context of the project, conducting a risk assessment including identification, analysis, and evaluation, and lastly, risk treatment through mitigation measures. This process requires continuous consultation with subject matter experts and monitoring to iteratively update the risks accordingly. The risk identification process led to a total of fourteen risks related to design, permitting, construction, and commissioning. The analysis involved running 1,000 Monte Carlo simulations through @RISK 8.0 Industrial software to determine potential milestone completion dates based on the project baseline schedule. These dates include the best case, most likely case, and worst case to provide an estimated delay for each milestone. Evaluation of these results provided insight into which risks were the highest contributors to the projected milestone completion dates. Based on the analysis results, the risk management team was able to provide recommendations for mitigation measures to reduce the likelihood of risks occurring. The risk management team also provided recommendations for managing the identified risks and project activities moving forward to meet the most likely or best-case milestone completion dates.

Keywords: construction management, monte carlo simulation, project delivery, risk assessment, transportation engineering

Procedia PDF Downloads 106
4576 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 469
4575 Partners Sharing Resources, Costs, and Risks

Authors: Lee Li

Abstract:

The strategic management literature posits that the major motive of strategic alliances is to share resources, costs and risks. However, the literature also indicates that such sharing leads to transaction costs which are positively correlated with environmental dynamism. As such, it is not clear why firms are willing to cover high transaction costs for sharing resources, costs and risks. This study categorizes resources into firm-specific and general resource; costs into accounting and non-accounting cost; and risks into visible and invisible risks. Using data from 167 Canadian firms in technology industries, we find that sharing firm-specific resources and non-accounting costs are negatively correlated with environmental dynamism but sharing general resources, accounting costs and visible risks are positively correlated with environmental dynamism. Findings suggest that sharing certain resources, costs and risks do not necessarily incur high transaction costs.

Keywords: environmental dynamism, strategic alliances, resource/cost/risk sharing

Procedia PDF Downloads 363
4574 Geographic Information System-Based Identification of Road Traffic Crash Hotspots on Rural Roads in Oman

Authors: Mohammed Bakhit Kashoob, Mohammed Salim Al-Maashani, Ahmed Abdullah Al-Marhoon

Abstract:

The use of Geographic Information System (GIS) tools in the analysis of traffic crash data can help to identify locations or hotspots with high instances or risk of traffic crashes. The identification of traffic crash hotspots can effectively improve road safety measures. Mapping of road traffic crash hotspots can help the concerned authorities to give priority and take targeted measures and improvements to the road structure at these locations to reduce traffic crashes and fatalities. In Oman, there are countless rural roads that have more risks for traveling vehicles compared to urban roads. The likelihood of traffic crashes as well as fatality rate may increase with the presence of risks that are associated with the rural type of community. In this paper, the traffic crash hotspots on rural roads in Oman are specified using spatial analysis methods in GIS and traffic crash data. These hotspots are ranked based on the frequency of traffic crash occurrence (i.e., number of traffic crashes) and the rate of fatalities. The result of this study presents a map visualization of locations on rural roads with high traffic crashes and high fatalities rates.

Keywords: road safety, rural roads, traffic crash, GIS tools

Procedia PDF Downloads 146
4573 Appraisal of Humanitarian Supply Chain Risks Using Best-Worst Method

Authors: Ali Mohaghar, Iman Ghasemian Sahebi, Alireza Arab

Abstract:

In the last decades, increasing in human and natural disaster occurrence had very irreparable effects on human life. Hence, one of the important issues in humanitarian supply chain management is identifying and prioritizing the different risks and finding suitable solutions for encountering them at the time of disaster occurrence. This study is an attempt to provide a comprehensive review of humanitarian supply chain risks in a case study of Tehran Red Crescent Societies. For this purpose, Best-Worst method (BWM) has been used for analyzing the risks of the humanitarian supply chain. 22 risks of the humanitarian supply chain were identified based on the literature and interviews with four experts. According to BWM method, the importance of each risk was calculated. The findings showed that culture contexts, little awareness of people, and poor education system are the most important humanitarian supply chain risks. This research provides a useful guideline for managers so that they can benefit from the results to prioritize their solutions.

Keywords: Best-Worst Method, humanitarian logistics, humanitarian supply chain, risk management

Procedia PDF Downloads 310
4572 An Overview of Risk Types and Risk Management Strategies to Improve Financial Performance

Authors: Azar Baghtaghi

Abstract:

Financial risk management is critically important as it enables companies to maintain stability and profitability amidst market fluctuations and unexpected events. It involves the precise identification of risks that could impact investments, assets, and potential revenues. By implementing effective risk management strategies, companies can insure themselves against adverse market changes and prevent potential losses. In today's era, where markets are highly complex and influenced by various factors such as macroeconomic policies, exchange rate fluctuations, and natural disasters, the need for meticulous planning to cope with these uncertainties is more pronounced. Ultimately, financial risk management means being prepared for the future and the ability to sustain business in changing environments. A company capable of managing its risks not only achieves sustainable profitability but also gains the confidence of shareholders, investors, and business partners, enhancing its competitive position in the market. In this article, the types of financial risk and risk management strategies for improving financial performance were investigated. By identifying the risks stated in this article and their evaluation techniques, it is possible to improve the organization's financial performance.

Keywords: strategy, risk, risk management, financial performance.

Procedia PDF Downloads 8
4571 The Relationship between Political Risks and Capital Adequacy Ratio: Evidence from GCC Countries Using a Dynamic Panel Data Model (System–GMM)

Authors: Wesam Hamed

Abstract:

This paper contributes to the existing literature by investigating the impact of political risks on the capital adequacy ratio in the banking sector of Gulf Cooperation Council (GCC) countries, which is the first attempt for this nexus to the best of our knowledge. The dynamic panel data model (System‐GMM) showed that political risks significantly decrease the capital adequacy ratio in the banking sector. For this purpose, we used political risks, bank-specific, profitability, and macroeconomic variables that are utilized from the data stream database for the period 2005-2017. The results also actively support the “too big to fail” hypothesis. Finally, the robustness results confirm the conclusions derived from the baseline System‐GMM model.

Keywords: capital adequacy ratio, system GMM, GCC, political risks

Procedia PDF Downloads 147
4570 Risk Mitigation of Data Causality Analysis Requirements AI Act

Authors: Raphaël Weuts, Mykyta Petik, Anton Vedder

Abstract:

Artificial Intelligence has the potential to create and already creates enormous value in healthcare. Prescriptive systems might be able to make the use of healthcare capacity more efficient. Such systems might entail interpretations that exclude the effect of confounders that brings risks with it. Those risks might be mitigated by regulation that prevents systems entailing such risks to come to market. One modality of regulation is that of legislation, and the European AI Act is an example of such a regulatory instrument that might mitigate these risks. To assess the risk mitigation potential of the AI Act for those risks, this research focusses on a case study of a hypothetical application of medical device software that entails the aforementioned risks. The AI Act refers to the harmonised norms for already existing legislation, here being the European medical device regulation. The issue at hand is a causal link between a confounder and the value the algorithm optimises for by proxy. The research identifies where the AI Act already looks at confounders (i.a. feedback loops in systems that continue to learn after being placed on the market). The research identifies where the current proposal by parliament leaves legal uncertainty on the necessity to check for confounders that do not influence the input of the system, when the system does not continue to learn after being placed on the market. The authors propose an amendment to article 15 of the AI Act that would require high-risk systems to be developed in such a way as to mitigate risks from those aforementioned confounders.

Keywords: AI Act, healthcare, confounders, risks

Procedia PDF Downloads 259
4569 Disability, Stigma and In-Group Identification: An Exploration across Different Disability Subgroups

Authors: Sharmila Rathee

Abstract:

Individuals with disability/ies often face negative attitudes, discrimination, exclusion, and inequality of treatment due to stigmatization and stigmatized treatment. While a significant number of studies in field of stigma suggest that group-identification has positive consequences for stigmatized individuals, ironically very miniscule empirical work in sight has attempted to investigate in-group identification as a coping measure against stigma, humiliation and related experiences among disability group. In view of death of empirical research on in-group identification among disability group, through present work, an attempt has been made to examine the experiences of stigma, humiliation, and in-group identification among disability group. Results of the study suggest that use of in-group identification as a coping strategy is not uniform across members of disability group and degree of in-group identification differs across different sub-groups of disability groups. Further, in-group identification among members of disability group depends on variables like degree and impact of disability, factors like onset of disability, nature, and visibility of disability, educational experiences and resources available to deal with disabling conditions.

Keywords: disability, stigma, in-group identification, social identity

Procedia PDF Downloads 322
4568 Identification of Architectural Design Error Risk Factors in Construction Projects Using IDEF0 Technique

Authors: Sahar Tabarroki, Ahad Nazari

Abstract:

The design process is one of the most key project processes in the construction industry. Although architects have the responsibility to produce complete, accurate, and coordinated documents, architectural design is accompanied by many errors. A design error occurs when the constraints and requirements of the design are not satisfied. Errors are potentially costly and time-consuming to correct if not caught early during the design phase, and they become expensive in either construction documents or in the construction phase. The aim of this research is to identify the risk factors of architectural design errors, so identification of risks is necessary. First, a literature review in the design process was conducted and then a questionnaire was designed to identify the risks and risk factors. The questions in the form of the questionnaire were based on the “similar service description of study and supervision of architectural works” published by “Vice Presidency of Strategic Planning & Supervision of I.R. Iran” as the base of architects’ tasks. Second, the top 10 risks of architectural activities were identified. To determine the positions of possible causes of risks with respect to architectural activities, these activities were located in a design process modeled by the IDEF0 technique. The research was carried out by choosing a case study, checking the design drawings, interviewing its architect and client, and providing a checklist in order to identify the concrete examples of architectural design errors. The results revealed that activities such as “defining the current and future requirements of the project”, “studies and space planning,” and “time and cost estimation of suggested solution” has a higher error risk than others. Moreover, the most important causes include “unclear goals of a client”, “time force by a client”, and “lack of knowledge of architects about the requirements of end-users”. For error detecting in the case study, lack of criteria, standards and design criteria, and lack of coordination among them, was a barrier, anyway, “lack of coordination between architectural design and electrical and mechanical facility”, “violation of the standard dimensions and sizes in space designing”, “design omissions” were identified as the most important design errors.

Keywords: architectural design, design error, risk management, risk factor

Procedia PDF Downloads 130
4567 Implementation of Risk Management System to Improve the Quality of Higher Education Institutes

Authors: Muhammad Wasif, Asif Ahmed Shaikh, Sarosh Hashmat Lodi, Muhammad Aslam Bhutto, Riazuddin

Abstract:

Risk Management System is quite popular in profit- based organizations, health and safety and project management fields since the last few decades. But due to rapidly changing environment and requirement of ISO 9001:2015 standards, public-sector institution, especially higher education institutes are also performing risk assessment to monitor the performance of the institution and aligning it with the latest benchmark. In this context, NED University of Engineering and Technology performed research and developed a Standard Operating Procedure (SOP) for the risk assessment, its monitoring and control. In this research, risks are broken into the four sources, namely; Internal Academics Risks, External Academics Risks, Internal Non-academic Risks, External Non-academic Risks. Risks are identified by the management at all levels. Severity and likelihood of the risks are assigned based on the previous audit results and the customer complains. Risk Ratings are calculated to orderly arrange the risk according to the Risk Rating, and controls for the risks are designed, which are assigned to the responsible person. At the end of the article, result and analysis on the different sources of risk are discussed in details and the conclusion is drawn. Discussion on few sample risks are presented in this article. Hence it is presented in the research that the Risk Management System can be applied in a Higher Education Institute to effectively control the risks which might affect the scope and Quality Management System of an organization.

Keywords: higher education, quality management system, risk assessment, risk management

Procedia PDF Downloads 309
4566 Cyber Security and Risk Assessment of the e-Banking Services

Authors: Aisha F. Bushager

Abstract:

Today we are more exposed than ever to cyber threats and attacks at personal, community, organizational, national, and international levels. More aspects of our lives are operating on computer networks simply because we are living in the fifth domain, which is called the Cyberspace. One of the most sensitive areas that are vulnerable to cyber threats and attacks is the Electronic Banking (e-Banking) area, where the banking sector is providing online banking services to its clients. To be able to obtain the clients trust and encourage them to practice e-Banking, also, to maintain the services provided by the banks and ensure safety, cyber security and risks control should be given a high priority in the e-banking area. The aim of the study is to carry out risk assessment on the e-banking services and determine the cyber threats, cyber attacks, and vulnerabilities that are facing the e-banking area specifically in the Kingdom of Bahrain. To collect relevant data, structured interviews were taken place with e-banking experts in different banks. Then, collected data where used as in input to the risk management framework provided by the National Institute of Standards and Technology (NIST), which was the model used in the study to assess the risks associated with e-banking services. The findings of the study showed that the cyber threats are commonly human errors, technical software or hardware failure, and hackers, on the other hand, the most common attacks facing the e-banking sector were phishing, malware attacks, and denial-of-service. The risks associated with the e-banking services were around the moderate level, however, more controls and countermeasures must be applied to maintain the moderate level of risks. The results of the study will help banks discover their vulnerabilities and maintain their online services, in addition, it will enhance the cyber security and contribute to the management and control of risks that are facing the e-banking sector.

Keywords: cyber security, e-banking, risk assessment, threats identification

Procedia PDF Downloads 349
4565 The Role of Risk Management Practices in the Relationship between Risks Factors and Construction Project Performance

Authors: Ali Abdullah Albezaghi

Abstract:

This article aims to introduce a conceptual framework that can facilitate investigations concerning the role of risk management practices in the relationship between construction risks and the construction project's performance. This article is structured based on the extant literature; it reviews theoretical perspectives, highlights the gaps, and illustrates the significance of developing a framework of suggested relationships. Despite growing interest in the role of risks in construction project performance, previous studies have paid little attention to investigating the moderating role of risk management practices on the risk-performance link. This has left researchers and construction project managers with minimal information to explain the conditions under which risk management practices can reduce the impact of project-related risks and improve performance. In this context, this article suggests a viable research model with propositions that assess risk-performance relationships and discusses the potential moderating effects on the domain relationship. This paper adds to the risk management literature by focusing on risk variables that directly impact performance. Further, it also considers the moderating role of risk management practices in such relationships.

Keywords: risk management practices, external risks, internal risks, project risks, project performance

Procedia PDF Downloads 134